WATER CONTROL STRUCTURE IN CAMERON PARISH [EXPIRATION DATE EXTENDED TO 8/27/2018 DUE TO TECHNICAL DIFFICULTIES WITH POSTING]

NAME OF APPLICANT: D.P. Land, c/o C.H. Fenstermaker and Associates, 135 Regency Square, Lafayette, Louisiana 70508. LOCATION OF WORK: Existing Canal, located approximately 3.8 miles southwest of Johnsons Bayou, in Cameron Parish, Louisiana, as shown on the enclosed drawings. Location: Latitude: 29°49ʹ40.16ʺ N / Longitude: -93°39ʹ17.61ʺ W, Hydrologic Unit Code: 08080206 – Calcasieu Basin. CHARACTER OF WORK: Conduct excavating operations within an existing levee area and install a six 42-inch wide by 20-foot long barrel flap gate style barrels within a new 53-foot wide by 78-foot long water control structure, two approximately 115-foot long temporary cofferdams, construct a 40-foot wide by 125-foot long temporary equipment staging area, two 40-foot wide by 60-foot long loading and unloading zone areas, two approximately 40-foot wide by 119-foot long temporary work areas, and place 878 cubic yards of dredged material within two 40-foot wide by 42-foot long temporary spoil placement areas. Approximately 0.60 of an acre of emergent wetlands would be temporarily impacted via project implementation. The applicant will be required to restore all temporarily impacted wetlands to be verified after one growing season from project completion, and will compensate for any unrepairable wetland impacts through acquisition of in-kind credits at a Department of the Army approved mitigation bank, should a DA permit be granted.

[EXPIRATION DATE EXTENDED TO 8/27/2018 DUE TO TECHNICAL DIFFICULTIES WITH POSTING]

JOINT PUBLIC NOTICE July 30, 2018 United States Army Corps of Engineers New Orleans District Regulatory Branch 7400 Leake Avenue New Orleans, Louisiana 70118-3651

State of Louisiana Department of Environmental Quality ATTN: Water Quality Certifications Post Office Box 4313 Baton Rouge, Louisiana 70821-4313

(504) 862-2284 Sara.B.Fortuna@usace.army.mil Project Manager Sara Fortuna Permit Application Number MVN-2018-00472-WKK

(225) 219-3225 Elizabeth.Hill@la.gov Project Manager Elizabeth Hill WQC Application Number WQC 180502-01

Interested parties are hereby notified that a permit application has been received by the New Orleans District of the U.S. Army Corps of Engineers pursuant to: [X] Section 10 of the Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404 of the Clean Water Act (86 Stat. 816; 33 USC 1344). Application has also been made to the Louisiana Department of Environmental Quality, Water Quality Certifications, for a Water Quality Certification (WQC) in accordance with statutory authority contained in LRS30:2047 A(3), and provisions of Section 401 of the Clean Water Act (P.L.95-17). WATER CONTROL STRUCTURE IN CAMERON PARISH NAME OF APPLICANT: D.P. Land, c/o C.H. Fenstermaker and Associates, 135 Regency Square, Lafayette, Louisiana 70508. LOCATION OF WORK: Existing Canal, located approximately 3.8 miles southwest of Johnsons Bayou, in Cameron Parish, Louisiana, as shown on the enclosed drawings. Location: Latitude: 29°4940.16 N / Longitude: -93°3917.61 W, Hydrologic Unit Code: 08080206 ­ Calcasieu Basin. CHARACTER OF WORK: Conduct excavating operations within an existing levee area and install a six 42-inch wide by 20-foot long barrel flap gate style barrels within a new 53-foot wide by 78-foot long water control structure, two approximately 115-foot long temporary cofferdams, construct a 40foot wide by 125-foot long temporary equipment staging area, two 40-foot wide by 60-foot long loading and unloading zone areas, two approximately 40-foot wide by 119-foot long temporary work areas, and place 878 cubic yards of dredged material within two 40-foot wide by 42-foot long temporary spoil placement areas. Approximately 0.60 of an acre of emergent wetlands would be temporarily impacted via project implementation. The applicant will be required to restore all temporarily impacted wetlands to be verified after one growing season from project completion, and will compensate for any unrepairable wetland impacts through acquisition of in-kind credits at a Department of the Army approved mitigation bank, should a DA permit be granted.

-2The comment period for the Department of the Army Permit and the Louisiana Department of Environmental Quality WQC will close 20 days from the date of this joint public notice. Written comments, including suggestions for modifications or objections to the proposed work, stating reasons thereof, are being solicited from anyone having interest in this permit and/or this WQC request and must be mailed so as to be received before or by the last day of the comment period. Letters concerning the Corps of Engineers permit application must reference the applicant's name and the Permit Application Number, and be mailed to the Corps of Engineers at the address above, ATTENTION: REGULATORY BRANCH. Similar letters concerning the Water Quality Certification must reference the applicant's name and the WQC Application number and be mailed to the Louisiana Department of Environmental Quality at the address above. Individuals or parties may request an extension of time in which to comment on the proposed work by writing or e-mailing the Corps of Engineers Project Manager listed above. Any request must be specific and substantively supportive of the requested extension, and received by this office prior to the end of the initial comment period. The Section Chief will review the request and the requestor will be promptly notified of the decision to grant or deny the request. If granted, the time extension will be continuous to the initial comment period and, inclusive of the initial comment period, will not exceed a total of 30 calendar days. The application for this proposed project is on file with the Louisiana Department of Environmental Quality and may be examined during weekdays between 8:00 a.m. and 4:30 p.m. Copies may be obtained upon payment of costs of reproduction. Corps of Engineers Permit Criteria The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state, and local agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the U.S. Army Corps of Engineers to determine whether to make, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. The New Orleans District is unaware of properties listed on the National Register of Historic Places near the proposed work. The possibility exists that the proposed work may damage or destroy presently unknown archeological, scientific, prehistorical, historical sites, or data. Copies of this public notice are being sent to the State Archeologist and State Historic Preservation Officer regarding potential impacts to cultural resources.

-3The New Orleans District has determined that 0.60 of an acre of the project footprint is in waters known to be utilized by the West Indian Manatee (Trichechus manatus) and determined the activity is not likely to adversely affect this species based on the Standard Local Operating Procedure for Endangered Species in Louisiana (SLOPES), dated October 22, 2014, between the U.S. Army Corps of Engineers, New Orleans and U.S. Fish and Wildlife Service, Ecological Services Office. If this permit modification/time extension is issued, the applicant has agreed to follow the Standard Manatee Conditions for In-Water Activities. This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the MagnusonStevens Fishery Conservation and Management Act. The applicant's proposal would result in the destruction or alteration of 0.60 of an acre of EFH utilized by various life stages of red drum and penaeid shrimp. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or federally managed fisheries in the Gulf of Mexico. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service. If the proposed work involves deposits of dredged or fill material into navigable waters, the evaluation of the probable impacts will include the application of guidelines established by the Administrator of the Environmental Protection Agency. Also, a certification that the proposed activity will not violate applicable water quality standards will be required from the Department of Environmental Quality, Water Quality Certifications, before a permit is issued. Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing. The applicant has certified that the proposed activity described in the application complies with and will be conducted in a manner that is consistent with the Louisiana Coastal Resources Program. The Department of the Army permit will not be issued unless the applicant received approval or a waiver of the Coastal Use Permit by the Department of Natural Resources. You are requested to communicate the information contained in this notice to any other parties whom you deem likely to have interest in the matter.

Darrell S. Barbara Chief, Western Evaluation Section Regulatory Branch Enclosure

AREA OF PROPOSED WORK

Approx. 3.8 miles Southwesterly from "JOHNSONS BAYOU, LOUISIANA"

Sec. 17

Sec. 16

Sec. 15

VICINITY MAP NOT TO SCALE

Sec. 20

Sec. 19

Sec. 30

PROPOSED SIX BARREL WATER CONTROL STRUCTURE Lat. 29°49'40.16" Long. 93°39'17.61" (NAD 83) SEE PLAN VIEW SHEET 2

Sec. 21

Sec. 29

Sec. 22

Sec. 27

Sec. 28

Marsh Buggy Access

2000'

0

1000'

2000'

NAD 27 LA. SOUTH ZONE

Scale: 1" = 2000' NOTE: THESE PLANS ARE INTENDED EXCLUSIVELY FOR THE PURPOSE OF OBTAINING ENVIRONMENTAL COMPLIANCE PERMITS AND ARE NOT TO BE USED FOR CONSTRUCTION, BIDDING, RECORDATION, CONVEYANCE, SALES OR ENGINEERING DESIGN. Not to be used for construction, bidding, recordation, conveyance, sales, or engineering design.

PRELIMINARY Robert L. Lastrapes Professional Land Surveyor Registration No. 4717

DORE ENERGY SIX BARREL WATER CONTROL STRUCTURE Cameron Meadows Marsh Creation Section 20, T14S-R13W Cameron Parish, Louisiana DRAWN BY: KJD

C. H. Fenstermaker & Associates, L.L.C. 135 Regency Sq. Lafayette, LA 70508 Ph. 337-237-2200 Fax. 337-232-3299 www.fenstermaker.com

PROJ. MGR.: CL

REVISED:

DATE: 01/16/2018 SHEET 1 OF 6

FILENAME: T:\2016\2164927\DWG\PERMIT PLANS_6 Barrel Structure.dwg

SHEETS

-6 .

-6 .

0

0

Temporary staging area for barge with marsh buggy

40'

.0

0

-6

0 -6 .

'

-5 .

Temporary Equipment ' Staging Area 125

0

-5 .

0

Loading & Unloading Zone

-5 .

0

40'

66

Canal

0

Existing

-6 .

-6 .

0

B

A

-6 .

0

R 13 W

-5 .

60'

-5 .

0

8'

-5 .

0

14

40'

115'

.0

-5

.0

-5 .

0

-5

' 60

-6 .

40

.0

C'

-3

-3 .0 4.

0

119

-4

78'

.0

53'

-4 .0 4. 0

-4 .0

42'

-3 .0 .0 -4

Temporary Proposed Coffer Dam For Construction

-4

.0

-5 .0 -2 -3. -3 .5 0 .0 4.0

.0

.0 -4

-3 .

0

-5 .

0

-5

-5

.0

-3

.0

-4 .0

-2 .0 .5 .0

Temporary Fill Placement

B'

-4

.0

-4

A'

-2 .0

40'

73'

-1 -4 -3. -3 .0 0 .0

42'

Temporary Fill Placement

Temporary Work Area

-2 .0 -3 .0

49' 40'

Typical 6 Barrel Structure (See Sheet 4)

73'

-1

Temporary Work Area

Loading & Unloading Zone

'

0

.0

-5 .

117'

111'

Sec. 20 C

'

.0 -4

0

Temporary Proposed Coffer Dam For Construction

T 14 S

60'

0

30'

60'

NAD 27 LA. SOUTH ZONE

Scale: 1" = 60' NOTE: THESE PLANS ARE INTENDED EXCLUSIVELY FOR THE PURPOSE OF OBTAINING ENVIRONMENTAL COMPLIANCE PERMITS AND ARE NOT TO BE USED FOR CONSTRUCTION, BIDDING, RECORDATION, CONVEYANCE, SALES OR ENGINEERING DESIGN. Not to be used for construction, bidding, recordation, conveyance, sales, or engineering design.

PRELIMINARY Robert L. Lastrapes Professional Land Surveyor Registration No. 4717

DORE ENERGY SIX BARREL WATER CONTROL STRUCTURE Cameron Meadows Marsh Creation Section 20, T14S-R13W Cameron Parish, Louisiana DRAWN BY: KJD

C. H. Fenstermaker & Associates, L.L.C. 135 Regency Sq. Lafayette, LA 70508 Ph. 337-237-2200 Fax. 337-232-3299 www.fenstermaker.com

PROJ. MGR.: CL

REVISED:

DATE: 01/16/2018 SHEET 2 OF 6

FILENAME: T:\2016\2164927\DWG\PERMIT PLANS_6 Barrel Structure.dwg

SHEETS

Temporary Coffer Dam

Temporary Coffer Dam

Proposed Excavation +0.5' MHWL

+0.15' MHWL

+0.5' MLWL

-1.85' MLWL

39'

CROSS SECTION A-A' Horizontal Scale: 1"=50' Vertical Scale: 1"=20'

Temporary Coffer Dam

Temporary Coffer Dam

Proposed Excavation +0.5' MHWL

+0.15' MHWL

-0.5' MLWL

-1.85' MLWL

49'

CROSS SECTION B-B' Horizontal Scale: 1"=50' Vertical Scale: 1"=20'

Temporary Spoil Placement

40'

Proposed Excavation

7.1'

7.1'

40'

76'

CROSS SECTION C-C' Horizontal Scale: 1"=50' Vertical Scale: 1"=20' NOTE: THESE PLANS ARE INTENDED EXCLUSIVELY FOR THE PURPOSE OF OBTAINING ENVIRONMENTAL COMPLIANCE PERMITS AND ARE NOT TO BE USED FOR CONSTRUCTION, BIDDING, RECORDATION, CONVEYANCE, SALES OR ENGINEERING DESIGN. Not to be used for construction, bidding, recordation, conveyance, sales, or engineering design.

PRELIMINARY Robert L. Lastrapes Professional Land Surveyor Registration No. 4717

DORE ENERGY SIX BARREL WATER CONTROL STRUCTURE Cameron Meadows Marsh Creation Section 20, T14S-R13W Cameron Parish, Louisiana DRAWN BY: KJD

C. H. Fenstermaker & Associates, L.L.C. 135 Regency Sq. Lafayette, LA 70508 Ph. 337-237-2200 Fax. 337-232-3299 www.fenstermaker.com

PROJ. MGR.: CL

REVISED:

DATE: 01/16/2018 SHEET 3 OF 6

FILENAME: T:\2016\2164927\DWG\PERMIT PLANS_6 Barrel Structure.dwg

SHEETS

Existing Marsh Elevation +1'

Front Stoplog Bay 4' Riser Height 5'

3/8" x 12" Wide Flange (Each Side & Bottom)

Top of Riser Elev. +1'

Riser Length As Required

Sheet Pile

Side Stoplog Bay 5' 4' - 9'

Riser Width As Required

Timber Pile Supports 6'x6' Post

Side Plate Height 2.5'

P.O.B. Top of Pipe -2.0' Elevation

Proposed Back Fill Min. 2' Cover

Sheet Pile P.O.E. Top of Pipe -2.5' Elevation

Corrugated Aluminum Pipe Length

Varmit Shield

20'

12 Ga. 3" x 1" Corrugations

Drill 5/8" Dia. Holes 1/4" Aluminum Plate Equally Spaced Sides & Bottom (11 Req'd Front & Back Flange) -4' at or just above water SIDE VIEW FRONT ELEVATION bottom

Top of Pipe +1.5' Aluminum Flap Gate -5' at or just above water bottom

5'

Timber Pile Supports 6'x6' Post

Weld Pipe To Riser With Continuous Weld

Weld Flap Gate To Pipe

Varmit Shield

5'

Timber Pile Supports 6'x6' Post

Timber Pile Supports 6'x6' Post

3/8" x 12" Wide Flange Req'd (Front & Back)

3 BAY ALUMINUM RISER STRUCTURE No Scale

In-Situ Fill (Type) Min. 2' Cover Over Pipe

42" Wide Corrugated Aluminum Pipe

Existing Ground

4" x 12' x 6' Timber Anchors

EL. Varies With Slope of Pipe

Timber Pile Supports

8.5' (TYP.)

TYPICAL 6 BARREL STRUCTURE No Scale

NOTE: THESE PLANS ARE INTENDED EXCLUSIVELY FOR THE PURPOSE OF OBTAINING ENVIRONMENTAL COMPLIANCE PERMITS AND ARE NOT TO BE USED FOR CONSTRUCTION, BIDDING, RECORDATION, CONVEYANCE, SALES OR ENGINEERING DESIGN. Not to be used for construction, bidding, recordation, conveyance, sales, or engineering design.

PRELIMINARY Robert L. Lastrapes Professional Land Surveyor Registration No. 4717

DORE ENERGY SIX BARREL WATER CONTROL STRUCTURE Cameron Meadows Marsh Creation Section 20, T14S-R13W Cameron Parish, Louisiana DRAWN BY: KJD

C. H. Fenstermaker & Associates, L.L.C. 135 Regency Sq. Lafayette, LA 70508 Ph. 337-237-2200 Fax. 337-232-3299 www.fenstermaker.com

PROJ. MGR.: CL

REVISED:

DATE: 01/16/2018 SHEET 4 OF 6

FILENAME: T:\2016\2164927\DWG\PERMIT PLANS_6 Barrel Structure.dwg

SHEETS

DPL Operational Plan Cameron Meadows West CS-66 Six Barrel Structure Operation Plan

Maintenance Phase Flap Gates Position

Dates

Stop Log Setting

Feb 1 - July 31

Open

Open

August 1 - Jan 31

Open

6" Below Marsh Elevation

Drawdown Phase * Flap Gates Position

Dates Jan 16 - May 31

Stop Log Setting

Flapping

Open

Jun 1 - Oct 31

Open

Open

Nov 1 - Jan 15

Open

6" Below Marsh Elevation

*No more than one attempt every three years

Additional Provisions 1. Maximum stop log elevation may not exceed 6" below marsh elevation. 2. Flap gates are closed only when salinity as measured inside each structure exceeds 6 ppt. 3. In the event of an impending extreme rainfall, tropical storm or hurrucane, all flap gates may be raised and all stop logs may be removed. Normal structure operation may may resume once salinity and water levels return to normal seasonal conditions. 4. If water salinty inside the management unit exceeds ssalinity outside the unit for greater than two weeks, the structures should be opened. 5. If water level inside the management unit exceeds marsh level by 6" for more than 14 consecutive days, the structures should be configured to evacuate excess water. ANormal structure operation may resume once water levels inside the management unit equilibrate to outside the unit. 6. All elevations are shown in NAVD 88.

NOTE: THESE PLANS ARE INTENDED EXCLUSIVELY FOR THE PURPOSE OF OBTAINING ENVIRONMENTAL COMPLIANCE PERMITS AND ARE NOT TO BE USED FOR CONSTRUCTION, BIDDING, RECORDATION, CONVEYANCE, SALES OR ENGINEERING DESIGN. Not to be used for construction, bidding, recordation, conveyance, sales, or engineering design.

PRELIMINARY Robert L. Lastrapes Professional Land Surveyor Registration No. 4717

DORE ENERGY SIX BARREL WATER CONTROL STRUCTURE Cameron Meadows Marsh Creation Section 20, T14S-R13W Cameron Parish, Louisiana DRAWN BY: KJD

C. H. Fenstermaker & Associates, L.L.C. 135 Regency Sq. Lafayette, LA 70508 Ph. 337-237-2200 Fax. 337-232-3299 www.fenstermaker.com

PROJ. MGR.: CL

REVISED:

DATE: 01/16/2018 SHEET 5 OF 6

FILENAME: T:\2016\2164927\DWG\PERMIT PLANS_6 Barrel Structure.dwg

SHEETS

TOTAL EXCAVATION REQUIRED FOR 6 BARREL STRUCTURE . . . . . . . . . . . 878 CU. YDS. TEMPORARY IMPACTS, LOADING & UNLOADING AREAS, WORK AREAS AND FILL PLACEMENT AREAS . . . . . . . . . . . . . . . . . . . . . . . . 0.09 ACRES

Tug WATERLINE 6' Draft MUDLINE

TYPICAL BACKHOE/MARSH BUGGY

TYPICAL TUG BOAT

No Scale

No Scale

NOTES: 1. All structures and/or facilities occurring in open water and/or Jurisdictional Wetlands shall be removed when all de-watering processes have been completed and no additional salt water will be added to the marsh for the herein permitted use unless prior written approval to leave such structures in place is received from the Coastal Management Division. This condition does not preclude the necessity for revising the current permit or obtaining a separate Coastal Use Permit, should one be required for such activities.

Proposed 40' x 75' Temporary Pulling Barge with Winch

Approx. 6' Draft

0.0' NAVD 88 2. As-built drawings shall be submitted within 30 days of completion of this project to the Louisiana Department of Natural Resources, Coastal Management Division, P.O. Box 44487, Baton Rouge, LA 70804-4487. 3. In order to ensure the safety of all parties, the permittee shall contact the Louisiana ONE CALL System (1-800-272-3020), a minimum of 48 hours prior to the commencement of any excavation (Digging, Dredging, Jetting, etc.) or demolition activity.

Mudline

TYPICAL PULLING BARGE

Proposed 3-Pile Cluster

No Scale

4. Structures will also be marked/lighted in accordance with U.S. Coast Guard regulations.

5. The entire proposed protection levee will be degraded to the marsh elevation of the adjacent marsh.

NOTE: THESE PLANS ARE INTENDED EXCLUSIVELY FOR THE PURPOSE OF OBTAINING ENVIRONMENTAL COMPLIANCE PERMITS AND ARE NOT TO BE USED FOR CONSTRUCTION, BIDDING, RECORDATION, CONVEYANCE, SALES OR ENGINEERING DESIGN. Not to be used for construction, bidding, recordation, conveyance, sales, or engineering design.

PRELIMINARY Robert L. Lastrapes Professional Land Surveyor Registration No. 4717

DISCLAIMER: At this time, C. H. Fenstermaker & Associates, L.L.C. has not performed nor was asked to perform any type of engineering, hydrological modeling, flood plain, or "No Rise" certification analyses, including but not limited to determining whether the project will impact flood hazards in connection with federal/FEMA, state, and/or local laws, ordinances and regulations. Accordingly, Fenstermaker makes no warranty or representation of any kind as to the foregoing issues, and persons or entities using this information shall do so at their own risk.

DORE ENERGY SIX BARREL WATER CONTROL STRUCTURE Cameron Meadows Marsh Creation Section 20, T14S-R13W Cameron Parish, Louisiana DRAWN BY: KJD

C. H. Fenstermaker & Associates, L.L.C. 135 Regency Sq. Lafayette, LA 70508 Ph. 337-237-2200 Fax. 337-232-3299 www.fenstermaker.com

PROJ. MGR.: CL

REVISED:

DATE: 01/16/2018 SHEET 6 OF 6

FILENAME: T:\2016\2164927\DWG\PERMIT PLANS_6 Barrel Structure.dwg

SHEETS

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas