Joe Hart, Manager Hart Farms & Cattle Company, L.P

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The application is for an after-the-fact (ATF) permit for the placement of fill material along the right descending bank of the Red River at three different sites for the purpose of bank stabilization.

The basic purpose of this work is to conduct bank stabilization associated with the applicant’s land along the Red River. A water dependency determination is not necessary due to no special aquatic sites located within the project site. The overall purpose of this work is to stabilize the bank line within the applicant’s property along the Red River using recycled (demolition) concrete. The applicant has already conducted bank stabilization along the right descending bank of the Red River at three different sites along their agricultural land. The bank stabilization was completed using recycled concrete and similar bricks, rocks, and gravel. The project impacts for Site 1 is approximately 6,238 lf, Site 2 is approximately 2,064 lf, and Site 3 is approximately 988 lf. Broken concrete ranges in size from 1x1 feet to 3x4 feet blocks.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas