DREDGE, TWO ROCK PADS & STRUCTURES TO PRODUCE KING LAKE PROSPECTS LAKE MENCHANT, TERREBONNE PARISH
NAME OF APPLICANT: CASTEX ENERGY, c/o EGR Services, Attn: Kasey Hebert, 1330 Park Drive, Suite 300, Mandeville, Louisiana 70471.
LOCATION OF WORK: Lake Menchant, approximately 20 miles west from Cocodrie, Louisiana, (29.285972, -90.990388), in Sections 23-27, 35 and 36, Township 20 South, Range 14 East, and in Section 1, Township 21 South, Range 14 East, in Terrebonne Parish, as shown on the enclosed drawings, within Hydrologic Unit Code 08090302, West Central Louisiana Coastal.
CHARACTER OF WORK: The applicant has requested Department of the Army authorization to bucket dredge an access channel in order to place a drilling barge at two (2) locations and install and maintain two (2) rock pads, two (2) well head protectors and appurtenant structures, all to drill and produce the King Lake No. 2 and King Lake No. 3 Prospects. The access channel length is 24,880-ft long x 70-ft wide. Approximately 277,608 cubic yards of water bottoms will be excavated and the staggered spoil will be placed 70-ft wide x 200-ft long x 5-ft height with 100-ft gaps along the access route. Spoil markers will be installed every 300 feet. A 70-ft wide x 250-ft long x 1-ft deep rock pad will be installed at each well site. The entire site is located in open waters and no adverse impacts to wetlands will be affected by this project.
It is presumed that the applicant has designed the project to avoid and minimize direct and secondary adverse impacts to the maximum extent practicable.
.
JOINT PUBLIC NOTICE
August 6, 2018
United States Army
Corps of Engineers
New Orleans District
Attn: Regulatory Branch
7400 Leake Avenue
New Orleans, Louisiana 70118
State of Louisiana
Department of Environmental Quality
Attn: Water Quality Certification Sec.
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
Project Manager: Dirreen Arnold
(504) 862-2301 / fax: (504) 862-2574
dirreen.s.arnold@usace.army.mil
Permit Application Number:
MVN-2018-00633-CA
Project Manager:
Elizabeth Hill
(225) 219-3225 / fax: (225) 219-3156
WQC Application Number:
WQC-180727-01
Interested parties are hereby notified that a permit application has been received by the
New Orleans District of the US Army Corps of Engineers pursuant to: [X] Section 10 of the
Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404
of the Clean Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental Quality,
Office of Environmental Services, for a Water Quality Certification (WQC) in accordance with
statutory authority contained in LRS 30:2074 A(3) and provisions of Section 401 of the Clean
Water Act.
DREDGE, TWO ROCK PADS & STRUCTURES TO PRODUCE KING LAKE PROSPECTS
LAKE MENCHANT, TERREBONNE PARISH
NAME OF APPLICANT: CASTEX ENERGY, c/o EGR Services, Attn: Kasey Hebert, 1330 Park
Drive, Suite 300, Mandeville, Louisiana 70471
LOCATION OF WORK: Lake Menchant, approximately 20 miles west from Cocodrie,
Louisiana, (29.285972, -90.990388), in Sections 23-27, 35 and 36, Township 20 South, Range
14 East, and in Section 1, Township 21 South, Range 14 East, in Terrebonne Parish, as shown
on the enclosed drawings, within Hydrologic Unit Code 08090302, West Central Louisiana
Coastal.
CHARACTER OF WORK: The applicant has requested Department of the Army authorization
to bucket dredge an access channel in order to place a drilling barge at two (2) locations and
install and maintain two (2) rock pads, two (2) well head protectors and appurtenant structures,
all to drill and produce the King Lake No. 2 and King Lake No. 3 Prospects. The access
channel length is 24,880-ft long x 70-ft wide. Approximately 277,608 cubic yards of water
bottoms will be excavated and the staggered spoil will be placed 70-ft wide x 200-ft long x 5-ft
height with 100-ft gaps along the access route. Spoil markers will be installed every 300 feet. A
70-ft wide x 250-ft long x 1-ft deep rock pad will be installed at each well site. The entire site is
located in open waters and no adverse impacts to wetlands will be affected by this project.
-2-
It is presumed that the applicant has designed the project to avoid and minimize direct
and secondary adverse impacts to the maximum extent practicable.
The comment period for the Department of the Army Permit and the Louisiana
Department of Environmental Quality WQC will close 20 days from the date of this joint public
notice. Written comments, including suggestions for modifications or objections to the
proposed work, stating reasons thereof, are being solicited from anyone having interest in this
permit and/or this WQC request and must be submitted so as to be received before or by the
last day of the comment period. Letters concerning the Corps of Engineers permit application
must reference the applicant's name and the Permit Application Number, and be forwarded to
the Corps of Engineers at the address above, ATTENTION: REGULATORY BRANCH. Similar
letters concerning the Water Quality Certification must reference the applicant's name and the
WQC application number and be mailed to the Louisiana Department of Environmental Quality
at the address above. Individuals or parties may request an extension of time in which to
comment on the proposed work by writing, faxing, or e-mailing the Corps of Engineers Project
Manager listed above. Any request must be specific and substantively supportive of the
requested extension, and received by this office prior to the end of the initial comment period.
The Section Chief will review the request and the requestor will be promptly notified of the
decision to grant or deny the request. If granted, the time extension will be continuous to the
initial comment period and, inclusive of the initial comment period, will not exceed a total of 30
calendar days.
The application for this proposed project is on file with the Louisiana Department of
Environmental Quality and may be examined during weekdays between 8:00 a.m. and 4:30
p.m. Copies may be obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable
impacts, including cumulative impacts of the proposed activity on the public interest. That
decision will reflect the national concern for both protection and utilization of important
resources. The benefit which reasonably may be expected to accrue from the proposal must be
balanced against its reasonably foreseeable detriments. All factors which may be relevant to
the proposal will be considered including the cumulative effects thereof; among those are
conservation, economics, aesthetics, general environmental concerns, wetlands, historic
properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation,
shoreline erosion and accretion, recreation, water supply and conservation, water quality,
energy needs, safety, food and fiber production, mineral needs, considerations of property
ownership and, in general, the needs and welfare of the people.
-3-
The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state,
and local agencies and officials, Indian Tribes, and other interested parties in order to consider
and evaluate the impacts of this proposed activity. Any comments received will be considered
by the U.S. Army Corps of Engineers to determine whether to make, modify, condition, or deny
a permit for this proposal. To make this decision, comments are used to assess impacts on
endangered species, historic properties, water quality, general environmental effects, and other
public interest factors listed above. Comments are used in the preparation of an Environmental
Assessment and/or an Environmental Impact Statement pursuant to the National Environmental
Policy Act. Comments are also used to determine the need for a public hearing and to
determine the overall public interest of the proposed activity.
The New Orleans District is unaware of properties listed on the National Register of
Historic Places near the proposed work. The possibility exists that the proposed work may
damage or destroy presently unknown archeological, scientific, pre-historical, historical sites, or
data. Issuance of this public notice solicits input from the State Archeologist and State Historic
Preservation Officer regarding potential impacts to cultural resources.
The New Orleans District has determined that the proposed project is located within
waters known to be occupied by the endangered West Indian Manatee (Trichechus manatus)
and determined with the inclusion of the Standard Manatee Conditions for In-Water Activities
the proposed activity is not likely to adversely affect the species based on the Standard Local
Operating Procedure for Endangered Species in Louisiana (SLOPES), dated October 22, 2014,
between the U.S. Army Corps of Engineers, New Orleans and U.S. Fish and Wildlife Service,
Ecological Services Office.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal may
result in the destruction or alteration of 41 acres of EFH utilized by various life stages of red
drum and penaeid shrimp. Our initial determination is that the proposed action would not have
a substantial adverse impact on EFH or federally managed fisheries in the Gulf of Mexico. Our
final determination relative to project impacts and the need for mitigation measures is subject to
review by and coordination with the National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters,
the evaluation of the probable impacts will include the application of guidelines established by
the Administrator of the Environmental Protection Agency. Also, a certification that the
proposed activity will not violate applicable water quality standards will be required from the
Department of Environmental Quality, before a permit is issued.
Any person may request, in writing, within the comment period specified in this notice,
that a public hearing be held to consider this application. Requests for public hearings shall
state, with particularity, the reasons for holding a public hearing. You are requested to
communicate the information contained in this notice to any other parties whom you deem likely
to have interest in the matter.
-4-
The applicant has certified that the proposed activity described in the application
complies with and will be conducted in a manner that is consistent with the Louisiana Coastal
Resources Program. The Department of the Army permit will not be issued unless the applicant
received approval or a waiver of the Coastal Use Permit by the Department of Natural
Resources.
JOHN M. HERMAN
Chief, Central Evaluation Section
Regulatory Branch
Enclosure
King Lake No.2 Prospect
X: 2,109,303', Y: 225,202' (NAD27)
X: 3,390,162', Y: 286,001' (NAD83)
LONG: 90° 59' 25.4" W, LAT: 29° 17' 9.5" N (NAD83)
1,500' Project Buffer
Proposed Access (Total Access Lenth = ± 24,880')
Proposed Dredge (Total Dredge Length = ± 23,335')
Spoil Beneficial Use Area
King Lake No.3 Prospect
X: 2,109,224', Y: 224,079' (NAD27)
X: 3,390,055', Y: 284,704' (NAD83)
LONG: 90° 59' 26.7" W, LAT: 29° 16' 56.7" N (NAD83)
0.5
Proposed Terrace (200' L x 70' W with 100' Gaps)
0.25
Oyster Lease Data
_
^
³
Project Location: King Lake II Prospect
Approx. 20 miles West of Cocodrie, LA
_
^
0
0.5
Miles
NOTES
1) All Structures, Facilities, well and pipelines/flowlines shall be
removed within 120 days of abandonment of the facilities for the
herein permitted use. This condition does not preclude the
necessity for revising the current permit or obtaining a separate
Coastal Use Permit, should one be required,
for such removal activities.
2) All structures will be marked and lighted in accordance with
US Coast Guard regulations.
3) As-Built drawings shall be submitted within 30 days of completion
of this project to the Louisiana Department of Natural Resources,
Office of Pipeline Safety, PO Box 94275, Baton Rouge, LA 70804, and
to the Louisiana Department of Natural Resources, Office of Coastal
Management, PO Box 44487, Baton Rouge, LA 70804-4487 and to
Louisiana Land and Exploration Company, P.O Box 7097,
Houma, Louisiana 70361-7097.
4) Permittee shall contact Louisiana ONE CALL at 1-800-272-3020
forty-eight hours prior to excavation or demolition.
Castex Energy, Inc.
µ
Proposed Well Locations, Dredging, Rock Pads & Structures
to Drill the King Lake No. 2 and King Lake No. 3 Prospects
FOR
SEC 23, 24, 25, 26, 27, 35, 36 T20S-R14E; SEC 01 T21S-R14E
Terrebonne Parish, Louisiana
P E R M I T T I N G O N LY
This document is not to be used for construction,
bidding, recordation, conveyance or sales.
Data Sources
Rev: (date:initial)
05/21/2017 : KFM
05/25/2018 : KFM
07/18/2018 : KFM
Created by:
Date:
Job #
Page
KFM
05/14/2018
18026
1 of 9
1.Background Data: Copyright: © 2013 National Geographic Socienty, I-cubed, Content may not reflect National Geograpghic's current map policy.
Sources: National Geographic, Exri, DeLorme, HERE, UNEP-WCMC, USGS, NASA, ESA, METI, NRCAN, GEBCO, NOAA, increment P Corp
2.Survey data was acquired for the preparation of these permit documents. Data sources are as follows:
Map Title or Sheet #
Licensed Firm Name
HYDROGRAPHIC SURVEY OF ACCESS ROUTE TO KING LAKE 2 PROSPECT
T. Baker Smith
Date Issued: 05/08/2018
Licensed Professional:
Rene Hebert
SEC: 23 T20S - R14E
SEC: 22 T20S - R14E
SEC: 26 T20S - R14E
SEC: 27 T20S - R14E
Permitted Access Route (P20170412)
To be Utilized
!A
A'
!
Permitted Access Route (P20170412)
Proposed Access (No Dredge Required)
1,500' Project Buffer
Proposed Dredge (Total Dredge Length = ± 26,175')
Proposed Terrace (200' L x 70' W with 100' Gaps)
Oyster Lease Data
POB of Dredge (Total Dredge Length = ± 26,175')
X: 2,103,568', Y: 229,938' (NAD27)
X: 3,384,399', Y: 290,562' (NAD83)
LONG: 91° 00' 30.3" W, LAT: 29° 17' 57.8" N (NAD83)
750
750
Castex Energy, Inc.
2
6
µ
Proposed Well Locations, Dredging, Rock Pads & Structures
to Drill the King Lake No. 2 and King Lake No. 3 Prospects
4
5
Map Index
0
Feet
3
Current Page
375
FOR
³
SEC 23, 24, 25, 26, 27, 35, 36 T20S-R14E; SEC 01 T21S-R14E
Terrebonne Parish, Louisiana
P E R M I T T I N G O N LY
This document is not to be used for construction,
bidding, recordation, conveyance or sales.
Data Sources
Rev: (date:initial)
05/21/2017 : KFM
05/25/2018 : KFM
07/18/2018 : KFM
Created by:
Date:
Job #
KFM
05/14/2018
18026
Page
2 of 9
1.Background Data: Copyright: © 2013 National Geographic Socienty, I-cubed, Content may not reflect National Geograpghic's current
map policy. Sources: National Geographic, Exri, DeLorme, HERE, UNEP-WCMC, USGS, NASA, ESA, METI, NRCAN, GEBCO, NOAA, increment P Corp
2. Water Depth Data Water Depths shown have been reduced to 0.0' NAVD88. Average water surface elevation durring time of survey was 0.9'
NAVD88. Bathymetric Data was colected and provided by T. Baker Smith from a field survey performed on Marsh 28, 2018.
2.Survey data was acquired for the preparation of these permit documents. Data sources are as follows:
Map Title or Sheet #
Licensed Firm Name
HYDROGRAPHIC SURVEY OF ACCESS ROUTE TO KING LAKE 2 PROSPECT
T. Baker Smith
Date Issued: 05/08/2018
Licensed Professional:
Rene Hebert
SEC: 24 T20S - R14E
SEC: 23 T20S - R14E
!B
B'
!
Proposed Access (No Dredge Required)
1,500' Project Buffer
750
Proposed Dredge (Total Dredge Length = ± 26,175')
Proposed Terrace (200' L x 70' W with 100' Gaps)
375
SEC: 23 T20S - R14E
Castex Energy, Inc.
2
4
5
6
µ
Proposed Well Locations, Dredging, Rock Pads & Structures
to Drill the King Lake No. 2 and King Lake No. 3 Prospects
3
Map Index
750
Feet
Oyster Lease Data
Current Page
0
FOR
³
SEC 23, 24, 25, 26, 27, 35, 36 T20S-R14E; SEC 01 T21S-R14E
Terrebonne Parish, Louisiana
P E R M I T T I N G O N LY
This document is not to be used for construction,
bidding, recordation, conveyance or sales.
Data Sources
Rev: (date:initial)
05/21/2017 : KFM
05/25/2018 : KFM
07/18/2018 : KFM
Created by:
Date:
Job #
KFM
05/14/2018
18026
Page
3 of 9
1.Background Data: Copyright: © 2013 National Geographic Socienty, I-cubed, Content may not reflect National Geograpghic's current
map policy. Sources: National Geographic, Exri, DeLorme, HERE, UNEP-WCMC, USGS, NASA, ESA, METI, NRCAN, GEBCO, NOAA, increment P Corp
2. Water Depth Data Water Depths shown have been reduced to 0.0' NAVD88. Average water surface elevation durring time of survey was 0.9'
NAVD88. Bathymetric Data was colected and provided by T. Baker Smith from a field survey performed on Marsh 28, 2018.
2.Survey data was acquired for the preparation of these permit documents. Data sources are as follows:
Map Title or Sheet #
Licensed Firm Name
HYDROGRAPHIC SURVEY OF ACCESS ROUTE TO KING LAKE 2 PROSPECT
T. Baker Smith
Date Issued: 05/08/2018
Licensed Professional:
Rene Hebert
SEC: 24 T20S - R14E
SEC: 30 T20S - R15E
SEC: 25 T20S - R14E
C'
!
SEC: 31 T20S - R15E
1,500' Project Buffer
Proposed Dredge (Total Dredge Length = ± 26,175')
!C
Spoil Beneficial Use Area
Proposed Terrace (200' L x 70' W with 100' Gaps)
750
375
Castex Energy, Inc.
2
4
5
6
µ
Proposed Well Locations, Dredging, Rock Pads & Structures
to Drill the King Lake No. 2 and King Lake No. 3 Prospects
3
Map Index
750
Feet
Oyster Lease Data
Current Page
0
FOR
³
SEC 23, 24, 25, 26, 27, 35, 36 T20S-R14E; SEC 01 T21S-R14E
Terrebonne Parish, Louisiana
P E R M I T T I N G O N LY
This document is not to be used for construction,
bidding, recordation, conveyance or sales.
Data Sources
Rev: (date:initial)
05/21/2017 : KFM
05/25/2018 : KFM
07/18/2018 : KFM
Created by:
Date:
Job #
KFM
05/14/2018
18026
Page
4 of 9
1.Background Data: Copyright: © 2013 National Geographic Socienty, I-cubed, Content may not reflect National Geograpghic's current
map policy. Sources: National Geographic, Exri, DeLorme, HERE, UNEP-WCMC, USGS, NASA, ESA, METI, NRCAN, GEBCO, NOAA, increment P Corp
2. Water Depth Data Water Depths shown have been reduced to 0.0' NAVD88. Average water surface elevation durring time of survey was 0.9'
NAVD88. Bathymetric Data was colected and provided by T. Baker Smith from a field survey performed on Marsh 28, 2018.
2.Survey data was acquired for the preparation of these permit documents. Data sources are as follows:
Map Title or Sheet #
Licensed Firm Name
HYDROGRAPHIC SURVEY OF ACCESS ROUTE TO KING LAKE 2 PROSPECT
T. Baker Smith
Date Issued: 05/08/2018
Licensed Professional:
Rene Hebert
!C
SEC: 26 T20S - R14E
SEC: 25 T20S - R14E
SEC: 31 T20S - R15E
SEC: 35 T20S - R14E
SEC: 36 T20S - R14E
D'
!
!D
1,500' Project Buffer
Proposed Dredge (Total Dredge Length = ± 26,175')
Spoil Beneficial Use Area
750
E'
!
Proposed Terrace (200' L x 70' W with 100' Gaps)
Oyster Lease Data
750
Castex Energy, Inc.
2
6
µ
Proposed Well Locations, Dredging, Rock Pads & Structures
to Drill the King Lake No. 2 and King Lake No. 3 Prospects
4
5
Map Index
0
Feet
3
Current Page
375
FOR
³
SEC 23, 24, 25, 26, 27, 35, 36 T20S-R14E; SEC 01 T21S-R14E
Terrebonne Parish, Louisiana
P E R M I T T I N G O N LY
This document is not to be used for construction,
bidding, recordation, conveyance or sales.
Data Sources
Rev: (date:initial)
05/21/2017 : KFM
05/25/2018 : KFM
07/18/2018 : KFM
Created by:
Date:
Job #
KFM
05/14/2018
18026
Page
5 of 9
1.Background Data: Copyright: © 2013 National Geographic Socienty, I-cubed, Content may not reflect National Geograpghic's current
map policy. Sources: National Geographic, Exri, DeLorme, HERE, UNEP-WCMC, USGS, NASA, ESA, METI, NRCAN, GEBCO, NOAA, increment P Corp
2. Water Depth Data Water Depths shown have been reduced to 0.0' NAVD88. Average water surface elevation durring time of survey was 0.9'
NAVD88. Bathymetric Data was colected and provided by T. Baker Smith from a field survey performed on Marsh 28, 2018.
2.Survey data was acquired for the preparation of these permit documents. Data sources are as follows:
Map Title or Sheet #
Licensed Firm Name
HYDROGRAPHIC SURVEY OF ACCESS ROUTE TO KING LAKE 2 PROSPECT
T. Baker Smith
Date Issued: 05/08/2018
Licensed Professional:
Rene Hebert
E'
!
King Lake No.2 Prospect
X: 2,109,303', Y: 225,202' (NAD27)
X: 3,390,162', Y: 286,001' (NAD83)
LONG: 90° 59' 25.4" W, LAT: 29° 17' 9.5" N (NAD83)
!E
F'
!
SEC: 2 T21S - R14E
SEC: 36 T20S - R14E
!F
SEC: 35 T20S - R14E
SEC: 1 T21S - R14E
G'
!
King Lake No.3 Prospect
X: 2,109,224', Y: 224,079' (NAD27)
X: 3,390,055', Y: 284,704' (NAD83)
LONG: 90° 59' 26.7" W, LAT: 29° 16' 56.7" N (NAD83)
!G
1,500' Project Buffer
Proposed Dredge (Total Dredge Length = ± 26,175')
750
Spoil Beneficial Use Area
Proposed Terrace (200' L x 70' W with 100' Gaps)
375
Castex Energy, Inc.
2
4
5
6
µ
Proposed Well Locations, Dredging, Rock Pads & Structures
to Drill the King Lake No. 2 and King Lake No. 3 Prospects
3
Map Index
750
Feet
Oyster Lease Data
Current Page
0
FOR
³
SEC 23, 24, 25, 26, 27, 35, 36 T20S-R14E; SEC 01 T21S-R14E
Terrebonne Parish, Louisiana
P E R M I T T I N G O N LY
This document is not to be used for construction,
bidding, recordation, conveyance or sales.
Data Sources
Rev: (date:initial)
05/21/2017 : KFM
05/25/2018 : KFM
07/18/2018 : KFM
Created by:
Date:
Job #
KFM
05/14/2018
18026
Page
6 of 9
1.Background Data: Copyright: © 2013 National Geographic Socienty, I-cubed, Content may not reflect National Geograpghic's current
map policy. Sources: National Geographic, Exri, DeLorme, HERE, UNEP-WCMC, USGS, NASA, ESA, METI, NRCAN, GEBCO, NOAA, increment P Corp
2. Water Depth Data Water Depths shown have been reduced to 0.0' NAVD88. Average water surface elevation durring time of survey was 0.9'
NAVD88. Bathymetric Data was colected and provided by T. Baker Smith from a field survey performed on Marsh 28, 2018.
2.Survey data was acquired for the preparation of these permit documents. Data sources are as follows:
Map Title or Sheet #
Licensed Firm Name
HYDROGRAPHIC SURVEY OF ACCESS ROUTE TO KING LAKE 2 PROSPECT
T. Baker Smith
Date Issued: 05/08/2018
Licensed Professional:
Rene Hebert
MHWL: +3.00'
MLWL: +1.25'
MHWL: +3.00'
MLWL: +1.25'
Cross Section A - A'
Cross Section B - B'
Proposed terraces stacked 6" above existing
marsh elevation (±4.00' NAVD 88)
No Scale
No Scale
Proposed Terrace
A
±8'
Proposed terraces stacked 6" above existing
marsh elevation (±4.00' NAVD 88)
Proposed Spoil Markers
To be placed every 300'
Proposed Spoil Markers
To be placed every 300'
Proposed Terrace
(70' Wide x 200' Length)
±15'
Top of Water = MLWL
±5.5'
±70'
A'
B
Proposed Spoil Markers
To be placed every 300'
±2.5'
Top of Water = MLWL
±8'
±2.5'
Proposed Terrace
(70' Wide x 200' Length)
±5.5'
Proposed Terrace
(70' Wide x 200' Length)
±70'
Proposed terraces stacked 6" above existing
marsh elevation (±4.00' NAVD 88)
MHWL: +3.00'
MLWL: +1.25'
Existing
Marsh
B'
±15'
C
Proposed terraces stacked 6" above existing
marsh elevation (±4.00' NAVD 88)
Cross Section C - C'
No Scale
Proposed terraces stacked 6" above existing
marsh elevation (±4.00' NAVD 88)
C'
Proposed Spoil Markers
To be placed every 300'
±8'
±2'
±35'
±5'
±15'
Proposed Terrace
Top of Water = MLWL
Existing
Marsh
±6'
Proposed Terrace
±70'
±100'
Proposed terraces stacked 6" above existing
marsh elevation (±4.00' NAVD 88)
Castex Energy, Inc.
Proposed Well Locations, Dredging, Rock Pads & Structures
to Drill the King Lake No. 2 and King Lake No. 3 Prospects
FOR
SEC 23, 24, 25, 26, 27, 35, 36 T20S-R14E; SEC 01 T21S-R14E
Terrebonne Parish, Louisiana
P E R M I T T I N G O N LY
This document is not to be used for construction,
bidding, recordation, conveyance or sales.
Data Sources
Rev: (date:initial)
05/21/2017 : KFM
05/25/2018 : KFM
07/18/2018 : KFM
Created by:
Date:
Job #
Page
KFM
05/14/2018
18026
7 of 9
1.Background Data: NA
2. Water Depth Data Water Depths shown have been reduced to 0.0' NAVD88. Average water surface elevation durring time of survey was 0.9'
NAVD88. Bathymetric Data was colected and provided by T. Baker Smith from a field survey performed on Marsh 28, 2018.
2.Survey data was acquired for the preparation of these permit documents. Data sources are as follows:
Map Title or Sheet #
Licensed Firm Name
HYDROGRAPHIC SURVEY OF ACCESS ROUTE TO KING LAKE 2 PROSPECT
T. Baker Smith
Date Issued: 05/08/2018
Licensed Professional:
Rene Hebert
No Scale
Proposed Spoil Markers
To be placed every 300'
±5'
±15'
Top of Water = MLWL
±8'
±8'
Proposed Terrace
±80'
Cross Section F - F'
No Scale
F'
Proposed Spoil Markers
To be placed every 300'
±5'
Existing
Marsh
±8'
Proposed Terrace
±5.5'
± 160'
± 35'
75
Proposed Barge
and Rock Pad
± 15'
± 70'
± 200'
0
Feet
± 85'
Proposed Dredge Area
Beneficial
Use Spoil
Typical Well Slip Detail
King Lake No. 3 Prospect
150
Spoil
150
75
0
Feet
± 30'
± 85'
± 15'
Proposed Dredge Area
Castex Energy, Inc.
150
³
± 345'
± 345'
±2.5'
Spoil
³
Typical Well Slip Detail
King Lake No. 2 Prospect
Proposed Barge
and Rock Pad
±70'
±130'
Proposed terraces stacked 6" above existing
marsh elevation (±4.00' NAVD 88)
±2.5'
±70'
± 160'
± 160'
±15'
Top of Water = MLWL
±5.5'
±130'
± 200'
± 70'
F
Top of Water = MLWL
Proposed terraces stacked 6" above existing
marsh elevation (±4.00' NAVD 88)
Proposed terraces stacked 6" above existing
marsh elevation (±4.00' NAVD 88)
MHWL: +3.00'
MLWL: +1.25'
E'
±15'
Proposed Terrace
±70'
No Scale
Proposed Spoil Markers
To be placed every 300'
±5'
Existing Existing
Marsh Marsh
±2'
±6'
E
Cross Section E - E'
± 70'
D
D'
MHWL: +3.00'
MLWL: +1.25'
± 70'
Cross Section D- D'
MHWL: +3.00'
MLWL: +1.25'
Proposed Well Locations, Dredging, Rock Pads & Structures
to Drill the King Lake No. 2 and King Lake No. 3 Prospects
FOR
SEC 23, 24, 25, 26, 27, 35, 36 T20S-R14E; SEC 01 T21S-R14E
Terrebonne Parish, Louisiana
P E R M I T T I N G O N LY
This document is not to be used for construction,
bidding, recordation, conveyance or sales.
Data Sources
Rev: (date:initial)
05/21/2017 : KFM
05/25/2018 : KFM
07/18/2018 : KFM
Created by:
Date:
Job #
Page
KFM
05/14/2018
17026
8 of 9
1.Background Data: NA
2. Water Depth Data Water Depths shown have been reduced to 0.0' NAVD88. Average water surface elevation durring time of survey was 0.9'
NAVD88. Bathymetric Data was colected and provided by T. Baker Smith from a field survey performed on Marsh 28, 2018.
2.Survey data was acquired for the preparation of these permit documents. Data sources are as follows:
Map Title or Sheet #
Licensed Firm Name
HYDROGRAPHIC SURVEY OF ACCESS ROUTE TO KING LAKE 2 PROSPECT
T. Baker Smith
Date Issued: 05/08/2018
Licensed Professional:
Rene Hebert
Cross Section G - G'
Typical Well Structure
Plan View
No Scale
No Scale
No Scale
G'
G
Typical Well Structure
Profile View
Navigation
Light
MHWL: +3.00'
MLWL: +1.25'
Proposed Spoil Marker
To be placed every 300'
Proposed Terrace
(70' Wide x 200' Length)
Proposed Rock Pad
( 70' W x 250' L x 1'D )
Varies
±5'
Navigation Light
±15'
±7'
±2'
±8'
Well
±5'
Well
Casing
Proposed
Pilings
±8'
Proposed Rock Pad
( 70' W x 250' L x 1'D )
Proposed Terrace
Varies
Proposed terraces stacked 6" above existing
marsh elevation (±4.00' NAVD 88)
Well
±160'
±140'
Mudline
±30'
Project Impact Summary
Typical Drill Barge
Excavation - Proposed Access
± 40.88 Total Acres of Proposed Access
± 39.02 Total Acres of Dredge
± 277,608.14 Cubic Yards of Dredge
Fill - Access Dredge Spoil Placement (Native Material)
± 51.84 Acres of Spoil Placement
± 277,608.14 Cubic Yards of Spoil Placement
Not to Scale
Plan View
±54'
Excavation - Proposed Rock Pad
± 0.80 Acres of Dredge
± 1,296.30 Cubic Yards of Dredge
Fill - Propose Rock Pad (Rock)
± 0.80 Acres of Rock
± 1,296.30 Cubic Yards of Rock
Thirteen (13) temporary five (5) pile clusters to be driven to assist in removing drill barge
from location. Temporary clusters to be removed when permanent well guard in installed.
Castex Energy, Inc.
Proposed Well Locations, Dredging, Rock Pads & Structures
to Drill the King Lake No. 2 and King Lake No. 3 Prospects
Elevation View
7.5' Draft
±209'
Proposed Rock Pad
( 70' W x 250' L x 1'D )
FOR
SEC 23, 24, 25, 26, 27, 35, 36 T20S-R14E; SEC 01 T21S-R14E
Terrebonne Parish, Louisiana
P E R M I T T I N G O N LY
This document is not to be used for construction,
bidding, recordation, conveyance or sales.
Data Sources
Rev: (date:initial)
05/21/2017 : KFM
05/25/2018 : KFM
07/18/2018 : KFM
Created by:
Date:
Job #
Page
KFM
05/14/2018
17026
9 of 9
1.Background Data: NA
2. Water Depth Data Water Depths shown have been reduced to 0.0' NAVD88. Average water surface elevation durring time of survey was 0.9'
NAVD88. Bathymetric Data was colected and provided by T. Baker Smith from a field survey performed on Marsh 28, 2018.
2.Survey data was acquired for the preparation of these permit documents. Data sources are as follows:
Map Title or Sheet #
Licensed Firm Name
HYDROGRAPHIC SURVEY OF ACCESS ROUTE TO KING LAKE 2 PROSPECT
T. Baker Smith
Date Issued: 05/08/2018
Licensed Professional:
Rene Hebert