Home

Tulsa District

Run scraper

Mr Lane Whitehouse

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The overall purpose of this work is to replace a structurally deficient bridge to maintain safe and reliable traffic along this segment of county road on NS 370 (South 369th West Avenue).

The applicant proposes the placement of fill material into jurisdictional waters and adjacent wetlands using earthen material for approximately 58,847 cubic yards (CY), 1,340 CY for 6-inch aggregate Type A, and 3,388 CY for 18- inch riprap for bank stabilization for abutments and the road base. The total project length is for approximately 2,365linear feet. The new road would impact two wetland areas that total 2.90 acres and two stream channels with reinforced concrete pipes for 0.18 acre (259 linear feet). The applicant also proposes to construct a new P.C. Beam Span bridgethat consist of two-115 feet and four- 100 feet and five- 48 inch diameter piers using for concrete and steel that total 0.005 acre.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas