This notice announces that a prospectus has been submitted by the Tennessee Department of Transportation (TDOT) for the establishment, operation, and maintenance of the Bledsoe Correctional Complex (BCCX) Mitigation Bank. These documents have been submitted pursuant to 33 CFR 332, Compensatory Mitigation for Losses of Aquatic Resources (Federal Register: April 10, 2008, effective June 9, 2008.
Public Notice No. 18-17
Nashville District
Application No. LRN-2018-00131
Date: August 6, 2018;Expires: September 6, 2018
Please address comments to:
Nashville District Corps of Engineers,
Regulatory Division
3701 Bell Road,
Nashville, TN 37214-2660
SUBJECT: This notice announces that a prospectus has been submitted by the Tennessee Department of Transportation (TDOT) for the establishment, operation, and maintenance of the Bledsoe Correctional Complex (BCCX) Mitigation Bank. These documents have been submitted pursuant to 33 CFR 332,
Compensatory Mitigation for Losses of Aquatic Resources (Federal Register: April 10, 2008, effective June 9, 2008.
BANK SPONSOR: Tennessee Department of Transportation (TDOT)
Environmental Division Attention: Mr. Ben Brown
James K. Polk Building, Suite 900 505 Deaderick Street
Nashville, Tennessee 37243
LOCATION: The proposed Bledsoe Correctional Complex (BCCX) Mitigation Bank site is located on Tennessee Department of Corrections (TDOC) property on both the north and south side of Highway 285 (Glade Creek Road) near Pikeville, Bledsoe County, Tennessee. The project site lies within the
Cumberland Plateau Ecoregion (68a), and the HUC8 watershed is 05130108 (Caney Fork River). Project coordinates are approximately 35.7524, -85.2507. The proposed BCCX Mitigation Bank would include the restoration and/or enhancement of nine streams totaling approximately 13,698 linear feet,
including Mill Creek and unnamed tributaries to Mill Creek, Bee Creek, and Glade Creek.
PURPOSE: The BCCX Mitigation Bank is proposed to provide compensatory mitigation for unavoidable adverse impacts on state and federally regulated waters, as required, for TDOT activities authorized under Sections 401 and/or 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act of 1899. The BCCX Mitigation Bank would be for TDOT use only.
The proposed geographic service area for the BCCX Stream Mitigation Bank includes the Caney Fork River HUC8 watershed (05130108) as well as adjacent HUC8 watersheds that are within the same major river drainage (Cumberland River). These include the Obey (05130105), Upper Cumberland‐Cordell Hull
Reservoir (05130106), Collins (05130107), Stones (05130203) and Lower Cumberland‐Old Hickory Lake (05130201). The proposed service area will cover approximately 6,250 square miles (4,000,000 acres).
Project goals include: 1) improving the transport of water in the channels, on the floodplains, and through sediments and 2) improving the transport of wood and sediment to create diverse bed forms and dynamic equilibrium within the channels.
GENERAL INFORMATION: Mitigation banks are defined as a site, or suite of sites, where aquatic resources (e.g., wetlands, streams, riparian areas) are restored, established, enhanced, and/or preserved for the purpose of providing compensatory mitigation for impacts authorized by Department of the Army (DA) permits pursuant to Section 10 of the Rivers and Harbors Act of 1899 and/or Section 404 of the Clean Water Act. In general, units of restored, established, enhanced or preserved wetlands or streams are expressed as “credits” which may subsequently
be withdrawn to offset “debits” incurred at a permitted project site. In this way, a permit requirement to provide compensatory mitigation can be transferred to the mitigation bank sponsor. The operation and use of mitigation banks are governed by an approved mitigation banking instrument (MBI). The MBI is the legal document for the establishment, operation and the use of a mitigation bank. This bank is intended to be a private mitigation bank, to be utilized exclusively by TDOT to offset impacts from highway projects. The sponsor would be responsible for the successful development of the mitigation bank including monitoring and reporting requirements.
A group of federal and state regulatory and resource agency representatives known as the Interagency Review Team (IRT) would oversee the establishment and management of the bank. The IRT is chaired by the U.S. Army Corps of Engineers, Nashville District (USACE). The primary role of the IRT is to facilitate the establishment of the mitigation bank through the development of a MBI. The IRT will review the prospectus, instrument, and other appropriate documents and provide comments to the USACE.
The approval for the use of the bank for specific projects is the decision of the USACE pursuant to Section 10 of the Rivers and Harbors Act of 1899 and/or Section 404 of the Clean Water Act and/or the Tennessee Department of Environmental Conservation (TDEC) pursuant to Section 401 of the CWA and/or applicable state of Tennessee statute(s) and regulation(s). The USACE and TDEC provide no guarantee that any particular individual or general permit would be authorized in order to use the bank for compensation.
PROJECT DESCRIPTION: The BCCX Mitigation Bank includes the restoration and/or enhancement of nine streams, including Mill Creek and unnamed tributaries to Mill Creek, Bee Creek, and Glade Creek. The total restoration area, including vegetative buffers, would total approximately 47 acres. Recent and historical land use disturbances have caused widespread stream degradation across the project site. Streams adjacent to agricultural fields have been straightened, channelized, and moved from their historic position. Other streams onsite have destabilized due to anthropogenic disturbances in the watershed associated with agriculture and development of the prison. These changes have led to incision and entrenchment of the streams. Other stressors include direct cattle access and effluent from the facility’s wastewater treatment plant discharging into Mill Creek. The project goals and objectives will address these impairments to the project streams.
The overall goal of the BCCX Mitigation Bank is to restore, to the greatest extent possible, the ecological function of the degraded aquatic resources within the mitigation bank site. The proposed project would consist of the restoration, re-establishment, enhancement, and riparian buffer planting of approximately 13,698 linear feet of stream channel, utilizing natural channel design techniques to provide a functional lift capable of restoring natural channel hydrology,
hydraulic, and geomorphic characteristics. Function-based goals include: (1) restoring floodplain connectivity, (2) restoring natural channel geomorphology and sediment transport, (3) providing large woody debris in the channels, (4) improving bed form diversity, (5) improving lateral stability, and (6) improving riparian vegetation buffer width and protection.
Of the 13,698 linear feet proposed for improvements, the proposal includes 11,565 linear feet of restoration, 1,355 linear feet of re-establishment, and 778 linear feet of enhancement. Details are contained in the BCCX Mitigation Bank Prospectus dated July 2018.TheProspectus and the Prospectus Appendix can be view here, Prospectus and Prospectus Appendix. Information in the prospectus would serve as the basis for establishing the mitigation banking instrument (MBI). The MBI would describe in detail the physical and legal characteristics of the bank and how the bank would be established and
operated.
HISTORIC AND CULTURAL RESOURCES: TDOT, acting on behalf of the Federal Highway Administration (FHWA), has been identified as the lead federal agency for complying with Section 106 of the NHPA. At this early stage in the design process, TDOT has not provided this documentation to USACE. The
USACE invites responses to this public notice from American Indian Tribes or tribal governments; Federal, State, and local agencies; historical and archeological societies; and other parties likely to have knowledge of or concerns regarding historic properties and cultural significance at or near the project area. Any substantive comments from this public notice will be provided to TDOT, for consideration of potential effects to historic and cultural resources for Section 106 compliance. If TDOT determines that consultation is required, TDOT would consult with the Tennessee Historic Commission (SHPO) and American Indian Tribes in accordance with Section 106 of the National Historic Preservation Act, as appropriate. TDOT is required to submit all applicable
Section 106 documentation to USACE prior to final permit decision.
ENDANGERED/THREATENED SPECIES REVIEW: TDOT, acting on behalf of the Federal Highway Administration (FHWA), has been identified as the lead federal agency for conducting environmental review under Section 7 of the ESA. At this early stage in the design process, TDOT has not provided this
documentation to USACE. A copy of this notice is being furnished to USFWS for their review. Any substantive comments from this public notice will be provided to TDOT, for consideration of potential effects to proposed and/or listed species and their designated critical habitat, and to initiate consultation with the U.S. Fish & Wildlife Service, if required. TDOT is required to submit all applicable Section 7 documentation to USACE prior to final permit decision.
PUBLIC HEARING REQUESTS: Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application.
Requests for hearings shall state, with particularity, the reasons for holding a public hearing.
COMMENT PERIOD: Written statements received in this office within 30 days from the date of this notice will become a part of the record and will be considered in the determination. Any response to this notice should be directed to the Nashville District Corps of Engineers, Regulatory Division, Attention: Transportation Program Manager, at the above address, by phone at 615-369-7500, or by email: william.e.worrall@usace.army.mil.
\\SIGNED\\
Joshua W. Frost
Chief, Technical Services Branch
Regulatory Division
U.S. Army Corps of Engineers