You can copy from here when filling out the rest of the page.
Mr. Jim Erickson, 1676 Fritz Cove Road, Juneau, AK 99801, states that the project purpose is to “replace an old and deteriorated private moorage facility with a safe, more accessible and secure dock for the resident owner”. Work being proposed includes: 1. Remove from below MHW an existing 10 foot wide by 36 foot long timber approach, 30 foot long aluminum gangway, 135 linear feet of sectional hinged beach floats, and a 10 foot wide by 40 foot wide mooring float and six timber piles. 2. Install below MHW a 107 foot long (over two spans of 67 feet and 40 feet in length) elevated aluminum truss approach structure on two bents, each bent supported by two 10.75-inch diameter steel piles with a total of four steel support piles with minimum of 15 feet of embedment; 3. Install below MHW one new 20 foot wide by 60 foot long timber decked, pile-supported (two each 24-inch diameter) float on poly pipe pontoons connected to a six foot wide by 60 foot long steel gangway. The float would be outfitted with domestic water and shore power. Piles would be driven to depth with a vibratory hammer; 4. Place 0.58 cubic yards of concrete and 0.29 cubic yards of clean rock armor rock side slope fill material into 52.2 square feet below the HTL to construct a 4.5 feet wide by 10 feet long retaining wall bulkhead; All work would be performed in accordance with the enclosed plan (sheets 1-2), dated 7-20-2018. The project site is located within Section 35, T. 40 S., R. 65 E., Copper River Meridian; USGS Quad Map Juneau B-2; Latitude 58.356436º N., Longitude 134.646890º W.; USS 1547, TR 1A; 1676 Fritz Cove Road; in Juneau, Alaska. Please contact Randal Vigil at (907) 790-4491, or by email at Randal.P.Vigil@usace.army.mil if further information is desired concerning this notice.
Mr. Jim Erickson, 1676 Fritz Cove Road, Juneau, AK 99801, states that the project purpose is to “replace an old and deteriorated private moorage facility with a safe, more accessible and secure dock for the resident owner”. Work being proposed includes: 1. Remove from below MHW an existing 10 foot wide by 36 foot long timber approach, 30 foot long aluminum gangway, 135 linear feet of sectional hinged beach floats, and a 10 foot wide by 40 foot wide mooring float and six timber piles. 2. Install below MHW a 107 foot long (over two spans of 67 feet and 40 feet in length) elevated aluminum truss approach structure on two bents, each bent supported by two 10.75-inch diameter steel piles with a total of four steel support piles with minimum of 15 feet of embedment; 3. Install below MHW one new 20 foot wide by 60 foot long timber decked, pile-supported (two each 24-inch diameter) float on poly pipe pontoons connected to a six foot wide by 60 foot long steel gangway. The float would be outfitted with domestic water and shore power. Piles would be driven to depth with a vibratory hammer; 4. Place 0.58 cubic yards of concrete and 0.29 cubic yards of clean rock armor rock side slope fill material into 52.2 square feet below the HTL to construct a 4.5 feet wide by 10 feet long retaining wall bulkhead; All work would be performed in accordance with the enclosed plan (sheets 1-2), dated 7-20-2018. The project site is located within Section 35, T. 40 S., R. 65 E., Copper River Meridian; USGS Quad Map Juneau B-2; Latitude 58.356436º N., Longitude 134.646890º W.; USS 1547, TR 1A; 1676 Fritz Cove Road; in Juneau, Alaska. Please contact Randal Vigil at (907) 790-4491, or by email at Randal.P.Vigil@usace.army.mil if further information is desired concerning this notice.
POA-2018-00276, Auke Bay_PN and Plans