The City of Huron requests Department of the Army authorization to construct a rock ramp. This project will impact 120 linear feet of river. The basic purpose of the project is to reduce a drowning hazard. The overall purpose of the project is to reduce the drowning hazard downstream of the Third Street Dam in Huron

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The City of Huron requests Department of the Army authorization to construct a rock ramp. This project will impact 120 linear feet of river. The basic purpose of the project is to reduce a drowning hazard. The overall purpose of the project is to reduce the drowning hazard downstream of the Third Street Dam in Huron, South Dakota.

The City of Huron requests Department of the Army authorization to construct a rock ramp. This project will impact 120 linear feet of river. The basic purpose of the project is to reduce a drowning hazard. The overall purpose of the project is to reduce the drowning hazard downstream of the Third Street Dam in Huron, South Dakota.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas