LETTER OF PERMISSION: The City of Plymouth is proposing a project that involves stabilization of an existing channel that is being done in conjunction with the Kilmer Park Street reconstruction project.
PROJECT DESCRIPTION AND PURPOSE: The City of Plymouth is proposing a project that involves stabilization of an existing channel that is being done in conjunction with the Kilmer Park Street reconstruction project.
Information for File # MVP-2018-00701-MMJ; Kilmer Park
Improvement Project
Applicant: City of Plymouth
Corps Contact: Melissa Jenny
Address: 180 East 5th Street East, Suite 700, St. Paul, Minnesota 55101-1678
E-Mail: melissa.m.jenny@usace.army.mil
Phone: (651) 290-5363
Primary County: Hennepin
Section: 24
Township: 118 North
Range: 22 West
Information Complete On: June 22, 2018
Posting Expires On: August 23, 2018
Authorization Type: LOP-05-MN
This application is being reviewed in accordance with the practices for documenting Corps
jurisdiction under Sections 9 & 10 of the Rivers and Harbors Act of 1899 and Section 404 of the
Clean Water Act identified in Regulatory Guidance Letter 16-01.
Project
PROJECT DESCRIPTION AND PURPOSE: The City of Plymouth is proposing a project that
involves stabilization of an existing channel that is being done in conjunction with the Kilmer
Park Street reconstruction project. The channel flows through neighborhoods as well as Kilmer
Park. The channel has abrupt steep slopes that are actively eroding. The project would occur at
two separate locations. The southern portion of the project involves reshaping the slopes along
1,557 linear feet of the channel and in some cases increasing the channel depth and bottom
width to improve conveyance capacity. The reshaping of the slopes would create laidback
banks with gentle slopes. The proposed channel slopes would be seeded with a native riparian
seed mix except in a small area where rip rap would be placed within the channel
(approximately 100 linear feet) where homes are very close to the channel and sloping with
native vegetation alone is not adequate to protect the adjacent structures. The northern portion
of the project would involve filling 611 linear feet of existing channel and rerouting hydrology
flowing through this area into storm water infrastructure. The filled channel would be converted
to a grass swale feature.
NAME, AREA AND TYPES OF WATERS (INCLUDING WETLANDS) SUBJECT TO LOSS: The
bank stabilization activities within the southern portion of the project site would result in the
discharge of dredged material along approximately 1,557 linear feet (into 5,761 square feet)
below the ordinary high water mark (OHWM) of the channel, and the discharge of dredged
material into approximately 0.10 acre of wetland abutting the existing channel. See the enclosed
figures labeled 2018-00701-MMJ, Posting Figures 12-14 for images of existing conditions for
this portion of the project. Channel filling activities within the northern portion of the project site
would result in the discharge of fill material along approximately 611 linear feet (into 1,307
square feet) below the OHWM of the channel, and grading work impacting an additional 0.01
acre of wetland abutting the channel. See the enclosed figures labeled 2018-00701-MMJ,
Posting Figure 15 for images of existing conditions for this portion of the project.
Page 1 of 2
ALTERNATIVES CONSIDERED: The applicant considered the following alternatives: The no
build alternative would eliminate water resource impacts but would result in an unstable channel
that has the potential to impact infrastructure and would continue contributing unnatural
sediment loads and the resulting nutrients sediments carry to Medicine Lake.
Riprap Stabilization Option: Most of the channel slopes are being stabilized by a combination of
reshaping to a flatter slope and seeding with native riparian seed mix (State Mix 34-261) and
installation of an erosion control blanket. There is a small section (approximately 100 linear feet)
where existing homes require the use of riprap. Steeper slopes could be maintained in other
sections of the channel and potentially wetlands protected if riprap was used to stabilize the
slopes along the entire channel; however, the use of riprap in place of native vegetation would
result in an overall project that has less habitat values than what is proposed.
COMPENSATORY MITIGATION: The applicant has proposed to compensate for the
unavoidable wetland impacts associated with this project (0.11 acre) at a 2:1 ratio via
withdrawal of 0.2200 wetland credit from a Corps approved wetland bank within Bank Service
Area 7, which is the same major watershed as the impact site.
Drawings: See attached, labeled as 2018-00701-MMJ Posting Figures 1-15
Page 2 of 2
V:\1937\Active\193706061\03_data\gis_cad\gis\mxds\fig1_location_kilmer_park.mxd
Revised: 2018-04-17 By: safoster
2018-00701-MMJ Posting Figure 1
252
T
S
MW Supplement
169
¤
£
55
T
S
101
S
T
NE / NC
Supplement
152
T
S
Hennepin
278
T
S
100
T
S
12
£
¤
Notes
1. Coordinate System: NAD 1983 StatePlane Minnesota
South FIPS 2203 Feet
2. Data Sources Include: Stantec, City of Plymouth, USGS,
NADS
3. Background: World Street Map
Disclaimer: Stantec assumes no responsibility for data
supplied in electronic format. The recipient accepts full
responsibility for verifying the accuracy and completeness
of the data. The recipient releases Stantec, its officers,
employees, consultants and agents, from any and all claims
arising in any way from the content or prov ision of the data.
Legend
Project Boundary
Figure No.
1
Title
Project Location
Client/Project
City of Plymouth
Kilmer Park Street Reconstruction Project
Wetland/Water Resource Permit Application
Project Location
T118N, R22W, S24,
C. of Plymouth,
Hennepin Co., MN
0
1,000
193706061
Prepared by SF on 2018-04-10
Technical Review by JM on 2018-04-10
Independent Review by MP on 2018-04-17
2,000
Feet
1:24,000 (at original document size of 8.5x11)
¯
(
$ $
Page 1 of 1
2
93
0
928
926
936
Ba s
set
t
H - 1u
ST-1
2
H
(
!
92
##
*
*
G
(
!
!
(
G - 1w
934
92
4
924
0
924
930
T118N, R22W, S24
T118N, R21W, S19
932
934
Lancas ter Ln N
92
924
93
934
930
G - 1u
928
93
4
6
ST-1
F - 1u
F - 1w
B - 1u
916
(
!
B
E - 1w
( !
!
(
*
#
*
#
A
91
8
920
922
924
6
916
938
C - 1u
C - 1w
D - 1u
( !
!
(
8
912
C
91
D
(
!
922
93
6
924
92
Kilmer Ln N
944
169
£
¤
E
2
946
924
A - 1u
A - 1w 27Th
Ave N
93
942
920
*
* #
#
940
948
950
8
6
4
(
!
(
!
91
93
(
!
*
##
*
91
F
ST-1
920
92
924
916
922
91
2
*
#
914
V:\1937\Active\193706061\03_data\gis_cad\gis\mxds\fig5_fcd_193706061.mxd
Revised: 2018-05-01 By: safoster
2018-00701-MMJ Posting Figure 2
924
101
S
T
MW Supplement
Legend
Project Location
Hennepin
100
T
S
169
¤
£
55
T
S
Notes
1. Coordinate System: NAD 1983 StatePlane Minnesota
South FIPS 2203 Feet
2. Data Sources Include: Stantec, City of Plymouth, NADS,
USGS, MnGeo
3. Orthophotography: NAIP 2017
Disclaimer: Stantec assumes no responsibility for data
supplied in electronic format. The recipient accepts full
responsibility for verifying the accuracy and completeness
of the data. The recipient releases Stantec, its officers,
employees, consultants and agents, from any and all claims
arising in any way from the content or prov ision of the data.
*
#
(
!
Culvert
Sample Point
Field Delineated Wetland
Field Delienated Waterway
2ft Elevation Contour
National Hydrography Dataset (NHD)
Perennial Stream
Intermittent Stream
924
Figure No.
2
Title
Existing Condtions
Client/Project
City of Plymouth
Kilmer Park Street Reconstruction Project
Wetland/Water Resource Permit
Project Location
T118N, R22W, S24,
C. of Plymouth,
Hennepin Co., MN
0
193706061
Prepared by SF on 2018-04-10
Technical Review by JM on 2018-04-10
Independent Review by MP on 2018-05-01
75
150
Feet
1:1,800 (at original document size of 8.5x11)
¯
(
$ $
Waterbody
Page 1 of 1
Highway 169 N
948
936
934
6
94
4
934
936
942
932
ST-2
*
#
*
#
#
*
*
#
93
930
8
936
eN
28 Th Av
0
932
926
93
924
928
*
#
940
930
B as s
e tt C
*
#
ree k
*
#
92
4
1U I
922
924
4
934
932
920
1W
924
Kilmer Ln N
( !
!
(
922
93
91
8
924
92
0
920
V:\1937\Active\193706061\03_data\gis_cad\gis\mxds\fig5_fcd_193706061_V2.mxd
938
94
Revised: 2018-05-30 By: mporzky
2018-00701-MMJ Posting Figure 3
918
101
S
T
MW Supplement
Wetland Investigation Limit
Hennepin
55
T
S
Legend
100
T
S
169
£
¤
Notes
1. Coordinate System: NAD 1983 StatePlane Minnesota
South FIPS 2203 Feet
2. Data Sources Include: Stantec, City of Plymouth, NADS,
USGS, MnGeo
3. Orthophotography: NAIP 2017
Disclaimer: Stantec assumes no responsibility for data
supplied in electronic format. The recipient accepts full
responsibility for verifying the accuracy and completeness
of the data. The recipient releases Stantec, its officers,
employees, consultants and agents, from any and all claims
arising in any way from the content or prov ision of the data.
*
#
(
!
Culvert
Sample Point
Field Delineated Wetland
Field Delineated Waterway
2ft Elevation Contour
National Hydrography Dataset
Perennial Stream
Intermittent Stream
Figure No.
2a
Title
Existing Conditions
Client/Project
City of Plymouth
Kilmer Park Street Reconstruction Project
Wetland Delineation
Project Location
T118N, R22W, S24,
C. of Plymouth,
Hennepin Co., MN
0
193706061
Prepared by mmp on 2018-05-30
Technical Review by xx on 2018-05-30
Independent Review by MCP on 2018-05-30
50
100
Feet
1:1,200 (at original document size of 8.5x11)
¯
(
$ $
Waterbody
Page 1 of 1
2018-00701-MMJ Posting Figure 4
Wetland B: Convert Wetland to
Channel (See Attachment A&B)
Impact: 0.02 Ac.
Wetland F: Convert
Wetland to Channel
(See Attachment
A&B)
Impact: 0.005 Ac.
SEE FIGURE 3a
FOR NORTHERLY
CHANNEL &
WETLANDS
Wetland C:
Channel Excavation
Wetland Drained
(See Attachment A&B)
Impact: 0.02 Ac.
Wetland A: Convert
Wetland to Channel
(See Attachment
A&B)
Impact: 0.02 Ac.
Wetland E: Convert
Wetland to Channel
(See Attachment
A&B)
Impact: 0.006 Ac.
Minor Channel
Excavation
Wetlands
Maintained (See
Attachment A&B)
Stream impacts:
1,557 linear feet
(5,761 sf)
LEGEND
N
Plot Date: 06/21/2018 - 7:33pm
Drawing name: V:\1937\active\193706061\03_data\gis_cad\cad\dwg\KilmerBase.dwg
Xrefs:, 193706061_Wetlands, kilmer_park_field_data_20180620
Wetland D:
Channel Excavation
Wetland Drained
(See Attachment A&B)
Impact: 0.03 Ac.
CUT
0
FILL
WETLAND
WATERWAY
CUT/FILL IMPACTS
WETLAND IMPACT: 0.10 AC
WATERWAY IMPACT: 1,557 LF (.13 AC)
WETLAND AND WATERWAY IMPACTS
CITY OF PLYMOUTH
FIGURE 3
KILMER PARK STREET RECONSTRUCTION PROJECT
DATE: 06/21/2018
PROJ. NO.: 193706061
2335 Highway 36 W
St. Paul, MN 55113
www.stantec.com
30'
60'
2018-00701-MMJ Posting Figure 5
CHANNEL TO
BE FILLED
CHANNEL TO
BE FILLED
SEE FIGURE 3
FOR SOUTHERLY
CHANNEL &
WETLANDS
LEGEND
CUT
Wetland I: Wetland
to be filled.
Impact: 0.007 Ac.
Stream impacts:
611 lf (1,307 sf)
FILL
WATERWAY
N
Plot Date: 06/21/2018 - 7:31pm
Drawing name: V:\1937\active\193706061\03_data\gis_cad\cad\dwg\KilmerBase.dwg
Xrefs:, 193706061_Wetlands, kilmer_park_field_data_20180620
WETLAND
CUT/FILL IMPACTS
WETLAND IMPACT: 0.007 AC
WATERWAY IMPACT: 611 LF (.03 AC)
0
30'
60'
WETLAND AND WATERWAY IMPACTS
CITY OF PLYMOUTH
FIGURE 3a
KILMER PARK STREET RECONSTRUCTION PROJECT
DATE: 06/21/2018
PROJ. NO.: 193706061
2335 Highway 36 W
St. Paul, MN 55113
www.stantec.com
2018-00701-MMJ Posting Figure 6
2018-00701-MMJ Posting Figure 7
2018-00701-MMJ Posting Figure 8
2018-00701-MMJ Posting Figure 9
2018-00701-MMJ Posting Figure 10
2018-00701-MMJ Posting Figure 11
2018-00701-MMJ Posting Figure 12
BWSR Forms 7-1-10
Page 25 of 34
2018-00701-MMJ Posting Figure 13
BWSR Forms 7-1-10
Page 26 of 34
2018-00701-MMJ Posting Figure 14
BWSR Forms 7-1-10
Page 27 of 34
2018-00701-MMJ Posting Figure 15
Photo 1.
Wetland I, sample points 1W and 1U,
view southeast
Photo 2.
Wetland I, view west
Photo 3.
southeast
Wetland I (north side of creek), view
Photo 4.
Unnamed channel, view northwest
Photo 5.
Unnamed channel, view west
Photo 6.
Unnamed channel, general view west