ISSUANCE OF PROGRAMMATIC GENERAL PERMIT 18-PGP-01 AUTHORIZING MINOR STRUCTURES, FILL AND WORK IN TENNESSEE VALEY AUTHORITY RESERVOIRS WITHIN THE STATES OF ALABAMA, KENTUCKY, MISSISSIPPI, TENNESSEE & VIRGINIA
Public Notice No. 18-32
Nashville District
Date: August 15, 2018
Please address all comments to:Nashville District Corps of Engineers
Regulatory Division (Attn: Aurora Scott),
3701 Bell Road, Nashville, TN 37214
ISSUANCE OF PROGRAMMATIC GENERAL PERMIT 18-PGP-01 AUTHORIZING MINOR STRUCTURES, FILL AND WORK IN TENNESSEE VALEY AUTHORITY RESERVOIRS
WITHIN THE STATES OF ALABAMA, KENTUCKY, MISSISSIPPI, TENNESSEE & VIRGINIA
CORRECTION NOTICE: This updated public notice for 18-PGP-01 removes Chickamauga Lake from table 1.3, “Reservoir Locations That Do Not Require PCN.” For a list or reservoir locations that require pre-construction notification, see Table 1.2 in the attached 18-PGP-01 permit document.
TO ALL CONCERNED: The Nashville District, U.S. Army Corps of Engineers (Corps) has issued Programmatic General Permit 18-01 (18-PGP-01) for a period of five (5) years to authorize minor structures, fill and work in Tennessee Valley Authority (TVA) reservoirs within the States of Alabama, Mississippi and Tennessee and the Commonwealths of Kentucky and Virginia.
Programmatic general permits are issued by the Corps to avoid unnecessary duplication of regulatory control over activities regulated by another Federal, state or local agency. Activities authorized by 18-PGP-01 cause only minimal individual and cumulative environmental impacts (33 C.F.R. §§ 322.2(f)(2), 323.2(h)(2) and 325.2(e)(2)). Work authorized under 18-PGP-01 would be performed in the locations referred to in Table 1.1:
Table 1.1
TVA manages shoreline construction activities along or in these reservoirs under Section 26a of the TVA Act (16 U.S.C. §§ 831, et seq., as amended). Prior toconducting work under the
authority of 18-PGP-01, a Section 26a permit must be issued by TVA. For actions that do not require pre-construction notification to the Corps, when TVA completes review of a proposal and issues a Section 26a permit for a structure, fill or work listed in 18-PGP-01, the activity is thereby
verified by the Corps to be authorized by 18-PGP-01. Neither the permittee nor TVA are
required to coordinate further with the Corps to confirm that activities authorized by a TVA 26a permit that do not require pre-construction notification to the Corps are also authorized by the Corps pursuant to 18-PGP-01.
General Permits may be issued for a category or categories of activities when: (1) those activities are substantially similar in nature and cause only minimal individual and cumulative environmental impacts; or (2) the General Permit would result in avoiding unnecessary duplication of the regulatory control exercised by another Federal, State, or local agency, provided it has been determined that the environmental consequences of the action are individually and cumulatively minimal. The final decision regarding a determination that the
proposed activity complies with the requirements for issuance of General Permits was made in the Environmental Assessment for the issuance of 18-PGP-01. The Environmental Assessment for
18-PGP-01 is available for inspection at the offices of the Nashville District's Regulatory Division at 3701 Bell Road, Nashville, Tennessee 37214.
Tammy R. Turley
Chief, Regulatory Division
U.S. Army Corps of Engineers
Enclosure – 18-PGP-01
TVA Managed Reservoir Locations
Beech River Projects
Guntersville Lake
Tellico Lake
Boone Lake
Kentucky Lake
Tims Ford Lake
Cedar Creek Lake
Little Bear Creek Lake
Upper Bear Creek Lake
Cherokee Lake
Melton Hill Lake
Watauga Lake
Chickamauga Lake
Nickajack Lake
Watts Bar Lake
Douglas Lake
Norris Lake
Wheeler Lake
Ft. Loudoun Lake
Pickwick Lake
Wilson Lake
Ft. Patrick Henry Lake
South Holston Lake