The Los Angeles District of the U.S. Army Corps of Engineers (Corps) conducted an engineering review of the Glendale Narrows section of the LAR in 2016 to assess the flood conveyance capacity in anticipation of large rainfall associated with the predicted El Nino season.
U.S. ARMY CORPS OF ENGINEERS, LOS ANGELES DISTRICT
ISSUES A PUBLIC NOTICE
The Los Angeles District of the U.S. Army Corps of Engineers (Corps) conducted an engineering review of the Glendale Narrows section of the LAR in 2016 to assess the flood conveyance capacity in anticipation of large rainfall associated with the predicted El Nino season. The evaluation identified Reach 5A, 5B, 5C and 6A of the Glendale Narrows which extends from Los Feliz Blvd to 900 feet south of the Glendale 2 Freeway as critical areas for restoring conveyance capacity. The design capacity in these critical areas is a 51-year storm event or 78,000 cubic foot per second (cfs). The existing channel capacity due to vegetation and accumulated material is approximately a 7-year storm event (43,500 cfs). Of the three reaches, Reach 5C and the upper section of Reach 6A has the largest deposit of accumulated material due to a bend in the river which causes sandbars to form against the left bank. In total, the sandbars contain approximately 40,000 cy of material. The material consists of approximately 65% cobbles and boulders (rock sizes greater than 3 inches in diameter) and 33% sub-cobbles and fines. Removal of this sediment would increase conveyance to approximately a 15-year storm event capacity (54,000 cfs) within this section of the LAR.
This document serves to notify interested parties of the Corps’ intent to complete an Environmental Assessment (EA) and, if warranted, a Finding of No Significant Impact (FONSI), in compliance with the National Environmental Policy Act (NEPA), to provide an assessment of potential impacts within the proposed project area. The public notice will be available until August 30, 2018, after which a Final EA and FONSI will be completed.
The Corps of Engineers is soliciting comments from the public; Federal, state, and local agencies and officials; and other interested parties in order to consider and evaluate the impacts of this proposed project.
Comments will be accepted through August 30, 2018. Comments may be submitted electronically to eric.l.nguyen@usace.army.mil.
PUBLIC NOTICE
U.S. ARMY CORPS OF ENGINEERS
Los Angeles District
BUILDING STRONG®
Public Notice: SPL-2018-00001-ELN
Project: Los Angeles River Reach 5C and 6A Sediment Removal Project
Comment Period: August 15, 2018 through August 30, 2018
Project Manager: Eric Nguyen; 213-452-3288; eric.l.nguyen@usace.army.mil
Location
The Proposed Project Area is located within a 2000 foot long section of the Los Angeles River (LAR) in
Reaches 5C and 6A of the Los Angeles County Drainage Area (LACDA) flood risk management project,
extending downstream of the Fletcher Drive bridge to approximately 900 feet downstream of the Glendale
Freeway, in the city of Los Angeles, Los Angeles County, California. The Proposed Project Area occurs
within an area referred to as the Glendale Narrows, which is an approximately 6.2-mile-long, soft bottom
section of the LAR between Griffith Park and downtown Los Angeles starts. (See Figure 1)
Activity
Approximately 40,000 cubic yards (cy) of accumulated material from the proposed project area would be
removed to the design elevation of the channel invert across the entire width of the channel. The design
elevation for the channel invert is the top of the toe. The depth of sediment to be removed ranges from 2 to
8 feet. Clean excavated material would be transported and disposed at a Corps-owned sediment
placement site downstream of Lopez Dam. Lopez Dam is located near the city of San Fernando, on the
Pacoima Wash, in the north-central part of San Fernando Valley, Los Angeles County, California. There
would be no structural alterations or modifications of structural element of the engineered channel.
Background
The Los Angeles District of the U.S. Army Corps of Engineers (Corps) conducted an engineering review of
the Glendale Narrows section of the LAR in 2016 to assess the flood conveyance capacity in anticipation of
large rainfall associated with the predicted El Nino season. The evaluation identified Reach 5A, 5B, 5C
and 6A of the Glendale Narrows which extends from Los Feliz Blvd to 900 feet south of the Glendale 2
Freeway as critical areas for restoring conveyance capacity. The design capacity in these critical areas is
a 51-year storm event or 78,000 cubic foot per second (cfs). The existing channel capacity due to
vegetation and accumulated material is approximately a 7-year storm event (43,500 cfs). Of the three
reaches, Reach 5C and the upper section of Reach 6A has the largest deposit of accumulated material due
to a bend in the river which causes sandbars to form against the left bank. In total, the sandbars contain
approximately 40,000 cy of material. The material consists of approximately 65% cobbles and boulders
(rock sizes greater than 3 inches in diameter) and 33% sub-cobbles and fines. Removal of this sediment
would increase conveyance to approximately a 15-year storm event capacity (54,000 cfs) within this
section of the LAR.
Purpose and Need
The LAR channel is a flood risk minimization structure. The accumulated material reduces the flood risk
minimization benefits of the LAR through Reaches 5C and 6A. The purposed of the Proposed Action is to
partially restore lost conveyance capacity and restore flood risk minimization benefits.
Alternatives
No Action Alternative: Under the No Action Alternative, accumulated material from the Proposed Project
Area would not be removed. The accumulated material would continue to remain within the channel and
the design conveyance capacity would not be partially restored.
Proposed Alternative: Under the Proposed Alternative, approximately 40,000 cy of accumulated material
from Reach 5C and a portion of Reach 6A would be removed to the design elevation of the channel invert
to partially restore diminished flood conveyance capacity through this section of the LAR. The depth of
sediment to be removed ranges from 2 to 8 feet. Clean excavated material would be disposed at a Corpsowned sediment placement site downstream of Lopez Dam. There would be no structural alterations or
modifications of structural elements of the engineered channel.
Trucking Routes: From San Fernando Road, trucks would proceed in a southwesterly direction via
Metrolink road into Taylor Yard. Once past the railway trestle bridge, vehicles would proceed in a
northwesterly direction along a paved access road that is parallel to the railway track heading towards the
Bowtie Parcel. From the Bowtie Parcel, trucks would transition onto the existing access road atop the left
embankment then enter the channel via temporary access ramp. Loaded trucks would exit the channel
using a second temporary access ramp and turn around in an open space area near the onramp to the
Glendale Freeway off Fletcher Drive. Exiting trucks would proceed in the opposite direction via the same
route through Bowtie Parcel and Taylor Yard onto San Fernando Road. Trucks would proceed northbound
on San Fernando Road and proceed onto the Glendale Freeway. See Figure 2.
Channel Access: Two 120 foot long by 15 foot wide by 2 foot high temporary access ramp constructed
from crushed miscellaneous base would be constructed into the channel on the left embankment. The
ramps would be constructed from a combination of broken stone, crushed gravel, natural rough surfaced
gravel, and sand (approximately 1,000 cy). To minimize turbidity, fiber rolls and or sand bags would be
installed below the ramp during its construction and removal; furthermore, the downslope face would be
armored with grout (approximately 10 cy). Approximately 50 cy of fill and 3.33 cy of grout would be
temporarily discharged into Waters of the U.S. for each ramp.
Dewatering: Dewatering structures such as k-rails or rubber dams would be temporarily placed on the
existing concrete sill at the upstream terminus just below Fletcher Drive crossing to redirect flows along the
right embankment. Fill material required to seal dewatering structures would be either a grout material or
visquin and sand bags.
Non-native Vegetation: Non-native, invasive vegetation would be removed. A biological monitor will be
on-site during all construction activities to insure vegetation removal proceeds accordingly. Species of
non-native vegetation that are not considered invasive according to the California Invasive Plant Council
(but potentially provide important on-site benefits) will be retained as appropriate.
Riparian Zone Preservation Area: Approximately 1.5 acres of contiguous native vegetation with complex
vertical structure (i.e., a matrix of mature trees with understory of differing heights and densities) along the
right bank would be excluded from the construction footprint. The vegetation would be protected by a 10foot radius buffer. The outer edge of the earthen buffer would be stabilized with a 2:1 (horizontal:vertical)
lope. See Figure 1.
Native Species Preservation Area: In-channel, native vegetation located adjacent to the left bank would
be excluded from the construction footprint. See Figure 1.
Upland Native Species Preservation Area: Native vegetation atop the left embankment would be
excluded from the construction footprint. See Figure 1.
Endangered Species: Preliminary determinations indicate the proposed activity has a no effect to a
federally-listed endangered or threatened species, specifically the endangered least Bell's vireo (Vireo bellii
pusillus). Observation was documented in Reach 6 near Taylor Yard during a one-day nesting bird survey
of the area, however, this area is locate outside of the proposed project area. However, protocol level
surveys from 2017 did not detect presence of vireo on-site. No critical habitat is present on-site and no
critical habitat would be affected.
Cultural Resources
The proposed activity entails excavation of accumulated alluvial deposits from the channel to partially
restore the original design capacity. However, no material would be excavated below the top of the
cobblestone invert repaired in 1956. Two temporary access ramps would be constructed of crushed base
to provide access to the channel invert. These ramps would be removed at the end of the project, so there
would be no permanent alteration of the channel wall. Thus, no alterations or modifications will be made to
any surviving portions of the historic constructed channel. Further, no alteration would be made to Fletcher
Drive Bridge by the proposed project. The access road is an existing road with a built up DG roadbed
constructed to provide access along the channel. Vehicular use of this road is a regular and routine activity
and would be restricted to the existing constructed roadbed. All ground disturbing activities would be
limited to recent alluvium or imported and disturbed soils. No native soil would be disturbed. No actions
are proposed that would alter the historic channel or Fletcher Bridge. Thus, the project would have no
potential to result in changes to the character or use of an historic property, nor diminish the integrity of the
location, design, setting, materials, workmanship, feeling, or association.
Coordination
California Regional Water Quality Control Board
In the interest of mutual cooperation, the Regional Water Board and the District has developed a
Memorandum of Understanding to coordinate the respective regulatory processes associated with the
District's Los Angeles County Drainage Area Operations, Maintenance, Repair, Rehabilitation, and
Replacement activities in waters of the United States.
City of Los Angeles
Request for right-of-entry permit, Taylor Yard G2 Parcel
City of Los Angeles, Department of Water and Power
Request for right-of-entry permit, Parcel (5442002903)
State of California, Department of Parks and Recreation
Request for right-of-entry permit, Bowtie Parcel
Additional Project Information
Flood events that occurred between 1914 and 1934 were some of the most economically devastating
floods the Los Angeles area historically experienced. These flood events prompted the Federal
Government to allocate funds in the Flood Control Act of 1936 to assist Los Angeles County in developing
and expanding flood control infrastructure, including channelizing 52 miles of the LAR. Construction of the
channel occurred between 1936 and 1959. The flood control channel is owned by Los Angeles County,
City of Los Angeles, and private land owners. In 1940, the Corps entered into an agreement with Los
Angeles County to operate and maintain the portion of the channel from Lankershim Boulevard to Stuart
and Grey Road which equates to 22.5 miles of the LAR channel. The Corps' maintenance area consists of
two different channel styles: rectangular or trapezoidal concrete/grouted stone with a low flow channel, and
a trapezoidal soft bottom channel with grouted stone/concrete levees. The soft bottom portion of the
channel is locally known as the Glendale Narrows, starting 1,400 feet North of Riverside Drive Bridge and
ending at Idell Street. Within the area known as Glendale Narrows, there are 6.43 miles or 124.50 +/acres of stabilized soft bottom structure.
Originally devoid of vegetation and sediment subsequent to completion of construction in 1959, the project
reach was periodically cleared of vegetation and sediment by the Corps until the 1980s. Once vegetation
management and sediment removal activities stopped, the Glendale Narrows area built up sediment
shoaling which gradually became vegetated. Vegetation within the river channel can inhibit the channel's
capacity to convey floodwaters. The channel is designed to be maintained free of vegetation to avoid
impacts to flood conveyance and channel structures. However, lack of funds for maintenance has resulted
in substantial vegetation growing within the channel. Due to limited funds available to maintain vegetation
in the channel, the Corps has focused on removing non-native vegetation using both herbicide and
mechanical means. Non-native plants often out-compete natives, degrading the ecological vitality and
productivity of native habitats. The most prevalent non-native invasive plant is giant reed (Arundo
donax). It spreads quickly, has little habitat value, and contributes to fire hazards through fuel
loading. Dominant native vegetation includes mulefat (Baccharis salicifolia) and willow species (Salix sp.).
Comments
The Corps of Engineers is soliciting comments from the public; Federal, state, and local agencies and
officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this
proposed activity. Comments are used in the completion of an Environmental Assessment pursuant to the
National Environmental Policy Act.
Comments should be sent electronically to: eric.l.nguyen@usace.army.mil
Comments may be mailed to:
DEPARTMENT OF THE ARMY
LOS ANGELES DISTRICT, U.S. ARMY CORPS OF ENGINEERS
OPERATIONS DIVISION
ATTN: ERIC NGUYEN
915 WILSHIRE BLVD STE 930
LOS ANGELES, CALIFORNIA 90017
Upland Native Species Preservation Area
Native Species Preservation Area
Legend
Native Species Preservation Area
Sediment Removal Area
Riparian Zone Preservation Area
Riparian Zone Preservation Area
0
75
150
300
Feet
³
LOS ANGELES RIVER
FIGURE 1: PROJECT VICINITY
MAP
U.S. ARMY CORPS OF ENGINEERS
LOS ANGELES DISTRICT
Loading Area
Legend
Access Ramp
Route 3
LACDA Right of Way
20' Sewer Easement
Loading Area
Sediment Removal Area
0
212.5 425
850
Feet
³
LOS ANGELES RIVER
FIGURE 2: HAUL ROUTE MAP
U.S. ARMY CORPS OF ENGINEERS
LOS ANGELES DISTRICT