The Los Angeles District of the U.S. Army Corps of Engineers (Corps) conducted an engineering review of the Glendale Narrows section of the LAR in 2016 to assess the flood conveyance capacity in anticipation of large rainfall associated with the predicted El Nino season.

U.S. ARMY CORPS OF ENGINEERS, LOS ANGELES DISTRICT ISSUES A PUBLIC NOTICE The Los Angeles District of the U.S. Army Corps of Engineers (Corps) conducted an engineering review of the Glendale Narrows section of the LAR in 2016 to assess the flood conveyance capacity in anticipation of large rainfall associated with the predicted El Nino season. The evaluation identified Reach 5A, 5B, 5C and 6A of the Glendale Narrows which extends from Los Feliz Blvd to 900 feet south of the Glendale 2 Freeway as critical areas for restoring conveyance capacity. The design capacity in these critical areas is a 51-year storm event or 78,000 cubic foot per second (cfs). The existing channel capacity due to vegetation and accumulated material is approximately a 7-year storm event (43,500 cfs). Of the three reaches, Reach 5C and the upper section of Reach 6A has the largest deposit of accumulated material due to a bend in the river which causes sandbars to form against the left bank. In total, the sandbars contain approximately 40,000 cy of material. The material consists of approximately 65% cobbles and boulders (rock sizes greater than 3 inches in diameter) and 33% sub-cobbles and fines. Removal of this sediment would increase conveyance to approximately a 15-year storm event capacity (54,000 cfs) within this section of the LAR.

This document serves to notify interested parties of the Corps’ intent to complete an Environmental Assessment (EA) and, if warranted, a Finding of No Significant Impact (FONSI), in compliance with the National Environmental Policy Act (NEPA), to provide an assessment of potential impacts within the proposed project area. The public notice will be available until August 30, 2018, after which a Final EA and FONSI will be completed.

The Corps of Engineers is soliciting comments from the public; Federal, state, and local agencies and officials; and other interested parties in order to consider and evaluate the impacts of this proposed project.

Comments will be accepted through August 30, 2018. Comments may be submitted electronically to eric.l.nguyen@usace.army.mil.

PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS Los Angeles District

BUILDING STRONG®

Public Notice: SPL-2018-00001-ELN Project: Los Angeles River Reach 5C and 6A Sediment Removal Project Comment Period: August 15, 2018 through August 30, 2018 Project Manager: Eric Nguyen; 213-452-3288; eric.l.nguyen@usace.army.mil

Location The Proposed Project Area is located within a 2000 foot long section of the Los Angeles River (LAR) in Reaches 5C and 6A of the Los Angeles County Drainage Area (LACDA) flood risk management project, extending downstream of the Fletcher Drive bridge to approximately 900 feet downstream of the Glendale Freeway, in the city of Los Angeles, Los Angeles County, California. The Proposed Project Area occurs within an area referred to as the Glendale Narrows, which is an approximately 6.2-mile-long, soft bottom section of the LAR between Griffith Park and downtown Los Angeles starts. (See Figure 1)

Activity Approximately 40,000 cubic yards (cy) of accumulated material from the proposed project area would be removed to the design elevation of the channel invert across the entire width of the channel. The design elevation for the channel invert is the top of the toe. The depth of sediment to be removed ranges from 2 to 8 feet. Clean excavated material would be transported and disposed at a Corps-owned sediment placement site downstream of Lopez Dam. Lopez Dam is located near the city of San Fernando, on the Pacoima Wash, in the north-central part of San Fernando Valley, Los Angeles County, California. There would be no structural alterations or modifications of structural element of the engineered channel.

Background The Los Angeles District of the U.S. Army Corps of Engineers (Corps) conducted an engineering review of the Glendale Narrows section of the LAR in 2016 to assess the flood conveyance capacity in anticipation of large rainfall associated with the predicted El Nino season. The evaluation identified Reach 5A, 5B, 5C and 6A of the Glendale Narrows which extends from Los Feliz Blvd to 900 feet south of the Glendale 2 Freeway as critical areas for restoring conveyance capacity. The design capacity in these critical areas is a 51-year storm event or 78,000 cubic foot per second (cfs). The existing channel capacity due to vegetation and accumulated material is approximately a 7-year storm event (43,500 cfs). Of the three reaches, Reach 5C and the upper section of Reach 6A has the largest deposit of accumulated material due to a bend in the river which causes sandbars to form against the left bank. In total, the sandbars contain approximately 40,000 cy of material. The material consists of approximately 65% cobbles and boulders (rock sizes greater than 3 inches in diameter) and 33% sub-cobbles and fines. Removal of this sediment would increase conveyance to approximately a 15-year storm event capacity (54,000 cfs) within this section of the LAR.

Purpose and Need The LAR channel is a flood risk minimization structure. The accumulated material reduces the flood risk minimization benefits of the LAR through Reaches 5C and 6A. The purposed of the Proposed Action is to partially restore lost conveyance capacity and restore flood risk minimization benefits.

Alternatives No Action Alternative: Under the No Action Alternative, accumulated material from the Proposed Project Area would not be removed. The accumulated material would continue to remain within the channel and the design conveyance capacity would not be partially restored. Proposed Alternative: Under the Proposed Alternative, approximately 40,000 cy of accumulated material from Reach 5C and a portion of Reach 6A would be removed to the design elevation of the channel invert to partially restore diminished flood conveyance capacity through this section of the LAR. The depth of sediment to be removed ranges from 2 to 8 feet. Clean excavated material would be disposed at a Corpsowned sediment placement site downstream of Lopez Dam. There would be no structural alterations or modifications of structural elements of the engineered channel. Trucking Routes: From San Fernando Road, trucks would proceed in a southwesterly direction via Metrolink road into Taylor Yard. Once past the railway trestle bridge, vehicles would proceed in a northwesterly direction along a paved access road that is parallel to the railway track heading towards the Bowtie Parcel. From the Bowtie Parcel, trucks would transition onto the existing access road atop the left embankment then enter the channel via temporary access ramp. Loaded trucks would exit the channel using a second temporary access ramp and turn around in an open space area near the onramp to the Glendale Freeway off Fletcher Drive. Exiting trucks would proceed in the opposite direction via the same route through Bowtie Parcel and Taylor Yard onto San Fernando Road. Trucks would proceed northbound on San Fernando Road and proceed onto the Glendale Freeway. See Figure 2. Channel Access: Two 120 foot long by 15 foot wide by 2 foot high temporary access ramp constructed from crushed miscellaneous base would be constructed into the channel on the left embankment. The ramps would be constructed from a combination of broken stone, crushed gravel, natural rough surfaced gravel, and sand (approximately 1,000 cy). To minimize turbidity, fiber rolls and or sand bags would be installed below the ramp during its construction and removal; furthermore, the downslope face would be armored with grout (approximately 10 cy). Approximately 50 cy of fill and 3.33 cy of grout would be temporarily discharged into Waters of the U.S. for each ramp. Dewatering: Dewatering structures such as k-rails or rubber dams would be temporarily placed on the existing concrete sill at the upstream terminus just below Fletcher Drive crossing to redirect flows along the right embankment. Fill material required to seal dewatering structures would be either a grout material or visquin and sand bags. Non-native Vegetation: Non-native, invasive vegetation would be removed. A biological monitor will be on-site during all construction activities to insure vegetation removal proceeds accordingly. Species of non-native vegetation that are not considered invasive according to the California Invasive Plant Council (but potentially provide important on-site benefits) will be retained as appropriate. Riparian Zone Preservation Area: Approximately 1.5 acres of contiguous native vegetation with complex vertical structure (i.e., a matrix of mature trees with understory of differing heights and densities) along the right bank would be excluded from the construction footprint. The vegetation would be protected by a 10foot radius buffer. The outer edge of the earthen buffer would be stabilized with a 2:1 (horizontal:vertical) lope. See Figure 1. Native Species Preservation Area: In-channel, native vegetation located adjacent to the left bank would be excluded from the construction footprint. See Figure 1. Upland Native Species Preservation Area: Native vegetation atop the left embankment would be excluded from the construction footprint. See Figure 1. Endangered Species: Preliminary determinations indicate the proposed activity has a no effect to a federally-listed endangered or threatened species, specifically the endangered least Bell's vireo (Vireo bellii pusillus). Observation was documented in Reach 6 near Taylor Yard during a one-day nesting bird survey of the area, however, this area is locate outside of the proposed project area. However, protocol level

surveys from 2017 did not detect presence of vireo on-site. No critical habitat is present on-site and no critical habitat would be affected. Cultural Resources The proposed activity entails excavation of accumulated alluvial deposits from the channel to partially restore the original design capacity. However, no material would be excavated below the top of the cobblestone invert repaired in 1956. Two temporary access ramps would be constructed of crushed base to provide access to the channel invert. These ramps would be removed at the end of the project, so there would be no permanent alteration of the channel wall. Thus, no alterations or modifications will be made to any surviving portions of the historic constructed channel. Further, no alteration would be made to Fletcher Drive Bridge by the proposed project. The access road is an existing road with a built up DG roadbed constructed to provide access along the channel. Vehicular use of this road is a regular and routine activity and would be restricted to the existing constructed roadbed. All ground disturbing activities would be limited to recent alluvium or imported and disturbed soils. No native soil would be disturbed. No actions are proposed that would alter the historic channel or Fletcher Bridge. Thus, the project would have no potential to result in changes to the character or use of an historic property, nor diminish the integrity of the location, design, setting, materials, workmanship, feeling, or association.

Coordination California Regional Water Quality Control Board In the interest of mutual cooperation, the Regional Water Board and the District has developed a Memorandum of Understanding to coordinate the respective regulatory processes associated with the District's Los Angeles County Drainage Area Operations, Maintenance, Repair, Rehabilitation, and Replacement activities in waters of the United States. City of Los Angeles Request for right-of-entry permit, Taylor Yard G2 Parcel City of Los Angeles, Department of Water and Power Request for right-of-entry permit, Parcel (5442002903) State of California, Department of Parks and Recreation Request for right-of-entry permit, Bowtie Parcel

Additional Project Information Flood events that occurred between 1914 and 1934 were some of the most economically devastating floods the Los Angeles area historically experienced. These flood events prompted the Federal Government to allocate funds in the Flood Control Act of 1936 to assist Los Angeles County in developing and expanding flood control infrastructure, including channelizing 52 miles of the LAR. Construction of the channel occurred between 1936 and 1959. The flood control channel is owned by Los Angeles County, City of Los Angeles, and private land owners. In 1940, the Corps entered into an agreement with Los Angeles County to operate and maintain the portion of the channel from Lankershim Boulevard to Stuart and Grey Road which equates to 22.5 miles of the LAR channel. The Corps' maintenance area consists of two different channel styles: rectangular or trapezoidal concrete/grouted stone with a low flow channel, and a trapezoidal soft bottom channel with grouted stone/concrete levees. The soft bottom portion of the channel is locally known as the Glendale Narrows, starting 1,400 feet North of Riverside Drive Bridge and ending at Idell Street. Within the area known as Glendale Narrows, there are 6.43 miles or 124.50 +/acres of stabilized soft bottom structure. Originally devoid of vegetation and sediment subsequent to completion of construction in 1959, the project reach was periodically cleared of vegetation and sediment by the Corps until the 1980s. Once vegetation management and sediment removal activities stopped, the Glendale Narrows area built up sediment shoaling which gradually became vegetated. Vegetation within the river channel can inhibit the channel's capacity to convey floodwaters. The channel is designed to be maintained free of vegetation to avoid impacts to flood conveyance and channel structures. However, lack of funds for maintenance has resulted in substantial vegetation growing within the channel. Due to limited funds available to maintain vegetation

in the channel, the Corps has focused on removing non-native vegetation using both herbicide and mechanical means. Non-native plants often out-compete natives, degrading the ecological vitality and productivity of native habitats. The most prevalent non-native invasive plant is giant reed (Arundo donax). It spreads quickly, has little habitat value, and contributes to fire hazards through fuel loading. Dominant native vegetation includes mulefat (Baccharis salicifolia) and willow species (Salix sp.). Comments The Corps of Engineers is soliciting comments from the public; Federal, state, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Comments are used in the completion of an Environmental Assessment pursuant to the National Environmental Policy Act. Comments should be sent electronically to: eric.l.nguyen@usace.army.mil Comments may be mailed to:

DEPARTMENT OF THE ARMY LOS ANGELES DISTRICT, U.S. ARMY CORPS OF ENGINEERS OPERATIONS DIVISION ATTN: ERIC NGUYEN 915 WILSHIRE BLVD STE 930 LOS ANGELES, CALIFORNIA 90017

Upland Native Species Preservation Area Native Species Preservation Area

Legend

Native Species Preservation Area

Sediment Removal Area

Riparian Zone Preservation Area

Riparian Zone Preservation Area

0

75

150

300 Feet

³

LOS ANGELES RIVER

FIGURE 1: PROJECT VICINITY MAP U.S. ARMY CORPS OF ENGINEERS LOS ANGELES DISTRICT

Loading Area

Legend Access Ramp Route 3 LACDA Right of Way 20' Sewer Easement Loading Area Sediment Removal Area

0

212.5 425

850 Feet

³

LOS ANGELES RIVER

FIGURE 2: HAUL ROUTE MAP

U.S. ARMY CORPS OF ENGINEERS LOS ANGELES DISTRICT

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas