You can copy from here when filling out the rest of the page.
Ms. Catherine Suda stated the following purpose, “Teck American Incorporated holds State of Alaska mining claims in the Aktigiruq and Anarraaq mineral exploration areas. The project purpose is to provide safe year-round overland access and sufficient support facilities to allow a multi-year exploration drilling campaign to assess the technical and economic viability of the Aktigiruq and Anarraaq mineral deposits.” PROPOSED WORK: Teck’s proposed project includes:13.1 miles of gravel road beginning at the Red Dog Mine and connecting to personnel camp facilities; equipment laydown areas; an underground access portal; underground vents; a temporary waste rock storage facility; and material sites. Exploration activities would occur year-round, for an estimated four years. LOCATION: The project site is located within Section 18, T. 31N., R. 18W, Sections 18, 19, 30, 31, T. 32N., R. 18W., Sections 1, 12, 13, T. 31N., R. 19W., Sections 11, 12, 13, 14, 15, 22, 23, 36, T. 32N., R. 19W., Kateel River Meridian; and USGS Quad Map Delong Mountains A-2. Project begins at Red Dog Mine near Kivalina, Alaska. Please contact Janet Post at (907) 753-2831, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at janet.l.post@usace.army.mil if further information is desired concerning this notice.
Ms. Catherine Suda stated the following purpose, “Teck American Incorporated holds State of Alaska mining claims in the Aktigiruq and Anarraaq mineral exploration areas. The project purpose is to provide safe year-round overland access and sufficient support facilities to allow a multi-year exploration drilling campaign to assess the technical and economic viability of the Aktigiruq and Anarraaq mineral deposits.” PROPOSED WORK: Teck’s proposed project includes:13.1 miles of gravel road beginning at the Red Dog Mine and connecting to personnel camp facilities; equipment laydown areas; an underground access portal; underground vents; a temporary waste rock storage facility; and material sites. Exploration activities would occur year-round, for an estimated four years. LOCATION: The project site is located within Section 18, T. 31N., R. 18W, Sections 18, 19, 30, 31, T. 32N., R. 18W., Sections 1, 12, 13, T. 31N., R. 19W., Sections 11, 12, 13, 14, 15, 22, 23, 36, T. 32N., R. 19W., Kateel River Meridian; and USGS Quad Map Delong Mountains A-2. Project begins at Red Dog Mine near Kivalina, Alaska. Please contact Janet Post at (907) 753-2831, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at janet.l.post@usace.army.mil if further information is desired concerning this notice.
POA-2018-00075, Ikalukrok Creek, Public Notice
Draft Environmental Evaluation Document
Anarraaq and Aktigiruq Exploration Program
July 2018
Teck American Incorporated
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
i
This page intentionally left blank
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
ii
TABLE OF CONTENTS
1
2
3
4
PURPOSE AND NEED..........................................................................................................1
1.1
PURPOSE AND NEED.................................................................................................1
1.2
PROJECT LOCATION .................................................................................................2
1.3
AUTHORITY ................................................................................................................2
1.4
SCOPE OF REVIEW ....................................................................................................2
ALTERNATIVES...................................................................................................................4
2.1
ALTERNATIVES DEVELOPMENT ...........................................................................4
2.2
PROPOSED ACTION ...................................................................................................8
2.3
NO ACTION ................................................................................................................11
AFFECTED ENVIRONMENT AND ENVIRONMENTAL CONSEQUENCES ..............12
3.1
NON-ISSUE RESOURCE CATEGORIES .................................................................12
3.2
PHYSICAL AND CHEMICAL ENVIRONMENT ....................................................13
3.3
BIOLOGICAL ENVIRONMENT ...............................................................................19
3.4
SOCIAL AND ECONOMIC ENVIRONMENT .........................................................28
MITIGATON ........................................................................................................................36
4.1
AVOIDANCE, MINIMIZATION, AND MITIGATION ...........................................36
4.2
COMPENSATORY MITIGATION ............................................................................40
5
CUMULATIVE EFFECTS ..................................................................................................41
6
COORDINATION ................................................................................................................42
7
6.1
PUBLIC INVOLVEMENT .........................................................................................43
6.2
AGENCY COORDINATION .....................................................................................45
REFERECES ........................................................................................................................46
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
iii
TABLES
Table 1: Alternatives Evaluation .................................................................................................... 6
Table 2: Non-Issue Resource Categories ...................................................................................... 12
Table 3. Impacts to Waters of the United States ........................................................................... 20
Table 4: Fishery Status of Creeks in the Project Area .................................................................. 26
Table 5: Noatak and Kivalina Socioeconomic Information (U.S. Census Bureau 2010)............. 29
Table 6: Top 10 Noatak Subsistence Resources (ADFG, 2010) .................................................. 31
Table 7: Top 10 Kivalina Subsistence Resources (ADFG, 2010) ................................................ 32
Table 8: Public Involvement ......................................................................................................... 43
Table 9: Agency Coordination ...................................................................................................... 45
FIGURES
Figure 1 ................................................................................................................... Project Location
Figure 2 .................................................................................................. Proposed Action Overview
Figure 3 ................................................................................. Road Alternative Options Considered
Figure 4 ...................................................... Comparison of Wetland Impacts for Road Alternatives
Figure 5 ...................................................................................................... Proposed Action Details
Figure 6 ...............................................................................................................Area Fish Presence
Figure 7 ................................................................................................................... Typical Sections
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
iv
LIST OF ACRONYMS
ADEC............................................................................ Alaska Department of Environmental Conservation
ADFG.................................................................................................. Alaska Department of Fish and Game
ADNR ........................................................................................................ Department of Natural Resources
ANSCA ............................................................................................... Alaska Native Claims Settlement Act
APDES ............................................................................... Alaska Pollutant Discharge Elimination System
APE ........................................................................................................................... Area of Potential Effect
ATV .................................................................................................................................. all-terrain vehicles
AVEC.................................................................................................... Alaska Village Electric Cooperative
BLM ................................................................................................................. Bureau of Land Management
BMP .................................................................................................................... Best Management Practice
CFR .................................................................................................................... Code of Federal Regulation
cy ................................................................................................................................................... cubic yards
DMTS ........................................................................................... Delong Mountain Transportation System
EA ........................................................................................................................ Environmental Assessment
EED .....................................................................................................Environmental Evaluation Document
EFH .............................................................................................................................. Essential Fish Habitat
ft ................................................................................................................................................................ feet
HUC .............................................................................................................................Hydrologic Unit Code
IPaC .................................................................................. Information, Planning, and Consultation System
LEDPA.................................................................Least Environmentally Damaging Practicable Alternative
MBTA ................................................................................................................... Migratory Bird Treaty Act
MSS ............................................................................................................................ Minor Source Specific
MSGP................................................................................................................. Multi Sector General Permit
MT ........................................................................................................................................... million tonnes
N............................................................................................................................................................. North
NAB ...................................................................................................................... Northwest Arctic Borough
NEPA ...................................................................................................... National Environmental Policy Act
NPS .............................................................................................................................. National Park Service
PAG ..............................................................................................................potentially acid generating rock
R ............................................................................................................................................................ Range
RECP ............................................................................................................Rolled Erosion Control Product
SWPPP ................................................................................................ Stormwater Pollution Prevention Plan
T ...................................................................................................................................................... Township
TAI .................................................................................................................... Teck American Incorporated
USACE .......................................................................................................... U.S. Army Corps of Engineers
USFWS ........................................................................................................... US Fish and Wildlife Service
USGS ......................................................................................................................... US Geological Survey
W ............................................................................................................................................................. West
WAH .............................................................................................................................. Western Arctic Herd
WOTUS ........................................................................................................wetlands and waters of the U.S.
WRF ................................................................................................................................ Waste Rock Facility
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
v
1
PURPOSE AND NEED
The purpose of this Environmental Evaluation Document (EED) is to support the U.S. Army Corps of
Engineers' (USACE) environmental assessment (EA) in compliance with the National Environmental
Policy Act (NEPA), per 15 Code of Federal Regulation (CFR) 1508.9. This EED provides the USACE
with "sufficient evidence and analysis for determining whether to prepare an environmental impact
statement or a finding of no significant impact" on an action authorized by the USACE. The EED will
also assist the USACE in completing a 404(b)(1) evaluation, per 40 CFR 230, and guide other agency
officials with jurisdiction in "taking actions that are based on understanding of environmental
consequences, and take actions to protect, restore, and enhance the environment" (15 CFR sections
1500.1(c) and 1508.9(s)(1)).
On May 3, 2018, the USACE, received an application from Teck American Incorporated (TAI) for a
Department of the Army permit to develop the Anarraaq and Aktigiruq Exploration Program. The
USACE will be evaluating the permit application for discharges of fill under Section 404 of the Clean
Water Act. An EA will be used as a basis for a permit decision in compliance with NEPA. This EED
supports the USACE's EA by evaluating environmental consequences for the implementation of actions
proposed by TAI as part of an exploration program at the Anarraaq and Aktigiruq mineral deposits.
1.1
Purpose and Need
Purpose: TAI holds State of Alaska mining claims in the Aktigiruq and Anarraaq mineral exploration
areas. The project purpose is to develop a gravel access road from the end of Fish Weir Access Road to
the Aktigiruq and Anarraaq mineral deposits to provide safe, year-round overland access and sufficient
support facilities for a multi-year exploration drilling campaign to assess the technical and economic
viability of the Aktigiruq and Anarraaq mineral deposits.
Need: A road is needed to support specialized heavy equipment to drive to and from mineral exploration
areas. Initial mineral exploration at Aktigiruq and Anarraaq was previously conducted during summer
months by helicopter-supported operations with portable drill rigs. To define the viability of the deposit,
the project requires a higher density drilling program in order to reach deep deposits that are no longer
practical to reach from the surface during helicopter-supported seasonal campaigns. The only practical
means of completing the definition drilling required is from an underground ramp system that would
allow a year-round program and shorter, more closely spaced drill holes to reach mineral horizons. The
development of an underground ramp system would require the use of specialized heavy equipment that
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
1
would need to be driven to and from the project area, and surface support facilities such as: personnel
camp facilities; equipment laydown areas; an underground access portal; underground vents; and a
temporary exploration waste rock storage facility.
1.2
Project Location
TAI proposes development of exploration access roads and support facilities to safely and practically
continue mineral exploration of the Aktigiruq and Anarraaq mineral deposits, located in Northwest
Alaska, approximately 51 miles (mi) east of Kivalina and 8 mi north of the existing Red Dog Mine
(Figure 1). The proposed exploration project is wholly owned and operated by TAI, a separate legal
entity from Teck Alaska who owns and operates the existing Red Dog Mine.
The project site is located within Section 18, Township (T.) 31 North (N.), Range (R.) 18 West (W.);
Sections 18, 19, 30, 31, T. 32N., R. 18W.; Sections 1, 12, 13, T. 31N., R. 19W.; Sections 11, 12, 13, 14,
15, 22, 23, 36, T. 32N., R. 19W.; Kateel River Meridian; and US Geological Survey (USGS) Quad Map
Delong Mountains A-2. The proposed road terminus is located at Latitude 68.1584; Longitude -162.9603
and the proposed facility area is located at Latitude 68.1795; Longitude -162.9567.
1.3
Authority
Construction of the proposed facilities would require terrain modification and discharge of clean fills.
Due to the abundance of wetlands within the project area, avoiding all discharges into waters of the U.S.
(WOTUS) is not practicable. The WOTUS within the project area are hydrologically connected to the
Chukchi Sea through a surface water connection via the Ikalukrok Creek and Wulik River. Therefore, the
USACE has authority over this action and must determine the Least Environmentally Damaging
Practicable Alternative (LEDPA) to authorize under Section 404 of the Clean Water Act. A Section 404
permit is required for the placement of fill within jurisdictional WOTUS.
1.4
Scope of Review
Scope of Analysis for NEPA: The scope of analysis under NEPA for the proposed project includes all
WOTUS as well as uplands where there is sufficient federal responsibility to warrant USACE review.
For this project, the scope of analysis for NEPA includes all proposed project components as depicted on
Figure 2.
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
2
Scope of Analysis for Section 7 of the Endangered Species Act: The Action Area for compliance with
Section 7 of the Endangered Species Act is not applicable to this project, as no federally recognized
Threatened or Endangered Species occur within the project area (See also Section 3.1, Table 2).
Determination of Permit Area for Section 106 of the National Historic Preservation Act: The
Preliminary Area of Potential Effect (APE) is depicted on Figure 2 and includes areas of direct and
indirect disturbance including the access road, material sites, vent raises, and portal area.
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
3
2
ALTERNATIVES
2.1
Alternatives Development
TAI evaluated the feasibility of several off-site and on-site road route alignments that could provide safe,
year-round overland access, to allow a multi-year advanced exploration campaign. TAI also evaluated
several on-site alternative options for pad and facility siting configurations in order to avoid and minimize
impacts to WOTUS.
This EED provides an alternatives evaluation to assist the USACE in the NEPA and 404(b)(1) evaluation
process. The USACE uses the following framework for alternatives evaluation:
·
"Reasonable" alternatives under NEPA are screened based on: project purpose; common sense;
cost; and technology.
·
"Practicable" alternatives under 404(b)(1) criteria are screened based on: Impacts to WOTUS;
project purpose; logistics; cost, and technology.
TAI evaluated a number of alternatives based on screening criteria developed in consultation with TAI
engineering technical groups, regulatory agencies, and input during 2016 and 2017 site walks with
subsistence users from Noatak and Kivalina. The following screening criteria covers key issues
understood during these preliminary consultations:
·
Safety
·
Geologic hazards
·
Impacts to fish habitat
·
Acres of impact to WOTUS
·
Number of water crossings
·
Impacts to secondary caribou migration trails
·
Impacts within the Wulik River watershed
Route screening for the criteria Acres of impact to WOTUS was completed for Routes 1, 3, and 4 early in
the alternatives development process and was based on a preliminary access road footprint that could be
compared across alternatives. In order to provide a true comparison on impacts across alternate routes, an
estimated 31-foot wide road footprint (19-foot wide, 2-foot fill, 3H:1V toe slope) was used for access
road routes to the facility area (Figure 2). Therefore, acres of impacts noted in alternatives evaluations are
different than those presented in the Proposed Action. A comparison for Acres of impact to WOTUS for
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
4
Routes 1B, 1C, and Route 2 was not completed, as these alternatives were dismissed for safety reasons
and further evaluation of WOTUS impacts was not warranted.
The following on-site and off-site road route alternatives (Figure 3, Figure 4) were evaluated based on the
above criteria, and determinations were made to either dismiss them without further study or carry them
forward for full environmental evaluation.
The Proposed Action is the only reasonable and practicable alternative that meets the purpose and need of
the project. The other alternatives evaluated were dismissed from further analysis as described below.
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
5
Table 1: Alternatives Evaluation
Off-Site
Alternatives
Route 1
(Proposed
Action)
Description
Alternative Evaluation
Route 1 begins at the end of Fish Weir Access Road and
continues north on the east side of Ikalukrok Creek to the
confluence of Grayling Junior Creek near the East Fork
Ikalukrok Creek. From there the route splits off into three
on-site alternative alignments before connecting to the
advanced exploration area:
·
·
Option 1A (Proposed Action): After crossing the
East Fork Ikalukrok Creek, this route follows
Ikalukrok Creek and switches between the north and
south banks of the creek to take advantage of gentle
terrain before accessing the exploration area.
Option 1B: This route crosses the East Fork
Ikalukrok Creek and continues northward along the
ridge of hills on the east bank of Ikalukrok Creek. It
then turns to the southeast and crosses Ikalukrok
while staying on the ridge to access the exploration
area.
·
Option 1C: This route does not cross the East Fork
Ikalukrok Creek but rather follows the east bank of
the creek along the eastern slopes of a nearby ridge,
then joins Route 1B and crosses Ikalukrok while
staying on the ridge to access the exploration area.
Route 1, Option 1A would impact 8.8 acres of WOTUS
using the comparison criteria described above
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
Route 1, Option 1A is considered feasible and was refined to form the
Proposed Action. This route has reduced risks of slope instability and follows
much gentler terrain as compared to the other routes. Route 1 also provides
relatively safe year-round access for equipment and personnel using the road.
In addition, Route 1 is located within a wider valley as compared to other
routes, which allows for safer weather conditions and fewer concerns
associated with drifting snow.
Environmental considerations such as wetlands, water crossings, and caribou
migration impacts are also fewer along this route. Route 1 has fewer wetland
impacts, allows for shorter bridge spans at stream crossings (which allow for
temporary bridges) and avoids impacts to secondary caribou migration trails.
Option 1A also minimizes impacts within the Wulik river watershed, which is
considered more environmentally preferable by subsistence users. Route 1,
Option 1A is considered a reasonable and practicable alternative and is carried
forward for further evaluation.
Option 1B is dismissed from further evaluation due to very steep terrain.
Use of the Option 1B route would not be viable year-round due to safety
concerns. Therefore, Option 1B is not considered a reasonable or practicable
alternative.
Option 1C is dismissed from further evaluation due to possible geologic
hazards along the route such as possible slope failures and landslide hazards
that could pose safety risks to drivers. Therefore, Option 1C is not considered
a reasonable or practicable alternative.
July 2018
6
Off-Site
Alternatives
Description
Alternative Evaluation
Route 2
Route 2 (Noa Creek Valley) begins at the end of the Fish
Weir Access Road and follows Route 1 to a point just south
of Noa Creek. The route then crosses Ikalukrok Creek,
follows the south bank of Noa Creek and continues
northwest up to the exploration area.
This alternative is dismissed from further evaluation due to very steep,
unsafe terrain. The Noa Creek Valley has a generally uniform, steep grade
through very rugged terrain for most of the route. Most of the grades in the
Noa Creek Valley are in excess of 5%, and in some locations in excess of 10%.
In addition, the route would be located in a narrow, steep valley bottom,
flanked by very steep slopes that are in excess of 45 degrees. Building a yearround road route in this valley would require safety berms as well as benching
the valley side slopes to maintain safety for drivers using the road. Therefore,
Route 2 is not considered a reasonable or practicable alternative.
Route 3
Route 3 (Sled Pass Lower Route) begins at the end of the
Fish Weir Access Road and follows Red Dog Creek
northwest to cross Ikalukrok Creek via a double span bridge
with in water pier. The route then heads north up the Sled
Creek Valley to Sled Pass, on the east side of Sourdock
Creek to Competition Creek. The route follows
Competition Creek for a short distance before veering to the
north-northeast up to the exploration area. Route 3 stays
generally at a low elevation within the pass approximately
halfway up the east side of the valley. Route 3 would
impact 11.1 acres of WOTUS using the comparison criteria
described above.
This alternative is dismissed from further evaluation due to technical and
environmental considerations. The narrow valley bottom and steep side slopes
would make it difficult to construct and maintain a road in a manner that is safe
for year-round use. In addition, a double span bridge across Ikalukrok Creek
would require permanent impacts to fish habitat when compared with other
routes. The narrow valley and close proximity to Sourdock and Competition
Creek (containing rearing Dolly Varden) make it impossible to construct a road
without impacting numerous wetlands and other waters associated with the
creeks. Route 3 has more acres of impacts to WOTUS than other routes.
Lastly, input from subsistence users determined the passage between the base
of steep hillsides and Competition Creek was too narrow for a full-size road,
without significantly impact existing secondary Caribou trails. Therefore,
Route 3 is not considered a reasonable or practicable alternative.
Route 4
Route 4 (Sled Pass Upper Route) begins at the end of the
Fish Weir Access Road and parallels Route 3, but generally
at a higher elevation. It crosses Ikalukrok Creek at a point a
little further upstream than Route 3 but still requires a
double span bridge with in water pier. It then heads north
up the Sled Creek Valley to Sled Pass, on alternating sides
of Route 3 to minimize wetlands impacts and avoid
culturally sensitive areas. North of the pass, it parallels
Sourdock Creek and Competition Creek, but considerably
to the east and at a higher elevation. Route 4 would impact
12.7 acres of WOTUS using the comparison criteria
described above.
This alternative is dismissed from further evaluation due to technical and
environmental considerations. Large quantities of fill and side slope benching
would be required to construct the route at the higher elevation and within
steep terrain. In addition, a double span bridge across Ikalukrok creek would
require additional permanent impacts to fish habitat when compared with other
routes. Sourdock Creek and Competition Creek contain rearing Dolly Varden
in the Wulik River watershed. While Route 4 stays a considerable distance
away from both creeks, it is still located closer to the Wulik River when
compared to other routes, and therefore less preferable by subsistence users.
Therefore, Route 4 is not considered a reasonable or practicable alternative.
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
7
2.2
Proposed Action
TAI proposes an advanced exploration program to assess the technical and economic viability of the
Aktigiruq and Anarraaq mineral deposits. The Proposed Action includes exploration roads and facilities
that cannot be practicably or logistically located off-site, including: exploration camp facilities;
equipment laydown areas; an underground access portal; underground vents; a temporary waste rock
storage facility; material sites; and approximately 13 miles of connecting roads (Figure 2). The Proposed
Action would include ground disturbance activities typically associated with road and pad construction
projects such as: vegetation removal; grading; and placement of fill. Construction of the proposed project
is anticipated to start in January 2019, subject to receipt of necessary authorizations. Exploration activities
would occur year-round, for an estimated four years. Construction of the Proposed Action would require
placement of approximately 83,778 cubic yards (cy) of clean fill into 16.1 acres and 5,031 linear feet of
WOTUS. The following describes the Proposed Action components in more detail:
2.2.1
Exploration Roads
The proposed exploration road infrastructure consists of the following (Figure 2):
·
Placement of 74,037 cy of fill into 15.7 acres of wetlands and loss of 1,928 linear feet of WOTUS
to construct 10.2 miles of access road connecting the Anarraaq and Aktigiruq exploration area to
existing surface roads.
·
Placement of 5,444 cy of fill into 0.4 acres of wetlands and loss of 512 linear feet of WOTUS to
construct 2.7 miles of secondary roads to connect the exploration access road with the surface
facility pads and material sites.
All roadway sections are designed as a single lane, with pullouts as needed to accommodate two-way
traffic. Access and secondary roads would have a running surface width of up to 19-feet (ft) wide, with
typical embankment side slopes of 3H:1V (Maximum 2H:1V), and cut section back slopes of 1.5H:1V
(Figures 7-1 and 7-2). Pullouts (11-ft-wide x 160-ft-long) along the access road would be spaced 0.5 mile
apart, to allow safe vehicle passage (Figure 7-3). The total roadway running surface width at pullouts is
30 ft. Roadway fill depths vary depending on ground contours but would be at least 5 feet deep at the top
of the roadway shoulder.
The proposed road design would maintain natural flow patterns through construction of six bridges and
27 culverts. Each bridge consists of a temporary Bailey-type steel bridge design spanning the width of
the creeks, supported by bridge abutments built with precast concrete blocks (Figure 7-4). Bridge
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
8
abutments would be constructed above ordinary high-water levels as to not hinder natural flow patterns or
modify natural stream channels. A bridge construction and maintenance area of 120 ft x 120 ft would be
required on one side of the bridge. Culverts would consist of a steel pipe spanning the width of the road
(toe to toe) and range from 24 to 48 inches in diameter in consideration of seasonal drainage. Culverts
would be underlined and surrounded by 1 ft minimum of bedding material (Figure 7-5). Slope protection
around the culvert would be placed, as needed, and may consist of a variety of engineered Rolled Erosion
Control Product (RECP) or natural materials (Riprap). Culverts installed within potential high water
would be embedded by 10% to aid flows and durability during high water events. Fill in WOTUS below
ordinary high water required for culvert installation are included in roadway quantities.
Roadway construction would begin in winter by first constructing a pioneer road staring at the southern
end of the Anarraaq and Aktigiruq access road and working to the north. Ice bridges would be used to
allow road construction to advance in winter, with bridge installation occurring after spring thaw. Bridge
abutments would be constructed during winter above ordinary high-water levels and without modifying
the natural stream channels. Material from an existing and permitted material site (DD2) would be used
to build the first 0.5-mile section of road until the route reaches the first identified material site at AAMS-1 (See Section 2.2.3). From there the road would be built using material from the identified material
sources adjacent to the road as construction advances to the north (Section 2.2.3 and Figure 2). Culvert
crossings would also be constructed in winter to avoid flowing water. A geotextile fabric underlayment
would be installed under the road embankment where required for road stability.
2.2.2
Surface and Underground Facilities
The proposed facilities (Figure 5-5) necessary for the advanced exploration of the Anarraaq and Aktigiruq
deposits consist of:
·
Underground ramp system
·
Portal and camp area
·
Vent raises and pads
·
Laydown areas
·
Temporary Exploration Waste Rock Facility
Underground activities would include developing an underground exploration ramp and executing
exploratory drilling over a multi-year period. The underground ramp system allows equipment to access
an underground exploration platform from which deeper drilling would occur. The underground system
would be accessed via a portal, located at the main camp facility area. Groundwater would be
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
9
encountered during development and operation of underground exploration activities and would be
pumped to an above ground treatment system before disposal. The underground exploration would be
ventilated by a series of vent raises and associated pads that provide access for maintenance.
In addition to the camp facility, four laydown pads would be constructed to store drill core, fuel, and
drilling and mining equipment and supplies, some of which would be stored in stacked connex containers.
The laydown pads would be connected to the access road by various secondary roads (see Section 2.2.1).
All pad facilities would be developed using cut and fill construction methods, with 2 percent cross slope
gradients, and 2H:1V side slopes. All camp and pad facilities were sited to avoid impacts WOTUS
except for the North Vent Raise. The North Vent raise cannot be sited to avoid impacts to WOTUS as it
is a vertical shaft that has to be aligned with the underground exploration ramp. Placement of 2,853 cy of
material would result in the loss of 642 linear feet of intermittent stream to construct the North Vent Raise
pad. No other laydown or facility pads would require fill within WOTUS (Figures 5-5).
Placement of 1,444 cy of material would result in the loss of 1,949 linear feet of intermittent stream to
construct a temporary exploration waste rock facility (WRF). The exploration WRF would be located on
a valley bottom, adjacent to the portal and camp, and would temporarily store rock and overburden
extracted from the development of the underground exploration tunnels and vents (Figure 5-5). Any cut
material from the road and pad construction that is unsuitable as fill material would also be placed in the
exploration WRF. The exploration WRF would be a fully-lined facility and include adequate drainage
control to handle expected precipitation events. The lining would consist of a geomembrane liner, placed
over a crushed drain rock bedding approximately 2 ft thick, equipped with engineered underdrain
channels. Surface runoff water would be collected and stored in a contact water pond designed to
temporarily hold precipitation events prior to treatment. All contact water collected within the exploration
WRF footprint would be treated and discharged. A drainage channel would be constructed around the
perimeter of the exploration WRF to divert non-contact precipitation runoff.
2.2.3
Material Sources
Fill material would be locally sourced at four proposed material sites located adjacent to the proposed
Anarraaq-Aktigiruq Exploration Road:
·
Material Site AA-MS-1 (Milepost (MP) 0.5)
·
Material Site AA-MS-2 (MP 3.3)
·
Material Site AA-MS-3 (MP 4.2)
·
Material Site AA-MS-4 (MP 7.2)
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
10
None of the proposed material sites would require excavation or fill within WOTUS. Material site
excavation would be benched to maintain slope stability, drainage, and access for development and
reclamation activities. Development of all four material sources would require blasting. Blasting would
occur during initial development of the road in winter but is likely to continue throughout the spring and
summer as the laydown pads and other features of the facility are developed.
2.2.4
Reclamation
Once exploration activities are completed, TAI would assess whether to advance mine development, or
complete project reclamation as planned. Any mine development activities would require additional
permits and authorizations. Currently, TAI is planning to reclaim the proposed facilities, per State of
Alaska requirements. Proposed reclamation activities include:
·
Removing the stockpiled material from the exploration WRF. The stockpiled material (including
waste rock) from the exploration WRF would likely be transported to the existing Red Dog WRF
or used to back fill the underground ramp system, or a combination of both. Once all stockpiled
material is removed, the area would be graded to blend with the surrounding environment, seeded
and/or allowed to naturally revegetate. Upon completion of reclamation of the temporary
exploration WRF, no stockpiled material would remain at that location, thereby eliminating the
need for long-term water management.
·
Support facilities and portal. All surface structures would be removed, and the pads would be
graded to blend with the surrounding environment, seeded, and allowed to naturally revegetate.
Any clean stockpiled topsoil would be re-applied where the terrain is suitable for such
application. The portal would be permanently barricaded to protect public safety and wildlife. If
necessary, it would receive a hydraulic portal plug.
·
Roads. Bridges (spans and abutments), and culverts would be removed, creating low water
crossings. The road would be reseeded for stabilization and then allowed to naturally revegetate.
2.3
No Action
Under the No-Action Alternative, an access road and associated support facilities would not be
constructed. As a consequence, there would be no safe, year-round overland access and sufficient support
facilities for a multi-year exploration drilling campaign to assess the technical and economic viability of
the Aktigiruq and Anarraaq mineral deposits.
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
11
3
AFFECTED ENVIRONMENT AND ENVIRONMENTAL
CONSEQUENCES
This section describes the existing environment and potential environmental consequences associated
with the Proposed Action and No Action Alternatives.
The proposed project is located in Northwest Alaska, specifically the Headwaters of the Wulik River
Hydrologic Unit Code (HUC) (1905040407, 168,557 acres) and Ikalukrok Creek HUC (1905040408,
123,791 acres) (Figure 1). These watersheds are dominated by permafrost tundra; including wetlands,
perennial/intermittent streams, and upland foothills of the Brooks Range. The Red Dog Mine and
associated Delong Mountain Transportation System (DMTS) are the only major developments in the
region, and the center for local industrial activity. Weathering of geological formations create naturally
occurring degraded water quality in some tributaries. The two local communities are Noatak and
Kivalina, which rely on subsistence resources to continue culturally important local traditional use. These
include fisheries resources from the Wulik River and caribou from the Western Arctic Caribou Herd
which migrate through the area.
3.1
Non-Issue Resource Categories
This EED is issue-based, meaning that only resource categories that were identified as key issues through
public and agency involvement are evaluated in detail. Table 2 summarizes resource categories identified
as non-issues, and consequently not discussed further in this document.
Table 2: Non-Issue Resource Categories
Resource
Category
Evaluation
Climate
Change
·
Observed local trends in increasing temperatures are taking place throughout the region
(Tetra Tech 2009). Permafrost is assumed to be a dynamic, but fundamentally stable,
condition in project design (Tetra Tech 2009). This project would not affect or accelerate
climate change.
Endangered
Species Act
·
The IPaC (Information, Planning, and Consultation System) website was consulted for the
project area (USFWS 2018) on May 23, 2018, and it indicated no threatened, endangered, or
candidate species or critical habitats for the Proposed Action.
Essential Fish
Habitat (EFH)
·
Consultation with the Alaska Department of Fish and Game (ADFG) (Johnson and Blossom
2017) Anadromous Waters Catalog indicates that no salmon EFH occurs within the project
area.
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
12
Resource
Category
Evaluation
·
The Alaska Coastal Management Program expired on June 11, 2011 and is no longer in
effect. Although a state coastal consistency determination is no longer required, the
Northwest Arctic Borough (NAB) Comprehensive Plan (1993) and the Northwest Area Plan
(ADNR, 2008) were evaluated to confirm no adverse coastal impacts would occur from the
Proposed Action and the project is consistent with coastal resource management plans
referenced in these documents.
·
The Public Interest Review for Shoreline Erosion and Accretion finds no significant
effect to coastal resources. The Proposed Action is not located near the shoreline.
Air
·
Air quality permitting under the Proposed Action has been determined by the Alaska
Department of Environmental Conservation (ADEC) to fit under a Minor Source Specific
(MSS) Permit. Compliance with the permit would ensure no significant air quality impacts.
Health, Safety,
and Public
Welfare
·
The proposed project would take place under a comprehensive TAI corporate Health,
Safety, and Environmental compliance policy. This would ensure the health and safety of
workers and other visitors to the site.
Energy Supply
and Natural
Resources
·
The proposed project would develop and operate energy facilities and other utilities as
required. Energy would be generated from onsite electricity generators. Freshwater sources
would be permitted from appropriate surface water locations. All sewage and wastewater
would be treated to meet ADEC water quality standards before being discharged. Solid
waste would be collected on site and shipped to appropriate landfill locations outside of the
Project Area. Construction materials, fill materials, and other natural resources are expected
to be available through local sources.
·
No impacts are anticipated to any local community energy supplies or utilities.
·
The Red Dog Mine (ADEC File number 475.38.010) (Figure 1) is the only known
hazardous site near the Proposed Action, located 8 miles southeast of the proposed
exploration facility area.
·
No other known hazardous waste sites, generators, or contaminated sites are identified in the
project area. Due to the natural state of the environment, anthropogenically caused
contamination or hazardous waste would not likely be encountered during construction.
·
Fuel would be stored near the portal during exploration. TAI would develop an EPAcompliant Spill Prevention Control and Countermeasure Plan for fuel for the Proposed
Action.
Coastal
Resources
Hazardous
Materials and
Contaminants
3.2
Physical and Chemical Environment
3.2.1
Noise
Affected Environment The majority of existing noises within the project area are from the natural
environment. The loudest natural noise within the undeveloped project area are sounds from storms.
Transportation used to support subsistence activities throughout the region (e.g. snowmachines, aircraft)
are also likely to periodically contribute noise to the environment. The most frequent anthropogenic noise
in most of the project area is from intermittent helicopter operations to support exploration. Industrial
noise (e.g. heavy equipment, blasting) occurs near the Fish Weir Road at the start of the Proposed Action
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
13
near the existing Red Dog Mine. Noise from these activities attenuate with distance from the Red Dog
Mine. Noises from industrial activities near the project area have taken place since the development of the
Red Dog Mine (1987), while noise from subsistence activities in the area have taken place for much
longer.
No Action There would be no increase to noise in the project area beyond is occurring currently. Some
anthropogenic noise, such as subsistence activities, helicopter supported exploration, and industrial
activity near Fish Weir Road, would continue.
Proposed Action The Proposed Action would generate noise from heavy equipment and mining related
activities. Blasting would be required to develop material sites during the construction phase and would
likely be the largest noise contributor to the surrounding area during project development, although
infrequently. Blasting noise may affect nearby activities by detracting from the secluded environment, or
subsistence hunting activities by startling wildlife. Generators and heavy equipment would be in operation
throughout the exploration project. The effects of noise from the Proposed Action would extend along the
new access road and exploration area. Noise generation from the Proposed Action would cease in
approximately 2023, 4 years from the estimated project start, and noise levels would return to preexploration conditions.
Avoidance, Minimization, and Mitigation
·
Noise impacts to caribou would be limited through implementation of a caribou policy. The
caribou policy would implement procedures for exploration access road users to minimize
impacts to caribou from vehicular traffic on the road, including temporary road closures or halted
traffic to accommodate caribou movements.
·
Safety procedures for blasting would ensure compliance with MSHA noise standards for
exploration workers.
3.2.2
Surface Water
Affected Environment The major surface water sources in the project area include Ikalukrok Creek,
Grayling Junior Creek, and Red Dog Creek (Figure 2). None are listed as Wild and Scenic Rivers by the
National Park Service, or Essential Fish Habitat by the National Marine Fisheries Service (NMFS 2018)
or ADFG for salmon at the locations of the crossing (Johnson and Blossom 2017).
There are six USGS hydrological sites with intermittent historical data on surface water in the vicinity of
the Red Dog Mine, downstream of the Proposed Action (15746983, 15746988, 15746990, 15746980,
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
14
1574699020, 15746991, 15746900) (USGS 2018). Hydrographs demonstrate patterns typical for
Northwest Alaska; including minimal winter flows, spring melt floods, summer decreases in discharge,
and fall rainy seasons.
Water estates govern the legal use to use surface or groundwater in Alaska (ADNR 2018) through a
number of permanent and temporary authorizations. Teck has three water rights at Red Dog Mine,
(LAS1453, 25095, 25096). These rights include Bonns Creek, Red Dog Creek, and the South Fork of Red
Dog Creek. The Wulik River has a water right for public drinking water issued to the City of Kivalina
(ADL 72129). Driver Philip has a water right on the Wulik River (ADL 402491). A reservation of water
has been issued to ADFG for the Wulik River from the mouth to the confluence with Ikalukrok Creek
(LAS 20067).
No Action The No Action alternative would have no impacts to water resources.
Proposed Action Impacts to surface water from the Proposed Action have been minimized. Water
quality impacts (Section 3.2.4) and fish habitat impacts (Section 3.3.2.3) are discussed in their respective
sections.
Streams would be bridged or culverted with no in water work. 5,031 linear feet of WOTUS would be
filled by roadway and pad embankments, however underdrains or other diversions would be constructed
as needed to accommodate flows (Table 3).
Construction would require water supply withdrawals for dust control, road compaction, construction, and
camp facilities. Temporary Water Use would be permitted through the Alaska Department of Natural
Resources (ADNR). There are no anticipated impacts from withdrawals to existing water rights.
The Public Interest Review for Navigation, Water Supply, and Conservation finds no significant
negative effect from the Proposed Action. The Proposed Action does not propose to alter Traditional
Navigable Waters.
Avoidance, Minimization, and Mitigation
·
Culverts and bridges have been designed to carry flows. Culverts will be installed without
requiring in water work but will require fill to be placed during the winter below ordinary high
water.
·
Surface waterbodies would be permitted for Temporary Water Use through ADNR.
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
15
3.2.3
Geochemistry
Affected Environment The soils of the area sit over shale and siltstone bedrock (Tetra Tech 2009). Soils
consist of surface organics followed with silty, clayey, and sandy mineral soils (Tetra Tech 2009). All
horizons are ice rich material. A shallow active layer thaws each summer, and permanent permafrost exists
in deep layers between the bedrock and shallow active layer (Tetra Tech 2009).
The geochemistry of the region is naturally active. Naturally occurring minerals in the project area form
harmful constituents (e.g. lead, zinc, cadmium, sulfur) when exposed to water and oxygen (Tetra Tech
2009). This process occurs naturally in exposed outcrops throughout the region and is not associated with
any industrial activity (Tetra Tech 2009). For example, constituent concentrations have been documented
in surface water exceeding water quality standards since before mining has taken place in the region
(Water Quality Section 3.2.4) (SRK Consulting 2018). The presence of these chemicals (e.g. iron sulfide,
lead sulfide, zinc sulfide) is visible at the surface and on aerial photography by the dark iron evidenced in
nearby streams (e.g. Cub Creek).
No Action Under the No Action alternative no disturbance to geology would occur from the Proposed
Action. Naturally occurring minerals would continue to form harmful constituents during naturally
occurring events.
Proposed Action Development of access roads, material sites, and underground ramp system as the
potential to expose naturally occurring geochemically active material, including potentially acid
generating rock (PAG), to water and oxygen. PAG can't be avoided as it is widespread within the rock
units that the exploration ramp will intersect. PAG would be temporarily stored in the WRF. At the end
of the exploration program (2023), waste rock would be placed back underground, or permanently
disposed of at another permitted WRF, preventing any further acid generating geochemistry from taking
place. After the exploration program is complete, the temporary exploration WRF would be removed, the
area graded and reclaimed to a naturally vegetated state.
TAI would construct a lined waste rock facility that would include contact water storage and underdrains
to allow natural drainage to pass under the lined facility. ADNR and ADEC approval would be required
before waste rock is placed in the WRF. The preliminary design of the engineered facility includes a
water collection sump inside the facility as well as an "event" pond just below the facility to capture
runoff.
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
16
Avoidance, Minimization, and Mitigation
·
During excavation of cut slopes for construction of access roads, development of material sites, or
any other areas resulting in exposure of PAG, a rock segregation plan would be implemented to
identify and manage it. The segregation plan would be approved by ADEC. During construction,
a qualified geologist would visually examine the cut material and make a determination whether
or not it is suitable for construction (i.e. non-PAG). Cut material designated as PAG would be
segregated, removed from the cut and be excluded from further use in accordance with the
segregation plan.
3.2.4
Water Quality
Affected Environment Baseline water quality is available from monitoring stations within the Wulik
River, Ikalukrok Creek, and Red Dog Creek watersheds, taken intermittently from 2000 to 2017 (SRK
Consulting 2018). ADFG speculate that Cub Creek (Figure 7), which often has a rusty color, may be what
limits the presence of fish in Ikalukrok Creek above the confluence with the East fork Ikalukrok Creek
(Al Ott, ADFG, 2018a).
Baseline exceedances in Alaskan Water Quality Criteria have been documented to be naturally occurring
in each monitoring station (SRK Consulting 2018). Aluminum and zinc are consistently high, and pH
consistently low, among all monitoring stations. Other exceedances include detections for selenium,
cadmium, copper, lead, and iron (SRK Consulting 2018). Total Dissolved Solids tend to be within normal
ranges, except for limited anomalous events.
No Action The No Action alternative would have not impacts to water quality. Naturally occurring
exceedances of the Alaskan water quality criteria would continue to occur.
Proposed Action Material stored in the WRF has the potential to be geochemically active, generate
acid and mobilize potentially harmful water quality constituents (e.g. sulfate and metals). All contact and
seepage water collection associated with the WRF facility would be treated and discharged in accordance
with Alaska Pollutant Discharge Elimination System (APDES) discharge permits.
Groundwater encountered underground, would also be treated prior to discharge under authority of an
APDES permit from ADEC.
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
17
Minor, short term impacts to water quality may result from construction activities. These temporary
impacts could originate from temporary water use, stormwater pollution, and stream crossings.
Temporary water use would be permitted by ADNR. Stormwater impacts are expected to be minor with
the implementation of required Stormwater Pollution Prevention Plan (SWPPP) and Best Management
Practices (BMP). Bridge abutments would be constructed during winter above ordinary high-water levels
and without modifying the natural stream channels. Culvert crossings would be constructed in winter to
avoid flowing water.
The Public Interest Review for Water Quality and Conservation finds no significant negative effect
from the Proposed Action. The Proposed Action would be treated and discharged in accordance with
APDES discharge permits.
Avoidance, Minimization, and Mitigation
·
Measures to minimize releases of sediment to water bodies would be implemented during
construction as part of compliance with the APDES Multi Sector General Permit (MSGP).
Compliance with the MSGP includes preparation of a SWPPP and implementation and
monitoring of erosion and sediment control BMPs;
·
Water withdrawal would require ADNR permitting and would specify appropriate BMPs;
including water withdrawal volume limitations.
·
All contact and seepage water collection associated with the WRF facility and underground
activities would be treated and discharged in accordance with APDES discharge permits.
·
Bridge abutments would be constructed during winter above ordinary high-water levels and
without modifying the natural stream channels. Culvert crossings would be constructed in winter
to avoid flowing water.
3.2.5
Floodplains
Affected Environment Executive Order 11988 Floodplain Management requires federal agencies to
avoid adverse impacts associated with the occupancy and modification of floodplains. There are no
Federal Emergency Management Agency floodplain maps available for the Study Area.
Aufeis is a mass of layered ice formed when freezing forces groundwater to the surface, which freezes
during cold temperatures. Streams near the Proposed Action can generate large masses of aufeis, which
can both generate flooding and act as a large erosive force during spring break up (ADFG, 2018a).
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
18
No Action No change would take place to the floodplain.
Proposed Action As no floodplain maps are available, portions of the Proposed Action may be
constructed within base floodplain areas susceptible to flooding but would not be located within a
regulatory floodway or Federal Emergency Management Agency mapped 100-year floodplain.
The access road has been sited as far away from the valley bottom and associated aufeis as practicable. In
many locations the contours of the natural landscape restrict completely avoiding susceptible valley
bottoms. In these areas, and throughout its length, the road would be designed to accommodate flooding
and aufeis.
The bridge abutments would be constructed above ordinary high-water levels and without modifying the
natural stream channels. This would minimize effects to natural stream channels; while also allowing
fish passage for the duration of the program. Construction would be performed during winter months,
which would prevent floods from impacting the construction.
The Public Interest Review for Flood Hazards and Floodplain Values finds no significant negative
effect from the Proposed Action. The Proposed Action does not alter any mapped floodplains and is being
engineered to withstand potential flooding. The Proposed Action has been designed to not significantly
reduce the floodplain capacity in the Proposed Action.
Avoidance, Minimization, and Mitigation
·
Stream crossings, roads, and pads would be designed to incorporate expected high-water flows
and aufeis.
·
Bridge abutments would be constructed above ordinary high-water levels and without modifying
the natural stream channels.
3.3
Biological Environment
3.3.1
Wetlands and Vegetation
Affected Environment The project area was delineated for wetlands (WHPacific 2018), along an
approximate 1,000-foot wide corridor of the Proposed Action (Figure 5). The survey found varied plant
communities, including: wet and moist tundra with dense shrubs, sparse alpine communities on mountain
tops, and barren rock areas. Vegetation was dominated by shrubs, ranging from tall (e.g. willow) to low
(e.g. Labrador tea) Viereck classifications. Only a few emergent dominated wetlands were delineated (e.g.
sedge and horsetail).
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
19
Wetlands geomorphic classifications included slope and riverine (flow-through and impounding) habitats.
Slope wetlands are common in the project area given the steep gradient topography. Riverine habitats are
located in and adjacent to streams draining the local topography. These included Ikalukrok Creek, and its
tributaries, including Red Dog Creek and Grayling Junior Creek.
All streams flow to the Wulik River and into the Chukchi Sea, and are thus anticipated to be
jurisdictional. All wetlands are expected to have significant surface or subsurface hydrologic connections
to the stream systems and are considered jurisdictional under the Clean Water Act.
No Action No impacts to wetlands and vegetation habitat would take place.
Proposed Action Wetland habitat would be permanently filled from the Proposed Action (Table 3).
Given the ubiquity of wetlands and Waters of the U.S. in the area, the relative loss of wetland habitat
within the HUC 10 would be less than 1% and is considered minor.
The project is not expected to change the connectivity of wetlands. Culverts and bridges would ensure
hydrologic connectivity is maintained during project operations. Culverts would be replaced with low
water crossings at the end of project operations.
Table 3. Impacts to Waters of the United States
Proposed Action Component
Wetlands (acres)
Other Waters
(linear feet)
Anarraaq-Aktigiruq Exploration Road
15.7
1,928
Main Vent Service Road
0.2
340
South Vent Service Road
0.2
172
North Vent Raise
-
642
Waste Rock Facility
-
1,949
Grand Total
16.1
5,031
The Public Interest Review for Wetlands finds a neutral effect from the Proposed Action. The Proposed
Action does not impact a significant number of wetlands. Wetlands are common throughout the region,
and the proposed Avoidance, Minimization, and Mitigation measures (below) will compensate for the
impact.
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
20
Avoidance, Minimization, and Mitigation (per the June 15, 2018 Memorandum of Agreement
between the Department of the Army and the Environmental Protection Agency)
·
Avoidance: Due to the linear nature of the proposed project and the abundance of WOTUS within
the project area, total avoidance is not practicable. Where practicable, facilities were located to
avoid impacts to WOTUS.
o
Lower impact crossing methods (e.g. bridges) were utilized along fish streams instead of
culverts.
o
The road corridor was located on drier ground with less WOTUS and greater use of uplands,
where practicable.
·
Minimization: The proposed project minimizes impacts to WOTUS to the maximum extent
practicable by reducing the project footprint, maximizing the use of uplands and controlling the
materials after the discharge:
o
The road was designed as a single lane road with vehicle pullouts, as opposed to a wider twolane road, reducing WOTUS impacts where crossings could not be avoided.
o
The proposed road corridor maximized, to the extent practicable the use of flat terrain,
reducing the need for fill material and side cut construction, reducing impacts where
crossings WOTUS could not be avoided.
o
At some locations, the road alignment was designed to impact edges of wetlands rather than
bisecting the entire wetland habitat, where practicable.
o
Stream crossings were designed to be perpendicular to flow direction, to the extent
practicable.
o
Natural flow patterns would be maintained through the use of culverts and bridges;
o
The temporary WRF was designed to maximize waste rock storage capacity, while
minimizing the facility footprint size and maintaining stability.
o
Sediment barriers would be installed around the perimeter of the construction areas at water
crossings.
o
ADFG - Fish Habitat Permit restrictions and BMPs for in-water work and bridge abutment
designs would be adhered to, in order to minimize potential impacts to fish and other aquatic
species.
o
The construction contractor would develop and implement a SWPPP to address erosion and
sediment control as required by the ADEC APDES MSGP.
·
Compensation: There are no existing mitigation banks, or In-lieu fee programs with service areas
in the watershed that can satisfy the mitigation needs for the proposed project. Permittee-
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
21
responsible mitigation is the only practical mechanism to provide compensatory mitigation for the
unavoidable loss of 16.1 acres, and 5,031 linear feet to streams of permanent impacts to WOTUS.
TAI is proposing preservation of WOTUS within the Red Dog Creek watershed at a 1:1 ratio, by
means of a deed restriction that would protect aquatic resources from future development as
described in the wetlands mitigation plan.
3.3.2
3.3.2.1
Fish and Wildlife
Birds
Affected Environment Most of the habitat in the Study Area can be potentially utilized by seasonal
migrants which breed and raise their young during the short arctic summers (Audubon Alaska 2016,
Tibbitts et al 2005). All of these species, and their nests and eggs, are protected under the Migratory Bird
Treaty Act (MBTA) except for the resident Willow and Rock Ptarmigan.
Bald and golden eagles are protected by the Bald and Golden Eagle Protection Act; and while both may
occur, golden eagles are the most likely to occupy the area. Higher elevation cliffs, rock outcrops, and
hill outcroppings in the region provide potential suitable breeding habitat for these and other raptors
(ADFG 2008; BLM 1999).
The original 1984 EIS for the Red Dog Mine indicated that the region provides suitable habitat for cliff
nesting raptors, such as the rough-legged hawk, gyre-falcon, and peregrine falcon (Dames & Moore
1983a, b). Nest surveys confirmed the nesting of all of these species except the peregrine falcon (Dames
& Moore 1983b; SRK 2007). Several nests were located in the vicinity of the Red Dog mine in similar
habitats, 8 miles to the south and east of the proposed facility area, and along the DMTS. In 2005, three
rough-legged hawk nests were reported in the mine area near the DD-2 materials site, one near the
confluence of the North Fork and Middle Fork Red Dog Creek and another approximately 2 miles
downstream from the North Fork and Middle Fork confluence (Tetra Tech 2009). The nearest recorded
peregrine falcon nest is located on the Omikviorok River bridge on the DMTS road (SRK 2007).
Two golden eagle nests were also documented in the vicinity of the Red Dog Mine in 1982 (Dames &
Moore 1983a). The nests were inactive in 1982, and subsequent surveys over the past 16 years have not
documented golden eagles using the area (Tetra Tech 2009). Other raptor species observed include
merlin, northern harriers, and the short-eared owl.
No Action No impacts to birds would take place.
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
22
Proposed Action A permanent loss or alteration of bird habitat would result from construction of
Proposed Action. The Proposed Action would remove and/or alter less than 200 acres of vegetation and
topography which are used by various resident and migratory bird species. During construction, birds
would likely relocate from disturbed areas to other nearby, similarly suitable habitats available in the
project area resulting in no permanent impacts to bird species. Winter activities would limit impacts to
resident species. Impacts by summer activities would be limited by adherence to recommendations from
the US Fish and Wildlife Service (USFWS) about land clearing timing guidance for Alaska (USFWS
2017).
Although the Proposed Action may result in the direct loss of bird habitat, most habitat types are common
and distributed ubiquitously throughout the region. In comparison with relatively undisturbed land
surrounding the project, impacts are expected to be minimal. No specific take of bald or golden eagles or
eagle nests is anticipated under the Proposed Action.
The Public Interest Review for Fish and Wildlife Values finds no significant negative effect from the
Proposed Action. The impact to birds is expected to be non-significant given the proposed Avoidance,
Minimization, and Compensation Measures (below).
Avoidance, Minimization, and Mitigation
·
The Proposed Action alternatives have been routed to minimize with steep slopes and potential
raptor nesting habitat wherever feasible;
·
TAI would make note of any Golden Eagle activity in the area during construction activities and
take all practical steps to minimize disturbance of the birds. TAI would contact USFWS if an
active Golden Eagle nest site is identified.
·
Where possible, vegetation clearing, site preparation, and construction activities would adhere to
the recommended periods to avoid vegetation clearing from June 1July 31 for Northern Alaska
(USFWS 2017). If vegetation clearing, site preparation, and construction occurs within these
periods, pre-construction nest surveys would be conducted by qualified personnel and appropriate
mitigation developed in consultation with the USFWS.
·
Winter road construction schedule would eliminate the risk of impacting the nests of migratory
birds in the program area during the months when snow covers the ground. TAI has scheduled the
access road and pad construction for the winter months to the greatest practical extent.
·
Disturbed ground is less desirable to ground-nesting birds which otherwise rely on the tundra
cover to disguise and construct their nests. If the actual schedule of activities indicates that
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
23
disturbance of native ground would be necessary during the typical nesting periods for the
migratory birds, TAI would place "bird tape" to discourage birds from nesting in areas designated
for disturbance during the nesting season.
·
Temporary disturbance, reclaimed land, and other areas of ground disturbance would be
revegetated with regionally appropriate seed mix that minimizes introduction of noxious weeds
where practicable.
3.3.2.2
Wildlife
Affected Environment Five species of large terrestrial mammals are known to occur in the Study Area:
caribou (Rangifer tarandus), moose (Alces alces), muskoxen (Ovibos moschatus), Dall's sheep (Ovis
dalli), and brown bear (Ursus arctos). Caribou were identified as a key species, important to local and
regional communities for subsistence purposes, and are discussed in additional detail below.
Caribou: The Western Arctic Herd (WAH) is the largest in the State of Alaska and is of both biological
and subsistence importance to local communities. The WAH had a population estimate of 259,000
animals released in January 2018 (ADFG 2018b). The herd experiences large peaks and troughs (e.g.
490,000 animals in 2003, 201,000 in 2016). The herd uses a large section of Northwest Alaska, including
the project area.
Satellite collar data (19882006) reveal the general WAH caribou distribution providing migration date
approximations, which vary year to year (CARMA 2018). Caribou occupy the vicinity of the Study Area
in dispersed winter densities between September 1May 31, leave between June 1June 30 for calving in
the North, return July 1July 31 for bug relief, and disperse August 1August 31 for the Brooks Range to
feed before dispersing for the winter season.
Caribou are considered especially sensitive during the fall southern migration to winter range. Since 1996,
most individuals have wintered south of the Study Area, on the Seward Peninsula. Satellite collar data
also revealed that a few individuals of the Teshekpuk Lake Herd may be present during the winter
(CARMA 2018). These data suggest that caribou can be present in the Study Area at any time, except for
the spring calving seasons.
No Action No impacts to wildlife would take place.
Proposed Action Construction of the project, as well as material source development and associated
access, would result in habitat alteration for terrestrial mammals. The removal of these vegetation
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
24
communities would result in a relatively small reduction in the amount of potential foraging habitat for
terrestrial mammals. No impacts are expected due to the large amount of substitute habitat available.
The Proposed Action may result in changes to other wildlife species, including migration patterns.
Overall, potential effects depend on species, season, timing and duration activities (Benítez-López et al.
2010; Northrup et al. 2012; Beyer et al. 2013; Kite et al. 2016). Given the large amount of undisturbed
suitable habitat available in the region, no impacts are expected to non-caribou species.
Caribou Migration Patterns and Movement: Roads and associated activities may alter caribou migration
patterns and habitat use (Murphy and Curatalo 1987, Wilson et al. 2016). Wilson et al. (2016) studied the
WAH response to the DMTS and observed individuals altering their movement behavior by taking longer
to cross the road (i.e., delayed crossing time) and increasing their movement rates despite the relatively
low traffic volume. Traditional and Ecological Knowledge suggest that letting the lead caribou pass
encourages a traditional migration, as other caribou follow the leaders. Using this research, the caribou
policy developed makes every effort to ensure that caribou are not disturbed in their efforts to cross the
road. Impacts to caribou during construction are not anticipated as road construction activities are not
scheduled during the fall caribou migration period, and blasting would occur during the winter months.
Mortality Risk: Overall, the degree of mortality risk during operations are dependent on seasonality and
species but is regarded to be low. Winter coincides with environmental factors (e.g., poor driving
conditions and reduced visibility) that can increase direct mortality risk. Implementation of the caribou
policy is expected to reduce the risk to negligible levels.
The Public Interest Review for Fish and Wildlife Values finds no significant negative effect from the
Proposed Action. The impact to wildlife is expected to be non-significant given the proposed Avoidance,
Minimization, and Compensation Measures (below).
Avoidance, Minimization, and Mitigation
·
The caribou policy implements procedures for exploration access road users to minimize impacts
to caribou from vehicular traffic on the road, including temporary road closures or halted traffic
to accommodate caribou movements.
·
Construction activities are not scheduled during the fall caribou migration period, and blasting
would occur during the winter months
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
25
3.3.2.3
Fish and Fish Habitat
Affected Environment The major surface water sources include Ikalukrok Creek, Grayling Junior
Creek, and Red Dog Creek. Other tributaries include Sled Creek, Moil Creek, and Noa Creek (Table 4,
Figure 6). The following table describes fish presence in streams in the project area (ADFG, 2018a).
Table 4: Fishery Status of Creeks in the Project Area
Location
West Fork Ikalukrok Creek
EFH Anadromous
Dolly Varden
Arctic
Grayling
Slimy
Sculpin
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
Yes
adults and
juveniles
No
Grayling Junior Creek
No
Yes
adults and
juveniles
No
Noa Creek
No
No
No
No
No
Moil Creek
No
No
No
No
No
Sled Creek
No
No
No
No
No
Ikalukrok Creek downstream to mouth
of Mainstem Red Dog Creek
Yes
Yes
rearing juveniles,
resident and/or
anadromous
adults and
juveniles
adults and
juveniles
Ikalukrok Creek upstream on its
confluence with West Fork Ikalukrok
Creek
Ikalukrok Creek upstream of its
confluence with East Fork Ikalukrok
Creek
East Fork Ikalukrok Creek upstream of
the confluence of East Fork and
Ikalukrok Creek
rearing juveniles,
resident and/or
anadromous
rearing juveniles,
resident and/or
anadromous
Biomonitoring studies conducted in support of the Red Dog Mine have provided a detailed fisheries and
invertebrate baseline for the region (ADFG 2017). The wetland report (WHPacific 2018) delineated
numerous smaller streams in the project area, which have no documented presence of fish. Dolly Varden
are the main fish of concern for direct impacts in the project area. Dolly Varden have complex life
histories, with several alternative life strategies. Juveniles often spend multiple years in freshwater
drainages growing into adults. Some adults (anadromous individuals) enter saltwater to feed during the
summer, while others stay and feed in the freshwater system (resident). Anadromous individuals are
generally larger than resident individuals.
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
26
Annual surveys conducted between 1979 and 2015 as part of ongoing monitoring for the nearby Red Dog
Mine, estimated between 22,000 and 144,000 mixed stock Dolly Varden in the Wulik River in each year
(Ott et al. 2016). In most years, greater than 90% of Dolly Varden overwintered downstream from
Ikalukrok Creek (ADFG 2017). Most Dolly Varden spawning outside of the Wulik River occur in Tutak
Creek and Dudd Creek (five miles below the project area), tributaries of Ikalukrok Creek downstream of
the project area (Ott and Morris 2007, 2012, Ott et al. 2016). Individuals in the project area are likely a
combination of juveniles that have not yet out migrated to the saltwater, and freshwater resident fish
(ADFG 2017).
Arctic grayling are also residents in the project area, with well documented use of the Red Dog Creek
drainage (ADFG 2017, Ott and Morris 2007, 2012, Ott et al. 2016). These fish overwinter in mainstem
rivers and migrate into small tributaries in the spring and summer (ADFG 2017, Ott and Morris 2007).
Arctic grayling dynamics are influenced by volume and water characteristics discharged from the Red
Dog Mine site (ADFG 2017).
Essential Fish Habitat: There is no EFH within the project area. Five miles below the project area, lower
sections of Ikalukrok Creek (below its confluences with Grayling Junior and Red Dog Creeks) support
chum salmon (Oncorhynchus keta) (spawning), Chinook salmon (O. tshawytscha) (spawning, rearing),
pink salmon (O. gorbuscha) (spawning), and sockeye salmon (O. nerka) (spawning).
No Action No impacts to fish and fish habitat would take place.
Proposed Action No impacts are anticipated to fish habitat. Bridges, culverts, and facility pads are
being constructed above ordinary high water. No impacts associated with the WRF are anticipated as all
contact water collected within the WRF footprint would be treated prior to discharge in accordance with
permitting requirements.
Water Crossings: The proposed water crossings in fish-bearing streams all consist of bridges. Both
bridges and culverts are used in the non-fish bearing streams. It is expected that topography and other
factors would not allow a simple and consistent setback distance to follow for road design. Additional
water management features such as ditches and sediment ponds may be required to manage impacts on
the water quality of adjacent streams, especially during construction. Crossing sites would be evaluated
for the potential for aufeis.
Water Withdrawal: Water withdrawal from area surface waterbodies would be required to support road
construction for dust suppression and some bridge construction activities. The primary concern is
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
27
ensuring that fish are not directly impacted during water withdrawal. Especially during the winter,
overwintering habitat can become anoxic or dewatered, resulting in impacts to fish. All water withdrawal
would be permitted through the ADNR and ADFG, including appropriately sized screened intake and
volume limitations to reduce accidental take of small fish.
The Public Interest Review for Fish and Wildlife Values finds no significant negative effect from the
Proposed Action. The impact to fish is expected to be non-significant given the proposed Avoidance,
Minimization, and Compensation Measures (below).
Avoidance, Minimization, and Mitigation
·
Alternative evaluation selected route and bridge type that avoided permanent impacts to Red Dog
Creek.
·
Compliance with the APDES MSGP, and implementation of the required SWPPP and BMPs to
reduce potential of sediment from entering fish bearing waterways.
·
Water withdrawal activity would be coordinated with ADFG and ADNR.
3.4
Social and Economic Environment
3.4.1
Land Use and Recreation
Affected Environment The project area lies north of the DMTS and Red Dog Mine. Landownership in
the region consists of Bureau of Land Management (BLM), National Park Service (NPS), Native, and
State lands. All lands in the project area are State lands and two parcels owned by NANA. NPS lands are
limited to the Noatak National Preserve, east of the project. (Bureau of Land Management) BLM lands
are scattered north and east, outside of the project area. There are no ANSCA (Alaska Native Claims
Settlement Act) 17(b) easements or Revised Statue 2477 easements in the project area.
All of the project is in the NAB. The NAB has designated the lands as resource development (NAB
2011).
Area residents use all-terrain vehicles (ATVs) and snow machines as personal modes of transportation to
conduct subsistence activities throughout the region.
No Action No impacts to land use would take place.
Proposed Action Use of the access road for travel would increase traffic in the area for subsistence,
recreation, and other land uses. Although the access road is not open to the public, inadvertent casual use
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
28
of the access road is expected to consist of primarily snow machines from adjacent communities
(Kivalina and Noatak). Proposed land use is compatible with the resource development zoning under the
NAB.
The Public Interest Review for Land Use and Recreation finds no significant negative effect from the
Proposed Action. In the long term, Land Use and Recreation is expected to have no significant impact
from the Proposed Action.
Avoidance, Minimization, and Mitigation
·
Public access would be restricted along the new access road under ADNR authority to protect
public safety. This would limit road traffic to project construction and support vehicles.
3.4.2
3.4.2.1
Socioeconomics
Environmental Justice
Affected Environment Kivalina and Noatak are the closest communities to the Proposed Action and
are representative of all of the communities in the entire region (Table 5). Both are majority Alaska
Native, with high levels of individuals below the poverty level. Incomes are relatively low, considering
the high cost of living in rural Alaska.
Table 5: Noatak and Kivalina Socioeconomic Information (U.S. Census Bureau 2010)
Noatak
Residents
Kivalina
514
374
467
364
47
10
Median Age
26.9
23.2
% High School Education or Greater
84%
63%
93
145
$44,464
$59,063
29%
26%
Alaska Native
Other
Housing Units
Median Household Income
Individuals below poverty level
Economic opportunities are limited, with many of the wage labor job/positions being part-time or
seasonal. The Alaska Department of Labor and Workforce Development (DLWD 2016) reports most
residents are employed by local government; with professional and business services, educational and
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
29
health services, and natural resources and mining also providing important jobs. Local employers include
the City, Village Council, school district, local store, NANA Regional Corporation, and Red Dog Mine.
Community and public facilities include the washeteria, the City/Tribal Office, the U.S. Post Office, the
Alaska Village Electric Cooperative (AVEC) facility, airport snow removal equipment building, and
associated community halls. Some households do not have full plumbing. In these cases, water is hauled
from the storage tanks to residences. Residential sewage is hauled from residences in "honey buckets" to
disposal bunkers located throughout the community. Washeterias are community facilities which house a
restroom, laundry, and bathing facility to allow community members to have access to running water and
sewage disposal.
NANA is the Alaska Native Claims Settlement Act chartered regional corporation representing Kivalina
and Noatak. The Native Village of Kivalina and Native Village of Noatak serve as the respective
federally recognized tribal government. Maniilaq Association, a non-profit corporation, provides tribal
government services for the twelve tribes of northwest Alaska.
No Action A negative impact to Environmental Justice would take place under the No Action.
Industrial activity provides an important source of economic activity for local residents. The No Action
would result in fewer jobs, lower earnings, and increased poverty for the region. Without continued
exploration, eventually current industrial activity and associated economic spending would end.
Proposed Action The Proposed Action would provide economic stimulus for the region. Exploration
activity could employ local residents, providing an important source of income for the region. Local
industry has a proven track record with long relationships with community members, and the ability to
implement meaningful local hire programs.
The Public Interest Review for Economics finds positive effects from the Proposed Action. The
industrial activity is expected to provide benefits to local area residents, communities, and disadvantaged
populations.
Avoidance, Minimization, and Mitigation
·
Local hire efforts would take place under the Proposed Action, with the objective of providing
sustainable jobs to local residents. These efforts spread the economic benefit to disadvantaged
communities and increase local opportunities.
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
30
3.4.3
Subsistence
Affected Environment Subsistence activities are an important cultural component of the area
communities. Caribou are the principal subsistence resource in the project area. The Western Arctic Herd
(WAH) provides food to communities throughout the North Slope Borough, NAB, Nome Borough, and
unincorporated interior Alaska communities. As a result, potential disturbances to migration patterns are a
significant risk to food security.
The most complete summaries of subsistence activities are from ADFG's surveys of community
subsistence practices (ADFG 2010). Kivalina and Noatak are summarized here due to their proximity to
the project and ability to represent a typical coastal and inland subsistence community.
Inland Noatak subsistence is dominated by caribou, freshwater fish, and saltwater resources they trade for
or travel to the coast to capture (Table 6). Caribou is by far the most important resource and are
customarily taken during the fall southern migration past town. Subsistence users have traditional
locations they hunt caribou; and are sensitive to changes in migration patterns which may take the herd
outside of their reach.
Table 6: Top 10 Noatak Subsistence Resources (ADFG, 2010)
Resource
Estimated Pounds Harvested
Percent of Total Harvest
Caribou
60,061
31
Trout
32,180
17
Bearded Seal
24,990
13
Chum Salmon
24,724
13
Whitefish
14,234
7
Beluga
7,633
4
Moose
5,691
3
Blueberry
4,268
2
Salmonberry
2,666
1
Walrus
1,851
1
Coastal Kivalina subsistence is dominated by reliance on freshwater and saltwater seafood and terrestrial
caribou (Table 7). Saltwater seal, beluga, and cod are easy to access from boats and sea ice. The
importance of trout (primarily Dolly Varden) is difficult to underestimate given their small size and large
pounds harvested. The Wulik River produces the State's largest Dolly Varden, and Kivalina harvest large
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
31
quantities of these anadromous fish. Caribou are also important, and residents often have to travel up the
Wulik River to intercept the herd as it migrates south in the fall. This can make residents very sensitive to
changes in the herd's movements from customary migration routes.
Table 7: Top 10 Kivalina Subsistence Resources (ADFG, 2010)
Resource
Estimated Pounds Harvested
Percent of Total Harvest
Bearded Seal
96,188
37
Trout
67,739
26
Caribou
36,458
14
Beluga
28,285
11
Saffron Cod
5,294
2
Ringed Seal
5,280
2
Salmonberry
3,184
1
Blackberry
2,320
1
Chum Salmon
2,291
1
Moose
2,075
1
No Action No impacts to subsistence would take place.
Proposed Action The Proposed Action may increase the local access to subsistence resources for area
residents. The access roads may be used incidentally during normal and traditional use of the area. It
would expand subsistence harvest opportunities for residents, particularly during low snow years where
snow cover or ice bridges may be rare.
Increased activity may cause changes to caribou movement (see Caribou Migration Patterns and
Movement, Section 3.3.2.2 above). This could increase or decrease the amount of caribou available to
harvest in traditional areas. Implementation of the caribou policy is expected to minimize any potential
negative interaction with caribou migration.
Avoidance, Minimization, and Mitigation
·
The caribou policy implements procedures for exploration access road users to minimize impacts
to caribou from vehicular traffic on the road, including temporary road closures or halted traffic
to accommodate caribou movements.
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
32
3.4.4
Aesthetics (Visual Resources)
Affected Environment The project area occupies a variety of landscapes. The majority of the study
area is in remote undeveloped land. This includes topography dominated by mountains, rolling hills, and
wetland valleys. Vegetation is typical of Northwest Alaska, with alpine, tundra, and freshwater stream
complexes visible during the summer. Most of the landscape is covered with scrub shrub vegetation.
Winter brings a change in aesthetics, with frozen landscapes, windblown snow, and a more rugged visual
resource. The closest local communities are at least 30 miles away.
An industrial resource extraction operation (e.g. Red Dog Mine) is present south of the project area.
Visual elements include a large open pit mine, along with existing access roads and associated industrial
equipment. Rehabilitated lands have been shaped to match existing topography and revegetated with
vegetation visually matching the surrounding area.
Viewer groups include industrial workers and individuals taking part in subsistence activities. Subsistence
activity may take place over any portion of the study area and is dispersed due to the lack of centralized
access routes.
No Action No impacts to aesthetics would take place.
Proposed Action The magnitude of impacts would differ for separate Proposed Action elements. The
access roads, bridges, culverts, and pads would have low to moderate visual contrast. Elements would be
visible from a distance, but not significantly change the regional setting. The underground exploration
would have little visual impacts, as the surface would be largely undisturbed. The WRF would have a
local moderate visual impact. The facility would distract from the natural landscape but is relatively
minor compared to regional resource extraction facilities.
The duration of visual impacts would differ for separate project elements. The bridges, culverts, WRF,
and structures would extend through the life of the project but be removed when the project is complete.
The pad and road impacts would be permanent and extend beyond the life of the project.
The scope of impact would be restricted due to the natural topography of the area. The potential viewers
are industrial workers or dispersed subsistence users. The Proposed Action has been sited inside a valley,
limiting long range visual impacts. Conducting underground exploration also limits the amount of
disturbance to the viewshed; avoiding a large surface disturbance.
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
33
The context of the impact matches adjacent land uses. This area has a history of mixing industrial mineral
development with subsistence land use practices. The existing visual resources are not recognized for
specific scenic value, and do not have management standards protecting it. The NAB planning documents
emphasize promotion of compatible industrial and subsistence use in the area (Northwest Arctic Borough.
1993).
The Public Interest Review for Aesthetics finds no significant negative effect from the Proposed Action.
With the Avoidance, Minimization, and Mitigation Measures (below), the impact to aesthetics is expected
to not be significant.
Avoidance, Minimization, and Mitigation: NEPA
Reclamation activities would include minimizing the impact to aesthetics, including:
·
Removing the stockpiled material from the WRF.
·
All surface structures would be removed, and the pads would be graded to blend with the
surrounding environment, seeded, and allowed to naturally revegetate. Any clean stockpiled
topsoil would be re-applied where the terrain is suitable for such application.
·
Bridges (spans and abutments), and culverts would be removed, creating low water crossings.
·
The road would be reseeded for stabilization and then allowed to naturally revegetate.
3.4.5
Cultural Resources
Affected Environment Northwest Alaska has been occupied by humans for at least the last 10,000
years. Archaeological investigations intended to identify archaeological resources within the APE have
included background research and pedestrian field investigations (August 24-29, 2017). Additional
surveys are anticipated in the summer of 2018, focused on the facility area. Research included a literature
review, archival research, and identification of expected resources. Field results included initial aerial
overflights and pedestrian surveys at high probability areas. No structures are present, so no building
surveys were conducted. Prehistoric and historic sites were identified, and site boundaries were identified
in cultural resource reports (WHPacific, 2017b).
No Action No impacts to cultural resources would take place.
Proposed Action Pursuant to 36 CFR 800.5(b), implementing regulations of Section 106 of the
National Historic Preservation Act, the USACE, in consultation with SHPO, will make a Finding of
Effect to historic properties by the Proposed Action.
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
34
Archaeological investigations to date did not result in the identification of any elements which contribute
to a continuing understanding of the prehistory or history within the APE. As such, construction of the
Proposed Action would not have an adverse effect to the integrity of the sites or their continuing
eligibility for the National Register of Historic Places.
We anticipate the USACE will determine that no historic properties would be affected and will seek
concurrence from SHPO.
The Public Interest Review for Historic Properties finds no significant negative effect from the
Proposed Action. Historic Properties have been avoided by the Proposed Action.
Avoidance, Minimization, and Mitigation: NEPA
·
Eligible, or potentially eligible, sites within the APE, for which the project has been designed to
avoid would include a protective buffer of 500 feet (ft). Where the protective buffer is less than
500 ft the site would be flagged by a cultural resources specialist meeting the qualification of 48
FR 44738-44739.
·
TAI would provide cultural training to project personnel, contractors, and subcontractors within
their first week of employment. The training materials would be prepared or approved by a
qualified archaeologist meeting the qualifications of 48 FR 44738-44739.
·
TAI also proposes to consult with local Native communities regarding DEL-00556 (reindeer
bells) in order to determine if there is any interest in collecting the reindeer bells. These could be
used to in an educational context to examine the role of the Alaska Reindeer Service in the
history of the region. Further information is available in the restricted cultural resources technical
report.
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
35
4
MITIGATON
Unavoidable effects associated with the Proposed Action would take place from: (1) temporary and
localized increases in noise; (2) fill in WOTUS; (3) temporary water quality impacts; and (4) minor
impacts to visual resources. The following measures have been incorporated into the Proposed Action to
avoid, minimize, and mitigate for adverse impacts to the natural and human environment.
4.1
Avoidance, Minimization, and Mitigation: NEPA
Noise
·
Noise impacts to caribou would be limited through implementation of a caribou policy. The
caribou policy would implement procedures for exploration access road users to minimize
impacts to caribou from vehicular traffic on the road, including temporary road closures or halted
traffic to accommodate caribou movements.
·
Safety procedures for blasting would ensure compliance with MSHA noise standards for
exploration workers.
Surface Water
·
Culverts and bridges have been designed to carry flows and not require in water work.
·
Surface waterbodies would be permitted for Temporary Water Use through ADNR.
Geochemistry
·
During excavation of cut slopes for construction of access roads, development of material sites, or
any other areas resulting in exposure of PAG, a rock segregation plan would be implemented to
identify and manage it. The segregation plan would be approved by ADEC. During construction,
a qualified geologist would visually examine the cut material and make a determination whether
or not it is suitable for construction (i.e. non-PAG). Cut material designated as PAG would be
segregated, removed from the cut and be excluded from further use in accordance with the
segregation plan.
Water Quality
·
Measures to minimize releases of sediment to water bodies would be implemented during
construction as part of compliance with the APDES Multi Sector General Permit (MSGP).
Compliance with the MSGP includes preparation of a SWPPP and implementation and
monitoring of erosion and sediment control BMPs;
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
36
·
Water withdrawal would require ADNR permitting and would specify appropriate BMPs;
including water withdrawal volume limitations.
·
All contact and seepage water collection associated with the WRF facility and underground
activities would be treated and discharged in accordance with APDES discharge permits.
·
Bridge abutments would be constructed during winter above ordinary high-water levels and
without modifying the natural stream channels. Culvert crossings would be constructed in winter
to avoid flowing water.
Floodplains
·
Stream crossings, roads, and pads would be designed to incorporate expected high-water flows
and aufeis.
·
Bridge abutments would be constructed above ordinary high-water levels and without modifying
the natural stream channels.
Wetlands and Vegetation
·
Avoidance: Due to the linear nature of the proposed project and the abundance of WOTUS within
the project area, total avoidance is not practicable. Where practicable, facilities were located to
avoid impacts to WOTUS.
o
Lower impact crossing methods (e.g. bridges) were utilized along fish streams instead of
culverts.
o
The road corridor was located on drier ground with less WOTUS and greater use of uplands,
where practicable.
·
Minimization: The proposed project minimizes impacts to WOTUS to the maximum extent
practicable by reducing the project footprint, maximizing the use of uplands and controlling the
materials after the discharge:
o
The road was designed as a single lane road with vehicle pullouts, as opposed to a wider twolane road, reducing WOTUS impacts where crossings could not be avoided.
o
The proposed road corridor maximized, to the extent practicable the use of flat terrain,
reducing the need for fill material and side cut construction, reducing impacts where
crossings WOTUS could not be avoided.
o
At some locations, the road alignment was designed to impact edges of wetlands rather than
bisecting the entire wetland habitat, where practicable.
o
Stream crossings were designed to be perpendicular to flow direction, to the extent
practicable.
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
37
o
Natural flow patterns would be maintained through the use of culverts and bridges;
o
The temporary WRF was designed to maximize waste rock storage capacity, while
minimizing the facility footprint size and maintaining stability.
o
Sediment barriers would be installed around the perimeter of the construction areas at water
crossings.
o
ADFG - Fish Habitat Permit restrictions and BMPs for in-water work and bridge abutment
designs would be adhered to, in order to minimize potential impacts to fish and other aquatic
species.
o
The construction contractor would develop and implement a SWPPP to address erosion and
sediment control as required by the ADEC APDES MSGP.
·
Compensation: There are no existing mitigation banks, or In-lieu fee programs with service areas
in the watershed that can satisfy the mitigation needs for the proposed project. Permitteeresponsible mitigation is the only practical mechanism to provide compensatory mitigation for the
unavoidable loss of 16.1 acres, and 5,031 linear feet of permanent impacts to WOTUS. TAI is
proposing preservation of WOTUS within the Red Dog Creek watershed at a 1:1 ratio, by means
of a deed restriction that would protect aquatic resources from future development as described in
the wetlands mitigation plan.
Birds
·
The Proposed Action alternatives have been routed to minimize with steep slopes and potential
raptor nesting habitat wherever feasible;
·
TAI would make note of any Golden Eagle activity in the area during construction activities and
take all practical steps to minimize disturbance of the birds. TAI would contact USFWS if an
active Golden Eagle nest site is identified.
·
Where possible, vegetation clearing, site preparation, and construction activities would adhere to
the recommended periods to avoid vegetation clearing from June 1July 31 for Northern Alaska
(USFWS 2017). If vegetation clearing, site preparation, and construction occurs within these
periods, pre-construction nest surveys would be conducted by qualified personnel and appropriate
mitigation developed in consultation with the USFWS.
·
Winter road construction schedule would eliminate the risk of impacting the nests of migratory
birds in the program area during the months when snow covers the ground. TAI has scheduled the
access road and pad construction for the winter months to the greatest practical extent.
·
Disturbed ground is less desirable to ground-nesting birds which otherwise rely on the tundra
cover to disguise and construct their nests. If the actual schedule of activities indicates that
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
38
disturbance of native ground would be necessary during the typical nesting periods for the
migratory birds, TAI would place "bird tape" to discourage birds from nesting in areas designated
for disturbance during the nesting season.
·
Temporary disturbance, reclaimed land, and other areas of ground disturbance would be
revegetated with regionally appropriate seed mix that minimizes introduction of noxious weeds
where practicable.
Wildlife
·
The caribou policy implements procedures for exploration access road users to minimize impacts
to caribou from vehicular traffic on the road, including temporary road closures or halted traffic
to accommodate caribou movements.
·
Construction activities are not scheduled during the fall caribou migration period, and blasting
would occur during the winter months
Fish and Fish Habitat
·
Alternative evaluation selected route and bridge type that avoided permanent impacts to Red Dog
Creek.
·
Compliance with the APDES MSGP, and implementation of the required SWPPP and BMPs to
reduce potential of sediment from entering fish bearing waterways.
·
Water withdrawal activity would be coordinated with ADFG and ADNR.
Land Use and Recreation
·
Public access would be restricted along the new access road under ADNR authority to protect
public safety. This would limit road traffic to project construction and support vehicles.
Environmental Justice
·
Local hire efforts would take place under the Proposed Action, with the objective of providing
sustainable jobs to local residents. These efforts spread the economic benefit to disadvantaged
communities and increase local opportunities.
Subsistence
·
The caribou policy implements procedures for exploration access road users to minimize impacts
to caribou from vehicular traffic on the road, including temporary road closures or halted traffic
to accommodate caribou movements.
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
39
Aesthetics (Visual Resources)
Reclamation activities would include minimizing the impact to aesthetics, including:
·
Removing the stockpiled material from the WRF.
·
All surface structures would be removed, and the pads would be graded to blend with the
surrounding environment, seeded, and allowed to naturally revegetate. Any clean stockpiled
topsoil would be re-applied where the terrain is suitable for such application.
·
Bridges (spans and abutments), and culverts would be removed, creating low water crossings.
·
The road would be reseeded for stabilization and then allowed to naturally revegetate.
Cultural Resources
·
Eligible, or potentially eligible, sites within the APE, for which the project has been designed to
avoid would include a protective buffer of 500 feet (ft). Where the protective buffer is less than
500 ft the site would be flagged by a cultural resources specialist meeting the qualification of 48
FR 44738-44739.
·
TAI would provide cultural training to project personnel, contractors, and subcontractors within
their first week of employment. The training materials would be prepared or approved by a
qualified archaeologist meeting the qualifications of 48 FR 44738-44739.
·
TAI also proposes to consult with local Native communities regarding DEL-00556 (reindeer
bells) in order to determine if there is any interest in collecting the reindeer bells. These could be
used to in an educational context to examine the role of the Alaska Reindeer Service in the
history of the region. Further information is available in the restricted cultural resources technical
report.
4.2
Compensatory Mitigation
There are no existing mitigation banks, or In-lieu fee programs with service areas in the watershed that
can satisfy the mitigation needs for the proposed project. Permittee-responsible mitigation is the only
practical mechanism to provide compensatory mitigation for the unavoidable loss of 16.1 acres, and 5,031
linear feet of permanent impacts to WOTUS. TAI proposes preservation of WOTUS within the Red Dog
Creek watershed at a 1:1 ratio, by means of a deed restriction that would protect aquatic resources from
future development. TAI would submit a Compensatory Mitigation Plan to the USACE for the proposal,
under separate cover, that would include timelines and designs, maintenance plans, performance
standards, and monitoring requirements.
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
40
5
CUMULATIVE EFFECTS
Cumulative effects include effects resulting from past, current, or reasonably foreseeable future Federal,
State, tribal, local or private actions that are reasonably foreseeable to occur in the project area. The scope
of the cumulative effects is the longest period of time of the Proposed Action (4 years). The geographic
area of cumulative effects is comprised of two watersheds totaling 292,348 acres (Headwaters of the
Wulik River HUC (1905040407, 168,557 acres) and Ikalukrok Creek HUC (1905040408, 123,791
acres)). In comparison the Proposed Action would disturb less than 200 acres within these watersheds.
Past actions: The Red Dog Mine is the only other existing development in the geographic area. It is
adjacent but unconnected to the Proposed Action. The Proposed Action would proceed independently of
any actions at the Red Dog Mine.
Current actions: There is one current proposed project within the geographic area. Teck Alaska
Incorporated has proposed to expand the Red Dog Mine's Tailings Storage Facility and Waste Dump
facility to contain mill material and waste rock from the Red Dog Mine's Aqqaluk and Qanaiyaq deposits.
The proposed wetland and upland disturbance area associated with this action is approximately 56 acres.
Reasonably foreseeable future actions: None. There are no known reasonably foreseeable future actions
being proposed within the geographic area of the Proposed Action. Although the results of the exploration
program may determine that the mineral resource is viable, it is premature to assume a mine would be
constructed at the site at some point in the future. Development of a mine is outside of the scope and
scale of what is considered a foreseeable future project as the likelihood of this taking place is not
definitive enough to be able to evaluate it in a qualitative or quantitative manner at this time.
Kivalina and Noatak are the two local communities within or near the geographic extent of the project.
Noatak is outside of the watershed HUCs but depends on subsistence resources which migrate through the
area. Kivalina is downstream of the Proposed Action, but outside of the 10 digit HUC
The Proposed Action would incrementally increase disturbance within the watersheds. However, given
the large undeveloped area in the region the Proposed Action is not anticipated to generate significant
incremental adverse effects, when considered in conjunction with other past, present, and reasonably
foreseeable future actions.
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
41
6
COORDINATION
Public involvement and agency coordination activities have occurred since 2015. Meetings in the
community are held consistently for this project to keep the community involved and informed about
ongoing activities in the region, including the current helicopter supported exploration activities as well as
the plans for a year-round exploration program and what that program would entail (Proposed Action).
Community input continues to be an important element of development planning in the region. Local
elders and community members provided local perspective, subsistence advice, and are kept up to date on
exploration work, the proposed access route, permitting and planned community engagement activities.
Table 8 outlines the public involvement activities and Table 9 outlines agency coordination completed to
date.
Planned exploration engagement for the remainder of 2018 would include:
·
In depth socio-economic baseline study with door to door surveys in the Local Study Area
(Kivalina and Noatak), and focus groups and surveys with community leadership and service
providers in the remaining nine villages. Secondary data on social, economic, land use and health
would be compiled for all 11 villages in the region.
·
Monthly Kivalina IRA/City Meetings.
·
Monthly Noatak IRA Meetings.
·
Community Meetings at least once per year.
·
Implementation of an Exploration Engagement Committee (TAI, NANA, Kivalina, Noatak
representatives) to meet quarterly and discuss permitting processes, engagement and socioeconomic study.
·
Opening a Project Office in Kivalina.
·
Training and Employment Plan.
·
Development of software to track engagement and community concerns/comments.
·
Implementation of a community level feedback mechanism.
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
42
6.1
Public Involvement
Table 8: Public Involvement
Public Involvement
Date
Community/
Organization
Activity
Description
June 19, 2015
Elders of
Noatak
In home Elders
Visits
Meeting with elders in the community to introduce the
Project and ask how they would like to be engaged on the
Project
July, 2015
Elders of
Kivalina
In home Elders
Visits
Meeting with elders in the community to introduce the
Project and ask how they would like to be engaged on the
Project
September 24,
2015
NANA
Leadership meeting
& Helicopter Site
Tour
NANA leadership, including board members from
Kivalina & Noatak, and the Red Dog Subsistence
Committee visit Teck Exploration at the Red Dog camp to
receive a PowerPoint presentation on exploration activities
and take a helicopter site tour of the Anarraaq site.
December 9,
2016
Noatak
Student Visits &
Community
Meeting
Presented to the High School Students and held a
community meeting in Noatak to introduce the exploration
project. Followed by a community meal.
January 16, 2017 Kivalina
Student Visits &
Community
Meeting
Presented to the High School Students and held a
community meeting in Kivalina to introduce the
exploration project. Followed by a community meal.
April 13, 2017
Noorvik
Community
Meeting
Part of a Red Dog Community Meeting 1-2 introductory
slides provided on exploration
May 16, 2017
Selawik
Community
Meeting
Part of a Red Dog Community Meeting 1-2 introductory
slides provided on exploration
June 9, 2017
Buckland
Community
Meeting
Part of a Red Dog Community Meeting 1-2 introductory
slides provided on exploration
July 5, 2017
Kiana
Community
Meeting
Part of a Red Dog Community Meeting 1-2 introductory
slides provided on exploration
September 12,
2017
Kotzebue
Leadership Meeting
Part of a Red Dog Community Meeting 1-2 introductory
slides provided on exploration to Kotzebue Leadership
April 13, 2019
Kivalina
Leadership Meeting
Meeting with Kivalina IRA to discuss the upcoming stages
of the exploration work, the proposed access route, and
planned community engagement activities
May 21, 2018
Noatak
Leadership Meeting
Meeting with Noatak IRA to discuss the upcoming stages
of the exploration work, the proposed access route, and
planned community engagement activities
May 21, 2018
Noatak
Community
Meeting
Meeting with community of Noatak to discuss the
upcoming stages of the exploration work, the proposed
access route, permitting and planned community
engagement activities
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
43
Public Involvement
Date
Community/
Organization
Activity
Description
May 22, 2018
Kobuk
Community
Meeting
Meeting with the Kobuk community to discuss the
upcoming stages of the exploration work, the proposed
access route, and planned permits
May 22, 2018
Shungnak
Community
Meeting
Meeting with the Shungnak community to discuss the
upcoming stages of the exploration work, the proposed
access route, and planned permits
May 24, 2018
Deering
Community
Meeting
Meeting with the Deering community to discuss the
upcoming stages of the exploration work, the proposed
access route, and planned permits
May 24, 2018
Noorvik
Community
Meeting
Meeting with the Noorvik community to discuss the
upcoming stages of the exploration work, the proposed
access route, and planned permits
May 30, 2018
Ambler
Community
Meeting
Meeting with the Ambler community to discuss the
upcoming stages of the exploration work, the proposed
access route, and planned permits
May 30, 2018
Kiana
Community
Meeting
Meeting with the Kiana community to discuss the
upcoming stages of the exploration work, the proposed
access route, and planned permits
May 31, 2018
Kivalina
Leadership Meeting
Meeting with Kivalina IRA to further discuss the
exploration work and proposed access route
May 31, 2018
Kivalina
Community
Meeting
Meeting with community of Kivalina to discuss the
upcoming stages of the exploration work, the proposed
access route, permitting and planned community
engagement activities
June 1, 2017
Regional
Elders
Council
Leadership Meeting
Meeting with regional Elders Council to discuss the
upcoming stages of the exploration work, the proposed
access route, permitting and planned community
engagement activities
June 7, 2018
Kotzebue
Leadership Meeting
Meeting with Kotzebue leadership to discuss the
upcoming stages of the exploration work, the proposed
access route, permitting and planned community
engagement activities
June 7, 2018
Buckland
Community
Meeting
Meeting with the Buckland community to discuss the
upcoming stages of the exploration work, the proposed
access route, and planned permits
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
44
6.2
Agency Coordination
Table 9: Agency Coordination
Organization
ADEC
Description
·
·
·
ADNR
·
·
·
·
ADFG
·
·
·
·
SHPO
·
·
·
EPA
·
·
TAI makes frequent phone contact with ADEC staff as the company develops baseline
environmental programs and strategies for managing water and development rock and
reclamation planning for future activities associated with the Anarraaq and Aktigiruq
exploration program.
In April 2018 TAI organized a web meeting with permitting agencies to review the entire
proposed exploration program.
TAI principal contact at ADEC is Tim Pilon, Engineer with the Water Section.
TAI makes frequent phone contact with ADNR staff in the mining and water sections as the
company has been developing its Plan of Operations for the Anarraaq and Aktigiruq
exploration program.
ADNR staff provide information to the company on material sales requirements, reclamation,
road construction, baseline studies and bonding requirements.
ADNR staff participated in the April 2018 Webinar where TAI presented plans for the project
and discussed the permitting that would be required.
TAI's principal contact at ADNR is Brent Martellaro, Geologist in ADNR's Mining Section.
TAI makes frequent phone contact with ADFG particularly with regard to fish passage, fish
habitat, bridge designs, stream crossings and Title 16 permitting for the Anarraaq and
Aktigiruq exploration program.
ADFG participated in the April 2018 webinar.
ADFG would have input into bridge abutment designs for those bridges that are proposed for
fish-bearing streams along the proposed road route. ADFG have been performing aquatic life
studies in the project area for more than 20 years.
TAI's principal contact at ADFG is Audra Brase, Regional Supervisor.
TAI is in regular contact with SHPO for the purpose of discussing past and ongoing cultural
resource surveys in the Anarraaq and Aktigiruq exploration area.
SHPO issues permits for the company's survey work and reviews the survey reports for
adequacy.
TAI's principal contact at SHPO is McKenzie Johnson, Archaeologist.
TAI has made infrequent contact with EPA for the purpose of discussing water management
and water discharges.
TAI has no principal contact with EPA.
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
45
7
REFERECES
ADFG. 2001. Memorandum of Agreement between Alaska Department of Fish and Game and Alaska
Department of Transportation and Public Facilities for the Design, Permitting, and Construction
of culverts for fish passage. Accessed on May 30, 2018 at
http://www.adfg.alaska.gov/static/license/uselicense/pdfs/dot_adfg_fishpass080301.pdf.
ADFG. 2008. Falcons. https://www.adfg.alaska.gov/static/education/wns/falcons.pdf. Accessed on
August 1, 2017.
ADFG. 2010. Community Subsistence Information System. Access on May 30, 2018 at
http://www.adfg.alaska.gov/sb/CSIS/
ADFG. 2017. Aquatic biomonitoring at Red Dog mine, 2016. Technical Report No. 17-07.
http://www.adfg.alaska.gov/static/home/library/pdfs/habitat/17_07.pdf. Accessed on August 28,
2017.
ADFG. 2018a. Al Ott, personal communication.
ADFG. 2018b. Western Arctic Caribou Herd Increases After Years of Decline - ADFG Press Release.
Accessed on May 30, 2018 at
http://www.adfg.alaska.gov/index.cfm?adfg=pressreleases.pr&release=2018_01_10
ADNR. 2008. Northwest Area Plan for State Lands. Adopted October 2008, Alaska Department of
Natural Resources, Division of Mining, Land and Water, Resource Assessment, and
Development Section. http://dog.dnr.alaska.gov/Documents/Leasing/
ADNR. 2018. Water Rights Estate Map. Accessed on May 23, 2018 at
http://dnr.alaska.gov/mapper/controller?do=view&view=map#map=8/18205624.11/10430742.77
Audubon. 2016. Ecological atlas of Alaska's western Arctic, Third Edition. Anchorage, Alaska, 71 pp.
Benítez-López. A., R. Alkemade, and P.A. Verweij. 2010. The impacts of roads and other infrastructure
on mammal and bird populations: A meta-analysis. Biological Conservation 143: 13071316.
Beyer, H.L., R. Ung, D.L. Murray, and M.J. Fortin. 2013. Functional responses, seasonal variation and
thresholds in behavioural responses of moose to road density. Journal of Applied Ecology, 50:
286-294.
BLM. 1999. https://www.blm.gov/nstc/library/pdf/RaptorTN413.pdf
CARMA (CircumArctic Rangifer Monitoring and Assessment Network). 2018. Western arctic caribou
herd and Teshekpuk Lake caribou herd. Accessed on May 30, 2018 at https://carma.caff.is
Dames & Moore. 1983a. Environmental baseline studies, Red Dog Project. Report for Cominco Alaska
Inc., Red Dog Mine, Kotzebue, by Dames and Moore, Anchorage, Alaska.
Dames & Moore. 1983b. Supplement to environmental baseline studies, Red Dog Project. Report for
Cominco Alaska Inc., Red Dog Mine, Kotzebue, by Dames and Moore, Anchorage, Alaska.
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
46
DLWD. 2016. Alaska Local and Regional Information. Accessed on May 30, 2018 at
http://live.laborstats.alaska.gov/alari/
Johnson, J. and B. Blossom 2017. Catalog of waters important for spawning, rearing, or migration of
anadromous fishes - Arctic Region, Effective June 1, 2017. Alaska Department of Fish and
Game, Special Publication No. 17-01, Anchorage. Accessed on May 23, 2018 at
https://www.adfg.alaska.gov/sf/SARR/AWC/index.cfm?ADFG=main.home
Kite, R., T. Nelson, G. Stenhouse, and C. Darimont. 2016. A movement-driven approach to quantifying
grizzly bear (Ursus arctos) near-road movement patterns in west-central Alberta, Canada.
Biological Conservation 195: 24-32.
Murphy, S.M., and J.A. Curatalo. 1987: Activity budgets and movement rates of caribou encountering
pipelines, roads, and traffic in northern Alaska. Canadian Journal of Zoology 65: 2483-2490.
NMFS. 2018. NOAA Habitat Conservation. Habitat Protection. EFH Mapper. Accessed on July 17, 2018
at https://www.habitat.noaa.gov/protection/efh/efhmapper/.
Northrup, J.M., J. Pitt, T.B. Muhly, G.B. Stenhouse, M. Musani, and M.S. Boyce. 2012. Vehicle traffic
shapes grizzly bear behaviour on a multiple-use landscape. Journal of Applied Ecology 49: 11591167.
Northwest Arctic Borough. 1993. Northwest Arctic Borough, Comprehensive Plan. March 1993.
Northwest Arctic Borough. 2011. Zoning Districts 2011. Accessed on May 30, 2018 at
http://www.nwabor.org/wp-content/uploads/zoningmap2011.pdf.
Ott, A.G. and W.A. Morris. 2007. Aquatic biomonitoring at Red Dog Mine, 2006 Permit No. AK003865-2. Technical Report No. 07-03. Alaska Department of Fish and Game, Division of
Habitat and Restoration. https://www.adfg.alaska.gov/static/home/library/pdfs/habitat/07_03.pdf
Ott, A.G. and W. A. Morris. 2012. Aquatic biomonitoring at Red Dog Mine, 2011 National Pollution
Discharge Elimination System Permit No. AK-003865-2. Alaska Department of Fish and Game
Division of Habitat. https://www.adfg.alaska.gov/static/home/library/pdfs/habitat/12_02.pdf
Ott, A.G., H.L. Scannell, and P.T. Bradley. 2016. Aquatic biomonitoring at Red Dog Mine, 2015 Permit
No. AK-003865 (Modification #1). Technical Report No. 16-01. Alaska Department of Fish and
Game, Division of Habitat and Restoration.
http://www.adfg.alaska.gov/static/home/library/pdfs/habitat/16_01.pdf
SRK. 2007. Environmental Information Document for the Aqqaluk Extension. Report to Teck Cominco
Alaska by Steffen Robertson and Kirsten (Canada) Inc. Rpt no 1CT006.004 April 2007.
SRK Consulting. 2018. A&A Exploration Project: Summary of Baseline Water Quality. Technical
Memo.
Tetra Tech. 2009. Red Dog mine extension Final Supplemental Environmental Impact Statement, Volume
1. Anchorage, AK. 530 pp.
http://dnr.alaska.gov/mlw/mining/largemine/reddog/pdf/rdseis2009vol1.pdf. Accessed on August
1, 2017.
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
47
Tibbitts, T. L., D. R. Ruthrauff, R.E. Gill, Jr., and C.M. Handel. 2005. Inventory of Montane nesting
Birds in the Arctic Network of National Parks, Alaska. Arctic Network Inventory and Monitoring
Program, USDI National Park Service. NPS/AKARCN/NRTR-2006/02. Fairbanks, AK. 156 pp.
Accessed on May 24, 2018 at
https://web.archive.org/web/20170211103913/https://www.nps.gov/gaar/learn/nature/upload/NPS
_AKRARCN_NRTR-2005-01-2.pdf
U.S. Census Bureau. 2010. Quickfacts. Accessed on May 30, 2018 at https://www.census.gov/quickfacts/
USFWS. 2017. Timing recommendations for land disturbance & vegetation clearing. Accessed on August
19, 2017 at
https://www.fws.gov/alaska/fisheries/fieldoffice/anchorage/pdf/vegetation_clearing_2017.pdf.
USFWS. 2018. IPAC Information for Planning and Consultation. Accessed on May 23, 2018 at
https://ecos.fws.gov/ipac/
USGS. 2018. Surface Water Historical Instantaneous Data for the Nation. Accessed on May 23, 2018 at
https://waterdata.usgs.gov/nwis/uv/?referred_module=sw
WHPacific. 2018b. Proposed Aktigiruq Exploration Access Road Cultural Resources Survey, Northwest
Arctic Borough, Alaska. Prepared for Teck American Incorporated.
WHPacific. 2018. Delineation of Wetlands and Other Waters for: Anarraaq Aktigiruq Exploration
Project. Prepared for Teck American Incorporated.
Wilson, R.R., L.S. Parrett, K. Joly, and J.R. Dau. 2016. Effects of roads on individual caribou movements
during migration. Biological Conservation 195:2-8.
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
July 2018
48
K
Wo
uk
u
R p o wr k
i ve
r
k
ol f
or
e
F
S ooner
Riv
r
er
or
li k
R
iv
Anarraaq and Aktigiruq
Exploration Site
!
(
k
8M
We
st F
Wu
in
NORTH SLOPE BOROUGH
NORTHWEST ARCTIC BOROUGH
r
K iv
al
ive
a
Ri
v er
ve
Headwaters
Wulik River
(1905040407)
er
R
Wul ik
uk
Kuk p
Ri
iles
Ferric C
re
Si n
g
Noatak
Noatak
National
National
Preserve
Preserve
ik
oal
Red
Do
g Creek
Red Dog Mine
ek
R ive r
k
er
t C
re
M
51
Ikalukrok Creek
(1905040408)
s
ile
Ik a
uk
r ok C r e e k
l
k
Kis i m i l a
Wu
li k R
iver
ka
ek
E v a in g
si
Riv
ak
lu
Cr e e
kp
Tu
ik
A
nu
k C r ek
e
ta
re e k
Tu k C
lu
g
P in a
Cre e r u k
k
W ulik
Noatak
Noatak
National
National
Preserve
Preserve
ve r
Ri
I
aivik
Ig r u g k
Cr ee
Ku
O mik v i o
ak
ch
Noatak
Noatak
National
National
Preserve
Preserve
k
ee
Kivalina
k
Cr
mi k r u k C r e e
r ok R i v e r
K
iy
ak
Cape
Cape Krusenstern
Krusenstern
National
National Monument
Monument
New
(Miles)
1 in = 7 miles
!
(
"
)
K
10
H ea r t
C r e ek
ve
ag a t s i a k
m
U Cre e k
Anarraaq and Aktigiruq Exploration Site
Borough Boundary
Place of Interest
Administrative Boundary
Proposed Road
Watershed (HUC10)
k
r
5
Ri
0
ak
2.5
C re e
k
Noatak
Noatak
National
National
Preserve
Preserve
Noa t
5
uk
R ab
SCALE
Cr e e k K u c h o r
b it
Chukchi Sea
C re
e
PROJECT LOCATION
Environmental Evaluation Document
Anarraaq and Aktigiruq Exploration Program
DATE:
06/22/2018
FIGURE:
1
ORNRC: TEA029, 07/11/2018, R04
3
er
iv
R
21
20
¬
«
& 13
18
25
26
28
29
16
21
20
19
Proposed Components
1. Anarraaq and Aktigiruq Exploration
Road
27
17
¬
«9
24
23
22
9
k
ree
¬
«3
Road Terminus
Lat: 68.158471
Long: -162.960369
li k
¬
« ¬
«
¬
«
¬
«
5
15
13
11
16
2
k
14
e
e
r
C
lukrok
rk Ika
W. Fo
¬
«
8
C
rok
Wu
14
¬
«
&
15
16
17
10
¬
«
7
12
k
alu
Facility Area
Lat: 68.1795411
Long: -162.9567713
Ik
ork
11
10
9
8
12
¬
«
¬
«4
State of Alaska
NANA Regional Corp.
4
E. F
5
¬
«1
28
29
30
2. Main Vent Service Road
g Ju
Grayl i n
3. South Vent Service Road
nio
rC
k
ree
W
er
k
Cr
ee
k
32
36
35
34
ro
k R iv
6. Materials Site AA-MS-1
33
Ik
ul i
4. North Vent Service Road
7. Materials Site AA-MS-2
k
alu
33
32
31
¬
«8
T32NR18W
T32NR19W
W
8. Materials Site AA-MS-3
T31NR18W
¬
«7
ul
T31NR19W
i
k
9.R Materials
Site AA-MS-4
i
ve
r
4
10. Portal
Camp Area
5
2
1
10
11
12
4
5
6
3
State of Alaska
NANA Regional Corp.
11. Main Vent Raise
12. North Vent Raise
13. South Vent Raise
9
8
14. Waste
Rock Facility
15. Laydown Area 1, 3, 4
9
8
7
og
dD
e
R
Creek
SCALE
0.5
0.5 0.25 0
1
21
(Miles)
1 in = 1 miles
K
e
14
¬
«6
13
23
24
19
21
29
PROPOSED ACTION OVERVIEW
Area of Potential Effect
Land Status Boundary
20
Existing
Red Dog Mine
Existing
Fish Weir Road
30
USGS Stream
Proposed Project
16
&
Road Origin
Lat: 68.0826321
Long: -162.8839214
22
17
18
&
16
17
20
a lu k r o k C r e
Ik
15
k
16. Laydown Area 2
28
Environmental Evaluation Document
Anarraaq and Aktigiruq Exploration Program
DATE:
06/22/2018
FIGURE:
2
ORNRC: TEA030, 06/20/2018, R02
35
34
33
31
36
10
11
1B
7
12
n
17
1A
lik
Ri
pt
io
W
u
21
20
22
Grayl i
un
ng J
27
ek
re
rC
io29
28
Cr
ee
k
29
30
25
26
27
28
22
21
20
19
24
23
15
16
C
ve
1
ion
k
ree
B
O
W. Fork Ikalukrok Creek
r
10
Opt
n1
C
rok
tio
Op
16
17
9
8
18
13
14
15
3
4
k
alu
9
Ik
ork
8
E. F
2
tion
Op
5
3
5
6
1
4
35
34
33
32
Route 4
u li k R i v e
35
36
34
kr
ok
e
Ika
W
34
33
32
Ro
ut
lu
33
32
31
2
r
T32NR18W
3
T32NR19W
ik
Sled
Pass
Ri
v
5
Route 3
ul
er
4
3
10
11
Re
d
17
SCALE
0.5
0.5 0.25 0
20
(Miles)
21
1 in = 1 miles
1
K
I
kr o k C r e e k
lu
14
ka
15
23
22
18
13
g
ee
Cr
k
19
24
9
8
7
12
D
o
10
16
4
5
6
1
2
Route 1
9
8
T31NR18W
T31NR19W
&
W
Existing
17 Weir Road
Fish
16
21
Existing
20
Red Dog Mine
Route 1 (Proposed Action)
Route 2
ROUTE ALTERNATIVE OPTIONS CONSIDERED
Option 1A (Proposed Action)
Route 3
Environmental Evaluation Document
Option 1B
Route 4
Anarraaq and Aktigiruq Exploration Program
Option 1C
DATE:
06/22/2018
FIGURE:
3
ORNRC: TEA036, 06/22/2018, R04
K
E.
Fo
kalu
rk I
General Area of
Proposed
Exploration
Facilities
&
krok
Creek
ro
ve
r
Ik
al
uk
k
ee
Cr
Ri
k
li
k
Cr
ee
k
Wu
r
io
W
ul
ik
Ri
Route 3
Route 4
k
Wuli
R i ver
Rou
te 1
un
gJ
n
li
y
Gra
v
er
re
&
SCALE
0.5 0.25 0
0.5
C
ek
Ik a l
k Cree k
ro
uk
k
r th
1 MILE
og
(Miles)
Route Alternative Options
Existing
Fish Weir Road
1
Existing
Red Dog Mine
1 in = 1 miles
Route 1 (Proposed Action)
k
ree
gC
No
Red
D
Fo
r
SCALE
o
dD
Re
HUC10 Watershed Boundary
USGS Stream
Route 3
Waters of the U.S.
Route 4
Other Water
Wetland
ROUTE ALTERNATIVE OPTIONS CONSIDERED
Comparison of Wetlands
Impacts For Road Alternatives
Anarraaq and Aktigiruq Exploration Program
Environmental Evaluation Document
DATE:
07/03/2018
FIGURE:
4
2
ORNRC: TEA050, 07/03/2018, R01
P4
&
P3
&
P2
&
AA-MS-1
&
og
Creek
P1
&
R
D
ed
Figure Index
4-5
4-4
4-3
4-2
K
4-1
Proposed Action
Access Infrastructure
Waters of the U.S.
Other Water
Culvert
Wetland
1,000
(FEET)
PROPOSED ACTION DETAILS
USGS Stream
Material Site
SCALE
500
500 250 0
Environmental Evaluation Document
Anarraaq and Aktigiruq Exploration Program
DATE:
06/22/2018
FIGURE:
5-1
ORNRC: TEA031, 06/22/2018, R02
AA-MS-3
&
P 12
&
P 11
&
AA-MS-2
&
Ik a
l
ok
u kr
Cre
ek
P 9-10
&
Figure Index
&
4-5
P 7-8
4-4
P 5-6
&
4-3
4-2
K
4-1
Proposed Action
Access Infrastructure
Waters of the U.S.
Other Water
Culvert
Wetland
1,000
(FEET)
PROPOSED ACTION DETAILS
USGS Stream
Material Site
SCALE
500
500 250 0
Environmental Evaluation Document
Anarraaq and Aktigiruq Exploration Program
DATE:
06/22/2018
FIGURE:
5-2
ORNRC: TEA032, 06/21/2018, R02
ek
P 15
&
G
al
ok
C
ni
C
re
ek
&
Ik
r
uk
re
Ju
ing
ra yl
or
P 14
Figure Index
&
4-5
P 13
4-4
4-3
4-2
AA-MS-3
&
K
4-1
Proposed Action
Access Infrastructure
P 12
T
Waters of the U.S.
Other Water
Culvert
Wetland
1,000
(FEET)
PROPOSED ACTION DETAILS
USGS Stream
Material Site
SCALE
500
500 250 0
Environmental Evaluation Document
Anarraaq and Aktigiruq Exploration Program
DATE:
06/22/2018
FIGURE:
5-3
ORNRC: TEA033, 06/21/2018, R04
I k a lu k
ro
k C r e ek
P 18
&
P 17
&
&
AA-MS-4
P 16
&
Figure Index
4-5
4-4
4-3
4-2
K
4-1
Proposed Action
Access Infrastructure
Waters of the U.S.
Other Water
Culvert
Wetland
1,000
(FEET)
PROPOSED ACTION DETAILS
USGS Stream
Material Site
SCALE
500
500 250 0
Environmental Evaluation Document
Anarraaq and Aktigiruq Exploration Program
DATE:
06/22/2018
FIGURE:
5-4
ORNRC: TEA034, 06/21/2018, R03
North
Vent
Raise
&
Waste Rock
&
Facility
&
P 20
&
&
P 19
&
&
Portal
Camp Area
North Vent
Service Road
Main Access Road
P 21
&
&
P 22
P 23
&
Main Vent
Service Road
Laydown
Area
1, 3, 4
&
&
&
Main
Vent
Raise
&
&
Laydown
Area 2
&
&
P 24
Figure Index
P 25
P 26
South Vent
Service Road
4-5
4-4
4-3
&
4-2
4-1
South
Vent
Raise
K
&
750 375 0
Proposed Action
Access Infrastructure
Waters of the U.S.
Other Water
Culvert
Wetland
1,500
(FEET)
PROPOSED ACTION DETAILS
USGS Stream
Facility Area
SCALE
750
Environmental Evaluation Document
Anarraaq and Aktigiruq Exploration Program
DATE:
06/22/2018
FIGURE:
5-5
ORNRC: TEA035, 06/21/2018, R03
r ok
Wu
li
aluk
rk I k
kR
i v er
K
o
E. F
Ikalukrok Creek
Upstream of West Fork
Cre
ek
Cub Creek
W. Fork
Ikalukrok Creek
Ikalukrok Creek
Upstream of East Fork
ing Junior Creek
ee
k
yl
Gra
Ik
kr
ok
Cr
Noa Creek
al u
Moil Creek
Sled Creek
d
Re
g
Do
ek
Cre
Existing
Fish Weir Road
&
SCALE
1
1 0.5 0
Existing
Red Dog Mine
Fish Presence
None
DV, AG
DV, AG, SS
(Miles)
1 in = 3 miles
AREA FISH PRESENCE
USGS Stream
Proposed Project
DV -Dolly Varden
AG -Arctic Grayling
SS -Slimy Sculpin
2
Environmental Evaluation Document
Anarraaq and Aktigiruq Exploration Program
DATE:
07/11/2018
FIGURE:
6
ORNRC: TEA051, 07/11/2018, R00
TYPICAL SECTIONS
Environmental Evaluation Document
SCALE: AS DEPICTED
Anarraaq and Aktigiruq Exploration Program
DATE:
06/22/2018
FIGURE:
1
7 1- ORNRC:
7-
TEA037, 06/22/2018, R01
TYPICAL SECTIONS
Environmental Evaluation Document
SCALE: AS DEPICTED
Anarraaq and Aktigiruq Exploration Program
DATE:
06/22/2018
FIGURE:
7- 2
ORNRC: TEA038, 06/22/2018, R01
TYPICAL SECTIONS
Environmental Evaluation Document
SCALE: AS DEPICTED
Anarraaq and Aktigiruq Exploration Program
DATE:
06/22/2018
FIGURE:
7-3
ORNRC: TEA039, 06/22/2018, R01
TYPICAL SECTIONS
Environmental Evaluation Document
SCALE: AS DEPICTED
Anarraaq and Aktigiruq Exploration Program
DATE:
06/22/2018
FIGURE:
7 -4
ORNRC: TEA040, 06/22/2018, R00
TYPICAL SECTIONS
Environmental Evaluation Document
SCALE: AS DEPICTED
Anarraaq and Aktigiruq Exploration Program
DATE:
06/22/2018
FIGURE:
7 -5
ORNRC: TEA040, 06/22/2018, R01