Home

Detroit District

Run scraper

Robert Lang

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Proposed Seawall Construction, Dredging, and Discharge of Dredged Material in Lake St Clair for a Septic Field at Harsens Island, Michigan

Please see attachment for full Public Notice.

Public Notice

US Army Corps of Engineers Detroit District Applicant:

Robert Lang

In Reply Refer To:

Corps File No. LRE-2017-01127-10-S17

August 17, 2018 September 6, 2018

Date: Expires:

Proposed Seawall Construction, Dredging, and Discharge of Dredged Material in Lake St Clair for a Septic Field at Harsens Island, Michigan

Applicant: Robert Lang 6556 Sturbridge Lane Canton, MI 48187 Project Location: The site is located at 8273 Maybury Hwy, a waterway crossing South Channel Drive at Walker's Landing, Section 01, Township 2 N, Range 15 E, Harsens Island, St. Clair County, Michigan, 48028. Federal Authority: Section 10 of the Rivers and Harbors Act of 1899 and Section 404 of the Clean Water Act. State Authority: Section 401 of the Clean Water Act requires that all discharges of dredged or fill material must be certified by the State as complying with applicable effluent limitations and water quality standards. Coastal Zone Management Certification (or waiver thereof) is required from the State of Michigan if this proposed activity would occur within the designated coastal zone. Project Description: As shown on the attached plans, the applicant proposes to: ·

·

Perform mechanical dredging of 164 cubic yards of sediment down to an elevation 1 foot above the Low Water Datum of Lake St Clair of 572.3 feet (IGLD1985) from 3 areas, measuring 100 feet long by 27 feet wide, 28 feet by 27 feet, and 36 feet long by 27 feet long; and, Install two, 100-foot long sections of new sheet steel seawall and discharge all dredged material in a 100-foot by 56.5-foot area (0.13 acre), of which approximately ¾ is presently inundated and ¼ is exposed wetland planted as lawn. The west end of filled area is proposed to be left without shore protection. The stated purpose of the proposed work is to provide moorage areas, create a septic field, and prevent erosion.

File No. LRE-2017-01127-10-S17

August 17, 2018

Avoidance & Minimization: The applicant has stated the following concerning avoidance and minimization of impacts to Waters of the United States: Homeowner is only filling in area and reclaiming what was previously land washed away by recent high water The Corps has not verified the adequacy of the applicant's avoidance and minimization statement at this time. Compensatory Mitigation: The applicant has stated the following concerning compensatory mitigation for unavoidable impacts to Waters of the United States: Homeowner needs area filled for septic field and seawall where area was washed away by recent high water just reclaiming what was lost Is Permittee-responsible mitigation proposed? No The applicant has stated that compensatory mitigation is not necessary or appropriate for the proposed work because: High water was land recently before the high water level washed away property. The Corps has not verified the adequacy of this mitigation proposal at this time. Other Authorizations: A permit is required from the Michigan Department of Environmental Quality under applicable provisions of the Natural Resources and Environmental Protection Act (NREPA), 1994 PA 451.) The State file number is 74-8273 Maybury Plaza-Harsens Island. Comments: We are publishing this notice in compliance with Title 33 Code of Federal Regulations Parts 320-332. Comments on the project should be submitted in writing and postmarked or delivered by the expiration date of this public notice. Comments of a positive or negative nature may be submitted. All responses must refer to file number LRE-2017-01127-10-S17. We will interpret a lack of response as meaning that there is no objection to the permit application. Comments should be filed with: Eric J. Warda Chief, Permit Evaluation Eastern Branch Regulatory Office Detroit District, Corps of Engineers 477 Michigan Avenue Detroit, Michigan 48226-2550 2

File No. LRE-2017-01127-10-S17

August 17, 2018

Comments may be e-mailed to: Patrick.S.O'Connor@usace.army.mil , but must include a name and mailing address. Public Hearing: Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing. Evaluation: The decision whether to issue the Department of the Army permit will be based on evaluation of the probable impacts of the proposed activity on the public interest. That decision will reflect the national concerns for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership, and, in general, the needs and welfare of the people. The Corps of Engineers is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. This activity involves the discharge of dredged or fill material into waters of the United States. Therefore, the U.S. Army Corps of Engineers' evaluation of the impact of the activity on the public interest will include application of the guidelines promulgated by the Administrator of the Federal Environmental Protection Agency, under the authority of Section 404(b)(1) of the Clean Water Act. Endangered Species: We will review this application for the potential impact on threatened or endangered species pursuant to Section 7 of the Endangered Species Act as amended. We are not aware of the presence of any listed species or critical habitat at or in the vicinity of the proposed worksite. We invite information and/or 3

File No. LRE-2017-01127-10-S17

August 17, 2018

comments regarding the potential presence of, or impacts to, any listed species or critical habitat. Cultural Resources: The District Staff has reviewed existing information on historic properties potentially affected by the proposed project, including the National Register of Historic Places. There are no recorded historic properties within the permit area. The permit area has been so extensively modified by modern development that little likelihood exists for the proposed project to impinge upon an undisturbed historic property. The District Engineer invites responses to this public notice from federal, state and local agencies, historical and archaeological societies, Indian tribes, and other parties likely to have knowledge of or concerns with historic properties in the area. Additional Information: This public notice and drawings are also available for viewing/printing at: http://www.lre.usace.army.mil/Missions/RegulatoryProgramandPermits/PublicNotices.as px. Questions concerning this application may be directed to Patrick Oconnor at the Corps of Engineers address listed above, or telephone number (313) 226-1328. FOR THE DISTRICT ENGINEER:

Eric J. Warda Chief, Permit Evaluation Eastern Branch Regulatory Office

NOTICE TO POSTMASTERS: We request that the above notice be conspicuously and continuously posted for the time period of this notice.

4

LRE-2017-01127-10-S17 (74-8273 Maybury Plaza-Harsens Island) Lang ­ New Seawall, Dredging, Wetland Fill for Septic Field Lake St Clair, St. Clair County, Michigan SHEET 4 OF 6

LRE-2017-01127-10-S17 (74-8273 Maybury Plaza-Harsens Island) Lang ­ New Seawall, Dredging, Wetland Fill for Septic Field Lake St Clair, St. Clair County, Michigan SHEET 5 OF 6

LRE-2017-01127-10-S17 (74-8273 Maybury Plaza-Harsens Island) Lang ­ New Seawall, Dredging, Wetland Fill for Septic Field Lake St Clair, St. Clair County, Michigan SHEET 6 OF 6

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas