You can copy from here when filling out the rest of the page.
PORT FOURCHON SINGLE USER MITIGATION BANK IN LAFOURCHE PARISH
NAME OF APPLICANT: Greater Lafourche Port Commission, Post Office Box 490, Cut Off, Louisiana, 70345.
LOCATION OF WORK: The project area is located in Lafourche Parish within Sections 22 and 23, Township 22 South, Range 22 East, near Port Fourchon, Louisiana. The approximate site center is Latitude 29.1650446 N, 90.2078125 W. The project is located within the Deltaic Plain of the Louisiana Coastal Zone.
CHARACTER OF WORK: The Greater Lafourche Port Commission proposes to build containment dikes and use a dredge discharge pipe to deposit dredge material into open waters adjacent to Bayou Lafourche. These activities are to be conducted for the purpose of constructing 36 acres of brackish marsh in the establishment of a single user mitigation bank.
JOINT PUBLIC NOTICE
August 20, 2018
United States Army
Corps of Engineers
New Orleans District
Regulatory Branch
7400 Leake Avenue
New Orleans, La. 70118-3651
(504) 862-1280/ FAX (504) 862-2289
Brandon.D.Gaspard@usace.army.mil
State of Louisiana
Department of Environmental Quality
Post Office Box 4313
Baton Rouge, La. 70821-4313
Attn: Water Quality Certifications
(225) 219-3225/FAX (225) 325-8250
Elizabeth.Hill@la.gov
Project Manager
Brandon Gaspard
Permit Application Number
MVN-2017-00570-MG
Project Manager
Elizabeth Hill
WQC Application Number
WQC # 180817-01
Interested parties are hereby notified that a prospectus and permit application has been
received by the New Orleans District of the U.S. Army Corps of Engineers pursuant to: [ X ]
Section 10 of the Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or
[ X ] Section 404 of the Clean Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental Quality, for a
Water Quality Certification (WQC) in accordance with statutory authority contained in Louisiana
Revised Statutes of 1950, Title 30, Chapter 11, Part IV, Section 2074 A(3) and provisions of
Section 401 of the Clean Water Act (P.L.95-17).
PORT FOURCHON SINGLE USER MITIGATION BANK IN LAFOURCHE PARISH
NAME OF APPLICANT: Greater Lafourche Port Commission, Post Office Box 490, Cut Off,
Louisiana, 70345.
LOCATION OF WORK: The project area is located in Lafourche Parish within Sections 22 and
23, Township 22 South, Range 22 East, near Port Fourchon, Louisiana. The approximate site
center is Latitude 29.1650446 N, 90.2078125 W. The project is located within the Deltaic Plain
of the Louisiana Coastal Zone.
CHARACTER OF WORK: The Greater Lafourche Port Commission proposes to build
containment dikes and use a dredge discharge pipe to deposit dredge material into open waters
adjacent to Bayou Lafourche. These activities are to be conducted for the purpose of
constructing 36 acres of brackish marsh in the establishment of a single user mitigation bank.
The comment period for the Department of the Army Permit and the Louisiana Department of
Environmental Quality WQC will close 30 days from the date of this joint public notice. Written
comments, including suggestions for modifications or objections to the proposed work, stating
reasons thereof, are being solicited from anyone having interest in this permit and/or this WQC
request and must be mailed so as to be received before or by the last day of the comment
period. Letters concerning the Corps of Engineers permit application must reference the
applicant's name and the Permit Application Number, and be mailed to the Corps of Engineers
at the address above, ATTENTION: REGULATORY BRANCH. Similar letters concerning the
-2-
Water Quality Certification must reference the applicant's name and the WQC Application
number and be mailed to the Louisiana Department of Environmental Quality at the
address above.
The application for this proposed project is on file with the Louisiana Department of
Environmental Quality and may be examined during weekdays between 8:00 a.m. and 4:30 p.m.
Copies may be obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable
impacts, including cumulative impacts of the proposed activity on the public interest. That
decision will reflect the national concern for both protection and utilization of important
resources. The benefit which reasonably may be expected to accrue from the proposal must be
balanced against its reasonably foreseeable detriments. All factors which may be relevant to the
proposal will be considered including the cumulative effects thereof; among those are
conservation, economics, aesthetics, general environmental concerns, wetlands, historic
properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation,
shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy
needs, safety, food and fiber production, mineral needs, considerations of property ownership
and, in general, the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state, and
local agencies and officials, Indian Tribes, and other interested parties in order to consider and
evaluate the impacts of this proposed activity. Any comments received will be considered by the
U.S. Army Corps of Engineers to determine whether to make, modify, condition, or deny a permit
for this proposal. To make this decision, comments are used to assess impacts on endangered
species, historic properties, water quality, general environmental effects, and other public
interest factors listed above. Comments are used in the preparation of an Environmental
Assessment and/or an Environmental Impact Statement pursuant to the National Environmental
Policy Act. Comments are also used to determine the need for a public hearing and to
determine the overall public interest of the proposed activity.
The New Orleans District is unaware of properties listed on the National Register of Historic
Places near the proposed work. The possibility exists that the proposed work may damage or
destroy presently unknown archeological, scientific, prehistorical, historical sites, or data.
Issuance of this public notice solicits input from the State Archeologist and State Historic
Preservation Officer regarding potential impacts to cultural resources.
The New Orleans District has determined that the proposed project is located in waters
known to be utilized by the West Indian Manatee (Trichechus manatus). Utilizing Standard
Local Operating Procedure for Endangered Species in Louisiana (SLOPES), dated October 22,
2014, between the U.S. Army Corps of Engineers, New Orleans and U.S. Fish and Wildlife
Service, Ecological Services Office, the Corps has determined that with the inclusion of the
Standard Manatee Conditions for In-Water Activities, proposed work is not likely to adversely
affect the West Indian Manatee.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal would
result in the destruction or alteration of 36 acre(s) of EFH utilized by various life stages of red
drum and penaeid shrimp. Our initial determination is that the proposed action would not have a
-3-
substantial adverse impact on EFH or federally managed fisheries in the Gulf of Mexico. Our
final determination relative to project impacts and the need for mitigation measures is subject to
review by and coordination with the National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters, the
evaluation of the probable impacts will include the application of guidelines established by the
Administrator of the Environmental Protection Agency. Also, a certification that the proposed
activity will not violate applicable water quality standards will be required from the Department of
Environmental Quality, before a permit is issued.
Any person may request, in writing, within the comment period specified in this notice, that a
public hearing be held to consider this application. Requests for public hearings shall state, with
particularity, the reasons for holding a public hearing.
You are requested to communicate the information contained in this notice to any other
parties whom you deem likely to have interest in the matter.
The applicant has certified that the proposed activity described in the application complies
with and will be conducted in a manner that is consistent with the Louisiana Coastal Resources
Program. The Department of the Army permit will not be issued unless the applicant received
approval or a waiver of the Coastal Use Permit by the Department of Natural Resources.
You are requested to communicate the information contained in this notice to any other
parties whom you deem likely to have interested in the matter.
Martin S. Mayer
Chief, Regulatory Branch
Enclosure
Prospectus for the Proposed
Port Fourchon Single User Mitigation Bank
Lafourche Parish, Louisiana
MVN-2017-00570-MG
July 6, 2018
Sponsor
Name:
Address:
Greater Lafourche Port Commission
P.O. Box 490
Cut Off, LA 70345
Port Fourchon Single User Mitigation Bank
1.0
1.1
2.0
3.0
3.1
3.2
3.3
3.4
4.0
4.1
4.2
4.3
5.0
6.0
6.1
6.2
6.3
6.4
6.5
7.0
INTRODUCTION .................................................................................................. 2
Site Location ....................................................................................................... 2
PROJECT GOALS AND OBJECTIVES ............................................................... 2
ECOLOGICAL SUITABILITY OF THE SITE ..................................................... 3
Historical Ecological Characteristics of the Site ................................................ 3
Current Ecological Characteristics of the Site .................................................... 3
General Need for the Project in this Area ........................................................... 4
Technical Feasibility ........................................................................................... 5
ESTABLISHMENT OF THE MITIGATION BANK ........................................... 5
Site Restoration Plan ........................................................................................... 5
Current Site Risks ............................................................................................... 6
Long-Term Sustainability of the Site .................................................................. 6
PROPOSED SERVICE AREA............................................................................... 6
OPERATION OF THE MITIGATION BANK ...................................................... 7
Project Representatives ....................................................................................... 7
Qualifications of the Sponsor.............................................................................. 7
Proposed Long-Term Ownership and Management Representatives ................. 8
Site Protection ..................................................................................................... 8
Long-Term Strategy ............................................................................................ 8
REFERENCES ....................................................................................................... 8
List of Figures
Figure 1
STATE VICINITY MAP (Sheet 1 of 13)
Figure 2
LOCAL VICINITY MAP (Sheet 2 of 13)
Figure 3
USGS 7.5' QUANDRANGLE MAP (Sheet 3 of 13)
Figure 4
MISSISSIPPI RIVER DELTAIC PLAIN MAP (Sheet 4 of 13)
Figure 5
EXISTING SITE MAP (Sheet 5 of 13)
Figure 6
EXISTING HABITAT MAP (Sheet 6 of 13)
Figure 7
PROPOSED SITE MAP (Sheet 7 of 13)
Figure 8
PROPOSED HABITAT MAP (Sheet 8 of 13)
Figure 9
HISTORICAL CONDITIONS MAP (Sheet 9 of 13)
Figure 10
TYPICAL MITIGATION BANK SECTION (Sheet 10 of 13)
Figure 11
WEB SOIL SURVEY (Sheets 11, 12, 13 of 13)
Figure 12
DRAFT CONSERVATION SERVITUDE
1
Port Fourchon Single User Mitigation Bank
1.0 INTRODUCTION
The Greater Lafourche Port Commission ("Port" or "GLPC") is a political
subdivision of the State of Louisiana. Since 2000, the Port has beneficially used millions
of cubic yards of native dredge material in converting over 800 acres of open water into
lush, saline marsh in its Harrison J. Cheramie Wildlife Sanctuary (the "Sanctuary")
located north of Port Fourchon. Hunting, trapping and fishing are prohibited in the
Sanctuary, which was dedicated by the Port in 2001. The Sanctuary is routinely patrolled
by the Port's Harbor Police force to prevent consumptive use of this pristine wetland
complex, and trespassers are prosecuted.
The Port furthered its environmental stewardship with the establishment of its
6,000' Maritime Forest Ridge situated in the Sanctuary and constructed atop the footprint
of the former Bayou Cochon ridge. The Ridge has served as a test site for woody and
grass species and is also a haven to fur-bearing animals and neo-tropical birds alike for
over 10 years.
The Port seeks to establish a single-user mitigation bank upon 36 acres of open
water in the Sanctuary. The acreage would be converted from open water to intertidal
saline marsh consistent with the Port's previous beneficial use work in the area. The
Bank would be for the sole use of Caillouet Land, LLC ("Caillouet") as compensation for
unavoidable impacts to aquatic resources associated with Caillouet development or
operations.
1.1
Site Location
The bank will be located just north of Port Fourchon in Lafourche Parish,
Louisiana in Sections 22 and 23, T-22-S, R-22-E. The approximate center of the bank is
located at 29º09'53.80" N, 90º12'28.80" W. The property surrounding the site of the
bank is predominantly non vegetated open water with broken, native marsh to the north
and marsh established by the Port to the south. See the Local Vicinity Map attached
hereto as Figure 1.
2.0 PROJECT GOALS AND OBJECTIVES
The project goal is to increase the ecological benefit of the site by converting the
area from non-vegetated open water to vegetated, intertidal marsh. Accordingly, the
habitat created will be 36 acres of saline marsh. This project will be a re-establishment of
brackish marsh which has eroded and subsided over the years. Aquatic functions that
will be re-established by this project include wildlife and fisheries habitat, wave energy
dissipation and carbon sequestration.
The primary project objective is to increase composition and productivity of the
animal community by re-establishing brackish marsh habitat. The creation of a vegetated
marsh platform provides important habitat for aquatic species (Rakocinski et al.1992,
Rozas 1992). Increased productivity of juvenile fish species is believed to occur when
2
Port Fourchon Single User Mitigation Bank
ample food sources are easily accessible (Boesch and Turner 1984, Zimmerman and
Minello 1984). Shallow water along the marsh edge provides food and protection for
young speckled trout, redfish, shrimp, and blue crabs (Barataria-Terrebonne Estuarine
Basins Map 1996). The proposed marsh platform will also provide habitat and forage for
wading and migratory waterfowl, and to a lesser degree, furbearing animals.
Secondary project objectives include increasing the footprint of vegetation and
soil organic matter in the area.
A 2011 study performed in nearby Terrebonne Bay confirmed the generally
accepted principle that waves approaching vegetated shores lose energy due to
obstructing vegetation. This reduces shore erosion and is of engineering significance for
shoreline protection. 1 Dense emergent vegetation has proven to significantly reduce
wave energy. 2 Waves propagating over salt marsh vegetation dissipate energy due to
drag induced by the stems. 3
Wetlands have the potential to remove large quantities of carbon from the
atmosphere. 4Soil organic matter in wetlands have been estimated to accrete at a rate
between 2,926 and 5,175 pounds of carbon per acre per year. 5 Further, plants capture
carbon dioxide from the air and convert it to plant parts such as leaves, stems, or roots
through a process called "fixation" or "uptake" of carbon dioxide. 6
3.0 ECOLOGICAL SUITABILITY OF THE SITE
3.1
Historical Ecological Characteristics of the Site
Historically, the site has consisted of brackish marsh interspersed with ponds and
trenasses subject to tidal influence primarily fed from the waters of nearby Bayou
Lafourche. Aerial imagery from 1989 shows roughly 1/6th of the site consisted of broken
marsh (see Historical Conditions Map attached hereto as Figure 9).
Prior to the establishment of the Sanctuary, the site and adjacent properties were
previously used recreational hunting, fishing and trapping.
3.2
Current Ecological Characteristics of the Site
The site is surrounded by (and has historically supported) the brackish marsh
sought to be established. The existing, protected population of both flora and fauna in
1
http://digitalcommons.unl.edu/cgi/viewcontent.cgi?article=1198&context=usarmyresearch
Smith, J., & Anderson, M. (2014). LIMITS OF WETLAND WAVE DISSIPATION. Coastal Engineering
Proceedings, 1(34), waves.18.
3
http://digitalcommons.unl.edu/cgi/viewcontent.cgi?article=1198&context=usarmyresearch
4
http://www.lsuagcenter.com/portals/communications/publications/agmag/archive/2013/spring/wetlandsoil-carbon-sequestration
5
http://www.lsuagcenter.com/portals/communications/publications/agmag/archive/2013/spring/wetlandsoil-carbon-sequestration
6
http://www.habitat.noaa.gov/coastalcarbonsequestration.html
2
3
Port Fourchon Single User Mitigation Bank
adjacent marsh makes the site ecologically ideal for increasing the composition and
productivity of the plant and animal community.
Currently, the site is located in the Sanctuary, where consumptive use including
fishing, hunting and trapping are prohibited by the Port. The site consists of shallow,
non-vegetated open water ranging in depth from 2 to 2.5 feet (see Typical Mitigation
Bank Section attached hereto as Figure 10) and is subject to the ebb and flow of the tide fed primarily from Bayou Lafourche and Bayou Moreau. Based on nearby readings, the
salinity levels are likely in excess of 5 ppt.
The USDA Web Soil Survey (2016) indicates the mapped soils for the site as
open water and those of adjacent marsh to be Belle Pass-Scatlake Association and
Scatlake Muck (see USDA Web Survey attached as Figure 11). These soils are found on
the federal and local hydric soils lists.
The site is permanently open water. Water depth is dictated by tidal range.
The site was previously accepted and approved by the Corps as a component of a
larger mitigation plan (MVN 2008-37-CZ, the "Slip C Mitigation Plan"). Recently, it
was removed from the Slip C Mitigation Plan. Accordingly, the Port respectfully
requests that the Corps take cognizance of the site being non vegetated open water and
forego the formal process of conducting a field Jurisdictional Determination.
3.3
General Need for the Project in this Area
Commercial fishing and eco-tourism are both significant sources of local and
regional income. Recreational fishing and hunting are not only a staple of our local
heritage, but remain a significant source of food for the community. Though the site is a
protected Sanctuary, increasing the composition and productivity of the animal
community will have far-reaching beneficial impacts on local commercial and
recreational fisheries and hunting grounds outside of the Sanctuary by enhancing
opportunities for these species to forage, feed, shelter and reproduce.
Re-creating 36 acres of marsh will enhance a rapidly deteriorating coastal buffer
system to protect against tropical weather systems. The increased protection will not
only assist the local community of Leeville, but will also assist in fortifying the "first line
of defense" for the Larose to Golden Meadow Hurricane Protection Levee System.
4
Port Fourchon Single User Mitigation Bank
3.4
Technical Feasibility
Over the past 15 years, the Port has successfully created over 800 acres of saline
marsh from open water in the immediate vicinity of the proposed site. The Port will
employ the same construction methods (ie. hydraulically dredging Port waterways and
pumping the resultant spoil material for free-flow displacement at the site) in constructing
the mitigation bank. The overall dredging projects are financially efficient, yielding not
only newly-created marsh, but also maintenance of our navigation channels.
4.0 ESTABLISHMENT OF THE MITIGATION BANK
4.1
Site Restoration Plan
Containment dikes will be constructed by the Port prior to beginning mitigation
fill by using our pontoon excavators to excavate material from the waterbottom of the
mitigation bank site. Actual material required for creation of the mitigation bank will be
hydraulically dredged from Bayou Lafourche and pumped through a disposal pipe floated
in open water to the mitigation bank site. The site will be filled to a final (postcompaction and consolidation) elevation ranging between +1.5 and +2.0 ft. NGVD an
elevation range which has proven as optimal for the development and nourishment of
intertidal marsh habitat.
The Port will take the necessary steps to ensure that no more than 15% of the
final elevation exceeds +2.0 ft. NGVD and no more than 15% falls below +1.25 ft.
NGVD (collectively referred to as the "15% Restriction Criteria"). Additionally, the
Port will ensure that none of the final elevations exceed +2.5 ft. NGVD. For purposes
of the 15% Restriction Criteria, elevations will be considered "final" as measured one
(1) year following completion of fill activities in the area measured. Should the 15%
Restriction Criteria not be met, the Port will take the necessary steps, including but not
limited to shaping or grading of material, to bring the site in compliance with the 15%
Restriction Criteria.
The proposed site is partially bordered by healthy marsh, vegetation from which
will only accelerate the process of vegetative propagation throughout the site. The Port
will retain the Barataria-Terrebonne National Estuary Program ("BTNEP") or another
Louisiana licensed grower to purchase and/or grow out spartina patens suitable for
planting in the mitigation bank. 17,000 Patens will be grown out in 3.5" x 3.5" square
plastic pots for the bank. Plants will be grown out in a peat-based potting mix with
perlite and mycorrhizae (which enhances the plants ability to take up nutrients and
water). The plants will be installed on 15 ft. triangular centers throughout the 36-acre
mitigation bank site.
5
Port Fourchon Single User Mitigation Bank
Should natural vegetative coverage of the site be less than 80% through the
third growing season following completion of fill operations, the Port will implement
those measures proven to be effective on nearby mitigation projects: plugs of Spartina
alterniflora cv. Vermilion (cultivated variety of smooth cordgrass released by Natural
Resources Conservation Service (NRCS) in Louisiana) will be planted on 20-foot
centers within the non-vegetated areas.
Aside from containment dikes which will be degraded to marsh elevation
following completion of fill operations, no temporary or long-term structural
management components will be necessary for the success of the project.
4.2
Current Site Risks
By virtue of its situation in coastal Louisiana, the mitigation bank site is subject to
natural threats of subsidence, coastal erosion and tropical weather systems. Aside from
these unavoidable circumstances, there are no other existing hydrologic disturbances on
or adjacent to the site over which the Port has no control.
There are no known or recorded encumberances, zoning regulations or adjacent
development (existing or proposed) affecting the mitigation bank site.
4.3
Long-Term Sustainability of the Site
Despite the natural threats identified above, the Port is committed to the long-term
sustainability of the mitigation bank site.
The mitigation site is somewhat isolated from the erosive impacts of the Gulf of
Mexico by Port Fourchon, hundreds of acres of constructed marsh and the Port's
Maritime Forest Ridge. Port Fourchon remains the premier intermodal hub for oil and
gas exploration and production in the Gulf of Mexico. Port Fourchon's industrial sites
(generally developed to a +8.0' NGVD ground elevation), along with LA 3090 (with a
centerline elevation of +5.0' NGVD), serve to divert storm surge and high tide events
away from the mitigation bank site. Not only is the Port committed to maintaining the
surrounding, constructed marsh as part of its environmental stewardship initiative, it's
also required to do so under various mitigation plans approved by DNR and the Corps.
These geographical features protect the mitigation bank site from natural threats.
There are no long-term structural management features of the mitigation bank
site.
6
Port Fourchon Single User Mitigation Bank
5.0 PROPOSED SERVICE AREA
The proposed service area consists of the Louisiana Deltaic Plain (USGS
Hydrologic Cataloging Units 08090301, 08090302, 08090100, 08090201, 08090202,
08090203, 08070204, 08070205, 08080101, 08080102 and 08080103).
As covered above, this mitigation bank is being sought as a single-user mitigation
bank for use by Caillouet Land, LLC. It is anticipated that any impacts being offset by
this mitigation bank will be located within the Deltaic Plain.
6.0 OPERATION OF THE MITIGATION BANK
6.1
Project Representatives
Sponsor/Landowner:
6.2
Greater Lafourche Port Commission
c/o Bryce Autin, General Counsel
16829 East Main Street
Cut Off, LA 70345
brycea@portfourchon.com
985-632-6701
Qualifications of the Sponsor
Over the past decade, the Port has successfully constructed and maintained over
800 acres of mitigation in the immediate vicinity of the proposed mitigation bank site
utilizing methods of construction identical to those proposed herein.
Under EG-19-980-1340-01 (P981007), the Port constructed roughly 710 acres of
saline marsh between the Maritime Forest Ridge and Flotation Canal. The project served
as mitigation for the impacts sustained by development of Slips A and B in the Port's
Northern Expansion. The mitigation was performed and monitored in compliance with
permit conditions instituted by the Corps and Louisiana Department of Natural Resources
("DNR"). The Port utilized spoil from dredging operations in its Northern Expansion
development to fill open water and establish the mitigation area.
Under MVN-2008-00037-WW (P20071098), the Port has embarked on the
construction of roughly 213 acres of marsh north of the Maritime Forest Ridge and an
additional 35 acres along the northern bank of Flotation Canal. To date, 75 acres of
marsh north of the Maritime Forest Ridge have been established. Again, marsh creation
was the product of spoil hydraulically dredged from the Port's Northern Expansion
development and piped to mitigation fill sites previously consisting of open water. This
mitigation project has also been coordinated with the Corps and DNR.
7
Port Fourchon Single User Mitigation Bank
The Port has historically proven itself as qualified to perform work identical to
that being proposed in this prospectus in areas essentially identical to that being proposed
as the mitigation bank site; all in coordination with the Corps and DNR.
6.3
Proposed Long-Term Ownership and Management Representatives
The Port holds 100% fee title ownership to the land upon which the mitigation
bank site will be located and is the party solely responsible for long term management of
the project.
6.4
Site Protection
The Port shall burden the bank site with a perpetual conservation servitude under
the Louisiana Conservation Servitude Act (the "Act," La.R.S. 9:1271, et seq). The
conservation servitude shall be substantially similar to the draft annexed hereto as Figure
12.
The Port proposes to utilize the Barataria-Terrebonne Estuary Foundation ("The
Foundation") as the holder of the conservation servitude. The Foundation is a 505(c)(3)
non-profit organization committed to supporting stewardship of the cultural, economic
and ecological resources of the Barataria and Terrebonne Basins within which the
mitigation bank will sit. Accordingly, as a charitable corporation formed for protecting
the natural, scenic and open-space values of the Basin and preserving historical,
archaeological and cultural aspects of the Basin, The Foundation clearly fits the
definition of an acceptable "Holder" under the Act.
6.5
Long-Term Strategy
The Port will establish the proposed marsh pursuant to the means and methods
previously set forth in this Prospectus. Following completion of fill operations and (if
necessary) planting, the site will be routinely monitored by the Port personnel to ensure
factors such as vegetative health, water exchange and shoreline integrity all remain in
order to meet the goal of increasing the ecological benefit of the site.
There are no long-term structural management features of the mitigation bank
site.
8
Port Fourchon Single User Mitigation Bank
7.0 REFERENCES
http://digitalcommons.unl.edu/cgi/viewcontent.cgi?article=1198&context=usarmyresearch
Smith, J., & Anderson, M. (2014). LIMITS OF WETLAND WAVE
DISSIPATION. Coastal Engineering Proceedings, 1(34), waves.18.
http://www.lsuagcenter.com/portals/communications/publications/agmag/archive/2013/sp
ring/wetland-soil-carbon-sequestration
http://www.habitat.noaa.gov/coastalcarbonsequestration.html
https://websoilsurvey.sc.egov.usda.gov/App/HomePage.html
9
C:\Work\0822-1601_GLPC MITIGATION BANK_TEMP\Mitigation Bank_CUP_REV3_06-15-2018\01_TITLE.dwg, Layout1, 6/18/2018 10:04:54 AM, leeg
STATE VICINITY MAP
PICCIOLA & ASSOCIATES, INC.
CIVIL ENGINEERS
LAND SURVEYORS
NAVAL ARCHITECTS
MARINE ENGINEERS
P.O. BOX. 687
CUT OFF, LOUISIANA 70345
(985) 632-5786
C:\Work\0822-1601_GLPC MITIGATION BANK_TEMP\Mitigation Bank_CUP_REV3_06-15-2018\02_VIC_MAP.dwg, VIC_MAP, 6/18/2018 7:39:23 AM, leeg
LOCAL VICINITY MAP
PICCIOLA & ASSOCIATES, INC.
CIVIL ENGINEERS
LAND SURVEYORS
NAVAL ARCHITECTS
MARINE ENGINEERS
C:\Work\0822-1601_GLPC MITIGATION BANK_TEMP\Mitigation Bank_CUP_REV3_06-15-2018\03_USGS QUAD MAP.dwg, VIC_MAP, 6/18/2018 7:46:39 AM, leeg
USGS 7.5' QUADRANGLE MAP
LEEVILLE, LA 1998
PORT FOURCHON MITIGATION BANK
PORT FOURCHON, LAFOURCHE PARISH, LOUISIANA
PICCIOLA & ASSOCIATES, INC.
CIVIL ENGINEERS
LAND SURVEYORS
NAVAL ARCHITECTS
MARINE ENGINEERS
C:\Work\0822-1601_GLPC MITIGATION BANK_TEMP\Mitigation Bank_CUP_REV3_06-15-2018\04_BASINS.dwg, Layout1, 6/18/2018 10:02:53 AM, leeg
LOUISIANA DELTAIC PLAIN
(APPROXIMATE)
BASIN MAP
PORT FOURCHON MITIGATION BANK
PORT FOURCHON, LAFOURCHE PARISH, LOUISIANA
PICCIOLA & ASSOCIATES, INC.
CIVIL ENGINEERS
LAND SURVEYORS
NAVAL ARCHITECTS
MARINE ENGINEERS
C:\Work\0822-1601_GLPC MITIGATION BANK_TEMP\Mitigation Bank_CUP_REV3_06-15-2018\05_EXISTING SITE.dwg, Layout1, 6/18/2018 7:45:53 AM, leeg
EXISTING SITE MAP
PICCIOLA & ASSOCIATES, INC.
CIVIL ENGINEERS
LAND SURVEYORS
NAVAL ARCHITECTS
MARINE ENGINEERS
C:\Work\0822-1601_GLPC MITIGATION BANK_TEMP\Mitigation Bank_CUP_REV3_06-15-2018\06_EXISTING HABITAT.dwg, Layout1, 6/18/2018 7:33:14 AM, leeg
EXISTING HABITAT MAP
PORT FOURCHON MITIGATION BANK
PORT FOURCHON, LAFOURCHE PARISH, LOUISIANA
PICCIOLA & ASSOCIATES, INC.
CIVIL ENGINEERS
LAND SURVEYORS
NAVAL ARCHITECTS
MARINE ENGINEERS
C:\Work\0822-1601_GLPC MITIGATION BANK_TEMP\Mitigation Bank_CUP_REV3_06-15-2018\07_PROJECT SITE.dwg, Layout1, 6/18/2018 8:24:07 AM, leeg
PROPOSED SITE MAP
PICCIOLA & ASSOCIATES, INC.
CIVIL ENGINEERS
LAND SURVEYORS
NAVAL ARCHITECTS
MARINE ENGINEERS
C:\Work\0822-1601_GLPC MITIGATION BANK_TEMP\Mitigation Bank_CUP_REV3_06-15-2018\08_DREDGE SITE PLAN.dwg, SITE PLAN, 6/18/2018 7:55:40 AM, leeg
BAYOU LAFOURCHE
MAINTENANCE DREDGING
PICCIOLA & ASSOCIATES, INC.
CIVIL ENGINEERS
LAND SURVEYORS
NAVAL ARCHITECTS
MARINE ENGINEERS
TYPICAL DREDGE SECTION
C:\Work\0822-1601_GLPC MITIGATION BANK_TEMP\Mitigation Bank_CUP_REV3_06-15-2018\09_TYPICAL DREDGE SECTION.dwg, 09-SHT, 6/18/2018 7:57:16 AM, leeg
PICCIOLA & ASSOCIATES, INC.
CIVIL ENGINEERS
LAND SURVEYORS
NAVAL ARCHITECTS
MARINE ENGINEERS
C:\Work\0822-1601_GLPC MITIGATION BANK_TEMP\Mitigation Bank_CUP_REV3_06-15-2018\10_DREDGE PIPE SECTIONS.dwg, 10-SHT, 6/18/2018 9:15:58 AM, leeg
SUBMERGED DISCHARGE PIPE (BAYOU LAFOURCHE)
DISCHARGE PIPE SECTION (LAND)
& TYPICAL SITE ACCESS SECTION
PICCIOLA & ASSOCIATES, INC.
CIVIL ENGINEERS
LAND SURVEYORS
NAVAL ARCHITECTS
MARINE ENGINEERS
P.O. BOX. 687
CUT OFF, LOUISIANA 70345
(985) 632-5786
C:\Work\0822-1601_GLPC MITIGATION BANK_TEMP\Mitigation Bank_CUP_REV3_06-15-2018\11_PROPOSED HABITAT.dwg, Layout1, 6/18/2018 7:33:30 AM, leeg
PROPOSED HABITAT MAP
PORT FOURCHON MITIGATION BANK
PORT FOURCHON, LAFOURCHE PARISH, LOUISIANA
PICCIOLA & ASSOCIATES, INC.
CIVIL ENGINEERS
LAND SURVEYORS
NAVAL ARCHITECTS
MARINE ENGINEERS
C:\Work\0822-1601_GLPC MITIGATION BANK_TEMP\Mitigation Bank_CUP_REV3_06-15-2018\12_HISTORICAL.dwg, Layout1, 6/18/2018 7:34:07 AM, leeg
HISTORICAL CONDITIONS MAP
PORT FOURCHON MITIGATION BANK
PORT FOURCHON, LAFOURCHE PARISH, LOUISIANA
PICCIOLA & ASSOCIATES, INC.
CIVIL ENGINEERS
LAND SURVEYORS
NAVAL ARCHITECTS
MARINE ENGINEERS
TYPICAL MITIGATION BANK SECTION
C:\Work\0822-1601_GLPC MITIGATION BANK_TEMP\Mitigation Bank_CUP_REV3_06-15-2018\13_14_15_16_SECTION_SOILS.dwg, 13_SHT, 6/18/2018 7:58:52 AM, leeg
PICCIOLA & ASSOCIATES, INC.
CIVIL ENGINEERS
LAND SURVEYORS
NAVAL ARCHITECTS
MARINE ENGINEERS
29° 10' 20"N
29° 9' 43"N
29° 10' 20"N
C:\Work\0822-1601_GLPC MITIGATION BANK_TEMP\Mitigation Bank_CUP_REV3_06-15-2018\13_14_15_16_SECTION_SOILS.dwg, 14_SHT, 6/18/2018 7:58:18 AM, leeg
PICCIOLA & ASSOCIATES, INC.
CIVIL ENGINEERS
LAND SURVEYORS
NAVAL ARCHITECTS
MARINE ENGINEERS
29° 9' 43"N
C:\Work\0822-1601_GLPC MITIGATION BANK_TEMP\Mitigation Bank_CUP_REV3_06-15-2018\13_14_15_16_SECTION_SOILS.dwg, 15_SHT, 6/18/2018 7:58:02 AM, leeg
PICCIOLA & ASSOCIATES, INC.
CIVIL ENGINEERS
LAND SURVEYORS
NAVAL ARCHITECTS
MARINE ENGINEERS
C:\Work\0822-1601_GLPC MITIGATION BANK_TEMP\Mitigation Bank_CUP_REV3_06-15-2018\13_14_15_16_SECTION_SOILS.dwg, 16_SHT, 6/18/2018 7:57:48 AM, leeg
PICCIOLA & ASSOCIATES, INC.
CIVIL ENGINEERS
LAND SURVEYORS
NAVAL ARCHITECTS
MARINE ENGINEERS