Home

Galveston District

Run scraper

Proposed Programatic General Permit with Trinity River Authority

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The proposed PGP, included with this notice, revises language to eliminate the requirement for separate piers and terminal structures and to clarify that maintenance of the structure is authorized.

Public Notice Programmatic General Permit The proposed PGP, included with this notice, revises language to eliminate the requirement for separate piers and terminal structures and to clarify that maintenance of the structure is authorized. The previous issuance of the PGP and their appropriate conditions and example drawings are available at: https://www.swg.usace.army.mil/Business-With-Us/Regulatory/Permits/Regional-General-Permits/.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas