In accordance with the National Environmental Policy Act (NEPA) of 1969, as amended, the U.S. Army Corps of Engineers, Baltimore District, (USACE) has prepared a draft Environmental Assessment (EA) to assess impacts for repairs to the Codorus Creek Flood Risk Management (FRM) component of the overall Indian Rock Dam/Codorus Creek FRM Project on Codorus Creek. The Codorus Creek FRM project is approximately 4.8 miles in length, and includes a widened and deepened creek channel, levees, floodwalls and bank protective works. The project’s infrastructure is aging and in need of repairs to ensure it continues to properly perform its FRM functions. At this time, rehabilitation of floodwall, levee, drainage structures and bank protective works are anticipated.

ALL INTERESTED PARTIES: In accordance with the National Environmental Policy Act (NEPA) of 1969, as amended, the U.S. Army Corps of Engineers, Baltimore District, (USACE)has prepared a draft Environmental Assessment (EA) to assess impacts for repairs to the CodorusCreek Flood Risk Management (FRM) component of the overall Indian Rock Dam/CodorusCreek FRM Project on Codorus Creek. USACE-Baltimore operates and maintains the CodorusCreek FRM project, which was constructed in the 1930s and operational in the 1940s. TheCodorus Creek FRM project passes through West Manchester Township, Spring GardenTownship, York City, North York Borough, and Springettsbury Township, all located in YorkCounty, Pennsylvania. The Codorus Creek FRM project is approximately 4.8 miles in length,and includes a widened and deepened creek channel, levees, floodwalls, and bank protectiveworks. The project’s infrastructure is aging and in need of repairs to ensure it continues toproperly perform its FRM functions. At this time, rehabilitation of floodwall, levee, drainagestructures, and bank protective works are anticipated.

The draft EA has been prepared for the actions relating to the construction and rehabilitation ofCodorus Creek FRM project. Potential impacts were assessed with regard to aquatic ecosystemimpacts; temporary construction impacts to water, air and traffic; endangered and threatenedspecies; hazardous, toxic and radioactive substances; flooding; cultural resources; and thegeneral needs and welfare of the public.

Any person who has an interest in the project may make comments and/or request a publichearing within 30 days of the date of publication of this notice. Comments must clearly set forththe interest that may be adversely affected by this proposed action and the manner in which theinterest may be adversely affected. Written comments received on or before this date willbecome part of the written record and will be considered in the determination of impacts to theenvironment. A Finding of No Significant Impact is anticipated to be signed upon review ofcomments received and resolution of objections, if any.

Individuals wishing to obtain an electronic copy may link to this webpagehttp://www.nab.usace.army.mil/Home/Public-Notices/Ops-Public-Notices/. If additionalinformation is needed about the EA or the draft Finding of No Significant Impact, you may writeto the U.S. Army Corps of Engineers, Baltimore District; CENAB-PL-P, Subject: Codorus CreekFRM Project, 2 Hopkins Plaza, Baltimore, Maryland 21201. Additionally, you may requestinformation by electronic mail at Ethan.A.Bean@usace.army.mil.

Signed Daniel M. Bierly, P.E. Chief, Civil Project Development Branch

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas