Home

New Orleans District

Run scraper

Urban Investments Company

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

EXCAVATE A BOAT ACCESS CHANNEL, CONSTRUCT A BULKHEAD AND BACKFILL, AND INSTALL BOAT LIFTS IN CALCASIEU PARISH

NAME OF APPLICANT: Urban Investments Company, c/o: Cypress Engineering & Development Group, LLC, Attn: David Minton, 4310 Ryan Street, Suite 122, Lake Charles, Louisiana 70605 LOCATION OF WORK: Located at the intersection of Sallier and Charvais Streets, in Lake Charles, Louisiana in Calcasieu Parish (30.20832, -93.24581) CHARACTER OF WORK: Excavate approximately 1300 linear feet of access channel, install approximately 1060 linear feet of bulkhead and backfill, and construct boat lifts at each lot for individual residential boat storage. (Note: residential/commercial project was originally authorized on August 23, 2010 and extended on November 30, 2015 to conduct site preparations to construct building foundations, access roadways, driveways, a parking lot and an elevated boardwalk). The proposed project would impact 1.15 acres of fresh marsh (0.69 acre of excavation and 0.35 acre of filling). If a Department of the Army permit is warranted, the applicant has proposed to mitigate any unavoidable wetlands impacts at an approved and acceptable mitigation bank within the N.O. District.

JOINT PUBLIC NOTICE September 3, 2018 United States Army Corps of Engineers New Orleans District Attn: Regulatory Branch 7400 Leake Ave. New Orleans, Louisiana 70118-3651

State of Louisiana Department of Environmental Quality Attn: Water Quality Certifications Post Office Box 4313 Baton Rouge, Louisiana 70821-4313

Project Manager: Bobby Quebedeaux (504) 862-2224 bobby.d.quebedeaux@usace.army.mil Application #: MVN-2009-3031-WJJ

Project Manager: Elizabeth Hill (225) 219-3225 WQC Application Number: WQC-180821-01

Interested parties are hereby notified that a permit application has been received by the New Orleans District of the U.S. Army Corps of Engineers pursuant to: [X] Section 10 of the Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404 of the Clean Water Act (86 Stat. 816; 33 USC 1344). The application has also been mailed to the Louisiana Department of Environmental Quality, for a Water Quality Certification (WQC) in accordance with statutory authority contained in Louisiana Revised Statute 30:2074 A(3), and provisions of Section 401 of the Clean Water Act (P.L. 95-17). EXCAVATE A BOAT ACCESS CHANNEL, CONSTRUCT A BULKHEAD AND BACKFILL, AND INSTALL BOAT LIFTS IN CALCASIEU PARISH NAME OF APPLICANT: Urban Investments Company, c/o: Cypress Engineering & Development Group, LLC, Attn: David Minton, 4310 Ryan Street, Suite 122, Lake Charles, Louisiana 70605 LOCATION OF WORK: Located at the intersection of Sallier and Charvais Streets, in Lake Charles, Louisiana in Calcasieu Parish (30.20832, -93.24581). CHARACTER OF WORK: Excavate approximately 1300 linear feet of access channel, install approximately 1060 linear feet of bulkhead and backfill, and construct boat lifts at each lot for individual residential boat storage. (Note: residential/commercial project was originally authorized on August 23, 2010 and extended on November 30, 2015 to conduct site preparations to construct building foundations, access roadways, driveways, a parking lot and an elevated boardwalk). The proposed project would impact 1.15 acres of fresh marsh (0.69 acre of excavation and 0.35 acre of filling). If a Department of the Army permit is warranted, the applicant has proposed to mitigate any unavoidable wetlands impacts at an approved and acceptable mitigation bank within the N.O. District.

The comment period for the Department of the Army Permit and the Louisiana Department of Environmental Quality WQC will close 20 days from the date of this joint public notice. Written comments, including suggestions for modifications or objections to the proposed work, stating reasons thereof, are being solicited from anyone having interest in this permit and/or this WQC request and must be submitted so as to be received before or by the last day of the comment period. Letters concerning the Corps of Engineers permit application must reference the applicant's name and the Permit Application Number, and be forwarded to the Corps of Engineers at the address above, ATTENTION: REGULATORY BRANCH. Individuals or parties may request an extension of time in which to comment on the proposed work by writing, faxing, or e-mailing the Corps of Engineers Project Manager listed above. Any request must be specific and substantively supportive of the requested extension, and received by this office prior to the end of the initial comment period. The Section Chief will review the request and the requestor will be promptly notified of the decision to grant or deny the request. If granted, the time extension will be continuous to the initial comment period and, inclusive of the initial comment period, will not exceed a total of 30 calendar days. Letters concerning the Water Quality Certification must reference the applicant's name and the WQC Application number and be mailed to the Louisiana Department of Environmental Quality at the address above. The application for this proposed project is on file with the Louisiana Department of Environmental Quality and may be examined during weekdays between 8:00 a.m. and 4:30 p.m. Copies may be obtained upon payment of costs of reproduction. Corps of Engineers Permit Criteria The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state, and local agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the U.S. Army Corps of Engineers to determine whether to make, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. The New Orleans District is unaware of properties listed on the National Register of Historic Places near the proposed work. The possibility exists that the proposed work may damage or destroy presently unknown archeological, scientific, prehistorical, historical sites, or data. Copies of this public notice are being sent to the State Archeologist and State Historic Preservation Officer regarding potential impacts to cultural resources.

Our initial finding is that the proposed work would neither affect any species listed as endangered by the U.S. Departments of Interior or Commerce, nor affect any habitat designated as critical to the survival and recovery of any endangered species. Based on the South Louisiana Standard Local Operating Procedure for Endangered Species (SLOPES), as signed on October 22, 2014, between the U.S. Army Corps of Engineers, New Orleans and the U.S. Fish and Wildlife Service, it has been determined that the project is located in waters known to be utilized by the West Indian manatee. If this permit modification/time extension is issued, the permittee will be required to the follow the SLOPES conditions: Standard West Indian Manatee Conditions. This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal may result in the destruction or alteration of 1.15 acres of EFH utilized by various life stages of red drum and penaeid shrimp. Our initial determination is that the proposed action would not have a substantial adverse impact on EFH or federally managed fisheries in the Gulf of Mexico. Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the National Marine Fisheries Service. If the proposed work involves deposits of dredged or fill material into navigable waters, the evaluation of the probable impacts will include the application of guidelines established by the Administrator of the Environmental Protection Agency. Also, a certification that the proposed activity will not violate applicable water quality standards will be required from the Department of Environmental Quality, before a Department of the Army permit is issued. Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing. You are invited to communicate the information contained in this notice to any other parties whom you deem likely to have interest in the matter.

Darrell S. Barbara Chief, Western Evaluation Section Regulatory Branch

Enclosure

NOTE: THESE DRAWINGS ARE TO BE USED EXCLUSIVELY FOR ACQUISITION OF REGULATORY PERMITS. REVISED:

CALCASIEU PARISH, LOUISIANA

STATE OF LOUISIANA INSET MAP

DEQUINCY

PARISH LINE

12

27

MOSS BLUFF

PARISH LINE

SULPHUR 90

LAKE CHARLES 10

IOWA

10 210

VINTON 10

PROJECT LOCATION LAT. 30° 12' 38"N LONG. 93° 14' 53.8"W SEE SHEET 2

THE CYPRESS GROUP 4310 RYAN ST. STE 122 LAKE CHARLES, LA OFFICE - 337.504.7755 FAX - 337.504.7744

WALNUT GROVE USACE PERMIT LAKE CHARLES, LOUISIANA

VICINITY MAP C.G.M. 7/16/2018 1" = 5,000'

1

NOTE: THESE DRAWINGS ARE TO BE USED EXCLUSIVELY FOR ACQUISITION OF REGULATORY PERMITS. REVISED:

SECTION 38, T. 10 S., R. 9 W CALCASIEU PARISH, LOUISIANA

LAKE CHARLES CLOONEY ISLAND

ACH

L BE

L SHE

DR

SITE PLAN

LAT. 30° 12' 38"N LONG. 93° 14' 53.8"W SEE SHEET 3

LAKE ST

CHA

RVA

LA C ACH

IS D

R

ED

R

W SALLIER ST

THE CYPRESS GROUP 4310 RYAN ST. STE 122 LAKE CHARLES, LA OFFICE - 337.504.7755 FAX - 337.504.7744

I-210 HOLLY HILL RD

NELSON RD

W PRIEN LAKE RD

WALNUT GROVE USACE PERMIT LAKE CHARLES, LOUISIANA

PROJECT LOCATION C.G.M. 7/16/2018 1" = 2000'

2

NOTE: THESE DRAWINGS ARE TO BE USED EXCLUSIVELY FOR ACQUISITION OF REGULATORY PERMITS. REVISED:

SECTION 38, T. 10 S., R. 9 W CALCASIEU PARISH, LOUISIANA

BEGIN DREDGING STA. 0+00 N. 627069.76 E. 2676773.78

BEGIN BULKHEAD STA. -0+07.5 OFF: 15.00'L N. 627064.48 E. 2676791.38

B

B

OM OTT 30' B IDTH W

BANKLINE BULKHEAD END BULKHEAD STA. 10+02 OFF: 147.00L N. 626275.75 E. 2677188.47

DREDGING TRANSITION STA. 8+68 SECTION"B-B" TO SECTION "A-A"

A A

BANKLINE

END DREDGING STA. 13+00 N. 625939.85 E. 2677013.46

WETLANDS AREA TO BE FILLED =0.35 ACRES

THE CYPRESS GROUP 4310 RYAN ST. STE 122 LAKE CHARLES, LA OFFICE - 337.504.7755 FAX - 337.504.7744

WETLANDS AREA TO BE DREDGED = 0.69 ACRES

WALNUT GROVE USACE PERMIT LAKE CHARLES, LOUISIANA

SITE PLAN C.G.M. 7/16/2018 1" = 250'

3

NOTE: THESE DRAWINGS ARE TO BE USED EXCLUSIVELY FOR ACQUISITION OF REGULATORY PERMITS. REVISED:

SECTION 38, T. 10 S., R. 9 W CALCASIEU PARISH, LOUISIANA

BEGIN DREDGING STA. 0+00 N. 627069.76 E. 2676773.78

BEGIN BULKHEAD STA. -0+07.5 OFF: 15.00'L N. 627064.48 E. 2676791.38

B

B

OM OTT 30' B IDTH W

BULKHEAD

BANKLINE

END BULKHEAD STA. 10+02 OFF: 147.00L N. 626275.75 E. 2677188.47

DREDGING TRANSITION STA. 8+68 SECTION"B-B" TO SECTION "A-A"

A

MARSH RECLAMATION AREA 4.01 ACRES

A

BANKLINE

END DREDGING STA. 13+00 N. 625939.85 E. 2677013.46

WETLANDS AREA TO BE FILLED =0.35 ACRES

THE CYPRESS GROUP 4310 RYAN ST. STE 122 LAKE CHARLES, LA OFFICE - 337.504.7755 FAX - 337.504.7744

WETLANDS AREA TO BE DREDGED = 0.69 ACRES

WALNUT GROVE USACE PERMIT LAKE CHARLES, LOUISIANA

SITE PLAN C.G.M. 7/16/2018 1" = 250'

4

NOTE: THESE DRAWINGS ARE TO BE USED EXCLUSIVELY FOR ACQUISITION OF REGULATORY PERMITS. REVISED:

CALCASIEU PARISH, LOUISIANA

±58' TOP WIDTH TOP ELEV. = +1.0' 0.0' NAVD 88

2

1

BOTTOM ELEV. = -6.0'

30' BOTTOM WIDTH

CHANNEL SECTION "A-A" SCALE: 1" = 20'

±44' TOP WIDTH / VARIES IN TRANSITION PROPOSED BULKHEAD

TOP ELEV. = +1.0' 0.0' NAVD 88

2

1

BOTTOM ELEV. = -6.0'

12" Ø ANCHOR PILE

30' BOTTOM WIDTH / VARIES IN TRANSITION

CHANNEL SECTION "B-B" SCALE: 1" = 20'

THE CYPRESS GROUP 4310 RYAN ST. STE 122 LAKE CHARLES, LA OFFICE - 337.504.7755 FAX - 337.504.7744

WALNUT GROVE USACE PERMIT LAKE CHARLES, LOUISIANA

TYPICAL CROSS SECTIONS C.G.M. 7/16/2018 AS NOTED

5

NOTE: THESE DRAWINGS ARE TO BE USED EXCLUSIVELY FOR ACQUISITION OF REGULATORY PERMITS. REVISED:

CALCASIEU PARISH, LOUISIANA

±44' TOP WIDTH TIMBER FRAMING (TYP.)

12" Ø TIMBER PILE (TYP.)

TOP ELEV. = +1.0' 0.0' NAVD 88

2

10'-0"

BOAT LIFT

PROPOSED BULKHEAD

1

BOTTOM ELEV. = -6.0'

12" Ø ANCHOR PILE

30' BOTTOM WIDTH

TYPICAL BOAT HOUSE CROSS SECTION SCALE: 1" = 20'

GENERAL NOTES:

1.

THIS PERMIT APPLICATION IS A MODIFICATION TO MVN-2009-3031-WJJ WHICH WAS APPROVES NOV 20, 2015. THIS MODIFICATION IS TO PROVIDE FOR BOAT ACCESS AND BULKHEAD VIA DREDGING AREAS WHICH FALL WITHIN THE CURRENTLY PERMITTED WETLAND LIMITS, AS WELL AS OUTSIDE OF THIS AREA. THESE DRAWINGS INDICATE THE PROPOSED IMPACTS, AS WELL AS RESTORATION ACTIVITIES PLANNED AS A PART OF THIS PROPOSED PERMIT MODIFICATION.

2.

APPROXIMATELY 13,254 CYD OF SPOIL MATERIAL WILL BE DREDGED TO PROVIDE THE CHANNEL ACCESS.

3.

APPROXIMATELY 0.69 ACRES OF WETLANDS WILL BE IMPACTED AS A RESULT OF THE PROPOSED DREDGING ACTIVITIES.

4.

APPROXIMATELY 0.35 ACRES OF WETLANDS WILL BE IMPACTED DUE TO FILLING ACTIVITIES WITH SPOIL MATERIAL AS A RESULT OF BULKHEAD CONSTRUCTION. APPROXIMATELY 1,060 L.F. OF BULKHEAD SHALL BE INSTALLED ALONG SHORELINE.

5.

APPROXIMATELY 13,254 CYD OF SPOIL MATERIAL TO BE HAULED OFF AND DISPOSED OF IN AN UPLAND AREA.

6.

IN ORDER TO ENSURE THE SAFETY OF ALL PARTIES INVOLVED, THE PERMITTEE OR ITS AGENTS WILL CONTACT THE LOUISIANA DOTTIE SYSTEM (1-800-272-3020) A MINIMUM OF 72 HOURS PRIOR TO THE COMMENCEMENT OF ANY ACTIVITY.

7.

ALL EXCESS EXCAVATED MATERIALS WILL BE DISPOSED OF WITHIN AN UPLAND AREA.

THE CYPRESS GROUP 4310 RYAN ST. STE 122 LAKE CHARLES, LA OFFICE - 337.504.7755 FAX - 337.504.7744

WALNUT GROVE USACE PERMIT LAKE CHARLES, LOUISIANA

TYPICAL SECTION AND NOTES C.G.M. 7/16/2018 N.T.S.

6

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas