SHIP MOORING IN THE MISSISSIPPI RIVER, BORROW PIT EXPANSION, DREDGING ALONG BATTURE NEAR CONVENT IN SAINT JAMES PARISH
NAME OF APPLICANT: Mr. Randy Anny, Post Office Box 367, Sorrento, La 70778
LOCATION OF WORK: Within the Mississippi River Basin, in the Lower Mississippi River – Baton Rouge hydrologic unit (HUC 08070100), in the Mississippi River, left descending bank, mile 164.6, in Convent, Louisiana, in Saint James Parish.
CHARACTER OF WORK: The applicant has requested a Department of the Army permit authorization for the installation and maintenance of five (5) midstream mooring piles to accommodate an approximate 656’ x 106’ midstream fleeting area for ship mooring and 2 crane barges. The applicant is also proposing to expand an existing borrow pit (measuring approximately 220’ x 800’) to an approximate 460’ x 800’ pit to use as a multi-purpose stockpiling area for many different material types (river pump sand, aggregate, stone, grain, fertilizers). A new haul road is also proposed for the pit expansion. The project purpose is to transfer dry bulk products from oceangoing vessels to river barges and vice versa, as well as to fill sand pits on the batture for stockpiling for commercial sale. Portions of the existing and proposed batture pit have been previously mitigated from previous authorizations. A jurisdictional determination for the batture expansion area is pending with the Corps’ Surveillance and Enforcement Section. The project also entails the dredging of sand material from the Mississippi River and the placement of dredged material into the proposed and existing borrow pit. Approximately 545,185 cubic yards of sand material would be hydraulically dredged from the river bottom and would be placed in the batture pit for stockpiling. Approximately 4.4 acres of potentially jurisdictional wetlands would be impacted by expansion of the batture pit. Based on the previous mitigation associated with the batture pit, the current expansion may require additional compensatory mitigation depending upon the pending jurisdictional determination.
The applicant stated that the impacted area has been minimized to the smallest footprint that will allow the goals of the project to be achieved. Best management practices will be employed during construction to minimize sediment excursion. To compensate for unavoidable impacts, the applicant has agreed to purchase mitigation credits from an approved mitigation bank.
JOINT PUBLIC NOTICE
September 10, 2018
United States Army Corps of Engineers
New Orleans District
Regulatory Branch
7400 Leake Avenue
New Orleans, Louisiana 70118
State of Louisiana
Department of Environmental Quality
Water Permits Division
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
(504) 862-2675
Project Manager
Kenny Blanke
Kenneth.G.Blanke@usace.army.mil
Permit Application Number
MVN 2018-0727-CQ
(225) 219-3225
Project Manager
Elizabeth Hill
WQC Application Number
WQC 180815-03
Interested parties are hereby notified that a permit application has been received by
the New Orleans District of the U.S. Army Corps of Engineers pursuant to:
[ X ] Section 10 of the Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC
403); and/or [X] Section 404 of the Clean Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental
Quality, Office of Environmental Services, for a Water Quality Certification (WQC) in
accordance with statutory authority contained in LRS30:2047 A(3), and provisions of
Section 401 of the Clean Water Act (P.L.95-17).
SHIP MOORING IN THE MISSISSIPPI RIVER, BORROW PIT EXPANSION,
DREDGING ALONG BATTURE NEAR CONVENT IN SAINT JAMES PARISH
NAME OF APPLICANT: Mr. Randy Anny, Post Office Box 367, Sorrento, La 70778
LOCATION OF WORK: Within the Mississippi River Basin, in the Lower Mississippi
River Baton Rouge hydrologic unit (HUC 08070100), in the Mississippi River, left
descending bank, mile 164.6, in Convent, Louisiana, in Saint James Parish.
CHARACTER OF WORK: The applicant has requested a Department of the Army
permit authorization for the installation and maintenance of five (5) midstream mooring
piles to accommodate an approximate 656' x 106' midstream fleeting area for ship
mooring and 2 crane barges. The applicant is also proposing to expand an existing
borrow pit (measuring approximately 220' x 800') to an approximate 460' x 800' pit to
use as a multi-purpose stockpiling area for many different material typed (river pump
sand, aggregate, stone, grain, fertilizers). A new haul road is also proposed for the pit
expansion. The project purpose is to transfer dry bulk products from oceangoing
vessels to river barges and vice versa, as well as to fill sand pits on the batture for
stockpiling for commercial sale. Portions of the existing and proposed batture pit have
been previously mitigated from previous authorizations. A jurisdictional determination
for the batture expansion area is pending with the Corps' Surveillance and Enforcement
Section. The project also entails the dredging of sand material from the Mississippi
River and the placement of dredged material into the proposed and existing borrow pit.
Approximately 545,185 cubic yards of sand material would be hydraulically dredged
from the river bottom and would be placed in the batture pit for stockpiling.
Approximately 4.4 acres of potentially jurisdictional wetlands would be impacted by
expansion of the batture pit. Based on the previous mitigation associated with the
batture pit, the current expansion may require additional compensatory mitigation
depending upon the pending jurisdictional determination.
The applicant stated that the impacted area has been minimized to the smallest
footprint that will allow the goals of the project to be achieved. Best management
practices will be employed during construction to minimize sediment excursion. To
compensate for unavoidable impacts, the applicant has agreed to purchase mitigation
credits from an approved mitigation bank.
The comment period for the Department of the Army Permit and the Louisiana
Department of Environmental Quality WQC will close 30 days from the date of this joint
public notice. Written comments, including suggestions for modifications or objections
to the proposed work, stating reasons thereof, are being solicited from anyone having
interest in this permit and/or this WQC request and must be mailed so as to be received
before or by the last day of the comment period. Letters concerning the Corps of
Engineers permit application must reference the applicant's name and the Permit
Application Number, and be mailed to the Corps of Engineers at the address above,
ATTENTION: REGULATORY BRANCH Letters concerning the Water Quality
Certification must reference the applicant's name and the WQC Application number
and be mailed to the Louisiana Department of Environmental Quality at the address
above. The application for this proposed project is on file with the Louisiana
Department of Environmental Quality and may be examined weekdays between 8:00
a.m. and 4:30 p.m. Copies may be obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the
probable impacts, including cumulative impacts of the proposed activity on the public
interest. That decision will reflect the national concern for both protection and utilization
of important resources. The benefit which reasonably may be expected to accrue from
the proposal must be balanced against its reasonably foreseeable detriments. All
factors which may be relevant to the proposal will be considered including the
cumulative effects thereof; among those are conservation, economics, aesthetics,
general environmental concerns, wetlands, historic properties, fish and wildlife values,
flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion,
recreation, water supply and conservation, water quality, energy needs, safety, food
and fiber production, mineral needs, considerations of property ownership and, in
general, the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public, federal,
state, and local agencies and officials, Indian Tribes, and other interested parties in
order to consider and evaluate the impacts of this proposed activity. Any comments
received will be considered by the U.S. Army Corps of Engineers to determine whether
to make, modify, condition, or deny a permit for this proposal. To make this decision,
comments are used to assess impacts on endangered species, historic properties,
water quality, general environmental effects, and other public interest factors listed
above. Comments are used in the preparation of an Environmental Assessment and/or
an Environmental Impact Statement pursuant to the National Environmental Policy Act.
Comments are also used to determine the need for a public hearing and to determine
the overall public interest of the proposed activity.
The New Orleans District is unaware of properties listed on the National Register of
Historic Places near the proposed work. The possibility exists that the proposed work
may damage or destroy presently unknown archeological, scientific, prehistorical,
historical sites, or data. Copies of this notice are being sent to the State Archeologist
and State Historic Preservation Officer.
Our initial finding is that the proposed work would not affect any species, nor affect
any habitat designated as critical to the survival and recovery of such species, listed as
endangered by the U.S. Department of Commerce.
The New Orleans District has determined that the proposed project is not likely to
adversely affect the pallid sturgeon (Scaphirhynchus albus) and will have no effect on
other known species. These determinations are based on the Standard Local
Operating Procedure for Endangered Species of Louisiana (SLOPES), dated October
22, 2014, between the U.S. Army Corps of Engineers and U.S. Fish and Wildlife
Service, Ecological Services Office.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of
the Magnuson-Stevens Fishery Conservation and Management Act. The applicant's
proposal would result in the destruction or alteration of n/a acres of EFH utilized by
various life stages of red drum and penaeid shrimp. Our initial determination is that the
proposed action would not have a substantial adverse impact on EFH or federally
managed fisheries in the Gulf of Mexico. Our final determination relative to project
impacts and the need for mitigation measures is subject to review by and coordination
with the National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable
waters, the evaluation of the probable impacts will include the application of guidelines
established by the Administrator of the Environmental Protection Agency. Also, a
certification that the proposed activity will not violate applicable water quality standards
will be required from the Department of Environmental Quality, Office of Environmental
Services, before a permit is issued.
Any person may request, in writing, within the comment period specified in this
notice, that a public hearing be held to consider this application. Requests for public
hearings shall state, with particularity, the reasons for holding a public hearing. You are
requested to communicate the information contained in this notice to any other parties
whom you deem likely to have interest in the matter.
You are requested to communicate the information contained in this notice to any
other parties whom you deem likely to have interest in the matter.
John M. Herman
Chief, Central Evaluation Section
Regulatory Branch
Enclosure