BULK LIQUID EXPORT TERMINAL FACILITY WITHIN AND ALONG THE MISSISSIPPI RIVER IN PLAQUEMINES PARISH
NAME OF APPLICANT: Plaquemines Port and Harbor Terminal District, c/o Coastal Engineering Solutions, Post Office Box 80735, Baton Rouge, Louisiana 70898.
LOCATION OF WORK: Project site is located within and along the right descending bank of the Mississippi River, at about mile 61 above Head of Passes, at 16111 Louisiana State Highway 23, in Myrtle Grove, Louisiana, in Plaquemines Parish, as shown on the attached drawings.
Latitude: 29.6611 Longitude: -89.9675
Hydrologic Unit Codes: 08090100 Lower Mississippi River - New Orleans and 080900301 East Central Louisiana Coastal.
CHARACTER OF WORK: Clear, grade, excavate, and deposit fill for a 200 acre bulk liquid export terminal facility including: tank storage area/s with supporting infrastructure, dock, additional rail spurs, and rail off-loading facility. Project implementation will require excavation and deposition of 150,250 cubic yards of native material, 14,000 cubic yards of rock, 65,500 cubic yards of crushed stone or gravel, and 20 cubic yards of concrete.
The proposed 200 acre parcel was originally part of Department of the Army permit authorization for RAM Terminals, LLC. Currently proposed project design would directly impact 19.6 acres of jurisdictional wetlands; 3.7 acres of the proposed direct impacts to jurisdictional wetlands have been compensated for through the previous Department of the Army authorization. The applicant proposes to contract with an approved mitigation bank in order to offset unavoidable adverse impacts to jurisdictional wetlands.
The proposed liquid export facility is located in the vicinity of the Mid-Barataria Sediment Diversion proposal.
JOINT PUBLIC NOTICE
September 10, 2018
United States Army
Corps of Engineers
New Orleans District
Regulatory Branch, ODR-E
Room 280
7400 Leake Avenue
New Orleans, Louisiana 70118
(504) 862-1564
Stephanie.L.Castaing@usace.army.mil
Project Manager
Stephanie Castaing
Permit Application Number
MVN-2012-0123-EPP
State of Louisiana
Department of Environmental Quality
ATTN: Water Quality Certifications
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
(225) 219-3225
Project Manager
Elizabeth Hill
WQC Application Number
WQC 180706-01
Interested parties are hereby notified that a permit application has been received by the New
Orleans District of the U.S. Army Corps of Engineers pursuant to: [X] Section 10 of the Rivers and
Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404 of the Clean
Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental Quality, Water
Quality Certifications, for a Water Quality Certification (WQC) in accordance with statutory authority
contained in LRS30:2047 A(3), and provisions of Section 401 of the Clean Water Act (P.L.95-17).
BULK LIQUID EXPORT TERMINAL FACILITY WITHIN AND ALONG THE MISSISSIPPI RIVER IN
PLAQUEMINES PARISH
NAME OF APPLICANT: Plaquemines Port and Harbor Terminal District, c/o Coastal Engineering
Solutions, Post Office Box 80735, Baton Rouge, Louisiana 70898.
LOCATION OF WORK: Project site is located within and along the right descending bank of the
Mississippi River, at about mile 61 above Head of Passes, at 16111 Louisiana State Highway 23, in
Myrtle Grove, Louisiana, in Plaquemines Parish, as shown on the attached drawings.
Latitude: 29.6611
Longitude: -89.9675
Hydrologic Unit Codes: 08090100 Lower Mississippi River - New Orleans and 080900301 East
Central Louisiana Coastal.
CHARACTER OF WORK: Clear, grade, excavate, and deposit fill for a 200 acre bulk liquid export
terminal facility including: tank storage area/s with supporting infrastructure, dock, additional rail
spurs, and rail off-loading facility. Project implementation will require excavation and deposition of
150,250 cubic yards of native material, 14,000 cubic yards of rock, 65,500 cubic yards of crushed
stone or gravel, and 20 cubic yards of concrete.
The proposed 200 acre parcel was originally part of Department of the Army permit authorization for
RAM Terminals, LLC. Currently proposed project design would directly impact 19.6 acres of
jurisdictional wetlands; 3.7 acres of the proposed direct impacts to jurisdictional wetlands have been
compensated for through the previous Department of the Army authorization. The applicant proposes
to contract with an approved mitigation bank in order to offset unavoidable adverse impacts to
jurisdictional wetlands.
The proposed liquid export facility is located in the vicinity of the Mid-Barataria Sediment Diversion
proposal.
The comment period for the Department of the Army Permit and the Louisiana Department of
Environmental Quality WQC will close 30 days from the date of this joint public notice. Written
comments, including suggestions for modifications or objections to the proposed work, stating
reasons thereof, are being solicited from anyone having interest in this permit and/or this WQC
request and must be mailed so as to be received before or by the last day of the comment period.
Letters concerning the Corps of Engineers permit application must reference the applicant's name
and the Permit Application Number, and be mailed to the Corps of Engineers at the address above,
ATTENTION: REGULATORY BRANCH.
The application for this proposed project is on file with the Louisiana Department of Environmental
Quality and may be examined during weekdays between 8:00 a.m. and 4:30 p.m. Copies may be
obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable impacts,
including cumulative impacts of the proposed activity on the public interest. That decision will reflect
the national concern for both protection and utilization of important resources. The benefit which
reasonably may be expected to accrue from the proposal must be balanced against its reasonably
foreseeable detriments. All factors which may be relevant to the proposal will be considered including
the cumulative effects thereof; among those are conservation, economics, aesthetics, general
environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards,
floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and
conservation, water quality, energy needs, safety, food and fiber production, mineral needs,
considerations of property ownership and, in general, the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state, and local
agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate
the impacts of this proposed activity. Any comments received will be considered by the U.S. Army
Corps of Engineers to determine whether to make, modify, condition, or deny a permit for this
proposal. To make this decision, comments are used to assess impacts on endangered species,
historic properties, water quality, general environmental effects, and other public interest factors listed
above. Comments are used in the preparation of an Environmental Assessment and/or an
Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are
also used to determine the need for a public hearing and to determine the overall public interest of the
proposed activity.
The New Orleans District is aware of two sites (16PL107 and 16PL269) near the proposed work.
The possibility exists that the proposed work may damage or destroy presently unknown
archeological, scientific, prehistorical, historical sites, or data. Issuance of this public notice solicits
input from the State Archeologist and State Historic Preservation Officer regarding potential impacts
to cultural resources.
The New Orleans District has determined that the proposed project is located in waters known to
be utilized by the Pallid Sturgeon (Scaphirhynchus albus) and it has been determined that the
proposed activity is not likely to adversely affect the species based on the Standard Local Operating
Procedure for Endangered Species of Louisiana (SLOPES), dated October 22, 2014, between the
U.S. Army Corps of Engineers and U.S. Fish and Wildlife Service, Ecological Services Office.
Our initial finding is that the proposed work would not affect any species, nor affect any habitat
designated as critical to the survival and recovery of such species, listed as endangered by the U.S.
Department of Commerce.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the MagnusonStevens Fishery Conservation and Management Act. The applicant's proposal would result in the
destruction or alteration of 19.6 acres of EFH utilized by various life stages of red drum and penaeid
shrimp. Our initial determination is that the proposed action would not have a substantial adverse
impact on EFH or federally managed fisheries in the Gulf of Mexico. Our final determination relative
to project impacts and the need for mitigation measures is subject to review by and coordination with
the National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters, the
evaluation of the probable impacts will include the application of guidelines established by the
Administrator of the Environmental Protection Agency. Also, a certification that the proposed activity
will not violate applicable water quality standards will be required from the Department of
Environmental Quality, Water Quality Certifications, before a permit is issued.
Any person may request, in writing, within the comment period specified in this notice, that a
public hearing be held to consider this application. Requests for public hearings shall state, with
particularity, the reasons for holding a public hearing.
The applicant has certified that the proposed activity described in the application complies with
and will be conducted in a manner that is consistent with the Louisiana Coastal Resources Program.
The Department of the Army permit will not be issued unless the applicant received approval or a
waiver of the Coastal Use Permit by the Department of Natural Resources.
You are requested to communicate the information contained in this notice to any other parties
whom you deem likely to have interest in the matter.
Michael V. Farabee
Chief, Eastern Evaluation Section
Enclosure
PLAQUEMINES LIQUID TERMINAL
JOINT PERMIT APPLICATION
PLAQUEMINES PARISH, LA
AUGUST 2018
N
INDEX OF SHEETS
SHEET NO.
01
02
03
04
05
06
07
08
09
10
11
12
13
14
DESCRIPTION
COVER SHEET
VICINITY MAP
BOUNDARY SURVEY
SITE PLAN
SITE PLAN WITH AERIAL
TANK FARM CROSS SECTION
LEVEE CROSSING PLAN
LEVEE CROSSING SECTIONS
LEVEE CRANE PAD AND TRUSS STAGING AREA
DOCK PLAN VIEW
DOCK APPROACH CROSS SECTION
DOCK CROSS SECTION
MOORING CROSS SECTION
DETAILS
M:\Department 39\Admin\GIS Engineering CAD Dept\Images\Louisiana Maps\louisiana-map.GIF
PROJECT VICINITY
VICINITY MAP
NOT TO SCALE
N
5000'
0'
5000'
10000'
15000'
N
PROJECT VICINITY
NOT TO SCALE
REVISIONS
No.
Description
Date
N
PLAQUEMINES
LIQUID TERMINAL
VICINITY MAP
Project number
6000'
0'
6000'
12000'
18000'
APRIL 2018
Date
Designed by
Drawn by
Checked by
Checked by
August 29, 2018
Plot Date
2
175' (TYP.)
PHILLIPS 66
RAIL OFFLOADING FACILITY ALLIANCE REFINERY
1,460 LF x 365' LF
N
E. RAVENNA RD
A
LA HWY 23
175' SETBACK
REVISIONS
RAILROAD
TRACKS ( F-I)
No.
Description
Date
1,500
SETB '
ACK
CONST
ACCES RUCTION
x 20 LF S (4,170± LF
B
ROAD) DIRT
PIPE
(SEE RACK
SHEE
T 9)
CONSTRUCTION
ACCESS
C
RAILROAD
TRACKS
(A-E)
DOCK
(SEE
SHEETS
10-14)
D
SECTION 10/
WETLAND
IMPACT
ION
RS
ION
DIVE
T
T
A
N
V
E
XCA
DIM
OF E AND FILL TARIA SE
S
T
I
LIM
ARA
175' (TYP.)
SED
ROPO
MIDB
LIMITS OF FILL
P
175'
.)
(TYP
PLAQUEMINES
LIQUID TERMINAL
800'
0'
800'
1600'
2400'
SITE PLAN
Project number
APRIL 2018
Date
Designed by
*WETLAND POLYGONS
IMPACTED
WETLANDS
MITIGATED
WETLANDS
A
11.67 AC
2.06 AC
B
1.40 AC
1.40 AC
C
0.12 AC
0.24 AC
D
6.47 AC
0.0 AC
Drawn by
Checked by
Checked by
August 29, 2018
Plot Date
4
175' (TYP.)
PHILLIPS 66
ALLIANCE REFINERY
RAIL OFFLOADING FACILITY
1,460 LF x 365 LF
N
E. RAVENNA RD
LA HWY 23
175' SETBACK
REVISIONS
RAILROAD
TRACKS ( F-I)
No.
Description
Date
1,500
SETB '
ACK
CONST
ACCES RUCTION
x 20 LF S (4,170± LF
ROAD) DIRT
PIPE
(SEE RACK
SHEE
T 9)
CONSTRUCTION
ACCESS
RAILROAD
TRACKS
(A-E)
DOCK (SEE
SHEETS
10-14)
ION
RS
ION
DIVE
T
175' (TYP.)
T
A
N
V
E
XCA
DIM
OF E AND FILL TARIA SE
S
T
I
RA
LIM
IDBA
DM
OSE
PROP
SECTION 10/
WETLAND
IMPACT
LIMITS OF FILL
175'
(TYP
.)
PLAQUEMINES
LIQUID TERMINAL
800'
0'
800'
1600'
2400'
SITE PLAN WITH AERIAL
Project number
APRIL 2018
Date
Designed by
Drawn by
Checked by
Checked by
August 29, 2018
Plot Date
5
REVISIONS
No.
Description
Date
(2) 60' X 1800'
UNLOAD SHEDS
(SEE SHEET 15)
N
R
TA
RA
BA ON
MID RSI
ED VE
OS DI
OP NT
PR DIME
SE
1,500 LF
SETBACK
RAIL
OFFLOADING
FACILITY
(1,460' X
365')
IA
PLAQUEMINES
LIQUID TERMINAL
E. RAVENNA RD
PHILLIPS 66
ALLIANCE
REFINERY
W
LA H
Y 23
SITE PLAN CROSS SECTION
CONSTRUCTION ACCESS (4,170±
LF x 20 LF DIRT ROAD)
1000'
0'
1000'
2000'
Project number
APRIL 2018
Date
3000'
Designed by
Drawn by
Checked by
Checked by
EXISTING GROUND
PROPOSED CONTAINMENT DIKE
ELEVATION
(FT.)
-2.0
+1.0
VOLUME
(CUYD)
150,250
August 29, 2018
Plot Date
6
NOTE: THE IMAGE ABOVE IS A GENERAL REPRESENTATION OF THE WORK AREA, ACTUAL FIELD CONDITIONS MAY DIFFER.
DATUM: NADV 88
No.
REVISIONS
Description
Date
PLAQUEMINES
LIQUID TERMINAL
August 29, 2018
LEVEE CROSSING PLAN
Project number
Date
Designed by
Drawn by
Checked by
Plot Date
Checked by
7
NOTE: THE IMAGE ABOVE IS A GENERAL REPRESENTATION OF THE WORK AREA, ACTUAL FIELD CONDITIONS MAY DIFFER.
DATUM: NADV 88
No.
REVISIONS
Description
Date
PLAQUEMINES
LIQUID TERMINAL
August 29, 2018
LEVEE
CROSSING SECTIONS
Project number
Date
Designed by
Drawn by
Checked by
Plot Date
Checked by
8
REVISIONS
No.
Description
Date
PLAQUEMINES
LIQUID TERMINAL
LEVEE CRANE PAD
AND TRUSS
STAGING AREAS
Project number
Date
NOTE: THE IMAGE ABOVE IS A GENERAL REPRESENTATION OF THE WORK AREA, ACTUAL FIELD CONDITIONS MAY DIFFER.
DATUM: NADV 88
Designed by
Drawn by
Checked by
Checked by
August 29, 2018
Plot Date
9
REVISIONS
No.
Description
Date
THIS DOCUMENT IS THE PROPERTY OF GRAND ISLE
SHIP YARD ("GISY"). IT MAY CONTAIN INFORMATION
DESCRIBING TECHNOLOGY OWNED BY GISY AND
DEEMED TO BE COMMERCIALLY SENSITIVE. IT IS
TO BE USED ONLY IN CONNECTION WITH WORK
BEING PERFORMED BY GISY OR APPROVED
CONTRACTOR. REPRODUCTION IN WHOLE OR IN
PART FOR ANY PURPOSE OTHER THAN WORK
PERFORMED BY GISY OR APPROVED CONTRACTOR
IS FORBIDDEN EXCEPT BY EXPRESS WRITTEN
PERMISSION OF GISY. IT IS TO BE SAFEGUARDED
AGAINST BOTH DELIBERATE AND INADVERTENT
DISCLOSURE TO ANY THIRD PARTY.
PLAQUEMINES
LIQUID TERMINAL
DOCK PLAN
39145-1104
Project number
APRIL 2018
Date
NOTE: THE IMAGE ABOVE IS A GENERAL REPRESENTATION OF THE WORK AREA, ACTUAL FIELD CONDITIONS MAY DIFFER.
DATUM: NADV 88
Designed by
GIS
Drawn by
GIS
Checked by
BJ
Checked by
ST
August 30, 2018
Plot Date
10
REVISIONS
No.
Description
Date
PLAQUEMINES
LIQUID TERMINAL
DOCK APPROACH
CROSS SECTION
Project number
Date
NOTE: THE IMAGE ABOVE IS A GENERAL REPRESENTATION OF THE WORK AREA, ACTUAL FIELD CONDITIONS MAY DIFFER.
DATUM: NADV 88
Designed by
Drawn by
Checked by
Checked by
August 29, 2018
Plot Date
11
NOTE: THE IMAGE ABOVE IS A GENERAL REPRESENTATION OF THE WORK AREA, ACTUAL FIELD CONDITIONS MAY DIFFER.
DATUM: NADV 88
13-190
No.
REVISIONS
Description
Date
PLAQUEMINES
LIQUID TERMINAL
August 29, 2018
DOCK CROSS SECTION
Project number
Date
Designed by
Drawn by
Checked by
Plot Date
Checked by
12
REVISIONS
No.
Description
Date
PLAQUEMINES
LIQUID TERMINAL
MOORING CROSS SECTION
Project number
Date
NOTE: THE IMAGE ABOVE IS A GENERAL REPRESENTATION OF THE WORK AREA, ACTUAL FIELD CONDITIONS MAY DIFFER.
DATUM: NADV 88
Designed by
Drawn by
Checked by
Checked by
August 29, 2018
Plot Date
13
REVISIONS
No.
Description
Date
PLAQUEMINES
LIQUID TERMINAL
REVETMENT REPAIR
DETAILS
Project number
APRIL 2018
Date
Designed by
Drawn by
Checked by
Checked by
August 29, 2018
Plot Date
14
REVISIONS
No.
Date
N
(2) 60' X 1800'
UNLOAD SHEDS
(SEE SHEET 15)
Description
R
TA
RA
BA ON
MID RSI
ED VE
OS DI
OP NT
PR DIME
SE
1,500 LF
SETBACK
RAIL
OFFLOADING
FACILITY
IA
E. RAVENNA RD
PHILLIPS 66
ALLIANCE
REFINERY
LA H
3
WY 2
CONSTRUCTION ACCESS (4,170±
LF x 20 LF DIRT ROAD)
1000'
0'
1000'
2000'
3000'
PLAQUEMINES
LIQUID TERMINAL
RAIL CROSS SECTION
Project number
APRIL 2018
Date
Designed by
Drawn by
Checked by
Checked by
August 30, 2018
Plot Date
15
REVISIONS
No.
Description
Date
PLAQUEMINES
LIQUID TERMINAL
TYPICAL RAIL
DETAILS
Project number
APRIL 2018
Date
NOTE: THE IMAGE ABOVE IS A GENERAL REPRESENTATION OF THE WORK AREA, ACTUAL FIELD CONDITIONS MAY DIFFER.
Designed by
Drawn by
Checked by
Checked by
August 29, 2018
Plot Date
16