You can copy from here when filling out the rest of the page.
The City of Sioux Falls requests Department of the Army authorization to install stream bank stabilization at ten locations in the Big Sioux River upstream of the City of Sioux Falls. If permitted, this action would represent the third phase of an ongoing proposal by the Applicant to stabilize eroding stream banks along a reach of the Big Sioux River which begins near the City of Baltic and runs downstream to the East 60th Street crossing near the City of Sioux Falls (Project Area). The reach of the Big Sioux River in the Project Area is approximately 105,202 linear feet in length. The Applicant has received previous authorization by the Corps to stabilize 23,690 linear feet of stream bank at 33 individual locations within the Project Area.
The City of Sioux Falls requests Department of the Army authorization to install stream bank stabilization at ten locations in the Big Sioux River upstream of the City of Sioux Falls. If permitted, this action would represent the third phase of an ongoing proposal by the Applicant to stabilize eroding stream banks along a reach of the Big Sioux River which begins near the City of Baltic and runs downstream to the East 60th Street crossing near the City of Sioux Falls (Project Area). The reach of the Big Sioux River in the Project Area is approximately 105,202 linear feet in length. The Applicant has received previous authorization by the Corps to stabilize 23,690 linear feet of stream bank at 33 individual locations within the Project Area.
PUBLIC NOTICE
US ARMY CORPS
OF ENGINEERS
OMAHA DISTRICT
APPLICANT:
APPLICATION NO:
WATERWAY:
ISSUE DATE:
EXPIRATION DATE:
City of Sioux Falls
NWO-2009-1745-PIE
Big Sioux River
September 11, 2018
October 11, 2018
________________________________________________________________
Regulatory Office, 28563 Powerhouse Rd, Room 118, Pierre, SD 57501
http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/SouthDakota.aspx
_____________________________________________________________________________
30-DAY NOTICE
JOINT NOTICE OF PERMIT PENDING
US ARMY CORPS OF ENGINEERS
AND
SOUTH DAKOTA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
The application of City of Sioux Falls for approval of plans and issuance of a permit under
authority of the Secretary of the Army is being considered by the District Commander, US Army
Engineer District, Omaha, Nebraska. The project described herein is not being proposed by the
Corps, but by the Applicant; the Corps will evaluate the proposed work to determine if it is
permittable under current laws and regulations.
Description of Proposed Project: The Applicant requests Department of the Army authorization
to install stream bank stabilization at ten locations in the Big Sioux River upstream of the City of
Sioux Falls. If permitted, this action would represent the third phase of an ongoing proposal by the
Applicant to stabilize eroding stream banks along a reach of the Big Sioux River which begins near
the City of Baltic and runs downstream to the East 60th Street crossing near the City of Sioux Falls
(Project Area). The reach of the Big Sioux River in the Project Area is approximately 105,202 linear
feet in length. The Applicant has received previous authorization by the Corps to stabilize 23,690
linear feet of stream bank at 33 individual locations within the Project Area.
The location of proposed and previously authorized bank stabilization sites within the Project Area
can be viewed in Figure 1. A description of the type and amount of proposed bank stabilization is
provided in Table 1. The Applicant has proposed to expand and repair six existing bank stabilization
sites. The Applicant has also proposed to install four new bank stabilization sites. The proposed
project would construct 7,220 linear feet of new bank stabilization within the Project Area.
The Applicant proposes to use two bank stabilization methods which are described as hard armoring
and soft armoring. The proposed hard armoring sites would use a self-adjusting rip-rap toe installed
at the base of the unstable stream bank. Work at hard armoring sites would also flatten the slope of
the upper bank and stabilize the upper bank with a combination of rip-rap and vegetation
establishment (Figure 2). Soft armoring sites would use a combination of stabilization methods
including rip-rap stone toe protection, root wads, and vegetation reestablishment (Figure 3). The
applicant has proposed to include a 100-foot buffer at all individual stabilization sites.
Purpose: The basic purpose of the project is to reduce total suspended sediment load (TSS) of
the Big Sioux River. The overall purpose of the project is to reduce TSS load of the Big Sioux
River to a level which meets water quality standards established for the designated beneficial uses
of the Big Sioux River. This is not a water dependent activity.
Existing Conditions: Elevated levels of TSS are present in the Project Area and this reach of the
Big Sioux River does not attain the established water quality standard for Total Maximum Daily
Sediment Load. The elevated level of TSS within the Project Area compromises the ability of the
Big Sioux River to support its designated beneficial uses (e.g., immersion contact recreation or
fish life propagation). A comprehensive study of all sediment sources entering the Study Area has
not been completed at this time. However, the rate and location of sediment sources associated
with unstable stream banks has been evaluated in the Big Sioux River. Bankhead and Simon
(2009) estimated that ten to twenty-five percent of the total sediment load of the middle Big Sioux
River originates from unstable stream banks. Other potential sources of sediment include stream
bed erosion, inputs from the upstream watershed, localized upland sources and inputs from
tributaries. The extent that these sources contribute to the total sediment load within the Big Sioux
River is not known.
The rate of stream bank erosion and channel migration within the Project Area appears to be higher
than other reaches of the Big Sioux River (Langendoen et al. 2014). Elevated rates of channel
migration within the Project Area are likely the result of historic actions taken in the 1900s which
straightened the Big Sioux River stream channel by removing meander bends (Langendoen et al.
2014 and City of Sioux Falls 2017).
Mitigation: The Applicant has stated that they believe that the project as proposed would not
have an adverse effect on waters of the United States and as such, they have not proposed a
compensatory mitigation plan. An alternative analysis has been completed by the Applicant.
Alternatives evaluated include three stream bank stabilization methods, riparian area enhancement
and a no action alternative.
The South Dakota Department of Environment and Natural Resources, Division of Environmental
Services, 523 East Capitol Avenue, Pierre, South Dakota, 57501-3181, will review the proposed
project for state certification in accordance with the provisions of Section 401 of the Clean Water Act.
The certification, if issued, will express the State's opinion that the operations undertaken by the
applicant will not result in a violation of applicable water quality standards. The South Dakota
2
Department of Environment and Natural Resources hereby incorporates this public notice as its own
public notice and procedures by reference (ARSD 74:51:01).
Omaha District will comply with the National Historic Preservation Act of 1966, as amended. We
have checked the National Register of Historic Places and "its current supplements," and no
property listed in the Register or proposed for listing is located in the permit area. This is the extent
of our knowledge about historic properties in the permit area at this time. We will evaluate input
by the State Historic Preservation Officer and the public in response to this public notice, and we
may conduct or require a reconnaissance survey of the permit area or check for unknown historic
properties, if warranted.
In compliance with the Endangered Species Act, a preliminary determination has been made that the
described work will not affect species designated as threatened or endangered, or adversely affect
critical habitat. In order to complete our evaluation of this activity, comments are solicited from the
U.S. Fish and Wildlife Service and other interested agencies and individuals.
The decision whether to issue a permit will be based on an evaluation of the probable impacts,
including cumulative impacts, of the proposed activity on the public interest. That decision will
reflect the national concern for both protection and utilization of important resources. The benefit
which reasonably may be expected to accrue from the proposals must be balanced against its
reasonably foreseeable detriments. All factors which may be relevant to the activity will be
considered including the cumulative effects thereof; among those are conservation, economics,
aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood
hazards, flood plain values, land use, navigation, shoreline erosion and accretion, recreation, water
supply and conservation, water quality, energy needs, safety, food production, and, in general the
needs and welfare of the people. In addition, the evaluation of the impacts of the project on public
interest will include application of the guidelines promulgated by the Administrator, Environmental
Protection Agency, under authority of Section 404(b) of the Clean Water Act (40 CFR Part 230).
The Corps of Engineers is soliciting comments from the public; Federal, state, and local agencies and
officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of
this proposed activity. Any comments received will be considered by the Corps of Engineers to
determine whether to issue, modify, condition or deny a permit for this proposal. To make this
decision, comments are used to assess impacts on endangered species, historic properties, water
quality, general environmental effects, and the other public interest factors listed above. Comments
are used in the preparation of an Environmental Assessment and/or an Environmental Impact
Statement pursuant to the National Environmental Policy Act. Comments are also used to determine
the need for a public hearing and to determine the overall public interest of the proposed activity.
Any person may request, in writing, within the comment period specified in this notice, that a public
hearing be held to consider this application. Requests for public hearings shall state, with
particularity, the reason for holding a public hearing. The request must be submitted to the US Army
Corps of Engineers, South Dakota Regulatory Office, 28563 Powerhouse Road, Room 118, Pierre,
South Dakota 57501.
3
Any interested party (particularly officials of any town, city, county, state, Federal agency, Indian
Tribe, or local association whose interests may be affected by the proposed work) is invited to submit
to this office, written facts, arguments, or objections on or before October 11, 2018. Any agency or
individual having an objection to the proposed work should specifically identify it as an objection
with clear and specific reasons. Comments, both favorable and unfavorable, will be accepted, made
a part of the record and will receive full consideration in subsequent actions on this permit application.
All replies to the public notice should be addressed to the address listed in the previous paragraph.
Nathan Morey, telephone number (605) 224-8531, may be contacted for additional information.
Comments received after the close of the business day on the expiration date of this public notice will
not be considered.
This project, if authorized, will be under the provisions of Section 404 of the Clean Water Act.
Drawings showing the location and extent of the work are attached to this notice.
Literature Cited:
Bankhead, N. and A. Simon. 2009. Analysis of Bank Stability and Potential Load Reduction
Along Reaches of the Big Sioux River, South Dakota. USDA Watershed Physical
Processes Research Unit National Sedimentation Laboratory Oxford, MS.
Langendoen, E.J., M.E. Ursic, C.E. Frias, J.D. Abad. 2014. Bank Erosion and Stabilization of the
Big Sioux River between Dell Rapids and Sioux Falls, South Dakota. USDA Watershed
Physical Processes Research Unit National Sedimentation Laboratory Oxford, MS.
City of Sioux Falls. 2017. Big Sioux River Geomorphic Assessment Final Report. City of
Sioux Falls, SD.
4
Sixth
St
5th St
4th St
Sverdrup Ave
475th Ave
476th Ave
Rock
Ridge
Ave
471st Ave
473rd Ave
I- 29 I- 29
Lyndale
Rd
475th Ave
477th Ave
12
14
13
N Cliff Ave
E 67th
St
N French
Ave
33
24
E 71st
E 72nd St St N
E Dike Dr
27
E 63rd St
E 61st
261st St St
25
26
Proposed Bank Stabilization Sites
E Robur Dr
Previous Bank Stabilization Sites
E 63rd
St N
E 60th St
34
I- 229
N 9th Ave
N 10th Ave
Show Pl
SIOUX FALLS
32
477th Ave
N
Tra King
il s
Pl
I- 90
E Dike Pl
Surrell St
Slip Up Creek Rd
N
Lewis
Ave
W 60
St
I- 90
28
22
23
35
N
Velocity
Ave
Silver
Creek
Rd
29
N D
itch
N Show Pl
N Western Ave
403
E Carol
St
E Beverly St
N Seubert
Ave
Haystack Pl
ka
rd
Coun
try
Ave
Pa
c
N Kiwani s Ave
N Marion Rd
N Lamesa Dr
W 60th St
11
ve
lt A
Ho
31
103
260th St
W 72nd St
260th St
E 78th St
Deanna
Dr
30
402
1
E 84th St
476th Ave
W 66th St N
104
15
N Angel
Ave
105
20
21
Rd
Ln
36
16
N Ditch Rd
469th Ave
17
2
Horizon
Dr
Co Hwy 130
Berry Ln
N 84th St W 84th St
e
nit
W 61st St
State Hwy 38
W
Trent
Ln
Gra
35
W 62nd St N
N
34
25
10
9
258th St
407
19
24
26
State Hwy 38
36
257th St
8
W 84th St
259th St
4
Rd
Kiwanis Ave
Kelsey
Cr
S West Ave
Co Hwy 137 470th Ave
Trade
Ave
469th Ave
N West Ave
14
N Castle
Dr
33
W 60th St
35
115
18
13
23
27
25
Hw y
Ave
Wild
Clover
Cir
Linco
ln
Trl
3
Ln
12
7
260th St
28
34
4
on
et
11
Lamesa
Ln
26
256th St
l
ap
M
Haylie St
Dominic
St
ood
Cottonw
Hanna Trl
Dr
22
24
Lincoln St
5
257th St
Park
S
Eric
Ave
21
15
27
33
32
6
1
Co Hwy 130
16
28
23
256th St
2
Western
Dr
ve
ro
hg L n
As
10
29
31
CROOKS
257th St
9
Meadowland St
River
3
4
22
254th St
Co Hwy 122
256th St
Co Hwy 126
21
ioux
Big S
33
20
State
35
34
16
13
14
15
255th St
36
12
253rd St
30
25
255th St
1
252nd St
Norway St
Rd
Ditch
28
17
19
472nd Ave Co Hwy 133
24
26
2
11
10
9
253rd St
23
27
3
252nd Ave
18
253rd St
22
21
36
251st St
Ditch Rd
Willow
Creek
St
16
13
14
35
Co Hwy 114
250th St
4
8
Big Sioux
Rd
Co Hwy 137 470th Ave
15
252nd St
252nd St
16
o
B ig Si u x Rive r
11
10
BALTIC
5
504
7
12
Lovely Ave
1st St
Big Sioux Rd
251st St
251st St
6
473rd Ave
1
2
34
6th
Pa
rk
er
Riv
Rd
250th St Co Hwy 114
3
249th St
33
Av
e
25
26
27
St
36
Dav
id
474th Ave
35
34
508
32
31
Homestead St
28
Sixth
St
249th St
472nd Ave
249th St
Homestead St
29
30
25
26
27
473rd Ave
www.ae2s.com | Advanced Engineering and Environmental Services, Inc.
Figure 1. Description of the location of existing and proposed bank stabilization sites within the project area. Individual bank
stabilization sites are labeled in red. See Table 1 for specific details regarding each proposed bank stabilization site.
36
SIOUX FALLS
I
nf
or
mat
i
onde
pi
c
t
e
dmayi
nc
l
udedat
aun
v
e
r
i
f
i
e
dbyAE
2S
.
Anyr
e
l
i
anc
eupons
uc
hdat
ai
satt
heus
e
r
'
sownr
i
s
k
.
AE
2Sdoe
snotwar
r
antt
hi
smapori
t
sf
e
at
ur
e
sar
ee
i
t
he
rs
pat
i
al
l
yort
e
mpor
al
l
yac
c
ur
at
e
.
Coordinate System: NAD 1983 BLM Zone 14N ftUS | Edited by: zmagdol | W:\S\Sioux Falls\00834-2018-004\GIS\Previous and Proposed Site Overview Map.mxd
Exhibit 1
Attachment
PREVIOUS ANDOVERVIEW
PROPOSED
MAP PROJECT SITES
BIG SIOUX STABILIZATION PROJECT SITES
¯
Locator Map Not to Scale
0
2,500
5,000
Feet
1 inch = 5,000 feet
BIG SIOUX RIVER BANK STABILIZATION
Minnehaha County, SD
Date: 8/24/2018
Table 1. Location and description of the proposed bank stabilization sites.
Bank Stabilization
Site Number
Location
Repair Type
103 Downstream
SW ¼ - Section 29
T102N R49W
SW ¼ - Section 29
T102N R49W
NW ¼ - Section
29 T102N
R49W
SW ¼ - Section 20
T102N R49W
SW ¼ - Section 20
T102N R49W
SE ¼ - Section 5
T102N R49W
NW ¼ - Section 8
T103N R49W
NW ¼ - Section 8
T103N R49W
NW ¼ - Section
29 T102N
R49W
SW ¼- Section 17
T102N R49W
SE ¼ - Section 29
T104N R49W
Repair and expand
existing stabilization
Repair and expand
existing stabilization
Repair and expand
existing stabilization
103 Upstream
403
104
105
4
16
504
402
407
508
Bank
Stabilization
Method
Hard Armoring
Riprap Fill Volume (cubic yards)
below Ordinary High Water Mark
(OHWM)
900
Length (linear
feet) of Bank
Effected
460
Hard Armoring
600
250
Hard Armoring
1050
600
Repair and expand
existing stabilization
Repair and expand
existing stabilization
Repair and expand
existing stabilization
Repair and expand
existing stabilization
New
Hard Armoring
600
370
Hard Armoring
450
300
Hard Armoring
1050
400
Hard Armoring
1200
470
Hard Armoring
2850
830
New
Soft Armoring
580*
950
New
Soft Armoring
330*
980
New
Soft Armoring
600*
1610
Totals:
10210
7220
* rip-rap volume only, volume of large wood not included.
Layout: Typical (1)
File: W:\S\Sioux Falls\00834-2018-004\CAD Dwgs\01-Civil\Plan Sheets\11046-TYPICAL.dwg
Figure 2. Typical section describing proposed bank stabilization sites which would use a hard armoring method. See Table 1 for a
description the proposed locations where hard armoring would be used.
1
C1
TYPICAL BANK STABILIZATION DETAIL - CLASS 'C' RIPRAP
2
C1
TYPICAL BANK STABILIZATION DETAIL - CLASS 'B' RIPRAP
Plotted: By: Michael Schille Date: Thursday, May 31, 2018
Last Saved: By: Michael Schille Date: Thursday, May 31, 2018 7:55:47 AM
Providing a Better Quality of Life for You!
1"=10'
TYPICAL SECTIONS
1"=10'
30% Design for Regulatory Review - Not Approved For Construction
UPPER PLANTING ZONE:
GRASSES, FORBS, TREES AND SHRUBS
1
SPACING OF LARGE WOOD
ALONG BANK TO BE 10 FT.
AREAS BETWEEN TO BE FILLED
WITH SOIL, SEED, AND FABRIC
LOWER PLANTING ZONE:
GRASSES, FORBS, SHRUB WILLOW
OHWM
REESTABLISH ACCESS ROUTE
EXISTING GRADE
LARGE WOOD, TYP.
BIOENGINEERING FABRIC
PLACEMENT (COIR BASED)
LARGE WOOD EMBEDMENT
10-15FT, TYP
FABRIC ENCAPSULATED LIFTS
PILES SHALL EXTEND ABOVE TOP
LAYER OF ROOTWAD LOGS 1 FT
1 TYPICAL CROSS-SECTION - SITE 402
TYP LARGE WOOD TOE WITH LAUNCHABLE ROCK & BANK SLOPING
NOT TO SCALE
ROCK TOE LAUNCHABLE, TYP.
TOP OF BANK
DRIVEN LOG PILE (TYP.)
TOE OF BANK
TOP OF BANK
TOE OF BANK
ATTACH ROOTWAD
LOGS TO ROOTWAD
LOGS (TYP.)
LOG PILES DRIVEN TO 25 FT BELOW
CHANNEL BED, MINIMUM
FLOW
LOG (TYP.)
LARGE WOOD. EMBEDMENT
10-15 FT, TYP.
2 TYPICAL CROSS-SECTION - SITE 407
TYP LARGE WOOD & PILE CRIB WITH LAUNCHABLE ROCK & BANK BENCH
REESTABLISH ACCESS ROUTE
EXISTING GRADE
ATTACH ROOTWAD LOGS
TO DRIVEN LOG PILES
(TYP.)
BIOENGINEERING FABRIC
PLACEMENT (COIR BASED)
FABRIC ENCAPSULATED LIFTS
OHWM
1.5
ROCK TOE LAUNCHABLE, TYP.
NOT TO SCALE
SLASH AND
STONE BACKFILL
DRIVEN LOG PILES, TYP.
BUMPER LOG
(TYP.)
1.1 TYPICAL PLAN - SITE 402
TYP LARGE WOOD TOE
OHWM
LARGE WOOD, TYP.
PACK VOIDS OF LARGE
WOOD STRUCTURE
WITH SLASH
PACK VOIDS OF LARGE
WOOD STRUCTURE
WITH SLASH
1
NOT TO SCALE
ROOTWAD LOG
(TYP.)
ROOTWAD LOG
(TYP.)
1.5
SPACING OF LARGE WOOD
ALONG BANK TO BE 25 FT.
AREAS BETWEEN TO BE FILLED
WITH SOIL, SEED, AND FABRIC
VARIABLE 5 - 7 FT
ROCK TOE LAUNCHABLE, TYP.
2.1 TYPICAL PLAN - SITE 407
TYP LARGE WOOD & PILE CRIB
NOT TO SCALE
1
2.2 TYPICAL CROSS-SECTION BETWEEN LARGE WOOD - SITE 407
TYP LAUNCHABLE ROCK & BANK BENCH
NOT TO SCALE
Ordinary high water mean (OHWM) estimated from 30 and 60 day
exceedance flows at Sioux Falls and will be revised for 60% plans
based on field indicators
2121 Randolph Ave, Suite 200
St. Paul, MN 55105
(651) 243-9700
www.interfluve.com
Providing a Better Quality of Life for You!
1.5
SLASH
FABRIC ENCAPSULATED LIFTS WITH
UNIFORM LIFT HEIGHT OF 1 FT
TYPICAL DETAILS 1 OF 2
EXISTING GRADE
BIOENGINEERING FABRIC
PLACEMENT (COIR BASED)
Figure 3. Typical section describing proposed bank stabilization sites which would use a soft armoring method. See Table 1 for a
description the proposed locations where soft armoring would be used.
DRIVEN LOG PILE (TYP.)
ROOTWAD LOG
(TYP.)
OHWM
ROOTWAD LOGS
SECURED TO PILES
SLASH
1.5
1
FLOW
PILES SHALL EXTEND ABOVE TOP
LAYER OF ROOTWAD LOGS 1 FT
ATTACH BUMPER LOG
TO LOGS (TYP.)
ROCK BASE, TYP.
TYPICAL LARGE WOOD SPUR SPACING OF 100 FT FROM THE
LEADING EDGE TO LEADING EDGE OF SPUR.
TYPICAL LARGE WOOD SPUR LENGTH IN THE DIRECTION OF FLOW
IS 30 FT.
LOG PILES DRIVEN TO 25 FT BELOW
CHANNEL BED, MINIMUM
3.1 TYPICAL PLAN - SITE 508
TYP LARGE WOOD SPUR & BANK SLOPING
NOT TO SCALE
3 TYPICAL CROSS-SECTION - SITE 508
TYP LARGE WOOD SPUR & BANK SLOPING
NOT TO SCALE
BIOENGINEERING FABRIC
PLACEMENT (COIR BASED)
BIOENGINEERING FABRIC
PLACEMENT (COIR BASED)
EXISTING
GRADE
EXISTING
GRADE
OHWM
OHWM
1.5
1.5
1
1
ROCK TOE LAUNCHABLE, TYP.
FINISHED GRADE
NATIVE MATERIAL
3.2 TYPICAL CROSS-SECTION - BETWEEN LARGE WOOD SPURS - SITE 508 STA. 10+00 - 13+50
TYP BANK SLOPING & ROCK TOE
NOT TO SCALE
Ordinary high water mean (OHWM) estimated from 30 and 60 day
exceedance flows at Sioux Falls and will be revised for 60% plans
based on field indicators
3.3 TYPICAL CROSS-SECTION - BETWEEN LARGE WOOD SPURS - SITE 508 STA. 1+50 - 9+50
TYP BANK SLOPING
NOT TO SCALE
2121 Randolph Ave, Suite 200
St. Paul, MN 55105
(651) 243-9700
www.interfluve.com
Providing a Better Quality of Life for You!
2.
ATTACH ROOTWAD LOGS
TO DRIVEN LOG PILES (TYP.)
DRIVEN LOG PILES, TYP.
LARGE WOOD SPUR NOTES:
1.
LOG (TYP.)
PACK VOIDS OF LARGE WOOD
STRUCTURE WITH SLASH
TOP OF BANK
EXISTING
GRADE
TOE OF BANK
TYPICAL DETAILS 2 OF 2
BIOENGINEERING FABRIC
PLACEMENT (COIR BASED)
Figure 3. Continued.