Home

Omaha District

Run scraper

APPLICATION NO:

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The City of Sioux Falls requests Department of the Army authorization to install stream bank stabilization at ten locations in the Big Sioux River upstream of the City of Sioux Falls. If permitted, this action would represent the third phase of an ongoing proposal by the Applicant to stabilize eroding stream banks along a reach of the Big Sioux River which begins near the City of Baltic and runs downstream to the East 60th Street crossing near the City of Sioux Falls (Project Area). The reach of the Big Sioux River in the Project Area is approximately 105,202 linear feet in length. The Applicant has received previous authorization by the Corps to stabilize 23,690 linear feet of stream bank at 33 individual locations within the Project Area.

The City of Sioux Falls requests Department of the Army authorization to install stream bank stabilization at ten locations in the Big Sioux River upstream of the City of Sioux Falls. If permitted, this action would represent the third phase of an ongoing proposal by the Applicant to stabilize eroding stream banks along a reach of the Big Sioux River which begins near the City of Baltic and runs downstream to the East 60th Street crossing near the City of Sioux Falls (Project Area). The reach of the Big Sioux River in the Project Area is approximately 105,202 linear feet in length. The Applicant has received previous authorization by the Corps to stabilize 23,690 linear feet of stream bank at 33 individual locations within the Project Area.

PUBLIC NOTICE

US ARMY CORPS OF ENGINEERS OMAHA DISTRICT

APPLICANT: APPLICATION NO: WATERWAY: ISSUE DATE: EXPIRATION DATE:

City of Sioux Falls NWO-2009-1745-PIE Big Sioux River September 11, 2018 October 11, 2018

________________________________________________________________ Regulatory Office, 28563 Powerhouse Rd, Room 118, Pierre, SD 57501 http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/SouthDakota.aspx _____________________________________________________________________________

30-DAY NOTICE JOINT NOTICE OF PERMIT PENDING US ARMY CORPS OF ENGINEERS AND SOUTH DAKOTA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES The application of City of Sioux Falls for approval of plans and issuance of a permit under authority of the Secretary of the Army is being considered by the District Commander, US Army Engineer District, Omaha, Nebraska. The project described herein is not being proposed by the Corps, but by the Applicant; the Corps will evaluate the proposed work to determine if it is permittable under current laws and regulations. Description of Proposed Project: The Applicant requests Department of the Army authorization to install stream bank stabilization at ten locations in the Big Sioux River upstream of the City of Sioux Falls. If permitted, this action would represent the third phase of an ongoing proposal by the Applicant to stabilize eroding stream banks along a reach of the Big Sioux River which begins near the City of Baltic and runs downstream to the East 60th Street crossing near the City of Sioux Falls (Project Area). The reach of the Big Sioux River in the Project Area is approximately 105,202 linear feet in length. The Applicant has received previous authorization by the Corps to stabilize 23,690 linear feet of stream bank at 33 individual locations within the Project Area. The location of proposed and previously authorized bank stabilization sites within the Project Area can be viewed in Figure 1. A description of the type and amount of proposed bank stabilization is provided in Table 1. The Applicant has proposed to expand and repair six existing bank stabilization sites. The Applicant has also proposed to install four new bank stabilization sites. The proposed project would construct 7,220 linear feet of new bank stabilization within the Project Area.

The Applicant proposes to use two bank stabilization methods which are described as hard armoring and soft armoring. The proposed hard armoring sites would use a self-adjusting rip-rap toe installed at the base of the unstable stream bank. Work at hard armoring sites would also flatten the slope of the upper bank and stabilize the upper bank with a combination of rip-rap and vegetation establishment (Figure 2). Soft armoring sites would use a combination of stabilization methods including rip-rap stone toe protection, root wads, and vegetation reestablishment (Figure 3). The applicant has proposed to include a 100-foot buffer at all individual stabilization sites. Purpose: The basic purpose of the project is to reduce total suspended sediment load (TSS) of the Big Sioux River. The overall purpose of the project is to reduce TSS load of the Big Sioux River to a level which meets water quality standards established for the designated beneficial uses of the Big Sioux River. This is not a water dependent activity. Existing Conditions: Elevated levels of TSS are present in the Project Area and this reach of the Big Sioux River does not attain the established water quality standard for Total Maximum Daily Sediment Load. The elevated level of TSS within the Project Area compromises the ability of the Big Sioux River to support its designated beneficial uses (e.g., immersion contact recreation or fish life propagation). A comprehensive study of all sediment sources entering the Study Area has not been completed at this time. However, the rate and location of sediment sources associated with unstable stream banks has been evaluated in the Big Sioux River. Bankhead and Simon (2009) estimated that ten to twenty-five percent of the total sediment load of the middle Big Sioux River originates from unstable stream banks. Other potential sources of sediment include stream bed erosion, inputs from the upstream watershed, localized upland sources and inputs from tributaries. The extent that these sources contribute to the total sediment load within the Big Sioux River is not known. The rate of stream bank erosion and channel migration within the Project Area appears to be higher than other reaches of the Big Sioux River (Langendoen et al. 2014). Elevated rates of channel migration within the Project Area are likely the result of historic actions taken in the 1900s which straightened the Big Sioux River stream channel by removing meander bends (Langendoen et al. 2014 and City of Sioux Falls 2017). Mitigation: The Applicant has stated that they believe that the project as proposed would not have an adverse effect on waters of the United States and as such, they have not proposed a compensatory mitigation plan. An alternative analysis has been completed by the Applicant. Alternatives evaluated include three stream bank stabilization methods, riparian area enhancement and a no action alternative. The South Dakota Department of Environment and Natural Resources, Division of Environmental Services, 523 East Capitol Avenue, Pierre, South Dakota, 57501-3181, will review the proposed project for state certification in accordance with the provisions of Section 401 of the Clean Water Act. The certification, if issued, will express the State's opinion that the operations undertaken by the applicant will not result in a violation of applicable water quality standards. The South Dakota 2

Department of Environment and Natural Resources hereby incorporates this public notice as its own public notice and procedures by reference (ARSD 74:51:01). Omaha District will comply with the National Historic Preservation Act of 1966, as amended. We have checked the National Register of Historic Places and "its current supplements," and no property listed in the Register or proposed for listing is located in the permit area. This is the extent of our knowledge about historic properties in the permit area at this time. We will evaluate input by the State Historic Preservation Officer and the public in response to this public notice, and we may conduct or require a reconnaissance survey of the permit area or check for unknown historic properties, if warranted. In compliance with the Endangered Species Act, a preliminary determination has been made that the described work will not affect species designated as threatened or endangered, or adversely affect critical habitat. In order to complete our evaluation of this activity, comments are solicited from the U.S. Fish and Wildlife Service and other interested agencies and individuals. The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts, of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposals must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards, flood plain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food production, and, in general the needs and welfare of the people. In addition, the evaluation of the impacts of the project on public interest will include application of the guidelines promulgated by the Administrator, Environmental Protection Agency, under authority of Section 404(b) of the Clean Water Act (40 CFR Part 230). The Corps of Engineers is soliciting comments from the public; Federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, the reason for holding a public hearing. The request must be submitted to the US Army Corps of Engineers, South Dakota Regulatory Office, 28563 Powerhouse Road, Room 118, Pierre, South Dakota 57501.

3

Any interested party (particularly officials of any town, city, county, state, Federal agency, Indian Tribe, or local association whose interests may be affected by the proposed work) is invited to submit to this office, written facts, arguments, or objections on or before October 11, 2018. Any agency or individual having an objection to the proposed work should specifically identify it as an objection with clear and specific reasons. Comments, both favorable and unfavorable, will be accepted, made a part of the record and will receive full consideration in subsequent actions on this permit application. All replies to the public notice should be addressed to the address listed in the previous paragraph. Nathan Morey, telephone number (605) 224-8531, may be contacted for additional information. Comments received after the close of the business day on the expiration date of this public notice will not be considered. This project, if authorized, will be under the provisions of Section 404 of the Clean Water Act. Drawings showing the location and extent of the work are attached to this notice. Literature Cited: Bankhead, N. and A. Simon. 2009. Analysis of Bank Stability and Potential Load Reduction Along Reaches of the Big Sioux River, South Dakota. USDA ­ Watershed Physical Processes Research Unit National Sedimentation Laboratory Oxford, MS. Langendoen, E.J., M.E. Ursic, C.E. Frias, J.D. Abad. 2014. Bank Erosion and Stabilization of the Big Sioux River between Dell Rapids and Sioux Falls, South Dakota. USDA ­ Watershed Physical Processes Research Unit National Sedimentation Laboratory Oxford, MS. City of Sioux Falls. 2017. Big Sioux River Geomorphic Assessment ­ Final Report. City of Sioux Falls, SD.

4

Sixth St

5th St

4th St

Sverdrup Ave

475th Ave

476th Ave

Rock Ridge Ave

471st Ave

473rd Ave

I- 29 I- 29

Lyndale Rd

475th Ave

477th Ave

12

14

13

N Cliff Ave

E 67th St

N French Ave

33

24

E 71st E 72nd St St N

E Dike Dr

27

E 63rd St

E 61st 261st St St

25

26

Proposed Bank Stabilization Sites

E Robur Dr

Previous Bank Stabilization Sites

E 63rd St N E 60th St

34

I- 229

N 9th Ave N 10th Ave

Show Pl

SIOUX FALLS

32

477th Ave

N Tra King il s Pl

I- 90

E Dike Pl

Surrell St Slip Up Creek Rd

N Lewis Ave

W 60 St

I- 90

28

22

23

35

N Velocity Ave

Silver Creek Rd

29

N D itch

N Show Pl

N Western Ave

403

E Carol St E Beverly St

N Seubert Ave

Haystack Pl

ka rd

Coun try Ave Pa c

N Kiwani s Ave N Marion Rd

N Lamesa Dr

W 60th St

11

ve lt A Ho

31

103

260th St

W 72nd St

260th St

E 78th St

Deanna Dr

30

402

1

E 84th St

476th Ave

W 66th St N

104

15

N Angel Ave

105

20

21

Rd

Ln

36

16

N Ditch Rd

469th Ave

17

2

Horizon Dr Co Hwy 130

Berry Ln

N 84th St W 84th St

e nit

W 61st St State Hwy 38

W Trent Ln

Gra

35

W 62nd St N

N

34

25

10

9

258th St

407

19

24

26

State Hwy 38

36

257th St

8

W 84th St

259th St

4

Rd

Kiwanis Ave

Kelsey Cr S West Ave

Co Hwy 137 470th Ave

Trade Ave

469th Ave

N West Ave

14

N Castle Dr

33

W 60th St

35

115

18

13

23

27

25

Hw y

Ave

Wild Clover Cir

Linco ln Trl

3

Ln

12

7

260th St

28

34

4

on et

11

Lamesa Ln

26

256th St

l ap M

Haylie St Dominic St

ood Cottonw

Hanna Trl

Dr

22

24

Lincoln St

5

257th St

Park

S Eric Ave

21

15

27

33

32

6

1

Co Hwy 130

16

28

23

256th St

2

Western Dr

ve ro hg L n As

10

29

31

CROOKS

257th St

9

Meadowland St

River

3

4

22

254th St

Co Hwy 122

256th St

Co Hwy 126

21

ioux Big S

33

20

State

35

34

16

13

14

15

255th St

36

12

253rd St

30

25

255th St

1

252nd St

Norway St

Rd Ditch

28

17

19

472nd Ave Co Hwy 133

24

26

2

11

10

9

253rd St

23

27

3

252nd Ave

18

253rd St

22

21

36

251st St

Ditch Rd

Willow Creek St

16

13

14

35

Co Hwy 114

250th St

4

8

Big Sioux Rd

Co Hwy 137 470th Ave

15

252nd St

252nd St

16

o B ig Si u x Rive r

11

10

BALTIC

5

504

7

12

Lovely Ave

1st St

Big Sioux Rd

251st St

251st St

6

473rd Ave

1

2

34

6th

Pa rk

er Riv Rd

250th St Co Hwy 114

3

249th St

33

Av e

25

26

27

St

36

Dav id

474th Ave

35

34

508

32

31

Homestead St

28 Sixth St

249th St

472nd Ave

249th St

Homestead St

29

30

25

26

27

473rd Ave

www.ae2s.com | Advanced Engineering and Environmental Services, Inc.

Figure 1. Description of the location of existing and proposed bank stabilization sites within the project area. Individual bank stabilization sites are labeled in red. See Table 1 for specific details regarding each proposed bank stabilization site.

36 SIOUX FALLS

I nf or mat i onde pi c t e dmayi nc l udedat aun v e r i f i e dbyAE 2S . Anyr e l i anc eupons uc hdat ai satt heus e r ' sownr i s k . AE 2Sdoe snotwar r antt hi smapori t sf e at ur e sar ee i t he rs pat i al l yort e mpor al l yac c ur at e . Coordinate System: NAD 1983 BLM Zone 14N ftUS | Edited by: zmagdol | W:\S\Sioux Falls\00834-2018-004\GIS\Previous and Proposed Site Overview Map.mxd

Exhibit 1 Attachment

PREVIOUS ANDOVERVIEW PROPOSED MAP PROJECT SITES BIG SIOUX STABILIZATION PROJECT SITES

¯

Locator Map Not to Scale 0 2,500 5,000 Feet

1 inch = 5,000 feet

BIG SIOUX RIVER BANK STABILIZATION Minnehaha County, SD

Date: 8/24/2018

Table 1. Location and description of the proposed bank stabilization sites. Bank Stabilization Site Number

Location

Repair Type

103 Downstream

SW ¼ - Section 29 ­ T102N ­ R49W SW ¼ - Section 29 ­ T102N ­ R49W NW ¼ - Section 29 ­ T102N ­ R49W SW ¼ - Section 20 ­ T102N ­ R49W SW ¼ - Section 20 ­ T102N ­ R49W SE ¼ - Section 5 ­ T102N ­ R49W NW ¼ - Section 8 ­ T103N ­ R49W NW ¼ - Section 8 ­ T103N ­ R49W NW ¼ - Section 29 ­ T102N ­ R49W SW ¼- Section 17 ­ T102N ­ R49W SE ¼ - Section 29 ­ T104N ­ R49W

Repair and expand existing stabilization Repair and expand existing stabilization Repair and expand existing stabilization

103 Upstream 403 104 105 4 16 504 402 407 508

Bank Stabilization Method Hard Armoring

Riprap Fill Volume (cubic yards) below Ordinary High Water Mark (OHWM) 900

Length (linear feet) of Bank Effected 460

Hard Armoring

600

250

Hard Armoring

1050

600

Repair and expand existing stabilization Repair and expand existing stabilization Repair and expand existing stabilization Repair and expand existing stabilization New

Hard Armoring

600

370

Hard Armoring

450

300

Hard Armoring

1050

400

Hard Armoring

1200

470

Hard Armoring

2850

830

New

Soft Armoring

580*

950

New

Soft Armoring

330*

980

New

Soft Armoring

600*

1610

Totals:

10210

7220

* rip-rap volume only, volume of large wood not included.

Layout: Typical (1) File: W:\S\Sioux Falls\00834-2018-004\CAD Dwgs\01-Civil\Plan Sheets\11046-TYPICAL.dwg

Figure 2. Typical section describing proposed bank stabilization sites which would use a hard armoring method. See Table 1 for a description the proposed locations where hard armoring would be used.

1 C1

TYPICAL BANK STABILIZATION DETAIL - CLASS 'C' RIPRAP

2 C1

TYPICAL BANK STABILIZATION DETAIL - CLASS 'B' RIPRAP

Plotted: By: Michael Schille Date: Thursday, May 31, 2018 Last Saved: By: Michael Schille Date: Thursday, May 31, 2018 7:55:47 AM

Providing a Better Quality of Life for You!

1"=10'

TYPICAL SECTIONS

1"=10'

30% Design for Regulatory Review - Not Approved For Construction

UPPER PLANTING ZONE: GRASSES, FORBS, TREES AND SHRUBS

1

SPACING OF LARGE WOOD ALONG BANK TO BE 10 FT. AREAS BETWEEN TO BE FILLED WITH SOIL, SEED, AND FABRIC

LOWER PLANTING ZONE: GRASSES, FORBS, SHRUB WILLOW

OHWM

REESTABLISH ACCESS ROUTE EXISTING GRADE

LARGE WOOD, TYP.

BIOENGINEERING FABRIC PLACEMENT (COIR BASED)

LARGE WOOD EMBEDMENT 10-15FT, TYP

FABRIC ENCAPSULATED LIFTS PILES SHALL EXTEND ABOVE TOP LAYER OF ROOTWAD LOGS 1 FT

1 TYPICAL CROSS-SECTION - SITE 402 TYP LARGE WOOD TOE WITH LAUNCHABLE ROCK & BANK SLOPING NOT TO SCALE

ROCK TOE LAUNCHABLE, TYP.

TOP OF BANK

DRIVEN LOG PILE (TYP.)

TOE OF BANK

TOP OF BANK

TOE OF BANK

ATTACH ROOTWAD LOGS TO ROOTWAD LOGS (TYP.)

LOG PILES DRIVEN TO 25 FT BELOW CHANNEL BED, MINIMUM

FLOW

LOG (TYP.)

LARGE WOOD. EMBEDMENT 10-15 FT, TYP.

2 TYPICAL CROSS-SECTION - SITE 407 TYP LARGE WOOD & PILE CRIB WITH LAUNCHABLE ROCK & BANK BENCH REESTABLISH ACCESS ROUTE EXISTING GRADE

ATTACH ROOTWAD LOGS TO DRIVEN LOG PILES (TYP.)

BIOENGINEERING FABRIC PLACEMENT (COIR BASED) FABRIC ENCAPSULATED LIFTS

OHWM 1.5 ROCK TOE LAUNCHABLE, TYP.

NOT TO SCALE

SLASH AND STONE BACKFILL

DRIVEN LOG PILES, TYP.

BUMPER LOG (TYP.)

1.1 TYPICAL PLAN - SITE 402 TYP LARGE WOOD TOE

OHWM

LARGE WOOD, TYP.

PACK VOIDS OF LARGE WOOD STRUCTURE WITH SLASH

PACK VOIDS OF LARGE WOOD STRUCTURE WITH SLASH

1

NOT TO SCALE

ROOTWAD LOG (TYP.)

ROOTWAD LOG (TYP.)

1.5

SPACING OF LARGE WOOD ALONG BANK TO BE 25 FT. AREAS BETWEEN TO BE FILLED WITH SOIL, SEED, AND FABRIC VARIABLE 5 - 7 FT

ROCK TOE LAUNCHABLE, TYP.

2.1 TYPICAL PLAN - SITE 407 TYP LARGE WOOD & PILE CRIB NOT TO SCALE

1

2.2 TYPICAL CROSS-SECTION BETWEEN LARGE WOOD - SITE 407 TYP LAUNCHABLE ROCK & BANK BENCH NOT TO SCALE

Ordinary high water mean (OHWM) estimated from 30 and 60 day exceedance flows at Sioux Falls and will be revised for 60% plans based on field indicators

2121 Randolph Ave, Suite 200 St. Paul, MN 55105 (651) 243-9700 www.interfluve.com

Providing a Better Quality of Life for You!

1.5

SLASH

FABRIC ENCAPSULATED LIFTS WITH UNIFORM LIFT HEIGHT OF 1 FT

TYPICAL DETAILS 1 OF 2

EXISTING GRADE BIOENGINEERING FABRIC PLACEMENT (COIR BASED)

Figure 3. Typical section describing proposed bank stabilization sites which would use a soft armoring method. See Table 1 for a description the proposed locations where soft armoring would be used.

DRIVEN LOG PILE (TYP.) ROOTWAD LOG (TYP.)

OHWM ROOTWAD LOGS SECURED TO PILES SLASH

1.5 1

FLOW

PILES SHALL EXTEND ABOVE TOP LAYER OF ROOTWAD LOGS 1 FT

ATTACH BUMPER LOG TO LOGS (TYP.)

ROCK BASE, TYP.

TYPICAL LARGE WOOD SPUR SPACING OF 100 FT FROM THE LEADING EDGE TO LEADING EDGE OF SPUR. TYPICAL LARGE WOOD SPUR LENGTH IN THE DIRECTION OF FLOW IS 30 FT.

LOG PILES DRIVEN TO 25 FT BELOW CHANNEL BED, MINIMUM

3.1 TYPICAL PLAN - SITE 508 TYP LARGE WOOD SPUR & BANK SLOPING NOT TO SCALE

3 TYPICAL CROSS-SECTION - SITE 508 TYP LARGE WOOD SPUR & BANK SLOPING NOT TO SCALE

BIOENGINEERING FABRIC PLACEMENT (COIR BASED)

BIOENGINEERING FABRIC PLACEMENT (COIR BASED) EXISTING GRADE

EXISTING GRADE OHWM

OHWM

1.5

1.5 1

1 ROCK TOE LAUNCHABLE, TYP.

FINISHED GRADE

NATIVE MATERIAL

3.2 TYPICAL CROSS-SECTION - BETWEEN LARGE WOOD SPURS - SITE 508 STA. 10+00 - 13+50 TYP BANK SLOPING & ROCK TOE NOT TO SCALE

Ordinary high water mean (OHWM) estimated from 30 and 60 day exceedance flows at Sioux Falls and will be revised for 60% plans based on field indicators

3.3 TYPICAL CROSS-SECTION - BETWEEN LARGE WOOD SPURS - SITE 508 STA. 1+50 - 9+50 TYP BANK SLOPING NOT TO SCALE

2121 Randolph Ave, Suite 200 St. Paul, MN 55105 (651) 243-9700 www.interfluve.com

Providing a Better Quality of Life for You!

2.

ATTACH ROOTWAD LOGS TO DRIVEN LOG PILES (TYP.)

DRIVEN LOG PILES, TYP.

LARGE WOOD SPUR NOTES: 1.

LOG (TYP.) PACK VOIDS OF LARGE WOOD STRUCTURE WITH SLASH

TOP OF BANK

EXISTING GRADE

TOE OF BANK

TYPICAL DETAILS 2 OF 2 BIOENGINEERING FABRIC PLACEMENT (COIR BASED)

Figure 3. Continued.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas