This notice announces a Prospectus that has been submitted for the development of the Redstone Arsenal Mitigation Bank pursuant to 33 CFR 332, Compensatory Mitigation for Losses of Aquatic Resources (Federal Register: April 10, 2008, effective June 9, 2008).
Public Notice No. 18-38
Nashville District
Date: September 13, 2018
Application No. LRN-2018-00664
Please address comments to: Nashville District Corps of Engineers, Regulatory Division
3701 Bell Road, Nashville, TN 37214-2660
SUBJECT: This notice announces a Prospectus that has been submitted for the development of the Redstone Arsenal Mitigation Bank pursuant to 33 CFR 332, Compensatory Mitigation for Losses of Aquatic Resources (Federal Register: April 10, 2008, effective June 9, 2008).
BANK SPONSOR: U.S. Army Garrison, Redstone Arsenal
ATTN: Jeff Duke - CEC, Inc.
325 Seaboard Ln, Ste. 170
Franklin, TN 37067
LOCATION: The proposed mitigation bank is located on Redstone Arsenal, a 37,910-acre federally owned facility in Huntsville, Madison County, Alabama (Latitude N 34.586516, Longitude W -86.675226). The proposed mitigation bank would rehabilitate 3,765 linear feet of unnamed tributaries to the Tennessee River, and enhance and preserve 121.38 acres of wetlands adjacent to the Tennessee River.
PURPOSE: The Redstone Arsenal Mitigation Bank proposes to provide compensatory stream and wetland mitigation credits for permitted impacts within a primary service area comprised of the Redstone Arsenal Base within the Wheeler Lake watershed (HUC 06030002). The Bank has not proposed a
secondary service area.
GENERAL INFORMATION: Mitigation banks are defined as a site, or suite of sites, where aquatic resources (e.g., wetlands, streams, riparian areas) are restored, established, enhanced, and/or preserved for the purpose of providing compensatory mitigation for impacts authorized by Department of the Army (DA) permits pursuant to Section 10 of the Rivers and Harbors Act of 1899 and/or Section 404 of the Clean Water Act. In general, units of restored, established, enhanced or preserved wetlands or streams are expressed as “credits” which may subsequently
be withdrawn to offset “debits” incurred at a permitted project site. In this way, a permit requirement to provide compensatory mitigation can be transferred to the mitigation bank sponsor. The operation and use of a mitigation bank are governed by an approved mitigation banking instrument (MBI). The MBI is the legal document for the establishment, operation and use of a mitigation bank. This bank is intended to be a private commercial bank. The sponsor would be responsible for the successful development of the mitigation bank including monitoring and reporting requirements.
A group of federal and state regulatory and resource agency representatives known as the Interagency Review Team (IRT) would oversee the establishment and management of the bank. The IRT is chaired by the US Army Corps of Engineers, Nashville District (USACE). The primary role of the IRT is to facilitate establishment of the mitigation bank through the development of a MBI. The IRT will review the prospectus, instrument, and other appropriate documents and provide comments to the USACE.
Approval of the use of the bank for specific projects is the decision of the USACE pursuant to Section 10 of the Rivers and Harbors Act of 1899 and/or Section 404 of the Clean Water Act and/or the Alabama Department of Environmental Management (ADEM) pursuant to Section 401 of the CWA and/or applicable state of Alabama statute(s) and regulation(s). The USACE and ADEM provide no guarantee that any particular individual or general permit would be authorized to use the bank for compensation.
PROJECT DESCRIPTION: A portion of the Redstone Arsenal Mitigation Bank was originally permitted as a compensatory mitigation site for wetland impacts associated with improvements to Martin Road, and an Advanced Credit Wetland Mitigation Site for future impacts that may occur in association with
Redstone Arsenal. The site was constructed, but following completion of construction and planting, no subsequent monitoring or maintenance was performed, which
resulted in no generation of future credits and a cease in operation of the Advanced Credit Wetland Mitigation Site.
The goal of the Redstone Arsenal Mitigation Bank is to bring the original compensatory mitigation site into compliance with the 2008 Compensatory Mitigation Rule and create a single-user mitigation bank for Redstone Arsenal. This will involve new hydrologic modifications and replanting of some areas with appropriate species based on proposed habitat types. This modification will capture additional areas of stream restoration and wetland enhancement that
were not included in the original permit.
Stream functional uplift is proposed to be provided through improvement of stream hydrology, reduction of streambank erosion, improvement to aquatic and terrestrial habitat, and improvement to riparian stream buffers. Wetland functional uplift is proposed to be provided through restoration of wetland hydrology and improvement to aquatic habitat. The proposed stream mitigation approach involves restoration of 3,765 linear feet of stream channel. The proposed wetland mitigation approach involves enhancement of 44.33 acres of wetland and preservation of 77.05 acres of wetland.
Details of the mitigation plan are contained in the Prospectus for Redstone Arsenal Mitigation Bank dated July 2018. The plan can be viewed by emailing Ms. Peyton Abernathy at: Peyton.S.Abernathy@usace.army.mil.
HISTORIC AND CULTURAL RESOURCES: A search of the National Register returned no findings of historic properties currently listed on the National Register of Historic Places within the project area. A Phase I cultural/archaeological survey has not been conducted for the site. At this early stage in the regulatory process, no project design plans have been submitted; therefore, USACE cannot yet complete an effects determination for historic and cultural resources. The USACE invites responses to this public notice from American Indian Tribes or tribal governments; Federal, State, and local agencies; historical and archeological societies; and other parties likely to have knowledge or concerns regarding historic properties and cultural significance at or near the
project area. Upon submittal of the design plans, USACE would evaluate the design plans along with any substantive comments from this public notice to determine the potential to effect historic and cultural resources in compliance with Section 106 of the National Historic Preservation Act. If USACE determines that consultation is required,
consultation with the Alabama Historic Commission State Historic Preservation Officer (SHPO), and American Indian Tribes will follow, as appropriate.
ENDANGERED/THREATENED SPECIES REVIEW: A review of the United States Fish and Wildlife Service (USFWS) website, http://ecos.fws.gov/ipac identified the following federally-listed species that are known to occur or believed to occur in Madison County, Alabama:
Species Nomenclature
Federal Status
Mammals
Indiana Bat (Myotis sodalist)
Endangered
Gray Bat (Myotis grisescens)
Endangered
Northern Long-eared Bat (Myotis septentrionalis)
Threatened
Clams
Pink Mucket (pearlymussel) (Lampsilis abrupta)
Endangered
Rough Pigtoe (Pleurobema plenum)
Endangered
Sheepnose Mussel (Plethobasus cyphyus)
Endangered
Snuffbox Mussel (Epioblasma triquetra)
Endangered
Spectaclecase (mussel) (Cumberlandia monodonta)
Endangered
Crustaceans
Alabama Cave Shrimp (Palaemonias alabamae)
Endangered
Flowering Plants
Price's Potato-bean (Apios priceana)
Threatened
A copy of this notice is being furnished to USFWS for their review. After receipt of any comments, the USACE will evaluate the potential effects to proposed and/or listed species and their designated critical habitat, and initiate consultation with the U.S. Fish & Wildlife Service, if required.
COMMENT PERIOD: Written statements received in this office within 30 days from the date of this notice will become part of the record and will be considered in the determination. Any response to this notice should be directed to the Nashville District Corps of Engineers, Regulatory Division, Attention: Peyton S. Abernathy at the above address or via email: Peyton.S.Abernathy@usace.army.mil.
\s\
Joshua W. Frost
Chief, Technical Services Branch
Regulatory Division
U.S. Army Corps of Engineers
\\SVR-NASH\ P:\2017\173-738\-GIS\Maps\Final_Maps\173-738_Fig_1_Land_Ownership.mxd (4/24/2018 10:29:04 AM)
Public Notice 18-38
File No. LRN-2018-00664
Exhibit A
NOTE:
ALL SURROUNDING LAND IS OWNED BY
THE U.S. GOVERNMENT.
LEGEND
Conservation Easement Boundary
REDSTONE ARSENAL MITIGATION BANK
MODIFIED PROSPECTUS
HUNTSVILLE, MADISON COUNTY, AL
SCALE IN FEET
0
REFERENCE
1,000
2,000
325 Seaboard Lane, Suite 170 Franklin,Tennessee 37067
615-333-7797 800-763-2326
www.cecinc.com
ESRI WORLD IMAGERY / ARCGIS MAP SERVICE:
HTTP://GOTO.ARCGISONLINE.COM/MAPS/W ORLD_IMAGERY, DRAWN BY:
ACCESSED 4/24/2018,
DATE:
BCL
4/24/2018
CHECKED BY:
SCALE:
CAD
1 " = 1,000 '
LAND OWNERSHIP MAP
APPROVED BY:
PROJECT NO:
JTD
* Hand signature
on file
173-738
FIGURE NO:
1
Public Notice 18-38
File No. LRN-2018-00664
Exhibit B
Existing Stream
~3,593 ft.
Existing Culvert
Second Growth Forest/
Scrub-Shrub Wetland Mix
~30.07 ac.
Failed Water Control
Structure
(
&
(4) Spoil Piles
~0.25 ac
Emergent Wetland
~1.04 ac
Upland Buffer
~90.22 ac
Open Water
~9.31 ac
Emergent Wetland
~8.06 ac.
Tupelo Gum Swamp
~63.87 ac
Spoil Pile
Forested Wetland
Forested Wetland
~6.99 ac
Emergent Wetland
Open Water
Road
Failed Water Control
Structure
Second Growth Forested/Scrub-Shrub Mix
(
&
Tupelo Gum Swamp
Open Water
~6.71 ac.
Upland
Existing Stream
Existing Culvert
(
&
Water Control
Structure
Water Control Structure
Scrub-Shrub Wetland
~7.77 ac
M
"&
J
Conservation Easement Boundary
Emergency
Spillway
Upland Island
~0.57 ac
Existing
Road Crossing
Forested Wetland
Emergent Wetland
Existing Earthen Berm
Scrub-Shrub Wetland
Upland Island
Emergent Wetland
~0.59 ac
Upland Buffer
Existing Ditch
Forested Wetland
~20.72 ac
Existing Earthen Berm
Existing Ditch
Existing Road crossing
"
J
M
&
Emergency Spillway
Water Control Structure
REDSTONE ARSENAL MITIGATION BANK
MODIFIED PROSPECTUS
HUNTSVILLE, MADISON COUNTY, AL
SCALE IN FEET
0
1,000
2,000
325 Seaboard Lane, Suite 170 Franklin,Tennessee 37067
615-333-7797 800-763-2326
www.cecinc.com
ESRI WORLD IMAGERY / ARCGIS MAP SERVICE:
HTTP://GOTO.ARCGISONLINE.COM/MAPS/WORLD_IMAGERY, DRAWN BY:
ACCESSED 7/2/2018,
DATE:
BCL
7/2/2018
CHECKED BY:
SCALE:
CAD
1 " = 1,000 '
EXISTING AQUATIC RESOURCES MAP
APPROVED BY:
PROJECT NO:
JTD
* Hand signature
on file
173-738
FIGURE NO:
Public Notice 18-38
File No. LRN-2018-00664
Exhibit C
Conservation Easement Boundary
Ad - Abernathy-Emory Silt Loam (Non-Hydric)
Al - Allen Clay Loam (Hydric Inclusion)
Cb - Captina and Capshaw Silt Loam (Hydric Inclusion)
De - Decatur Silty Clay (Non-Hydric)
Eg - Egam Silty Clay Loam (Hydric Inclusion)
Ex - Etowah Silt Loam (Hydric Inclusion)
Ey - Etowah Silty Clay Loam (Hydric Inclusion)
Hz - Huntington Silt Loam (Hydric Inclusion)
Lk - Lindside Silty Clay Loam (Hydric Inclusion)
Me - Melvin Silty Clay Loam (Hydric)
Op - Ooltewah Silt Loam (Hydric)
Pr - Prader Fine Sandy Loam (Hydric)
Ro - Robertsville Silt Loam (Hydric)
Tu - Tupelo Silt Loam (Hydric Inclusion)
Wo; Wp - Wolftever Silt Loam (Hydric Inclusion)
W - Water
REDSTONE ARSENAL MITIGATION BANK
MODIFIED PROSPECTUS
HUNTSVILLE, MADISON COUNTY, AL
SCALE IN FEET
0
1,000
2,000
ESRI WORLD IMAGERY / ARCGIS MAP SERVICE:
HTTP://GOTO.ARCGISONLINE.COM/MAPS/W ORLD_IMAGERY,
ACCESSED 4/24/2018,
NRCS WEB SOIL SURVEY. ACCESSED 4/24/2018,
325 Seaboard Lane, Suite 170 Franklin,Tennessee 37067
615-333-7797 800-763-2326
www.cecinc.com
DRAWN BY:
DATE:
BCL
4/24/2018
CHECKED BY:
SCALE:
CAD
1 " = 1,000 '
NRCS SOILS MAP
APPROVED BY:JTD
PROJECT NO:
* Hand signature
on file
173-738
FIGURE NO:
Public Notice 18-38
File No. LRN-2018-00664
Exhibit D
Conservation Easement Boundary
Estuarine and Marine Deepwater
Estuarine and Marine Wetland
Freshwater Emergent Wetland
Freshwater Forested/Shrub Wetland
Freshwater Pond
Lake
Other
Riverine
SCALE IN FEET
0
1,000
REDSTONE ARSENAL MITIGATION BANK
MODIFIED PROSPECTUS
HUNTSVILLE, MADISON COUNTY, AL
2,000
325 Seaboard Lane, Suite 170 Franklin,Tennessee 37067
615-333-7797 800-763-2326
www.cecinc.com
ESRI WORLD IMAGERY / ARCGIS MAP SERVICE:
HTTP://GOTO.ARCGISONLINE.COM/MAPS/W ORLD_IMAGERY,
ACCESSED 4/24/2018,
U.S. FISH & WILDLIFE SERVICE
NATIONAL WETLANDS INVENTORY (NWI) MAP.
ACCESSED 4/24/2018,
DRAWN BY:
DATE:
BCL
4/24/2018
CHECKED BY:
SCALE:
CAD
1 " = 1,000 '
NATIONAL WETLANDS INVENTORY MAP
APPROVED BY:JTD
PROJECT NO:
* Hand signature
on file
173-738
FIGURE NO:
Public Notice 18-38
File No. LRN-2018-00664
Exhibit E
Proposed Low-ford Crossing
Stream Restoration
~3,765 ft.
Wetland Enhancement
Area-4
~26.44 ac.
Upland Buffer Preservation
~90.22 ac
Open Water Preservation
~9.31 ac
Wetland Habitat Enhancement
Area-3
~8.06 ac.
Tupelo Gum Swamp Preservation
~63.87 ac
Wetland Enhancement
Area-2
~3.12 ac.
Forested Wetland Preservation
~3.87 ac
Wetland Enhancement
Area-1
~6.71 ac.
Proposed Scrub-Shrub
Tupelo ~8.07 ac
Proposed Supplemental Oak and Hickory Planting
Earthen Berm
Elevation: 560.5'
Proposed Tupelo
Forested Wetland to Remain
Earthen Berm
Elevation: 562'
Scrub-Shrub
~0.93 ac
Upland Buffer Preservation
Upland Island
~0.57 ac
Repair Existing
Road Crossing
Upland Buffer Hardwood Planting
Upland Island to Remain
Supplemental Oak and
Hickory Planting ~6.65 ac
Proposed Low-ford Crossing
Upland Buffer
Hardwoods Planting
~1.74 ac
Wetland Enhancement
Wetland Preservation
Fill
Existing Ditch
Forested Wetland to Remain
~20.72 ac
Upland Buffer Preservation
Proposed Stream Restoration
25 ft. Stream Buffer
Conservation Easement Boundary
REDSTONE ARSENAL MITIGATION BANK
MODIFIED PROSPECTUS
HUNTSVILLE, MADISON COUNTY, AL
SCALE IN FEET
0
1,000
2,000
325 Seaboard Lane, Suite 170 Franklin,Tennessee 37067
615-333-7797 800-763-2326
www.cecinc.com
USGS TOPOGRAPHIC MAP/ ARCGIS MAP SERVICE:
HTTP://GOTO.ARCGISONLINE.COM/MAPS/USA_TOPO_MAPS,
ACCESSED 7/3/2018
DRAWN BY:
DATE:
BCL
7/3/2018
CHECKED BY:
SCALE:
CAD
1 " = 1,000 '
CONCEPTUAL MITIGATION
TOPOGRAPHIC MAP
APPROVED BY:
PROJECT NO:
JTD
* Hand signature
on file
173-738
FIGURE NO:
Public Notice 18-38
File No. LRN-2018-00664
Exhibit F
Proposed Low-ford Crossing
Stream Restoration
~3,765 ft.
Wetland Enhancement
Area-4
~26.44 ac.
Upland Buffer Preservation
~90.22 ac
Open Water Preservation
~9.31 ac
Wetland Habitat Enhancement
Area-3
~8.06 ac.
Tupelo Gum Swamp Preservation
~63.87 ac
Wetland Enhancement
Area-2
~3.12 ac.
Forested Wetland Preservation
~3.87 ac
Wetland Enhancement
Area-1
~6.71 ac.
Proposed Scrub-Shrub
Tupelo ~8.07 ac
Proposed Supplemental Oak and Hickory Planting
Earthen Berm
Elevation: 560.5'
Proposed Tupelo
Forested Wetland to Remain
Earthen Berm
Elevation: 562'
Scrub-Shrub
~0.93 ac
Upland Buffer Preservation
Upland Island
~0.57 ac
Repair Existing
Road Crossing
Upland Buffer Hardwood Planting
Upland Island to Remain
Supplemental Oak and
Hickory Planting ~6.65 ac
Proposed Low-ford Crossing
Upland Buffer
Hardwoods Planting
~1.74 ac
Wetland Enhancement
Wetland Preservation
Fill
Existing Ditch
Forested Wetland to Remain
~20.72 ac
Upland Buffer Preservation
Proposed Stream Restoration
25 ft. Stream Buffer
Conservation Easement Boundary
REDSTONE ARSENAL MITIGATION BANK
MODIFIED PROSPECTUS
HUNTSVILLE, MADISON COUNTY, AL
SCALE IN FEET
0
1,000
2,000
325 Seaboard Lane, Suite 170 Franklin,Tennessee 37067
615-333-7797 800-763-2326
www.cecinc.com
ESRI WORLD IMAGERY / ARCGIS MAP SERVICE:
HTTP://GOTO.ARCGISONLINE.COM/MAPS/WORLD_IMAGERY, DRAWN BY:
ACCESSED 7/3/2018,
DATE:
BCL
7/3/2018
CHECKED BY:
SCALE:
CAD
1 " = 1,000 '
CONCEPTUAL MITIGATION AERIAL MAP
APPROVED BY:
PROJECT NO:
JTD
* Hand signature
on file
173-738
FIGURE NO:
Public Notice 18-38
File No. LRN-2018-00664
Exhibit G
_
^
_
^
Site Location
Service Area
ESRI WORLD STREET MAP / ARCGIS MAP SERVICE:
HTTP://GOTO.ARCGISONLINE.COM/MAPS/WORLD_STREET_MAP,
ACCESSED 6/29/2018, IMAGERY DATE: 2014.
REDSTONE ARSENAL
WETLAND MITIGATION BANK
HUNTSVILLE, MADISON COUNTY, ALABAMA
325 Seaboard Lane, Ste. 170 Franklin, Tennessee
615-333-7797 800-763-2326
www.cecinc.com
DRAWN BY:
DATE:
BCL CHECKED BY:
6/29/2018 SCALE:
SERVICE AREA MAP
JTD APPROVED BY: CEC
1 " = 3 miles
PROJECT NO:
* Hand signature
on file
174-738
FIGURE NO: