CALCASIEU SALINITY CONTROL MEASURES PROJECT IN CALCASIEU PARISH
NAME OF APPLICANT: Louisiana Coastal Protection and Restoration Authority, Post Office Box 44027, Baton Rouge, Louisiana, 70804-4027.
LOCATION: Project located at approximately Latitude 29.85861, Longitude -93.34694, on the Calcasieu Ship Channel, in the community of Lake Charles, within Calcasieu Parish, Louisiana.
The Project is located within the Calcasieu Watershed, Hydrologic Unit 08080206.
DESCRIPTION: The applicant proposes construction of structures designed to control saltwater entering Calcasieu Lake through the Calcasieu Ship Channel. Structures would control salinity spikes, provide storm surge benefits, and would be constructed in a manner that would allow for the continued functioning, improvement and viability of the Calcasieu Ship Channel and the Port of Lake Charles. The purpose of the proposed project is to manage the introduction of saline water from the Calcasieu Ship Channel into adjacent water bodies thereby reducing the rate of wetland loss in the project area and surrounding wetlands. To achieve, in part, the goals in the 2012 Louisiana State Master Plan, the proposed project is needed to address modifications to hydrology that have caused an increase in salinity within the project area, resulting in loss of wetlands. This project, as proposed, should achieve the following: (1) manage salinity levels in Calcasieu Lake and adjacent marshes to maintain marsh productivity and avoid marsh collapse; (2) minimize the economic impact to the navigation industry caused by potential delays in travel times resulting from any structures or modifications to the ship channel and avoid actions that cause safety issues for vessel operation; (3) achieve salinity management with minimal changes to the magnitude, frequency, duration, or extent of flood conditions in the project area. The project study area has undergone substantial land loss since 1932. The present-day Calcasieu Ship Channel cross section is more than 40 times larger than when it was first dredged for navigation in the late 1800s. This change has affected hydrology by: channeling saltwater inland into a historically low-salinity estuary; reducing freshwater residence time when the tide ebbs; and, increasing tidal amplitude through the broader waterway. Approximately 866,160 cubic yards (cy) of material would be excavated and redeposited onsite, approximately 97,791 cy of material would be excavated and hauled offsite, and approximately 1,219,246 cy of rock material would be deposited onsite for project construction. The project would potentially affect 56,244 acres of wetlands and/or waterbottoms. Approximately 6 acres of vegetated wetlands between the water’s edge and tie-in locations of adjacent spoil banks would be permanently impacted by project construction. Additionally, the project would provide 30 acres of newly constructed artificial reef and, over the life of the project, an estimated 12,000 acres of marsh would be protection and sustained.
JOINT PUBLIC NOTICE
September 17, 2018
United States Army
Corps of Engineers
New Orleans District
Regulatory Branch
7400 Leake Avenue
New Orleans, LA 70118-3651
State of Louisiana
Department of Environmental Quality
Post Office Box 4313
Baton Rouge, La. 70821-4313
Attn: Water Quality Certifications
(504) 862-2548/ FAX (504) 862-2574
Project Manager
Johnny Duplantis
Permit Application Number
MVN-2016-00678-WPP
(225) 219-3225/FAX (225) 325-8125
Project Manager
Elizabeth Hill
WQC Application Number
WQC # 180911-01
Interested parties are hereby notified that a permit application has been received by the New
Orleans District of the U.S. Army Corps of Engineers pursuant to: [X] Section 10 of the Rivers
and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404 of the
Clean Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental Quality, for a
Water Quality Certification (WQC) in accordance with statutory authority contained in Louisiana
Revised Statutes of 1950, Title 30, Chapter 11, Part IV, Section 2074 A(3) and provisions of
Section 401 of the Clean Water Act (P.L.95-17).
CALCASIEU SALINITY CONTROL MEASURES PROJECT IN CALCASIEU PARISH
NAME OF APPLICANT: Louisiana Coastal Protection and Restoration Authority, Post Office
Box 44027, Baton Rouge, Louisiana, 70804-4027.
LOCATION: Project located at approximately Latitude 29.85861, Longitude -93.34694, on the
Calcasieu Ship Channel, in the community of Lake Charles, within Calcasieu Parish, Louisiana.
The Project is located within the Calcasieu Watershed, Hydrologic Unit 08080206.
DESCRIPTION: The applicant proposes construction of structures designed to control
saltwater entering Calcasieu Lake through the Calcasieu Ship Channel. Structures would
control salinity spikes, provide storm surge benefits, and would be constructed in a manner that
would allow for the continued functioning, improvement and viability of the Calcasieu Ship
Channel and the Port of Lake Charles. The purpose of the proposed project is to manage the
introduction of saline water from the Calcasieu Ship Channel into adjacent water bodies thereby
reducing the rate of wetland loss in the project area and surrounding wetlands. To achieve, in
part, the goals in the 2012 Louisiana State Master Plan, the proposed project is needed to
address modifications to hydrology that have caused an increase in salinity within the project
area, resulting in loss of wetlands. This project, as proposed, should achieve the following: (1)
manage salinity levels in Calcasieu Lake and adjacent marshes to maintain marsh productivity
and avoid marsh collapse; (2) minimize the economic impact to the navigation industry caused
by potential delays in travel times resulting from any structures or modifications to the ship
channel and avoid actions that cause safety issues for vessel operation; (3) achieve salinity
management with minimal changes to the magnitude, frequency, duration, or extent of flood
conditions in the project area. The project study area has undergone substantial land loss since
1932. The present-day Calcasieu Ship Channel cross section is more than 40 times larger than
-2when it was first dredged for navigation in the late 1800s. This change has affected hydrology
by: channeling saltwater inland into a historically low-salinity estuary; reducing freshwater
residence time when the tide ebbs; and, increasing tidal amplitude through the broader
waterway. Approximately 866,160 cubic yards (cy) of material would be excavated and
redeposited onsite, approximately 97,791 cy of material would be excavated and hauled offsite,
and approximately 1,219,246 cy of rock material would be deposited onsite for project
construction. The project would potentially affect 56,244 acres of wetlands and/or waterbottoms.
Approximately 6 acres of vegetated wetlands between the water's edge and tie-in locations of
adjacent spoil banks would be permanently impacted by project construction. Additionally, the
project would provide 30 acres of newly constructed artificial reef and, over the life of the project,
an estimated 12,000 acres of marsh would be protection and sustained.
The comment period for the Department of the Army Permit and the Louisiana Department of
Environmental Quality WQC will close 20 days from the date of this joint public notice. Written
comments, including suggestions for modifications or objections to the proposed work, stating
reasons thereof, are being solicited from anyone having interest in this permit and/or this WQC
request and must be mailed so as to be received before or by the last day of the comment
period. Letters concerning the Corps of Engineers permit application must reference the
applicant's name and the Permit Application Number, and be mailed to the Corps of Engineers
at the address above, ATTENTION: REGULATORY BRANCH. Similar letters concerning the
Water Quality Certification must reference the applicant's name and the WQC Application
number and be mailed to the Louisiana Department of Environmental Quality at the address
above.
The application for this proposed project is on file with the Louisiana Department of
Environmental Quality and may be examined during weekdays between 8:00 a.m. and 5:00 p.m.
Copies may be obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable
impacts, including cumulative impacts of the proposed activity on the public interest. That
decision will reflect the national concern for both protection and utilization of important
resources. The benefit which reasonably may be expected to accrue from the proposal must be
balanced against its reasonably foreseeable detriments. All factors which may be relevant to the
proposal will be considered including the cumulative effects thereof; among those are
conservation, economics, aesthetics, general environmental concerns, wetlands, historic
properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation,
shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy
needs, safety, food and fiber production, mineral needs, considerations of property ownership
and, in general, the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state, and
local agencies and officials, Indian Tribes, and other interested parties in order to consider and
evaluate the impacts of this proposed activity. Any comments received will be considered by the
U.S. Army Corps of Engineers to determine whether to make, modify, condition, or deny a permit
for this proposal. To make this decision, comments are used to assess impacts on endangered
species, historic properties, water quality, general environmental effects, and other public
interest factors listed above. Comments are used in the preparation of an Environmental
Assessment and/or an Environmental Impact Statement pursuant to the National Environmental
Policy Act. Comments are also used to determine the need for a public hearing and to
determine the overall public interest of the proposed activity.
-3The New Orleans District is unaware of properties listed on the National Register of Historic
Places near the proposed work. The possibility exists that the proposed work may damage or
destroy presently unknown archeological, scientific, pre-historical, historical sites, or data.
Copies of this notice are being sent to the State Archeologist and the State Historic Preservation
Officer.
Our initial finding is that the proposed work would neither affect any species listed as
endangered by the U.S. Departments of Interior or Commerce, nor affect any habitat designated
as critical to the survival and recovery of any endangered species. Based on the South
Louisiana Standard Local Operating Procedure for Endangered Species (SLOPES), as signed
on October 22, 2014, between the U.S. Army Corps of Engineers, New Orleans and the U.S.
Fish and Wildlife Service, it has been determined that the project is located in waters known to
be utilized by the Western Indian Manatee and determined that the activity is not likely to
adversely affect this species. If this permit is issued, the permittee will be required to the follow
the SLOPES Manatee conditions.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal would
result in the destruction or alteration of 56,244 acre(s) of EFH utilized by various life stages of
red drum and penaeid shrimp. Our initial determination is that the proposed action would not
have a substantial adverse impact on EFH or federally managed fisheries in the Gulf of Mexico.
Our final determination relative to project impacts and the need for mitigation measures is
subject to review by and coordination with the National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters, the
evaluation of the probable impacts will include the application of guidelines established by the
Administrator of the Environmental Protection Agency. Also, a certification that the proposed
activity will not violate applicable water quality standards will be required from the Department of
Environmental Quality, before a permit is issued.
Any person may request, in writing, within the comment period specified in this notice, that a
public hearing be held to consider this application. Requests for public hearings shall state, with
particularity, the reasons for holding a public hearing.
The applicant has certified that the proposed activity described in the application complies
with and will be conducted in a manner that is consistent with the Louisiana Coastal Resources
Program. The Department of the Army permit will not be issued unless the applicant received
approval or a waiver of the Coastal Use Permit by the Department of Natural Resources.
You are requested to communicate the information contained in this notice to any other
parties whom you deem likely to have interest in the matter.
Darrell S. Barbara
Chief, Western Evaluation Section
Regulatory Branch
Enclosures
INDEX TO SHEETS
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
DESCRIPTION
TITLE SHEET
GENERAL NOTES
ACCESS PLAN
CROSS SECTIONS A - D
EAST PASS
WEST PASS
CROSS SECTIONS E - F
JOE'S CUT
LAKE WALL KEY PLAN
LAKE WALL 1 OF 3
LAKE WALL 2 OF 3
LAKE WALL 3 OF 3
NINE MILE CUT
SILL DETAIL 1
POB: X: N29°53'54.55"
SILL DETAIL 2
Y: W93°20'16.74"
FISH PASSAGE
TIE-IN DETAIL 1
TIE-IN DETAIL 2
TEMPORARY ACCESS CHANNEL
PROJECT LOCATION
CALCASIEU
LAKE
EAST PASS
LAKE WALL
POE: X: N29°50'18.01"
Y: W93°20'39.19"
POE: X: N29°49'55.59"
Y: W93°19'47.09"
POB: X: N29°50'02.31"
Y: W93°20'12.77"
WEST PASS
POB: X: N29°49'21.66"
Y: W93°21'27.33"
POB: X: N29°53'21.39"
Y: W93°20'55.68"
NINE MILE CUT
POE: X: N29°52'53.68"
Y: W93°20'55.12"
JOE'S CUT
POB: X: N29°51'02.65"
Y: W93°21'05.35"
POE: X: N29°50'33.14"
Y: W93°21'07.60"
APPLICATION BY:
150 TERRACE STREET
BATON ROUGE, LOUISIANA 70802
DRAWN BY: SPF
POE: X: N29°49'32.42"
Y: W93°21'27.20"
CALCASIEU
LAKE WEST
COVE
CALCASIEU SALINITY
CONTROL MEASURES
COASTAL PROTECTION AND RESTORATION AUTHORITY
150 TERRACE STREET
BATON ROUGE, LA 70802
DESIGNED BY:
LRM
APPROVED BY: BR
PRELIMINARY - FOR PERMIT PURPOSES ONLY
SHEET NO.
STATE OF LOUISIANA
INSET MAP
TITLE SHEET
STATE PROJECT NUMBER: CS-65
DATE: 20-APR-2018
FEDERAL PROJECT NUMBER:
SHEET 1 OF 19
GENERAL NOTES:
CDF
CL,
CSC
D
EG
EL
GIWW
GPS
LOC
MHW
MLG
MLW
NTS
POB
POE
R
REF
REQ'D
SIM
SLL
STA
SYM
TYP
UON
VERT
W/
1.
2.
CONFINED DISPOSAL FACILITY
CENTER LINE
CALCASIEU SHIP CHANNEL
DIAMETER
EXISTING GRADE
ELEVATION
GULF INTRACOASTAL WATERWAY
GLOBAL POSITIONING SYSTEM
LOCATIONS
MEAN HIGH WATER
MEAN LOW GULF
MEAN LOW WATER
NOT TO SCALE
POINT OF BEGINNING
POINT OF ENDING
RADIUS
REFERENCE
REQUIRED
SIMILAR
STRUCTURE LIMIT LINE
STATION
SYMMETRICAL
TYPICAL
UNLESS OTHERWISE NOTED
VERTICAL
WITH
3.
4.
5.
6.
LEGEND:
7.
ACCESS CHANNEL
ACCESS CORRIDOR
TEMPORARY SPOIL PLACEMENT
AREA
OVERALL QUANTITY SUMMARY
BACKGROUND IMAGERY BASED ON NAIP (2015).
PLANS ARE BASED ON SURVEY CONDUCTED BY LONNIE
HARPER & ASSOCIATES IN 2016 AND 2017, UNLESS
STATED OTHERWISE. THE HORIZONTAL DATUM IS NAD
83, LOUISIANA SOUTH ZONE-STATE PLANE COORDINATE
SYSTEM. THE VERTICAL DATUM IS NAVD88, GEOID 12B.
THE UNITS ARE U.S. SURVEY FEET.
THERE IS NO UPLAND ACCESS TO THE PROJECT SITE.
CONTRACTOR SHALL ACCESS THE PROJECT SITE FROM
A NAVIGABLE WATER BODY SUCH AS THE CALCASIEU
SHIP CHANNEL.
TEMPORARY ACCESS/FLOTATION CHANNEL DREDGING
MAY BE REQUIRED TO ACCESS THE PROJECT SITE. ALL
DREDGED MATERIAL MAY BE PLACED INTO THE
TEMPORARY SPOIL PLACEMENT AREAS SHOWN. THE
TEMPORARY SPOILS SHALL BE BACKFILLED INTO THE
TEMPORARY ACCESS CHANNEL AT THE COMPLETION OF
THE PROJECT.
PERMANENT NAVIGATION AIDS TO BE LOCATED AND
MARKED/LIGHTED IN ACCORDANCE WITH U.S. COAST
GUARD REGULATIONS.
AS-BUILT DRAWINGS AND/OR PLATS SHALL HAVE
WRITTEN ON THEM THE DATE OF COMPLETION OF SAID
ACTIVITIES AND SHALL BE SUBMITTED TO THE
LOUISIANA DEPARTMENT OF NATURAL RESOURCES,
OFFICE OF COASTAL MANAGEMENT, P.O. BOX 44487,
BATON ROUGE, LA 70804-4487 WITHIN 30 DAYS
FOLLOWING PROJECT COMPLETION.
IN ORDER TO ENSURE THE SAFETY OF ALL PARTIES,
THE PERMITTEE SHALL CONTACT THE LOUISIANA ONE
CALL SYSTEM (1-800-272-3020) A MINIMUM OF 48 HOURS
PRIOR TO THE COMMENCEMENT OF ANY EXCAVATION
(DIGGING, DREDGING, JETTING, ETC.) OR DEMOLITION
ACTIVITY.
APPLICATION BY:
150 TERRACE STREET
BATON ROUGE, LOUISIANA 70802
DESIGNED BY:
LRM
APPROVED BY: BR
QUANTITY
28,701 LF
WALL AREA
56.04 ACRES
ROCK VOLUME
1,219,246 CY
PERMANENT DREDGE AREA
29.31 ACRES
PERMANENT DREDGE VOLUME
TEMPORARY ACCESS/FLOTATION
DREDGING AREA
TEMPORARY ACCESS/FLOTATION
DREDGING VOLUME
TEMPORARY SPOIL PLACEMENT
AREA
TEMPORARY ACCESS CORRIDOR
AREA
95,791 CY
101.61 ACRES
886,160 CY
130.42 ACRES
11.61 ACRES
OVERALL ESTIMATED IMPACT
TYPE
PERMANENT IMPACTED
VEGETATED WETLANDS
TEMPORARY IMPACTED
VEGETATED WETLANDS
PERMANENT IMPACTED
SUBMERGED BOTTOM
TEMPORARY IMPACTED
SUBMERGED BOTTOM
QUANTITY
5.29 ACRES
10.96 ACRES
50.19 ACRES
232.03 ACRES
OVERALL ESTIMATED BENEFITS
TYPE
QUANTITY
DIRECT BENEFITS
50-YEAR PROTECTION
CALCASIEU SALINITY
CONTROL MEASURES
COASTAL PROTECTION AND RESTORATION AUTHORITY
150 TERRACE STREET
BATON ROUGE, LA 70802
DRAWN BY: SPF
TYPE
WALL LENGTH
GENERAL NOTES
STATE PROJECT NUMBER: CS-65
DATE: 20-APR-2018
FEDERAL PROJECT NUMBER:
SHEET 2 OF 19
PRELIMINARY - FOR PERMIT PURPOSES ONLY
ACRONYMS AND ABBREVIATIONS:
2.
)&0$&02D1
,#0*-#
2.
(*55
Calcasieu
Lake
We s t C o v e
Source: 2017 NAIP
31'51!
5&12!%.4&
$.#2!+#3-%)
'&006
+#3-%)
%?9C!$>7A!#889@@
%>=@A?B8A;>=!#889@@
/?><98A!'97AB?9
APPLICATION BY:
CALCASIEU SALINITY
CONTROL MEASURES
TETRA TECH
748 MAIN STREET, SUITE B
BATON ROUGE, LA 70802
150 TERRACE STREET
BATON ROUGE, LOUISIANA 70802
DRAWN BY: HMC
DESIGNED BY:
BR
APPROVED BY: SDG
ACCESS PLAN
STATE PROJECT NUMBER: CS-65
DATE:
FEDERAL PROJECT NUMBER:
SHEET
3
OF 18
FILL W/ STONE
COMBI WALL BEYOND,
SEE SECTION B
NOTES:
24" ROCK
MATTRESS
1.
2.
3.
FILTER STONE
d50 = 1.6', w50 = 685#
5.0'
3.0'
FISH PASSAGE AND VESSEL SILL
EL -8.0
BOTTOM OF MATTRESS
EL -15.0
ALL SECTIONS SYM ABOUT CL
PAINT TOP 10 FEET OF PILES.
REFER TO TABLE FOR PILE SECTION
AND TIP ELEVATION.
20.0'
MUD LINE
4H:1V
PILE SECTIONS
BEDDING STONE
d50 = 0.4', w50 = 7#
PZC13, TIP EL -35.0
A
SILL SECTION
60"x0.875" PIPE w/ TIP EL
-85.0, PZC 13 w/ TIP EL -35.0
EAST PASS REACH B, MUD LINE EL
-8.0 TO -23.0
48"x0.75" PIPE w/ TIP EL
-65.0, PZC 13 w/ TIP EL -35.0
EAST PASS, REACH C & D
PZC 26, TIP EL -35.0
EAST PASS REACH B, MUD LINE EL
-23.0 TO -28.0
48"x0.50" PIPE w/ TIP EL
-65.0, PZC 13 w/ TIP EL -35.0
EAST PASS REACH B, MUD LINE EL
-8.0 TO -23.0
42"x0.50" PIPE w/ TIP EL
-55.0, PZC 13 w/ TIP EL -35.0
COMBI WALL
13.0'
3.0'
3.0'
FILTER STONE
d50 = 1.6', w50 = 685#
TOP OF BERM
EL +5.0
3H:1V
3.0'
2H:1V
3.0'
MUD LINE
2.0'
BEDDING STONE
d50 = 0.3', w50 = 3#
B
10.0'
PZC 26, TIP EL -35.0
JOE'S CUT, REACH B
48"x0.50" PIPE w/ TIP EL
-60.0, PZC 13 w/ TIP EL -35.0
TOP OF BERM
EL +5.0
3H:1V
18" ROCK
MATTRESS
MUD LINE
25.0'
C
25.0'
D
SCALE: 1"=30'
APPLICATION BY:
0'
CALCASIEU SALINITY
CONTROL MEASURES
COASTAL PROTECTION AND RESTORATION AUTHORITY
150 TERRACE STREET
BATON ROUGE, LA 70802
150 TERRACE STREET
BATON ROUGE, LOUISIANA 70802
APPROVED BY: BR
FILTER STONE
d50 = 1.6', w50 = 685#
NOTE 3
30'
LRM
MUD
LINE
3.0'
BEDDING STONE
d50 = 0.4', w50 = 7#
SECTION
SCALE: 1"=30'
DESIGNED BY:
10.0'
1.5'
NOTE 3
SECTION
WEST PASS, REACH C & D
FILTER STONE
d50 = 1.6', w50 = 685#
NOTE 3
DRAWN BY: SPF
SECTION
EAST PASS REACH B, MUD LINE EL
-23.0 TO -28.0
SCALE: 1"=30'
FILL TOP 5' OF PIPE WITH CONCRETE
AND REMAINING HEIGHT W/ STONE
TOP OF WALL
EL +5.0
FEATURE
30'
SECTION
SCALE: 1"=30'
60'
CROSS SECTIONS
A-D
STATE PROJECT NUMBER: CS-65
DATE: 20-APR-2018
FEDERAL PROJECT NUMBER:
SHEET 4 OF 19
90'
TOS
LIMITS OF
CONSTRUCTION, TYP
EAST FORK OF THE
A
CALCASIEU RIVER
-10
0
68 8
B
-20
POINT A
B
N
TYP 2
LOCS
19
-10
-20
C
D
0
EAST PASS QUANTITY SUMMARY
WALL LENGTH
1,997 LF
WALL AREA
5.15 ACRES
ROCK VOLUME
48,334 CY
PERMANENT DREDGE AREA
0.00 ACRES
PERMANENT DREDGE VOLUME
0 CY
TEMPORARY ACCESS/FLOTATION
DREDGING AREA
TEMPORARY ACCESS/FLOTATION
DREDGING VOLUME
TEMPORARY SPOIL PLACEMENT
AREA
TEMPORARY ACCESS CORRIDOR
AREA
REACH 5,
SHEET 18
5'
1.06 ACRES
D'
C'
B'
POINT C
REACH D
7,690 CY
A'
B'
REACH C
1.56 ACRES
C'
REACH B
3.99 ACRES
N
REACH A
REACH B
EAST PASS ESTIMATED IMPACT
19
PERMANENT IMPACTED
VEGETATED WETLANDS
TEMPORARY IMPACTED
VEGETATED WETLANDS
PERMANENT IMPACTED
SUBMERGED BOTTOM
TEMPORARY IMPACTED
SUBMERGED BOTTOM
D'
TYP 2
LOCS
QUANTITY
TYPE
5
2
QUANTITY
TYPE
APPROXIMATE
SHORELINE
6 6
APPROXIMATE
SHORELINE
POINT B
C
5 D
2.66 ACRES
REACH C
PROPOSED SALINITY BARRIER =
1,997 LINEAR FEET
REACH 5,
SHEET 18
REACH D
3.99 ACRES
5'
2.49 ACRES
2.61 ACRES
MHW= +0.78 FT
MLW= -0.08 FT
(NAVD 88)
ALIGNMENT TABLE
Point
LATITUDE
LONGITUDE
A
N29° 50' 02.31"
W93° 20' 12.77"
B
N29° 50' 02.77"
W93° 20' 07.12"
C
N29° 49' 55.62"
W93° 19' 47.16"
EAST PASS
400
800
Feet
SCALE: 1" = 400'
APPLICATION BY:
CALCASIEU SALINITY
CONTROL MEASURES
COASTAL PROTECTION AND RESTORATION AUTHORITY
150 TERRACE STREET
BATON ROUGE, LA 70802
150 TERRACE STREET
BATON ROUGE, LOUISIANA 70802
DRAWN BY: VR
0
DESIGNED BY:
LRM
APPROVED BY: BR
EAST PASS
STATE PROJECT NUMBER: CS-65
DATE: 20-APR-2018
FEDERAL PROJECT NUMBER:
SHEET 5 OF 19
LIMITS OF CONSTRUCTION, TYP
WEST FORK OF THE
CALCASIEU RIVER
N
APPROXIMATE SHORELINE
POINT B
B
D
D
A
4
0
0
QUANTITY
WALL LENGTH
749 LF
WALL AREA
0.97 ACRES
POINT A
ROCK VOLUME
39,613 CY
PERMANENT DREDGE AREA
0.00 ACRES
PERMANENT DREDGE VOLUME
0 CY
TEMPORARY ACCESS/FLOTATION
DREDGING AREA
TEMPORARY ACCESS/FLOTATION
DREDGING VOLUME
TEMPORARY SPOIL PLACEMENT
AREA
TEMPORARY ACCESS CORRIDOR
AREA
APPROXIMATE SHORELINE
B
4
WEST PASS QUANTITY SUMMARY
TYPE
TYP 2
LOCS
19
0
0.69 ACRES
0.79 ACRES
-10
-10
4,976 CY
1.32 ACRES
REACH B
WEST PASS ESTIMATED IMPACT
N
QUANTITY
TYPE
PERMANENT IMPACTED
VEGETATED WETLANDS
TEMPORARY IMPACTED
VEGETATED WETLANDS
PERMANENT IMPACTED
SUBMERGED BOTTOM
TEMPORARY IMPACTED
SUBMERGED BOTTOM
REACH 4,
SHEET 17
19
TYP 2
LOCS
0.36 ACRES
A'
1.20 ACRES
4'
0.61 ACRES
D'
B'
REACH 4,
SHEET 17
1.48 ACRES
4'
D'
B'
REACH D
REACH D
REACH A
REACH B
MHW= +0.77 FT
MHW= -0.09 FT
(NAVD 88)
ALIGNMENT TABLE
PROPOSED SALINITY BARRIER
=
749 LINEAR FEET.
Point
LATITUDE
LONGITUDE
A
N29° 49' 21.66"
W93° 21' 27.33"
B
N29° 49' 32.05"
W93° 21' 27.21"
WEST PASS
0
200
400
Feet
SCALE: 1" = 400'
APPLICATION BY:
CALCASIEU SALINITY
CONTROL MEASURES
COASTAL PROTECTION AND RESTORATION AUTHORITY
150 TERRACE STREET
BATON ROUGE, LA 70802
150 TERRACE STREET
BATON ROUGE, LOUISIANA 70802
DRAWN BY: VR
DESIGNED BY:
LRM
APPROVED BY: BR
WEST PASS
STATE PROJECT NUMBER: CS-65
DATE: 20-APR-2018
FEDERAL PROJECT NUMBER:
SHEET 6 OF 19
NOTES:
1.
54.0'
45.0'
2.
24.0'
CHANNEL SIDE
15.0'
LAKE SIDE
SHEET PILE
TOP EL +5.0
3H:1V
5.0'
TOP OF BERM EL +2.5
(NOTE 4)
3.
2H:1V
4.
5.
3H:1V
MUD LINE
ARMOR STONE
d50 = 2.6', w50 = 2900#
3.0'
3.0'
GEOTEXTILE
FILTER STONE
d50 = 1.6', w50 = 685#
3.0'
1.5' MIN
(NOTE 6)
BEDDING STONE
d50 = 0.3', w50 = 3#
NOTE 1
E
WALL - SECTION
SCALE: 1"=20'
42.0'
29.0'
27.0'
CHANNEL SIDE
6.
REFER TO TABLE FOR SHEET
PILE SECTION AND TIP
ELEVATION
PAINT TOP TEN FEET OF SHEET
PILES.
CROSS SECTIONS SHOW
GEOMETRY AT END OF
CONSTRUCTION.
TYP TOP OF BERM EL AFTER
SHORT TERM SETTLEMENT.
OVERLAP GEOTEXTILE AGAINST
SHEET PILE.
INCREASE BEDDING STONE
THICKNESS AS REQUIRED TO
REACH TOP OF BERM
THICKNESS.
14.0'
LAKE SIDE
SHEET PILE
TOP EL +5.0
TOP OF BERM EL -1.0
(NOTE 4)
MUD LINE
1.5' MIN
(NOTE 6)
2H:1V TYP
GEOTEXTILE
4.5'
SHEET PILE SECTIONS
FEATURE
SECTION
JOE'S CUT, REACH F
PZC 18, TIP EL -22.0
EAST PASS, REACH C & D
PZC 26, TIP EL -35.0
WEST PASS, REACH C & D
PZC 26, TIP EL -35.0
LAKE WALL
PZC 18, TIP EL -26.0
NINE MILE CUT
PZC 13, TIP EL -25.0
BEDDING STONE
d50 = 0.3', w50 = 3#
FILTER STONE
d50 = 1.6', w50 = 685#
NOTE 1
F
WALL - SECTION
SCALE: 1"=20'
APPLICATION BY:
0'
CALCASIEU SALINITY
CONTROL MEASURES
COASTAL PROTECTION AND RESTORATION AUTHORITY
150 TERRACE STREET
BATON ROUGE, LA 70802
150 TERRACE STREET
BATON ROUGE, LOUISIANA 70802
DRAWN BY: SPF
20'
DESIGNED BY:
LRM
APPROVED BY: BR
20'
40'
CROSS SECTIONS
E-F
STATE PROJECT NUMBER: CS-65
DATE: 20-APR-2018
FEDERAL PROJECT NUMBER:
SHEET 7 OF 19
60'
JOE'S CUT QUANTITY SUMMARY
ALIGNMENT TABLE
Point
LATITUDE
LONGITUDE
A
N29° 51' 02.65"
W93° 21' 05.35"
JOE'S CUT ESTIMATED IMPACT
TYPE
QUANTITY
TYPE
WALL LENGTH
2,218 LF
WALL AREA
3.51 ACRES
PERMANENT IMPACTED
VEGETATED WETLANDS
TEMPORARY IMPACTED
VEGETATED WETLANDS
PERMANENT IMPACTED
SUBMERGED BOTTOM
TEMPORARY IMPACTED
SUBMERGED BOTTOM
ROCK VOLUME
94,277 CY
1.39 ACRES
PERMANENT DREDGE VOLUME
5,013 CY
B
N29° 50' 53.18"
W93° 21' 07.16"
PERMANENT DREDGE AREA
C
N29° 50' 41.34"
W93° 21' 08.24"
D
N29° 50' 33.14"
W93° 21' 07.60"
TEMPORARY ACCESS/FLOTATION
DREDGING AREA
TEMPORARY ACCESS/FLOTATION
DREDGING VOLUME
TEMPORARY SPOIL PLACEMENT
AREA
TEMPORARY ACCESS CORRIDOR
AREA
4.84 ACRES
QUANTITY
1.11 ACRES
2.76 ACRES
2.18 ACRES
11.20 ACRES
35,132 CY
6.36 ACRES
2.91 ACRES
LIMITS OF CONSTRUCTION, TYP
APPROXIMATE SHORELINE
1
F
POINT B
1
A
B
POINT A
338.8'
248.8'
0
-10
B
POINT C
F
-20
-10
MHW=+ 0.77 FT
MLW=+ 0.03 FT
(NAVD88)
0
-20
OPEN WATER
POINT D
954.8'
F'
601.0'
179.7'
1'
B'
B'
189.4'
DETAIL 1
F'
A'
REACH B
REACH F
CALCASIEU LAKE
WEST COVE
1'
REACH F
DETAIL 1
PROPOSED SALINITY BARRIER
= 2,218 LINEAR FEET
REACH B
0
400
800
Feet
APPLICATION BY:
CALCASIEU SALINITY
CONTROL MEASURES
COASTAL PROTECTION AND RESTORATION AUTHORITY
150 TERRACE STREET
BATON ROUGE, LA 70802
150 TERRACE STREET
BATON ROUGE, LOUISIANA 70802
DRAWN BY: VR
DESIGNED BY:
LRM
APPROVED BY: BR
JOE'S CUT
STATE PROJECT NUMBER: CS-65
DATE: 20-APR-2018
FEDERAL PROJECT NUMBER:
SHEET 8 OF 19
POINT A
PL
CALCASIEU LAKE
PL
LIMITS OF CONSTRUCTION
PL
PL
POINT D
POINT E
PL
PL
PL
PL
PL
POINT B
POINT C
CSC FAIRWAY
LIMIT
CSC
CSC SLL
450' FROM
0
2500
5000
Feet
LAKE WALL
SCALE: 1" = 2500'
PROPOSED SALINITY BARRIER
= 21,830 LINEAR FEET
MHW= +0.75 FT
MLW= +0.02 FT
(NAVD 88)
LAKE WALL QUANTITY SUMMARY
QUANTITY
TYPE
ALIGNMENT TABLE
Point
LATITUDE
LONGITUDE
A
N29° 53' 54.55" W93° 20' 16.74"
B
N29° 53' 03.83" W93° 20' 27.57"
C
N29° 52' 37.97" W93° 20' 29.01"
D
N29° 52' 32.03" W93° 20' 29.00"
E
N29° 50' 17.96" W93° 20' 39.20"
WALL LENGTH
21,830 LF
WALL AREA
42.50 ACRES
ROCK VOLUME
952,957 CY
PERMANENT DREDGE AREA
25.95 ACRES
PERMANENT DREDGE VOLUME
83,729 CY
TEMPORARY ACCESS/FLOTATION
DREDGING AREA
TEMPORARY ACCESS/FLOTATION
DREDGING VOLUME
TEMPORARY SPOIL PLACEMENT
AREA
TEMPORARY ACCESS CORRIDOR
AREA
89.02 ACRES
789,928 CY
113.12 ACRES
1.51 ACRES
APPLICATION BY:
TYPE
PERMANENT IMPACTED
VEGETATED WETLANDS
TEMPORARY IMPACTED
VEGETATED WETLANDS
PERMANENT IMPACTED
SUBMERGED BOTTOM
TEMPORARY IMPACTED
SUBMERGED BOTTOM
CALCASIEU SALINITY
CONTROL MEASURES
COASTAL PROTECTION AND RESTORATION AUTHORITY
150 TERRACE STREET
BATON ROUGE, LA 70802
150 TERRACE STREET
BATON ROUGE, LOUISIANA 70802
DRAWN BY: VR
LAKE WALL ESTIMATED IMPACT
DESIGNED BY:
LRM
APPROVED BY: BR
QUANTITY
0.53 ACRES
1.40 ACRES
41.93 ACRES
202.14 ACRES
LAKE WALL
KEY PLAN
STATE PROJECT NUMBER: CS-65
DATE: 20-APR-2018
FEDERAL PROJECT NUMBER:
SHEET 9 OF 19
LIMITS OF CONSTRUCTION, TYP
N
APPROXIMATE SHORELINE
0
19
3
E
F
0
E
MATCHLINE (BELOW)
F
REACH E,
SHEET 7
REACH E,
SHEET 7
OPEN WATER
REACH F,
SHEET 7
N
19
REACH F,
SHEET 7
F'
TIE - IN
SHEET 17
CALCASIEU SHIP
CHANNEL
E'
3'
0
E'
F'
400
800
Feet
DETAIL 3,
SHEET 16
E
-10
3
-20
F
-20
MATCHL
F
E
N
-10
N
REACH E, SHEET 7
0
400
19
-10
800
Feet
-10
REACH F,
SHEET 7
E'
3'
F'
APPLICATION BY:
F'
E'
DETAIL 3, SHEET 16
CALCASIEU SALINITY
CONTROL MEASURES
150 TERRACE STREET
BATON ROUGE, LOUISIANA 70802
DESIGNED BY:
LRM
APPROVED BY: BR
CALCASIEU SHIP
CHANNEL
LAKE WALL
1 OF 3
STATE PROJECT NUMBER: CS-65
DATE: 20-APR-2018
FEDERAL PROJECT NUMBER:
SHEET 10 OF 19
ET 11)
REACH F,
SHEET 7
COASTAL PROTECTION AND RESTORATION AUTHORITY
150 TERRACE STREET
BATON ROUGE, LA 70802
DRAWN BY: VR
INE (SHE
MATCHLINE (ABOVE)
19
-20
PL
PL
PL
N
2
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
REACH F SHEET 7
883.4'
PL
REACH F
351.3'
N
19
SHEET 7
PL
2'
F'
F'
PL
CALCASIEU SHIP CHANNEL
E'
3'
0
REACH E, SHEET 7
REACH E, SHEET 7
F'
400
800
Feet
APPROXIMATE
SHORELINE
CALCASIEU LAKE
N
19
E
3
F
E
REACH E,
SHEET 7
SECTION F, SHEET 7
N
19
509.8'
CALCASIEU SHIP CHANNEL
1553.1'
E'
3'
E'
F'
REACH F SHEET 7
DETAIL 3
SHEET 16
LAKE WALL
0
400
800
Feet
SCALE: 1" = 400'
APPLICATION BY:
CALCASIEU SALINITY
CONTROL MEASURES
COASTAL PROTECTION AND RESTORATION AUTHORITY
150 TERRACE STREET
BATON ROUGE, LA 70802
150 TERRACE STREET
BATON ROUGE, LOUISIANA 70802
DRAWN BY: VR
DESIGNED BY:
LRM
APPROVED BY: BR
MATCHLINE SHEET 12
MATCHLINE (ABOVE)
E'
PL
E'
DETAIL 3
SHEET 16
REACH E,
SHEET 7
PL
-20
LIMITS OF CONSTRUCTION, TYP
PL
F
PL
10
MATCHLINE SHEET
F
-10
F
MATCHLINE (BELOW)
E
E
3
PL
-20
E
CALCASIEU LAKE
19
LAKE WALL
2 OF 3
STATE PROJECT NUMBER: CS-65
DATE: 20-APR-2018
FEDERAL PROJECT NUMBER:
SHEET 11 OF 19
N
19
MATCHLINE BELOW
228.5'
N
OPEN WATER
REACH E
SHEET 7
192+26
REACH F SHEET 7
DETAIL 3
SHEET 16
19
CALCASIEU SHIP CHANNEL
F'
E
190+26
166+96
165+56
REACH F SHEET 7
3'
LIMITS OF CONSTRUCTION, TYP
E
Z
791.1'
MATCHLINE SHEET 11
F
200.0'
2'
E'
3'
A'
0
E'
400
800
DETAIL 2 SHEET
Feet
APPROXIMATE SHORELINE
APPROXIMATE SHORELINE
N
19
MATCHLINE ABOVE
4'
LIMITS OF
CONSTRUCTION,
TYP
F
REACH F SHEET 7
1681.0'
228.5'
DETAIL 4
SHEET 17
N
CALCASIEU SHIP CHANNEL
F'
4'
19
0
LAKE WALL
400
800
Feet
SCALE: 1" = 400'
APPLICATION BY:
CALCASIEU SALINITY
CONTROL MEASURES
COASTAL PROTECTION AND RESTORATION AUTHORITY
150 TERRACE STREET
BATON ROUGE, LA 70802
150 TERRACE STREET
BATON ROUGE, LOUISIANA 70802
DRAWN BY: VR
DESIGNED BY:
LRM
APPROVED BY: BR
LAKE WALL
3 OF 3
STATE PROJECT NUMBER: CS-65
DATE: 20-APR-2018
FEDERAL PROJECT NUMBER:
SHEET 12 OF 19
N
CALCASIEU
SHIP CHANNEL
19
LIMITS OF
CONSTRUCTION, TYP
4
E
F
E
4
2
REACH F
SHEET 7
0
REACH F
SHEET 7
10
10
10
F
0
E'
4'
F'
2'
4'
REACH E
SHEET 7
TIE IN DETAIL
SHEET 17
REACH E
SHEET 7
19
PROPOSED SALINITY BARRIER =
1,907 LINEAR FEET
CALCASIEU
LAKE WEST
COVE
DETAIL 2
SHEET 15
N
TIE IN DETAIL
SHEET 17
F'
E'
MNE MILE CUT
SCALE: 1" = 400'
NINE MILE CUT QUANTITY SUMMARY
QUANTITY
TYPE
NINE MILE CUT ESTIMATED IMPACT
TYPE
ALIGNMENT TABLE
Point
LATITUDE
LONGITUDE
A
N29° 53' 21.39"
W93° 20' 55.68"
B
N29° 52' 53.68"
W93° 20' 55.12"
PERMANENT IMPACTED
VEGETATED WETLANDS
TEMPORARY IMPACTED
VEGETATED WETLANDS
PERMANENT IMPACTED
SUBMERGED BOTTOM
TEMPORARY IMPACTED
SUBMERGED BOTTOM
QUANTITY
0.66 ACRES
1.60 ACRES
2.98 ACRES
14.60 ACRES
1,907 LF
WALL AREA
3.91 ACRES
ROCK VOLUME
84,066 CY
PERMANENT DREDGE AREA
1.97 ACRES
PERMANENT DREDGE VOLUME
TEMPORARY ACCESS/FLOTATION
DREDGING AREA
TEMPORARY ACCESS/FLOTATION
DREDGING VOLUME
TEMPORARY SPOIL PLACEMENT
AREA
TEMPORARY ACCESS CORRIDOR
AREA
APPLICATION BY:
150 TERRACE STREET
BATON ROUGE, LOUISIANA 70802
DESIGNED BY:
LRM
APPROVED BY: BR
MHW= +0.75 FT
MLW= +0.01 FT
(NAVD 88)
7,049 CY
6.00 ACRES
48,434 CY
8.60 ACRES
0
400
1.88 ACRES
CALCASIEU SALINITY
CONTROL MEASURES
COASTAL PROTECTION AND RESTORATION AUTHORITY
150 TERRACE STREET
BATON ROUGE, LA 70802
DRAWN BY: SPF
WALL LENGTH
800
FEET
NINE MILE CUT
STATE PROJECT NUMBER: CS-65
DATE: 20-APR-2018
FEDERAL PROJECT NUMBER:
SHEET 13 OF 19
A
4
SILL
B
B
4
4
60'
G
-
DOLPHIN,
TYP
PILES AT SILL NOT
SHOWN FOR CLARITY
SILL
1
SILL PLAN
SCALE: 1" = 50'
G
_
APPLICATION BY:
SLOPE ROCK
TO MATCH
0'
150 TERRACE STREET
BATON ROUGE, LOUISIANA 70802
DESIGNED BY:
LRM
APPROVED BY: BR
TOP OF WALL
EL +5.0
50'
100'
SILL
CALCASIEU SALINITY
CONTROL MEASURES
COASTAL PROTECTION AND RESTORATION AUTHORITY
150 TERRACE STREET
BATON ROUGE, LA 70802
DRAWN BY: VR
50'
SECTION
SCALE: 1" = 50'
EL -8.0'
SILL
SILL DETAIL
1
STATE PROJECT NUMBER: CS-65
DATE: 20-APR-2018
FEDERAL PROJECT NUMBER:
SHEET 14 OF 19
150'
12" ROCK MATTRESS
SILL
MATCH
ADJACENT
BERM
NOTE 4
(TYP)
NOTES
1.
DESIGN
WIDTH
CSC
SIDE
40.0'
TYP
2.
3.
4.
MATCH
ADJACENT BERM
NOTE 4 (TYP)
MINIMUM SILL DEPTH (MAX EL):
60 FOOT OPENING:
EL -5.0
100 FOOT OPENING:
EL -8.0
DREDGE SILL AREA AS NEEDED
TO REACH MINIMUM DEPTH.
WHERE SILL ELEVATION IS
GREATER THAN 12" ABOVE MUD
LINE, FILL WITH ROCK TO 12"
BELOW SILL ELEVATION.
IF THE BERM ADJACENT TO THE
SILL DOES NOT HAVE PILE IN IT,
THEN OMIT THE 36" PIPE PILE
AND SHEET PILE.
210.0'
SILL EL
(NOTE 1)
3H:1V
NOTE 3
12" ROCK
MATTRESS
MATCH BERM
SIDE SLOPES TYP
36" X 1.00"
PIPE PILE
TIP EL -30
NOTE 5
BAYOU/LAKE SIDE
H
2H:1V
_
2
SILL PLAN
SCALE: 1" = 40'
40'
0'
40'
APPLICATION BY:
120'
H
_
CALCASIEU SALINITY
CONTROL MEASURES
COASTAL PROTECTION AND RESTORATION AUTHORITY
150 TERRACE STREET
BATON ROUGE, LA 70802
150 TERRACE STREET
BATON ROUGE, LOUISIANA 70802
DRAWN BY: VR
80'
DESIGNED BY:
LRM
APPROVED BY: BR
ELEVATION
SCALE: 1" = 40'
SILL DETAIL
2
STATE PROJECT NUMBER: CS-65
DATE: 20-APR-2018
FEDERAL PROJECT NUMBER:
SHEET 15 OF 19
I
-
EL +5
EL 0
A
7
EL -5
10.0'
20.0'
10.0'
10.0'
130' X 130' X 12"
ROCK MATTRESS
10.0'
3H:1V
ARMOR STONE
3
50'
SYM
ABOUT
FISH PASSAGE
SCALE: 1" = 50'
0'
EL +5
EL 0
50'
SYM
ABOUT
100'
GEOTEXTILE
3.0'
12" ROCK MATTRESS
150'
I
_
20'
SECTION
SCALE: 1" = 20'
1.5'
0'
CALCASIEU SALINITY
CONTROL MEASURES
150 TERRACE STREET
BATON ROUGE, LOUISIANA 70802
LRM
APPROVED BY: BR
2H:1V
3.0'
3.0' MIN
APPLICATION BY:
DESIGNED BY:
EL 0
2H:1V
3.0'
BERM BEYOND NOT
SHOWN FOR CLARITY
COASTAL PROTECTION AND RESTORATION AUTHORITY
150 TERRACE STREET
BATON ROUGE, LA 70802
DRAWN BY: VR
9.0'
10.0'
FILTER STONE
20'
40'
FISH PASSAGE
STATE PROJECT NUMBER: CS-65
DATE: 20-APR-2018
FEDERAL PROJECT NUMBER:
SHEET 16 OF 19
60'
50.0'
TRANSITION
SECTION
NOTES
K
_
1.
OPTIONAL
SEE NOTE 1
2.
3.
J
_
TIE-IN DETAIL
4
SYM ABOUT
SHEET PILE
EL +5.0
15.0'
3.0'
3H:1V
2H:1V
END TIE-IN
@ EG EL +7.5
(NOTE 1)
BEGIN TIE-IN
REFER TO PLAN
SCALE: 1" = 50'
END SHEET PILE
REFER TO PLAN
BERM SECTION PER
PLAN AND PROFILE
WHERE TIE-IN ENDS AND THERE
IS NO EXISTING GRADE AT OR
ABOVE EL. +7.5, SLOPE DOWN
ROCK AT 10H:1V.
SHEET PILE TIP EL MATCHES
ADJACENT BERM SECTION.
REFER TO PLAN FOR THE
LOCATION OF THE END OF THE
SHEET PILE.
ARMOR STONE
d50 = 2.3' w50 =
1899#
4.0' MIN
EG
BEDDING STONE
d50 = 0.4' w50 = 7#
2H:1V
K
_
EXCAVATE TO PROVIDE
MIN ROCK THICKNESS
ELEVATION
J
_
50'
SCALE: 1" = 50'
APPLICATION BY:
CALCASIEU SALINITY
CONTROL MEASURES
COASTAL PROTECTION AND RESTORATION AUTHORITY
150 TERRACE STREET
BATON ROUGE, LA 70802
150 TERRACE STREET
BATON ROUGE, LOUISIANA 70802
DRAWN BY: VR
0'
DESIGNED BY:
LRM
APPROVED BY: BR
50'
SECTION
SCALE: 1" = 50'
100'
TIE-IN DETAIL
1
STATE PROJECT NUMBER: CS-65
DATE: 20-APR-2018
FEDERAL PROJECT NUMBER:
SHEET 17 OF 19
150'
ROAD/BERM
40' LONG MATTRESS TYP
PZC 26 SHEET PILE
TIP EL -35
HEAD EL +8
3' OF STONE
18" ROCK
MATTRESS
PLACE (2) MATS BEYOND
DRIVEN SHEET PILING
EL +8.0 (CDF BERM)
END SHEET PILE
EL +6.0 (ROAD)
EXISTING
GRADE
MAT
50.0'
SPLIT SHEET PILE
w/ TEE CONNECTOR
END ROCK BERM
R100.0'
SECTION
L
_
NTS
L
-
18" ROCK
MATTRESS
BERM WITH SHEET
PILE PER PLAN
R100.0'
M
EL +8.0 (CDF BERM)
EL +6.0 (ROAD)
50.0'
_
PZC 26 SHEET PILE
TIP EL -35
HEAD EL +8
END SHEET PILE
5
M
TOE
TOP
TOP
TOE
PLACE (2) MATS BEYOND
DRIVEN SHEET PILING
_
NTS
TIE-IN DETAIL
SCALE: NTS
APPLICATION BY:
CALCASIEU SALINITY
CONTROL MEASURES
COASTAL PROTECTION AND RESTORATION AUTHORITY
150 TERRACE STREET
BATON ROUGE, LA 70802
150 TERRACE STREET
BATON ROUGE, LOUISIANA 70802
DRAWN BY: VR
SECTION
DESIGNED BY:
LRM
APPROVED BY: BR
TIE-IN DETAIL
2
STATE PROJECT NUMBER: CS-65
DATE: 20-APR-2018
FEDERAL PROJECT NUMBER:
SHEET 18 OF 19
NOTE:
1.
TEMPORARY ACCESS CHANNEL
AS REQUIRED FOR
CONSTRUCTION ACCESS. REFER
TO PLANS FOR ESTIMATED
EXTENTS. REFER TO NOTE 4,
SHEET 2.
EDGE OF STRUCTURE
T.O. TEMP SPOIL PLACEMENT
AREA MAX EL = +6.0'
TEMPORARY ACCESS CHANNEL
(EXCAVATE AND BACKFILL)
20.0'
ANGLE OF REPOSE ,
BOTH SIDES
TEMPORARY WARNING SIGN
VARIES FROM 80' TO 110'
VARIES
CAST
SIDE
B.O ACCESS CHANNEL
TYP EL NOT TO EXCEED -10.0'
EXISTING GROUND
MIN 20'
TYP 90.0'
TYP 120.0'
3H: 1V, TYP. BOTH SIDES
N
ACCESS CHANNEL TYPICAL SECTION
SCALE: 1" = 40'
40'
APPLICATION BY:
CALCASIEU SALINITY
CONTROL MEASURES
COASTAL PROTECTION AND RESTORATION AUTHORITY
150 TERRACE STREET
BATON ROUGE, LA 70802
150 TERRACE STREET
BATON ROUGE, LOUISIANA 70802
DRAWN BY: SPF
0'
DESIGNED BY:
LRM
APPROVED BY: BR
40'
80'
TEMPORARY
ACCESS CHANNEL
STATE PROJECT NUMBER: CS-65
DATE: 20-APR-2018
FEDERAL PROJECT NUMBER:
SHEET 19 OF 19