Stonearch, LLC requests authorization to construct the 4th phase of the Canterbury Heights residential development northeast of the intersection of North Dubuque Avenue and East Madison Street in eastern Sioux Falls, South Dakota. The project will include the construction of new roads and the extension of existing roads, the construction of approximately 47 lots, and the installation of sewer main. The project will impact 1.54 acres of wetlands. The proposed project alternative was selected to avoid wetlands to the greatest extent possible. Compensatory mitigation for the 1.54 acres of permanent wetland impacts will be provided by the purchase of credits from the Ducks Unlimited In-Lieu Fee Program.

Stonearch, LLC requests authorization to construct the 4th phase of the Canterbury Heights residential development northeast of the intersection of North Dubuque Avenue and East Madison Street in eastern Sioux Falls, South Dakota. The project will include the construction of new roads and the extension of existing roads, the construction of approximately 47 lots, and the installation of sewer main. The project will impact 1.54 acres of wetlands. The proposed project alternative was selected to avoid wetlands to the greatest extent possible. Compensatory mitigation for the 1.54 acres of permanent wetland impacts will be provided by the purchase of credits from the Ducks Unlimited In-Lieu Fee Program.

PUBLIC NOTICE

US ARMY CORPS OF ENGINEERS OMAHA DISTRICT

APPLICANT: APPLICATION NO: WATERWAY: ISSUE DATE: EXPIRATION DATE:

STONEARCH, LLC NWO-2016-1344-PIE UNNAMED WETLANDS SEPTEMBER 14, 2018 OCTOBER 5, 2018

________________________________________________________________ Regulatory Office, 28563 Powerhouse Rd, Room 118, Pierre, SD 57501 http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/SouthDakota.aspx _____________________________________________________________________________

21-DAY NOTICE JOINT NOTICE OF PERMIT PENDING US ARMY CORPS OF ENGINEERS AND SOUTH DAKOTA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES The application of Stonearch, LLC for approval of plans and issuance of a permit under authority of the Secretary of the Army is being considered by the District Commander, US Army Engineer District, Omaha, Nebraska. The project described herein is not being proposed by the Corps, but by the applicant; the Corps will evaluate the proposed work to determine if it is permittable under current laws and regulations. Description of Proposed Project: The applicant requests authorization to construct the 4th phase of the Canterbury Heights residential development northeast of the intersection of North Dubuque Avenue and East Madison Street in eastern Sioux Falls, South Dakota. The project will include the construction of new roads and the extension of existing roads, the construction of approximately 47 lots, and the installation of sewer main. The project will impact 1.54 acres of wetlands. See attached design drawings. Location: The project is located in Section 12, Township 101 North, Range 49 West, Minnehaha County, South Dakota. Purpose: The purpose of the proposed project is to provide residential housing for the growing population of Sioux Falls. Mitigation: The proposed project alternative was selected to avoid wetlands to the greatest extent possible. Compensatory mitigation for the 1.54 acres of permanent wetland impacts will be provided by the purchase of credits from the Ducks Unlimited In-Lieu Fee Program. Hydrogeomorphic functional assessment scores were calculated to account for the functional loss

of the impacted wetlands. A mitigation ratio of 1.5 to 1 will be used to compensate for the impacts and a total of 5.54 credits will be purchased from the mitigation bank. Existing Conditions: This property originally comprised approximately 119 acres. The City of Sioux Falls added 0.22 acres to the North Dubuque right-of-way and 12.53 acres in the southwest corner of the property was sold and has been developed into a 56-unit townhome development along East Madison Street. This left approximately 106 acres on which the owner has been building a 138-lot residential development in four phases (Canterbury Heights). The development currently contains 57 sold/built lots, 28 platted lots for sale, and 53 unplatted, but planned lots. Most of the unplatted lots are in the 4th and final phase. The South Dakota Department of Environment and Natural Resources, Division of Environmental Services, 523 East Capitol Avenue, Pierre, South Dakota, 57501-3181, will review the proposed project for state certification in accordance with the provisions of Section 401 of the Clean Water Act. The certification, if issued, will express the State's opinion that the operations undertaken by the applicant will not result in a violation of applicable water quality standards. The South Dakota Department of Environment and Natural Resources hereby incorporates this public notice as its own public notice and procedures by reference (ARSD 74:51:01). The Omaha District will comply with the National Historic Preservation Act of 1966, as amended. We will evaluate input by Indian Tribes, the South Dakota State Historic Preservation Officer (SHPO), and any interested parties in response to this public notice. The Corps' initial review is that the project would not affect properties listed, or eligible for listing, on the National Register of Historic Places. In compliance with the Endangered Species Act, a preliminary determination has been made that the described work will not affect species designated as threatened or endangered or adversely affect critical habitat. In order to complete our evaluation of this activity, comments are solicited from the U.S. Fish and Wildlife Service and other interested agencies and individuals. The decision whether to issue a permit will be based on an evaluation of the probable impacts including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposals must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards, flood plain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food production, and, in general the needs and welfare of the people. In addition, the evaluation of the impacts of the project on public interest will include application of the guidelines promulgated by the Administrator, Environmental Protection Agency, under authority of Section 404(b) of the Clean Water Act (40 CFR Part 230). The Corps of Engineers is soliciting comments from the public; Federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above.

2

Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, the reason for holding a public hearing. The request must be submitted to the US Army Corps of Engineers, South Dakota Regulatory Office, 28563 Powerhouse Road, Room 118, Pierre, South Dakota 57501. Any interested party (particularly officials of any town, city, county, state, Federal agency, Indian Tribe, or local association whose interests may be affected by the proposed work) is invited to submit to this office, written facts, arguments, or objections on or before October 5, 2018. Any agency or individual having an objection to the proposed work should specifically identify it as an objection with clear and specific reasons. Comments, both favorable and unfavorable, will be accepted, made a part of the record and will receive full consideration in subsequent actions on this permit application. All replies to the public notice should be addressed to the address listed in the previous paragraph. Cathy Juhas, telephone number (605) 224-8531, may be contacted for additional information. Comments received after the close of the business day on the expiration date of this public notice will not be considered. This project, if authorized, will be under the provisions of Section 404 of the Clean Water Act. Drawings showing the location and extent of the work are attached to this notice.

3

CANTERBURY HEIGHTS DEVELOPMENT SIOUX FALLS, SD

WETLAND A/B (ON-SITE)

WETLANDS A AND B: CONTRIBUTING WATERSHED AND 100-FOOT BUFFER

1.449 AC.± 63115 SQ. FT.

WETLAND A/B (OFF-SITE)

2.457 AC.± 107020 SQ. FT.

Legend -Jurisdictional Wetlands -Canterbury Heights Property Boundary -Study Area (Phase 4) Boundary -Contributing Watershed Boundary -100-Foot Buffer Boundary

N DUBUQUE AVE

Notes: The East Boundary of the development differs slightly from the boundary shown in the previous wetland delineation and JurisdictionalDetermination. This is due to a planned road Right-Of-Way along that boundary being vacated by the City of Sioux Falls.

WETLAND A/B (ON-SITE) PREVIOUS PROPERTY BOUNDARY LOCATION (USED IN DELINEATION AND AJD)

0.089 AC.± 3864 SQ. FT.

NON-SLOPE (EPHEMERAL STREAM) PORTION OF THE CONTIGUOUS WETLAND

E MADISON STREET

Delineation of the watershed boundaries was completed by hand using 1-ft contours from National Elevation Dataset Data.

216 S. Duluth Avenue Sioux Falls, SD 57104 Phone: (605) 332-7211 Fax: (605) 332-7222

Figure 1: Canterbury Heights wetland map.

WETLAND A

0.089 AC

WETLAND B

N HILINE AVENUE (FUTURE)

N MARLOWE AVENUE MARLOWE CIR

NOTLEY CO

URT

E MADISON STREET

1.449 AC

CANTERBURY HEIGHTS DEVELOPMENT SIOUX FALLS, SD MA

YN

AR

D

LA

PROPOSED DEVELOPMENT PLAN AND WETLAND IMPACTS

NE

TON TRAIL

ST

N PADDING

AH OE

PA

N

ET

N

I DD

O GT

CIR

RE ET

Legend

N DUBUQUE AVENUE

-Jurisdictional Wetlands -Canterbury Heights Property Boundary -Study Area (Phase 4) Boundary -Proposed Wetland Impacts Notes: The East Boundary of the development differs slightly from the boundary shown in the previous wetland delineation and JurisdictionalDetermination. This is due to a planned road Right-Of-Way along that boundary being vacated by the City of Sioux Falls.

216 S. Duluth Avenue Sioux Falls, SD 57104 Phone: (605) 332-7211 Fax: (605) 332-7222

Figure 2: Canterbury Heights development plan.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits