The Wyoming Water Development Office has requested authorization to expand Leavitt Reservoir on Bureau of Land Management (BLM) lands and private property in Big Horn County at latitude 44.64, longitude -107.87. The project purpose is to expand the water storage capacity of Leavitt Reservoir to provide late season supplemental irrigation water to irrigated lands in the Beaver Creek and Shell Creek drainages to reduce irrigation water shortages. The attached map shows the project location in Section 24, Township 54 North, Range 92 West, Big Horn County, Wyoming.

The Wyoming Water Development Office has requested authorization to expand Leavitt Reservoir on Bureau of Land Management (BLM) lands and private property in Big Horn County at latitude 44.64, longitude -107.87. The project purpose is to expand the water storage capacity of Leavitt Reservoir to provide late season supplemental irrigation water to irrigated lands in the Beaver Creek and Shell Creek drainages to reduce irrigation water shortages. The attached map shows the project location in Section 24, Township 54 North, Range 92 West, Big Horn County, Wyoming.

PUBLIC NOTICE Application No.: NWO-2016-00623 Applicant: Wyoming Water Development Office Waterway: Leavitt Reservoir, Beaver Creek, Unnamed ephemeral draw along Beaver Creek, and wetlands adjacent to these resources Issue Date: September 18, 2018 Expiration Date: October 17, 2018

30 DAY NOTICE Wyoming Regulatory Office

2232 Dell Range Blvd., Suite 210

Cheyenne, Wyoming 82009

JOINT NOTICE OF PERMIT PENDING U.S. ARMY CORPS OF ENGINEERS AND WYOMING DEPARTMENT OF ENVIRONMENTAL QUALITY The application of Wyoming Water Development Office (WWDO), 6920 Yellowtail Road, Cheyenne, Wyoming, 82002 is being considered by the District Engineer, U.S. Army Corps of Engineers, Omaha, Nebraska, for approval of plans and issuance of a permit under the authority of the Secretary of the Army. A permit, if issued, will be under the provisions of Section 404 of the Clean Water Act of 1972, as amended. The applicant has requested authorization to expand Leavitt Reservoir on Bureau of Land Management (BLM) lands and private property in Big Horn County at latitude 44.64, longitude -107.87. The project purpose is to expand the water storage capacity of Leavitt Reservoir to provide late season supplemental irrigation water to irrigated lands in the Beaver Creek and Shell Creek drainages to reduce irrigation water shortages. The attached map shows the project location in Section 24, Township 54 North, Range 92 West, Big Horn County, Wyoming. The existing earthen dam embankment will be removed and a new embankment will be constructed. The reservoir expansion of 5,962 acre feet (AF) would bring the total storage capacity to 6,604 AF to reduce drought vulnerability and irrigation shortages. Storage in the expanded Leavitt Reservoir would include the existing 643 AF; 1,500 AF for minimum environmental/recreation pool; and 4,461 AF for a supplemental irrigation supply. The reservoir would be filled from a new Beaver Creek diversion and 2-mile long, buried supply line. A new Beaver Creek transfer diversion and 3-mile long, buried pipeline would convey reservoir releases to existing irrigation ditches. The new earthen embankment contains approximately 1.42 million cubic yards (CY) of fill and has a crest length of approximately 1,800 feet with a maximum height of 80 feet. The expanded reservoir surface area at the normal high water line is approximately 203 acres. The project also includes improvements to existing roads, new access road construction, recreational facilities, and constructed wetlands. Removal of the dam embankment and construction of the new embankment will disturb approximately 45 acres resulting in a loss of approximately 0.92 acre of wetlands. Approximately 17.15 acres of wetlands will be permanently impacted and 3.3 acres of wetlands will be temporarily impacted due to excavation and construction of the entire reservoir, including the inundation of the reservoir once filled.

The applicant has proposed compensatory mitigation for permanent wetland loss resulting from Leavitt Reservoir Expansion Project (LREP). WWDO has identified three potential areas (North, South, and Rim wetlands areas) and an additional area that may be used for either wetland mitigation or recreation. The combined areas are likely to be more than sufficient to mitigate for wetland impacts. The final areas and configurations will depend on mitigation requirements determined by the United States Army Corps of Engineers (USACE) once a determination is made on the least environmentally damaging practicable alternative (LEDPA). Wetlands would be replaced at a minimum of 1.5:1 ratio at any or all of the three mitigation sited identified on the attached figure WM-1 (Conceptual Wetland Mitigation Locations). The three locations are also attached as figures WM-2, WM-3, and WM-4. The applicant will mitigate for all permanent impacts to wetlands within the project area. All mitigation will be "on-site" located on lands owned by the BLM and or private inholdings and establishment would be "in-kind". The U.S. Army Corps of Engineers is soliciting comments from the public; federal, state, and local agencies; Tribes; and other interested parties in order to consider and evaluate impacts of the project. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for the project. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental affects, and other public interest factors. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the project. Any person may request, in writing and within the comment period specified in this notice, that a public hearing be held for the purpose of gathering additional information. Requests for public hearings must be identified as such and shall state specifically the reasons for holding a public hearing and shall identify what additional information would be obtained. The request must be submitted to the address shown above. Any interested party (particularly officials of any town, county, state, federal agency, or local association whose interests may be affected by the project) is invited to submit to this office written facts, arguments, or objections on or before the expiration date of this notice. Any agency or individual having an objection to the project should specifically identify it as an objection with clear and specific reasons. Comments, both favorable and unfavorable, will be accepted, made a part of the record and will receive full consideration in subsequent actions on this application. All replies to the public notice should be mailed to the address listed above. Mr. Michael Stanley may be contacted for additional information by telephone at (307) 772-2300 or by electronic mail at michael.g.stanley@usace.army.mil The Wyoming Department of Environmental Quality (WDEQ), Water Quality Division, 200 West 17th Street, Cheyenne, Wyoming 82002, will review the application and comments with intent to certify in accordance with provisions of Section 401 of the Clean Water Act of 1972, as amended. The certification, if issued, will express the state's opinion that construction of the project will not result in a violation of applicable water quality standards. The WDEQ hereby incorporates this public notice as its own public notice and procedures by reference thereto. The BLM is the lead federal agency responsible for ensuring compliance with the National Historic Preservation Act of 1966 and the Endangered Species Act of 1973 through the EIS process as stated in the Memorandum of Understanding dated April 5, 2016 between the United State Army Corps of Engineers and the BLM. As the lead federal agency, the BLM retains final responsibility for the content of all planning and NEPA documents, which include the Draft EIS, the Final EIS, any Supplemental Drafts, and the BLM's Record of Decision (ROD). BLM published the Draft EIS on August 31, 2018. This draft can be reviewed in further detail at https://go.usa.gov/xUsa7. The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts, of the project on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits which reasonably may be expected to accrue from the project must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered, including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and

wildlife, flood plains, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, and considerations of property ownership. In addition, the evaluation will include application of the guidelines promulgated by the Administrator, Environmental Protection Agency, under the authority of Section 404 (b) of the Clean Water Act of 1972, as amended (40 C.F.R.; Part 230). Comments received after the expiration date of this public notice will not be considered. Public Notices issued by the Wyoming Regulatory Office can also be obtained by visiting its web site at http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Wyoming.aspx

Figure 1

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas