Home

Philadelphia District

Run scraper

The applicant is proposing to make site improvements to their scrap metal recycling facility and perform maintenance dredging of their barge unloading area. Maintenance dredging would involve the mechanical removal of 30

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant is proposing to make site improvements to their scrap metal recycling facility and perform maintenance dredging of their barge unloading area. Maintenance dredging would involve the mechanical removal of 30,000 cubic yards of sediment within the approximate 33,320 square foot barge berthing area (dredge template) over a 10-year period and as frequently as once every other year to a design depth of 24 feet below MLLW water with allowance of 2 further feet of over-dredging. The applicant’s stated purpose for dredging is to maintain proper depth for the safe mooring of single 400’ long x 100‘ wide barges. The stated purpose for open water fill is to construct a scrap metal containment area and stormwater system; the stated purpose for “H” pin piles is to repair the existing bulkhead. For more details, view the "Public Notice & Plan Details" attachment. Public comments are due by Oct. 5, 2018.

The applicant is proposing to make site improvements to their scrap metal recycling facility and perform maintenance dredging of their barge unloading area. Maintenance dredging would involve the mechanical removal of 30,000 cubic yards of sedimentwithin the approximate 33,320 square foot barge berthing area (dredge template) over a 10-year period and as frequently as once every other year to a design depth of 24 feet below MLLWwater with allowance of 2 further feet of over-dredging. The applicant’s stated purpose for dredging is to maintain proper depth for the safe mooring of single 400’ long x 100‘ wide barges. The stated purpose for open water fill is toconstruct a scrap metal containment area and stormwater system; the stated purpose for “H” pin piles is to repair the existing bulkhead. For more details, view the "Public Notice & Plan Details" attachment. Public comments are due by Oct. 5, 2018.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas