Montana Department of Transportation is requesting Department of the Army authorization for impacts to waters of the United States in order to reconstruct Five Mile Road from its intersection with Mary Street to Dover Road and to construct a new segment of Five Mile Road from Dover Road to Old Highway 312. The project as proposed would result in permanent impacts to 182.2 linear feet of an unnamed spring located in a man-made outflow channel, 3,507 linear feet of jurisdictional irrigation canals/ditches, and 0.59 acre of wetlands from the placement of fill, culverts, and irrigation structures. Temporary impacts will occur to 2,818 linear feet of irrigation canals/ditches and 0.67 acre of adjacent wetlands that will be reconstructed in a new location.
Montana Department of Transportation is requesting Department of the Army authorization for impacts to waters of the United States in order to reconstruct Five Mile Road from its intersection with Mary Street to Dover Road and to construct a new segment of Five Mile Road from Dover Road to Old Highway 312. The project as proposed would result in permanent impacts to 182.2 linear feet of an unnamed spring located in a man-made outflow channel, 3,507 linear feet of jurisdictional irrigation canals/ditches, and 0.59 acre of wetlands from the placement of fill, culverts, and irrigation structures. Temporary impacts will occur to 2,818 linear feet of irrigation canals/ditches and 0.67 acre of adjacent wetlands that will be reconstructed in a new location.
PUBLIC NOTICE
Omaha District
Application No: NWO-2006-90399-MTB
Project: Billings Bypass BBP Five Mile Road
Applicant: Montana Department of Transportation
Waterway: Multiple Irrigation Ditches and Wetlands
Issue Date: September 24, 2018
Expiration Date: October 24, 2018
30 DAY NOTICE
Post Office Box 7032, Billings, Montana 59103
JOINT PUBLIC NOTICE
FOR PERMIT APPLICATION SUBMITTED TO
U.S. ARMY CORPS OF ENGINEERS
AND
MONTANA DEPARTMENT OF ENVIRONMENTAL QUALITY
SUBJECT: The U.S. Army Corps of Engineers, Omaha District, (Corps) is evaluating a permit
application from the Montana Department of Transportation to reconstruct Five Mile Road from
its intersection with Mary Street to Dover Road and to construct a new segment of Five Mile
Road from Dover Road to Old Highway 312. The project as proposed would result in permanent
impacts to 182.2 linear feet of an unnamed spring located in a man-made outflow channel, 3,507
linear feet of jurisdictional irrigation canals/ditches, and 0.59 acre of wetlands from the placement
of fill, culverts, and irrigation structures. Temporary impacts will occur to 2,818 linear feet of
irrigation canals/ditches and 0.67 acre of adjacent wetlands that will be reconstructed in a new
location. This notice is to inform interested parties of the proposed activity and to solicit
comments. This notice may also be viewed at the Corps web site at:
http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Montana/PublicNotices.aspx
AUTHORITY: This application is being evaluated under Section 404 of the Clean Water Act for
the discharge of dredged or fill material in waters of the United States.
APPLICANT: Tommy Griffeth
Montana Department of Transportation
PO Box 201001
Helena, Montana 59620-1001
LOCATION: The Five Mile Road segment of the Billings Bypass is located northeast of the
Heights area of the City of Billings, within Yellowstone County, Montana. The project is located
within Sections (S) 1 and 2 of Township (T) 1 North, Range (R) 26 East; S6 and S7, T1N, R27E;
and S26, T2N, R26E. The midpoint of the project is approximately Latitude 45.856618,
Longitude -108.424883. Approximately 8,566 linear feet of irrigation ditches and 2.78 acres of
emergent wetlands are located within the project area of this phase.
PROJECT DESCRIPTION: Proposed impacts include installing new culverts and irrigation
headworks, extending existing culverts, bank protection, realigning/reconstructing irrigation
ditches and drains, piping ditches, and placement of road fill for reconstructing the existing Five
U.S. ARMY CORPS OF ENGINEERS OMAHA DISTRICT
http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Montana.aspx
CENWO-OD-RMT
Page 2
Action ID: NWO-2006-90399-MTB
Mile roadway, constructing a new segment of Five Mile Road from Dover Road to Old Highway
312, and constructing a roundabout at the Five Mile Road and Old Highway 312 intersection.
The applicant's preferred alternative would result in impacts to 1.26 acres of wetlands as part of
the proposed Five Mile Road project. However, approximately 0.67 acres of these wetland
impacts are associated with proposed impacts to an irrigation drain that will be relocated as part
of the project.
The purpose of the Billings Bypass project is to improve access and connectivity between
Interstate 90 (I-90) and Old Highway 312 to improve mobility in the eastern area of Billings.
Improvements to Five Mile Road are needed to accommodate increased traffic volumes that
would be generated due to the bypass and to meet project objectives for operations, safety, and
mobility. The attached drawings provide additional project details.
BACKGROUND: The proposed project is the first of six separate construction projects to be
implemented under Phase I of the Billings Bypass Project. A Final Environmental Impact
Statement and Record of Decision (FEIS/ROD) were prepared for this project in 2014. As
described in the FEIS, the lead agencies, the Federal Highway Administration (FHWA) and the
MDT, identified the four-lane Mary Street Option 2 Alternative as the Preferred Alternative. The
Preferred Alternative has been separated into two phases, which are referred to throughout the
FEIS as Phase 1 (an initial two-lane road) and the Full Buildout (a final four-lane road). Public
comments were previously solicited at three public meetings prior to the release of the Draft EIS
in 2006, 2007, and 2010, and a public hearing was held in September 2012 after the DEIS was
released. Additional public meetings were held in 2014 and 2017. The FEIS can be accessed
at: https://www.mdt.mt.gov/pubinvolve/billingsbypass/
ALTERNATIVES: The FEIS/ROD analyzed three build alternatives and the No Build Alternative.
The preferred alignment (Mary Street Option 2 Alternative) was chosen because it would meet
the purpose and need of the project while minimizing impacts to development and natural
resources, such as existing wetlands. As part of the EIS/ROD process a 404(b)(1) analysis was
also performed and included as Appendix F in the FEIS.
MITIGATION: Avoidance, Minimization and Compensatory Mitigation: The project design team
has made all practicable efforts to avoid and minimize impacts to wetlands, streams and
irrigation facilities. Preliminary wetland delineations and evaluations were completed along all
alignments. Those areas with wetland impacts were adjusted to avoid as many impacts as
possible. However, complete avoidance was not possible due to the linear nature of the project
and the orientation of the wetlands, streams, and irrigation facilities in relation to the new
roadway alignment. Contractors will be expected to follow Best Management Practices (BMPs)
for control of erosion and sediment transport, to re-establish permanent vegetation in disturbed
areas within MDT right-of-way or easements to reduce the spread and establishment of noxious
weeds, and will be required to operate in compliance with applicable federal, state, and local
permits and standards. To compensate for unavoidable impacts, the applicant proposes the
following mitigation measures:
Wetland Mitigation: Approximately 1.26 acres of wetlands would be impacted as part of the
proposed Five Mile Road project. However, approximately 0.67 acres of these wetland impacts
are associated with proposed impacts to an irrigation drain that will be relocated as part of the
project. Because the relocated drain will be designed with similar ditch hydrology, length, and
width as the existing drain that supports these wetlands, it is predicted that wetland vegetation
U.S. ARMY CORPS OF ENGINEERS OMAHA DISTRICT
http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Montana.aspx
CENWO-OD-RMT
Page 3
Action ID: NWO-2006-90399-MTB
will re-establish along the newly constructed channel at a similar size and quality. The remaining
wetland impacts (0.59 acre) will be mitigated through credits from purchases at the Upper
Yellowstone 4-Acre, 2017, wetland bank, located in Carbon County within the Middle
Yellowstone River Basin Watershed (Watershed #14). Because the mitigation reserve is located
within the same watershed as the impacted wetlands, a replacement ratio of 1:1 will be used.
Compensatory stream mitigation is not anticipated as the unnamed spring's man-made outflow
channel is not a natural stream and permanent impacts to the unnamed spring total 182.2 linear
feet (below the 300 feet threshold).
OTHER GOVERNMENTAL AUTHORIZATIONS: The Montana Department of Environmental
Quality, 1520 East 6th Avenue, Post Office Box 200901, Helena, Montana 59620-0901 will review
the proposed project with the intent to certify in accordance with the provisions of Section 401 of
the Clean Water Act. The certification, if issued, will express the State's opinion that the operations
undertaken by the applicant will not result in a violation of applicable water quality standards. The
Montana Department of Environmental Quality hereby incorporates this public notice as its own
public notice and procedures by reference thereto.
HISTORIC PROPERTIES: Historic properties eligible for or included on the National Register of
Historic Places (NRHP) are protected under Section 106 of the Historic Preservation Act and
Section 4(f) of the 1966 Department of Transportation Act. Tribal cultural resources are
protected through the Native American Graves Protection and Repatriation Act and the
Archaeological Resources Protection Act.
The Federal Highway Administration (FHWA) is the lead Federal Agency for the proposed
project and is responsible for ensuring compliance with these regulations. FHWA completed a
cultural resource survey as part of the FEIS and found three historic properties in the project
area that are eligible for listing on the NRHP: the Billings Bench Water Association Canal
(24YL0161), the Northern Pacific Railway (24YL0277), and the abandoned Billings Central and
Montana Railroad (24YL1592). They made a No Adverse Effect determination at that time and
received concurrence from the SHPO in December 2011. The findings are documented in the
FEIS Appendix D. We will evaluate input by the State Historic Preservation Office (SHPO),
Tribes and the public in response to this public notice and we may conduct or require a survey of
the permit area to check for unknown historic or prehistoric properties, if warranted.
ENDANGERED SPECIES: In compliance with the Endangered Species Act, a preliminary
determination has been made by FHWA that the described work will not affect species
designated as threatened or endangered, or adversely affect critical habitat. Federally listed
species reasonably expected to occur within this area of Yellowstone County include the
endangered whooping crane (Grus americana) and the threatened Red Knot (Calidris canutus
rufa). There are no federal, state, or local designated wildlife or waterfowl sanctuaries or refuges
in the project area. There would no impacts to these types of sites. In order to complete our
evaluation of this activity, comments are solicited from the U.S. Fish and Wildlife Service and
other interested agencies and individuals.
The above determinations are based on information provided by the applicant and our
preliminary review.
EVALUATION FACTORS: The decision whether to issue a permit will be based on an
evaluation of the probable impacts, including cumulative impacts, of the described activity on the
U.S. ARMY CORPS OF ENGINEERS OMAHA DISTRICT
http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Montana.aspx
CENWO-OD-RMT
Page 4
Action ID: NWO-2006-90399-MTB
public interest. That decision will reflect the national concern for both protection and utilization of
important resources. The benefit, which reasonably may be expected to accrue from the
described activity, must be balanced against its reasonably foreseeable detriments. All factors
which may be relevant to the described activity will be considered, including the cumulative
effects thereof; among those are conservation, economics, aesthetics, general environmental
concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values,
land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation,
water quality, energy needs, safety, food and fiber production, mineral needs, consideration of
property ownership and, in general, the needs and welfare of the people. The activity's impact
on the public interest will include application of the Section 404(b)(1) guidelines promulgated by
the Administrator, Environmental Protection Agency (40 CFR Part 230).
COMMENTS: The Corps of Engineers is soliciting comments from the public; federal, state, and
local agencies and officials; Indian Tribes; and other interested parties in order to consider and
evaluate the impacts of this proposed activity. Any comments received will be considered by the
Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this
proposal. To make this decision, comments are used to assess impacts on endangered species,
historic properties, water quality, general environmental effects, and the other public interest
factors listed above. Comments are used in the preparation of an Environmental Assessment
and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act.
Comments are also used to determine the need for a public hearing and to determine the overall
public interest of the proposed activity. All public notice comments will be considered public
information and will be subject to review by the applicant.
The Corps is particularly interested in receiving comments related to the proposal's probable
impacts on the affected aquatic environment and the secondary and cumulative effects. Any
person may request, in writing and within the comment period specified in this notice, that a public
hearing be held for the purpose of gathering additional information. Requests for public hearings
must be identified as such and shall state specifically the reasons for holding a public hearing and
what additional information would be obtained. The request must be submitted to the U.S. Army
Corps of Engineers, at Post Office Box 7032, Billings, Montana 59103. If it is decided that
additional information is required and that a public hearing should be held, interested parties will be
notified of the date, time and location.
Any interested party (particularly officials of any town, city, county, state, or Federal agency; Indian
tribe; or local association whose interests may be affected by the work) is invited to submit to this
office written facts, arguments, or objections on or before the expiration date listed on the front of
this notice. Any agency or individual having an objection to the work should specifically identify it
as an objection with clear and specific reasons. Comments, both favorable and unfavorable, will
be accepted, made a part of the record and will receive full consideration in subsequent actions on
this application. All replies to the public notice should be addressed to Sage Joyce at P.O. Box
7032, Billings, Montana 59103, by email at Sage.L.Joyce@usace.army.mil. Please refer to
identification number NWO-2006-90399-MTB in any correspondence concerning this project.
Comments postmarked after the expiration date of this public notice, or received by fax or e-mail
after the expiration date, will not be considered. Comments left on our voicemail system will not be
considered.
Attachments: 1 map and 11 plan sheets
U.S. ARMY CORPS OF ENGINEERS OMAHA DISTRICT
http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Montana.aspx
BBP Five Mile Road
NCPD-MT 56(55)
CN 4199002
Five Mile Road Aquatic Resources Finding Report
MDT Activity 148
July 17, 2018
Figure 4. Delineated Wetlands within Five Mile Road Project Corridor
11
2
OF TRANSPORTATION
MONTANA DEPARTMENT
NCPD-MT 56(55)
NCPD-MT (55)
N U M B E R S
$TIME$
$DATE$
$FILEABBREV$
POWDER
RIVER
CUSTER
CARTER
FALLON
$username$
CHECKED BY
REVIEWED BY
DESIGNED BY
TGC
TLS
NWP
CONN. TO EX. HIGHWAY
END STPU 56(87)
STA STA 89+48.24
THIS PROJECT
BIG HORN
ROSEBUD
P
R
A
IR
IE
DAWSON
02/09/2018
02/09/2018
02/09/2018
BEG. CONN. TO PTW
STA 10+45.74
BEG. STPU 56(87)
STA 14+50.00
7
2
14
11
U-1012
E 343 B
UPN 4199002
ROAD PLANS
LAUREL
TO
90
I-
B
7
8
8
7
6
5
X
E
HEIGHTS
5
3
7
B 734 E
736
2
737
1027
6
N-1
U-
ELMO
LAKE
15
Fi
v
e
mi
l
e
10
B 723
87
TO
ROUNDUP
R. 26 E.
12
731
732
13
9
72
U-
36
BASE
1028
E
N
O
T
S
W
O
LL
YE
B
C
r
e
e
k
B 728
2.0
1
7
2.7
Se
v
e
n
mi
l
e
Creek
C
B
344
X5
69
1
6
E
19
B
MILES
R. 27 E.
1.4
NEW ALIGNMENT
X
8
10
16
3
5
2
B
B 349 E
E
32
T. 1 S.
T. 1 N.
5
34
B 357 E
I
9
0
LOCKWOOD
E 346
Hirsch
Spur
20
17
HYSHAM
TO
SURFACING SOURCES CONTRACTOR FURNISHED
2039
LETTING
DESIGN
4,490
440
A.D.T. =
D.H.V. =
V. =
GROWTH RATE =
12.0%
181
MONTANA
DOWL
S
N T A
S
IC
E
D
ENS
G
N
IO
NAL E
L
12269 PE
CORMIER
TODD G.
O
ER
DATE
DIVISION ADMINISTRATOR
:
DATE
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
CONSULTANT DESIGN ENGINEER
APPROVED
BY
RECEIVED :
DEPARTMENT OF TRANSPORTATION
DATE
BY
CSF = 0.99945297
N
45 MPH
10.0%
1,750-2,750
A.D.T. =
TRUCKS =
110
A.D.T. =
18 KIP ESAL'S =
2016
2019
PRESENT
LETTING DATE - __________________________
PRELIMINARY
FOR PLAN IN HAND REVIEW ONLY
B 413 E
B 346
30
18
6
TO
HUNTLEY
8
8
7
6
5
X
LENGTH
YELLOWSTONE COUNTY
BBP - FIVE MILE ROAD
GRADE, GRAVEL & PLANT MIX SURFACE
FEDERAL AID PROJECT STPU 56(87)
B 333
1
P. E.
R / W & I.C.
A G R E E M E N T
P R O J E C T
P R O J E C T S
CARBON
E
N
O
T
S
W
O
L
L
E
Y
MUSSELSHELL
GARFIELD
MC CONE
B
A S S O C I A T E D
R E L A T E D
BY
PARK
WHEATLAND
JUDITH
BASIN
MEAGHER
CASCADE
FERGUS
PHILLIPS
ry
D
3
PREPARED
BEAVERHEAD
J
E
F
F
E
R
R
R
E
E GE
S
V
E
O
D OD
N
IL W
L
S O
B
222 N. 32nd STREET, SUITE 700
BILLINGS, MONTANA 59101
(406) 656-6399
P LA N S
LL
POWE
GRANITE
CLARK
AND
LEWIS
TETON
BROADWATER
MISSOULA
RAVA
LLI
LI
BERTY
GALLATIN
LAKE
SWEET GRASS
P
E
T
R
O
L
E
U
M
SANDERS
GOLDEN
VALLEY
ST
IL
LW
AT
ER
RICHLAND
THI
S CONTRACT
BLAINE
BI
LLI
NGS
CHOUTEAU
T. 1 N.
PONDERA
E 411 B
ROOSEVELT
E 730 B
WI
BA
UX
R.
P.__.
_ TO R.
P.__.
_
MONTANA DEPARTMENT OF TRANSPORTATION
U-1027
HILL
E 729
FLATHEAD
RI
VE
R
SHERIDAN
Co
ul
so
n
DANIELS
3
73
N-16
Di
tch
VALLEY
12
TOOLE
B
GLACIER
E
R. 26 E.
I94
B
728
C
U-1032
E
11
T. 1 N.
LINCOLN
TO
N
O
IS
D
A
M
HARDI
N
E
R
U
S
A
E
R
T
F
R. 27 E.
P RO
E 916
B
M
L
A
R
E
IN
M
N-16
IN
E
A
1E
43
E 337
3
1
2
= 4167 LBS. PER CUBIC YARD
= 5.4% OF PL.MIX BIT.SURF.
= 1.4% OF PL.MIX BIT.SURF.
= 8.5 LBS. PER GAL.
COMP. WEIGHT OF PL. MIX BIT. SURF.
ASPHALT CEMENT - GRADE S - 3/4" AGG.
HYDRATED LIME
BITUMINOUS MATERIAL
= 25 LBS. PER SQ.YARD
= 0.05 GAL. PER SQ.YARD (UNDILUTED)
COVER
FOG SEAL
= 124
= 4.4
= 594
CRUSHED AGGREGATE COURSE
ASPHALT CEMENT
AGG. TREATMENT
= 77.0 tons
= 132.0 cubic yards
= 4.15 tons
PLANT MIX BITUMINOUS SURF.
CRUSHED AGGREGATE COURSE
ASPHALT CEMENT
= 26.5 tons
= 53.5 cubic yards
= 1.43 tons
PLANT MIX BITUMINOUS SURF.
CRUSHED AGGREGATE COURSE
ASPHALT CEMENT
= 30
AGG. TREATMENT
OF TRANSPORTATION
$TIME$
$DATE$
$username$
= 0.75 tons
ASPHALT CEMENT
$FILEABBREV$
= 18.0 cubic yards
CRUSHED AGGREGATE COURSE
MONTANA DEPARTMENT
= 13.5 tons
PLANT MIX BITUMINOUS SURF.
CHECKED BY
REVIEWED BY
DESIGNED BY
TGC
TLS
NWP
sq. yards
= 189.1 linear feet
AVERAGE LENGTH
QUANTITIES FOR ONE MAILBOX TURNOUT (FOR ESTIMATING PURPOSES ONLY):
MAINLINE linear feet CRUSHED AGGREGATE COURSE
MAINLINE linear feet PLANT MIX BITUMINOUS SURF.
PROVIDE THE FOLLOWING SURFACING:
OR AS STAKED BY THE ENGINEER.
CONSTRUCT MAILBOX TURNOUTS AT LOCATIONS SHOWN IN THE PLANS
MAILBOXES & MAILBOX TURNOUTS
= 57.7 linear feet
AVERAGE LENGTH
QUANTITIES FOR ONE FARM FIELD APPROACH:
WIDE PLANT MIX STRIP ADJACENT AND PARALLEL TO THE ROADWAY.
GRAVEL SURFACE ALL FARM FIELD APPROACHES TO R/W WITH A 12'
= 182.7 linear feet
sq. yards
tons
AVERAGE LENGTH
QUANTITIES FOR ONE PRIVATE APPROACH:
PLANT MIX SURFACE ALL PRIVATE APPROACHES TO R/W.
= 81.0 tons
PLANT MIX BITUMINOUS SURF.
cubic yards
= 135.5 linear feet
AVERAGE LENGTH
QUANTITIES FOR ONE PUBLIC APPROACH:
02/09/2018
02/09/2018
81+72
88+98
84+36
41+33
82+34
82+71
WL1e
WL1b
AREA
0.02
2.78
1.26
0.14
0.14
0.14
0.02
0.03
0.09
0.76
0.001
0.08
(PERM.)
0.77
0.03
0.37
1.36 *
0.01 *
0.08
AREA
IMPACTED
WETLAND AREA (ACRES)
DELINEATED
YELLOWSTONE COUNTY
REMARKS
PRELIMINARY PIH
* AREA OF EXISTING WETLAND EXTENDS BEYOND PLAN LIMITS
TOTAL
84+79
1133+97
1132+60
WL1c
83+66
1132+85
1128+61
WL1a
WL1d
26+90
26+75
26+38
TO
19+63
STATION
WL3a
FROM
PERMANENT WATERWAY IMPACTED AREAS
DELINEATED WATERWAY AREAS
WETLAND DELINEATION TABLE
PERMANENT WETLAND IMPACTED AREAS
WL3b
ROAD PLANS
WL2
WL1
WL3
DESIGNATION
WETLAND
IMPACT AREAS SHOWN IS THE RESPONSIBILITY OF THE CONTRACTOR.
DELINEATED WETLAND AREAS
PLANS. ANY ACTION IMPACTING WETLAND AREAS OUTSIDE OF THE PERMANENT
0.60' CRUSHED AGGREGATE COURSE
PLANT MIX SURFACE ALL PUBLIC APPROACHES TO R/W.
WITHIN THE PROJECT LIMITS HAVE BEEN DELINEATED AND ARE SHOWN ON THE
0.20' PLANT MIX BITUMINOUS SURF.
PROJECT LIMITS. WETLAND AREAS AND PERMANENT WETLAND IMPACT AREAS
WETLANDS EXIST ADJACENT TO THE ROADWAY AND MAY EXIST BEYOND THE
WETLANDS
ALL PRIVATELY OWNED SIGNS TO BE REMOVED BY OWNER.
MISC. TO BE MOVED OR REMOVED BY OTHERS
FROM EXISTING GROUND LINE.
BEFORE EXCAVATING. ALL CLEARANCES OR DEPTHS PROVIDED FOR UTILITIES ARE
NOTIFICATION SYSTEM FOR THE MARKING AND LOCATION OF ALL LINES AND SERVICE
CALL THE UTILITIES UNDERGROUND LOCATION CENTER (811) OR OTHER
UTILITIES
AND GRUBBING IN THE UNIT PRICE BID FOR UNCLASSIFIED EXCAVATION
CLEAR AND GRUB TO CONSTRUCTION LIMITS. INCLUDE THE COST OF CLEARING
CLEARING AND GRUBBING
PROVIDE THE FOLLOWING SURFACING:
SUBGRADE UNLESS NOTED OTHERWISE IN THE PLANS.
CONSTRUCT APPROACHES TO A 24' FINISHED TOP ON A 34'
02/09/2018
= 0.42 GAL. PER SQ.YARD
SEAL
APPROACHES
= 0.075 GAL. PER SQ.YARD (UNDILUTED)
EMULSIFIED ASPHALT-FOG SEAL(S & C)
EMULSIFIED ASPHALT-TACK (ALL OTHER SURFACES)= 0.05 GAL. PER SQ.YARD (UNDILUTED)
= 4000 LBS. PER CUBIC YARD
COMP. AGGREGATE WEIGHT
(QUANTITIES FOR ESTIMATING PURPOSES ONLY)
BASIS OF PLAN QUANTITIES
NOTES
CSF = 0.99945297
MATERIAL
MATERIAL
MATERIAL
BBP - FIVE MILE ROAD
LEFT
UPN 4199002
RIGHT
SKEW
SKEW
RIGHT
SKEW
LEFT
SKEW
BORING NUMBER
SHEET 3
STPU 56(87)
C ROADWAY
L
(PLAN VIEW)
(DISTRICT SOIL SURVEY)
SOIL SURVEY NUMBER (SS-#)
(GEOTECHNICAL BORING)
SKEW DIAGRAM
(XS & PROFILE VIEW)
WATER ELEV.
AT END OF DRILLING
WATER ELEV.
DURING DRILLING
MATERIAL
BORING / SOIL SURVEY NUMBER
STATION
OFFSET DIRECTION AND DIST.
ELEVATION
- MATERIAL IS LABELED AT THE BOTTOM OF THE LAYER
- A MINUS (-) OFFSET INDICATES A DIRECTION LEFT OF PROJECT CENTERLINE
GEOTECHNICAL BORING / SOIL SURVEY LEGEND
OF THE SOILS CLASSES. SEE SPECIAL PROVISIONS FOR ADDITIONAL INFORMATION.
SOILS INFORMATION ON THE PLAN AND PROFILE SHEETS IS A BRIEF SUMMARY
SOILS INFORMATION
CP
L I
PE
PE
I
CLP
1
3
2
3125
OF TRANSPORTATION
MONTANA DEPARTMENT
$DATE$
$FILEABBREV$
$TIME$
3135
3135
3130
3140
$username$
REVIEWED BY
CHECKED BY
DESIGNED BY
TGC
TLS
NWP
1 N, R 27 E
T
3140
3145
3150
3155
3160
3165
1 N, R 26 E
T
02/09/2018
02/09/2018
02/09/2018
5+00
5+
16
.
55
59
.
FN 31'
D
BE .R/
G. W M
CO O N.
R/
N
S
W
T.
5+
44
50
PM
.8
T.
5'
EX
.
E
A
SE
.
=
R/
BE
W
G.
CO
AC
NS
5+63
Q
U
T
IS
.
I
14"PVC I
N PL.RT.
TI
PM
ON
T.
USE AS I
S
RT
15
.
'
MB
5+
10
FN
.
99
D
.
R/
3.
W
M O 50'
N.
5+50 R/W
ROAD PLANS
ACQUI
SI
TI
ON
LT.
85'
6
2
3
4
1
9
9
YELLOWSTONE COUNTY
18.38'
EX. EASE. = R/W
BEG.
6+50 R/W
R/W 6+50
55'
CONST. PMT
. 15'
6+73
12"CSP I
N PL.LT.
R/W
85'
6+90
USE AS I
S
BEG. CONST.
7+10,129'LT TO 26+73,69'LT
PMT. 50'
NEW 8"PVC I
RR.PI
PELI
NE
PRELIMINARY PIH
FIVE MILE ROAD
AT PROP. LI
NE
BEG. IRR.
EASE. 50'
END CONST.
PMT. 50'
R/W 8+50
8+50 R/W
75'
R/W = R/W
8+64.14
95'
85'
R/W = R/W
C4199
120'
8+83.33
135'
AT R/W LI
NE
AT R/W LI
NE
END I
RR.
EASE. 50'
10+00
A-2
A-6
A-1
ASPHALT
B-10
B-10
10+16.65
9.02 LT.
3152.75
8" PVC PIPELINE
(SEE DETAILS)
BEG. CONN. TO PTW
END CONST.
PMT.
W
STATION 10+45.74
183+50 R
/W
/W
00 R
188+
105'
W
10+45.74
CSF = 0.99945297
100' VC
(UNDER ROADWAY)
+0.500%
BBP - FIVE MILE ROAD
GEOTEXTILE STABILIZATION
DITCH 9
DITCH 8
10+45.74 TO 88+50
-0.500%
EL.3,153.08
11+25.00
EL.3,152.69
0
12+0
R/W
00
R/W 187+
165'
110'
W
= R/
R/W
UPN 4199002
BEG. STPU 56(87)
STATION 14+50.00
.
CONST
BEG.
130'
PMT.
W
13+00 R/
100'
W
R/W = R/
51
13+55.
28'
10.
W M ON.
FND.R/
13+54.
05
49.
67'
FND.R/
W M ON.
PRIVATE APP. RT.
15+00
13+81.12 R/W
100'
R/W 14+00
14+00
BEG. EASE. AT
49.98'
PROP. LI
NE
R/W
R/W 100'
R/W = EX. EASE.
AT EASE. LI
NE
END CONST. PMT.
BEG. CO. RD. EASE. 50'
230'
3125
3130
3145
3150
3155
3160
3165
15+00
SHEET 44
STPU 56(87)
AT R/W
BEG. I
RR. EASE. 50'
15+00,42'RT.
NEW 18"RCP APP.DR.
15+00,69'RT.
NEW 18"RCP APP.I
RR.
1
3
OF TRANSPORTATION
MONTANA DEPARTMENT
$DATE$
$FILEABBREV$
DITCH 8
$TIME$
3130
3130
2
3135
3135
15+00
3140
3140
3145
3150
3155
3160
3165
3170
15
230'
$username$
REVIEWED BY
CHECKED BY
DESIGNED BY
TGC
TLS
NWP
18+41
54"RCP I
N PL.LT.
REM OVE
02/09/2018
02/09/2018
02/09/2018
1 N, R 27 E
T
20+00
1 N, R 26 E
T
20+00
IRR. EASE. 50'
20+18
20
12"CM P I
N PL.LT.
ROAD PLANS
21+00
500' VC
DITCH 9
YELLOWSTONE COUNTY
+0.500%
REM OVE
W
IRR. EASE. 30'
21+50.00
EL.3,157.81
-0.500%
PRELIMINARY PIH
8" PVC PIPELINE
(SEE DETAILS)
26+26,70'RT TO 26+77,84'RT
WETLAND WL3b
NEW 18"RCP I
RR.PI
PELI
NE
26+46
12"PVC I
N PL.RT.
I
NC.12"GATE VALVE
REM OVE
26+50,77'LT TO 26+74,77'LT
NEW 18"PVC I
RR.PI
PELI
NE
26+53
15"CM P I
N PL.LT.
REM OVE
26+65,40'LT.
CONC.I
NLET STR.I
N PL.
REM OVE
25+00
26+65
24"RCP I
N PL.
SEE DETAIL
SHEET 29
REM OVE
FIVE MILE ROAD
26+65,84'RT.
CONC.OUTLET STR.I
N PL.
25
BEG. CONST. PMT.
W/ GEOTEXTILE
BBP - FIVE MILE ROAD
UPN 4199002
ERAL
AT
DOVERL
BANK PROT.
TYPE 3 BANK PROTECTION
26+83, 84' RT.
W/ GEOTEXTILE
10'
30'
BANK PROT.
TYPE 3 BANK PROTECTION
26+80, 63' LT.
CSF = 0.99945297
W/ GEOTEXTILE
26+40
90'
EASE. = EX. EASE.
END IRR. EASE.
6
0
8
4
1
9
9
FARM FIELD APP. RT.
FARM FIELD APP. LT.
26+53
27+40
BEG. CONST. PMT.
AT EASE. LI
NE
END CONST. PMT.
26+74,77'LT.
NEW TURNOUT STRUCTURE
W /18"I
RR.CANAL GATE
26+74,69'LT.
NEW TURNOUT STRUCTURE
W /8"I
RR.DI
STRI
BUTI
ON GATE
26+74,51'LT.
CONC.STR.& HEADGATE I
N PL.
REM OVE
26+80,63'LT.
NEW I
RR.TRANS.STR.
W /TRASHGUARD
26+80
NEW 24"RCP I
RR.SI
PHON
26+80,84'RT.
WETLAND WL3a
(TAPER TO EXISTING)
FARM FIELD APP. LT.
TYPE 3 BANK PROTECTION
26+71,52'LT
CONC.STR.& HEADGATE I
N PL.
REM OVE
26+00
26+53
26+26, 71' RT.
BANK PROT.
REM OVE
+80
V
WV
V
DO VER LATERAL
27+70
END CONST. PMT.
40'
PC 28+13.
28
CO. RD. EASE.
50'
28+50
NEW SI
PHON OUTLET
CO. RD. EASE.
26+84
55'
12"CM P I
N PL.LT.
REM OVE
26+86,69'LT.
R =5,000'
T =153.53'
L =306.96'
E =2.36'
S=NC
SHEET 45
30
3145
3150
3155
3160
3165
3170
30+00
STPU 56(87)
PI =29+66.81
NEW TURNOUT STRUCTURE
W /18"I
RR.CANAL GATE
26+87,69'LT TO 27+00,62'LT
NEW 18"PVC I
RR.PI
PELI
NE
27+40
NEW 18"APP.DR.LT.
CO. RD. EASE.
55'
24
PT 31+20.
$username$
NWP
02/09/2018
ROAD PLANS
40+00
CSF = 0.99945297
70'
41+20
34+00
30
T
UPN 4199002
1 N, R 27 E
BBP - FIVE MILE ROAD
T
1 N, R 26 E
3170
3145
3150
3155
3160
3165
WETLAND WL1e
TYPE "B" FIELD DITCH
3
1
2
30+00
OF TRANSPORTATION
$TIME$
$DATE$
REVIEWED BY
CHECKED BY
TGC
TLS
02/09/2018
02/09/2018
YELLOWSTONE COUNTY
PRELIMINARY PIH
SHEET 46
STPU 56(87)
45+00
3130
35+00
800' VC
CO. RD. EASE.
NEW CO. RD. EASE. =
42+50
3130
A-6
A-1
ASPHALT
W/ GEOTEXTILE
-0.500%
TYPE 3 BANK PROTECTION
(SEE DETAILS)
CONST. PMT. 30'
3135
DESIGNED BY
B-9
36+70.23
57.85 RT.
3150.66
41+23, 76' RT.
TYPE "B" FIELD DITCH
TYPE "B" FIELD DITCH
38+67, 131' RT. TO 39+31, 514' RT
41+20, 74.5' LT. TO 60+18, 54.5' LT
(DOVER RD.)
CO. RD. EASE. 70'
SECTION/ PROPERTY LINE
BANK PROT.
W/ GEOTEXTILE
PUBLIC APP. RT.
43+50
FIVE MILE ROAD
CONST. PMT. 30'
3135
$FILEABBREV$
+0.423%
BEG. CONST.
PMT. 45'
TYPE 3 BANK PROTECTION
35+84.25
(SEE DETAILS)
+0.423%
DITCH 4
MH-1
39+93
39+85
(DOVER RD.)
NEW 84"TYP.3 M ANHOLE
PUBLIC APP. LT.
DOVER ROAD
39+93
100'
(FI
VE MI
LE)
DITCH 5
UNKN. DEPTH
6" N.G. X-ING
40+36
CO. RD. EASE. 50'
3140
MONTANA DEPARTMENT
-0.500%
500' VC
34+50
UNKN. DEPTH
41+20
38+50, 75' LT.
38+50.00
45
3140
3145
3150
3155
3160
CONST. PMT. 20'
AT EX. IRR. EASE.
AT EASE. LI
NE
BEG. IRR. EASE.
UNKN. DEPTH
39+85,CL TO 41+23,76'RT.
F.O. X-ING
PMT. 30'
W/ EROSION CONTROL BLANKET
NEW 18"RCP I
RR.
(FI
VE MI
LE)
+50
3165
24"CM P I
N PL.RT.
UG PWR X-ING
BANK PROT.
REM OVE
37+99.85
39+46
39+62.
67
(DOVER) 80'
34+20
(DOVER)
50'
39+61,1
02'RT.
39+73
39+62.
56
EASE. = EASE.
EASE.
= DROP
EASE.
CONC.
I
NLET
60'
CO. RD. EASE.
15'
CONST. PMT.
25
PC 35+84.
39.
47'RT.
FND.R/
W M ON.
99.
44'RT.
FND.R/
W M ON.
55'
CO. RD. EASE.
15'
CONST. PMT.
TYPE "B" FIELD DITCH
38+50,75'RT.TO 39+85,CL
40
NEW 36"RCP I
RR.
UNKN. DEPTH
15"CM P I
N PL.RT.
35
34+11, 86' LT. TO 38+50, 75' LT
R =5,000'
T =107.82'
L =215.60'
E =1.16'
S=NC
CO. RD. EASE. 65'
REM OVE
LATERAL
PI =36+92.06
NEW 36"RCP I
RR.
38+50
38+80
DOVER
39+09,53.
5 RT.TO 39+85,CL
CO. RD. EASE. 65'
PT 37+99.
85
97.94'
34+20
LE) 158.79' =
MI
40+35
39+91
B-9
EX. EASE.
(DOVER) 65'
(DOVER) 75'
12" RCP STM X-ING
24"CM P I
N PL.RT.
DITCH 7
= EASE.
EASE. = EASE.
EASE. = EASE.
39+62
REM OVE
40+58.21
REM OVE
TYPE "B" FIELD DITCH
39+42.51
141.51' =
37+00
EL.3,155.31
3170
32+00.00
40+28
AT EASE. LI
NE
70.00'
39+13.21
W
(FI
VE MI
LE)
141.07' =
(FI
VE
40+67.49
BEG. CONST.
EASE. = PROP. LI
NE
END CONST. PMT. 20'
W
138.69' =
W
37+20
DI
EL.3,152.56
TP
46+43
USE AS I
S
10"PVC I
N PL.RT.
USE AS I
S
12"CM P I
N PL.RT.
47+86
$username$
DESIGNED BY
NWP
02/09/2018
USE AS I
S
51+09
ROAD PLANS
USE AS I
S
12"STEEL I
N PL.RT.
53+27
12"PVC I
N PL.RT.
48+74
CSF = 0.99945297
BBP - FIVE MILE ROAD
UPN 4199002
NEW CO. RD. EASE. =
NE
ON/ PROPERTY LI
SECTI
3140
3145
3150
3155
3160
3165
3
1
2
45+00
OF TRANSPORTATION
$TIME$
$DATE$
REVIEWED BY
CHECKED BY
TGC
TLS
02/09/2018
02/09/2018
YELLOWSTONE COUNTY
PRELIMINARY PIH
SHEET 47
STPU 56(87)
60+00
3125
55+00
55+82
3125
50+00
10"PVC I
N PL.RT.
+0.500%
24"CM P I
N PL.RT.
3130
-0.500%
1,350' VC
DITCH 4
WETLAND WL1e
USE AS I
S
3130
$FILEABBREV$
47+86
FIVE MILE ROAD
55+92
3135
MONTANA DEPARTMENT
12"CM P I
N PL.RT.
TYPE "B" FIELD DITCH
12"CM P I
N PL.RT.
3135
3140
3145
3150
3155
3160
USE AS I
S
1 N, R 27 E
50+00
T
USE AS I
S
1 N, R 26 E
NEW 24"RCP DR.RT.
50+00.00
T
+00
NEW CO. RD. EASE. =
NE
ON/ PROPERTY LI
SECTI
EL.3,149.56
3165
DITCH 3
DITCH 2
USE AS I
S
NEW I
RR.TRANS.STR.
NEW 18"RCP I
RR.DROP PI
PE
60+75
60+22,54.
5'LT.TO 60+58,54.
5'LT.
B-8
60+04.78
36.92 RT.
3147.81
02/09/2018
CO. RD. EASE. 50'
W/ GEOTEXTILE
$FILEABBREV$
$username$
950' VC
DESIGNED BY
NWP
-0.500%
REM OVE
12"CM P I
N PL.RT.
66+20
ROAD PLANS
(SEE DETAILS)
12"PVC I
N PL.RT.
(SEE DETAILS)
TYPE "B" FIELD DITCH
70+00
IRR. EASE
.
CONST.
PMT. 30'
70+57,40.
7'LT.
10"CM P I
N PL.RT.
71+55
CSF = 0.99945297
FARM FIELD APP. LT.
70+53
72+20.39
BBP - FIVE MILE ROAD
UPN 4199002
(SEE SPECIAL PROVISIONS)
3140
3145
3150
3155
3160
3165
3170
TYPE "B" FIELD DITCH
FLAP GATE
MISCELLANEOUS ITEM - FLAP GATE
73+94, 81' RT.
73+77,145'RT.
REM OVE
NEW 18"RCPA APP.I
RR.
70+56,60'LT.
68+27
CO. RD. EASE. 55'
CONST. PMT. 15'
IRR. EASE.
BEG. CONST.
PMT. 30'
3
1
2
OF TRANSPORTATION
$TIME$
$DATE$
REVIEWED BY
CHECKED BY
TGC
TLS
02/09/2018
02/09/2018
YELLOWSTONE COUNTY
PRELIMINARY PIH
SHEET 48
STPU 56(87)
75+00
3130
60+00
MONTANA DEPARTMENT
65+00
66+50
NE
AT PROP. LI
W/ EROSION CONTROL BLANKET
REM OVE
68+42, 135' RT. TO 80+64, 131' RT
TYP. 3 DIV. BOX
MI-1
NEW TYP.3 DI
V.BOX
3130
A-2
+0.500%
W/ GEOTEXTILE
67+00
66+60
(SEE DETAILS)
TYPE 3 BANK PROTECTION
61+00, 55' LT.
CONST. PMT. 15'
DRAIN DITCH
12"CM P I
N PL.RT.
66+42, 75' RT. TO 81+05, 78' RT
TYPE "B" FIELD DITCH
R =4,000'
T =139.68'
L =279.25'
E =2.44'
S=NC
DRAIN DITCH
F
I
VEMI
L
EROAD
12"PVC I
N PL.RT.
3135
A-6
A-6
NEW 42"RCP DR.
TYPE 3 BANK PROTECTION
61+74,55'LT.
TYPE 3 BANK PROTECTION
NEW I
RR.TRANS.STR.
61+74, 55' LT.
W/ GEOTEXTILE
CO. RD. EASE. 55'
USE AS I
S
TYPE "B" FIELD DITCH
62+76
60+58, 54.5' LT.
W/ GEOTEXTILE
67+89.32
32
PC 67+89.
61+74, 55' LT. TO 66+35, 55' LT
W /TRASHGUARD
70+68.57
CO. RD. EA
SE. 55'
CONST. PM
T. 15'
WETLAND WL1e
NEW 18"RCP APP.DR.
CONST. PMT. 15'
120'
RR. EASE.
BEG. I
CONST. PMT. 30'
61+00,55'LT.TO 61+70,55'LT.
TYPE 3 BANK PROTECTION
1 N, R 27 E
T
PI =69+29.00
1 N, R 26 E
CO.
RD
.
EA
SE. 50'
PROP. LI
NE
= EASE.
IRR. EASE
80'
CONST. PM
T. 30'
70
T
75
3135
3140
3145
3150
3155
3160
3165
3170
NEW 18"RCP I
RR.DROP PI
PE
60+18, 54.5' LT.
W /TRASHGUARD
WETLAND WL1e
12"CM P I
N PL.RT.
120'
PT 70+68.
57
NE
ON/ PROPERTY LI
SECTI
73+65
B-8
REM OVE
73+00
CO. RD. E
ASE. 55'
CONST. PM
T. 15'
10"CM P I
N PL.RT.
NEW CO. RD. EASE. =
REM OVE
DROP PIPE
REM OVE
60
60+18,54.
5'LT.
74+00
CO. RD. EA
SE. 65'
END CONST
. PMT. 15
'
73+94
65
TYPE "B" FIELD DITCH
NEW 30"RCP DR.
BANK PROT.
61+20
+20
73+94,40.
3'RT.
BANK PROT.
62+00
62+00.00
73+90
+94
CONST. PMT. 15'
EL.3,155.56
NEW TYP.3 M ED.I
NLET
DROP PIPE
73+94
UNNAMED
SPRING
NEW 30"RCP DR.RT.
WETLAND WL1e
I
NCL.FLAPGATE RT.
3
1
2
OF TRANSPORTATION
MONTANA DEPARTMENT
-0.500%
REM OVE
$TIME$
$DATE$
$FILEABBREV$
$username$
1,000' VC
C
O
.
REVIEWED BY
C
O
.
TGC
TLS
NWP
79
+
5
0
IRR
.
EA
CO
SE
N
S
.
T.
70
PM
'
T.
30
'
R
D
.
CHECKED BY
79+99,134'RT.
E
A
7
S
7
E
+
.
0
0
6
5
'
DESIGNED BY
80+
50
IRR.
REM OVE
15"CM P I
N PL.RT.
80+08
02/09/2018
02/09/2018
02/09/2018
EAS
E.
70'
CON
ST.
PMT
. 3
0'
80+00
80
END CONST.
PMT. 20'
37'
IRR. EASE.
81+00
WETLAND WL1b
YELLOWSTONE COUNTY
PROP. COR.
WETLAND WL1d
. =
EASE
RD.
NE
LI
CO.
NEW
ERTY
P
O
R
P
ON/
I
SECT
G.
BE
UNKN. DEPTH
150' VC
CI-2
CI-3
64
3.
+6
88
PI
.
EX
W
R/
0
+0
88
'
80
85+00
CSF = 0.99945297
A-4
A-6
BBP - FIVE MILE ROAD
UPN 4199002
W/ GEOTEXTILE
A-6
TYPE 3 BANK PROTECTION
04%
+1.5
87+64, 42' LT.
W/ GEOTEXTILE
NEW 18"RCP I
RR.
TYPE 3 BANK PROTECTION
B-13
86+58.64
76.06 LT.
3160.86
=
W
NE
R/
LI
W
NE
TY
ER
OP
R
P
END STPU 56(87)
STATION 1135+40.63 (OLD HWY 312)
STATION 89+48.24 (FIVE MILE)=
13
B-
88+09,28.
7'LT.
84+57, 51' RT.
.
RD
.
CO
=
.
SE
R.
EA
CO
.
OP
PR
CI-1
D
OA
ER
L
MI
E
V
FI
WETLAND WL2
UNKN. DEPTH
UG TEL. X-ING
UNKN. DEPTH
UG TEL. X-ING
88+86
89+12
UNKN. WIRES
NEW TYP.B CURB I
NLET
OVHD PWR X-ING
88+85
4" N.G. X-ING
PRELIMINARY PIH
%
085
+2.
W/ GEOTEXTILE
TYPE 3 BANK PROTECTION
82+48, 78' RT.
CO. RD. EASE. =
BANK PROT.
ROAD PLANS
C
O
.
RD.
EASE
. 50
'
CO.
RD.
EASE
. =
PROP
. LI
NE
P
R
C
D
77
.
+6
E
0.
A
S
8
6
E
.
8
0
'
79
+0
0
IR
R
.
CO
EA
NS
SE
T.
.
8
PM
0
'
T.
30
'
%
085
+2.
NEW TYP.3 DI
V.BOX
TYP. 3 DIV. BOX
81+30
UNKN. DEPTH
9
9
1
4
3
0
6
'
9
8
1
SHEET 49
STPU 56(87)
9
9
1
D4
3140
3145
3150
3155
3160
3165
3170
3175
3180
90+00
12
Y3
75+00
3140
3145
3150
3155
3160
3165
3170
3175
3180
TYPE "B" FIELD DITCH
END IRR. EASE.
WETLAND WL1e
NEW 30"RCP DR.
85
W
R/
88+92
86+04,35.
7'RT.
PI
=
8
1
+
3
7
.
2
7
LINE
ROP.
AT P
'
. 75
EASE
RD.
CO.
N
IO
IT
IS
QU
AC
91
6.
'
+5
95
88
W
=
R/ /W
R
.
SE
EA
D
EN
.
LT
AC
T
PO
24
48.
89+
E)
MIL
IVE
(F
.
05
.
SE
7.
RT
EA
+3
.
88
N
EX
TIO
=
ISI
W
QU
R/
AC
D
EN
D
EN
.
RT
89+48.23
UG TEL. X-ING
85+49,34.
7'RT.
R =750'
T=
3
7
6
.
4
1
'
L=
6
9
7
.
7
2
'
E =89.16'
S=3%
LINE
P.
PRO
75'
AT
E.
EAS
RD.
CO.
DRAIN DITCH
76+95
77+00.00
RD.
CO.
=
E.
.
EAS
COR
P.
RD.
PRO
CO.
END
E.
EAS
.
COR
P.
PRO
/W
= R
/W
. R
BEG
0
+5
84
.
RD
.
CO
'
D
80
EN
.
'
SE
80
EA
W
R/
58
8.
+5
84
'
PT
80
83+75.00
7
7
+
6
C
0
O
.
IR .
8
6
R
R
.
D
C
.
O
E
N
A
E
S
S
A
T
E
S
.
.
E
.
P
8
M
0
5
T
'
0
.
'
3
0
'
12"PVC I
N PL.
EL.3,148.06
82+74
+74
4
.4
25
'
3+
45
.
W
SE
R/
EA
=
E.
S
EA
EL.3,170.76
88+75
NEW TYP.B CURB I
NLET
U
NEW 18"RCP I
RR.
P
P
EL.3,162.14
P
PP
NEW TYP.B CURB I
NLET
T
NEW 18"RCP I
RR.
W
DH
OL
P
P
1
3
2
1125+00
3145
3150
3155
3160
3165
3170
3175
3180
3185
9
9
1
4
4
0
6
P
$TIME$
$DATE$
$FILEABBREV$
B
OF TRANSPORTATION
MONTANA DEPARTMENT
R/
W 1125+60
59.
97'
CALC R/
W M ON
T
B
$username$
I
D
REVIEWED BY
59.
97'
CALC R/
W M ON
TGC
TLS
NWP
I
CHECKED BY
DESIGNED BY
R/
W 1127+80.
05
PP
TT
D
U
1131+22
24"RCP I
N PL.
REM OVE
1130+86,83'LT TO
1131+57,80'RT
NEW 24"RCP I
RR
02/09/2018
02/09/2018
1130+00
02/09/2018
1131+57,80'RT
NEW 72"TYP.3 M ANHOLE
1129+70
R/W
59.96'
1131+57,80'RT TO
EX. EASE. = R/W
1131+64,96'RT
BEG. ACQUI
SI
TI
ON LT.
NEW 24"RCP I
RR
1130+25.00
1130
1131+57,80'RT TO
1133+50,80'RT
EL.3,173.30
NEW 24"RCP I
RR
W/ GEOTEXTILE
(UNDER ROADWAY)
ROAD PLANS
TYPE 3 BANK PROTECTION
YELLOWSTONE COUNTY
1134+17, 177.5' LT.
GEOTEXTILE STABILIZATION
R/W
90'
WETLAND WL1b
1130+25 TO 1143+50
R/W 1130+60
1130+70
59.97'
EX. EASE. = R/W
BEG. ACQUI
SI
TI
ON RT.
1133+22,25.
0'RT.
NEW TYP.B CURB I
NLET
R/W 1131+50
WETLAND WL1a
+22
NEW 18"RCP I
RR.
99.95'
1133+31
12"CM P I
N PL.LT.
1133+68.
99 R/
W
59.
97'
FND R/
W M ON
MH-2
USE AS I
S
R/
W 1131+70.
24
1132+75
59.
97'
CALC R/
W M ON
BEG. CONST.
R/W
90'
PRELIMINARY PIH
WETLAND WL1c
CI-5
CONST. PMT.
15'
1133+69.
94 R/
W
99.
94'
CALC R/
W M ON
PMT. AT
CI-4
NEW 48"TYP.3 M ANHOLE
MH-3
1133+50,80'RT TO
1136+37,175'LT
NEW 24"RCP I
RR
EASE.
CI-6
88+00
6034199
189'
1134+50
R/W
170'
1134+61,48.
3'RT.
CI-7
1135+00
SHALE
A-6
A-6
A-2
ASPHALT
B-34
1134+55.17
6.02 LT.
3171.20
B-34
EASE. = R/W
EASE. 45'
3+25.44
1133+83,43.
9'LT.
NEW TYP.B CURB I
NLET
NEW 18"RCP I
RR.
1134+17,177.
5'LT.
NEW I
RR.TRANS.STR.
STATION 89+48.24 (FIVE MILE)
R/W = EX. EASE.
1134+10.05
END CONST.
1133+50,80'RT
'
R/W 80
STATION 1135+40.63 (OLD HWY 312)=
PMT. 15'
R/
W 1133+65.
57
1133+50
59.
97'
FND R/
W M ON
R/
W 1133+65.
15
99.
95'
CALC R/
W M ON
END ACQUI
SI
TI
ON
RT.
91
88+56.
'
R/W 95
R/W =
SE.
EX. EA
END
.
ON LT
TI
SI
ACQUI
NEW TYP.B CURB I
NLET
NEW 18"RCP I
RR.
2+97.47
EASE. 55'
PMT. 15'
AT EASE.
2+45.21
CSF = 0.99945297
W/ GEOTEXTILE
EASE. = R/W
1136+25
NEW TYP.B CURB I
NLET
NE
PROPERTY LI
NEW 18"RCP I
RR.
BEG. I
RR.
BBP - FIVE MILE ROAD
-0.492%
W/ GEOTEXTILE
TYPE 3 BANK PROTECTION
PMT. 15'
CI-10
1136+81, 43' RT.
EASE. 15'
END CONST.
1136+27
18"CM P I
N PL.LT.
USE AS I
S
1136+54,57.
6'LT.
NEW TYP.B CURB I
NLET
NEW 18"RCP I
RR.
1136+71
18"CM P I
N PL.LT.
REM OVE
DITCH 1
TYPE 3 BANK PROTECTION
EASE. 60'
CI-9
1135+79, 177.5' LT.
UNKN. CLEARANCE
OVHD PWR X-ING, UNKN. WIRES
(TAPER TO EXSTING)
1135+64.25
BEG. CONST.
1135+27
NEW 18"APP.DR.LT.
1135+79,177.
5'LT.
NEW I
RR.TRANS.STR.
W /TRASHGUARD
1135+81,91.
8'LT.
NEW R/W =
1137+28
PRIVATE APP. LT.
1135+33
CI-8
1134+78,87.
9'LT.
NEW TYP.B CURB I
NLET
NEW 18"RCP I
RR.
D
RO A
R/W =
PROP. LI
NE
170'
D4199
AT PROP.
LI
NE
END I
RR.
EASE. 15'
OLD HWY 312
UPN 4199002
1136+93,84'LT.
P
P
CONC.I
NLET STR.I
N PL.
88+37.05 (FIVE MILE)
R/W = EX. EASE.
RT.
ON
TI
SI
END ACQUI
PP
+50
LE
I
VE M
FI
P
T
REM OVE
1136+95
18"CM P I
N PL.
REM OVE
R/W =
PROP. LI
NE
125'
1137+71.
99 R/
W
99.
94'
PCF
CI-11
1136+96,79'RT.
CONC.OUTLET STR.I
N PL.
1138+50
R/W
UNKN. DEPTH
N.G. GAS X-ING
125'
1139+97
REM OVE
1137+73,49.
4'LT.
NEW TYP.B CURB I
NLET
NEW 18"RCP I
RR.
1138+97,58.
0'LT.
NEW TYP.B CURB I
NLET
1139+50
NEW 18"RCP I
RR.
R/W
3145
3150
3155
3160
3165
3170
3175
3180
3185
1140+00
SHEET 50
STPU 56(87)
99.94'
R/W = EX. EASE.
END ACQUI
SI
TI
ON LT.
1140
R/W = EX. EASE.
99.94'
1140+48,34.
1'LT.
1140
18"CM P I
N PL.
1142+99
1142+50
1144+88.
14 R/
W
60.
03'
FND R/
W M ON
59.
97'
PCF
1144+86.
01 R/
W
NEW 24"RCP I
RR.
R/
W 1144+33.
81
1144+05
ROAD PLANS
U
PRELIMINARY PIH
9
9
1
4
1
0
6
CSF = 0.99945297
BBP - FIVE MILE ROAD
UPN 4199002
STPU 56(87)
3160
3165
3170
3175
3180
3185
1
2
3
OF TRANSPORTATION
$TIME$
$DATE$
CHECKED BY
REVIEWED BY
TGC
TLS
02/09/2018
02/09/2018
02/09/2018
YELLOWSTONE COUNTY
SHEET 51
3145
1140+00
$username$
59.
97'
FND R/
W M ON
1145+00
POT 1145+27.
08
3145
99.
95'
FND R/
W M ON
3150
DESIGNED BY
DITCH 10
1145+27.
5 R/
W
3150
NWP
(TAPER TO EXSTING)
P
3155
$FILEABBREV$
MAILBOX TURNOUT RT.
1141+36 TO 1143+13
MONTANA DEPARTMENT
1142+73.
43 R/
W
(TAPER TO EXSTING)
MAILBOX TURNOUT LT.
REM OVE
PRIVATE APP. LT.
PRIVATE APP. RT.
1141+12 TO 1143+14
99.
94'
PCF
NEW 24"RCP DR.
1142+95
W/ GEOTEXTILE
2
E
1142+13
R
7
P
3155
3160
3165
3170
3175
NEW TYP.B CURB I
NLET
TYPE 3 BANK PROTECTION
T
,
2
E
+50
END ACQUI
SI
TI
ON LT.
3180
NEW 18"RCP I
RR.
1140+62, 51' LT.
1
N
PRIVATE APP. LT.
N
MB
1141+96
T
1
1
MB
,
R
R
6
6
E
3185
CI-12
T
1141+96
,
NEW 18"RCP APP.DR.LT.
UNKN. DEPTH
1144+05
UG TEL. X-ING
24"RCP I
N PL.
1143+05
REM OVE
N
2
EL.3,166.29
2
R/
W 1144+73.
79
T
,
E
MB
N
6
MB
R
99.
95'
FND R/
W M ON
2
+05
T
1144+50.00
T
1
3125
3125
3
3130
3130
2
3135
3135
30+00
3140
3140
3145
3150
3155
3160
3165
POB 30+00.
00
30
30+50
OF TRANSPORTATION
MONTANA DEPARTMENT
EASE. = EX. EASE.
BEG. ACQUI
SI
TI
ON . RT.
30+50
EX. EASE. = EASE.
BEG. ACQUI
SI
TI
ON
31+50
LT.
31+50
$TIME$
CO. RD. EASE. 65'
$username$
FARM FIELD APP. LT.
32+10
REVIEWED BY
CHECKED BY
DESIGNED BY
DITCH 5
TGC
TLS
NWP
DOVER ROAD
34+00.00
EL.3,153.07
02/09/2018
02/09/2018
02/09/2018
35+00
+0.454%
35+61.27
EL.3,154.22
NEW CO. R
ROAD PLANS
ON/ P
SECTI
TP
N,
1
T
PI 36+31.
27
W
W
W
DI
-1.00
9%
N,
1
T
FI
VE M I
LE ROAD
DITCH 4
100'
DOVER LATERAL
PRELIMINARY PIH
RR. EASE.
BEG. I
97.94'
38+80
EX. EASE.
= EASE.
(FIVE MILE)
39+42.51
37+00
138.69' =
EASE. = EASE.
(DOVER) 50'
WETLAND WL1e
YELLOWSTONE COUNTY
%
000
+2.
-2.
000
%
DITCH 7
35+34.27
EL.3,153.68
35+88.27
EL.3,153.68
37+25.00
EL.3,152.30
RR. EASE.
AT EX. I
99.44' RT.
FND. R/W MON.
39+62.56
40+67.49 (FIVE
MILE) 158.79' =
EASE. = EASE.
37+20 (DOVER) 75'
41+20
$DATE$
$FILEABBREV$
CO. RD. EASE.
80'
6074199
37+99.85
CONST. PMT. 20'
CO. RD. EASE. 65'
38+50
CO. RD. EASE. 65'
AT EASE. LINE
END CONST. PMT. 20'
141.51' =
39+13.21 (FIVE MILE)
EASE. = EASE.
34+20 (DOVER) 80'
39.47' RT.
FND. R/W MON.
39+62.67
40+58.21
(FIVE MILE)
34+20
141.07' =
(DOVER) 65'
EASE. = EASE.
AT EASE. LINE
PMT. 30'
BEG. CONST.
EASE. = PROP. LINE
70.00'
39+75
CO. RD. EASE.
50'
39+75
RR. EASE.
I
CO. RD. EASE.
40+00
50'
75'
40
40+75
40+79.14
EASE. = EX. EASE.
EASE. = EX. EASE.
RR. EASE. =
I
29.98'
CSF = 0.99945297
RR. EASE.
EX. I
END ACQUI
SI
TI
ON
LT.
END ACQUI
SI
TI
ON RT.
BBP - FIVE MILE ROAD
6064199
UPN 4199002
DI
00
POE 44+00.
SHEET 52
STPU 56(87)
3145
3150
3155
3160
3165