Montana Department of Transportation is requesting Department of the Army authorization for impacts to waters of the United States in order to reconstruct Five Mile Road from its intersection with Mary Street to Dover Road and to construct a new segment of Five Mile Road from Dover Road to Old Highway 312. The project as proposed would result in permanent impacts to 182.2 linear feet of an unnamed spring located in a man-made outflow channel, 3,507 linear feet of jurisdictional irrigation canals/ditches, and 0.59 acre of wetlands from the placement of fill, culverts, and irrigation structures. Temporary impacts will occur to 2,818 linear feet of irrigation canals/ditches and 0.67 acre of adjacent wetlands that will be reconstructed in a new location.

Montana Department of Transportation is requesting Department of the Army authorization for impacts to waters of the United States in order to reconstruct Five Mile Road from its intersection with Mary Street to Dover Road and to construct a new segment of Five Mile Road from Dover Road to Old Highway 312. The project as proposed would result in permanent impacts to 182.2 linear feet of an unnamed spring located in a man-made outflow channel, 3,507 linear feet of jurisdictional irrigation canals/ditches, and 0.59 acre of wetlands from the placement of fill, culverts, and irrigation structures. Temporary impacts will occur to 2,818 linear feet of irrigation canals/ditches and 0.67 acre of adjacent wetlands that will be reconstructed in a new location.

PUBLIC NOTICE

Omaha District

Application No: NWO-2006-90399-MTB Project: Billings Bypass ­ BBP Five Mile Road Applicant: Montana Department of Transportation Waterway: Multiple Irrigation Ditches and Wetlands Issue Date: September 24, 2018 Expiration Date: October 24, 2018 30 DAY NOTICE Post Office Box 7032, Billings, Montana 59103

JOINT PUBLIC NOTICE FOR PERMIT APPLICATION SUBMITTED TO U.S. ARMY CORPS OF ENGINEERS AND MONTANA DEPARTMENT OF ENVIRONMENTAL QUALITY SUBJECT: The U.S. Army Corps of Engineers, Omaha District, (Corps) is evaluating a permit application from the Montana Department of Transportation to reconstruct Five Mile Road from its intersection with Mary Street to Dover Road and to construct a new segment of Five Mile Road from Dover Road to Old Highway 312. The project as proposed would result in permanent impacts to 182.2 linear feet of an unnamed spring located in a man-made outflow channel, 3,507 linear feet of jurisdictional irrigation canals/ditches, and 0.59 acre of wetlands from the placement of fill, culverts, and irrigation structures. Temporary impacts will occur to 2,818 linear feet of irrigation canals/ditches and 0.67 acre of adjacent wetlands that will be reconstructed in a new location. This notice is to inform interested parties of the proposed activity and to solicit comments. This notice may also be viewed at the Corps web site at: http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Montana/PublicNotices.aspx AUTHORITY: This application is being evaluated under Section 404 of the Clean Water Act for the discharge of dredged or fill material in waters of the United States. APPLICANT: Tommy Griffeth Montana Department of Transportation PO Box 201001 Helena, Montana 59620-1001 LOCATION: The Five Mile Road segment of the Billings Bypass is located northeast of the Heights area of the City of Billings, within Yellowstone County, Montana. The project is located within Sections (S) 1 and 2 of Township (T) 1 North, Range (R) 26 East; S6 and S7, T1N, R27E; and S26, T2N, R26E. The midpoint of the project is approximately Latitude 45.856618, Longitude -108.424883. Approximately 8,566 linear feet of irrigation ditches and 2.78 acres of emergent wetlands are located within the project area of this phase. PROJECT DESCRIPTION: Proposed impacts include installing new culverts and irrigation headworks, extending existing culverts, bank protection, realigning/reconstructing irrigation ditches and drains, piping ditches, and placement of road fill for reconstructing the existing Five

U.S. ARMY CORPS OF ENGINEERS ­ OMAHA DISTRICT http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Montana.aspx

CENWO-OD-RMT

Page 2

Action ID: NWO-2006-90399-MTB

Mile roadway, constructing a new segment of Five Mile Road from Dover Road to Old Highway 312, and constructing a roundabout at the Five Mile Road and Old Highway 312 intersection. The applicant's preferred alternative would result in impacts to 1.26 acres of wetlands as part of the proposed Five Mile Road project. However, approximately 0.67 acres of these wetland impacts are associated with proposed impacts to an irrigation drain that will be relocated as part of the project. The purpose of the Billings Bypass project is to improve access and connectivity between Interstate 90 (I-90) and Old Highway 312 to improve mobility in the eastern area of Billings. Improvements to Five Mile Road are needed to accommodate increased traffic volumes that would be generated due to the bypass and to meet project objectives for operations, safety, and mobility. The attached drawings provide additional project details. BACKGROUND: The proposed project is the first of six separate construction projects to be implemented under Phase I of the Billings Bypass Project. A Final Environmental Impact Statement and Record of Decision (FEIS/ROD) were prepared for this project in 2014. As described in the FEIS, the lead agencies, the Federal Highway Administration (FHWA) and the MDT, identified the four-lane Mary Street Option 2 Alternative as the Preferred Alternative. The Preferred Alternative has been separated into two phases, which are referred to throughout the FEIS as Phase 1 (an initial two-lane road) and the Full Buildout (a final four-lane road). Public comments were previously solicited at three public meetings prior to the release of the Draft EIS in 2006, 2007, and 2010, and a public hearing was held in September 2012 after the DEIS was released. Additional public meetings were held in 2014 and 2017. The FEIS can be accessed at: https://www.mdt.mt.gov/pubinvolve/billingsbypass/ ALTERNATIVES: The FEIS/ROD analyzed three build alternatives and the No Build Alternative. The preferred alignment (Mary Street Option 2 Alternative) was chosen because it would meet the purpose and need of the project while minimizing impacts to development and natural resources, such as existing wetlands. As part of the EIS/ROD process a 404(b)(1) analysis was also performed and included as Appendix F in the FEIS. MITIGATION: Avoidance, Minimization and Compensatory Mitigation: The project design team has made all practicable efforts to avoid and minimize impacts to wetlands, streams and irrigation facilities. Preliminary wetland delineations and evaluations were completed along all alignments. Those areas with wetland impacts were adjusted to avoid as many impacts as possible. However, complete avoidance was not possible due to the linear nature of the project and the orientation of the wetlands, streams, and irrigation facilities in relation to the new roadway alignment. Contractors will be expected to follow Best Management Practices (BMPs) for control of erosion and sediment transport, to re-establish permanent vegetation in disturbed areas within MDT right-of-way or easements to reduce the spread and establishment of noxious weeds, and will be required to operate in compliance with applicable federal, state, and local permits and standards. To compensate for unavoidable impacts, the applicant proposes the following mitigation measures: Wetland Mitigation: Approximately 1.26 acres of wetlands would be impacted as part of the proposed Five Mile Road project. However, approximately 0.67 acres of these wetland impacts are associated with proposed impacts to an irrigation drain that will be relocated as part of the project. Because the relocated drain will be designed with similar ditch hydrology, length, and width as the existing drain that supports these wetlands, it is predicted that wetland vegetation

U.S. ARMY CORPS OF ENGINEERS ­ OMAHA DISTRICT http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Montana.aspx

CENWO-OD-RMT

Page 3

Action ID: NWO-2006-90399-MTB

will re-establish along the newly constructed channel at a similar size and quality. The remaining wetland impacts (0.59 acre) will be mitigated through credits from purchases at the Upper Yellowstone 4-Acre, 2017, wetland bank, located in Carbon County within the Middle Yellowstone River Basin Watershed (Watershed #14). Because the mitigation reserve is located within the same watershed as the impacted wetlands, a replacement ratio of 1:1 will be used. Compensatory stream mitigation is not anticipated as the unnamed spring's man-made outflow channel is not a natural stream and permanent impacts to the unnamed spring total 182.2 linear feet (below the 300 feet threshold). OTHER GOVERNMENTAL AUTHORIZATIONS: The Montana Department of Environmental Quality, 1520 East 6th Avenue, Post Office Box 200901, Helena, Montana 59620-0901 will review the proposed project with the intent to certify in accordance with the provisions of Section 401 of the Clean Water Act. The certification, if issued, will express the State's opinion that the operations undertaken by the applicant will not result in a violation of applicable water quality standards. The Montana Department of Environmental Quality hereby incorporates this public notice as its own public notice and procedures by reference thereto. HISTORIC PROPERTIES: Historic properties eligible for or included on the National Register of Historic Places (NRHP) are protected under Section 106 of the Historic Preservation Act and Section 4(f) of the 1966 Department of Transportation Act. Tribal cultural resources are protected through the Native American Graves Protection and Repatriation Act and the Archaeological Resources Protection Act. The Federal Highway Administration (FHWA) is the lead Federal Agency for the proposed project and is responsible for ensuring compliance with these regulations. FHWA completed a cultural resource survey as part of the FEIS and found three historic properties in the project area that are eligible for listing on the NRHP: the Billings Bench Water Association Canal (24YL0161), the Northern Pacific Railway (24YL0277), and the abandoned Billings Central and Montana Railroad (24YL1592). They made a No Adverse Effect determination at that time and received concurrence from the SHPO in December 2011. The findings are documented in the FEIS Appendix D. We will evaluate input by the State Historic Preservation Office (SHPO), Tribes and the public in response to this public notice and we may conduct or require a survey of the permit area to check for unknown historic or prehistoric properties, if warranted. ENDANGERED SPECIES: In compliance with the Endangered Species Act, a preliminary determination has been made by FHWA that the described work will not affect species designated as threatened or endangered, or adversely affect critical habitat. Federally listed species reasonably expected to occur within this area of Yellowstone County include the endangered whooping crane (Grus americana) and the threatened Red Knot (Calidris canutus rufa). There are no federal, state, or local designated wildlife or waterfowl sanctuaries or refuges in the project area. There would no impacts to these types of sites. In order to complete our evaluation of this activity, comments are solicited from the U.S. Fish and Wildlife Service and other interested agencies and individuals. The above determinations are based on information provided by the applicant and our preliminary review. EVALUATION FACTORS: The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts, of the described activity on the

U.S. ARMY CORPS OF ENGINEERS ­ OMAHA DISTRICT http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Montana.aspx

CENWO-OD-RMT

Page 4

Action ID: NWO-2006-90399-MTB

public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the described activity will be considered, including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people. The activity's impact on the public interest will include application of the Section 404(b)(1) guidelines promulgated by the Administrator, Environmental Protection Agency (40 CFR Part 230). COMMENTS: The Corps of Engineers is soliciting comments from the public; federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. All public notice comments will be considered public information and will be subject to review by the applicant. The Corps is particularly interested in receiving comments related to the proposal's probable impacts on the affected aquatic environment and the secondary and cumulative effects. Any person may request, in writing and within the comment period specified in this notice, that a public hearing be held for the purpose of gathering additional information. Requests for public hearings must be identified as such and shall state specifically the reasons for holding a public hearing and what additional information would be obtained. The request must be submitted to the U.S. Army Corps of Engineers, at Post Office Box 7032, Billings, Montana 59103. If it is decided that additional information is required and that a public hearing should be held, interested parties will be notified of the date, time and location. Any interested party (particularly officials of any town, city, county, state, or Federal agency; Indian tribe; or local association whose interests may be affected by the work) is invited to submit to this office written facts, arguments, or objections on or before the expiration date listed on the front of this notice. Any agency or individual having an objection to the work should specifically identify it as an objection with clear and specific reasons. Comments, both favorable and unfavorable, will be accepted, made a part of the record and will receive full consideration in subsequent actions on this application. All replies to the public notice should be addressed to Sage Joyce at P.O. Box 7032, Billings, Montana 59103, by email at Sage.L.Joyce@usace.army.mil. Please refer to identification number NWO-2006-90399-MTB in any correspondence concerning this project. Comments postmarked after the expiration date of this public notice, or received by fax or e-mail after the expiration date, will not be considered. Comments left on our voicemail system will not be considered. Attachments: 1 map and 11 plan sheets

U.S. ARMY CORPS OF ENGINEERS ­ OMAHA DISTRICT http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Montana.aspx

BBP Five Mile Road NCPD-MT 56(55) CN 4199002

Five Mile Road Aquatic Resources Finding Report MDT Activity 148 July 17, 2018

Figure 4. Delineated Wetlands within Five Mile Road Project Corridor

11

2

OF TRANSPORTATION

MONTANA DEPARTMENT

NCPD-MT 56(55)

NCPD-MT (55)

N U M B E R S

$TIME$

$DATE$

$FILEABBREV$

POWDER RIVER

CUSTER

CARTER

FALLON

$username$

CHECKED BY

REVIEWED BY

DESIGNED BY

TGC

TLS

NWP

CONN. TO EX. HIGHWAY

END STPU 56(87)

STA STA 89+48.24

THIS PROJECT

BIG HORN

ROSEBUD

P R A IR IE

DAWSON

02/09/2018

02/09/2018

02/09/2018

BEG. CONN. TO PTW

STA 10+45.74

BEG. STPU 56(87)

STA 14+50.00 7 2

14

11

U-1012

E 343 B

UPN 4199002

ROAD PLANS

LAUREL

TO

90 I-

B

7

8 8 7 6 5 X

E

HEIGHTS

5 3 7

B 734 E

736

2

737

1027

6 N-1

U-

ELMO

LAKE

15

Fi v e mi l e

10

B 723

87

TO ROUNDUP

R. 26 E.

12

731

732

13

9 72

U-

36

BASE

1028

E N O T S W O LL YE

B

C r e e k

B 728

2.0

1

7

2.7

Se v e n mi l e Creek

C

B

344

X5 69 1 6

E

19

B

MILES

R. 27 E.

1.4

NEW ALIGNMENT

X 8 10 16

3 5 2 B

B 349 E

E

32

T. 1 S.

T. 1 N.

5 34

B 357 E

I 9 0

LOCKWOOD

E 346

Hirsch Spur

20

17

HYSHAM

TO

SURFACING SOURCES CONTRACTOR FURNISHED

2039

LETTING DESIGN

4,490 440

A.D.T. = D.H.V. =

V. =

GROWTH RATE =

12.0%

181

MONTANA

DOWL

S

N T A

S

IC

E

D

ENS G N IO NAL E

L

12269 PE

CORMIER

TODD G.

O

ER DATE

DIVISION ADMINISTRATOR

:

DATE

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

CONSULTANT DESIGN ENGINEER

APPROVED

BY

RECEIVED :

DEPARTMENT OF TRANSPORTATION

DATE

BY

CSF = 0.99945297

N

45 MPH

10.0%

1,750-2,750

A.D.T. =

TRUCKS =

110

A.D.T. =

18 KIP ESAL'S =

2016 2019

PRESENT

LETTING DATE - __________________________

PRELIMINARY FOR PLAN IN HAND REVIEW ONLY

B 413 E

B 346

30

18

6

TO HUNTLEY

8 8 7 6 5 X

LENGTH

YELLOWSTONE COUNTY

BBP - FIVE MILE ROAD

GRADE, GRAVEL & PLANT MIX SURFACE

FEDERAL AID PROJECT STPU 56(87)

B 333

1

P. E.

R / W & I.C.

A G R E E M E N T

P R O J E C T

P R O J E C T S

CARBON

E N O T S W O L L E Y

MUSSELSHELL

GARFIELD

MC CONE

B

A S S O C I A T E D

R E L A T E D

BY

PARK

WHEATLAND

JUDITH BASIN

MEAGHER

CASCADE

FERGUS

PHILLIPS

ry D

3

PREPARED

BEAVERHEAD

J E F F E R R R E E GE S V E O D OD N IL W L S O B

222 N. 32nd STREET, SUITE 700 BILLINGS, MONTANA 59101 (406) 656-6399

P LA N S

LL POWE

GRANITE

CLARK

AND

LEWIS

TETON

BROADWATER

MISSOULA

RAVA LLI

LI BERTY

GALLATIN

LAKE

SWEET GRASS

P E T R O L E U M

SANDERS

GOLDEN VALLEY

ST IL LW AT ER

RICHLAND

THI S CONTRACT

BLAINE

BI LLI NGS

CHOUTEAU

T. 1 N.

PONDERA

E 411 B

ROOSEVELT

E 730 B

WI BA UX

R. P.__. _ TO R. P.__. _

MONTANA DEPARTMENT OF TRANSPORTATION

U-1027

HILL

E 729

FLATHEAD

RI VE R

SHERIDAN

Co ul so n

DANIELS

3 73

N-16

Di tch

VALLEY

12

TOOLE

B

GLACIER

E

R. 26 E.

I94 B

728 C

U-1032

E 11

T. 1 N.

LINCOLN

TO

N O IS D A M

HARDI N

E R U S A E R T

F

R. 27 E.

P RO

E 916 B

M

L A R E IN M

N-16

IN E

A

1E 43

E 337

3

1

2

= 4167 LBS. PER CUBIC YARD

= 5.4% OF PL.MIX BIT.SURF.

= 1.4% OF PL.MIX BIT.SURF.

= 8.5 LBS. PER GAL.

COMP. WEIGHT OF PL. MIX BIT. SURF.

ASPHALT CEMENT - GRADE S - 3/4" AGG.

HYDRATED LIME

BITUMINOUS MATERIAL

= 25 LBS. PER SQ.YARD

= 0.05 GAL. PER SQ.YARD (UNDILUTED)

COVER

FOG SEAL

= 124

= 4.4

= 594

CRUSHED AGGREGATE COURSE

ASPHALT CEMENT

AGG. TREATMENT

= 77.0 tons

= 132.0 cubic yards

= 4.15 tons

PLANT MIX BITUMINOUS SURF.

CRUSHED AGGREGATE COURSE

ASPHALT CEMENT

= 26.5 tons

= 53.5 cubic yards

= 1.43 tons

PLANT MIX BITUMINOUS SURF.

CRUSHED AGGREGATE COURSE

ASPHALT CEMENT

= 30

AGG. TREATMENT

OF TRANSPORTATION

$TIME$

$DATE$

$username$

= 0.75 tons

ASPHALT CEMENT

$FILEABBREV$

= 18.0 cubic yards

CRUSHED AGGREGATE COURSE

MONTANA DEPARTMENT

= 13.5 tons

PLANT MIX BITUMINOUS SURF.

CHECKED BY

REVIEWED BY

DESIGNED BY

TGC

TLS

NWP

sq. yards

= 189.1 linear feet

AVERAGE LENGTH

QUANTITIES FOR ONE MAILBOX TURNOUT (FOR ESTIMATING PURPOSES ONLY):

MAINLINE linear feet CRUSHED AGGREGATE COURSE

MAINLINE linear feet PLANT MIX BITUMINOUS SURF.

PROVIDE THE FOLLOWING SURFACING:

OR AS STAKED BY THE ENGINEER.

CONSTRUCT MAILBOX TURNOUTS AT LOCATIONS SHOWN IN THE PLANS

MAILBOXES & MAILBOX TURNOUTS

= 57.7 linear feet

AVERAGE LENGTH

QUANTITIES FOR ONE FARM FIELD APPROACH:

WIDE PLANT MIX STRIP ADJACENT AND PARALLEL TO THE ROADWAY.

GRAVEL SURFACE ALL FARM FIELD APPROACHES TO R/W WITH A 12'

= 182.7 linear feet

sq. yards

tons

AVERAGE LENGTH

QUANTITIES FOR ONE PRIVATE APPROACH:

PLANT MIX SURFACE ALL PRIVATE APPROACHES TO R/W.

= 81.0 tons

PLANT MIX BITUMINOUS SURF.

cubic yards

= 135.5 linear feet

AVERAGE LENGTH

QUANTITIES FOR ONE PUBLIC APPROACH:

02/09/2018

02/09/2018

81+72 88+98 84+36

41+33 82+34 82+71

WL1e WL1b

AREA

0.02

2.78 1.26

0.14

0.14

0.14

0.02

0.03

0.09

0.76

0.001

0.08

(PERM.)

0.77

0.03

0.37

1.36 *

0.01 *

0.08

AREA

IMPACTED

WETLAND AREA (ACRES)

DELINEATED

YELLOWSTONE COUNTY

REMARKS

PRELIMINARY PIH

* AREA OF EXISTING WETLAND EXTENDS BEYOND PLAN LIMITS

TOTAL

84+79

1133+97

1132+60

WL1c 83+66

1132+85

1128+61

WL1a

WL1d

26+90

26+75

26+38

TO

19+63

STATION

WL3a

FROM

PERMANENT WATERWAY IMPACTED AREAS

DELINEATED WATERWAY AREAS

WETLAND DELINEATION TABLE

PERMANENT WETLAND IMPACTED AREAS

WL3b

ROAD PLANS

WL2

WL1

WL3

DESIGNATION

WETLAND

IMPACT AREAS SHOWN IS THE RESPONSIBILITY OF THE CONTRACTOR.

DELINEATED WETLAND AREAS

PLANS. ANY ACTION IMPACTING WETLAND AREAS OUTSIDE OF THE PERMANENT

0.60' CRUSHED AGGREGATE COURSE

PLANT MIX SURFACE ALL PUBLIC APPROACHES TO R/W.

WITHIN THE PROJECT LIMITS HAVE BEEN DELINEATED AND ARE SHOWN ON THE

0.20' PLANT MIX BITUMINOUS SURF.

PROJECT LIMITS. WETLAND AREAS AND PERMANENT WETLAND IMPACT AREAS

WETLANDS EXIST ADJACENT TO THE ROADWAY AND MAY EXIST BEYOND THE

WETLANDS

ALL PRIVATELY OWNED SIGNS TO BE REMOVED BY OWNER.

MISC. TO BE MOVED OR REMOVED BY OTHERS

FROM EXISTING GROUND LINE.

BEFORE EXCAVATING. ALL CLEARANCES OR DEPTHS PROVIDED FOR UTILITIES ARE

NOTIFICATION SYSTEM FOR THE MARKING AND LOCATION OF ALL LINES AND SERVICE

CALL THE UTILITIES UNDERGROUND LOCATION CENTER (811) OR OTHER

UTILITIES

AND GRUBBING IN THE UNIT PRICE BID FOR UNCLASSIFIED EXCAVATION

CLEAR AND GRUB TO CONSTRUCTION LIMITS. INCLUDE THE COST OF CLEARING

CLEARING AND GRUBBING

PROVIDE THE FOLLOWING SURFACING:

SUBGRADE UNLESS NOTED OTHERWISE IN THE PLANS.

CONSTRUCT APPROACHES TO A 24' FINISHED TOP ON A 34'

02/09/2018

= 0.42 GAL. PER SQ.YARD

SEAL

APPROACHES

= 0.075 GAL. PER SQ.YARD (UNDILUTED)

EMULSIFIED ASPHALT-FOG SEAL(S & C)

EMULSIFIED ASPHALT-TACK (ALL OTHER SURFACES)= 0.05 GAL. PER SQ.YARD (UNDILUTED)

= 4000 LBS. PER CUBIC YARD

COMP. AGGREGATE WEIGHT

(QUANTITIES FOR ESTIMATING PURPOSES ONLY)

BASIS OF PLAN QUANTITIES

NOTES

CSF = 0.99945297

MATERIAL

MATERIAL

MATERIAL

BBP - FIVE MILE ROAD

LEFT

UPN 4199002

RIGHT

SKEW

SKEW RIGHT

SKEW

LEFT

SKEW

BORING NUMBER

SHEET 3

STPU 56(87)

C ROADWAY L

(PLAN VIEW)

(DISTRICT SOIL SURVEY)

SOIL SURVEY NUMBER (SS-#)

(GEOTECHNICAL BORING)

SKEW DIAGRAM

(XS & PROFILE VIEW)

WATER ELEV. AT END OF DRILLING

WATER ELEV. DURING DRILLING

MATERIAL

BORING / SOIL SURVEY NUMBER STATION OFFSET DIRECTION AND DIST. ELEVATION

- MATERIAL IS LABELED AT THE BOTTOM OF THE LAYER - A MINUS (-) OFFSET INDICATES A DIRECTION LEFT OF PROJECT CENTERLINE

GEOTECHNICAL BORING / SOIL SURVEY LEGEND

OF THE SOILS CLASSES. SEE SPECIAL PROVISIONS FOR ADDITIONAL INFORMATION.

SOILS INFORMATION ON THE PLAN AND PROFILE SHEETS IS A BRIEF SUMMARY

SOILS INFORMATION

CP L I PE PE I CLP

1

3

2

3125

OF TRANSPORTATION

MONTANA DEPARTMENT $DATE$

$FILEABBREV$

$TIME$

3135

3135

3130

3140

$username$ REVIEWED BY

CHECKED BY

DESIGNED BY

TGC

TLS

NWP

1 N, R 27 E

T

3140

3145

3150

3155

3160

3165 1 N, R 26 E

T

02/09/2018

02/09/2018

02/09/2018

5+00

5+ 16 . 55 59 . FN 31' D BE .R/ G. W M CO O N. R/ N S W T. 5+ 44 50 PM .8 T. 5' EX . E A SE . = R/ BE W G. CO AC NS 5+63 Q U T IS . I 14"PVC I N PL.RT. TI PM ON T. USE AS I S RT 15 . '

MB

5+ 10 FN . 99 D . R/ 3. W M O 50' N.

5+50 R/W

ROAD PLANS

ACQUI SI TI ON LT.

85'

6 2 3 4 1 9 9

YELLOWSTONE COUNTY

18.38' EX. EASE. = R/W

BEG.

6+50 R/W

R/W 6+50 55'

CONST. PMT . 15' 6+73 12"CSP I N PL.LT.

R/W 85'

6+90

USE AS I S

BEG. CONST. 7+10,129'LT TO 26+73,69'LT

PMT. 50'

NEW 8"PVC I RR.PI PELI NE

PRELIMINARY PIH

FIVE MILE ROAD

AT PROP. LI NE BEG. IRR.

EASE. 50'

END CONST. PMT. 50'

R/W 8+50

8+50 R/W

75' R/W = R/W 8+64.14 95'

85' R/W = R/W

C4199

120'

8+83.33

135'

AT R/W LI NE

AT R/W LI NE END I RR. EASE. 50'

10+00

A-2

A-6

A-1

ASPHALT

B-10

B-10 10+16.65 9.02 LT. 3152.75

8" PVC PIPELINE (SEE DETAILS)

BEG. CONN. TO PTW

END CONST. PMT.

W

STATION 10+45.74

183+50 R /W

/W 00 R 188+ 105'

W

10+45.74

CSF = 0.99945297

100' VC

(UNDER ROADWAY)

+0.500%

BBP - FIVE MILE ROAD

GEOTEXTILE STABILIZATION

DITCH 9

DITCH 8

10+45.74 TO 88+50

-0.500%

EL.3,153.08

11+25.00 EL.3,152.69

0 12+0 R/W

00 R/W 187+ 165'

110' W = R/ R/W

UPN 4199002

BEG. STPU 56(87)

STATION 14+50.00

. CONST BEG. 130' PMT.

W 13+00 R/ 100' W R/W = R/

51 13+55. 28' 10. W M ON. FND.R/

13+54. 05 49. 67' FND.R/ W M ON.

PRIVATE APP. RT.

15+00

13+81.12 R/W 100'

R/W 14+00

14+00

BEG. EASE. AT 49.98'

PROP. LI NE

R/W

R/W 100'

R/W = EX. EASE.

AT EASE. LI NE END CONST. PMT.

BEG. CO. RD. EASE. 50'

230'

3125

3130

3145

3150

3155

3160

3165

15+00

SHEET 44

STPU 56(87)

AT R/W BEG. I RR. EASE. 50'

15+00,42'RT. NEW 18"RCP APP.DR.

15+00,69'RT. NEW 18"RCP APP.I RR.

1

3

OF TRANSPORTATION

MONTANA DEPARTMENT $DATE$

$FILEABBREV$

DITCH 8

$TIME$

3130

3130

2

3135

3135

15+00

3140

3140

3145

3150

3155

3160

3165

3170

15 230'

$username$ REVIEWED BY

CHECKED BY

DESIGNED BY

TGC

TLS

NWP

18+41 54"RCP I N PL.LT. REM OVE

02/09/2018

02/09/2018

02/09/2018

1 N, R 27 E

T

20+00

1 N, R 26 E

T 20+00 IRR. EASE. 50'

20+18

20

12"CM P I N PL.LT.

ROAD PLANS

21+00

500' VC

DITCH 9

YELLOWSTONE COUNTY

+0.500%

REM OVE

W

IRR. EASE. 30'

21+50.00 EL.3,157.81

-0.500%

PRELIMINARY PIH

8" PVC PIPELINE (SEE DETAILS)

26+26,70'RT TO 26+77,84'RT WETLAND WL3b

NEW 18"RCP I RR.PI PELI NE

26+46 12"PVC I N PL.RT. I NC.12"GATE VALVE REM OVE 26+50,77'LT TO 26+74,77'LT NEW 18"PVC I RR.PI PELI NE 26+53 15"CM P I N PL.LT. REM OVE 26+65,40'LT. CONC.I NLET STR.I N PL. REM OVE

25+00

26+65 24"RCP I N PL. SEE DETAIL SHEET 29

REM OVE FIVE MILE ROAD

26+65,84'RT. CONC.OUTLET STR.I N PL.

25

BEG. CONST. PMT.

W/ GEOTEXTILE

BBP - FIVE MILE ROAD

UPN 4199002

ERAL AT DOVERL

BANK PROT.

TYPE 3 BANK PROTECTION

26+83, 84' RT.

W/ GEOTEXTILE

10'

30'

BANK PROT.

TYPE 3 BANK PROTECTION

26+80, 63' LT.

CSF = 0.99945297

W/ GEOTEXTILE

26+40

90'

EASE. = EX. EASE. END IRR. EASE.

6 0 8 4 1 9 9

FARM FIELD APP. RT.

FARM FIELD APP. LT.

26+53

27+40

BEG. CONST. PMT.

AT EASE. LI NE END CONST. PMT. 26+74,77'LT. NEW TURNOUT STRUCTURE W /18"I RR.CANAL GATE 26+74,69'LT. NEW TURNOUT STRUCTURE W /8"I RR.DI STRI BUTI ON GATE 26+74,51'LT. CONC.STR.& HEADGATE I N PL. REM OVE

26+80,63'LT. NEW I RR.TRANS.STR. W /TRASHGUARD 26+80 NEW 24"RCP I RR.SI PHON 26+80,84'RT.

WETLAND WL3a

(TAPER TO EXISTING)

FARM FIELD APP. LT.

TYPE 3 BANK PROTECTION

26+71,52'LT CONC.STR.& HEADGATE I N PL. REM OVE

26+00 26+53

26+26, 71' RT.

BANK PROT.

REM OVE

+80

V WV V

DO VER LATERAL

27+70 END CONST. PMT. 40'

PC 28+13. 28 CO. RD. EASE. 50' 28+50

NEW SI PHON OUTLET

CO. RD. EASE. 26+84

55'

12"CM P I N PL.LT. REM OVE 26+86,69'LT. R =5,000' T =153.53' L =306.96' E =2.36' S=NC

SHEET 45

30

3145

3150

3155

3160

3165

3170

30+00

STPU 56(87)

PI =29+66.81

NEW TURNOUT STRUCTURE W /18"I RR.CANAL GATE 26+87,69'LT TO 27+00,62'LT NEW 18"PVC I RR.PI PELI NE

27+40 NEW 18"APP.DR.LT.

CO. RD. EASE. 55'

24 PT 31+20.

$username$

NWP

02/09/2018

ROAD PLANS

40+00

CSF = 0.99945297

70'

41+20

34+00

30

T

UPN 4199002

1 N, R 27 E

BBP - FIVE MILE ROAD

T

1 N, R 26 E

3170

3145

3150

3155

3160

3165

WETLAND WL1e

TYPE "B" FIELD DITCH

3

1

2

30+00

OF TRANSPORTATION

$TIME$

$DATE$

REVIEWED BY

CHECKED BY

TGC

TLS

02/09/2018

02/09/2018

YELLOWSTONE COUNTY

PRELIMINARY PIH

SHEET 46

STPU 56(87)

45+00

3130 35+00

800' VC

CO. RD. EASE.

NEW CO. RD. EASE. =

42+50

3130

A-6

A-1

ASPHALT

W/ GEOTEXTILE

-0.500%

TYPE 3 BANK PROTECTION

(SEE DETAILS)

CONST. PMT. 30'

3135

DESIGNED BY

B-9 36+70.23 57.85 RT. 3150.66

41+23, 76' RT.

TYPE "B" FIELD DITCH

TYPE "B" FIELD DITCH

38+67, 131' RT. TO 39+31, 514' RT

41+20, 74.5' LT. TO 60+18, 54.5' LT

(DOVER RD.)

CO. RD. EASE. 70'

SECTION/ PROPERTY LINE

BANK PROT.

W/ GEOTEXTILE

PUBLIC APP. RT.

43+50

FIVE MILE ROAD

CONST. PMT. 30'

3135

$FILEABBREV$

+0.423%

BEG. CONST. PMT. 45'

TYPE 3 BANK PROTECTION

35+84.25

(SEE DETAILS)

+0.423%

DITCH 4

MH-1

39+93

39+85

(DOVER RD.)

NEW 84"TYP.3 M ANHOLE

PUBLIC APP. LT.

DOVER ROAD

39+93

100'

(FI VE MI LE)

DITCH 5

UNKN. DEPTH

6" N.G. X-ING

40+36

CO. RD. EASE. 50'

3140

MONTANA DEPARTMENT

-0.500%

500' VC

34+50

UNKN. DEPTH

41+20

38+50, 75' LT.

38+50.00

45

3140

3145

3150

3155

3160

CONST. PMT. 20'

AT EX. IRR. EASE.

AT EASE. LI NE

BEG. IRR. EASE.

UNKN. DEPTH

39+85,CL TO 41+23,76'RT.

F.O. X-ING

PMT. 30'

W/ EROSION CONTROL BLANKET

NEW 18"RCP I RR.

(FI VE MI LE) +50

3165

24"CM P I N PL.RT.

UG PWR X-ING

BANK PROT.

REM OVE

37+99.85 39+46

39+62. 67

(DOVER) 80' 34+20 (DOVER) 50' 39+61,1 02'RT.

39+73

39+62. 56

EASE. = EASE. EASE. = DROP EASE. CONC. I NLET

60' CO. RD. EASE. 15' CONST. PMT. 25 PC 35+84.

39. 47'RT. FND.R/ W M ON. 99. 44'RT. FND.R/ W M ON.

55' CO. RD. EASE. 15' CONST. PMT.

TYPE "B" FIELD DITCH

38+50,75'RT.TO 39+85,CL

40 NEW 36"RCP I RR.

UNKN. DEPTH

15"CM P I N PL.RT.

35

34+11, 86' LT. TO 38+50, 75' LT

R =5,000' T =107.82' L =215.60' E =1.16' S=NC

CO. RD. EASE. 65' REM OVE

LATERAL PI =36+92.06

NEW 36"RCP I RR.

38+50 38+80

DOVER

39+09,53. 5 RT.TO 39+85,CL

CO. RD. EASE. 65' PT 37+99. 85 97.94'

34+20 LE) 158.79' = MI

40+35

39+91

B-9

EX. EASE.

(DOVER) 65' (DOVER) 75'

12" RCP STM X-ING

24"CM P I N PL.RT.

DITCH 7

= EASE.

EASE. = EASE. EASE. = EASE.

39+62

REM OVE

40+58.21 REM OVE

TYPE "B" FIELD DITCH

39+42.51

141.51' = 37+00

EL.3,155.31

3170

32+00.00

40+28

AT EASE. LI NE 70.00'

39+13.21 W

(FI VE MI LE)

141.07' = (FI VE 40+67.49

BEG. CONST. EASE. = PROP. LI NE

END CONST. PMT. 20' W

138.69' =

W

37+20

DI

EL.3,152.56

TP

46+43

USE AS I S

10"PVC I N PL.RT.

USE AS I S

12"CM P I N PL.RT.

47+86

$username$

DESIGNED BY

NWP

02/09/2018

USE AS I S

51+09

ROAD PLANS

USE AS I S

12"STEEL I N PL.RT.

53+27

12"PVC I N PL.RT.

48+74

CSF = 0.99945297

BBP - FIVE MILE ROAD

UPN 4199002

NEW CO. RD. EASE. = NE ON/ PROPERTY LI SECTI

3140

3145

3150

3155

3160

3165

3

1

2

45+00

OF TRANSPORTATION

$TIME$

$DATE$

REVIEWED BY

CHECKED BY

TGC

TLS

02/09/2018

02/09/2018

YELLOWSTONE COUNTY

PRELIMINARY PIH

SHEET 47

STPU 56(87)

60+00

3125 55+00

55+82

3125 50+00

10"PVC I N PL.RT.

+0.500%

24"CM P I N PL.RT.

3130

-0.500%

1,350' VC

DITCH 4

WETLAND WL1e

USE AS I S

3130

$FILEABBREV$

47+86

FIVE MILE ROAD

55+92

3135

MONTANA DEPARTMENT

12"CM P I N PL.RT.

TYPE "B" FIELD DITCH

12"CM P I N PL.RT.

3135

3140

3145

3150

3155

3160

USE AS I S

1 N, R 27 E

50+00

T

USE AS I S

1 N, R 26 E

NEW 24"RCP DR.RT.

50+00.00

T

+00

NEW CO. RD. EASE. = NE ON/ PROPERTY LI SECTI

EL.3,149.56

3165

DITCH 3

DITCH 2

USE AS I S

NEW I RR.TRANS.STR.

NEW 18"RCP I RR.DROP PI PE

60+75

60+22,54. 5'LT.TO 60+58,54. 5'LT.

B-8 60+04.78 36.92 RT. 3147.81

02/09/2018

CO. RD. EASE. 50'

W/ GEOTEXTILE

$FILEABBREV$

$username$

950' VC

DESIGNED BY

NWP

-0.500%

REM OVE

12"CM P I N PL.RT.

66+20

ROAD PLANS

(SEE DETAILS)

12"PVC I N PL.RT. (SEE DETAILS)

TYPE "B" FIELD DITCH

70+00

IRR. EASE . CONST. PMT. 30' 70+57,40. 7'LT.

10"CM P I N PL.RT. 71+55

CSF = 0.99945297

FARM FIELD APP. LT.

70+53

72+20.39

BBP - FIVE MILE ROAD

UPN 4199002

(SEE SPECIAL PROVISIONS)

3140

3145

3150

3155

3160

3165

3170

TYPE "B" FIELD DITCH

FLAP GATE

MISCELLANEOUS ITEM - FLAP GATE

73+94, 81' RT.

73+77,145'RT. REM OVE

NEW 18"RCPA APP.I RR. 70+56,60'LT.

68+27

CO. RD. EASE. 55' CONST. PMT. 15'

IRR. EASE. BEG. CONST. PMT. 30'

3

1

2

OF TRANSPORTATION

$TIME$

$DATE$

REVIEWED BY

CHECKED BY

TGC

TLS

02/09/2018

02/09/2018

YELLOWSTONE COUNTY

PRELIMINARY PIH

SHEET 48

STPU 56(87)

75+00

3130

60+00

MONTANA DEPARTMENT

65+00

66+50 NE AT PROP. LI W/ EROSION CONTROL BLANKET

REM OVE

68+42, 135' RT. TO 80+64, 131' RT

TYP. 3 DIV. BOX

MI-1

NEW TYP.3 DI V.BOX

3130

A-2

+0.500%

W/ GEOTEXTILE

67+00 66+60

(SEE DETAILS)

TYPE 3 BANK PROTECTION

61+00, 55' LT.

CONST. PMT. 15'

DRAIN DITCH

12"CM P I N PL.RT.

66+42, 75' RT. TO 81+05, 78' RT

TYPE "B" FIELD DITCH

R =4,000' T =139.68' L =279.25' E =2.44' S=NC

DRAIN DITCH

F I VEMI L EROAD

12"PVC I N PL.RT.

3135

A-6

A-6

NEW 42"RCP DR.

TYPE 3 BANK PROTECTION

61+74,55'LT.

TYPE 3 BANK PROTECTION

NEW I RR.TRANS.STR.

61+74, 55' LT.

W/ GEOTEXTILE

CO. RD. EASE. 55' USE AS I S

TYPE "B" FIELD DITCH

62+76

60+58, 54.5' LT.

W/ GEOTEXTILE

67+89.32 32 PC 67+89.

61+74, 55' LT. TO 66+35, 55' LT

W /TRASHGUARD

70+68.57 CO. RD. EA SE. 55' CONST. PM T. 15' WETLAND WL1e

NEW 18"RCP APP.DR.

CONST. PMT. 15' 120'

RR. EASE. BEG. I

CONST. PMT. 30'

61+00,55'LT.TO 61+70,55'LT.

TYPE 3 BANK PROTECTION

1 N, R 27 E

T

PI =69+29.00

1 N, R 26 E

CO. RD . EA SE. 50' PROP. LI NE = EASE. IRR. EASE 80' CONST. PM T. 30'

70 T

75

3135

3140

3145

3150

3155

3160

3165

3170

NEW 18"RCP I RR.DROP PI PE

60+18, 54.5' LT.

W /TRASHGUARD

WETLAND WL1e

12"CM P I N PL.RT.

120'

PT 70+68. 57

NE ON/ PROPERTY LI SECTI

73+65

B-8

REM OVE

73+00 CO. RD. E ASE. 55' CONST. PM T. 15' 10"CM P I N PL.RT.

NEW CO. RD. EASE. =

REM OVE

DROP PIPE

REM OVE

60

60+18,54. 5'LT.

74+00 CO. RD. EA SE. 65' END CONST . PMT. 15 ' 73+94

65 TYPE "B" FIELD DITCH

NEW 30"RCP DR.

BANK PROT.

61+20

+20

73+94,40. 3'RT.

BANK PROT.

62+00

62+00.00

73+90 +94

CONST. PMT. 15'

EL.3,155.56

NEW TYP.3 M ED.I NLET

DROP PIPE

73+94

UNNAMED SPRING

NEW 30"RCP DR.RT.

WETLAND WL1e

I NCL.FLAPGATE RT.

3

1

2

OF TRANSPORTATION

MONTANA DEPARTMENT

-0.500%

REM OVE

$TIME$

$DATE$

$FILEABBREV$

$username$

1,000' VC

C O .

REVIEWED BY

C O .

TGC

TLS

NWP

79 + 5 0 IRR . EA CO SE N S . T. 70 PM ' T. 30 '

R D .

CHECKED BY

79+99,134'RT.

E A 7 S 7 E + . 0 0 6 5 '

DESIGNED BY

80+ 50 IRR.

REM OVE

15"CM P I N PL.RT.

80+08

02/09/2018

02/09/2018

02/09/2018

EAS E. 70' CON ST. PMT . 3 0'

80+00

80

END CONST. PMT. 20'

37'

IRR. EASE.

81+00

WETLAND WL1b

YELLOWSTONE COUNTY

PROP. COR.

WETLAND WL1d

. = EASE RD. NE LI CO. NEW ERTY P O R P ON/ I SECT

G. BE

UNKN. DEPTH

150' VC

CI-2

CI-3

64 3. +6 88 PI

. EX

W R/

0 +0 88 ' 80

85+00

CSF = 0.99945297

A-4

A-6

BBP - FIVE MILE ROAD

UPN 4199002

W/ GEOTEXTILE

A-6

TYPE 3 BANK PROTECTION

04% +1.5

87+64, 42' LT.

W/ GEOTEXTILE

NEW 18"RCP I RR.

TYPE 3 BANK PROTECTION

B-13 86+58.64 76.06 LT. 3160.86

= W NE R/ LI W NE TY ER OP R P

END STPU 56(87)

STATION 1135+40.63 (OLD HWY 312)

STATION 89+48.24 (FIVE MILE)=

13 B-

88+09,28. 7'LT.

84+57, 51' RT.

. RD . CO = . SE R. EA CO . OP PR

CI-1

D OA ER L MI E V FI

WETLAND WL2

UNKN. DEPTH

UG TEL. X-ING

UNKN. DEPTH

UG TEL. X-ING

88+86

89+12

UNKN. WIRES

NEW TYP.B CURB I NLET

OVHD PWR X-ING

88+85

4" N.G. X-ING

PRELIMINARY PIH

% 085 +2.

W/ GEOTEXTILE

TYPE 3 BANK PROTECTION

82+48, 78' RT.

CO. RD. EASE. =

BANK PROT.

ROAD PLANS

C O . RD. EASE . 50 ' CO. RD. EASE . = PROP . LI NE

P R C D 77 . +6 E 0. A S 8 6 E . 8 0 '

79 +0 0 IR R . CO EA NS SE T. . 8 PM 0 ' T. 30 '

% 085 +2.

NEW TYP.3 DI V.BOX

TYP. 3 DIV. BOX

81+30

UNKN. DEPTH

9 9 1 4 3 0 6

' 9 8 1

SHEET 49

STPU 56(87)

9 9 1 D4

3140

3145

3150

3155

3160

3165

3170

3175

3180

90+00

12 Y3

75+00

3140

3145

3150

3155

3160

3165

3170

3175

3180

TYPE "B" FIELD DITCH

END IRR. EASE.

WETLAND WL1e

NEW 30"RCP DR.

85 W R/

88+92

86+04,35. 7'RT.

PI = 8 1 + 3 7 . 2 7

LINE ROP. AT P ' . 75 EASE RD. CO.

N IO IT IS QU AC

91 6. ' +5 95 88 W = R/ /W R . SE EA D EN . LT

AC

T PO

24 48. 89+ E) MIL IVE (F . 05 . SE 7. RT EA +3 . 88 N EX TIO = ISI W QU R/ AC D EN

D EN . RT

89+48.23

UG TEL. X-ING

85+49,34. 7'RT.

R =750' T= 3 7 6 . 4 1 ' L= 6 9 7 . 7 2 ' E =89.16' S=3%

LINE P. PRO 75' AT E. EAS RD. CO.

DRAIN DITCH

76+95

77+00.00

RD. CO. = E. . EAS COR P. RD. PRO CO. END E. EAS . COR P. PRO /W = R /W . R BEG

0 +5 84 . RD . CO ' D 80 EN . ' SE 80 EA W R/ 58 8. +5 84 ' PT 80

83+75.00

7 7 + 6 C 0 O . IR . 8 6 R R . D C . O E N A E S S A T E S . . E . P 8 M 0 5 T ' 0 . ' 3 0 '

12"PVC I N PL.

EL.3,148.06

82+74 +74

4 .4 25 ' 3+ 45 . W SE R/ EA = E. S EA

EL.3,170.76

88+75

NEW TYP.B CURB I NLET

U

NEW 18"RCP I RR.

P P

EL.3,162.14

P

PP

NEW TYP.B CURB I NLET

T

NEW 18"RCP I RR.

W DH OL

P

P

1

3

2

1125+00

3145

3150

3155

3160

3165

3170

3175

3180

3185 9 9 1 4 4 0 6 P

$TIME$

$DATE$

$FILEABBREV$

B

OF TRANSPORTATION

MONTANA DEPARTMENT

R/ W 1125+60 59. 97' CALC R/ W M ON T

B

$username$

I D

REVIEWED BY

59. 97' CALC R/ W M ON

TGC

TLS

NWP

I

CHECKED BY

DESIGNED BY

R/ W 1127+80. 05

PP TT D

U

1131+22 24"RCP I N PL. REM OVE 1130+86,83'LT TO 1131+57,80'RT NEW 24"RCP I RR 02/09/2018

02/09/2018

1130+00

02/09/2018

1131+57,80'RT NEW 72"TYP.3 M ANHOLE

1129+70

R/W

59.96' 1131+57,80'RT TO

EX. EASE. = R/W

1131+64,96'RT

BEG. ACQUI SI TI ON LT.

NEW 24"RCP I RR 1130+25.00

1130

1131+57,80'RT TO 1133+50,80'RT

EL.3,173.30

NEW 24"RCP I RR

W/ GEOTEXTILE

(UNDER ROADWAY)

ROAD PLANS

TYPE 3 BANK PROTECTION

YELLOWSTONE COUNTY

1134+17, 177.5' LT.

GEOTEXTILE STABILIZATION

R/W 90'

WETLAND WL1b

1130+25 TO 1143+50

R/W 1130+60 1130+70

59.97' EX. EASE. = R/W BEG. ACQUI SI TI ON RT. 1133+22,25. 0'RT. NEW TYP.B CURB I NLET

R/W 1131+50

WETLAND WL1a

+22

NEW 18"RCP I RR.

99.95'

1133+31 12"CM P I N PL.LT.

1133+68. 99 R/ W 59. 97' FND R/ W M ON

MH-2

USE AS I S

R/ W 1131+70. 24

1132+75

59. 97' CALC R/ W M ON

BEG. CONST.

R/W 90'

PRELIMINARY PIH

WETLAND WL1c

CI-5

CONST. PMT. 15' 1133+69. 94 R/ W 99. 94' CALC R/ W M ON

PMT. AT

CI-4

NEW 48"TYP.3 M ANHOLE

MH-3

1133+50,80'RT TO 1136+37,175'LT

NEW 24"RCP I RR

EASE.

CI-6

88+00

6034199

189'

1134+50

R/W

170'

1134+61,48. 3'RT. CI-7

1135+00

SHALE

A-6

A-6

A-2

ASPHALT

B-34 1134+55.17 6.02 LT. 3171.20

B-34

EASE. = R/W

EASE. 45'

3+25.44

1133+83,43. 9'LT.

NEW TYP.B CURB I NLET NEW 18"RCP I RR. 1134+17,177. 5'LT. NEW I RR.TRANS.STR.

STATION 89+48.24 (FIVE MILE)

R/W = EX. EASE.

1134+10.05 END CONST.

1133+50,80'RT ' R/W 80

STATION 1135+40.63 (OLD HWY 312)=

PMT. 15'

R/ W 1133+65. 57

1133+50

59. 97' FND R/ W M ON R/ W 1133+65. 15 99. 95' CALC R/ W M ON END ACQUI SI TI ON RT. 91 88+56. ' R/W 95 R/W = SE. EX. EA END . ON LT TI SI ACQUI

NEW TYP.B CURB I NLET NEW 18"RCP I RR.

2+97.47 EASE. 55'

PMT. 15' AT EASE. 2+45.21

CSF = 0.99945297

W/ GEOTEXTILE

EASE. = R/W

1136+25

NEW TYP.B CURB I NLET NE PROPERTY LI NEW 18"RCP I RR.

BEG. I RR.

BBP - FIVE MILE ROAD

-0.492%

W/ GEOTEXTILE

TYPE 3 BANK PROTECTION

PMT. 15'

CI-10

1136+81, 43' RT.

EASE. 15'

END CONST. 1136+27 18"CM P I N PL.LT. USE AS I S 1136+54,57. 6'LT. NEW TYP.B CURB I NLET NEW 18"RCP I RR. 1136+71 18"CM P I N PL.LT. REM OVE

DITCH 1

TYPE 3 BANK PROTECTION

EASE. 60'

CI-9

1135+79, 177.5' LT.

UNKN. CLEARANCE

OVHD PWR X-ING, UNKN. WIRES

(TAPER TO EXSTING)

1135+64.25 BEG. CONST.

1135+27 NEW 18"APP.DR.LT. 1135+79,177. 5'LT. NEW I RR.TRANS.STR. W /TRASHGUARD 1135+81,91. 8'LT.

NEW R/W =

1137+28

PRIVATE APP. LT.

1135+33

CI-8

1134+78,87. 9'LT. NEW TYP.B CURB I NLET NEW 18"RCP I RR.

D RO A

R/W = PROP. LI NE 170'

D4199 AT PROP. LI NE END I RR. EASE. 15'

OLD HWY 312

UPN 4199002

1136+93,84'LT.

P

P

CONC.I NLET STR.I N PL.

88+37.05 (FIVE MILE)

R/W = EX. EASE. RT. ON TI SI END ACQUI

PP

+50

LE I VE M FI P T

REM OVE 1136+95 18"CM P I N PL. REM OVE

R/W = PROP. LI NE 125' 1137+71. 99 R/ W 99. 94' PCF

CI-11

1136+96,79'RT. CONC.OUTLET STR.I N PL.

1138+50

R/W UNKN. DEPTH

N.G. GAS X-ING

125'

1139+97

REM OVE 1137+73,49. 4'LT. NEW TYP.B CURB I NLET NEW 18"RCP I RR. 1138+97,58. 0'LT. NEW TYP.B CURB I NLET

1139+50

NEW 18"RCP I RR.

R/W

3145

3150

3155

3160

3165

3170

3175

3180

3185

1140+00

SHEET 50

STPU 56(87)

99.94' R/W = EX. EASE. END ACQUI SI TI ON LT.

1140

R/W = EX. EASE.

99.94'

1140+48,34. 1'LT.

1140

18"CM P I N PL.

1142+99

1142+50

1144+88. 14 R/ W

60. 03' FND R/ W M ON

59. 97' PCF

1144+86. 01 R/ W

NEW 24"RCP I RR.

R/ W 1144+33. 81

1144+05

ROAD PLANS

U

PRELIMINARY PIH

9 9 1 4 1 0 6

CSF = 0.99945297

BBP - FIVE MILE ROAD

UPN 4199002

STPU 56(87)

3160

3165

3170

3175

3180

3185

1

2

3

OF TRANSPORTATION

$TIME$

$DATE$

CHECKED BY

REVIEWED BY

TGC

TLS

02/09/2018

02/09/2018

02/09/2018

YELLOWSTONE COUNTY

SHEET 51

3145

1140+00

$username$

59. 97' FND R/ W M ON

1145+00

POT 1145+27. 08

3145

99. 95' FND R/ W M ON

3150

DESIGNED BY

DITCH 10

1145+27. 5 R/ W

3150

NWP

(TAPER TO EXSTING)

P

3155

$FILEABBREV$

MAILBOX TURNOUT RT.

1141+36 TO 1143+13

MONTANA DEPARTMENT

1142+73. 43 R/ W

(TAPER TO EXSTING)

MAILBOX TURNOUT LT.

REM OVE

PRIVATE APP. LT.

PRIVATE APP. RT.

1141+12 TO 1143+14

99. 94' PCF

NEW 24"RCP DR.

1142+95

W/ GEOTEXTILE

2

E

1142+13

R

7

P

3155

3160

3165

3170

3175

NEW TYP.B CURB I NLET

TYPE 3 BANK PROTECTION

T

,

2

E

+50

END ACQUI SI TI ON LT.

3180

NEW 18"RCP I RR.

1140+62, 51' LT.

1

N

PRIVATE APP. LT.

N

MB

1141+96

T

1

1

MB

,

R

R

6

6

E

3185

CI-12

T

1141+96

,

NEW 18"RCP APP.DR.LT.

UNKN. DEPTH

1144+05

UG TEL. X-ING

24"RCP I N PL.

1143+05

REM OVE

N

2

EL.3,166.29

2

R/ W 1144+73. 79

T

,

E

MB

N

6

MB

R 99. 95' FND R/ W M ON

2

+05

T

1144+50.00

T

1

3125

3125

3

3130

3130

2

3135

3135

30+00

3140

3140

3145

3150

3155

3160

3165

POB 30+00. 00

30

30+50 OF TRANSPORTATION

MONTANA DEPARTMENT

EASE. = EX. EASE. BEG. ACQUI SI TI ON . RT.

30+50 EX. EASE. = EASE. BEG. ACQUI SI TI ON

31+50

LT.

31+50

$TIME$

CO. RD. EASE. 65'

$username$

FARM FIELD APP. LT.

32+10

REVIEWED BY

CHECKED BY

DESIGNED BY

DITCH 5

TGC

TLS

NWP

DOVER ROAD

34+00.00 EL.3,153.07

02/09/2018

02/09/2018

02/09/2018

35+00

+0.454% 35+61.27 EL.3,154.22

NEW CO. R

ROAD PLANS

ON/ P SECTI

TP

N,

1

T PI 36+31. 27

W

W

W

DI

-1.00 9%

N,

1

T FI VE M I LE ROAD

DITCH 4

100'

DOVER LATERAL

PRELIMINARY PIH

RR. EASE. BEG. I

97.94'

38+80

EX. EASE.

= EASE.

(FIVE MILE)

39+42.51

37+00

138.69' =

EASE. = EASE.

(DOVER) 50'

WETLAND WL1e

YELLOWSTONE COUNTY

% 000 +2. -2. 000 %

DITCH 7

35+34.27 EL.3,153.68

35+88.27 EL.3,153.68

37+25.00 EL.3,152.30

RR. EASE. AT EX. I

99.44' RT. FND. R/W MON.

39+62.56

40+67.49 (FIVE

MILE) 158.79' =

EASE. = EASE.

37+20 (DOVER) 75'

41+20

$DATE$

$FILEABBREV$

CO. RD. EASE. 80'

6074199

37+99.85

CONST. PMT. 20'

CO. RD. EASE. 65'

38+50

CO. RD. EASE. 65'

AT EASE. LINE

END CONST. PMT. 20'

141.51' =

39+13.21 (FIVE MILE)

EASE. = EASE.

34+20 (DOVER) 80'

39.47' RT. FND. R/W MON.

39+62.67

40+58.21

(FIVE MILE)

34+20

141.07' =

(DOVER) 65'

EASE. = EASE.

AT EASE. LINE

PMT. 30'

BEG. CONST. EASE. = PROP. LINE

70.00'

39+75 CO. RD. EASE. 50'

39+75

RR. EASE. I

CO. RD. EASE.

40+00

50'

75'

40

40+75

40+79.14

EASE. = EX. EASE.

EASE. = EX. EASE.

RR. EASE. = I

29.98'

CSF = 0.99945297

RR. EASE. EX. I

END ACQUI SI TI ON

LT.

END ACQUI SI TI ON RT.

BBP - FIVE MILE ROAD

6064199

UPN 4199002

DI

00 POE 44+00.

SHEET 52

STPU 56(87)

3145

3150

3155

3160

3165

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas