Home

St. Louis District

Run scraper

The applicant

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant, Delmar Gardens, seeks authorization to conduct grading and filling operations in waters of the United States for construction and expansion of a senior living facility. The development will consist of the addition of a three story building with a partial basement, featuring 120 independent living/assisted living/memory care apartments. The building and associated infrastructure is proposed to impact 915 linear feet of two tributaries onsite. The tributaries are part of the Fenton Creek watershed. The site currently exists as the undeveloped backlot of an existing Delmar Gardens Facility. The public notice comment period opens on September 20, 2018 and closes October 11, 2018.

The applicant, Delmar Gardens, seeks authorization to conduct grading and filling operations in waters of the United States for construction and expansion of a senior living facility. The development will consist of the addition of a three story building with a partial basement, featuring 120 independent living/assisted living/memory care apartments. The building and associated infrastructure is proposed to impact 915 linear feet of two tributaries onsite. The tributaries are part of the Fenton Creek watershed. The site currently exists as the undeveloped backlot of an existing Delmar Gardens Facility. The public notice comment period opens on September 20, 2018 and closes October 11, 2018.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas