Home

Galveston District

Run scraper

SWQ IRT SOP establish standard preferential criteria

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

This SOP will be applicable to all mitigation bank in-lieu-fee proposals with the boundaries of SWG.

Full Public Notice Mitigation Bank Appendix 1 Appendix 1 (Word) Appendix 2 Appendix 2 (Word) Appendix 3 Appendix 3 (Word) The purpose of the Standard Operating Procedure (SOP) is to disseminate established standards and implemented preferential criteria required to expedite the effective review and approval of mitigation bank and in-lieu fee proposals by the U.S. Army Corps of Engineers, Galveston District (SWG) and the SWG Inter-agency Review Team (IRT).

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas