FLOOD GATES AND CULVERTS IN ST. LANDRY PARISH
NAME OF APPLICANT: Lake Owners, Inc., c/o Mr. Rickey Broussard, 119 Magnolia Street, Port Barre, Louisiana 70577.
LOCATION OF WORK: Three Mile Lake, North Wilderness Road, located in the community of Port Barre, St. Landry Parish, Louisiana, as shown on the enclosed drawings.
Location: Latitude: 30°33ʹ17ʺN/ Longitude: -91°49ʹ40ʺ W, Hydrologic Unit Code: 08080101- Atchafalaya Basin.
CHARACTER OF WORK: Install three 48.5-inch wide by 48.5-inch long flood gates onto three existing 40-foot long 48-inch diameter culverts in Two O’Clock Bayou, all to provide flood protection during high water events which flow from Bayou Darbonne into Three Mile Lake. During normal water levels, the flood gates would remain open. No dredging or filling operations would occur during project construction. Approximately 0.028 of an acre of non-wetland waterbottoms would be temporarily impacted via project implementation.
JOINT PUBLIC NOTICE
October 1, 2018
United States Army
Corps of Engineers
New Orleans District
Attn: Regulatory Branch
7400 Leake Ave.
New Orleans, Louisiana 70118-3651
Project Manager:
Sara B. Fortuna
(504) 862-2284
Sara.B.Fortuna@usace.army.mil
Application #: MVN-2018-00509 WKK
Interested parties are hereby notified that a permit application has been received by the
New Orleans District of the U.S. Army Corps of Engineers pursuant to: [X] Section 10 of the
Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [ ] Section 404 of
the Clean Water Act (86 Stat. 816; 33 USC 1344).
FLOOD GATES AND CULVERTS IN ST. LANDRY PARISH
NAME OF APPLICANT: Lake Owners, Inc., c/o Mr. Rickey Broussard, 119 Magnolia Street,
Port Barre, Louisiana 70577.
LOCATION OF WORK: Three Mile Lake, North Wilderness Road, located in the community of
Port Barre, St. Landry Parish, Louisiana, as shown on the enclosed drawings.
Location: Latitude: 30°3317N/ Longitude: -91°4940 W, Hydrologic Unit Code: 08080101Atchafalaya Basin.
CHARACTER OF WORK: Install three 48.5-inch wide by 48.5-inch long flood gates onto three
existing 40-foot long 48-inch diameter culverts in Two O'Clock Bayou, all to provide flood protection
during high water events which flow from Bayou Darbonne into Three Mile Lake. During normal
water levels, the flood gates would remain open. No dredging or filling operations would occur
during project construction. Approximately 0.028 of an acre of non-wetland waterbottoms would be
temporarily impacted via project implementation.
The comment period for the Department of the Army Permit will close 15 days from the
date of this joint public notice. Written comments, including suggestions for modifications or
objections to the proposed work, stating reasons thereof, are being solicited from anyone having
interest in this permit must be submitted so as to be received before or by the last day of the
comment period. Letters concerning the Corps of Engineers permit application must reference
the applicant's name and the Permit Application Number, and be forwarded to the Corps of
Engineers at the address above, ATTENTION: REGULATORY BRANCH. Individuals or parties
-2may request an extension of time in which to comment on the proposed work by writing, faxing,
or e-mailing the Corps of Engineers Project Manager listed above. Any request must be specific
and substantively supportive of the requested extension, and received by this office prior to the
end of the initial comment period. The Section Chief will review the request and the requestor
will be promptly notified of the decision to grant or deny the request. If granted, the time
extension will be continuous to the initial comment period and, inclusive of the initial comment
period, will not exceed a total of 30 calendar days.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable
impacts, including cumulative impacts of the proposed activity on the public interest. That
decision will reflect the national concern for both protection and utilization of important
resources. The benefit which reasonably may be expected to accrue from the proposal must be
balanced against its reasonably foreseeable detriments. All factors which may be relevant to
the proposal will be considered including the cumulative effects thereof; among those are
conservation, economics, aesthetics, general environmental concerns, wetlands, historic
properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation,
shoreline erosion and accretion, recreation, water supply and conservation, water quality,
energy needs, safety, food and fiber production, mineral needs, considerations of property
ownership and, in general, the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state,
and local agencies and officials, Indian Tribes, and other interested parties in order to consider
and evaluate the impacts of this proposed activity. Any comments received will be considered
by the U.S. Army Corps of Engineers to determine whether to make, modify, condition, or deny
a permit for this proposal. To make this decision, comments are used to assess impacts on
endangered species, historic properties, water quality, general environmental effects, and other
public interest factors listed above. Comments are used in the preparation of an Environmental
Assessment and/or an Environmental Impact Statement pursuant to the National Environmental
Policy Act. Comments are also used to determine the need for a public hearing and to
determine the overall public interest of the proposed activity.
The New Orleans District is unaware of properties listed on the National Register of
Historic Places near the proposed work. The possibility exists that the proposed work may
damage or destroy presently unknown archeological, scientific, prehistorical, historical sites, or
data. Copies of this public notice are being sent to the State Archeologist and State Historic
Preservation Officer regarding potential impacts to cultural resources.
Our initial finding is that the proposed work would neither affect any species listed as
endangered by the U.S. Departments of Interior or Commerce, nor affect any habitat designated
as critical to the survival and recovery of any endangered species. Based on the South
Louisiana Standard Local Operating Procedure for Endangered Species (SLOPES), as signed
on October 22, 2014, between the U.S. Army Corps of Engineers, New Orleans and the U.S.
Fish and Wildlife Service, it has been determined that the project would have no effect to any
listed species.
-3This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal may
result in the destruction or alteration of N/A acres of EFH utilized by various life stages of red
drum and penaeid shrimp. Our initial determination is that the proposed action would not have a
substantial adverse impact on EFH or federally managed fisheries in the Gulf of Mexico. Our
final determination relative to project impacts and the need for mitigation measures is subject to
review by and coordination with the National Marine Fisheries Service.
Any person may request, in writing, within the comment period specified in this notice,
that a public hearing be held to consider this application. Requests for public hearings shall
state, with particularity, the reasons for holding a public hearing.
You are invited to communicate the information contained in this notice to any other
parties whom you deem likely to have interest in the matter.
Darrell S. Barbara
Chief, Western Evaluation Section
Regulatory Branch
Enclosure
Culvert Gates 3 Mile Lake
3 Culverts
4' X 40'
North
49 1/4"
(Typical for 3)
Frame slides on to end of
49 1/4"
of culvert and bolted to culvert
40'
26'
12'
14'
30'
Lake Side
(Typical for 3)
Slide Gate 48 1/2" X 48 1/2"
1/4" Aluminum plate to slide in frame to close off culvert opening
2" Support Bar
Section Drawing AA
North
Post Indicatiing road edge
6'
Open
8'
Normal Levels
4"
Lake
Water Elevation Above Normal
Closed
Flow