The Los Angeles District, U. S. Army Corps of Engineers (Corps) has prepared a draft Environmental
The Los Angeles District, U. S. Army Corps of Engineers (Corps) has prepared a draft Environmental Assessment (EA) for proposed maintenance dredging of the Federal channels in Ventura Harbor, Ventura County, California. The proposed project would consist of a six-year program with a one-year extension to dredge approximately 6,000,000 million cubic yards (CY) of sandy sediment from the Federal channels in Ventura Harbor. Dredged materials would be placed be on South Beach, South Jetty Beach, McGrath State Beach and/or McGrath State Nearshore. The Federal entrance and navigation channels, and sand traps at Ventura Harbor would be dredged annually . Each annual dredging cycle would remove between approximately 500,000 to 1,000,000 CY.
Public agencies, stakeholders, and the general public are invited to review the Environmental Assessment and the appendices and submit comments from October 5, 2018 through November 5, 2018. Written comments can be submitted to Mr. Kirk Brus at:
U.S. Army Corps of Engineers, Los Angeles District
Attention: Kirk Brus, Environmental Coordinator
915 Wilshire Blvd., Suite 930, CESPL-PDR-L
Los Angeles, California 90017
In the alternative, comments can be submitted by email at Kirk.C.Brus@usace.army.mil
If you have questions or would like additional information, please contact Kirk Brus at (213) 452-3876.
DRAFT ENVIRONMENTAL ASSESSMENT (DEA)
FOR THE
VENTURA HARBOR
SIX-YEAR
FEDERAL MAINTENANCE
DREDGING PROGRAM
VENTURA COUNTY, CALIFORNIA
PREPARED BY:
U.S. ARMY CORPS OF ENGINEERS
LOS ANGELES DISTRICT
915 WILSHIRE BOULEVARD
LOS ANGELES, CALIFORNIA 90017-2645
October 2018
FINDING OF NO SIGNIFICANT IMPACT (FONSI)
VENTURA HARBOR
SIX-YEAR FEDERAL MAINTENANCE DREDGING PROGRAM
VENTURA COUNTY, CALIFORNIA
I have reviewed the attached Environmental Assessment (EA) prepared for the proposed Ventura Harbor SixYear Federal Maintenance Dredging Program, located in Ventura County, California. The Proposed Project
(Alternative 1) includes annual dredging of a maximum total of approximately 1,000,000 cubic yards (CY) of littoral
drift material from the Federal entrance and navigation channels, and sand trap areas, or approximately 6,000,000
CY covering a multi-cycle program period. Placement of suitable dredge material would occur at South Beach,
McGrath State Beach, McGrath State Beach Nearshore, and/or South Jetty Beach for beach replenishment
downcoast of the harbor. Dredged material would not be placed in Santa Clara River estuary or in the mouth of the
Santa Clara River. The Proposed Project is required to maintain federally-authorized channel configurations, restore
and ensure safe navigability within Ventura Harbor, and provide necessary access for repair of Federal structures.
Annual dredging and placement of suitable dredged material is expected to be performed annually for a
period of up to seven years, using a hydraulic dredge (with a temporary pipeline), or a hopper dredge, or a clamshell
dredge, or a combination of dredge platforms. Annual dredging would typically be completed within a one month
duration during the late winter/early spring season, but could occur between September 15 and March 15 during any
year. Weather conditions, performance of the dredging equipment, and funding levels could all influence the
duration of the dredging, and therefore, up to 75 days annually are allowed for the dredging.
Sediment has been tested in accordance with applicable regulations. Sediment within seven of the nine
dredge footprint areas is beach/surf zone and nearshore suitable and compatible, and would be discharged on the
placement of suitable dredged material area sites. The Corps will conduct confirmatory sampling of areas B and D
to confirm the sandy nature of sediment prior to dredging in those areas.
Potential impacts to environmental resources would be avoided, minimized or reduced to negligible, short
term or temporary levels, as outlined in the attached EA. Resources potentially affected by the Proposed Project
include general physical environment/littoral transport, water quality, biological resources, air resources, noise, land
use and recreation, aesthetics, cultural resources, vessel traffic and safety, ground transportation, and
socioeconomics and environmental justice.
The Proposed Project is in compliance with all applicable laws, including the National Environmental Policy
Act (NEPA), Sections 401 and 404 of the Clean Water Act (CWA), Coastal Zone Management Act (CZMA),
National Historic Preservation Act (NHPA), Endangered Species Act (ESA), Fish and Wildlife Coordination Act
(FWCA), Magnuson-Stevens Act, and Clean Air Act (CAA). Alternatives to the project have been included in the
EA, in compliance with NEPA.
The Proposed Project has been evaluated pursuant to Section 404(b)(1) of the CWA, and is in compliance
with these guidelines. The Corps has applied for a CWA 401 WQC (WQC) from the California Regional Water
Quality Control Board (CRWQCB) Los Angeles Region.
The Proposed Project has been analyzed by the Corps as required under the CZMA of 1972 and the
California Coastal Act (CCA). A Negative Determination (ND) has been sent to the California Coastal Commission.
Annual dredging activities emissions from the project would be short term and temporary, and would fall
below thresholds levels. Therefore, a Conformity Determination would not be required.
No cultural resources listed on or eligible for the National Register of Historic Places (NRHP) are present
within the Area of Potential Effect (APE). Therefore, The Corps has determined that proposed project has "No
potential to cause effects," as described at § 800.3(a)(1) under Section 106 of the NHPA.
Coordination with the U.S. Fish and Wildlife Service (USFWS), National Marine Fisheries Service (NMFS),
US EPA, California Department of Parks and Recreation (CDPR, State Parks), CCC, CRWQCB Los Angeles
Region, and the California Department of Fish and Game (CDFG), would continue throughout the multi-cycle
program. No adverse impacts are anticipated, and the Proposed Project is in compliance with the ESA and other
applicable laws.
I have considered the available information contained in the EA, and it is my determination that
environmental impacts associated with the proposed Ventura Harbor Six-year Federal Maintenance Dredging
Program would not have a significant adverse effect upon the existing environment or the quality of the human
environment. Preparation of an Environmental Impact Statement (EIS), therefore, is not required.
Date
_________________________________
Aaron C. Barta
Colonel, U.S. Army
Commander and District Engineer
Table of Contents
1.0
2.0
INTRODUCTION ..........................................................................................................................1
AREA DESCRIPTION ..................................................................................................................2
2.1 Project Location ........................................................................................................................................................... 2
2.2 Purpose and Need ......................................................................................................................................................... 2
2.3 Background .................................................................................................................................................................. 2
2.4 Previous Harbor Projects .............................................................................................................................................. 4
2.5 Plan Formulation .......................................................................................................................................................... 6
3.0.
PROPOSED PROJECT (ALTERNATIVE 1) AND ALTERNATIVES...................................8
3.1 Authorization................................................................................................................................................................ 8
3.2 Alternatives Considered ............................................................................................................................................... 8
3.2.1 Proposed Project (Alternative 1) ............................................................................................................................... 8
3.2.2 No Action Alternative (Alternative 2)..................................................................................................................... 13
3.2.3 Alternative 3: Biennial (every two years) dredging ................................................................................................ 13
3.2.4 Alternative 4: Biannual (twice a year) dredging ..................................................................................................... 14
4.0 AFFECTED ENVIRONMENT..........................................................................................................15
4.1 General Physical Environment/Littoral Transport ..................................................................................................... 15
4.1.1 Watershed ................................................................................................................................................................ 16
4.1.2 Estuary..................................................................................................................................................................... 17
4.1.3 Wave Action ............................................................................................................................................................ 18
4.2 Water Quality ............................................................................................................................................................ 18
4.2.1 Local Weather Influences........................................................................................................................................ 23
4.3 Biological Resources .................................................................................................................................................. 25
4.4 Air Resources ............................................................................................................................................................. 39
4.4.1 Meteorology ............................................................................................................................................................ 39
4.4.2 Air Quality............................................................................................................................................................... 40
4.5 Noise........................................................................................................................................................................... 45
4.6 Land Use (LU) and Recreation .................................................................................................................................. 47
4.6.1 Land Use ................................................................................................................................................................. 47
4.6.2 Recreation................................................................................................................................................................ 49
4.7 Aesthetics ................................................................................................................................................................... 51
4.8 Cultural Resources ..................................................................................................................................................... 51
4.9 Vessel Traffic & Safety .............................................................................................................................................. 53
4.9.1 Vessel Traffic .......................................................................................................................................................... 53
4.9.2 Safety....................................................................................................................................................................... 53
4.10 Ground Transportation ............................................................................................................................................. 54
4.11 Socioeconomics and Environmental Justice ............................................................................................................ 55
4.11.1 Socioeconomics ..................................................................................................................................................... 55
4.11.2 Environmental Justice ........................................................................................................................................... 56
5.0. ENVIRONMENTAL CONSEQUENCES........................................................................................58
5.1 General Physical Environment/Littoral Transport ..................................................................................................... 58
5.1.1 Watershed ................................................................................................................................................................ 59
5.1.2 Estuary..................................................................................................................................................................... 60
5.1.3 Wave Action ............................................................................................................................................................ 61
5.2 Water Quality ............................................................................................................................................................ 61
5.2.1 Local Weather Influences........................................................................................................................................ 70
6.0
7.0
8.0
9.0
10.0
11.0
5.3. Biological Resources ................................................................................................................................................. 73
5.4 Air Quality.................................................................................................................................................................. 82
5.5 Noise........................................................................................................................................................................... 92
5.6 Land Use (LU) and Recreation .................................................................................................................................. 95
5.6.1 Land Use (LU) ........................................................................................................................................................ 95
5.6.2 Recreation................................................................................................................................................................ 97
5.7 Aesthetics ................................................................................................................................................................... 99
5.8 Cultural Resources ................................................................................................................................................... 101
5.9 Vessel Traffic and Safety ......................................................................................................................................... 103
5.9.1 Vessel Traffic ........................................................................................................................................................ 103
5.9.2 Safety..................................................................................................................................................................... 104
5.10 Ground Transportation ........................................................................................................................................... 104
5.11 Socioeconomics and Environmental Justice .......................................................................................................... 106
5.12 Growth Inducement and Cumulative Impacts ........................................................................................................ 107
5.12.1 Growth Inducement ............................................................................................................................................. 107
5.12.2 Cumulative Impacts............................................................................................................................................. 108
ENVIRONMENTAL COMMITMENTS.................................................................................114
COORDINATION .....................................................................................................................119
COMPLIANCE WITH ENVIRONMENTAL REQUIREMENTS .......................................123
A. NATIONAL ENVIRONMENTAL POLICY ACT of 1969. ................................................................................... 123
B. CLEAN WATER ACT (33 U.S.C. 1251 et seq.) ..................................................................................................... 123
C. COASTAL ZONE MANAGEMENT ACT of 1972 ................................................................................................ 124
D. ENDANGERED SPECIES ACT OF 1972, SECTION 7(c) .................................................................................... 124
E. NATIONAL HISTORIC PRESERVATION ACT................................................................................................... 125
F. MAGNUSON-STEVENS FISHERY MANAGEMENT AND CONSERVATION ACT ....................................... 125
G. FISH AND WILDLIFE COORDINATION ACT (FWCA) .................................................................................... 125
H. CLEAN AIR ACT of 1970 (42 U.S.C. 7401 et seq.) ............................................................................................... 126
I. ENVIRONMENTAL JUSTICE ................................................................................................................................ 127
CONCLUSION ...........................................................................................................................128
LIST OF PREPARERS .............................................................................................................129
REFERENCES ...........................................................................................................................130
FIGURES
Figure 1a: Study Area Site Location Map
Figure 1b: Project Area Site Location Map
Figure 2a: Ventura Harbor Federal Maintenance Dredge Areas
Figure 2b: Placement of Suitable Dredged Material Discharge Disposal Area(s)/Site(s)
Figure 3: Bathymetry for Ventura Harbor Federal Maintenance Dredge Areas
Figure 4: Vibracore Sample Locations For Ventura Harbor Federal Maintenance Dredge Areas
Figure 5: Staging (Storage/Laydown) Area(s)
TABLES
Table 1: Ventura Harbor Dredging History (1969 through 2018)
Table 2: Water Quality Characteristics
Table 3: Ventura County Watershed Protection District, Precipitation Data [Precipitation Depth- Duration (Long
Term) Maximum Annual Precipitation (inches)], Station # VC 216B (Ventura Marina Port District), years 19652010
Table 3.1.1: Federally Protected threatened and endangered wildlife species within the Proposed Project (Alternative
1)
Table 3.1.2: Designated critical habitats in the Proposed Project (Alternative 1) analysis area
Table 4: Ambient Air Quality Standards (state of California and Federal)
Table 5: Federal and State Attainment Status for Ventura County of the South Central Coast Air Basin (SCCAB)
Table 6: VCAPCD Evaluation Criteria
Table 7: Range of Noises
Table 8: Current Traffic Volumes
Table 9: Socioeconomic, Environmental Justice Demographics for City of Ventura and Ventura County
Table 10: Federal Construction Threshold (Tons/Year) for Ventura County of the South Central Coast Air Basin
(SCCAB)
Table 11: VCAPCD Evaluation Criteria
Table 12: Proposed Project (Alternative 1) Peak daily emissions (lbs/day) and
Maximum annual emissions (tons/year)
Table 13: Proposed Project (Alternative 1) Maximum Annual GHG Emission to
VCAPCD/SCAQMD/CARB/USEPA Annual GHG Emission Thresholds (MT/yr CO2eq)
Table 14: Summary of Proposed Project (Alternative 1) Emissions By Dredge Type
Table 15: Potential Noise Levels At Various Distances
Table 16: Comparison of Baseline AADT to Proposed Project (Alternative 1) Traffic Increases
APPENDICES
Appendix A: Comparison of Dredge Types
Appendix B: Federally Threatened and Endangered Species in Ventura County
Appendix C: 404(b)(1) Evaluation
Appendix D: Water Quality Monitoring Data During Dredging Activities, 2017, 2018
Appendix E: U.S. Fish and Wildlife, U.S. Army Corps of Engineers Correspondences (2002, 2003) on Procedural
Changes to Ongoing Dredging Activities
Appendix F: Air Quality Emission Calculations and Analysis, Ventura Harbor Federal Maintenance Dredging Program
Appendix G: Contingency Plan (Corps 1998b; 2016)
Appendix H: 2017-2018 Sampling and Analysis Plan (SAP), SAP Results (SAPR) Report, and Appendices
Appendix I: Draft Plans
Appendix J: Fishery Management Plans & managed species/species complexes for the Pacific region
Appendix K: Intertidal Biological Characteristics of McGrath State Beach, Ventura Harbor Dredging and Beach
Replenishment
Appendix L: Mailing List
This Page Left Blank Intentionally This Page Left Blank Intentionally
1.0
INTRODUCTION
The Los Angeles District of the U.S. Army Corps of Engineers (Corps), as part of a six (6) year program for
periodic Operations and Maintenance (O&M) , proposes to perform annual maintenance dredging in the Federal
entrance and navigation channels, and the sand trap areas of Ventura Harbor, Ventura County, California [Proposed
Project (Alternative 1)]. Annual dredging would be a maximum total of approximately 1,000,000 cubic yards (CY),
or a potential maximum 6,000,000 CY over a multi-cycle program period, of littoral drift material from the Federal
entrance and navigation channels and sand trap areas (Figure 2a) in Ventura Harbor. An annual average range of
approximately 500,000 to 1,000,000 cubic yards (CY) of littoral material (or substrate) is expected to be removed
from Federal entrance and navigation channel dredge areas A (entrance), B (navigation), C (navigation), D
(navigation), E (entrance), and the Federal sand trap areas F, G, H, and I (Figure 2a). These dredge areas are the
federally authorized configurations maintained by the Corps, and deemed necessary for safe navigation. The
Proposed Project (Alternative 1) would satisfy the need by simulating the littoral material that is naturally moving
down the beach from the north side of the harbor to the south of the harbor. This material would be excavated using
either a hydraulic dredge, hopper dredge, clamshell dredge, or a combination of dredge platforms. The Proposed
Project (Alternative 1) would typically be completed within a one month period during the late winter/early spring
season, but could occur between September 15 and March 15 during any year. Weather conditions, performance of
the dredging equipment, and funding levels could all influence the duration of the dredging, and therefore,
approximately 75 days annually are expected to be required for dredging. Both the number of days per year and the
number of times the dredge is mobilized could very slightly, depending on conditions. The Proposed Project would
also simulate the natural north to south movement of littoral material that is currently interrupted by the harbor.
A contingency plan (Appendix G) would be implemented if dredging extends beyond March 15 anytime
during the multi-cycle program period. Suitable dredge material placement areas would be South Beach, McGrath
State Beach, and/or McGrath State Beach Nearshore south of the harbor, or South Jetty Beach (only for contingency
purposes) located immediately north of South Beach. Dredged material would not be placed in Santa Clara River
estuary or in the mouth of the Santa Clara River. The Proposed Project (Alternative 1) is a Federal project,
exclusively supported by Federal funds. The Proposed Project (Alternative 1) is similar in kind to all previous
Federal maintenance dredging projects in Ventura Harbor.
The purpose of this Environmental Assessment (EA) is to evaluate potential environmental impacts that may
result from the continuation of O&M dredging of the Federal entrance and navigation channels, and the Federal sand
trap areas, and the disposal of dredged materials for the period from September 15, 2018 to September 15, 2024, in
compliance with NEPA. Weather conditions, performance of the dredging equipment, and funding levels could all
influence the multi-cycle program period duration of the dredging, and therefore, the completion period could be
extended to September 15, 2025. Annual dredging and placement of suitable dredged material is expected to be
performed annually for a period of up to seven years. Evaluation of environmental impacts over an extended period
allows the government to award cost-effective, multi-year (multi-cycle) dredging contracts at a considerable savings
to the public.
1
2.0
AREA DESCRIPTION
2.1 Project Location
Ventura Harbor is located on the California coast approximately 65 miles northwest of Los Angeles, within
the city limits of San Buenaventura, Ventura County, north of the Santa Clara River (Figure 1a). The harbor and
local shoreline are situated such that waves originating from the west cause sediment to move predominantly in the
downcoast (southerly) direction. During most of the year, clean beach sand from upcoast beaches, and the Ventura
River, located approximately 2 miles upcoast from the harbor, migrates downcoast along the beaches into the
entrance channel of Ventura Harbor and adjacent sand traps.
2.2 Purpose and Need
The purpose of the Proposed Project is to maintain federally-authorized channel configurations, to restore and
assure safe navigability within the harbor for commercial and recreational traffic, and to provide necessary access for
construction for repairs to Federal structures (North Jetty, South Jetty, Detached Breakwater, South Beach Groin).
The Proposed Project (Alternative 1) satisfies the purpose and would serve the following functions: (1) maintain the
entrance and navigation channels, and sand trap areas that are subject to continual shoaling by sand accretion; (2)
assure the continued safe navigation for maritime traffic within the harbor; and (3) provide beach nourishment
material for downcoast beaches eroded by littoral processes. The Proposed Project (Alternative 1) area map (Figure
1b) identifies project features.
The need for the Proposed Project is to prevent shoaling at Ventura Harbor that would result in unsafe
navigation conditions, close the harbor to commercial or recreational traffic, or prevent maintenance to Federal
structures.
2.3 Background
Due to the dynamic nature of beaches located along the coast of California, longshore and onshore/offshore
sedimentary material (i.e., mud, sand or gravel) moves under the influence of waves and currents, known as littoral
transport. This transport process can vary seasonally in intensity depending on local oceanographic and weather
conditions. Particles of sediment moving via this erosion process are typically suspended into the water column by
wave or current action, are transported some distance by longshore currents, and then deposited on beaches. The void
(or erosion) left behind by this movement is normally replenished by similar sediment that has been eroded from yet
another beach area. Although giving the impression of stationary beaches, actual sediment constituting beaches is in
a state of constant movement. The two immediate sources of littoral material are the Ventura River to the north of
Ventura Harbor and the Santa Clara River to the south of Ventura Harbor. Ventura Harbor interrupts the north to
south transport process. The risk of hazardous shoaling increases within the entrance and navigation channels if
regular maintenance does not occurs in the sand trap area adjacent to these channels. The result is sediment
accumulates in certain parts of the harbor, which creates shallow and varying depths and generates breaking waves in
the channel and adjacent harbor areas that, ultimately, creates unsafe navigable waters in the harbor.
2
Responding to coastal erosion at the state of California level is the responsibility of the California Division of
Boating and Waterways. The primary mission of the California Division of Boating and Waterways is provide safe
and convenient public access to California's waterways and leadership in promoting the public's right to safe,
enjoyable, and environmentally sound recreational boating. Part of the mission of the California Division of Boating
and Waterways is to preserve and protect the California shoreline by restoring and maintaining natural and
recreational beach resources and minimizing economic losses caused by natural and human induced beach erosion.
The Corps has a Project Management Plan (PMP) [Corps, 2004a] in place and has entered in to an agreement for a
regional shore protection and sand management plan with the Beach Erosion Authority For Clean Oceans and
Nourishment (BEACON) on the Coast of California Storm and Tidal Waves Study for Ventura and Santa Barbara
Counties to seek solutions to reestablish their eroding shorelines (BEACON, 2011). BEACON is a California Joint
Power Authority (JPA) established in 1986 to address coastal erosion, beach nourishment and clean oceans within the
Central Coast from Point Conception to Point Mugu. The member agencies of BEACON include the Counties of
Santa Barbara and Ventura as well as the coastal cities of Santa Barbara, Goleta, Carpinteria, Ventura, Oxnard and
Port Hueneme (BEACON, 2018). The Corps is also involved with BEACON's Coastal Regional Sediment
Management Plan, sometimes referred to as Regional Sediment Management (RSM) that considers receiver beach
placement areas for incorporation into the BEACON RSM plan, which includes some beaches in Ventura County.
The Corps is also part of the state of California Coastal Sediment Management Workgroup that implements RSM in
order to augment or restore natural processes.
Approximately 1500 craft, including 10 sport fishing vessels and 73 commercial fishing vessels, are moored
in Ventura Harbor. There are two full service boat yards, and one of the full service boat yards has a 150 ton lift
capacity, which is the largest lift capacity between Los Angeles and San Francisco. A commercial fish processing
facility, offshore oil drilling support facility, the headquarters for the Channel Islands National Park Service (NPS),
and two boat launching ramps for public use are in or based at Ventura Harbor. The harbor is one of the top squid
landing ports on the West Coast.
Ventura Harbor provides important recreational resources for the region and local area. Recreational
activities within the vicinity of the dredging project include a variety of onshore and offshore activities, including
walking/jogging, swimming, surfing, windsurfing, sunbathing, beach combing, fishing, scuba and skin diving, hiking,
picnicking, boating, sailing, and bicycling. Fishing includes commercial fishing, sporting fishing, lobster fishing, and
gillnetting. Some of the species most commonly caught in the region include white seabass, rockfish, shark, halibut,
lobster, sea urchins, and abalone. Fishing can occur throughout the offshore area, although most of the activity
concentrates around offshore kelp beds. The large majority of human activity occurs closer to shore rather than at the
outer edge of the kelp beds. Whale watching is also a popular seasonal recreational activity.
Ventura Harbor is home to wide range of businesses offering a host of services including several full-service
marinas, dive and fishing excursions, water sports, bait and fuel docks, shopping, dining, and entertainment. The
Harbor is also home to the Four Points Sheraton hotel and conference center.
Primary project benefits realized from the Proposed Project (Alternative 1) would be as follows: (1) dredging
would re-establish a safe and navigable harbor within the existing Corps authorization; (2) maintain recreational and
3
commercial viability/operations within Ventura Harbor; and (3) placement of suitable dredged material on the
beach/surf zone, and/or nearshore would help to replenish beaches.
2.4 Previous Harbor Projects
Historically, Ventura Harbor has been dredged on an annual basis since 1969.
The Federal North and South Jetty, entrance channel, and basin of Ventura Harbor were constructed in the
mid-1960s by the Ventura Port District (VPD). In 1972, the Corps assumed maintenance responsibility for the North
and South jetty, and the entrance channel. A detached breakwater was constructed in the same year. Since 1972, the
Corps repaired the detached breakwater in 1987, 1992, 1993, 1995, 1997 through 1998, January 2001, September
2002, and 2009 through 2010.
In June 1989, a Feasibility Study and an EA were prepared to analyze the need for harbor modifications that
would improve navigation conditions and decrease the frequency of maintenance dredging (Corps 1989, revised
1990). The project was authorized by Congress in the Water Resources Development Act (WRDA) of 1990, and was
completed in August 1994. The project included construction of the following features: (1) a 300-foot north jetty
spur; (2) a 625-foot south beach groin approximately 1,000 feet (ft.) down coast of the Federal South Jetty; (3)
deepening of the entrance channel; (4) an approximate 200-foot extension of sand trap A to the south; and (5) a 300
foot extension of the detached breakwater. The South Beach Groin was repaired in 2003. South Jetty repair was
completed in October 1998. Completion of these improvements, with subsequent repairs and modifications has
helped to reduce shoaling in the harbor and undesirable wave action.
In 1995, a Federal emergency breakwater repair, sill construction, and dredging were required at Ventura
Harbor (memorandum, dated 14 Feb 95), after the area experienced a series of severe winter storms. In response to
this situation, the Corps authorized emergency repairs to the Detached Breakwater, and construction of a sill between
the breakwater and the North Jetty Spur head. Construction of the sill was necessary to reduce scouring effects and
further damage to the breakwater and the North Jetty Spur.
Expedited dredging was also initiated in January 1995 to restore Federal authorized channel depths in the
entrance channel. An access channel to the corridor between the Federal breakwater and the Federal North Jetty Spur
was also dredged. A hopper dredge was used in the entrance channel, and a clamshell dredge was used in the access
channel. Construction of the emergency sill began at the end of February 1995, and took approximately 3-4 weeks to
complete.
The most recent Federal maintenance annual dredging in Ventura Harbor was completed in March 2018.
The annual dredged volumes removed by Corps since 1969 through 2018 are summarized in Table 1 (Corps,
2018b).
4
Table 1. Ventura Harbor Dredging History (1969 through 2018)
Dredge Year
Vol. Removed
(cubic yards)
Dredge Method
Placement Location
1969
1970
1972
1973
1974
1976
1979
1981
1981
1983
1984
1984
1986
1987
1988
1989
1990
1991
1992
1993
1995
Feb 1996
Dec 1996
1997
1998
2000
2001
2002
2003
2004
2005
1,883,000
325,000
2,400,000
1,193,820
420,000
152,000
1,021,500
320,000
812,000
1,186,000
300,601
914,671
850,000
363,100
800,000
150,000
218,000
377,000
566,000
471,000
229,000
844,000
438,000
715,000
640,000
837,000
625,000
670,000
785,000
578,400
139,400
hydraulic cutterhead
hydraulic cutterhead
hydraulic cutterhead
hydraulic cutterhead
hydraulic cutterhead
hydraulic cutterhead
hydraulic cutterhead
hydraulic cutterhead
hydraulic cutterhead
hydraulic cutterhead
hydraulic cutterhead
hydraulic cutterhead
hydraulic cutterhead
hydraulic cutterhead
hydraulic cutterhead
hydraulic cutterhead
hydraulic cutterhead
hydraulic cutterhead
hydraulic cutterhead
hydraulic cutterhead
hydraulic cutterhead
hydraulic cutterhead
hydraulic cutterhead
hydraulic cutterhead
hydraulic cutterhead
hydraulic cutterhead
hydraulic cutterhead
hydraulic cutterhead
hydraulic cutterhead
hydraulic cutterhead
hydraulic cutterhead
McGrath Beach
McGrath Beach
McGrath Nearshore
McGrath Beach
McGrath Beach
McGrath Beach
McGrath Beach
McGrath Beach
McGrath Beach
McGrath Beach
McGrath Beach
McGrath Beach
2006
Jan 2007
Nov 2007
2008
2009
450,000
459,500
387,000
355,000
379,000
hydraulic cutterhead
hydraulic cutterhead
hydraulic cutterhead
hydraulic cutterhead
hydraulic cutterhead
McGrath Beach
McGrath State Beach
South Beach
McGrath and South Beach
South Beach
2010
386,000
hydraulic cutterhead
South Beach
2011
316,000
hydraulic cutterhead
South Beach
2012 (USACE)
227,000
hydraulic cutterhead
South Beach
2012 (Ventura Port Dist.)
273,000
hydraulic cutterhead
South Beach
2013
240,000
hydraulic cutterhead
South Beach
2014
440,000
hydraulic cutterhead
South Beach
5
2015
778,000
hydraulic cutterhead
South Beach
2016
906,000
hydraulic cutterhead
South Beach
2017
470,000
hydraulic cutterhead
South Beach
2018
600,000
hydraulic cutterhead
South Beach
Source: Corps, 2018b.
2.5 Plan Formulation
A multi-evaluation Corps process was used to formulate and evaluate project alternatives leading to selection
of the Proposed Project (Alternative 1). Part of the Corps planning process includes identification of planning
objectives and constraints, defining a decision making process, and discussion of potential alternatives. The process
also involved evaluation of whether alternatives met project objectives, and were the least environmental damaging
practicable alternative (LEDPA) pursuant to 404(b)(1) guidelines. Alternative(s) that meet these criteria are carried
forward for further analysis in the EA, prior to determining the Proposed Project (Alternative 1) Alternative. All
alternatives previously addressed in the current Ventura Harbor Federal maintenance dredging Six Year Maintenance
Dredging Program Environmental Assessment (FEA) [Corps, 2004b; 2001] remain applicable, and have been carried
forward into this new EA. A 404(b)(1) Evaluation (Appendix C) analyzes and evaluates discharge of dredged or fill
materials.
a. Planning Objectives
Planning objectives were identified to direct the formulation and evaluation of alternative plans. The order of the
planning objectives listed below does not indicate their level of urgency or their priority.
1. Dredging would re-establish a safe and navigable harbor within the existing Corps authorization.
2. Placement of suitable dredged material on the beach(es) and/or nearshore would help to replenish beaches
and would make beneficial use of the dredged material by utilizing this suitable material for environmental
and economic purposes.
3. Sustain environmental resources to the extent practicable.
4. Compliance with the Federal Section 103 of the Marine Protection, Research and Sanctuaries Act of
1972, and with Section 30233 of the California Coastal Act.
6
b. Planning Constraints
Planning constraints are defined as overriding concerns that must be considered in the formulation of a plan. Planning
constraints are of such importance that they may not be bartered or exchanged in the planning process.
1.
A planning constraint identified for this study is the limited availability of placement location sites for
suitable dredged material.
2.
A planning constraint is the operation and maintenance (O&M) funding budget to dredge all of Ventura
Harbor Federal maintenance dredging, which depends on Congress. A considerable amount of available
funding expires every Federal fiscal year (FY) at the end of September 30.
3.
A planning constraint is scheduling of the operation and maintenance (O&M) dredging due to funding
availability to dredge all of Ventura Harbor Federal maintenance dredging. Availability of funding to
dredge could occur late during a fiscal year, and expenditure of all of the dredging funding to dredge all
of the Ventura Harbor Federal dredge areas may be limited due to a reduced, fiscal year funding schedule.
4.
A planning constraints could be environmental window(s) that limit placement of suitable dredged
material on the beach due to the presence of a federally listed species (e.g., Western snowy plover) and/or
when a nest is observed on the beach.
7
3.0.
PROPOSED PROJECT (ALTERNATIVE 1) AND ALTERNATIVES
3.1 Authorization
Federal maintenance dredging of Ventura Harbor (Ventura Marina), California is authorized under the River
and Harbor Act of 1968 (House Document 356, 90th Congress, 2nd Session), with the date of the authorizing act of
August 13, 1968.
3.2 Alternatives Considered
Since legislation directs Federal dredging to occur specifically at Ventura Harbor and placement at local
beaches/nearshore, no other alternative dredge sites or placement sites are considered viable or reasonable. Therefore,
no other alternative dredge sites outside of Ventura Harbor and/or placement sites are analyzed in detail. However, if
the sediments are determined to be unsuitable for beach/surf zone or nearshore placement, disposal options would be
analyzed. Different options for timing the frequency of dredge and placement activities are considered.
The Alternatives considered are as follows:
3.2.1 Proposed Project (Alternative 1)
The Proposed Project (Alternative 1), consists of annual maintenance dredging of the Federal entrance and
navigation channels and the Federal sand trap areas, in Ventura Harbor, Ventura, Ventura County, California, as well
as placement of suitable dredge material on nearby beaches and/or nearshore environment. It is expected that
dredging would occur annually depending on the existing conditions at that time. The maximum total amount of
sediment that is expected to be dredged over the multi-cycle program period is approximately 6,000,000 CY.
The multi-cycle program period occurs from September 15, 2018, to September 15, 2024. Weather
conditions, performance of the dredging equipment, and funding levels could all influence program duration of the
dredging, and therefore, the completion period could be extended to September 15, 2025. Annual dredging and
placement of suitable dredged material is expected to be performed annually for a period of up to seven years.
Dredging
This component of the Proposed Project (Alternative 1) consists of annual dredging of a maximum total of
approximately 1,000,000 CY, or a potential maximum 6,000,000 CY over the program period, of littoral drift
material from the Federal entrance and navigation channels, and sand trap areas (Figure 2a) in Ventura Harbor. The
Proposed Project (Alternative 1) would typically be completed within a one month period annually during the late
winter/early spring season, but could occur between September 15 and March 15 during any year. Weather
conditions, performance of the dredging equipment, and funding levels can all influence the multi-cycle dredging
activities. Because of these uncertainties, a performance period of approximately 75 days annually is expected to be
required for dredging. Both the number of days per year and the numbers of times the dredge is mobilized could vary
8
slightly, depending on conditions. A contingency plan (Appendix G) would be implemented if dredging extends
beyond March 15 anytime during the multi-cycle program period.
The Federal Entrance and Navigation Channel feature of the Proposed Project (Alternative 1) consists of
dredging variable quantities of littoral material from the Federal entrance and navigation channels (Figure 2a) in
Ventura Harbor. Entrance Channel (Area A) has an authorized depth of -20 ft. MLLW plus two feet for overdepth
allowance. Entrance Channel (Area E) and Navigation Channel (Area B, C, and D) have an approved advanced
maintenance depth of -40 feet MLLW.
The Sand Trap feature of the Proposed Project (Alternative 1) consists of dredging a variable quantity of
littoral material from the Federal sand trap area (Figure 2a) in Ventura Harbor. Area F Sand Trap has an approved
advanced maintenance depth of -12ft MLLW, and Area G Sand Trap has an approved advanced maintenance depth of
-40 feet MLLW. Areas H and I sand traps have approved advance maintenance depths of -30 feet MLLW and -25
feet MLLW, respectively.
Placement of Suitable Dredged Material Area(s)
The proposed Federal dredging project utilizes the following four placements of suitable dredged material
areas (Figure 1b): 1) South Beach; 2) McGrath State Beach (subject to concurrence from California Department of
Parks and Recreation/State Parks); 3) McGrath State Beach Nearshore, and/or; 4) South Jetty Beach (a contingency
beach). The fourth placement area for suitable dredged material is South Jetty Beach. Historically, South Jetty Beach
has provided the pipeline corridor to the beach nourishment site(s)/placement dredged material area/site(s) [e.g.,
South Beach; McGrath State Beach; McGrath State Beach Nearshore] further south. If South Jetty Beach has
retreated or eroded, and therefore the dredge pipeline could not be placed on said beach for safety or operational
reasons, the beach would need to be replenished.
Placement of suitable dredged material areas would occur within the limits of the areas identified. A detailed
description of the proposed placement of suitable dredged material areas (for beach replenishment) follows.
A Beach (and/or Surf Zone) suitable dredged material could be placed along South Beach, at approximately
+ 10 ft. MLLW for the beach placement, and/or in the surf zone. Replenishment on South Beach would take place
between the harbor's South Beach Groin and 200 feet north of the point where the Santa Clara River flows into the
Pacific Ocean. Dredged material would not be placed in Santa Clara River estuary or in the mouth of the Santa Clara
River. A temporary pipeline for placement of suitable dredged material would be sited to avoid the sand dunes and
Western snowy plover at South Beach.
Another Beach (and/or Surf Zone) suitable dredged material could be placed along McGrath State Beach, at
approximately + 10 ft. MLLW on the beach placement, and/or in the surf zone. Replenishment on McGrath State
Beach would begin approximately 200 feet south of the point where the Santa Clara River flows into the Pacific
Ocean, and extend south approximately 4,300 feet. The temporary pipeline would cross the Santa Clara River mouth
on the protected, backside of the sand spit at the Santa Clara River mouth. The placement of suitable dredged
9
material on McGrath State Beach would not be in the proximity of McGrath Lake or the GenOn Generating Station,
and would not encroach to the McGrath Lake or the GenOn Generating Station.
Nearshore Placement of Suitable Dredged Material Area
A nearshore placement of suitable dredged material area could be McGrath State Beach Nearshore
placement, beginning approximately 500 feet south of the mouth of the Santa Clara River, and extending south
approximately 4,300 feet, in waters -15 ft. MLLW to -28 ft. MLLW. The placement of suitable dredged material
from Ventura Harbor on to McGrath State Beach Nearshore is not in the proximity of McGrath Lake or the GenOn
Generating Station, and would not encroach to McGrath Lake or the GenOn Generating Station.
Contingency Beach/Surf Zone Placement of suitable Dredged Material Area
Historically, South Jetty Beach has provided the pipeline corridor to the beach nourishment site(s)/placement
dredged material area site(s) further south. South Jetty Beach, approximately 1,000 feet in linear length, is located
immediately north of South Beach and extends up to the South Jetty. When South Jetty Beach has retreated or eroded,
and therefore the dredge pipeline could not be placed on South Jetty Beach for safety or operational reasons, then
there would be a need to replenish sand on South Jetty Beach for contingency purposes.
Specific method(s) of placement of dredge material (i.e. beach and/or surf zone, and/or nearshore) would
depend on the type of dredge to be used. One type of dredge is a hydraulic cutterhead pipeline dredge. Typically, a
floating dredge with an attached hydraulic cutterhead is used to dredge the sand. Then, the sand slurry is pumped
through a pipeline onto the beach, surf zone, or into a nearshore placement area. Following pipeline transport, the
sand typically is uniformly spread over the beach using conventional earth moving equipment (typically a bulldozer,
and/or an excavator). Approximately 10,000 to 40,000 CY of sediment can be piped to the beach per day using a
hydraulic dredge. Additional construction equipment typically required to support dredging activities are support
(ancillary) boats (e.g., tug boats; crew boats).
For placement of suitable dredge material on the beach, dredging equipment and placement of suitable
dredged material area(s) would be chosen by the contractor unless specific restrictions were imposed in consideration
of potential environmental impacts. After beach placement, mounds could be graded to obtain the desired beach
profile, and to maintain the aesthetic quality of the beach. The dredged material would not be moved or transported
from one location to another in the project area to another area in the project area by trucks or any other type of land
vehicles.
The future disposition of dredged sediment for the analysis period (2018 to 2025) from Ventura Harbor by the
Corps of Engineers will be made at the placement areas of McGrath State Beach Onshore, McGrath Nearshore,
South Beach Onshore, and South Beach Jetty Onshore (contingency beach). These areas have been preselected for
placement because sediment from the harbor has been placed at these areas during past Corps routine maintenance
dredge events. The Corps preference for placement of future sediment from the harbor would be onshore placement
area because this placement area offers the maximum beneficial use of dredged material for the surrounding
community. South Beach would be the preferred beach placement area as it would logistically be more advantageous
10
since it would require less pipeline and would be the most cost effective compared to McGrath beach placement area
that is on State Parks land that would require additional coordination.
Dredging an Approach to a Federal Dredge Area(s)
Conditions may exist when an approach to any of the Federal Dredge Area(s), for example, the Sand Trap, is
restricted due to littoral transport build up to the approach(es) in the Federal Dredge Area(s) which would require
additional dredging of the approach in the Sand Trap to allow annual maintenance dredging to be performed.
Staging Area(s)
A proposed staging area(s)/(storage area(s) is an area historically utilized for storing maintenance equipment,
primarily for temporary pipeline used for Corps' Ventura Harbor dredging maintenance activities.
The primary staging area, located at the north end of Spinnaker Drive, is an empty lot in Ventura Harbor
owned by the VPD, which has been used for many Corps and VPD projects (Figure 5). The Spinnaker Drive
contractor work area is approximately 18,400 square feet (SF), with dimensions of about 230 feet by 80 feet.
Spinnaker Drive staging area is approximately 400 ft. from the beach. The area is completely disturbed, cleared of
vegetation, and unpaved.
An alternate staging area, located in Surfer's Knoll parking lot, and on a portion of South Beach immediately
west of Surfer's Knoll Parking lot, would be utilized in the event that the Spinnaker Drive staging area is unavailable.
The portion of South Beach to be used as an alternate staging area would be on the seaward side of and west of
(adjacent to) Surfer's Knoll parking lot. The approximate area to be used as an alternate staging area is the Surfer's
Knoll parking lot, approximately 35,000 square feet (SF), and the portion of South Beach, approximately 22,500 SF,
totaling approximately 57,500 SF. Surfer's Knoll parking lot is a paved area with thirty-five (35) parking spaces, and
has two ingress/egress from Spinnaker Drive. Equipment and piping material would be transported from Spinnaker
Drive through Surfer's Knoll parking lot. To accommodate safe access, transport, and storage of equipment and
pipeline to the alternate staging area, the parking lot would temporarily be closed during the duration of the
winter/spring annual dredging timeframe. During the temporary closure of Surfer's Knoll parking lot, the public
would be able to park vehicles along Spinnaker Drive or park across the street in the Ventura Harbor Village parking
lot where additional parking is available. Two, ingress/egress exist to South Beach from Surfer's Knoll parking lot.
Ingress and egress of equipment and materials to South Beach from Surfer's Knoll Parking lot would occur on the
south side entrance of Surfer's Knoll parking lot to reduce potential impacts to South Beach. Equipment and pipeline
would not be placed on sand dunes. The north side entrance of Surfer's Knoll Parking lot to South Beach would
remain open to the public for beach access. Furthermore, since 2004 when Western snowy plover surveys during
dredging were initially conducted annually through the present (2018), the Western snowy plover has never been
documented using the area of South Beach adjacent to the Surfer's Knoll parking lot being proposed as alternate
staging/storage area (Corps, 2018a); this disturbance has primarily been due to human activity and dogs not on
leashes. The Corps would continue to implement environmental commitments and protection measures to avoid
potential impacts to Western snowy plover during pre-mobilization and de-mobilization of equipment and pipeline
when utilizing the alternate staging area on South Beach
11
Equipment Mooring
The squid port in Ventura Harbor is available to the dredging contractor as a marine access area and equipment
mooring is available near the eastern end of the North Jetty (Figure 5).
Dredging Crew Parking
The dredging crew would use the public parking at the VPD Harbor's Boat Launching facility for parking of their
personnel owned vehicles (POVs),
Equipment Alternatives
Contractors have the option of utilizing different types of dredge equipment including a hydraulic dredge
(with temporary pipeline), a clamshell (bucket) dredge (barge-mounted cranes with clamshell or bucket with
nearshore placement of suitable dredged material), a hopper dredge (with nearshore placement of suitable dredged
material), or a combination of any of the dredge platforms. A comparison of the advantages and disadvantages of
dredge types (Appendix A) are summarized below.
Hydraulic Dredge Capable of dredging most types of materials and use of temporary pipeline provides
direct pumping to beach placement of suitable dredged material area(s). Pontoons would support the dredge pipeline
from the hydraulic dredge on the water in the harbor. After the dredge pipeline is on the beach, the pipeline would
either be buried in the sand or would be placed on top of on the sand.
Clamshell (Bucket) Dredge Equipment typically consists of derrick mounted on a barge outfitted with a
clamshell bucket. Dredged materials are placed on a separate barge for transport to a placement site. This method is
generally not used for on shore beach placement, but can be used to place material at a nearshore placement site.
Approximately 10,000 cubic yards of sediment can be removed and transported to a placement site per day using a
clamshell dredge. The clamshell dredge may result in higher levels of turbidity at the dredge area as compared with
the hydraulic dredge. When dealing with a high percentage of sand content, turbidity is not a primary concern.
Hopper Dredge Hopper dredges are self-propelled equipment (e.g., ships). A hopper dredge operates by
pumping sand into its holds, and then moving to a placement site to pump sand onto a beach or into a nearshore
placement area or it opens its hull (for a spilt-hull designs commonly found on the west coast of the U.S) to dump
sand into nearshore placement areas. Typically a hopper dredge have a capacity of 500 to 3,000 CY. Normally, a
load is filled in about one hour. The vessel travels with an average speed of eight miles per hour loaded and nine
miles per hour unloaded. A hopper dredge typically requires a crew boat for additional support. Hopper dredges are
unable to operate in most shallow areas. Hopper dredges also cause higher levels of turbidity at the dredge area as
compared with the hydraulic dredge.
Scheduling Alternatives
Daily and seasonal alternatives to the proposed dredging schedule and are described below.
12
Daily Schedule - The contractor may choose to dredge on a 24-hour per day schedule.
Seasonal Schedule Dredging is intended to occur during dates that minimize impacts to threatened and
endangered species. The project intends to avoid on-shore placement during nesting windows for Western snowy
plover (15 March thru 15 September) south of Surfer's Knoll and at McGrath State Beach. If unforeseen
circumstances (such as weather related storms, funding constraints, and/or equipment failure) delay completion of the
annual dredging and beach replenishment by March 15 during any year, a contingency plan (Appendix G) would be
implemented beyond March 15 anytime during the program.
Short term Schedule - The project description proposes a Federal Maintenance Dredging Program from
September 15, 2018 to September 15, 2024 (with a possible extension to September 15, 2025). Annual dredging and
placement of suitable dredged material is expected to be performed annually for a period of up to seven years. The
existing environment is not expected to change substantially during the period. Monitoring and coordination would
continue to ensure sustained environmental compliance throughout the proposed duration.
3.2.2 No Action Alternative (Alternative 2)
The No Action Alternative assumes that no Federal action would be undertaken to address the shoaling of the
Federal channel, entrance and sand trap dredge areas in Ventura Harbor and no Federal placement of suitable dredged
material on the beach/surf zone or nearshore would occur. Although the Corps has been mandated and authorized by
Congress to maintain safe navigation, the No Action Alternative (Alternative 2) is carried forward for evaluation and
analysis in this EA in compliance with the National Environmental Policy Act. As a result, there would be continued
shoaling of the harbor channels and sand trap areas, and beach erosion would accelerate because there would be no
beach replenishment from the placement of suitable dredged material. Unsafe conditions for navigation would
develop resulting in impassable channels. A high potential for danger to life and property can be expected if the
harbor channels are not maintained at safe depths.
3.2.3 Alternative 3: Biennial (every two years) dredging
Alternative 3 would limit dredging to every two years, and would not allow for annual dredging needed due
to shoaling of the Federal channel in Ventura Harbor. Table 1 [Ventura Harbor Dredging History (1969 through
2018)] identifies a biennial dredging, 1970 and 1972, and the 1972 dredging quantity was 2,400,000 CY, which was
the largest dredging by quantity summarized in Table 1. If the 1972 biennial dredging was considered for present day
dredging, it would far exceed the maximum annual dredging of 1,000,000 CY, and therefore, Alternative 3 would not
be feasible. Biennial dredging of the Federal channels would result in the creation of navigational hazards, and
unacceptable erosion of downcoast beaches. Since Alternative 3 does not meet most of the Proposed Project Purpose
and Need, it is not carried forward for further evaluation and analysis in the Affected Environment or Environmental
Consequences (Impacts) sections of the EA.
13
3.2.4 Alternative 4: Biannual (twice a year) dredging
The amount of sediment buildup in the Federal channels in Ventura Harbor is not normally sufficient to
justify biannual dredging. Table 1 [Ventura Harbor Dredging History, (1969 through 2018)] identifies twice a year
dredging in 1981, with volumes removed of 320,000 CY and 812,000 CY respectively, with 320,000 CY being the
smallest quantity removed when dredging of the Federal channel started in 1969. Though biannual dredging would
beneficial for beach nourishment of downcoast beaches, additional costs and a restrictive environmental window
starting on March 15 for the Western snowy plover and grunion, would make Alternative 4 not feasible as a regular
maintenance alternative. Since Alternative 4 does not meet some of the Proposed Project Purpose and Need, it is not
carried forward for further evaluation and analysis in the Affected Environment or Environmental Consequences
(Impacts) sections of the EA.
14
4.0 AFFECTED ENVIRONMENT
The environmental setting, sometimes referred to as the affected environment and/or existing conditions, is
detailed in the following sections below and citations of several previous reports (i.e.,Corps 1987, etc.; USFWS 1981,
etc., and; USEPA 1971, etc.), and discussed in this document. The subject reports are hereby incorporated by
reference, as per 40 CFR 1502.21.
4.1 General Physical Environment/Littoral Transport
Beaches along the central and southern coasts of California are typically dynamic in nature, involving
constant and continual longshore and onshore/offshore sedimentary material (i.e., mud, sand or gravel) being moved
under the influence of waves and currents, which is a process known as littoral transport. This process varies
seasonally in intensity depending upon local oceanographic conditions, weather conditions, and on other conditions
throughout the eastern Pacific Ocean. Particles of sediment moving via this erosion process are typically suspended
into the water column by wave or current action, transported some distance by longshore currents, and then deposited
on adjacent beaches. The void (or erosion) left behind by this movement is normally replenished by similar sediment
that has been eroded from yet another beach area. Although giving the illusion of stationary beaches, actual sediment
constituting beaches is in a state of constant movement. The two immediate sources of littoral material are the
Ventura River to the north of Ventura Harbor and the Santa Clara River to the south of Ventura Harbor.
When littoral material is transported past or into the protected low-energy waters of Ventura Harbor,
suspended material settles, and is then only rarely resuspended. Therefore, Ventura Harbor, like other harbors, acts as
an interceptor of this longshore transport of sediment that would otherwise continue upcoast or downcoast. Over
time, this settling of material results in shoaling of navigation channels within the harbor, necessitating periodic
maintenance dredging to ensure safe navigation conditions. The quantity of material, and the periodicity and extent
of the annual maintenance dredging activities in Ventura Harbor, is dependent upon the highly variable local
oceanographic conditions and specifically on the frequency, intensity, and duration of longshore currents, wind,
storms, and other wave actions.
Based on a study of sediment discharge in the Santa Clara River Basin, the sediment grain sizes discharged
by the Santa Clara River range from clays and silts to gravels (VPD, 2018e). Particle size measurements were
collected during the years 1969 to 1975. Fine grain silts and clays comprised over 79 percent of the sediments
discharged by the Santa Clara River during these years. The river has discharged between 0.4 and 40,200,000 tons per
day (estimated to be between 0.3 and 30,000,000 cubic yards) from the river mouth into the marine environment. The
estimated mean daily total sediment discharge during the period 1950 to 1975 for the Santa Clara River was 9,720
tons (estimated at approximately 7,200 cubic yards). This can be estimated to consist of over 2.5 million cubic yards
of sediment per year.
A 1994 sediment investigation included the collection of sediment cores from the inner harbor and in
addition, samples were collected offshore of the Santa Clara River mouth (VPD, 2018e). The dredge material
collected in the Ventura Inner harbor were compared to the grain size results of the deposition site located at the
mouth of the Santa Clara River. Results showed that both the dredge material and nearshore deposition location
15
consisted of predominately silts, sands, and to a lesser degree clays. Silt constituted 42.2 percent of the inner harbor
material and 64.8 percent of the nearshore deposition site material. Conversely clay accounted for 20.8 percent in the
inner harbor dredge material and 5.3 percent at the nearshore deposition site. Sand accounted for the remaining
fractions in both cases. It was the conclusion of the 1994 study report that the sediments in the Ventura Harbor were
comparable with sediments regularly discharged by the Santa Clara River. Additionally, it was the conclusion of the
study that the sediments dredged from the Ventura Harbor could be deposited near the river mouth without causing a
long-term alteration of the grain size distributions in the area of the river mouth.
In the period of 1997 to 2006 dredge events saw the deposition of 172,283 cubic yards (ranged from 13,500
to 71,147 cubic yards per event) of Ventura Keys sediment to the area of the Santa Clara River mouth (VPD, 2018e).
The average discharge is calculated at 43,000 cubic yards per deposition year. In review inner harbor dredge material,
including that of the Keys Connecting Channel, is very similar to sediment discharged by the Santa Clara River and
residing within the nearshore area of the deposition site. No adverse impacts were recorded.
The sediment discharged from the Santa Clara River is transported down-coast via longshore transport as a
part of the Santa Barbara Littoral Cell (Stillwater Sciences, 2011). Littoral cells are discrete coastal regions that can
be considered closed systems within which sediment is transported. The Santa Barbara Littoral Cell, which is
associated with the Santa Barbara Channel, is adjacent to the Santa Maria Littoral Cell and extends from Point
Conception to Mugu submarine canyon. The portion of the littoral cell (subcell) for which the Santa Clara River
specifically contributes sediment extends from Ventura Harbor at the northern extent to Channel Islands Harbor at the
southern extent. Although Ventura River north of Ventura Harbor does contribute sediment to this subcell, Ventura
Harbor is considered the northern subcell extent. The strength and direction of the longshore current is a function of
incoming wave height, direction of wave approach, and beach slope. In response to prevailing wind direction of 247°
(degrees) in the area of the Santa Clara River mouth and wave shelter from offshore islands, the longshore current
generally flows down-coast in a southeasterly direction (O'Hirok 1985, Noble Consultants 1989). Longshore
velocity can reach 2 meters per second (Orme 1982 as cited in O'Hirok 1985).
4.1.1 Watershed
The Santa Clara River watershed lies in the tectonically active, semi-arid Transverse Mountain ranges of
southern California (Stillwater Sciences, 2011). As part of this setting, the 4,200 square kilometer (1,620 square mile)
watershed is host to a diverse patchwork of landscape types, each composed of a unique suite of geomorphic
processes controlled by regional and local forces--tectonics, climate, geology, topography, wildfires, and land use.
Where rapid uplift rates, weak lithologies, extreme yet episodic rainfall, steep slopes, and intensive land practices
coincide, sediment-production rates can be dramatically high. The variability in sediment-production rates across the
watershed has a pronounced effect on the river morphology, which, at the reach scale, is further influenced by the
degree of sediment connectivity with specific sediment sources and by the transport capacity along the channel.
Overall, the watershed sediment-production rate is approximately 8.2 million metric tonnes per year, or 2,000
tonnes per square kilometer per year averaged across the entire watershed area (Stillwater Sciences, 2011).
16
Throughout much of the (Santa Clara) river, active channel widths have been further reduced by floodplain
encroachment and even river channel encroachment over the past several decades (Stillwater Sciences, 2011). These
developments have stabilized channel boundaries along most of the channel reaches situated near the cities of
Ventura and Santa Clarita. The flow constrictions associated with the width reductions have the potential to create an
unstable condition in the river's morphology, which could result in accelerated channel bed level changes and/or bank
failure and create additional hazards to the population and infrastructure. Partly in response to this dynamic, some
lower tributary reaches have now been completely lined with concrete (e.g., Santa Paula, Bouquet Canyon),
essentially locking those channels in place but impacting a range of natural geomorphic and ecological processes.
4.1.2 Estuary
The downstream end of the Santa Clara River forms an estuary composed of a main lagoon impounded by a
seasonally closed-mouth berm (Stillwater Sciences, 2011). The total inundated area of the Santa Clara River Estuary,
defined by the maximum inundation extent within the river channel and main lagoon under closed-mouth, low-flow
conditions, is currently 0.84 square kilometers (0.33 acre) and extends approximately 750 meters (2,500 feet)
upstream of Harbor Boulevard Bridge. The most current bathymetric survey (2005 LiDAR surveys by both Ventura
County and the USGS) reveals that bed elevations range from 1.2 meters (4.0 feet) in the current mouth channel
location to 3.1 meters (10.2 feet) at the upstream extent of inundation during low-flow, closed-mouth conditions,
with a median bed elevation of approximately 1.9 meters (6.5 feet). The beach berm elevation currently varies
between 4 meters (14 feet) and 5 meters (17 feet), which is approximately between 2.6 and 3.5 meters (8.7 and 11.7
feet) above mean higher high water (MHHW). On average, the Santa Clara River estuary bed is currently
approximately 1 meter (3 feet) below the adjacent floodplain that defines the southern and northern boundaries.
Swanson et al. (1990) reported a ground surface elevation range between 0.3 meter (1 feet) above mean sea level
(MSL) (1.1 meters [3.7 feet]) on the bed at the Santa Clara River estuary mouth and 4 meters (15 feet) MSL (5.3
meters [17.7 feet]) on the mouth berm, indicating that the current elevation range is very similar to what existed over
20 years ago.
The City of Ventura (also known as City of San Buenaventura) operates a Water Reclamation Facility
(WRF) and uses a three-step treatment process to treat wastewater (sewer) that is then discharged into the estuary.
The Ventura WRF's tertiary treatment plant is located in the Ventura Harbor area near the mouth of the Santa Clara
River (City of Ventura, 2011). At the mouth of the Santa Clara River, the City of Ventura WRF discharges an
average of approximately of 32,000 cubic meters per day (8.4 million gallons per day) of treated freshwater into the
Santa Clara River estuary, which is equivalent to an average year-round stream flow of approximately 0.4 cubic
meter per second (14 cubic feet per second) [Stillwater Sciences, 2011].
Tidal inflow to the Santa Clara River estuary during open-mouth conditions can account for a large portion of
the total Santa Clara River estuary water volume when the estuary has drained following a storm or other breaching
event (Stillwater Sciences, 2011). The tides adjacent to the Santa Clara River estuary are mixed semidiurnal
(O'Hirok 1985), meaning that in general there are two high tides (a lower high and a higher high) and two low tides
(a higher low and a lower low) per day, although there are days in which there is only one high tide and one low tide.
17
Historically, significant geomorphic change has also occurred within the Santa Clara River estuary, where
the river discharges to the Santa Barbara Littoral Cell in the Pacific Ocean (Stillwater Sciences, 2011). Currently,
flood flows within much of the lower river are constrained compared with historical conditions due to the network of
flood-control levees. Overall, the high, episodic storm flows in the river will maintain a river mouth and estuary that
will: (1) remain in a fixed location on the Oxnard Plain in comparison with historical conditions; (2) migrate within
the current constrained active channel during high discharge events; and (3) supply sediment for mouth closure
(nearshore deposition) and down-coast beach building (near-shore and offshore deposition). Although sediment
loading to the Santa Clara River mouth is reduced compared with historical levels and sea level will continue to rise,
hyperpycnal flow events--flows in which the river discharge is denser than ocean water due to high suspended
sediment concentration, thereby causing the suspended sediment to pass through the estuary and nearshore zone, and
be deposited on the offshore delta--still occur with sufficient frequency to maintain the mouth/estuary.
4.1.3 Wave Action
The effective wave energy modifying the coast is a function of wave direction, height, and period (Stillwater
Sciences, 2011). Waves breaking onshore at the Santa Clara River mouth often approach from due west and are
generated in the winter by low pressure systems over the Gulf of Alaska, and during the remainder of the year by the
Hawaiian high pressure cell driving winds and swells to the east. Late summer tropical storms and Southern
Hemisphere cyclones generate large swells from the south and south-southwest (O'Hirok 1985). The average wave
height along this shoreline is 1 meter but ranges from 0.3 meter to 7 meters (Orme 1982, as cited in O'Hirok 1985).
Breaking wave type (plunging, spilling, or surging) influences the relative onshore movement of beach
material (Stillwater Sciences, 2011). The most common wave type at the mouth of the Santa Clara River is a mixed
plunge-spill breaker (O'Hirok 1985). Owing to predominant deposition along this short segment of the coast, the
foreshore is rarely steepened enough to generate surging waves. The width of the surf zone is a function of the slope
of the near-shore bottom, wave height, tidal stage, and discharge. The submerged delta formed off the Santa Clara
River can create surf zones greater than 250 meter (m) wide. Surf zones measured during high spring tides are
narrower, as waves break closer to the steeper foreshore. When river discharge is low and sediment moved onshore
by wave action forms a barrier that closes the Santa Clara River mouth, the surf zone can decrease to less than 100
meter with waves breaking only once (O'Hirok 1985).
4.2 Water Quality
Water quality data has been collected annually during dredging in the Federal channel of Ventura Harbor
since 1993 by Applied Environmental Technologies, Inc. (AET). The results of the most recent water quality
monitoring and reporting periods (i.e., 2017; 2018) that occurred during the Federal Ventura Harbor maintenance
dredging are discussed and summarized below, and the most recent yearly (2017, 2018) summary water quality
sampling results during dredging are located in Appendix D [AET, 2017, 2018].
For the 2017 dredging event, water quality was monitored at three (3) dredging stations (Station A, B, and
C) during pre-dredge and post-dredge surveys, and during dredging was monitored at eight (8) stations: four (4)
dredging stations (Station A, B, C, and D (control)), four (4) placement/discharge stations (Station E, F, G, and H
18
(control)). During the 2017 Federal maintenance dredging from March 3, 2017 through April 4, 2017, the 2017
water quality data was gathered on March 2, 2017 (pre dredge, initial baseline); March 8, 2017 (during dredging);
March 17, 2017 (during dredging); March 21, 2017 (during dredging); April 4, 2017 (during dredging), and; April
12, 2017 (post dredge, final baseline). The 2017 water quality data and results showed that the Dissolved Oxygen
(D. O.) ranged from: 6.90 to 10.60 mg/L for Stations A, B, and C on March 3, 2017 (pre-dredge); 6.66 to 10.93
mg/liter for Stations A, B, C, D, E, F, G and H on March 8, 17, 21 and April 4, 2017 (during dredging), and; 5.55 to
7.70 mg/liter for Stations A, B, C, and D on April 12, 2017 (post-dredge).
For the 2018 dredging event, water quality was monitored at four (4) dredging stations Station A, B, C. and
D (control) during pre-dredge and post-dredge surveys and eight (8) stations comprised of four (4) dredging Station
A, B, C, and D (control), and four (4) placement/discharge Station E, F, G, and H (control) during dredging. During
the 2018 Federal maintenance dredging from February 1, 2018 through February 26, 2018, the 2018 water quality
data was gathered on January 29, 2018 (pre dredge, initial baseline); February 5, 2018 (during dredging); February
15, 2018 (during dredging); February 24, 2018 (during dredging); and; March 7, 2018 (post dredge, final baseline).
The 2018 water quality data and results showed that the Dissolved Oxygen (D. O.) ranged from: 9.50 to 13.58 mg/L
for Stations A, B, C, and D on January 29, 2018 (pre-dredge); 4.57 to 12.89 mg/liter for Stations A, B, C, D, E, F, G
and H on February 5, 15, 24, 2018 (during dredging), and; 8.67 to 10.77 mg/liter for Stations A, B, C, and D on
April 12, 2018 (post-dredge).
The 2017 water quality D.O. concentrations are above the 5.0 mg/liter compliance criteria typically required
by the California Regional Water Quality Control Board (CRWQCB). The 2018 D.O readings were consistent
between stations and control(s) for all weekly dredging WQ sampling/monitoring reporting. DO levels ranged from
5.96 to 11.60 milligrams per liter (mg/l) in the WQ dredge monitoring location stations A, B and C, and the WQ
dredging activities control station D had DO ranging from 5.40 to 11.18 mg/l. DO levels ranged from 4.57 to 12.15
mg/l in the WQ beach placement monitoring location stations E, F and G, and the WQ beach placement control
station H had DO ranging from 4.77 to 12.89 mg/l with DO values less than 5 mg/l at only 3 WQ beach placement
monitoring location stations (E, F and H) during one sampling episode (February 24, 2018) caused by post-storm
flows and not dredging activities. Additionally, the 2018 D.O. water column average was greater than the D.O.
compliance objective of 5 mg/l.
Based on recent (2017 and 2018 water quality reporting during Federal dredging in Ventura Harbor), water
quality in Ventura Harbor is clean. Chemical and physical composition of the nearby bottom materials do not
contain known contaminants. Recent and past water sample have shown no indication of discoloration or turbidity.
There is no evidence of turbidity in the harbor. There are no existing water quality problems associated with urban
runoff, agricultural runoff or petroleum products and other pollutants into the Pacific Ocean in the proposed project
area. Water quality is typically characterized by salinity [parts per thousand (ppt.)], pH, temperature (degree
Celsius), clarity (ft.), and dissolved oxygen (DO) [milligrams per liter (mg/l)]. Table 2 characterizes the overall
water quality parameters for Ventura Harbor proposed project site.
19
Table 2 Water Quality Characteristics
Parameters
Salinity (ppt)
Surface Temperature (degree Celsius)
pH
Clarity (ft.)
Dissolved Oxygen (mg/l)
Note: Readings are approximate
Source: AET, 2017, 2018.
Readings
29.6 to 34.3
11.13 to 14.9
7.4 to 9.8
13 to 15
4.57 to 13.58
According to the 2016-2017 Heal The Bay Beach Report Card, Ventura County beaches earned 100% A
grades during summer dry weather for the 9th consecutive year (Heal The Bay, 2018). Ventura beaches also earned
great grades during winter dry weather with only one beach not earning an A or B grade - Harbor Beach Park at the
south end of Victoria Avenue earned a D grade. Wet weather water quality was again well above average, with 80%
of the 40 sites earning A or B grades.
The Santa Clara River provides seasonal flows to the Pacific Ocean where an estuary forms due to the
formation of a sand bar. The near surface groundwater is the result of a clay layer that occurs between 3 and 8 feet
below the surface of the ground. This clay layer prevents surface water from penetrating further into the soil and
into deeper aquifers. The hydrologically independent areas at McGrath State Beach include the active dunes that
occur along the 2-mile stretch of beach, areas of back dune, and coastal dune scrub habitat. These upland areas are
an important contrast to the wetlands and riparian areas, which are not in the proposed project area.
McGrath State Beach is a sink for actions that occur up river due to its location at the mouth of the Santa
Clara River. A series of groundwater aquifers in the watershed contribute to a complex hydrology that has a
significant influence on McGrath State Beach, being at a low elevational position and associated with near surface
groundwater level.
Substantial flooding on the Santa Clara River has occurred relatively frequently, with flood events recorded
in 1938, 1940, 1955, 1962, 1965, 1969, 1970, 1980, 1983 (State Parks/CDPR, 2003), and 2014. During an August
2014 flooding at McGrath State Beach Park, the park was closed due to flooding caused by the Santa Clara River
estuary backing up behind the naturally occurring sand bar blocking the mouth of the estuary (State Parks/CDPR,
2014). An increase of peak discharges from 11% at the Ventura County and Los Angeles County lines to 13% at
Montalvo reflected the two most recent major flooding events in 1998 and 2005 (County of Ventura Watershed
Protection District, 2010). Although the riverbed itself is wide, flows rarely encompass the channel in its entirety
except during flood events. These flood events carry substantial quantities of sediment, and the rapidly moving, high
volume flows wash away existing sediment deposits and then gradually re-deposit sediment carried by flood waters
as flows gradually subside. In this manner sandbar locations are constantly shifted, altering the future meandering
path of the river. Stream flow records indicate the riverbed is altered at least every 2 to 3 years.
20
The Ventura WRF provides treatment services to approximately 98% of City residences, which equates to 8
to 9 million gallons of wastewater per day. Currently, following a 3-step treatment process at the Ventura WRF,
most of the treated wastewater is discharged into the SCR estuary after flowing through a series of wildlife ponds for
about four days or is delivered to reclaimed water customers.
Under Section 303(d) of the 1972 Clean Water Act (CWA), States, Territories and authorized Tribes are
required to develop a list of water quality limited segments. The waters on the list do not meet water quality
standards, even after point sources of pollution have installed the minimum required levels of pollution control
technology. The law requires that these jurisdictions establish priority rankings for water on the lists and develop
action plans, called Total Maximum Daily Loads (TMDL), to improve water quality. A TMDL is the sum of the
individual waste load allocations for point sources and load allocations for nonpoint sources and natural background
(40 CFR 130.2) such that the capacity of the water body to assimilate pollutant loads (loading capacity) is not
exceeded. The TMDL shall be established at levels necessary to attain and maintain the applicable narrative and
numerical water quality objectives with seasonal variations and a margin of safety (MOS) to address uncertainty in
the analysis. Determinations of TMDLs shall take into account critical conditions for stream flow, loading, and water
quality parameters (40 CFR 130.7(c)(1)). On April 6, 2018, the US Environmental Protection Agency (US EPA)
gave approval to the 2014 and 2016 California's Section 303(d) List requiring TMDLS.
The 2014 and 2106 California Integrated Report (Clean Water Act Section 303(d) list identified in the study
area included: 1) Ventura Harbor: Ventura Keys, with the following pollutants: a. arsenic, b. coliform bacteria, c.
dieldrin, d. indicator bacteria, and e. Polychlorinated biphenyls (PBCs); all pollutant sources unknown; 2) Ventura
Marina Jetties, with the following pollutants: a. Dichlorodiphenyltrichlorethane (DDT), b. PCB; all pollutant sources
unknown; and 3) the Santa Clara River Estuary, with the following pollutant: a. ammonia, b. Chem A, c. indicator
bacteria, d. toxaphene, e. toxicity; all pollutant sources unknown. (CRWQCB Los Angeles Region, 2018). The
impairment listings were based on data showing the presence of high coliform counts from Ventura County
Environmental Health Division (VCEHD) sampling and State Water Resources Control Board (SWRCB) records of
beach closures. Pollutants listed in some of the above mentioned water bodies also include historic pesticides in the
Santa Clara River Estuary besides coliform already noted.
A 2017-2018 Sampling and Analysis Plan (SAP) and SAP Results (SAPR) Report were produced for
Ventura Harbor Federal maintenance dredge areas that are part of the Proposed Project (Alternative 1)[Corps,
2018b]. The SAP is required to determine and present the procedures for collecting, handling, compositing,
preserving, and testing sediment samples including the testing that would be conducted and the procedures to be
followed during the testing. The SAP was prepared in accordance with requirements outlined in the Ocean Dumping
Regulations (40 CFR 220-228), the Evaluation of Dredged Material Proposed for Ocean Disposal: Testing Manual
(i.e., the Green Book) [USEPA & Corps, (1991)], the Draft Regional Implementation Agreement (RIA) for the
Evaluation of Dredged Material for Ocean Dumping (USEPA & Corps,1993), Assuring the Adequacy of
Environmental Documentation for Construction and Maintenance Dredging of Federal Navigation Projects (Corps,
2006), and Overdepth Dredging and Characterization Depth Recommendations (Corps, 2007).
The Corps coordinated the draft SAP during January 2018 and February 2018 monthly SC-DMMT meetings.
The SC-DMMT is an interagency group for review of dredging projects in Southern California from boundaries
21
defined by the Los Angeles District of the US Army Corps of Engineers (USEPA, 2008). The main objective of the
SC-DMMT is to facilitate or streamline regulatory review of proposed dredging projects. The Draft SAP and
Appendices had an out of cycle review and comment from the SC-DMMT agencies with jurisdictional authority
(USEPA; California Coastal Commission (CCC) and Los Angeles Regional Water Quality Control Board
(RWQCB)) on May 3, 2018, and the SAP and Appendices were approved by these agencies on May 15, 2018. A
conditions survey was moved to May 2018 to determine the best areas to sample since limited material was present.
On May 30, 2018, updated vibracore locations based on the May 2018 survey were coordinated with the agencies,
and on May 31, 2018, the SC-DMMT concurred with the revised locations in the SAP. Sampling occurred on June
19 and 20, and July 2, 2018. In August 2018, the Corps coordinated with the SC-DMMT the Final SAPR and
Appendices for review and comment, and the Final SAPR and Appendices were approved by the SC-DMMT on
August 29, 2018.
For the purposes of the dredged material evaluation, the Ventura Harbor Federal maintenance dredge areas
has nine (9) areas, designated as Areas A through I, identified as the Federal dredge footprint, according to location
and design depths (Figure 2a) [Corps 2018b]. Entrance Channel (Area A) has an authorized depth of -20 ft. MLLW
plus two feet for overdepth allowance. Entrance Channel (Area E), Navigation Channel (Area B, C, and D), and
Area G Sand Trap have an approved "advanced maintenance" depth of -40 feet MLLW. Area F sand trap has an
approved advanced maintenance depth of -12ft MLLW, while Areas H and I sand traps have approved advance
maintenance depths of -30 feet MLLW and -25 feet MLLW, respectively. Vibracore sampling, as described in
SAPR, was carried out on June 19, 2018 to collect subsurface sediment data at three (3) locations within Area A,
three (3) locations in Areas B, two (2) locations in Area C, three (3) locations in Area D, two (2) locations in Area E,
one (1) location in Area F, two (2) locations in Area G, and one (1) location in each of Areas H and I. In addition,
there was one (1) sampling location within the transition between Areas A and B. This location was sampled as part
of the Area A composite area. All together there were 19 separate vibracore sampling locations. All cores were
advanced to below the authorized elevations. Also included in the SAP are the testing requirements that would be
conducted and the procedures that were followed during testing. A total of eight (8) area composite samples were
created from the nine (9) channel areas shown on Figure 2a were analyzed for bulk sediment chemistry. One
composite sample was created from each of the A, B, C, D, E, F, G and H/I channel areas. Continuous samples were
formed from the mudline to the authorized depth plus two feet for Area A and from the mudline to the advanced
maintenance depths in all other areas. These primary core intervals were homogenized and then combined with all
primary core intervals in a composite area to the form composite samples for bulk sediment chemistry analyses and
Tier III archiving. Sediments below overdepth and advance maintenance elevations were not included in any
sediment composite samples for chemistry. In addition to the composite samples, at least two archive bulk sediment
chemistry samples were collected for most core locations. One archive was collected from the entire core interval
(mudline to overdepth/advance maintenance elevations) and the other from the finest size sediment interval layer
observed in the entire interval from each core if it existed. An archive sample for potential Tier III testing was also
formed from each composite area
A series of reference samples were collected from placement of suitable dredged material sites along transect
line(s) extending offshore from the receiving beach at regular depth intervals in order to assess grain size analysis
and compatibility of dredged sediment of the proposed suitable dredged material from the Federal channels in
Ventura Harbor [Figure 2b shows the location of the placement of suitable dredged material area(s), also known as
22
receiver beach(es) or beach nourishment sites]. A series of surface grabs were collected along six (6) transects
perpendicular to the shore at South Jetty Beach, represented by Transect A, South Beach represented by Transects B
and C, and McGrath State Beach, represented by Transects D, E and F, as shown on Figure 1b, on June 20 and July
2, 2018 (Corps, 2018b). The beach transect sampling consisted of collecting surface grab samples at eight elevations
(+12, +6, 0, -6, -12, -18, -24 and -30 feet MLLW) along each transect. The McGrath State Beach nearshore site
sampling consisted of collecting eleven (11) randomly placed sampling locations as identified on Figure 1b.
Individual geotechnical grain size testing was performed on all grab samples collected from the beach and nearshore
sites. McGrath State Beach nearshore placement site was also composited into a single composite sample. This
composite sample has been archived as reference material should additional Tier III testing of the Ventura Harbor
Federal composite samples becomes warranted. The grain size analysis report and compatibility of dredged sediment
test report was generated by the Corps LAD Geology Section are discussed in Section 5.2 (Corps, 2018b).
4.2.1 Local Weather Influences
Regarding weather precipitation data gathered over a specific period (1965 through 2010), the Ventura
County Watershed Protection District generates a precipitation data report on Precipitation Depth-Duration (Long
Term) -Maximum Annual Precipitation (inches) from rain gauge stations in Ventura County (Ventura County
Watershed Protection District, 2018). Station # VC (Ventura County) 216B (Ventura Marina Port District) is the
Ventura County Watershed Protection District rain gauge station that is closest to the Proposed Project (Alternative
1), and the precipitation data report for Station # VC 216B between 1965 through 2010 is summarized in Table 3 of
the EA.
23
Table 3 Ventura County (VC) Precipitation Station # VC 216B (Ventura Marina Port District) between 1965
through
2010.
PRELIMINARY
Page 1
PRECIPITATION DEPTH-DURATION (LONG TERM) MAXIMUM ANNUAL PRECIPITATION (IN) VENTURA
COUNTY WATERSHED PROTECTION DISTRICT
STATION #
STATION NAME ELEV
LATITUDE LONGITUDE
TOWNSHIP RANGE
COUNTY VC 216B VENTURA
MARINA - PORT DISTRICT
5 34:15:07.6 119:15:57.2
T2N R23W SEC 23
VENTURA
M=MINUTES,H=HOURS,D=DAYS,W YR=WATER YEAR
WATER YR
1D
2D
3D
4D
5D
6D
8D
10D
15D
20D
30D
60D
W YR
1965
1966
1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2.45
3.29
1.84
2.35
2.13
2.05
2.20
2.00
2.45
3.03
2.98
1.32
2.20
2.75
2.72
3.79
2.88
1.23
2.32
2.70
1.53
1.90
1.17
1.96
1.06
0.73
3.20
2.04
3.11
1.15
2.54
1.93
2.00
4.90
1.45
2.35
3.86
1.10
3.10
2.68
3.13
2.85
3.29
2.47
2.76
3.76
2.91
4.20
2.50
2.54
5.67
3.00
2.32
2.20
4.56
3.82
5.86
4.50
1.69
2.86
3.09
1.69
2.50
1.37
2.01
1.45
0.91
5.95
3.33
3.76
1.33
4.70
3.43
3.43
5.12
1.54
3.13
5.71
1.10
5.80
2.68
4.56
3.16
4.05
2.57
3.66
5.25
4.95
5.20
3.27
4.07
6.41
3.09
2.92
2.20
5.96
4.34
6.28
4.50
1.79
3.68
3.09
1.74
3.49
1.37
2.01
1.49
1.09
6.05
4.50
4.32
1.33
6.27
3.49
3.70
5.88
1.54
3.13
5.71
1.28
6.20
2.68
5.24
3.37
4.87
3.74
4.87
5.50
4.95
5.20
4.50
4.16
6.91
3.09
3.38
3.60
6.16
4.34
7.33
4.50
2.18
4.44
3.09
2.21
3.97
1.87
2.09
1.49
1.09
6.05
5.12
4.32
2.11
6.65
3.49
3.70
6.40
1.59
3.87
5.71
1.28
6.20
3.26
5.78
3.87
5.54
3.98
4.87
5.50
4.95
5.50
5.00
4.16
8.31
3.09
3.74
3.96
6.77
4.34
8.09
5.97
2.40
4.93
3.72
2.21
3.98
1.87
2.26
1.55
1.22
6.05
5.18
4.32
2.11
7.25
3.49
3.70
6.42
1.60
4.15
5.71
1.35
6.20
4.25
6.32
3.87
5.79
3.98
4.87
6.63
6.63
5.50
6.47
4.16
8.36
3.09
4.01
3.96
7.66
4.34
8.51
6.00
2.52
5.37
3.72
2.21
4.39
1.87
2.51
2.29
1.22
6.41
6.33
4.32
2.11
7.63
3.49
3.70
8.03
1.83
4.15
5.71
1.38
6.20
4.25
6.84
4.41
6.20
3.98
4.87
8.94
6.63
5.74
6.97
5.43
8.47
3.96
4.01
4.11
8.18
4.34
9.94
6.69
3.07
7.07
3.75
2.25
5.08
1.87
2.51
2.33
1.22
6.41
6.47
4.32
2.11
9.46
3.49
3.70
10.22
2.23
4.26
5.82
1.38
6.20
4.48
7.48
5.71
8.15
4.09
4.87
9.24
6.63
5.74
6.97
6.01
8.52
3.96
4.01
4.47
9.16
4.42
10.31
6.72
3.16
7.07
3.76
3.02
5.08
1.87
2.81
2.68
1.22
7.55
7.43
4.38
2.11
10.27
3.98
3.70
10.65
2.23
4.54
7.14
1.62
6.20
4.92
8.02
6.33
8.74
4.09
5.65
10.18
6.63
5.89
6.97
6.01
9.05
3.96
4.01
4.47
9.16
4.83
10.31
6.72
3.29
8.20
3.76
4.34
5.15
1.87
2.81
2.68
1.25
7.56
7.53
6.07
3.44
10.55
3.98
3.96
12.09
2.34
6.80
7.59
2.38
6.20
5.22
12.06
6.33
8.74
4.34
5.82
10.47
6.69
5.95
7.24
6.01
9.21
3.96
4.06
4.47
9.16
4.88
12.13
7.25
3.80
9.15
3.76
4.51
6.57
2.05
2.81
2.69
1.38
11.12
7.53
6.23
3.79
11.19
4.17
4.89
14.27
3.11
7.19
7.63
2.66
6.20
5.22
12.23
6.60
9.12
5.21
6.25
11.41
8.23
9.82
7.34
10.17
9.61
5.35
4.78
4.55
16.05
6.35
13.78
8.06
4.73
10.07
3.76
5.26
7.35
2.44
2.81
3.01
1.69
13.98
8.85
6.74
4.17
13.68
5.95
6.06
17.74
4.58
9.36
11.22
2.96
6.25
6.54
12.23
7.34
12.58
8.07
7.12
16.10
10.91
10.71
7.58
12.79
11.17
7.86
5.18
4.73
23.29
11.00
21.91
11.12
5.86
16.76
6.04
6.49
11.48
3.26
4.74
5.34
2.73
13.99
12.77
11.78
6.12
16.68
8.54
9.40
20.29
4.90
10.87
17.40
4.10
9.90
6.67
20.49
15.20
15.66
16.59
11.94
20.12
13.70
12.88
7.98
19.09
15.61
14.94
6.22
9.21
32.58
18.05
26.19
12.64
12.30
29.21
10.40
10.61
20.66
6.33
11.83
7.17
3.88
15.29
17.62
20.17
9.37
28.12
11.58
12.78
35.25
9.10
14.99
19.69
5.42
19.80
11.04
29.35
24
2006
2007
2008
2009
2010
2.60
1.88
1.75
1.58
1.42
3.16
1.99
2.86
1.97
2.41
3.16
2.04
3.96
2.15
3.32
3.17
2.31
4.01
2.54
4.51
3.73
2.36
4.84
2.55
5.42
3.78
2.36
5.24
2.55
5.81
5.20
2.36
5.29
2.84
5.81
5.53
2.36
5.29
3.75
5.81
5.68
2.51
5.67
5.09
5.94
6.21
2.56
5.67
5.12
7.62
6.66
3.48
8.23
5.46
8.39
10.48
3.71
10.20
5.83
10.66
17.22
5.31
12.19
10.09
16.01
Source: Ventura County Watershed Protection District, 2018
The El NiñoSouthern Oscillation (ENSO) is a climatic phenomenon that is characterized
by warming and cooling cycles (oscillations) in the waters of the eastern equatorial Pacific
Ocean. ENSO cycles have a 11.5 year duration and a 38 year recurrence interval, and they are
related to changes in atmospheric circulation, rainfall, and upper ocean heat content (Stillwater
Sciences, 2011). In southern California, ENSO years are normally characterized by relatively
high rainfall intensities, with rivers and streams exhibiting higher annual peak flows than they do
in non-ENSO years. This difference in flow magnitude is shown quantitatively in an analysis of
the instantaneous peak flow record for the upper Santa Clara River and lower Santa Clara River
(County line gauges and Montalvo gauge) for ENSO and non-ENSO years over their respective
periods of record. For ENSO years there is nearly a 50% probability of peak flows exceeding
280 cubic meter per second (10,000 cubic feet per second) in the upper Santa Clara River and
2,300 cubic meter per second (81,400 cubic feet per second) in the lower Santa Clara River
whereas a non-ENSO year has less than a 10% probability of peak flows exceeding that same
value. This relationship is more pronounced in the lower Santa Clara River because it is more
directly under the influence of coastal conditions.
4.3 Biological Resources
The biological analysis portions of the EA summarize the analysis of the potential
impacts upon biological resources of the Proposed Project (Alternative 1) area, federally listed
taxa, and other sensitive species or habitats from the Proposed Project (Alternative 1) activities.
Only those species that are known to occur or are expected to occur within the area of this
biological analysis during Proposed Project (Alternative 1) activities are considered in detail in
the body of this document. Appendix B is a summary list of federally-listed threatened and
endangered species potentially occurring in Ventura County (USFWS 2018), which were
considered in the biological analysis of this Proposed Project (Alternative 1).
The purpose of the biological analysis is to review the Proposed Project (Alternative 1) in
sufficient detail to determine if the Proposed Project (Alternative 1) may result in adverse
impacts to the special status species. A team of resource specialists is involved in the Proposed
Project (Alternative 1) planning to ensure that Corps activities do not contribute to the loss of
viability of any native or desirable non-native species which might lead to Federal listing, and to
ensure that endangered, threatened, proposed, candidate, and sensitive species receive
consideration and protection during Federal activities, in compliance with the Endangered
25
Species Act of 1973, as amended.
4.3.1
Baseline Existing Conditions
The Proposed Project (Alternative 1) area is located within the vicinity of Ventura
Harbor, on land parcels adjacent to the harbor infrastructure for staging use, within the outer
harbor channel areas, on the beaches from the harbor southward to include McGrath State Beach,
and the nearshore marine areas to the west and south of the harbor entrance and breakwater.
Figure 1b of the EA includes a Proposed Project (Alternative 1) area map. The Proposed Project
(Alternative 1) area is situated within the lowest elevation portion of the Santa Clara River
watershed adjacent to its estuary and at the river's mouth and other adjacent coastal zone
sloughs. The Proposed Project (Alternative 1) area elevation is approximately from -40 feet
below sea level to + 12 feet above sea level.
The existing vegetation within this area tends to be very sparse, with naturally sparse
dune vegetation on the beaches subject to wind and wave scouring, barren sites on the harbor
infrastructure and surrounding commercial land developments, and weedy or barren within the
land staging areas. Aquatic vegetation is largely not present, due to the high frequency of
disturbance by weather and ocean water turbulence throughout the Proposed Project (Alternative
1) dredging and dredged material placement areas, which are primarily deep sand substrate. The
adjacent riparian area vegetation includes wetland and non-wetland plants within restoration sites
and the estuary. The Proposed Project (Alternative 1) land area is not an area subject to wildfire.
Noxious weeds are not known within the Proposed Project (Alternative 1) area sites, but several
non-native or invasive plants (e.g. black mustard, giant reed) occur along road margins, adjacent
to the beaches, and within riparian areas of the estuary.
Significant occurrences of marine or freshwater aquatic invasive species are not known in
the immediate vicinity of the harbor.
The stream corridor of the Santa Clara River has existing land use developments and
improvements, but fish and wildlife passage and habitat connectivity exists between freshwater
and marine habitats.
The Proposed Project (Alternative 1) area is within a high-use recreation area with public
and private access to commercial, municipal, and residential areas surrounding the harbor. The
presence of human activity is daily and year-long within and adjacent to the Proposed Project
(Alternative 1) area.
Federally protected threatened and endangered wildlife species having a range of distribution
expected within the Proposed Project (Alternative 1) area are listed in Table 3.1.1
26
Table 3.1.1: Federally Protected threatened and endangered wildlife species
within the Proposed Project (Alternative 1)
Species
steelhead trout
western snowy plover
California least tern
tidewater goby
humpback whale
Steller sea lion
Guadalupe fur seal
Status
Federally endangered
Federally threatened
Federally endangered
Federally endangered
Federally endangered
Federally threatened
Federally threatened
Critical habitats designated within the area of biological analysis for the Proposed Project
(Alternative 1) are those of the western snowy plover, steelhead trout, tidewater goby, and
Ventura marsh milk-vetch (Table 3.1. 2).
Table 3.1.2. Designated critical habitats in the Proposed Project (Alternative 1) analysis area.
Species
Habitat designation
Proposed Project
(Alternative 1) effects
western snowy plover
Final Sep. 29, 2005
None
steelhead trout
Final Sep. 2, 2005
None
tidewater goby
Final Jan. 31, 2008
None
Ventura marsh milk-vetch
Final May 20, 2004
None
Other listed species, types of important habitats, or sensitive species that do not occur within the
Proposed Project (Alternative 1) area, or that do not have potential habitat within the Proposed
Project (Alternative 1) area will not be considered in further detail in the 4.3.2 Species Accounts
and Habitat Status section, below.
4.3.2
Species Accounts and Habitat Status
4.3.2.1 Characteristic Habitats and Vegetation
Characteristic habitats of the Ventura Harbor vicinity consist of wetlands (salt and
brackish marsh) and deepwater marine and estuarine ecosystems (as defined by the U.S. Fish and
Wildlife Service (USFWS) National Wetlands Inventory; and coastal strand habitat of sandy
beaches and dunes. The proposed contractor staging area at Spinnaker Drive is highly disturbed
due to years of previous use, and has no significant habitat value (Corps 1998b). The alternate
contractor staging area is located at Surfer's Knoll parking lot, and on a portion of South Beach
27
immediately west of the lot. This staging area would be used if the Spinnaker staging area is
unavailable. The parking lot is paved, and the adjacent beach area is sandy but free of dune
habitat.
Maintenance dredging operations occur in marine habitat (dredging channel footprint and
nearshore dredged material placement site) and in coastal strand habitat (temporary dredge
pipeline locations and beach placement sites for dredged material). Adjacent to the coastal
strand habitat areas of the Proposed Project (Alternative 1) area are dune habitats of South Beach
and McGrath State Beach, and the riparian (estuarine, wetland, and aquatic) habitat of the Santa
Clara River.
Marine Habitat. Marine habitats include natural open seawater and sandy-bottom benthic
habitat, as well as artificial habitats created by the jetties, breakwater, and groins. Vegetation
consists of several species of green, brown and red algae diatoms, and phytoplankton. Important
macroscopic algae (seaweeds) potentially occurring in the area include giant kelp (Macrocystis
pyrifera), the red, calcareous, Corallina (Corallina sp.), and sea lettuce (Ulva sp.). Fauna
includes many marine invertebrates and fish. Numerous marine birds and occasional marine
mammals also rest and feed in the marine environment (Corps 1998b). Eelgrass and Caulerpa
taxifolia algae surveys were conducted in November 2010 (AMEC Geomatrix, 2011b), and did
not indicate presence of either species within the dredge footprint or nearshore dredged material
placement area. Eelgrass and Caulerpa taxifolia surveys conducted within Ventura Harbor by
the Ventura Port District have not indicated the presence of either species in the inner harbor
areas. While surveys in 2005/2006 did identify presence of eelgrass near Area A, a combined
pre-dredge eelgrass/Caulerpa survey was conducted in Area A prior to dredging in 2015 and no
eelgrass or Caulerpa was present (Pi Environmental, 2015). The dredge footprint, and the
nearshore dredged material placement area are not suitable for eelgrass. The physical
characteristics of these sites tend to be unsuitable for caulerpa or eelgrass due to frequency and
intensity of wave action and tidal scouring, high amounts of sandy substrate, and water depth.
Riparian, Estuarine, and Wetland Habitat. Estuarine and wetland habitats include the
lagoon at the mouth of the Santa Clara River, and a salt marsh behind the dunes of McGrath
State Beach. Pickleweed (Salicornia virginica) is the dominant plant species in the marsh. At
slightly higher elevations in the marsh, pickleweed is partially replaced by salt grass (Distichlis
spicata). In areas of lower salinity, willow (Salix spp.), giant reed (Arundo donax), yerba mansa
(Anemopsis californica) and other species more typical of freshwater and riparian habitats are
found. Silverweed (Potentilla egedei var. grandis) and curly dock (Rumex crispus) are common
plant species found near the river mouth. The Santa Clara River mouth is a Ventura County
Environmentally Sensitive Habitat, and a State of California Natural Preserve (Corps 1998b).
Coastal Strand Habitat. The coastal strand includes portions of the temporary pipeline
corridor, and the beach replenishment sites. Typical coastal strand plant species include sea
rocket (Cakile maritima), sand verbena (Abronia maritima and A. umbellata), suncup
(Camissonia cheiranthifolia) and beach ragweed (Ambrosia chamissonis). Non-vegetated sand
along the temporary pipeline corridor provides habitat for clams and other burrowing organisms,
28
which is foraging habitat for shorebirds near the water's edge. Coastal strand habitats, especially
dunes (see below), provide habitat for insects such as dune beetles; lizards; and rodents such as
California ground squirrel (Citellus beecheyi), pocket gopher (Thomomys bottae), and deer mice
(Peromyscus spp.).
South Beach Dunes. The Ventura Port District began a re-vegetation program on the
dunes and beach at South Beach (between the Harbor and the Santa Clara River) in 1985, in
order to stabilize the sand. Sea fig (Carpobrotus chilensis), sometimes called iceplant (probably
a non-native species) appeared to be the most successful species used in the re-seeding program
when observed in 1986. An introduced species of sea lavender (Limonium pectinatum) was also
relatively successful. Although a lupine (Lupinus sp.) was present, it did not appear to be bush
lupine (Lupinus arboreus), the species used in the seed mix. Bush lupine and California poppy
(Eschscholzia californica), another species used in the seed mix, did not become established on
the site. Two additional species that were not included in the seed mix, sea rocket (introduced)
and beach ragweed (native), have become well established in the seeded area. The seeded area
includes the corridor that was used for the dredge temporary pipeline for dredging activities prior
to 1985-86. In 1985-86, the temporary pipeline corridor was moved seaward to avoid the
planting, but in 1986-87 the beach had eroded to the extent that the contractor was required to lay
the temporary pipeline in the re-vegetated area. This caused minor damage, which has
subsequently recovered (Corps 1998b). The temporary pipeline will not be routed through the
dunes during this dredging program.
McGrath State Beach Dunes. The dunes at McGrath State Beach, approximately one
mile downcoast of the harbor, are less disturbed than the dunes at South Beach, and continue to
support native plant species such as sand verbenas, suncup, beach morning glory (Convolvulus
soldanella) and beach ragweed, as well as several introduced species, including sea rocket and
sea fig. Giant reed (Arundo donax), an invasive plant, has also become established and appears
to be spreading (Corps 1998b; Corps 2004).
4.3.2.2 Characteristic Fauna
Invertebrates. For the most part, open coast nearshore sand communities in the Southern
California Bight are remarkably similar. Detailed studies on the structure of sand bottom
communities of southern California have been conducted by many, for example, Fager (1968),
Merril and Hobson (1970), Kastendiek (1975), Davis and Van Blaricom (1978), Davis (1978),
and Van Blaricom (1978). An Environmental Impact Report/EA, prepared for the BEACON
Beach Nourishment Demonstration Project (Chambers Group, Inc., 1992), included extensive
surveys of the benthic environment offshore of the Santa Clara River mouth. There were no kelp
beds in the area. The most abundant infaunal species were polychaete worms (Mediomastus
ambisetta and Apoprionospio pygmaea), small sand dwelling anemones of the family
Edwardsiidae, and clams (Tellina modesta). Other typical invertebrates expected in the marine
habitats in the areas to be dredged include additional polychaete worms (Nainereis dentricata
and Lumbrinaris sp.), pismo clam (Tivela stultorum), other clams (Donax spp. and Macoma
spp.), and sand dollars (Dendraster sp.). Invertebrates expected on the beach disposal sites
29
include sand crabs (Emerita analoga), isopods (mainly Tylos punctatus), and clams
(Kastendiek,1975), Davis and Van Blaricom (1978), Davis (1978), and Van Blaricom (1978),
and Morin et al. (1985, 1988) in Corps (1996b).
The State of California Department of Parks and Recreation (CDPR) has jurisdiction over
McGrath State Beach. Since 1996, the state permit for beach replenishment has stipulated that
biological characterization of the point of deposition be conducted in conjunction with each
dredging cycle that places material on the beach. Material has not been placed at McGrath State
Beach since 2008. The invertebrate characterization surveys were conducted just prior to and six
months after each dredging cycle where material was placed on the beach. Applied
Environmental Technologies (AET 2000, 2002, 2003, 2004) had conducted the intertidal
biological characterizations since November 1996.
From November 1996 through August 2001, AET (AET 2000 and 2002) collected the
samples from the points of deposition (area of beach replenishment) and at a control site
approximately 3/4 mile southeast of the beach replenishment area. Four core samples from each
sampling area (eight samples total) were collected at the water's edge during a low tide. The
samples were collected in undisturbed areas by inserting a coring device [26 centimeter (cm)
diameter by 10 cm depth] into the sand to a depth of 10 cm. Samples were preserved and taken
to a laboratory where biologists sorted the invertebrates into five major taxonomic groups:
polychaeta, mollusca, crustacea, echinodermata, and "other minor phyla," then further identified,
and counted the organisms.
In November 2001 (AET 2002), the characterization procedures were modified because
additional surveys of the type conducted in previous years were not expected to generate
substantial new information. The modified characterization stresses the invertebrates that are
used a food source for shore birds. The species collected in the past have been predominantly
very small polychaetes, nematodes, and nemertean worms, most of which are not consumed by
shore birds. Species identified that would represent potential food sources for shore birds
include sand crab (Emerita analoga) and other isopods, amphipods or large polychaetes. Since
shore birds feed at different elevation strata, they may not be affected by changes in the lower
intertidal zone, where previous samples were collected. In the modified sampling design, three
transects are placed at approximately 30-foot intervals at the proposed deposition location and at
a control station approximately 100 to 200 feet upcoast (between deposition point and Santa
Clara River mouth). Samples are collected at lower, middle, and upper intertidal zones.
Samples consist of an area of approximately 9 inches in diameter and up to 12 inches deep.
Samples are sieved over a 1.7 to 2 mm screen to remove sand and smaller organisms. Organisms
observed are identified and recorded on field data sheets.
The findings of the beach characterization at the dredged material beach replenishment
site on McGrath State Beach are consistent with generally accepted knowledge that surf-swept
sandy beaches are sparsely populated with minimal species diversity (Ricketts and Calvin 1968,
in AET 2000, 2002, 2003, 2004). In addition, the species that inhabit the sandy beach
community may be present one year and absent the next (Ricketts and Calvin 1968, in AET
30
2000, 2002, 2003). This is due to the short life spans of the sandy beach fauna, generally less
than 2 years (AET 2000, 2002, 2003, 2004), and the naturally changing conditions of the beach.
This condition of sparse populations followed by large populations with different species is seen
with the McGrath State Beach findings. The presence of various species is contingent on the
beach substrate and the availability of food. The nature of the substrate is of prime importance to
the species inhabiting the beach (Smith and Carlton 1975, in AET 2000, 2002, 2003, 2004). The
substrate at McGrath State Beach has been observed to change from year to year, not from the
placement of suitable dredged materials, but from the Santa Clara River and ocean storms. Prior
to 2000, gravel and large cobbles were present in the top 4 inches at the placement of suitable
dredged material site on McGrath State Beach. These types of conditions can severely limit the
number and types of species on the beach. From 1997 through 2000, greater changes were
observed at the deposition site (Site 1, at McGrath State Beach) than at the control site, due
primarily to its closer proximity to the mouth of the Santa Clara River. In addition, most of the
invertebrates living on the beach have pelagic larval stages in which the young drift and settle on
different beaches without beach recruitment occurring on a particular beach (Smith and Carlton
1975, in AET 2000, 2002, 2003, 2004). The emigration of species to a particular beach is
dependent on the predominant wave patterns and strength, shape of the beach, substrate, and
predation. As can be deduced from the findings and literature on sandy beach intertidal
communities, the organisms present at McGrath State Beach have adapted to living in the sand,
and can be considered successful in terms of numbers. In favorable years, the populations of
intertidal organisms in the sand may number in the millions, whereas, in poor years they may be
absent. The McGrath State Beach characterization confirms this condition that shows the
diversity of the placement of suitable dredged material and control sites to be relatively small,
whereas, the standard deviation is large (AET, 2000, 2002, 2003, 2004).
For more detailed information, refer to Appendix F, which includes several examples of
the AET Biological Characterization Reports, and summary tables of species diversity and
abundance.
Fishes. Numerous fish species, including several important game and commercial
species, are found in Ventura Harbor, the Santa Clara River and lagoon, and in the nearshore
ocean waters. Love et al., (1986) conducted a trawling program at several shallow water soft
bottom stations within the Southern California Bight. This program included a station off
Ormond Beach, near the proposed nearshore beach replenishment site. Queenfish (Seriphus
politus) and white croakers (Genyonemus lineatus) were the dominant species at all depths
sampled. Northern anchovy (Engraulis mordax), California halibut (Paralichthys californicus),
and speckled sanddabs (Citharichthys stigmaeus) were important species at all depths. Other
important fish species in the harbor area include sea bass (Paralabrax spp.), and several species
of rockfish (Sebastes spp.) (Corps 1998b; Gotshall 1989).
The California grunion (Leuresthes tenuis), a small fish in the silversides family
(Antherinidae), is extremely unusual among fish in its spawning behavior. The grunion spawns
on some southern California beaches, including McGrath State Beach, immediately following
high tides from mid-March through August. The eggs are incubated in the sand until the
31
following series of high tide conditions, when the eggs hatch and are washed into the sea.
California grunion is a species of concern due to its unique spawning behavior, and is carefully
managed as a game species by the California Department of Fish and Game (Corps 1998b). In
March 2016, grunion monitoring during dredging found approximately 30 grunion spawning on
the beach just north of the Santa Clara River, and south of the dredge discharge location.
Birds. Numerous bird species are found in the harbor area, at South Beach, and at
McGrath State Beach. The State Park provided a checklist of nearly 70 bird species known from
McGrath State Beach. Some of the more common species expected in the Harbor and near-shore
areas include western grebe (Aechmorphus occidentalis), great blue heron (Ardea herodias),
western sandpiper (Tryngites subruficollis), willet (Catoptrophorus semipalmatus), American
avocet (Recurvirostra americana), marbled godwit (Limosa fedoa), and western gull (Larus
occidentalis). Birds typical of the marsh and riparian areas include northern harrier (Circus
cyaneus), cinnamon teal (Anas cyanoptera), mallard (Anas platyrhinchos), loggerhead shrike
(Lanius ludovicianus), long-billed marsh wren (Telmatodytes palustris), Virginia rail (Rallus
limicola) and yellow-breasted chat (Icteria virens) (Corps 1998b).
Mammals. Several terrestrial and marine mammal species occur in the Proposed Project
(Alternative 1) area. Terrestrial species common to onshore areas include California ground
squirrel, pocket gopher, deer mice, raccoon, and coyote. Marine mammals, namely, the
California sea lion (Zalophus californianus) and harbor seal (Phoca vitulina) are found feeding
and resting in nearshore waters and occasionally resting on the beach; however, these species do
not breed at this site (Corps 1998b).
4.3.2.3
Essential Fish Habitat
In the Pacific region, essential fish habitat (EFH) has been identified for a total of 119
species covered by four fishery management plans (FMPs) under the auspices of the Pacific
Fishery Management Council. With jurisdiction over the 317,690 square mile exclusive
economic zone off Washington, Oregon and California, the Council manages fisheries for
salmon, groundfish, coastal pelagic species (sardines, anchovies, and mackerel), and highly
migratory species (tunas, sharks, and swordfish). Ventura Harbor and surrounding waters
provide habitat for several of these species, including the northern anchovy, Pacific sanddab
(Citharichthys sordidus) and several species of rockfishes. The jetties, breakwater, and groins
provide relatively good feeding habitat, especially for the rockfishes. The harbor and adjacent
habitats are not identified as important fish breeding or nursery areas. Appendix J lists the
current National Marine Fisheries Service FMPs and managed species or species complexes for
the Pacific and Western regions.
Eelgrass and Caulerpa taxifolia algae surveys conducted in November 2010 (Corps
2011a) did not indicate presence of either species within the dredge footprint or nearshore
dredged material placement area (Corps 2011a). Eelgrass and Caulerpa taxifolia algae surveys
conducted by the Ventura Port District have not indicated presence of either species within
Ventura Harbor (Ventura Port District 2011a and 2011b). While surveys in 2005/2006 did
32
identify presence of eelgrass near Area A, a combined pre-dredge eelgrass/Caulerpa survey was
conducted in Area A prior to dredging in 2015 and no eelgrass or Caulerpa was present (Pi
Environmental, 2015). The dredge footprint, and the nearshore dredged material placement area
are not suitable for eelgrass or Caulerpa. The physical characteristics of these sites tend to be
unsuitable due to frequency and intensity of wave action and tidal scouring, high amounts of
sandy substrate, and water depth.
4.3.2.4 Federally Listed Species and Critical Habitat
Critical habitat is an area specified by the FWS as essential to the conservation of a federally
protected threatened or endangered species. Section 7 of the Endangered Species Act prohibits
destruction or adverse modification of constituent components of critical habitat.
No species proposed for listing or candidate species occupy the Proposed Project (Alternative 1)
area.
The following species listed as threatened or endangered by the USFWS or NMFS pursuant to
the Endangered Species Act of 1973 (ESA), as amended, have been identified in the Ventura
Harbor vicinity or the Proposed Project (Alternative 1) area.
Western snowy plover (Charadrius alexandrinus nivosus)
The western snowy plover (WSP) is federally listed as threatened (58 FR 12864, March
5, 1993). WSP occur within the Proposed Project (Alternative 1) area on South Beach and
McGrath State Beach and are part of the Pacific coastal WSP population. The designated critical
habitat (unit named CA-96) includes part of South Beach and McGrath State Beach that contain
the primary constituent elements (PCEs) of critical habitat and where the dredging pipeline and
dredged material placement operation may occur. Critical habitat unit CA-95 is located just
north of the harbor jetties and is outside of the Proposed Project (Alternative 1) area. The
USFWS determined that the Pacific Coast WSP's PCEs of critical habitat are: (1) sparsely
vegetated areas above daily high tides (e.g., sandy beaches, dune systems immediately inland of
an active beach face, salt flats, seasonally exposed gravel bars, dredge spoil sites, artificial salt
ponds and adjoining levees) that are relatively undisturbed by the presence of humans, pets,
vehicles or human-attracted predators; (2) sparsely vegetated sandy beach, mud flats, gravel bars
or artificial salt ponds subject to daily tidal inundation but not currently under water, that support
small invertebrates such as crabs, worms, flies, beetles, sand hoppers, clams, and ostracods; and,
(3) surf or tide-cast organic debris such as seaweed or driftwood located on open substrates such
as those mentioned above (essential to support small invertebrates for food, and to provide
shelter from predators and weather for reproduction).
Bowland and Associates (2010 and 2011) observed WSP occupying a particular area
along South Beach located between Surfer's Knoll and the Santa Clara River estuary bar during
past dredging operations, and on the beaches above the high tide. The distribution of WSP
appears to be influenced by foraging and shelter habitat characteristics.
33
McGrath State Beach exhibited an overall positive trend in nests initiated and hatch rate
since 2003 (California Dept. of Parks and Recreation 2010). In 2017 nests initiated declined to 5,
from 16 in 2016. However, all 5 of these nests hatched, resulting in 100% hatch rate for 2017
(California Dept. of Parks and Recreation 2017).
During past annual dredging, landside operations on South Beach consisting of dredged
material pipeline placement and equipment travel corridors have been located within and
adjacent to areas where WSP were present. Landslide operations are restricted to a designated
50-to-100-feet-wide area along the beach, which is monitored for WSP during dredging events.
Wintering WSP often roost on dry beach sites in the vicinity of the temporary pipeline on South
Beach, especially during windy periods. Wintering flocks of WSP are also known to occur on
McGrath State Beach. Three snowy plover nests were identified near or within the least tern
nesting area at McGrath State Beach during bird surveys in the summer of 1993 (Corps, 1998).
In 2001, Bowland & Associates (2002) observed two unsuccessful snowy plover nesting
attempts on McGrath State Beach (by the same pair), and two successful nests north of the Santa
Clara River mouth. In 2002, Bowland & Associates (2003[a]) found one successful snowy
plover nest in the survey area, just south of the river mouth. In 2003, CDPR Ecologists found a
nest in the middle of the Santa Clara River estuary bar and provided a predator exclosure for the
nest; the nest successfully hatched (Ventura Audubon Society 2004). Another nest was found
inside the tern nesting area but was predated before an exclosure could be positioned to protect
it.
During the dredging cycle from 2007 through 2011, CDPR monitoring found several
WSP nests located on various points on South Beach just north of the Santa Clara River estuary
bar area, on the Santa Clara River estuary bar area, and on McGrath State Beach including sites
adjacent to McGrath Lake. During surveys in 2015 and 2016, CDPR monitoring found WSP
nests located at the mouth of the Santa Clara River (2016), and south of the River mouth along
McGrath State Beach to McGrath Lake. During 2017 surveys, 3 WSP nests were found just
south of the River mouth and 2 were found adjacent to McGrath Lake (California Dept. of Parks
and Recreation 2017).
During the bird wintering season when dredging is scheduled, WSP may be expected to
occur along the whole length of South Beach, the estuary bar, and McGrath State Beach,
however, their occupancy of any particular location may vary from year to year. The drier beach
areas situated between the wet intertidal zone and back dune areas tend to be selected most
frequently by WSP for winter foraging and sheltering. These same beach areas have been
selected for nesting by WSP as well.
Nest sites typically occur in flat, open areas with sandy or saline substrates. Vegetation
and driftwood are usually sparse or absent. Nest site selection and pair bond formation occur
from early to mid-March, and eggs of the first clutch are usually laid by early April. WSP forage
on invertebrates in the wet sand and among surf-cast kelp within the intertidal zone, also in dry
sandy areas above the high tide, tidal wrack, on salt pans, and along the edges of salt marshes
and salt ponds.
34
Public recreation use on South Beach and McGrath State Beach is a year-round activity
and constitutes a significant human presence within areas occupied by WSP.
Studies in California, Oregon, and Washington indicated that the coastal breeding
population had declined significantly in the 1980s (Page and Stenzel 1981; Wilson 1984). By
2001, the breeding population of western snowy plovers along the coast of the three states was
estimated at 2,000 or less, with a similar population size along the western coast of Baja
California (USFWS 2001). The western snowy plover has disappeared as a breeding bird from
most California beaches south of Los Angeles, and development has eliminated the plover as a
breeding species from many other coastal areas, as well. Dune stabilization by introduced beach
grass has also modified much formerly open coastal sand flat habitat. Evidence exists that
human activity (i.e. recreation, beach cleaning), is responsible for some of the coastal decline, as
well as predation by dogs, coyotes, foxes, skunks, crows, etc. (Corps 1998b).
California least tern (Sterna antillarum browni)
The California least tern (CALT) is federally listed as endangered; critical habitat is not
designated for this species. It is one of three subspecies of least tern that breed in North America
(Keane 2000). A migratory species, it nests from April through August along the western coast
of North America from the San Francisco Bay area, California, to Baja California Sur, Mexico.
Winter sightings have been reported from western Mexico, Guatemala, Gulf of Panama, Ecuador,
Peru, Chile, and Hawaii (Frost 2015). This subspecies was listed as endangered under the federal
ESA on October 13, 1970, and by the California ESA on June 27, 1971.
California least tern historically nested in several small, scattered aggregations on sandy
beaches and salt flats along the coast (Chambers 1908). The progressive loss during the early
part of this century of undisturbed sandy beaches resulted in a severe reduction in both nesting
sites and numbers of nesting pairs. By the 1940's, terns were gone from most beaches of Orange
and Los Angeles counties, and were considered sparse elsewhere (Grinnell and Miller 1944).
The current breeding range of the least tern in California extends along the coast from the
Tijuana River estuary, just north of the U.S.-Mexico border, to San Francisco Bay (Small 1994).
An estimated 4,141 to 4,182 pairs of California least terns nested at 39 nesting sites in the state
of California during 1998 and produced an estimated 2,686 to 2,810 fledglings (Keane 2000).
After a 54% increase in pairs and a 200% increase in fledglings between 1995 and 1997, 1998
statewide pair estimates increased 3.9% but fledgling estimates decreased by 14.6% from 1997
estimates, as evidenced by high chick mortality, poor nest attendance, abnormal chick feeding
and kleptoparasitism. Fledglings per pair were 0.64 to 0.68 during 1998, lower than 1997 (0.80).
In comparison to the percentage of all California least tern nesting sites, the three Ventura
County nesting sites [Santa Clara River, Ormond Beach, and Naval Air Warfare Station
(NAWS) Point Mugu] supported only 5 % in 1997 but 10% in 1998 (Keane 2000).
In 2014, an estimated 4,232-5,786 California least tern breeding pairs established 6,038
35
nests and produced 2,136-2,859 fledglings at 48 documented locations across California (Frost
2015a). Statewide, 10,827 eggs were reported, with a Site Mean clutch size of 1.7 eggs per nest
and a Statewide clutch size of 1.8 eggs. Numbers of nesting least terns were not uniformly
distributed across all sites. Camp Pendleton, Naval Base Coronado, Huntington Beach, Point
Mugu, and Batiquitos Lagoon represented 60% of the breeding pairs. 2014 CALT nest
monitoring at the Santa Clara River/McGrath State Beach found 4 breeding pairs, resulting in 4
nests and 2 fledglings (Frost 2015a).
In 2015, an estimated 4,202-5,295 California least tern breeding pairs established 5,504
nests and produced 1,514-1,887 fledglings at 49 documented locations across California (Frost
2015b). Camp Pendleton, Naval Base Coronado, Huntington, Point Mugu, and Alameda Point
represented 64% of the state total breeding pairs. 2015 CALT nest monitoring at the Santa Clara
River/McGrath State Beach found 45-69 breeding pairs, resulting in 72 nests and 27 fledglings
(Frost 2015b).
Within the Proposed Project (Alternative 1) vicinity, an established nesting site is located
on the north side of the mouth of the Santa Clara River, between the beach replenishment sites at
South Beach and McGrath State Beach. The designated nesting site is fenced to protect the
nesting terns from predators and human intrusion, but some least terns nest outside the fenced
area. The temporary dredge pipeline runs adjacent to this nesting site on the seaward side when
McGrath State Beach is used for dredge material placement. At the Santa Clara River mouth
site, breeding begins in middle to late April and continues through August. Breeding habitat
consists of un-vegetated, open, sandy areas, usually in areas either naturally protected from
predators and humans or in sites protected through management measures conducted by the
Ventura Audubon Society. The least tern feeds primarily on surface fishes, such as topsmelt
(Atherinops affinis) and anchovy, in nearshore waters and estuaries near their breeding colonies.
The species is not present within the Proposed Project (Alternative 1) area during fall and winter
when dredging takes place.
Tidewater goby (Eucyclogobius newberryi)
The goby is federally listed as endangered (February 4, 1994). Designated critical habitat
(final rule effective March 3, 2008) includes part of the Santa Clara River and estuary, and the
goby is known to occur there, adjacent to the Proposed Project (Alternative 1) area. Critical
habitat unit Ventura-2 contains 350 acres of State, local government, and private lands
ownership, containing primary constituent elements (PCEs) of critical habitat associated with the
Santa Clara River.
The USFWS has determined that the goby's PCEs are: (1) persistent, shallow (in the
range of about 0.1 to 2 m), still-to-slow-moving, aquatic habitat most commonly ranging in
salinity from 0.5 ppt to about 10 to 12 ppt, which provides adequate space for normal behavior
and individual population growth; (2) substrates (e.g. sand, silt, mud) suitable for the
construction of burrows for reproduction; (3) submerged and emergent aquatic vegetation, such
as Potamogeton pectinatus, Ruppia maritima, Typha latifolia, and Scirpus species that provides
protection from predators; and (4) presence of sandbar(s) across the mouth of a lagoon or estuary
36
during the late spring, summer, and fall that closes or partially closes the lagoon or estuary,
thereby providing relatively stable water levels and salinity.
A brackish water fish species, the goby is adapted to both freshwater and saltwater. This
species was once found in the brackish water portions of streams from Humboldt County to San
Diego County. The draining of lagoons, channelization of streams and lagoons, and other
destruction of habitat have been the major causes of population losses of this species. Sediment
deposition during storm flows of the Santa Clara River can impact the stream and estuarine
habitat by filling the plunge pools where these fish feed. The Proposed Project (Alternative 1)
area does not include the estuarine habitat of the goby.
Steelhead trout (Onchorhynchus mykiss)
The southern California coast evolutionarily significant unit (ESU) of steelhead trout
distinct population segment (DPS) is federally listed as endangered (February 6, 2006). This
DPS of steelhead includes all naturally spawned (and their progeny) in streams from the Santa
Maria River to Malibu Creek, California (inclusive). Distribution of the southern California ESU
has been reduced to an estimated 1% of the stream miles it formerly inhabited. Steelhead occur
occasionally in the Proposed Project (Alternative 1) area, and spawn in the Santa Clara River
(McEwan and Jackson 1996). Steelhead juveniles emerge from gravelly spawning areas
between March and May and live in fresh water for one to four years (usually 2-3 years in
California). During their downstream migration, juveniles often remain in estuaries for a period
between February and May to feed and to adjust to saltwater before completing their migration
to the ocean. The steelhead has well-developed homing abilities and often spawns in the same
stream in which they were reared as juveniles. Upstream migration usually takes place between
January and March. Fish movements both upstream and downstream coincide with flow pulses
from storms. These coastal streams are characterized by sand bar build-up during low flow
summer months at the mouth. The lower main stem of the Santa Clara River is primarily a
migration corridor for steelhead and is less used as a spawning and rearing area, with the
exception of the estuary. Continuing concerns for this DPS include barriers to upstream
freshwater spawning habitats within the region, the continuing loss of habitat, water allocation
problems, and the genetic effects of widespread stocking of rainbow trout.
Designated critical habitat exists in the vicinity of the Proposed Project (Alternative 1)
area including the Santa Clara River mouth and estuary and nearshore marine areas.
The specific PCEs of the rule (2005) include: (1) Freshwater spawning sites with water
quantity and quality conditions and substrate supporting spawning, incubation and larval
development. These features are essential to conservation because without them the species
cannot successfully spawn and produce offspring. (2) Freshwater rearing sites with water
quantity and floodplain connectivity to form and maintain physical habitat conditions and
support juvenile growth and mobility; water quality and forage supporting juvenile development;
and natural cover such as shade, submerged and overhanging large wood, log jams and beaver
dams, aquatic vegetation, large rocks and boulders, side channels, and undercut banks. These
features are essential to conservation because without these juveniles cannot access and use the
37
areas needed to forage, grow, and develop behaviors (e.g., predator avoidance, competition) that
help ensure their survival. (3) Freshwater migration corridors free of obstruction with water
quantity and quality conditions and natural cover such as submerged and overhanging large
wood, aquatic vegetation, large rocks and boulders, side channels, and undercut banks supporting
juvenile and adult mobility and survival. These features are essential to conservation because
without them juveniles cannot use the variety of habitats that allow them to avoid high flows,
avoid predators, successfully compete, begin the behavioral and physiological changes needed
for life in the ocean, and reach the ocean in a timely manner. Similarly, these features are
essential for adults because they allow fish in a non-feeding condition to successfully swim
upstream, avoid predators, and reach spawning areas on limited energy stores. (4) Estuarine
areas free of obstruction with water quality, water quantity, and salinity conditions supporting
juvenile and adult physiological transitions between fresh- and saltwater; natural cover such as
submerged and overhanging large wood, aquatic vegetation, large rocks and boulders, and side
channels; and juvenile and adult forage, including aquatic invertebrates and fishes, supporting
growth and maturation. These features are essential to conservation because without them
juveniles cannot reach the ocean in a timely manner and use the variety of habitats that allow
them to avoid predators, compete successfully, and complete the behavioral and physiological
changes needed for life in the ocean. Similarly, these features are essential to the conservation of
adults because they provide a final source of abundant forage that will provide the energy stores
needed to make the physiological transition to fresh water, migrate upstream, avoid predators,
and develop to maturity upon reaching spawning areas. (5) Nearshore marine areas free of
obstruction with water quality and quantity conditions and forage, including aquatic invertebrates
and fishes, supporting growth and maturation; and natural cover such as submerged and
overhanging large wood, aquatic vegetation, large rocks and boulders, and side channels. As in
the case with freshwater migration corridors and estuarine areas, nearshore marine features are
essential to conservation because without them juveniles cannot successfully transition from
natal streams to offshore marine areas. (6) Offshore marine areas with water quality conditions
and forage, including aquatic invertebrates and fishes, supporting growth and maturation. These
features are essential for conservation because without them juveniles cannot forage and grow to
adulthood. However, for the reasons stated previously in this document, it is difficult to identify
specific areas containing this PCE as well as human activities that may affect the PCE condition
in those areas. Therefore, we have not designated any specific areas based on this PCE but
instead have identified it because it is essential to the species' conservation and specific offshore
areas may be identified in the future (in which case any designation would be subject to separate
rulemaking).
The dredged material beach placement and nearshore placement sites do not contain
PCEs of critical habitat, although, adult steelhead can be expected to occur throughout the
nearshore placement site.
Listed marine mammals
The National Marine Fisheries Service (NMFS) has indicated that one endangered marine
mammal, the humpback whale (Megaptera novaeangliae), and two threatened marine mammals,
the Steller sea-lion (Eumetopias jubatus) and the Guadalupe fur seal (Arctocephalus townsendi)
38
are potential but unlikely visitors to the Proposed Project (Alternative 1) area during fall and
winter when dredging would occur. Some humpback whales are present year-round in the
Southern California bight; and there have been frequent observations of humpbacks, from June
to September, further offshore off San Miguel Island. The Guadalupe fur seal and the Steller sea
lion are known to occur at San Miguel and San Nicolas Islands, but they prefer undisturbed areas
and are unlikely to venture near Ventura Harbor.
Ventura marsh milk-vetch (Astragalus pycnostachyus var. lanosissimus)
This federally-listed endangered plant and its suitable or potential habitat are not found
within the Proposed Project (Alternative 1) area. The general habitat of this species is often
coastal salt marsh and coastal dunes. The nearest designated critical habitat is situated adjacent
to McGrath Lake approximately ½ mile south of the dredged material placement site on
McGrath State Beach.
Salt marsh bird's beak (Cordylanthus maritimus maritimus)
This annual plant is federally-listed endangered. It was found in the salt marsh behind
the dunes at McGrath State Beach. The occurrence was last observed in this marsh in 1983 but
may have been locally extirpated. The habitat in the marsh remains suitable for the plant. This
species is usually found at the higher elevations in the marsh, above the pickleweed zone,
associated with salt grass (Distichlis spicata) or shoregrass (Monanthochloe littoralis). Salt
marsh bird's beak or suitable habitat are not found in the harbor waters, in the beach
replenishment areas, or along the proposed dredging temporary pipeline corridor (USFWS 1984;
Corps 1984, 1998b). The Proposed Project (Alternative 1) area does not overlap with any
potential habitat of this plant.
4.4 Air Resources
4.4.1 Meteorology
The climate of the south central coast in the City of Ventura, California, is
Mediterranean, with approximately one-half of the year being wet and cool (November to April)
and the remainder of the year characterized by dry, warm weather (May to October). The major
climatic influences on the study area are the Pacific High, a semi-permanent pressure system
which generally lies over the ocean to the west; migratory cyclonic storms, which yield most of
the annual rainfall; and the Pacific Ocean, which serves as a source of moisture for the
atmosphere. The net effect of the above factors is a mild climate with little severe weather and
with rainfall concentrated in the winter months.
Temperatures can vary widely throughout the Proposed Project (Alternative 1) located in
Ventura County and within the South Central Coast Air Basin (SCCAB). Temperatures below
freezing are rare, as are those in excess of 100°Fahrenheit (F) (38°Celsius [C]). Land-sea
temperature differences are greater in the winter (by several degrees Fahrenheit) than in the
summer. This maritime influence weakens further inland, resulting in greater temperature
fluctuations. These variations depend not only on the distance from the ocean, but also on local
39
topography, elevation, and the degree of exposure. Extreme temperatures observed in the Ojai
area range from about 100°F (38°C) to about 25°F (-4°C). Annual average temperatures in the
Oxnard plain range from 50°F (10°C) at the coast to 77°F (25°C) in Simi Valley.
Precipitation in the study area is primarily a winter phenomenon (November to April),
with approximately 90 percent of the total annual precipitation occurring during this period.
Precipitation is mainly in the form of rain along the coast and the lowland areas, and may occur
as both rain or snow in the higher mountain areas. The summer months are usually characterized
as dry with thundershowers producing occasional rainfall. Average annual precipitation varies
markedly over relatively short distances within the region, primarily because of topographic
features. For Ventura County, mean annual precipitation varies by year and with the terrain, but
averages approximately 14 inches (35.6 cm).
The jet stream pressure produces a regional prevailing northwesterly to westerly flow
throughout the year. During the winter, the flow reverses to a prevailing southeasterly direction
under conditions of pre-storm passage. Except for the coastal zone, the rugged and varied terrain
of the area is responsible for deflecting the basic flow. The wind direction and wind speed within
the area are mostly a result of local terrain influences, rather than prevailing circulation.
4.4.2 Air Quality
The U.S. Environmental Protection Agency (USEPA) has promulgated the Federal Clean
Air Act (CAA) of 1970, and associated amendments, which include the national ambient air
quality standards (NAAQS), developed to protect those segments of the public most susceptible
to respiratory distress, such as asthmatics, the very young, the elderly, people weak from other
illness or disease, or persons engaged in strenuous work or exercise. Some portions of the CAA
(e.g., certain mobile source and other requirements) are implemented directly by the USEPA.
Other portions of the CAA (e.g., stationary source requirements) are implemented by state and
local agencies. California has established its own air quality standards, the California Ambient
Air Quality Standards (CAAQS), and because of the unique meteorological conditions and
associated air quality problems in the state, there is considerable diversity between state and
Federal standards currently in effect in California. Pursuant to the 1990 Federal CAA
amendments, the USEPA classifies air basins (or portions thereof) as "attainment" or
"nonattainment" for each criteria air pollutant, based on whether or not the NAAQS had been
achieved.
Federal, state, regional, and local air pollution control districts (APCDs) agencies operate
a network of monitoring stations throughout California to provide data on ambient
concentrations of air pollutants. Monitoring data from monitoring stations is used to
continuously monitor ambient air quality and to determine compliance with the NAAQS and
CAAQS.
The VCAPCD has a Monitoring and Technical Services Division that employs
technicians, chemists, and meteorologists who continuously maintain and operate the
40
sophisticated gaseous pollutant analyzers, particle collectors, and weather sensors at monitoring
stations in Piru, Simi Valley and Simi Valley (Upper Air), Thousand Oaks, El Rio, and Ojai to
determine the type and level of pollutants in the outside air (VCAPCD, 2018a). These
monitoring stations also measure relative humidity, ultraviolet and solar radiation, barometric
pressure, visibility, surface temperature, winds, and precipitation. Because weather conditions
are crucial to the formation and movement of air pollution, each monitoring station also
measures atmospheric conditions.
The Ventura County Air Pollution Control District (VCAPCD) quality assurance (QA)
program ensures that valid and representative air pollution and weather data are gathered from
each monitoring station. These data are collected and stored at the VCAPCD headquarters. Some
historical summaries of pollutant data are also available. When air quality exceeds or is forecast
to exceed the air quality standards, the elderly, the very young, or those with certain health
problems should curtail their physical activity, especially during the afternoon hours. It should
be noted that "smog" is measured as ground-level ozone concentration. Also, the VCAPCD
monitors PM at regularly scheduled 24-hour periods. PM is sampled on separate instruments for
10 micron and 2.5 micron sizes, identified as PM10 and PM2.5, respectively. (Ten microns
equals about one-seventh the diameter of a human hair).
The USEPA, California Air Resources Board (CARB), and local APCDs classify an area
as attainment, unclassified, or nonattainment depending on whether or not the monitored ambient
air quality data shows compliance, insufficient data available, or non-compliance with the
ambient air quality standards, respectively. Table 4 summarizes the state of California and
Federal (National) ambient air quality standards for pollutants.
41
Table 4 Ambient Air Quality Standards (state of California and Federal)
Source: CARB (California Air Resources Board, 5/4/16), 2018a
Local APCDs in California are responsible for regulating all sources of air emissions
located in their jurisdiction with the exception of motor vehicles. The VCAPCD has adopted
rules and regulations governing stationary air emission sources as well as thresholds of
42
significance for projects in their jurisdiction. The State has adopted standards for mobile
emission sources.
The Proposed Project (Alternative 1) is located in Ventura County and within the South
Central Coast Air Basin (SCCAB). Ventura County is currently designated as a nonattainment
area (does not meet NAAQS and/or CAAQS) for fine particulate matter less than 10 microns
(PM10), and ozone (O3). Ambient air pollutant concentrations have generally been monitored by
the CARB and the VCAPCD. Criteria air pollutants are typically O3, PM10, PM2.5 (fine
particulate matter less than 2.5 microns), carbon moNO2ide (CO), nitrogen dioxide (NO2),
sulfur dioxide (SO2), and lead (Pb) air emission compounds with thresholds, Table 5
summarizes the Federal and state of California attainment status of criteria pollutants for the
study area located in Ventura County, as part of the South Central Coast Air Basin (SCCAB),
based on the NAAQS and CAAQS, respectively.
Table 5 Federal and State Attainment Status for Ventura County of the South Central
Coast Air Basin (SCCAB)
Pollutants
Federal Classification
State Classification
O3
Attainment (1 hour Standard) Non-attainment
Non-attainment (8 hour
(1 hour and 8 hour Standard)
Standard)
PM10
Attainment
Non-attainment (24 Hour and
Annual Arithmetic Mean)
PM2.5
Attainment
Attainment
CO
Attainment
Attainment
NO2
Attainment
Attainment
SO2
Attainment
Attainment
Pb
Attainment
Attainment
Source: VCAPCD, 2018b; CARB, 2018b
The VCAPCD implements, and periodically updates, the Ventura County Air Quality
Management Plan (AQMP). The AQMP uses projections of population growth and trends in
energy and transportation demand to predict future emissions and determine control strategies to
eventually achieve attainment with the ambient air quality standards. The control strategies are
then either codified into the VCAPCD's rules and regulations or otherwise set forth as formal
VCAPCD recommendations to other agencies. The VCAPCD most recent AQMP was updated
in 2017 (VCAPCD, 2018c).
The Ventura County General Plan includes policies that require consistency with the
AQMP, and specifies review according to the recommendations contained in the VCAPCD's Air
Quality Assessment Guidelines. Other policies are aimed at reducing emissions from
transportation demand and major stationary sources. This air quality analysis has been prepared
in accordance with the recommendations of the VCAPCD's Air Quality Assessment Guidelines;
consequently, it is consistent with the air quality policies of the Ventura County General Plan.
43
The VCAPCD rules and regulations contain both requirements and exemptions for
certain types of equipment that may be used during implementation of the Proposed Project
(Alternative 1). Equipment with small internal combustion engines (less than 50 horsepower)
would be exempt from permitting through VCAPCD Rule 23-D. Similarly, dust emissions from
mobile equipment that may occur would be exempt under Ventura County Rule 23-B. VCAPCD
Rule 74-9 contains limitations for larger, stationary internal combustion engines (greater than 50
horsepower) if they are operated for more than one year. However, within the context of the
Proposed Project (Alternative 1), use of these types of engines would not occur for more than a
few weeks; thus, these VCAPCD limitations would not be applicable. Nuisances from either dust
or emissions of other contaminants are prohibited by VCAPCD Rule 51.
The major source of air pollution in the study area that includes the Proposed Project
(Alternative 1) area, which is within Ventura Harbor, is the automobile, followed by recreational
facilities, power boats, and agriculture equipment. A diesel dredge, commonly in use between
December and March for the Proposed Project (Alternative 1), is an additional source of air
pollution in the Harbor. The VCAPCD (re)issues annual permits to the VPD (No. 1139) and to
dredging contractors to operate diesel dredges and other construction equipment in the harbor.
Permitted emissions are usually based on a fuel consumption limit of 192,050 gallons per year. A
dredging contractor can operate a diesel dredge using its own permit or can request to use the
VPD air permit for the Proposed Project (Alternative 1).
General Conformity Rule
The General Conformity Rule, established pursuant to Section 176(c) of the Clean Air
Act requires Federal actions to comply with the NAAQS. A federal agency cannot issue a permit
for, or support an activity within, a nonattainment or maintenance area that would cause or
contribute to any new violation of a NAAQS; increase the frequency or severity of any existing
NAAQS violation; or delay attainment of any NAAQS standard, interim emission reduction, or
other milestone. As indicated above, the portion of the SCCAB under jurisdiction of the Ventura
County ACPD (VCAPCD) is currently in attainment or unclassified/attainment for all criteria air
pollutants. Furthermore, emissions associated with maintenance dredging is exempt from
General Conformity Rule per 40 CFR 93.153(c)(ix). Thus, the General Conformity Rule is not
applicable to the Proposed Project.
VCAPCD Evaluation Criteria
The VCAPCD has developed the following criteria for evaluating estimated emissions
(Table 6).
Table 6 VCAPCD Evaluation Criteria1
Pollutant
Reactive Organic Compounds
Nitrogen Oxides
Thresholds, pounds per day (lbs/day)2
25 lbs/day
25 lbs/day
44
1. Source: http://www.vcapcd.org/pubs/Planning/VCAQGuidelines.pdf, 2018d
2. Applicable to remainder of Ventura County except Ojai Planning Area and the City of Simi Valley.
Greenhouse Gas Emissions (GHG)
Effective April 5, 2017, the Council on Environmental Quality withdrew its "Final Guidance for
Federal Departments and Agencies on Consideration of Greenhouse Gas Emissions and the
Effects of Climate Change in National Environmental Policy Act Reviews." The guidance
established a recommended reference point of 25,000 metric tons of annual CO2 emissions as
warranting further review. Thus, estimates of greenhouse gas emissions are included herein for
the purpose of disclosure under NEPA.
4.5 Noise
In general, noise is defined as unwanted sound. The effects of noise on people range from
annoyance to inconvenience to temporary or permanent hearing loss. Level of annoyance or
impact produced by a sound depends on its loudness, duration, time of day, and land use. Sound
measurements are usually expressed as decibels (dB) which equally weights all frequencies. The
dB level decreases with distance from the source, usually by a rate of 6 dB for every doubling of
distance. However, the human ear is not equally sensitive to sounds at all frequencies. Therefore,
the dBA scale that primarily weighs frequencies within the human range of hearing is used to
assess the impact of noise on human hearing (USEPA, 1971, 1972, 1974). A range of noise
levels is summarized below in Table 7.
Table 7 Range of Noises
Noise level (dBA) Examples
0
recording studio
20
rustling leaves
40
conversational speech
60
freeway at 50 feet
70
freight train at 100 feet
90
heavy truck at 50 feet
110
ambulance siren at 100 feet
120
jet engine at 200 feet
Source: USEPA, 1971, 1972, 1974.
Human Response
hearing threshold
quiet
moderately loud
very loud
threshold of pain
Many cities and counties have provision in their noise ordinance that addresses
construction noise levels and time of operation. For a relatively long-term noise exposure
resulting from construction activities, a CNEL (Community Noise Equivalent Level) up to
65dBA is generally acceptable for noise sensitive land uses, including residences, schools,
hospitals, and churches. A CNEL up to 75 dBA is often considered acceptable for office building
45
and other commercial activities. However, for short-term construction activities, levels
considerably higher may be acceptable because of the temporary nature of the activity. A CNEL
up to 90dBA for noise sensitive land uses and up to 100 dBA for offices and commercial
activities would not be considered unacceptable and is in fact found in the vicinity of many
construction sites in many urban areas throughout the country.
Division 8, Chapter 1.1, Section 8107-9.6.22 (Noise Standard) of the Codified
Ordinances of the County of Ventura states that noise and other forms of pollution shall be
limited to levels determined to be appropriate for the area, and shall not be objectionable to
surrounding properties (County of Ventura, 2018). Noise standards applicable to the Ventura
Harbor dredging project include community standards adopted by Ventura County, and traffic
noise abatement criteria adopted by the Federal Highway Administration (FHA) and the
California Department of Transportation (CALTRANS).
The exterior noise level thresholds in the City of Ventura for commercial properties, such
at Ventura Harbor, are 60 decibels (dB) from 7:00 a.m. to 10:00 p.m., and 55 dB from 10:00 p.m.
to 7:00 a.m. [City of Ventura, 2018b]. In residential areas of Ventura, the thresholds are reduced
to 50 dB and 45 dB, respectively. Noise levels are measured at the receiving property. Louder
sounds are acceptable for short periods of time, or if the ambient noise levels exceed the
threshold limits. Noise generated from construction of structures, even within residential zones,
is permitted between 7:00 a.m. and 8:00 p.m. [City of Ventura Municipal Codes, Article 1. Noise
Regulations Generally, Section 10.650.150 Special noise sources, section D (Construction of
buildings and structures), 2018c]. Trucks are not permitted to idle for more than five minutes in
public rights-of-way or within 200 feet of a residential area, between 10:00 p.m. and 7:00 a.m.
(Noise Ordinance Section 6264.63). Notwithstanding these and other sections, the local noise
ordinance states it is unlawful to make loud or unusual noises which disturb the peace or quiet of
any neighborhood or which causes discomfort or annoyance to any reasonable person. Sensitive
receptors area(s), generally, are residential areas, churches, schools, hospitals, retirement homes.
The Proposed Action (Alternative 1) would not be in the proximity or vicinity of sensitive
receptors.
The existing noise environment in the vicinity of the proposed project area in general is
typical of most urban areas within southern California, characterized by a relatively high
background or "ambient" noise level generated by vehicular traffic on nearby freeways and
major thoroughfares, industrial activities, and a variety of other characteristic urban noise events,
such as emergency vehicle sirens, barking dogs, car alarms, and loud stereos. Noise environment
consists of a base of steady "background" noise that is the sum of many distant and
indistinguishable noise sources. Superimposed on this background noise is usually the sound
from individual local sources. These sources can vary from an occasional aircraft to virtually
continuous noise from traffic on an adjacent street or highway. Noise environments would vary
from city to city for some have less noise than others, but still have some of the typical ambient
noises as most general areas. Automobiles, including those on Highway 101 and on Harbor
Blvd., recreational boats and vehicles, and small commercial fishing boats are the major
46
contributors to the ambient noise environment at Ventura Harbor and nearby beaches that
generate noise levels that tend to increase during heavy summer recreational utilization.
The Proposed Action (Alternative 1) generates noise that comes from the dredge, tug boat
and crew boat(s) that would typically occur annually for approximately one (1) month, sometime
from September 15 to March 15 during the multi-cycle program period. The placement of
suitable dredged material on the beach(es) typically occurs with a temporary pipeline coming
from the dredge that sits in Ventura Harbor, where the temporary pipeline disperses and spews
dredge sediment on the beach(es) that results in beach nourishment, and typically generates a
low level of dBA noise.
4.6 Land Use (LU) and Recreation
Land uses (LU) in the vicinity of the proposed dredging area consist of primarily
commerce, commercial, recreational, and open spaces.
4.6.1 Land Use
1. Ventura Harbor. The VPD is the owner/operator of the Ventura Harbor [VPD,
2018a]. The VPD is what is known as an Independent "Special District." State law defines a
special district as "any agency of the state for the local performance of governmental or
proprietary functions within limited boundaries." A special district is a separate local
government that delivers public services.
Ventura Harbor is regulated by Ventura Harbor Ordinance 44 [VPD, 2018b].
On the City of Ventura General Plan, Land Use (LU) Element, the entire marina is
designated as `Commerce' (2017b). The marina is zoned `Harbor Commercial' in the City's
zoning map.
2. Placement of suitable dredged material area(s).
The VPD is responsible with providing all lands, easements, and right-of-ways for the
annual Federal maintenance dredging, which includes suitable disposal areas (e.g., placement of
suitable dredged material areas).
South Beach. South Beach is located immediately south of the Ventura Harbor entrance,
extending downcoast to the mouth (and north of) of the Santa Clara River, and is located in the
City of Ventura. South Beach is leased by the VPD from California State Lands.
McGrath State Beach. Adjacent to McGrath State Beach is the McGrath State Beach
State Park, located immediately south of and adjacent to the Santa Clara River, has 174 camp
sites which attracted approximately 167,357 visitors during years 2005-2006, is managed by
CDPR (also known as State Parks), and is located in City of Oxnard, California. 2009 visitation
47
at McGrath State Beach Park was approximately 193,986. 2014-2015 visitation at McGrath State
Beach Park was approximately 15,118, and the low number of visitation reflected during this
time period, in part, was due to the park's closure from flooding in August 2014.
McGrath State Beach Nearshore. McGrath State Beach Nearshore is the furthest
placement of suitable dredged material area from the Proposed Project (Alternative 1) and would
occur in the nearshore, off of McGrath State Beach.
South Jetty Beach. South Jetty Beach, located immediately north of South Beach, has
historically been used as a beach for the pipeline placement coming from the harbor where the
dredge operates and connects the pipeline to placement of suitable dredged material site(s)
further south [e.g., South Beach; McGrath State Beach; McGrath State Beach Nearshore]. Due
to erosion on South Beach and South Jetty Beach, South Jetty Beach would be a contingency
beach for future beach nourishment, where placement of dredge material at South Jetty Beach
would occur in order to provide access of pipeline and construction equipment to South Beach.
South Jetty Beach is leased by the VPD from California State Lands.
3. Staging Area(s), parking, and mooring
Staging Area(s)
A proposed staging area(s)/(storage area(s) is an area historically utilized for storing
maintenance equipment, primarily for temporary pipeline used for Corps' Ventura Harbor
dredging maintenance activities.
The primary staging area, located at the north end of Spinnaker Drive, is an empty lot in
Ventura Harbor owned by the VPD, which has been used for many Corps and VPD projects
(Figure 5). The Spinnaker Drive contractor work area is approximately 18,400 square feet (SF),
with dimensions of about 230 feet by 80 feet. Spinnaker Drive staging area is approximately 400
ft. from the beach. The area is completely disturbed, cleared of vegetation, and unpaved.
An alternate staging area, located in Surfer's Knoll parking lot, and on a portion of South
Beach immediately west of Surfer's Knoll Parking lot, would be utilized in the event that the
Spinnaker Drive staging area is unavailable. The portion of South Beach to be used as an alternate
staging area would be on the seaward side of and west of (adjacent to) Surfer's Knoll parking lot.
The approximate area of the Surfer's Knoll parking lot, approximately 35,000 square feet (SF),
and the portion of South Beach, approximately 22,500 SF, for a total of approximately 57,500 SF
to be used as an alternate staging area is (Figure 5). Surfer's Knoll parking lot is a paved area
with thirty-five (35) parking spaces, and has two ingress/egress from Spinnaker Drive. Dredging
construction equipment including piping material, construction vehicles, and a trailer would be
placed on Surfer's Knoll parking lot and on a portion of South Beach.
48
Equipment Mooring
The squid port in Ventura Harbor is available to the dredging contractor as a marine access area
and equipment mooring is available near the eastern end of the North Jetty (Figure 5).
Dredging Crew Parking
The dredging crew would use the public parking at the VPD Harbor's Boat Launching facility to
park their personnel owned vehicles (POVs).
4.6.2 Recreation
1. Ventura Harbor. The Ventura Harbor is a 274 acre multiple use recreational and
commercial fishing small craft harbor [VPD, 2018a]. Other than a 2.74 acre area owned by the
Department of Interior (DOI), National Park Service (NPS), the VPD is the sole landowner
within the Harbor. The VPD current property holdings include approximately 152 acres of land
and 122 acres of water area.
Approximately 1500 craft, including 10 sport fishing vessels and 73 commercial fishing
vessels, are moored in Ventura Harbor. There are two full service boat yards, and one of the full
service boat yards has a 150 ton lift capacity, which is the largest lift capacity between Los
Angeles and San Francisco. A commercial fish processing facility, offshore oil drilling support
facility, the headquarters for the Channel Islands National Park Service (NPS), and two boat
launching ramps for public use are in or based at Ventura Harbor. Ventura Harbor is one of the
top squid landing ports on the West Coast.
Ventura Harbor provides important recreational resources for the region and local area.
Recreational activities within the vicinity of the dredging project include a variety of onshore and
offshore activities, including walking/jogging, swimming, surfing, windsurfing, sunbathing,
beach combing, fishing, scuba and skin diving, hiking, picnicking, boating, sailing, and
bicycling. Fishing includes commercial fishing, sporting fishing, lobster fishing, and gillnetting.
Some of the species most commonly caught in the region include white seabass, rockfish, shark,
halibut, lobster, sea urchins, and abalone. Fishing can occur throughout the offshore area,
although most of the activity concentrates around offshore kelp beds. The large majority of
human activity occurs closer to shore that at the outer edge of the kelp beds. Whale watching is
also a popular seasonal recreational activity.
A proposed staging area(s)/(storage area(s) is an area historically utilized for storing
maintenance equipment, primarily for temporary pipeline used for Corps' Ventura Harbor
dredging maintenance activities. The primary staging area, located at the north end of Spinnaker
Drive, is an empty lot in Ventura Harbor owned by the VPD, which has historically been used for
many Corps and VPD projects (Figure 5). The Spinnaker Drive contractor work area is
approximately 18,400 square feet (SF), with dimensions of about 230 feet by 80 feet. Spinnaker
Drive staging area is approximately 400 ft. from the beach. The area is completely disturbed,
cleared of vegetation, and unpaved. An alternate staging area, located in Surfer's Knoll parking
lot, and on a portion of South Beach immediately west of Surfer's Knoll Parking lot, would be
49
utilized in the event that the Spinnaker Drive staging area is unavailable. The portion of South
Beach to be used as an alternate staging area would be on the seaward side of and west of
(adjacent to) Surfer's Knoll parking lot. The approximate area of the Surfer's Knoll parking lot,
approximately 35,000 square feet (SF), and the portion of South Beach, approximately 22,500 SF,
for a total of approximately 57,500 SF to be used as an alternate staging area. Surfer's Knoll
parking lot is a paved area with thirty-five (35) parking spaces, and has two ingress/egress from
Spinnaker Drive. Equipment and piping material would be transported from Spinnaker Drive
through Surfer's Knoll parking lot. To accommodate safe access, transport, and storage of
equipment and pipeline to the alternate staging area, the parking lot would temporarily be closed
during the duration of the winter/spring annual dredging timeframe. During the temporary closure
of Surfer's Knoll parking lot, the public would be able to park vehicles along Spinnaker Drive or
park across the street in the Ventura Harbor Village parking lot where additional parking is
available. Two, ingress/egress exist to South Beach from Surfer's Knoll parking lot. Ingress and
egress of equipment and materials to South Beach from Surfer's Knoll Parking lot would occur on
the south side entrance of Surfer's Knoll parking lot to South Beach, which would have the least
amount of potential impacts to South Beach. Equipment and pipeline would not be placed on
sand dunes. The north side entrance of Surfer's Knoll Parking lot to South Beach would remain
open to the public for beach access. Furthermore, since 2004 when Western snowy plover surveys
during dredging were initially conducted annually through the present (2018), the Western snowy
plover has never been documented using the area of South Beach adjacent to the Surfer's Knoll
parking lot being proposed as alternate staging/storage area (Corps, 2018a); this disturbance has
primarily been due to human activity and dogs not on leashes. The Corps would continue to
implement environmental commitments and protection measures to avoid potential impacts to
Western snowy plover during pre-mobilization and de-mobilization of equipment and pipeline
when utilizing the alternate staging area on South Beach.
2. Placement of suitable dredged material area(s).
South Beach. South Beach is heavily used by surfers, day visitors to the Harbor Village
and by dog walkers. Recreational uses at this beach include surfing, sunbathing, fishing, and
jogging. The beach is dangerous for swimming due to rip currents, and no lifeguards are
provided. Warning signs are posted.
McGrath State Beach. The major attraction of McGrath State Beach is the coastal
campground. Other attraction(s) of McGrath State Beach State Park are the expansive beach and
the adjoining wildlife habitat found in the Santa Clara River Estuary and McGrath Lake.
Swimming is discouraged along certain portions of the McGrath State Beach due to dangerous
riptide and current conditions.
McGrath State Beach Nearshore. Small boating craft, including sea-doos, have been
known to frequent this nearshore area in the Pacific Ocean.
South Jetty Beach. South Jetty Beach is typically accessed through a parking lot that is
adjacent to the beach, which allows beach access to the public.
50
4.7 Aesthetics
The scenic and visual resources of the proposed project area are primarily the harbor,
marina, wharf, bay, estuary, beach, with the Pacific Ocean adjacent to the proposed project area.
The aesthetic character of Ventura Harbor and immediate vicinity is primarily comprised of
recreational and commercial water-oriented facilities.
The scenic and visual resources of the study area including the Proposed Project
(Alternative 1) are dominated by beaches and Ventura Harbor, which include Ventura Marina
and open-water vistas of the Pacific Ocean.
The aesthetic character of South Jetty Beach, South Beach and McGrath State Beach is
basically comprised of open space and relatively wide beaches that have an unobstructed
viewshed because there are no recreational structures or homes on these beaches, except for
small restrooms facilities and outdoor showering area(s) that are available for use by local
residents, beach goers, vacationers and walkers whom spend time at or walking on the beaches.
South Jetty Beach and South Beach typically are natural, pristine beaches and are not heavily
used by the public whereas McGrath State Beach is typically a heavily used beach and has more
foot traffic by the public, partly due to the McGrath State Beach Park camp areas. The Proposed
Project (Alternative 1) would have a temporary pipeline that typically lays on South Jetty Beach,
South Beach, and/or McGrath State Beach when the annual maintenance dredging occurs. The
temporary pipeline to place dredged material would be placed to avoid the sand dunes and
Western snowy plover beach habitat area at South Jetty Beach, South Beach, and at McGrath
State Beach. The temporary pipeline crosses the Santa Clara River mouth on the protected,
backside of the sand spit at the Santa Clara River mouth. There may be an odor that comes from
the dredge sediments when it come out of the temporary pipeline as it disperses and spews on the
beach(es).
Ventura Harbor's open water area, approximately 51 acres, provides for channels and
turning basins (VPD, 2010), for an unobstructed view of the Pacific Ocean. The Ventura Harbor
complex includes administration facilities, the marina center, a resort hotel, parking areas, boat
ramps, a sport fishing center, a boat repair yard, restaurants, marina hardware, and a mobile
home park. Mooring areas comprise approximately 71 acres. Approximately 1500 craft,
including 10 sport fishing vessels and 73 commercial fishing vessels, are moored in Ventura
Harbor.
4.8 Cultural Resources
Cultural resources can be prehistoric or historic. Prehistoric resources are physical
properties resulting from human activities that predate written records and are generally
identified as isolated finds or sites. Native American resources consist of properties of traditional
religious and cultural importance to a Native American group. These include traditional cultural
places or properties; prehistoric and historic (pre- and post-European contact) archaeological
51
sites, which may include sacred places and burial sites, traditional dwelling sites and other
gathering places, work sites and other use areas; and plants and animals used for subsistence and
other cultural purposes. Historic resources consist of properties, structures, or built items
resulting from human activities that post-date written records. Buildings and other structures may
be historic resources if they are more than 50 years old.
The "Area of Potential Effects" or APE is as described in Section 3.2.1, and includes the
federal channels, entrance channel, and sand traps, surf zone and pipeline placement areas on
South Beach, McGrath State Beach, and South Jetty Beach, and the nearshore dredged material
placement area near McGrath State Beach. Also included in the project area/APE are the VPD
staging area at the north end of Spinnaker Road and the Surfer's Knoll parking lot. All sand
dunes on all beaches would be avoided, as would the Santa Clara River estuary and river
terraces, as these areas are both biologically and culturally sensitive (cf. King 2012).
4.8.1 Proposed Project Alternative (1): Annual Maintenance Dredging of Federal Channels
and Sand Traps
Under the proposed Project Alternative, annual maintenance dredging and dredged
material placement would occur as described in Section 3.2.1. All the areas described have been
dredged routinely since 1963 when the harbor was constructed, prior to passage of the National
Historic Preservation Act in 1966. The Corps began consulting with the SHPO regarding
Ventura Harbor projects in 1985; as part of the 1985 consultation, the Corps proposed enlarging
the sand trap area. The Corps has continued consultation with the SHPO for subsequent
dredging in the harbor, including 1986, 1987, 1988, 1996, and 1998 for both routine and
emergency dredging, obtaining concurrence with Corps determinations of "no historic properties
affected" or responses that SHPO was unable to comment in a timely manner.
4.8.1.1 Dredge Material Placement Areas
Sediment from the harbor has been placed at the same placement areas during past Corps
routine maintenance dredge events. All surf zone placement areas and the pipeline placement
area were surveyed by Corps archaeologists between 1978 and 1983 (Sturm 1985) and included
in initial consultation with the SHPO in 1985. The nearshore placement area described (about
500 feet south of the outlet of the Santa Clara River and extending about 4,300 feet further south,
across from McGrath State Beach), was surveyed by underwater remote sensing in 1994
(MacFarlane 1988, 1994) and consultation with the SHPO resulted no objection to a "no historic
properties affected" determination.
Cultural resources were not identified in any of the placement areas and use of them has
been continuous since the 1980s at the surf zone locations and 1994 at the nearshore location.
The dredge material placement areas were addressed in previous environmental documentation
and Corps consultation with the SHPO (1985-1994).
4.8.1.2 Staging Area(s)
52
The primary staging area is an empty, unpaved lot at the north end of Spinnaker Drive
that is owned by VPD and used as a staging area by VPD and the Corps. Although the area
appears to been cleared of vegetation, SCCIC records do not indicate it has been subjected to
archaeological survey, nor is there a record of previous consultation with SHPO. Based on
historical aerial photography (https://www.historicaerials.com) before and after construction of
the harbor, the area was obviously an active beach and in a dynamic setting.
An alternate staging area is planned at the Surfer's Knoll parking lot and a portion of
South Beach immediately west of (and adjacent to) the Surfer's Knoll Parking lot to access the
beach if the Spinnaker Drive staging area is unavailable. This area was previously surveyed as
discussed in Section 4.8.1.1 as one of the dredge placement areas (Sturm 1985), and is primarily
also an active beach setting.
4.8.1.3 Equipment Mooring
The mooring area available to the dredging contractor is an open marine access area
north of Area A.
4.8.1.4 Dredging Crew Parking
The dredging crew would use the public parking at the VPD Harbor Boat Launching
facility for parking of their personal vehicles.
4.9 Vessel Traffic & Safety
4.9.1 Vessel Traffic
Ventura Harbor is a busy commercial and recreational boating facility. Boat traffic,
including commercial boats, fishing vessels, and recreational vessels, transverse the harbor.
The dredge and dredge equipment including the temporary pipeline, tug boat and crew
boats, would be transported by sea, in the Pacific Ocean, for the Proposed Project (Alternative 1).
The dredge would be self contained with a crane and a barge, and would be entirely a sea based
operation. The sea based access would be the primary mode of transportation for movement of
heavy equipment for the Proposed Project (Alternative 1).
A mooring berth area in the harbor is available for the dredging contractor's use.
4.9.2 Safety
The Corps has a Safety Engineering Manual (EM) known as EM 385-1-1, Safety
Safety and Health Requirements (Corps, 2008). The purpose of this manual prescribes the
53
safety and health requirements for all Corps activities and operations that includes dredging.
The Ventura Harbor Patrol (VHP) provides a safe harbor environment through education,
enforcement and training. The VHP provides rescue and enforcement services within the VPD.
The speed limit in the harbor and entrance channel is five (5) miles per hour (mph). The state of
California 5 mph speed limit within 200 feet of all beaches frequented by bathers or within 100
feet of any bather is also strictly enforced. California State Boating Laws apply in the harbor as
well. The US Coast Guard (USCG) regularly patrols Ventura Harbor as part of its
responsibilities of maritime Federal Department of Homeland Security (DHS) and for National
Defense purposes.
4.10 Ground Transportation
Transportation and traffic routes in the vicinity of Ventura Harbor include the following:
·
U.S Highway (Hwy) -101. US Hwy 101 is a four to six lane highway through the Cities
of Oxnard and Ventura, and is one of the primary South/west roadways serving Ventura
County.
·
Pacific Coast Highway (PCH) 1. PCH 1 is a two to four lane highway through the
Cities of Oxnard and Ventura that typically runs north/south and parallel along the
Pacific Coast coastline in Ventura County.
·
Harbor Boulevard (Blvd). Harbor Blvd., a principal two to four lane artery roadway
through the Cities of Oxnard and Ventura, typically runs parallel along the coastline
between Oxnard and Ventura. Harbor Blvd. is the main entrance to Ventura Harbor.
Harbor Blvd intersects PCH 1 and US Hwy 101 through the Cities of Oxnard and
Ventura.
·
Seeward Avenue. Seeward Avenue is a four lane surface street in the City of Ventura and
serves as one of the on/off ramp roadways along U.S. Hwy 101 through Ventura, and
connects to Harbor Blvd.
·
Olivas Park Drive. Olivas Park Drive is a two lane road surface street in the City of
Ventura and runs perpendicular between Victoria Avenue and Harbor Blvd, and provides
an alternate entrance to Ventura Harbor from Olivas Park Drive, and is accessed from
Victoria Avenue; Victoria Avenue serves as one of the on/off ramp roadways along U.S.
Hwy 101 through Ventura.
Annual Average Daily Traffic (AADT) capacities represent the general level of daily
traffic that each roadway type can carry. Table 8 below shows the current (baseline) traffic
volumes, for roadways in the vicinity of Ventura Harbor (CALTRANS, 2016; Ventura County,
2017).
54
Table 8 Current Traffic Volumes
Roadway Name
US Hwy 101 (at Victoria Avenue)
PCH-1 (at US Hwy 101
Harbor Blvd. (at Gonzales Road)
Seeward Avenue (at US Hwy 101
Olivas Park Drive (at Victoria Avenue
Source: CALTRANS, 2016; County of Ventura. 2017*.
AADT
137,000
30,500
22,000 *
134,000
43,700 *
Land access to Ventura Harbor and the VPD is located off of US Highway 101, with the
main exit off of Seeward Avenue exit onto Harbor Blvd. Commuter vehicles by laborers working
for the dredging contractor could be used. If necessary, land based access could be another and/or
alternate mode of transportation for movement of heavy equipment for the Proposed Project
(Alternative 1).
Vehicle traffic does occur on South Jetty Beach, South Beach and McGrath State Beach,
and vehicle driving on the beach could be from the VPD personnel, lifeguards that are part of State
Parks (CDPR), local law enforcement, or from the dredging contractor personnel. Land based
Proposed Project (Alternative 1) operations would include a dozer to place the temporary pipeline
on the beach. A dredging contractor truck would be on the beach for periodic inspection, operation
& maintenance (O&M), and safety of the pipeline.
A standard condition applied to a harbor dredge project by the USFWS and communicated
to the Corps in a letter dated September 4, 2003 and cited in Appendix E of the EA states, "The
number of vehicles trips on the beach south of the estuary will be limited to the installation
(mobilization), emergency maintenance, and removal (demobilization). Routine maintenance
inspections will be made by foot."
4.11 Socioeconomics and Environmental Justice
4.11.1 Socioeconomics
The FY16 through FY 18Federal maintenance dredging multi-year construction contract
for Ventura Harbor provided approximately $9,000,000 worth of work over a three year period
that benefit the economies of the City of Ventura and Ventura County.
The socioeconomic and environmental justice demographics for the City of Ventura and
Ventura County are shown in Table 9.
Table 9 Socioeconomic, Environmental Justice Demographics for City of Ventura and
Ventura County
Parameters
Ventura
Ventura County
Total population
109,067
843,110
55
White
57.2%
Black
1.4%
American Indian and Alaskan
0.3%
Native
Asian
3.8%
Native Hawaiian and Other
0.1%
Pacific Islander
Some Other Race
0.3%
Two or More Races
2.4%
Hispanic or Latino
34.5%
Median Household Income
$ 70,541
Persons below poverty
10.7%
Source: U.S. Census Bureau, 2018.
46.6%
1.6%
0.3%
6.9%
0.1%
0.1%
2.4%
41.9%
$ 78,593
10.6%
In general, the socioeconomic demographics for the City of Ventura are similar to those
for Ventura County. The percentage of White population is higher in the City of Ventura, and the
percentage of Hispanic or Latino and Asian populations are higher in Ventura County. The
socioeconomic demographics data for the City of Ventura do not reflect a disproportionately
high percentage of minorities or poverty level in comparison to Ventura County socioeconomic
demographic data.
4.11.2 Environmental Justice
The 1994 Executive Order (EO) 12898, Federal Actions to Address Environmental
Justice in Minority Populations and Low-Income Populations, requires all Federal agencies to
conduct "programs, policies, and activities that substantially affect human health or the
environment, in a manner that ensures that such programs, policies, and activities do not have the
effect of excluding persons (including populations) from participation in, denying persons
(including populations) the benefits of, or subjecting persons (including populations) to
discrimination under, such programs, policies, and activities, because of their race, color, or
national origin." Section 1-101 of the Order requires Federal agencies to identify and address
"disproportionately high and adverse human health or environmental effects" of programs on
minority and low-income populations.
The Federal Council on Environmental Quality (CEQ) identifies minority groups as
Asian, American Indian and Alaskan Native, Native Hawaiian & Pacific Islander, Black or
African American, and Latino. CEQ further notes that a minority population may be present if
minorities exceed 50% of the existing population within an area or if a minority group comprises
a meaningfully greater percentage of the local population than in the general population. A
minority population also exists if there is more than one minority group present and the minority
percentage, as calculated by aggregating all minority persons, meets one of the above-stated
thresholds. Both the EO and the CEQ definitions of environmental justice and minority groups
assist in describing the existing without project demographic condition within the City of
56
Ventura that is adjacent to the proposed project area. The City of Ventura, and Ventura County
serve as the environmental justice demographics reference for population, ethnicity, and low
income (percentage below poverty threshold), as summarized in Table 9. As summarized above
in Table 9, the socioeconomic demographics data for Ventura do not reflect a disproportionately
high percentage of minorities or poverty level in comparison to Ventura County socioeconomic
demographic data. The proposed project is located in Ventura Harbor in open water, and the
breakwater is a manmade, navigation structure that is not constructed for human habitation. The
1994 Executive Order (EO) 12898, Federal Actions to Address Environmental Justice in
Minority Populations and Low-Income Populations, requires all Federal agencies to conduct
"programs, policies, and activities that substantially affect human health or the environment, in a
manner that ensures that such programs, policies, and activities do not have the effect of
excluding persons (including populations) from participation in, denying persons (including
populations) the benefits of, or subjecting persons (including populations) to discrimination
under, such programs, policies, and activities, because of their race, color, or national origin."
Section 1-101 of the Order requires Federal agencies to identify and address "disproportionately
high and adverse human health or environmental effects" of programs on minority and lowincome populations.
The Federal CEQ identifies minority groups as Asian, American Indian and Alaskan
Native, Native Hawaiian & Pacific Islander, Black or African American, and Latino. CEQ
further notes that a minority population may be present if minorities exceed 50% of the existing
population within an area or if a minority group comprises a meaningfully greater percentage of
the local population than in the general population. A minority population also exists if there is
more than one minority group present and the minority percentage, as calculated by aggregating
all minority persons, meets one of the above-stated thresholds. Both the EO and the CEQ
definitions of environmental justice and minority groups assist in describing the existing without
project demographic condition for the Proposed Project. The City of Ventura served as the
environmental justice demographics reference for population, ethnicity, and low income
(percentage below poverty threshold), as summarized in Table 9. The City of Ventura and
Ventura County was selected as it would presumably reflect an overall representative picture of
the ethnicity and percentage below poverty threshold statistics for all of the residences in
Ventura County.
57
5.0. ENVIRONMENTAL CONSEQUENCES
Potential impacts from the Proposed Project (Alternative 1), and the No Action
(Alternative 2) are evaluated and analyzed below.
5.1 General Physical Environment/Littoral Transport
Significance Threshold
Based on the existing conditions discussed above, impacts would be considered
significant if the alternative results in:
·
A long term impact to the physical environment or littoral transport in the proposed
project area
Proposed Project Alternative (Alternative 1)
The proposed placement of suitable dredged material/discharge would not cause or
contribute to the erosion of existing downcoast beaches and would result in temporary beach
accretion because material would be returned to the intertidal zone. The primary dredged
material placement site is typically in the surf zone and/or above the Mean Higher High Water
level (approximately +10 feet MLLW) and is the most desirable location for the purposes of
beach nourishment and minimizing return of sediment into the harbor from the littoral processes.
Disturbances resulting from dredge material discharge occurring approximately once per year are
in amounts smaller than the average annual sediment load coming out of the Santa Clara River.
Since the dredged material in the harbor are similar in compositions to those sediments in the
Santa Clara River, the dredged material discharge is simulating and replacing a portion of the
natural littoral process sediment deposition from the Ventura River to the north and the Santa
Clara River to the south. The dredged material and discharge would not significantly degrade the
value of intertidal and subtidal beach habitats, and would be a benefit as beach nourishment. No
significant long term or cumulative adverse effects on the terrestrial or aquatic ecosystems would
occur as a result of the proposed project. The general physical marine environment would return
to pre-project conditions upon completion of project. Based on the above, impacts would be less
than significant impact.
The Proposed Project (Alternative 1) would have a temporary and short term impact on
littoral transport (littoral material/sediment is sometimes referred to as substrate). The
predominant littoral process transports sediment down coast in a southerly direction. Ventura
Harbor interrupts the north-to-south sediment transport process, depriving downcoast beaches of
sediment replenishment. Dredging would temporarily remove benthic material and sediment
from the dredging footprint. However, the existing downcoast littoral transport of sediment into
the dredge areas would replenish removed substrate. In addition, the placement of suitable
dredged material would return material to littoral cell.
58
Littoral transport would return to pre-project conditions upon completion of project.
Therefore, the Corps has determined that the Proposed Project (Alternative 1), maintenance
dredging activity in Ventura Harbor would have a temporary and short term impact on the
physical environment and littoral transport. Based on the above, impacts would be less than
significant.
5.1.1 Watershed
Due to the episodic nature of the system, the active Santa Clara river channel has adjusted
primarily in response to the largest flood events (as observed over the past century) [Stillwater
Sciences, 2011]. Channel boundaries have only significantly expanded during the largest flows
on record (e.g., 1928 St. Francis Dam failure, and the 1938, 1969, and 2005 floods). Of these
events, the 1928 dam-break flood released down San Francisquito Canyon caused a massive
scouring of the mainstem river and valley floor and, therefore, this event represents the most
recent and significant channel-forming flow in those impacted reaches.
As summarized in Table 1 (Ventura Harbor Dredging Volume, 1969-2018) of the EA,
the average annual CY dredge volumes from 1969 through 2018 were approximately 570,000
CY, which is on the lower end of the average annual dredge volume of 500,000 CY to 1,000,000
CY for the Proposed Project (Alternative 1). Table 1 also shows the FY 2017 dredged volume
was 480,000 CY and the FY 2018 dredged volume were 600,000 CY. Overall, the Santa Clara
River watershed sediment-production rate is approximately 8.2 million metric tonnes per year
averaged across the entire watershed area (Stillwater Sciences, 2011), or approximately 6.0
million CY per year averaged across the entire watershed area. When 6.0 million CY per year is
compared to the Proposed Project's (Alternative 1) average annual CY dredge volume of
570,000 CY that would be used for beach replenishment, the Proposed Project (Alternative 1)
average annual CY dredged volume represents only approximately 9.5 % of the total annual
watershed sediment production rate going on the nearby beaches (i.e., South Beach; McGrath
State Beach; South Jetty Beach), which is a small amount of annual dredged material that is used
as placement of suitable dredged material for beach replenishment, than the total annual amount
of sediment that flows through the Santa Clara River watershed, through the Santa Clara River,
into the Santa Clara River estuary, and onto the nearby beaches. The Proposed Project
(Alternative 1) would not adversely impact the natural processes, such as breaching cycles or
impounding in the Santa Clara River (estuary), or the littoral transport going onto South Jetty
Beach, South Beach, or McGrath State Beach, and/or McGrath State Beach Nearshore. The
natural processes would return to pre-project conditions upon completion of project. Therefore,
the Proposed Project (Alternative 1) would have a less than significant impact on the natural
flow of sediment (e.g., littoral transport) coming out of the Santa Clara river (estuary) and a less
than significant impact on the natural deposition of sediment (e.g., littoral transport) being
deposited on the South Jetty Beach, South Beach, McGrath State Beach, and McGrath State
Beach Nearshore.
59
5.1.2 Estuary
Water in the Santa Clara River estuary is supplied predominantly by flow from the Santa
Clara River and effluent from the City of Ventura waste water treatment plant, with local
agricultural runoff and wave overwash also contributing to the overall supply (Stillwater
Sciences, 2011). Water surface elevations within the Santa Clara River estuary can range from
approximately 1.5 meter (5 feet) when the estuary is essentially empty to over 4.3 meters (14
feet) when the estuary fills with river discharge during storm events. The Santa Clara River
discharge is very low most of the year (less than 0.03 cubic meter per second [1 cubic feet per
second]), but winter and spring storms can increase discharges by several orders of magnitude
within just a few hours. At the mouth of the Santa Clara River, the City of Ventura Water
Reclamation Facility (WRF) discharges an average of approximately of 32,000 cubic meters per
day (or approximately 8.4 million gallons per day) of treated freshwater into the Santa Clara
River Estuary, which is equivalent to an average year-round stream flow of approximately 0.4
cubic meter per second (or approximately 14 cubic feet per second). During the winter months
when river flows dominate and generally maintain an open mouth, effluent discharge is a
relatively small portion of total discharge volume. However, the average daily effluent discharge
is far more than the average summer and fall streamflow that would be expected from an
unregulated southern California river when the mouth is closed. Discharge of treated effluent
from the City of Ventura's WRF while the mouth is closed can cause the water level of the Santa
Clara River estuary to rise above the sand barrier and cause the barrier at the mouth to breach at
a time of year when this would not occur under natural conditions. When the City of Ventura
WRF's 8.4 million gallons per day approximate average discharges [approximately 41,588 cubic
yards (CY) per day or 15,179,766 CY per year] into the Santa Clara River estuary is compared to
the Proposed Project's (Alternative 1) average annual CY dredge volume of 570,000 CY
(average annual from 1969 through 2018 in Table 1 of the EA) that would be used for beach
replenishment, the Proposed Project (Alternative 1) average annual CY dredged volume
represents only 3.75% of the total annual deposition that would end up on the nearby beaches
(i.e., South Beach; McGrath State Beach; South Jetty Beach), which is a small amount of annual
dredged material that is used as placement of suitable dredged material for beach replenishment,
than the total annual amount of discharge (flows) from the City of Ventura's WRF going into the
Santa Clara River (estuary) annually. Impacts would be less than significant.
An August 2014 flooding at McGrath State Beach Park, closed due to flooding caused by
the Santa Clara River estuary backing up behind the naturally occurring sand bar blocking the
mouth of the estuary (CDPR, 2014), was not influenced directly or indirectly by the 2014 Corps
dredging of the Federal channel in Ventura Harbor, as it was completed on March 6, 2014.
Furthermore, the Corps 2014 dredging, previous annual Corps dredging before 2014, and more
recent annual Corps dredging since 2014 through the present (2018), have not directly or
indirectly effected or impacted tidal circulation or fresh water inflows of the Santa Clara River
estuary or the mouth of the Santa Clara River. The estuary would return to pre-project conditions
upon completion of project. Therefore, the Proposed Project (Alternative 1) would have a less
than significant impact on the Santa Clara River (estuary) including breaching, on the placement
60
of suitable dredged material area(s), South Jetty Beach, South Beach, McGrath State Beach, and
McGrath State Beach Nearshore, and on sediment transport.
5.1.3 Wave Action
The placement of suitable dredged material on South Jetty Beach, South Beach, McGrath
State Beach, and/or McGrath State Beach Nearshore would replenish sediment on beaches south
of Ventura Harbor. A general goal of both beach and nearshore placement of dredge material is
to place the dredged sediment in such a manner that the material remains available to the littoral
system as beach replenishment. The Ventura Harbor region is exposed to high energy, turbulent
water and wave action due partly to its position along the Pacific Coast. Therefore, sediments
placed in this area tend to be highly dispersive, transitory, and subject to significant movement
from wave action. Suitable dredged material placed in the nearshore would move with currents
and wave action to adjacent beaches. Suitable dredged material beach nourishment would move
replenish sand on South Jetty Beach, South Beach and McGrath State Beach, and would be a
benefit but would be temporary since wave action and currents could transport some suitable
deposited dredged material downcoast. Wave action would return to pre-project conditions upon
completion of project. Based on the above, the Proposed Project (Alternative 1) would have a
less than significant impact on wave action.
No Action alternative (Alternative 2)
Sediment would not be dredged from the harbor, nor discharged back to the beach for
availability in littoral processes. There would be no change to the existing marine environment in
the absence of dredging, and the No Action alternative would result in a less than significant
impact to the general marine environment.
The No Action alternative (Alternative 2) would allow shoaling of the littoral drift into
the Federal entrance and navigation channels in Ventura Harbor that would result in unsafe
navigation conditions. The No Action alternative would provide minimal sedimentary material
for the littoral system downcoast of Ventura Harbor. If no dredging occurs at the sand trap areas
in the long term, the littoral transport would continue to build up and the downcoast coastal
beaches would be deprived of sand.
5.2 Water Quality
Significance Threshold
Based on the existing conditions discussed above, impacts would be considered
significant if the alternative results in:
·
A long term impact to water quality in the proposed project area
Proposed Project (Alternative 1)
61
Potential impacts from the Proposed Project (Alternative 1) on water quality [i.e.,
potential increase in turbidity; potential dissolved oxygen (DO) reduction; potential)] are
expected to be temporary and localized. LaSalle (1991) reported that dredging-related turbidity
impacts are expected to be limited to within 500 meters (1640 ft.) of the area excavated, with the
maximum concentrations generally restricted to the lower water column, and decreasing rapidly
with distance due to settling and dilution. Field observations of hydraulic dredging activities in
southern California indicate that turbidity increases above background levels may be
considerably more limited than those reported by LaSalle (1991), and are typically confined to
within 70 to 170 meters of the activities (Corps 1994b, 1998). Temporary physical and chemical
changes in water quality characteristics may result from re-suspension of bottom sediments
during proposed dredging activities. The dredged material proposed for discharge does not
contain toxic materials.
The results of the most recent water quality monitoring and reporting periods (i.e., 2017;
2018) that occurred during the Federal Ventura Harbor maintenance dredging are discussed and
summarized above in Section 4.2, and the most recent yearly (2017, 2018) summary water
quality sampling results during dredging are located in Appendix D [AET, 2017, 2018].
The 2017 water quality data and results showed that the Dissolved Oxygen (D. O.)
ranged from: 6.90 to 10.60 mg/L for Stations A, B, and C on March 3, 2017 (pre-dredge); 6.66 to
10.93 mg/liter for Stations A, B, C, D, E, F, G and H on March 8, 17, 21 and April 4, 2017
(during dredging), and; 5.55 to 7.70 mg/liter for Stations A, B, C, and D on April 12, 2017 (postdredge). During the 2018 Federal maintenance dredging from February 1, 2018 through February
26, 2018, the 2018 water quality data was gathered on January 29, 2018 (pre dredge, initial
baseline); February 5, 2018 (during dredging); February 15, 2018 (during dredging); February
24, 2018 (during dredging); and; March 7, 2018 (post dredge, final baseline).
The 2018 water quality data and results showed that the Dissolved Oxygen (D. O.)
ranged from: 9.50 to 13.58 mg/L for Stations A, B, C, and D on January 29, 2018 (pre-dredge);
4.57 to 12.89 mg/liter for Stations A, B, C, D, E, F, G and H on February 5, 15, 24, 2018 (during
dredging), and; 8.67 to 10.77 mg/liter for Stations A, B, C, and D on April 12, 2017 (postdredge). The 2017 water quality D.O. concentrations are above the 5.0 mg/liter compliance
criteria typically required by the California Regional Water Quality Control Board (CRWQCB).
The 2018 D.O readings were consistent between stations and control(s) for all weekly dredging
WQ sampling/monitoring reporting. DO levels ranged from 5.96 to 11.60 milligrams per liter
(mg/l) in the WQ dredge monitoring location stations A, B and C, and the WQ dredging
activities control station D had DO ranging from 5.40 to 11.18 mg/l. DO levels ranged from
4.57 to 12.15 mg/l in the WQ beach placement monitoring location stations E, F and G, and the
WQ beach placement control station H had DO ranging from 4.77 to 12.89 mg/l with DO values
less than 5 mg/l at only 3 WQ beach placement monitoring location stations (E, F and H) during
one sampling episode (February 24, 2018) caused by post-storm flows and not dredging
62
activities. Additionally, the 2018 D.O. water column average was greater than the D.O.
compliance objective of 5 mg/l.
Based on recent (2017 and 2018) water quality reporting results for Federal maintenance
dredging taken before (initial baseline, pre dredge), during dredging and after (final baseline,
post dredge) for the Proposed Project (Alternative 1), results showed that the D.O. concentrations
are typically above the 5.0 mg/l compliance objective for CRWQCB. Dredging and dredged
material placement activities have adhered to the requirements set forth by the CRWQCB. With
the implementation of water quality environmental commitments in Section 6 of the EA or Best
Management Practices (BMPs) for Alternative 1 (Proposed Project), requirements of a CWA 401
WQC would continue to be met. Water quality would return to pre-project condition upon
completion of dredging. Impacts would be less than significant.
There have been no major oil spill accidents in the Ventura Harbor since the September
2011 Environmental Assessment through the present. The implementation of a spill prevention
plan would confine and reduce potential spread of spills coming from the dredge operation.
Impacts to water quality would be temporary and short term. Water quality would return
to pre-project conditions upon completion of project. Based on the above, and with the
implementation of a spill prevention plan environmental commitment under water quality
discussed in Section 6, impacts would be less than significant.
A 2017-2018 SAPR Report included a grain size analysis and compatibility of dredged
sediment suitability determination on the sediment sampling, bulk chemistry testing, and
geotechnical testing results, was produced for Ventura Harbor Federal maintenance dredge areas
[Corps, 2018b] The SAPR suitability is required to assist the Corps in collecting data necessary
to evaluate and analysis and sediment, chemistry, and geotechnical properties of the sediments to
be dredged within the Federal channels and sand traps in Ventura Harbor and to collect data for
evaluating the geotechnical properties of the beach sediments at the South Beach, South Jetty
Beach (a contingency beach), McGrath State Beach, and McGrath State Beach Nearshore
placement sites. The SAPR suitability was prepared in accordance with requirements outlined in
the Ocean Dumping Regulations (40 CFR 220-228), the Evaluation of Dredged Material
Proposed for Ocean Disposal: Testing Manual (i.e., the Green Book) [USEPA & Corps, (1991)],
the Draft Regional Implementation Agreement (RIA) for the Evaluation of Dredged Material for
Ocean Dumping (USEPA & Corps,1993), Assuring the Adequacy of Environmental
The 2017-2018 SAPR Report grain size analysis and compatibility of dredge sediment
sampling, bulk chemistry testing, and geotechnical testing results are discussed below.
Bulk Sediment Chemistry.
Overall analyte concentrations in the Ventura Harbor area composite samples, as
summarized in Table 10 of the 2017-2018 SAPR Report (Appendix H), were below detection
limits or low compared to effects based screening values (Corps, 2018b). The only constituents
63
detected above National Oceanic Atmospheric Administration (NOAA) Effects Range Low
(ERL) values were total Dichlorodiphenyltrichloroethane (DDT) and 4,4'Dichlorodiphenyldichloroethane (DDD) in all but the Areas E and F composite samples for total
DDT and Areas E, F and H/I for 4,4'-DDD. There were no sample values that exceeded a NOAA
Effects Range Medium (ERM) value. Low levels of some Polyaromatic Hydrocarbons (PAH)
compounds and 4,4'-Dichlorodiphenyldichloroethylene (DDE) in most samples were the only
other organic constituents reported above a laboratory reporting limit. Phthalate compounds were
also detected in the sediments. However, method blank detections negated these results. Based
on the chemistry results, no adverse ecological effects are expected from the dredge material.
This is further supported by the fact mean ERM quotients were only 0.01 to 0.03. With an ERM
Quotient (ERMq) of 0.1, there is less than a 12% probability of a toxic response.
Except for arsenic, all contaminants detected in the Ventura Harbor sediments were well
below Regional Screening Levels for Cleanup of Superfund Sites (RSLs) and California Human
Health screening Level (CHHSLs) for residential soils developed for human protection. Elevated
arsenic concentrations occur commonly in Southern California dredge sediments and soils, and
the concentrations of arsenic in the Ventura Harbor samples were less than the background
concentration (3.5 mg/kg) found in soils throughout California (Bradford et al., 1996).
Dredge material placement compatibility analysis (Beach Compatibility) based on grain size
analysis.
The 19 vibracore samples discussed in the Final SAP were collected on June 19, 2018
with the onshore beach transect sampling and the offshore beach transect sampling (nearshore)
collected on June 20, 2018 and on July 2, 2018, as part of the grain size analysis and
compatibility of dredge sediment determination (Corps, 2018b).
The sediment within the Federal Channel dredge footprint at Ventura Harbor have been
routinely dredged before by the Corps as part of its maintenance dredging activities. Sediment
from these areas have been routinely placed as beach nourishment by the Corps on the two
onshore placement sites, just down coast of the harbor's southern breakwater at McGrath State
Beach and South Beach. Sediment has also been placed at the nearshore area McGrath Beach
area, located just offshore of onshore McGrath State Beach. A new placement of suitable
dredged material site, South Jetty Beach (a contingency beach), was also analyzed and is part of
the South Beach compatibility analysis (beach compatibility) based on grain size and dredged
material placement compatibility analysis.
The sediment within the Federal Channel footprint was analyzed in August 2018 as to its
physical suitability for use as nourishment material for the onshore and nearshore beach
placement sites at McGrath State Beach, South Beach (and South Jetty Beach), and McGrath
nearshore, respectively. All areas were recently dredged in April of 2018. Shortly afterwards, the
footprints and placement areas were sampled and tested for grain size and bulk sediment
chemistry analysis as part of the most recent dredge sediment investigation in June of 2018
(Corps, 2018b). This investigation was performed by AECOM Inc. and Kinnetics Lab Inc.
64
Grain sampling and test tests from the earlier 2011 investigation by AMEC Geomatrix
Inc. and beach compatibility analysis by the Los Angeles District (LAD) Corps indicated that all
nine areas within the Federal channel footprint were compatible for placement at McGrath State
Beach, South Beach, and in the nearshore area located just offshore of onshore McGrath State
Beach, based on the composite weighted grain size average (Corps, 2011a). The individual
weighted average of each vibracore location for Areas B, D, E, G, H and I showed that sediment
from all vibracores collected in these areas was compatible for placement at these sites. For Area
A, 3 of 5 individual vibracores were compatible and for Area C, 2 of 3 individual vibracores
were compatible, for a total of only 3 cores incompatible out of a total of 30 vibracores collected.
The approximate volume of incompatible sediment in the vicinity of the three cores for Area A
and C amounted to 12,000 cubic yards. Follow up discussion and agreements with the pertinent
agencies in 2011 recommended that this incompatible sediment be allowed to be dredged and
placed at any one of the three placement areas. This was because the fines portions was relatively
small in comparison with the overall remaining amount of sediment to be dredged. But also any
future dredging of the fines would result in dissemination and well mixing of fines with coarser
sand sediment dredged from the overall footprints.
The recent 2018 analysis is based on the grain size compatibility between the nine
footprints and the placement sites and was conducted according to LAD Corps Geotechnical
Branch and SC-DMMT guidelines. These guidelines are the same as the SCOUP (Sand
Compatibility and Opportunistic Use Program). This analysis was performed by the LAD Corps
Geology and Investigations Section, Geotechnical Branch and is based on deep subsurface and
shallow sediment samples collected and tested for grain size on behalf of the Corps LAD in
February of 2018 by AECOM Technical Services and Kinnetic Laboratories Inc. The deep
samples were collected by vibratory borehole core methods, while the shallow samples were
collected by shovel and ponar grab methods. All samples were tested according to ASTM D 422,
using the U.S. Standard sieve sizes of: No. 4, 7, 10, 14, 18, 25, 35, 45, 60, 80, 120, 170, 200, and
230 sieves. Samples of sediment collected by vibracores were taken to project maintenance
depth plus over depth as follows:
Channel/Composite Area
Project Elevation
Project Elevation
Plus Overdepth
Entrance Channel (Area A)
-20 feet MLLW
-22 feet MLLW
Navigation Channel (Area B)
-40 feet MLLW
-40 feet MLLW
Navigation Channel (Area C)
-40 feet MLLW
-40 feet MLLW
Navigation Channel (Area D)
-40 feet MLLW
-40 feet MLLW
Entrance Channel (Area E)
-40 feet MLLW
-40 feet MLLW
65
Sand Trap (Area F)
-40 feet MLLW
-40 feet MLLW
Sand Trap (Area F)
-12 feet MLLW
-12 feet MLLW
Sand Trap (Area G)
-40 feet MLLW
-40 feet MLLW
Sand Trap (Area H)
-30 feet MLLW
-30 feet MLLW
Sand Trap (Area I)
-25 feet MLLW
-25 feet MLLW
Results of dredge material placement compatibility analysis.
The grain size compatibility analysis was made according to the USACE LAD
guidelines. These guidelines specify that individual sediment samples collected from each
dredged borrow area footprint area and/or the composite gradation curve for the overall dredge
footprint area can be no more than 10% above the finest limit gradation curve of the beach fill
or placement area. The finest limit curve is one of the three curves representing the overall
composite grain size gradation of the weighted average calculated profile or "beach
compatibility envelope" of the placement area(s). The compatibility envelope is based on the
weighted average of the finest, coarsest and average grain sizes from the individual beach
profile samples. The "finest limit" gradation is based on a sample for a U.S. Sieve size no. 200
(0.08 mm) result. The guidelines also specify that the dredged sediment can be greater than the
"coarsest limit" placement profile sample grain size composite curve, as long as aesthetic
quality of the dredged sediment in this coarser size range is acceptable. The placement
composite samples for McGrath State Beach and South Beach collected in 2018 were made up
of three transects each (i.e., McGrath State Beach (Transects D, E, and F); South Beach
(Transects A, B, and C), in which sediment samples were collected from an elevation of plus (+)
12 feet above MLLW (onshore) to offshore at the deepest elevation of -36 feet MLLW (Corps,
2018b). For South Beach, one of the three transects (Transect A) covered the South Jetty Beach
contingency placement area just established for 2018, while the other two (Transect B and C)
covered the rest of South Beach. The South Jetty Beach contingency transect (Transect A)
was collected between the Ventura Harbor south Jetty and the South Beach Groin structures.
The two transects (Transects B and C) for South Beach were collected between South Beach
Groin and approximately the McGrath State Beach property line. The samples were collected
approximately along a straight line, perpendicular to the coast along the transect lines. The
composite sample for McGrath Nearshore was made up of eleven (11) offshore samples only,
which were all collected in a random fashion. All the composite samples were surface grab
type sediment samples collected by hand. The results of the analysis are summarized as
follows:
Area A-
66
All four individual vibratory core samples collected from Area A fit within the grain size
compatibility envelopes for all three placement areas for onshore at McGrath State Beach,
South Beach and nearshore at McGrath. The composite grain size curve for all three vibratory
core samples collected from Area A also fits within the overall grain size compatibility
envelopes for all three placement areas.
Area BOne of the three individual vibracore samples collected from Area B fits within the grain
size compatibility envelopes for all three placement areas. Two of the three individual samples
(18-B-01 and 18-B-03) do not fit. The composite grain size curve for all three vibratory core
samples collected from Area B does not fit within the overall grain size compatibility envelopes
for all three placement areas
Area COne of the two individual vibratory core grain size curves from Area C fits within the
grain size compatibility envelopes for all three placement areas. The one exception is core
sample 18-C-02, which was approximately only 2 percentage points above the finest limits
curve for the South Beach onshore placement site. The composite grain size curve for both of
the two C core samples does, however, fit within the overall grain size compatibility envelope
for all three placement areas.
Area DVibracore D-02 is one of only three individual vibratory core grain size curves from Area
D that fits within the grain size compatibility envelopes for all three placement areas. Vibracore
samples 18-D-01 and 18-D-03 do not fit the compatibility envelope for all three areas. The
individual weighted average curve results for these two cores were approximately 27 and 13
percentage points above the finest limits curve for South Beach onshore placement site,
respectively. They were also 14 and 10 percent above the finest limits curve for McGrath
nearshore and 25 and 21 percent above finest limits curve for McGrath onshore areas,
respectively. The composite grain size curve for the three vibracore samples does not fit within
the overall grain size compatibility envelope for all three placement areas.
Area EThe two individual vibratory core grain size curves from Area E fit within the grain size
compatibility envelopes for all three placement areas. The composite grain size curve for the
two vibracore samples also fits the compatibility envelopes for all three placement sites.
Areas F, H, G and I-
67
All individual vibratory core grain size curves and their composite grain size curves from
these areas fit within the overall grain size compatibility envelope for all three placement areas.
Summary results of grain size analysis.
The composite grain size curves for seven (A, C, E, F, H, G and I) of the nine
designated Federal dredge footprint areas fit within the overall grain size envelope for all three
placement areas. The two areas of B and D do not fit as a composite curve for the three
placement areas. Five of the individual vibratory core borehole sample grain size curves from
amongst areas B, C and D did not fit within the overall grain size envelope for all three
placement areas. These five cores were 18-B-01 and 18-B-03; and 18-C-02; and 18-D-01 and
18-D-03. 18-D-01 and 02 were approximately 4 and 3 percentage points above the fine limits
grain size curves for McGrath onshore beach and 6 and 5 points above this curve for South
Beach onshore areas. 18-D-01 and 18-D-03 were approximately 27 and 13 percentage points
above the fine limits grain size curves for all 3 placement areas. 18-C-02 was approximately
only 2 percentage points above the finest limits curve for the South Beach onshore placement
site only. 18-B-01 and 18-B- 03 were 55 and 49 percentage points above fine limits curves for
McGrath Beach nearshore areas and much more above the two onshore areas.
The incompatible sediment from these five individual vibracore locations is described
according to Engineering Soils Classification, as follows: For 18-B-01 and 03 = Highly Plastic
(Fat) clay; for 18-D-01 and 03 = Sandy Silt and Silty Sand; and for 18-C-02 = Poorly Graded
Sand with Silt.
Of notable mention, the least "finest" grain size curve of all three placement areas is
South Beach, i.e. its fines limit curve is coarser than the other two placement areas. This means
that this beach is slightly coarser than McGrath nearshore and McGrath onshore beaches and is
therefore the most conservative or cleaner placement area of the three, based on grain size
alone, i.e. exhibits a fine limit curve that is coarser than the other two. Results from the older
2010 sampling investigation showed that McGrath onshore beach was instead the coarser of the
same three placement areas. Both of these onshore placement areas are relatively close in
overall fines limit content and it is not unreasonable to assume that either one would be coarser
than the other, and would vary. This comparison between the two sampling collection
timeframes indicates this change is more likely natural and due to the natural seasonal variation
in deposition of beach sediment.
It is important to note that all vibratory core samples collected from the harbor footprints
shortly thereafter the April 2018 dredging event represent the small amount of shoaled sediment
filled in these areas since this event. The amount of fines sampled in the cores in areas B and D
is reflective of a very short shoaling (depositional) timeframe for the sediment in these areas.
During the 2010 sediment sampled in these areas was more representative of the shoaled
conditions for the harbor because all of the samples tested were very sandy in nature with some
small amount of fines. They were straightforwardly compatible for all 3 placement areas based
on both individual and composite weighted average analysis. It is reasonable to assume that the
68
large percentage, but relatively small quantity of fines present in these areas from the 2018 test
results is not representative of the longer term shoaling and deposition of sediment in these
areas. If sediment samples were collected in these areas later on at end of 2018 or beginning of
2019, it would be sandier. This is because a larger amount of sand would have accumulated and
the entrapped finer grained silty/clay sediment would compress into a smaller volume. This
would result in a sediment stratigraphy that contains a smaller amount and thinner layers of
fines trapped within an overall thicker larger amount of sandy sediment. Because of its sandier
nature, it is reasonable to assume that this sediment would be acceptable for placement at all
three sites. The samples collected in 2018 for these areas is thus assumed not to be
representative of a normal longer term depositional event that occurs prior or after dredging.
Placement of sediment dredged from Ventura Harbor.
All of the sediment within the 7 of the nine dredge footprint areas (A, C, E, F, G, H and I)
is compatible for placement at the 3 preselected placement areas based on the weighted grain
size composite curve and analysis of each footprint area as a whole. Areas B and D are not
compatible based on this curve.
The sediment for much of the footprint areas is also compatible for placement at the 3
preselected areas based on the individual weighted average grain size curve and from most all of
the 19 individual vibratory borehole core sample locations. Five of the 19 boreholes are the
exception, in that the "fines" (percentage of sediment passing a U.S. No. 200 sieve) content of
the sediment is greater than 10% of the finest limit for some of the 3 placement areas gradation
curves. This appreciable amount of "fines" was found in the 5 vibratory core boreholes 18-B-01
and 03; 18-C-01; 18-D-01 and 03. Thus the sediment in the vicinity of these 5 core locations in
the 2018 testing event is considered incompatible for placement at the three preselected
placement areas based on individual weighted grain size average, with the exception of 18-C-01
which is compatible for McGrath onshore and nearshore areas.
Although incompatible, the amount of "fines" sediment remaining in the dredge footprint
surrounding these five vibratory borehole locations is likely of limited extent and by the time the
upcoming 2019 dredging event occurs, the sediment will have become sandier in nature. This is
reasonable to assume, since these areas have tested as sandy compatible sediment and passed
weighted average compatibility analysis based on the 2018 dredge samples collected by
Construction Contractor Manson, and the 2010 previous individual vibracore by vibracore
comparisons, summarized in the 2011 SAPR.
The 2018 dredge samples are grab samples of sediment at the surface of ocean bottom
(mudline), collected by Construction Contractor Manson during dredging (Manson Construction
Company, 2018). All 22 samples collected by Manson in 2018 were fine grained poorly graded
sand (SP) with the percentage of sand ranged from 99 to 95 percent and that percent fines
passing a U.S. no. 200 sieve ranged from approximately 1 to 5 percent.
In August 2018, the SC-DMMT concurred with Corps Determination that no adverse
69
ecological effects expected from dredge material based on chemistry results, and that Areas A,
C, E, F; I, H, G are physically compatible for both beach and nearshore placement. Areas B and
D are currently physically incompatible with beach and nearshore placement areas. Additional
sampling w i l l be conducted of areas B and D prior to the next dredging event to confirm the
sandy nature of sediment, and the results of this analysis will be coordinated with the
appropriate agencies. If Areas B & D are coarse grain and compatible, proposed placement sites
are acceptable. Results will be provided to the DMMT for verification. If Areas B & D are still
fine grained, but the material is minimal, placement may be allowed at the mouth of the Santa
Clara River in accordance with the conditions of the Ventura Port District's/City of Ventura
Regional General Permit (RGP). Results and quantities will be provided to the DMMT for
concurrence. If Areas B and D are still fine grained, and there has been additional infill of fine
grained material, additional chemical testing would be performed and results coordinated with
appropriate agencies for concurrence. SC-DMMT was not opposed to option 2 for disposal of
fines from areas B & D, if the quantity was minimal (similar to what was allowed for areas A &
C in 2011). Dredging and placement of the areas B and D will not be performed until the results
of further testing are known and coordinated with those agencies with jurisdictional authority.
Placement of materials outside of the placement areas analyzed in this EA would be covered
under separate environmental documentation.
Placement of dredge material area(s) [i.e., South Beach; South Jetty Beach (contingency)
McGrath State Beach; McGrath State Beach Nearshore] impacts may also include temporary
increases in turbidity and suspended solids, along with associated decreases in D.O. These water
column conditions may contribute to a decrease in light penetration. They may also cause a
general decline in primary aquatic productivity due to decreased photosynthesis in phytoplankton
populations. However, the placement of suitable dredged material would be confined to the
immediate vicinity of dredging activities, with turbidity levels dissipating rapidly through
resettlement. The high percentage of sand, relative to silts, would cause most sediment to settle,
rather than to remain suspended in the water column. With the implementation of the Water
Quality Environmental Commitment in Section 6 of the EA that the Proposed Project
(Alternative 1) would not interfere with the tidal circulation and fresh water inflows into and
through the Santa Clara River estuary or the mouth of the Santa Clara River, the Corps has
determined that the potential impacts from the Proposed Project (Alternative 1) placement of
suitable dredged material beach replenishment would be reduced to a level of short term and
temporary impact. Moreover, maintenance dredging activities, nonetheless, most probably
contribute only a small percentage to the total turbidity found in nearshore waters when
compared with: 1) turbidity created by natural beach erosion, and 2) re-suspension of material by
waves, currents, tidal action, and boat traffic. Therefore, the Corps has determined that the
potential impacts from the Proposed Project (Alternative 1) placement of suitable dredged
material area(s) would be a short term and temporary impact to the placement of suitable
dredged material area(s) (i.e., South Beach; South Jetty Beach; McGrath State Beach; McGrath
State Beach Nearshore) from the Proposed Project (Alternative 1).
5.2.1 Local Weather Influences
70
As shown in the Ventura County (VC) Watershed Protection District's rain gauge Station
# VC 216 B (Ventura Marina Port District) precipitation data, years 1965-2010, (Table 3), the
year(s) with the greatest amount of precipitation total was in 1998, with a total of 35.25 inches,
followed next in 1978 with a total of 32.58 inches of precipitation, followed by 2005 that had a
total of 29.35 inches of precipitation, and followed by 1983 with a total of 29.21 inches. For the
years 1998, 1978, 2005 and 1983, when there was substantial, above average rainfall, it is
concluded that these substantial, naturally occurring annual rain events have had a more
substantial impact on the Santa Clara River watershed, on the Santa Clara River, and on the
Santa Clara River estuary including breaching of the Santa Clara River and the Santa Clara River
estuary, and on depositing on the nearby beaches, on South Beach, on McGrath Beach, on South
Jetty Beach, and in the McGrath State Beach Nearshore, than the Proposed Project (Alternative
1). Therefore, the Proposed Project (Alternative 1) would have a less than significant impact on
water quality, on related water resources activities including water management and sediment
transport, on the Santa Clara River and the Santa Clara River estuary including breaching, and on
the placement of suitable dredged material area(s), South Beach, McGrath Beach, McGrath State
Beach Nearshore, and South Jetty Beach.
As discussed above, the annual precipitation weather data for Ventura Harbor (Table 3)
includes years 2007 and 2008 from the Ventura County Watershed Protection District's
Maximum Annual Precipitation (inches) data for rain gauge Station # VC 216 B (Ventura
Marina Port District), years 1965-2010. The 2007 precipitation total was 5.31 inches, the 2nd
lowest yearly total precipitation on record (1965-2010), with 1990 being the lowest yearly
precipitation at 3.88 inches. With the 2007 precipitation data showing a low (and below
average) yearly precipitation, it is concluded that there was a corresponding lack of regular flow
of water going through the Santa Clara River watershed, and the Santa Clara River and Santa
Clara River estuary, and that the lack of water flow in the Santa Clara River from a low 2007
precipitation had a substantial effect on the sandbar closing the Santa Clara River estuary in late
January 2008, and that the lack of water flow in the Santa Clara River from a low 2007
precipitation had a substantial effect on why the river did not breach again until December 19th,
2008, and that the lack of water flow from a low 2007 precipitation had a had a substantial effect
on the park closure to public use from October 2007 through March 2008, than the Proposed
Project (Alterative 1). It is concluded that it is the lack of substantial storm events during 2007
and 2008 from a lack of substantial annual precipitation (rain) events, cited above, that are
natural and regular occurring events, that have had a more substantial impact on the Santa Clara
River watershed, on the Santa Clara River and on the Santa Clara River estuary including
impounding, and on the nearby beaches, South Jetty Beach, South Beach, McGrath Beach, and
the McGrath State Beach Nearshore, than the Proposed Project (Alternative 1). Therefore, the
Proposed Project (Alternative 1) would have a less than significant impact on water quality, on
water resources including water management and sediment transport, on the Santa Clara River
and on Santa Clara River estuary including impounding, and on the placement of suitable
dredged material area(s), South Jetty Beach, South Beach, McGrath Beach, and the McGrath
State Beach Nearshore.
71
The frequency of ENSO - induced climate fluctuations vary on a multi-decadal time scale
that is consistent with the observed shift from a relatively dry climate (averaged over the period
1944 1968) to a relatively wet climate (averaged over the period 1969 1995) in North
America's Pacific region (Stillwater Sciences, 2011). The wet-period ENSO cycle, which existed
to the end of the Inman and Jenkins study (1995) and has likely continued to the present, has
been marked by strong ENSO years every 37 years and mean sediment fluxes for southern
California rivers (from the Pajaro River south to the Tijuana River) that have been approximately
5 times greater than during the preceding dry period (19441968). For the entire Santa Clara
River, the annual net sediment yield during the recent wet period was approximately 8 times
greater than it was during the preceding dry period. Within the period of 1950 to 1999, it was
found that almost 90% of the historical suspended sediment flux from the Santa Clara River (as
measured at the Montalvo gauge) has occurred during ENSO winters. The characteristic episodic
delivery of sediment from southern California watersheds in general, and the entire Santa Clara
River watershed in particular, is thus strongly linked to ENSO-induced precipitation events with
high daily or multi-day rainfall totals. A good example of this phenomenon in the Upper Santa
Clara River is a 10-day period during and directly after the January 2005 storm event, which
accounted for approximately 10% of the total sediment delivered from 19532009 (i.e., 10% of
the total sediment was delivered in 0.05% of the total time). In summary, sediment transport
throughout the Santa Clara River drainage network, and particularly in the mainstem river, is
highly concentrated in very brief periods of time. It is concluded that weather and climatic
phenomena (e.g., floods; high energy storms; ENSO; precipitation; etc.) and natural processes
(e.g., river flows; strong tidal surges, wave/wind actions, and longshore currents from the Pacific
Ocean; etc.), which occur on a regular and natural cycle, have a more substantial impact on water
quality, on water resources activities including water management and sediment transport
throughout the Santa Clara River drainage network, on the Santa Clara River (estuary) and on
adjoining beaches, South Jetty Beach, South Beach, McGrath State Beach, and McGrath State
Beach Nearshore than the Proposed Project (Alternative 1). Therefore, the Proposed Project
(Alternative 1) would have a less than significant impact on water quality, on water resources
activities including water management and sediment transport, on the Santa Clara River (estuary)
including breaching, and on the placement of suitable dredged material area(s), South Jetty
Beach, South Beach, McGrath State Beach, and McGrath State Beach Nearshore.
No Action alternative (Alternative 2)
No adverse effects (turbidity or disturbance of contaminants) would occur under the No
Action alternative for dredging or dredged material placement. However, hazardous conditions
caused by shoaling could result in more frequent boating accidents, which would likely involve
spillage of oil, gas, and other hazardous substances.
72
5.3. Biological Resources
Significance Threshold
Based on the existing conditions discussed above, impacts would be considered
significant if the alternative results in:
· permanent deterioration or contamination of aquatic or terrestrial habitats such that
the ecosystem is substantially disrupted; or
· permanent impacts or reductions to populations of native flora and fauna.
5.3.1
Alternatives Studied in Detail
In addition to No Action alternative (Alternative 2), the Proposed Project (Alternative 1) is the
only alternative considered in detail by the project analysis for biological resources.
5.3.2
Effects of the Proposed Project (Alternative 1)
5.3.2.1 Proposed Project (Alternative 1) - Dredging Impacts
The general impacts of dredging on marine biological resources are discussed at length in
LaSalle et al. (1991). That review summarizes much of the literature concerning impacts of the
physical and chemical alterations associated with dredging on shellfish, fish, benthic organisms,
seabirds, and marine mammals. The report describes in detail specific impacts of dredging to
marine biological resources from suspended sediments, sedimentation, dissolved oxygen
reduction, and entrainment. The subject report is hereby incorporated by reference per 40 CFR
1502.21.
Dredging would temporarily increase turbidity in the dredge area and the immediate
vicinity. Increases in turbidity and suspended solids at the dredging site would decrease light
penetration, causing a decline in primary productivity due to decreased photosynthesis by
phytoplankton. Increased turbidity may also cause clogging of gills and feeding apparatuses of
fish and filter feeders. Turbidity would also clog gills and feeding apparatuses slow moving
benthic fauna such as polychaete worms, clams, crabs, and sea stars. Furthermore, slow moving
benthic fauna would be subject to mechanical impacts including abrasion, entrainment, or
mortality from the dredge equipment.
A comparison of the dredging-induced suspended sediment concentrations observed in
the field and physical effects concentrations reported in the literature indicate that dredging is not
likely to cause acute lethal effects in aquatic organisms [Los Angeles Contaminated Sediment
Task Force (CSTF), 2003]. There is some overlap between potential acute sub-lethal and
chronic effects ranges and observed suspended sediment concentrations. However, because of
the transient nature of dredging-induced sediment plumes, more long-term chronic and sub-lethal
effects from re-suspended sediments are not expected to occur around most dredging activities.
Further, chronic and sublethal effects reported for sediments in the literature appear to overlap
73
with naturally occurring background suspended sediment concentrations in the Los Angeles
region indicating that regional aquatic life may be adapted to occasional exceedance of these
chronic and sublethal effects levels. Very high levels of re-suspended sediments and turbidity do
have the potential to affect marine organisms; however, most of those impacts occur at resuspension levels and durations that are typically not present during dredging activities.
Furthermore, turbidity would return to baseline levels after completion of dredging
activities. Fish and other mobile species would likely avoid the dredging area and relocate away
from the active dredging area. Mobile species would reoccupy the water column after turbidity
has returned to baseline levels. Furthermore, impacts would be localized. Decreases of benthic
infauna abundance immediately after maintenance dredging have been found to extend at least
100 meters (328 ft.) from the site of actual dredging in Coos Bay, Oregon (McCauley, Parr, and
Hancock 1977). Furthermore, turbidity levels generated by southern California harbor dredging
projects would likely not have an adverse effect on marine organisms greater than 100 meters
from the dredge site (Chambers 2004). Field observations of hydraulic dredging activities in
southern California indicate that turbidity increases above background levels may be
considerably more limited than those reported by LaSalle (1991), and are typically confined to
within 70 to 170 meters of the activities (Corps 1994b, 1998). Last, slow moving benthic fauna
such as polychaete worms, clams, crabs, and sea stars are common and abundant. Accordingly,
benthic fauna would recolonize the dredge footprint after completion of dredging activities.
Field studies of dredged areas have shown that recolonization occurs within 2 weeks to 3 years
after dredging stops (McCauley, Parr, and Hancock 1977; Oliver et al 1977; Rosenberg 1977,
Corps 1998). Oliver et al (1977) found that shallow water communities inhabiting naturally
highly variable and frequently disrupted physical environments rebounded or recovered more
quickly from experimental disturbances than those found in less variable and more benign
conditions. Based on the above, dredging impacts would be localized and temporary. Impacts
from dredging would be less than significant.
5.3.2.2 Proposed Project (Alternative 1) - Dredged Material Placement Impacts
Placement of suitable dredged material could bury benthic and beach dwelling fauna.
However, impacts would be temporary. Due to their abundance, benthic invertebrates are
expected to rapidly recolonize affected areas. A study (Parr et al. 1978) of the effects of
placement of suitable dredged material of 765,000 cubic meters of dredged material at an eroded
beach at Imperial Beach, California found that measured effects on the intertidal fauna were
short-term (5 weeks or less). Observations between 1996 and 2004, AET (2003, 2004;
Appendix K) indicate that the placement of suitable dredged material onto McGrath State Beach
has no long term impact on the presence or absence of invertebrate organisms in the substrate.
Weather, wave and tidal forces, and Santa Clara River discharges during high flow events have
substantially more influence on long term invertebrate populations at South Beach, the beach and
intertidal area of Surfers Knoll, and on McGrath State Beach than does the maintenance dredging
or dredged material placement activities. Based on the above, the Proposed Project (Alternative
1) would result in less than significant impacts to benthic and beach dwelling fauna.
74
Discharge of dredged material would temporarily increase turbidity levels in the surf
zone and the nearshore environment during dredging operations. Turbidity levels are anticipated
to return to baseline conditions upon completion of beach replenishment activities. Marine
mammals, birds, and other motile fish and wildlife species are expected to avoid the immediate
work area and thus avoid direct impacts from turbidity. Some species would be attracted to the
beach replenishment site, to feed on the benthic organisms dredged from the harbor (Corps,
1986b). Based on the above, turbidity associated with beach replenishment activities would
result in less than significant impacts to marine mammals, birds, and other motile fish and
wildlife that may inhabit the nearshore environment.
Beach placement of suitable dredged material during the California grunion spawning
season could include premature washing of eggs into the ocean, crushing of eggs by discharging
dredged materials, burial of eggs too deep to be returned to the ocean by the subsequent high
tide, and avoidance of the beach replenishment area by spawning fish due to the elevated
turbidity levels. Grunion season begins after March 15, and protected runs begin in April. The
season ends in late August. However, the project area is scheduled to be dredged outside of the
spawning season. Annual dredging would occur over one to two months during the period from
mid-September through mid-March. Typically annual dredging would be completed during a
one month period sometime between mid-September through mid-March. If dredging continues
into spawning season, impacts will be mitigated by utilizing single-point surf zone placement of
suitable dredged material, or diked-placement of suitable dredged material, which will limit the
area affected by placement of suitable dredged material and minimize adverse impacts. Beach
replenishment may result in improved physical conditions of spawning habitat for grunion at
McGrath State Beach and South Beach. With the implementation of the above management
measures, the Proposed Project (Alternative 1) would result in less than significant impacts to the
California grunion.
Placement of suitable dredged material on the beach would temporarily create new beach
habitat, potentially benefitting terrestrial organisms, including nesting shorebirds. Little or no
vegetation is located on the beach replenishment sites due to wave action, deposition and
erosion, and previous placement of suitable dredged material activities. The contractor's storage
and staging areas (Figure 5 of the EA) do not support biological resources of significance. The
location of the temporary pipeline placement, and placement of suitable dredged material
activities (Figure 1b) within the specified areas shown will avoid impacts to sand dunes and the
Santa Clara River. Based on the above, the Proposed Project (Alternative 1) would result in less
than significant impacts to terrestrial species and habitats.
Beach placement of suitable dredged material on McGrath State Beach, involving dredge
pipeline placement along the Santa Clara River estuary sandbar and across the river mouth, if or
when it is actively flowing, is too small in volume to result in a change in stream channel
position or any changes in the factors influencing the breaching and impoundment of the estuary.
Beach replenishment will not occur within 200 feet of the flowing Santa Clara river channel or
its estuary. Beach placement on McGrath State Beach using methods other than the dredge
75
pipeline along the beach, such as transfer of dredged material by watercraft, would have no
impacts to the beaches, dunes, Santa Clara River, the estuary sandbar, or the estuary.
There have been infrequent occurrences when the dredge pipeline has been displaced or
ruptured where it crossed the Santa Clara River mouth; these unusual incidences have occurred
only twice since 1969, when the first dredging began in Ventura Harbor, and were repaired
quickly. These two incidents occurred during high flow river conditions. Typically, river
discharges during similar events carry high sediment loads to the ocean. The dredged material
volume at the placement sites is relatively negligible in magnitude compared with the millions of
cubic yards of sediments discharging from the river under high flow conditions. The movements
of sediment by river flows, wave and tidal actions, and longshore currents are disturbances
continually changing the beach topography and river mouth location along the estuary sandbar.
The placement of suitable dredged material from this dredging operation essentially transfers
sandy sediment material past the harbor breakwater and jetties that are obstacles to the
downcoast (north to south) littoral transport of this material. After equipment mobilization and
placement of the temporary dredge pipeline, regular inspection of the pipeline occurs as part of
the operations and maintenance, as noted in Appendix E (U.S. Fish and Wildlife, Corps
Correspondences on Procedural Changes to Ongoing Dredging Activities). Frequent inspections
would detect any pipeline leaks and enable immediate repair, thus preventing any significant
erosion of beach sand along the pipeline placement zone.
Based on the above, beach placement of suitable dredged material or placement of the
dredge pipeline across the Santa Clara River mouth would result in less than significant impacts
to the Santa Clara River, its estuary, and estuary sandbar.
5.3.2.3 Proposed Project (Alternative 1) Impacts to Essential Fish Habitat
Dredging will disperse benthic fish resting or feeding in the immediate dredge area. Fish
mortality may occur due to injury from the cutterhead mechanism or suction into the dredge.
Most fish will avoid the dredge area due to turbidity and noise, resulting mostly in a temporary
displacement of fish from the dredge footprint. Turbidity will limit visibility for sight-feeding
fish, and these species will likely avoid the turbidity plume. Other species will be attracted to the
site to forage on benthic organisms suspended by the dredging. Noise effects may be indirectly
beneficial, causing fish to avoid the direct mechanical effects of the dredge. Noise impacts will
be limited because short, high-intensity noises that can cause startle responses in fish are not
expected. Displaced fish would reoccupy the water column once dredging activities are
complete, and turbidity returns to baseline levels. Therefore, dredging would entail less than
significant impacts on fish protected under the Pacific ground fish fishery management plan.
The dredge footprint and the beach nourishment sites do not contain rocky intertidal or
rocky subtidal fish habitat. Sandy benthic substrate is present at both the dredging footprint and
dredged material placement sites. Furthermore, eelgrass is not present within the project area
and the dredge footprint and all dredged material placement areas are not suitable for eelgrass
(Corps 2011a, Pi Environmental 2015). Therefore, dredging and beach nourishment activities
76
would not impact Essential Fish Habitat, and that the Proposed Project (Alternative 1) will not
substantially adversely affect EFH.
5.3.2.4 Proposed Project (Alternative 1) Direct and Indirect Effects to Federally-Listed Species
and Critical Habitat
Western snowy plover:
The plover may be temporarily disturbed and occasionally caused to flush short distances
at times when they occupy South Beach and McGrath State Beach areas during the placement,
maintenance, and demobilization of dredge pipeline equipment. The operation of the dredge
pipeline and outfall of dredged material at the surf zone has no impact on plover behavior.
Important habitat elements of these beach areas utilized by the plover would not be impacted or
reduced by dredging or dredged material placement operations.
The harbor channels and the Spinnaker staging area are approximately ½ mile away from
the areas typically occupied by the plovers, and their occupancy and use patterns of beach area
habitats would not be influenced by the dredge equipment or the staging and storage of
equipment, due to these adequate avoidance distances. Use of the alternate staging area at
Surfer's Knoll may temporarily disturb roosting plovers using South Beach, however plovers are
expected to find other nearby beach and dune areas to roost.
Beach placement of suitable dredged material and temporary dredge pipeline placement,
operation, maintenance, and demobilization along South Beach, across the Santa Clara River and
estuary sandbar, and on McGrath State Beach would be conducted as to avoid the dry beach
areas selected by plovers for nesting, roosting, and foraging to the extent practicable. The
availability of dry beach areas and primary constituent elements of plover habitat including
dunes, dune vegetation, and tide-cast debris such as driftwood, seaweed, and tidal wrack would
not be reduced or eliminated by dredging operations or beach placement. In 2011, the Santa
Clara River (estuary) bar and the beach immediately south of the estuary (i.e., McGrath State
Beach), had 8 plover nests (Ventura Audubon Society, 2011). In 2017, 5 nests were found south
of the Santa Clara River on McGrath State Beach (California Dept. of Parks and Recreation
2017).
Potential impacts to plovers from vehicle or equipment incursion on the beach would be
minimized, by implementing USFWS-recommended measures to (1) restrict beach nourishment
activities from October 15 to March 31; (2) limit beach recontouring activities to the footprint of
the dredge pipeline; and (3) limit vehicle use to dredge pipe mobilization, maintenance, and
demobilization activities. These management measures cover the entire timeframe of dredging
and its associated operations as well as contingencies involving the plover breeding season and
are designed to avoid impacts to plovers. These measures are described in Appendix E. Plovers
tend not to forage in dredged material pipeline outfall and are not attracted to it in the same
manner of many other shorebirds. Their behavior and use of the beaches nearby the dredge
pipeline would not be substantially altered by the presence of dredging equipment or personnel
conducting approved operation and maintenance of the dredge pipeline.
77
Nearshore placement of suitable dredged material would not impact the plover or its
habitat. The associated dredging in the harbor channels and offshore equipment operation and
noise entails no impacts to the western snowy plover, due to the lack of disturbance to beach
habitat and adequate avoidance distances involved in this type of dredging operation. Nearshore
placement itself does not involve use of a pipeline on the beach. Based on the above, the
Proposed Project (Alternative 1) would have less than significant impacts on western snowy
plover use and behavior within its beach habitat areas.
The Corps has informally consulted with the USFWS for the species. In a letter dated
October 26, 2000, the USFWS concurred that the Corps' determination that the Proposed Project
(Alternative 1) "may affect but not adversely affect" the plover. Subsequent to a September 2,
2002 meeting between the Corps and USFWS, the USFWS recommended additional avoidance
and minimization measures in a letter dated November 18, 2002, including limiting beach
recontouring activities to the footprint of the dredge pipeline; and limiting vehicle use to dredge
pipe mobilization, maintenance, and demobilization activities. Furthermore, said letter
concluded that the USFWS would continue to concur with a "may affect but not adversely
affect" determination with the implementation of the additional avoidance and minimization
measures. In a letter dated March 6, 2003, the Corps agreed to implement the measures.
In the event that dredging and beach nourishment activities extend beyond March 15, the
Corps would re-initiate informal consultation with the USFWS and implement a Contingency
Plan (Corps 2016) to execute additional minimization and avoidance measures. Based on the
above, the Proposed Project (Alternative 1) may affect but not adversely affect the western
snowy plover. The Proposed Project (Alternative 1) would be in compliance with the
Endangered Species Act.
California least tern:
The tern would not be directly impacted or disturbed by the dredging or dredge material
placement. During the mid-September through mid-March annual period of dredging, neither
migrating nor breeding terns would typically be present within the vicinity. Suitable habitat and
active nesting areas, such as the back dune areas of South Beach, would be avoided by the
dredge pipeline placement, and dredging is anticipated to occur outside of the breeding season.
The harbor channels and the project staging areas are at least 1 mile away from the areas at
McGrath State Beach typically occupied by nesting terns, and their occupancy and use patterns
of nesting habitat would not be influenced by the dredge equipment or the staging activities, due
to these adequate avoidance distances. There are no known aerial hazards or attractants
introduced by the dredging operations to the project area. Based on the above, the Proposed
Project (Alternative 1) would entail minimal impacts on the tern.
Dredging is expected to be completed by March 15th, and not anticipated to continue into
mid-April when the tern breeding season begins. Interference with least tern foraging due to
dredging and turbidity is no longer a concern during the breeding season. Recent studies have
demonstrated no connection between turbidity impacts and California least tern foraging success
78
(Keane and Smith 2016). The Corps is responsible for monitoring water quality during dredging,
per a 401 Water Quality Certification application and letter to the Los Angeles Regional Water
Quality Control Board (LA-RWQCB).
Minor delays due to equipment failure or late-winter storms are possible, but are not
expected to extend into the tern's breeding season (April 15). The temporary dredge pipeline is
also expected to be demobilized from the site prior to April 1st. However, if dredging and
debmobilization activities are not completed by April 15, the Corps would initiate informal
Section 7 consultation with the USFWS for the least tern and a Contingency Plan (Appendix G)
would be implemented (Corps 1998b, 2016).
If potential impacts to nearby western snowy plover nesting prevent pipeline
demobilization, then the pipeline would remain in place during the tern nesting season also,
unless coordination with the USFWS results in a plan whereby removal can be accomplished
with minimal impacts to the plover or nesting terns.
Nearshore placement of suitable dredged material would not impact the tern nesting
habitat. The associated dredging in the harbor channels and offshore equipment operation and
noise entails no impacts to the tern, due to the lack of disturbance to nesting area habitat and
adequate avoidance distances involved in this type of dredging operation. Tern foraging
behavior is not expected to be influenced in the nearshore placement site, as recent studies have
demonstrated no connection between turbidity impacts and California least tern foraging success
(Keane and Smith 2016).
Based on the above, the Proposed Project (Alternative 1) would have no effect on the
California least tern. If dredging and debmobilization activities are not completed by April 15,
the Corps would initiate informal Section 7 consultation with the USFWS for the least tern and a
Contingency Plan (Appendix G) would be implemented (Corps 1998b, 2016).
Tidewater goby:
No impacts to goby individuals or its fishery habitat are anticipated. The dredging
footprint and dry beach areas where the dredge pipeline would be located are unsuitable habitat
for the goby and are not within designated critical habitat.
The mobilization and demobilization of the dredge pipeline would be within the
designated critical habitat area when it crosses the Santa Clara River mouth and is placed along
the estuary sand bar. Any surface substrate disturbance to the estuary bar can be reshaped in like
manner to the condition prior to pipeline mobilization, thus maintaining the sand bar elevation
and avoiding any change to its function of estuary impoundment. The beach replenishment sites
where the dredge pipeline outfall may be located are in the saltwater surf zone and do not contain
primary constituent elements of critical habitat, such as estuarine reproductive habitat, brackish
water, or freshwater. No project activities will occur within the estuarine habitat of the Santa
Clara River, and accordingly, no changes would occur to primary constituent elements of critical
habitat, such as suitable substrate for reproduction or submerged vegetation.
79
Placement of the dredge pipeline outfall would be located a minimum of 200 feet away
from the active Santa Clara river mouth channel(s). The flows of the Santa Clara River and the
breaching or impoundment of estuarine water are not significantly influenced by the beach
replenishment placement of suitable dredged material. The dredged material would not be
placed upon dry beach sites or within the active river channel.
Nearshore placement of suitable dredged material would occur in the saltwater marine
nearshore zone and is not significant enough in volume to affect the water quality associated
with goby that may be in the vicinity of the river mouth and estuary.
The Proposed Project (Alternative 1) would: not affect the presence, persistence, or
availability of aquatic habitats; not affect salinity; not change the substrate within potential
spawning or rearing sites; not reduce or prevent establishment of aquatic vegetation; and not
result in beach erosion or the loss or reduction of sandbars occurring across the river mouth and
estuary areas. This dredging project is not anticipated to introduce any known threats to the
goby or its habitats that would require special protection measures of the primary constituent
elements of critical habitat. Therefore, the Proposed Project (Alternative 1) would have no
impacts to the tidewater goby and the physical and biological characteristics of its habitats.
The Proposed Project (Alternative 1) would not result in take of gobies and would not
adversely impact any primary constituent elements of critical habitat or occupied critical habitat
of unit Ventura-2. Therefore, the Proposed Project (Alternative 1) would have no effect on the
tidewater goby or its critical habitat.
Steelhead trout:
No impacts to steelhead individuals or its fishery habitat are anticipated.
The waters of dredging footprint within the harbor channels could potentially have
steelhead. Dredging in the harbor is a slow-moving activity and the steelhead is generally a fastmoving fish. It is unlikely that steelhead would remain in close proximity to dredging equipment
during operation due to the nuisance created by elevated turbidity and noise. Any steelhead
presence within the back channels of the harbor would remain unaffected due to the temporary
and localized effects of turbidity in the entrance channel.
The mobilization and demobilization of the dredge pipeline would be within the
designated critical habitat area when it crosses the Santa Clara River mouth, being placed along
the estuary sand bar. Any surface substrate disturbance to the estuary bar can be reshaped in like
manner to the condition prior to pipeline mobilization, thus maintaining the sand bar elevation
and avoiding any change to its function of estuary impoundment. The beach replenishment sites
where the dredge pipeline outfall may be located are in the saltwater surf zone located adequate
distances from the river mouth and such sites do not contain primary constituent elements of
critical habitat. No project activities will occur within the estuarine habitat of the Santa Clara
River, and accordingly, no changes would occur to primary constituent elements of critical
80
habitat, such as suitable substrate for reproduction or submerged vegetation. Spawning habitat
for the steelhead does not occur in the vicinity of the river mouth or estuary.
Placement of the dredge pipeline outfall would be located a minimum of 200 feet away
from the active Santa Clara river mouth channel(s). The flows of the Santa Clara River and the
breaching or impoundment of estuarine water are not significantly influenced by the beach
replenishment placement of suitable dredged material. The dredged material would not be
placed upon dry beach sites or within the active river channel. No impediment to smolt or adult
steelhead movement would be introduced near the river mouth and beach replenishment has no
influence upon stream discharge volume and less than significant amount of change in physical
characteristics to the surf zone adjacent to the river mouth.
Nearshore placement of suitable dredged material would occur in the saltwater marine
nearshore zone and is not significant enough in volume to affect the water quality associated the
Santa Clara river mouth. However, turbidity in the nearshore would be increased temporarily
and could potentially impact steelhead behavior within this localized nearshore zone. Marine
nearshore areas adjacent to the Santa Clara River mouth, having similar benthic substrate
character and nearshore saltwater condition, would remain unaffected by active nearshore
placement operations. Thus adjacent areas where migrating adults might be found as they swim
toward the river mouth would provide significantly large enough habitat area for the steelhead.
The ability of young and adult steelhead to move quickly away from harmful levels of turbidity
and to tolerate a physical disturbance such as nearshore disposal within a localized zone is
anticipated to result in no adverse impacts to any individuals that might be in the vicinity of the
nearshore placement site during dredging.
The Proposed Project (Alternative 1) would: not affect the presence, persistence, or
availability of aquatic habitats; not affect salinity; not affect adult spawning migration; not affect
juvenile or smolt behavior; not affect fish passage or habitat connectivity; and not result in
changes to the breaching of the estuary sand bar or impoundment of the estuary waters. This
dredging project is not anticipated to introduce any known threats to the steelhead or its habitats
that would require special protection measures of the primary constituent elements of critical
habitat. Therefore, the Proposed Project (Alternative 1) would have no impacts to the steelhead
and the physical and biological characteristics of its habitats.
The Proposed Project (Alternative 1) would not result in take of steelhead individuals and
would not adversely impact any primary constituent elements of critical habitat or occupied
critical habitat. Therefore, the Proposed Project (Alternative 1) would have no effect on the
southern California coast steelhead or its critical habitat.
Marine mammals:
The humpback whale (Megaptera novaeangliae), the Steller sea lion (Eumetopias
jubatus) and the Guadalupe fur seal (Arctocephalus townsendi) are unlikely to occupy the project
area even temporarily, and no known attractants to the project area would be introduced due to
project activities. If any individuals of these species were to occupy the project vicinity, it is
81
likely that they would move as to avoid active project areas where risk of mechanical injury
might exist. The Proposed Project (Alternative 1) would have no effect on the humpback whale,
Steller sea lion, and Guadalupe fur seal.
Salt marsh bird's beak:
This plant was observed historically, outside of the project area but in the project vicinity,
in a salt marsh that would not be affected by the project. No suitable or potential habitat for this
plant occurs in the project area. Coordination with the USFWS in 1985 and 1986 indicates that
this species has probably been extirpated from the historic occurrence. Therefore, the Proposed
Project (Alternative 1) would have no effect on the salt marsh bird's beak.
Ventura marsh milk-vetch:
The occurrence sites and potential habitat areas of this plant are not found within the
project area. Project activities are not occurring within designated critical habitat. Suitable or
potential habitat outside of critical habitat areas would not be reduced. The Proposed Project
(Alternative 1) would have no effect on the Ventura marsh milk-vetch or its critical habitat.
5.3.3
Effects of No Action alternative (Alternative 2)
No direct or indirect impacts would occur to biological resources under a no action scenario
during the timeframe of proposed dredging, from the middle of September (September 15, 2018)
2018 through the middle of September (September 15, 2024) 2024 with a one year extension to
September 15, 2025. However, no action alternative (Alternative 2) would potentially involve a
change in harbor management from the annual dredging schedule that has occurred in recent
years to a less frequent dredging cycle. Shoaling within the harbor channels could result in a
change in water depth in some areas and the translocation of the annual dredge material volume
of sediment could change, with less sediment being transported past the harbor via longshore
drift or other forces of movement such as water currents, and wind, wave, and tidal action.
No effects to any threatened or endangered species or to critical habitat would occur under the
No Action alternative (Alternative 2).
5.4 Air Quality
Significance Threshold
Impacts would be considered significant if the alternative:
·
Exceeds Federal yearly emissions thresholds
Proposed Project Alternative
5.4.1
Federal Emission Criteria Pollutants Thresholds (Tons Per Year)
82
The USEPA has developed criteria and procedures for determining the conformity of
Federal actions to the applicable State Implementation Plans (SIPs). The General Conformity
Rule is used to assess conformity with an applicable SIP. Section 93.158 (a)(5)(v) of the 1990
amendments to the Clean Air Act (CAA), as cited in the General Conformity Rule, states that an
action would be considered to conform to the applicable SIP if such projects are sized to meet
only the needs of the population projections that are in the applicable SIP.
Per Section 176(c) of the Clean Air Act Amendments (CAAA) of 1990, the Corps must
make a determination of whether the Proposed Project (Alternative 1) conforms to the SIP.
However, if the total direct and indirect emissions from the Proposed Project (Alternative 1) are
below the General Conformity Rule de minimis emission thresholds, the Proposed Project
(Alternative 1) would be exempt from performing a comprehensive Air Quality Conformity
Analysis, and would be considered to be in conformity with the SIP federally, state, and
regionally (including local).
As cited under Federal Register (FR) 63247 (US EPA, November 30, 1993), the
following Federal emission criteria pollutants for construction thresholds exists for the South
Coast Air Basin (SCAB), in Table 10:
Table 10 Federal Construction Threshold (Tons/Year) for Ventura County of the South
Central Coast Air Basin (SCCAB)
Pollutants
Federal Construction
Threshold (Tons/Year)
O3
50
PM10
100
PM2.5
100
CO
100
NO2
100
SO2
100
Pb
25
Source: USEPA, 2018a
Volatile Organic Compound (VOC), is an air emission compound, which has a National
(Federal) air emission criteria threshold. VOC would be similar to Reactive Organic Compound
(ROC), Reactive Organic Gases (ROG), or O3, and would be used interchangeably in the
discussion for the Proposed Project (Alternative 1) on air quality emission calculations. O3,
PM10, PM2.5, CO, NO2, SO2, and Pb are typically identified as criteria air pollutants with
thresholds, as discussed above.
5.4.2
VCAPCD Evaluation Criteria
The VCAPD has not adopted any thresholds of significance for construction emissions but has
established the following emissions criteria shown below in Table 11 for evaluating air quality
83
impacts. Estimates of daily emissions in comparison to the VCAPD emissions evaluation are
included herein for the purpose of disclosure under NEPA.
Table 11 VCAPCD Evaluation Criteria1
Pollutant
Reactive Organic Compounds
Nitrogen Oxides
Thresholds, pounds per day (lbs/day)2
25 lbs/day
25 lbs/day
1. Source: http://www.vcapcd.org/pubs/Planning/VCAQGuidelines.pdf, 2018d
2. Applicable to remainder of Ventura County except Ojai Planning Area and the City of Simi Valley.
As discussed in Table 11, Reactive Organic Compounds (ROC), is an air emission compound
that has a regional threshold for VCAPCD. It is noted that ROC would be similar to Reactive
Organic Gases (ROG), Volatile Organic Compound (VOC), and/or O3, would be used
interchangeably in the discussion for the Proposed Project (Alternative 1) on air quality emission
calculations.
5.4.3
Air Quality Analysis, Potential Impacts
Proposed Project (Alternative 1)
Guidance on air conformity includes 40 Code of Federal Regulation (C.F.R., 2010),
General Conformity Guidance: Questions and Answers (US EPA, 1994), VCAPCD Rule 220 on
General Conformity (VCAPCD, 1995), and the Ventura County Air Quality Assessments
Guidelines (VCAPCD, 2003).
The proposed annual Ventura Harbor Federal maintenance dredging activities that
contribute to air emissions include dredging, and the use of worker's vessels and /or vehicles.
Proposed Project (Alternative 1) related air pollution would be minor, relative to the total
emissions and other sources of air pollution in the project area. Potential impacts to air quality
would be restricted, primarily to emissions from dredging and maintenance equipment, from
emissions from vessels and/or vehicles used to transport dredging materials from the area of
origin, to the harbor, and to the harbor dredging area.
The proposed annual maintenance dredging activities would involve the following
equipment: 2 Tug Boats, 2 Crew Boats, and a Dredge (e.g., a Hydraulic w/temporary pipeline
dredge; or a Hopper dredge; or a mechanical Clamshell dredge), and would dredge, a maximum
1,000,000 cubic yards (CY) of sediment per year. Land based equipment and vehicles include a
dozer, an excavator, a forklift and 36 worker's truck vehicles The Corps used guidelines for air
quality calculation provided in the USEPA's AP-42, A Compilation of Air Pollutant Emission
Factors (USEPA, 1985) and the California Environmental Quality Act (CEQA) Air Quality
Handbook (SCAQMD, 1993). The maximum days of dredging annual would be 75 days
annually, and the maximum number of dredging operational hours per day would be 24
hours/day. In an effort to better quantify air conformity calculations from a diesel operated
84
dredged for the Proposed Project (Alternative 1), a comparative dredge emission analysis was
performed with data and information from local Southern California dredging companies and
analyzed their operations of diesel dredges, specifically on hydraulic cutterhead dredges with a
temporary pipeline to determine the air conformity analysis for the Proposed Project (Alternative
1). Additional permitting data from was also obtained for the analysis.
Discussed below are some methods to reduce diesel emissions that may be used for
dredges. These methods may be used singularly or in unison. The USEPA's AP-42, A
Compilation of Air Pollutant Emission Factors provides a listing of these methods along with
effected parameters. Some of these measures also include a range of control efficiencies, but
only with respect to NO2. Additionally, in the CARB staff report of January 9, 1992, Initial
Statement of Reasons for Proposed Rulemaking, the CARB provides a range of control
efficiencies for some of these measures. Where applicable, these measures are discussed in
Appendix F (Air Quality Emissions Calculations and Analysis), Table 4.5.1 (Current Diesel
Technology Available to Dredges).
The engines used to provide suction and power the dredges, which are the basis of the air
conformity analyses for the Proposed Project (Alternative 1) are large bore stationary diesels
similar to diesel engines discussed. In the past, permit applications and emissions calculations
have typically been based on data included in Table 3.4-1, Gaseous Emission Factors for Large
Stationary Diesel and All Stationary Dual Fuel Engines included in USEPA's AP-42. These
factors are included in Appendix F, Table 4.5.2, Emission Factors for Dredges. The footnote in
AP-42 on Table 3.4-1 states Factors are based on averages across all manufacturers and duty
cycles. The actual emissions from a particular engine or manufacturer could vary considerably
from these levels. Table 4.5.2 also includes an analysis of a single 2,600 HP diesel engine using
the AP-42 emission factors. From the County of Santa Barbara Environmental Thresholds and
Guidelines Manual and discussion with Caterpillar Diesel, a 50 percent load factor was used for
the engine. Table 4.5.2 also reflects the emissions associated with diesel engine that uses
modern technology. In the comparative dredge emission study, NO2 and CO emissions are based
on actual source testing. Caterpillar Diesel was also contracted for the specifications of the
engines used, and the addition of the selective catalytic reduction (SCR) and ammonia injection.
In lieu of source testing, PM10 emission associated with the Caterpillar engine was assumed.
The SCR is estimated to reduce ROG by at least 50 percent over the values reported by
Caterpillar Diesel.
A dredge comparative analysis study (Chambers, 2002) of existing hydraulic cutterhead
dredges including a 2,600 horsepower (HP) Diesel fuel with Best Available Control Technology
(BACT) with included selective catalytic reduction (SCR) and ammonia injection for the
dredge's air quality/air conformity analysis is part of the air quality calculation and analysis. Air
quality calculations applicable to the multi-cycle program period for Ventura Harbor Federal
annual maintenance dredging program are located in Appendix F with supplemental information
provided in the CEQA 1993 SCAQMD Handbook (with revisions through 2018), the US EPA's
AP-42, A Compilation of Air Pollutant Emission Factors to determine the land vehicles and
ancillary support water vessels [i.e., tug boats; sea boats (crew)] air conformity analyses on the
85
proposed Ventura Harbor Federal maintenance dredging project. As described above and
following Table 4.5.3 (Emissions for Dredges, 1bs/day), in Appendix F, the annual dredging
involves removal of a maximum 1,000,000 CY of sediment from the Ventura Harbor Federal
maintenance dredging project. Though annual dredging typically is performed during a one
month period, a maximum of 75 working days accounts for constraints and contingencies due to
inclement weather conditions, operational or performance issues of the dredging equipment,
and/or insufficient funding levels, and therefore, the maximum 75 work days annually was
incorporated for in the emissions calculations for the Proposed Project (Alternative 1). The
maximum dredging operational hours per day is 24 hours a day for the dredge, tug boats and tug
boats. Pipeline and beach heavy duty equipment includes, a dozer, an excavator, and a forklift
with 8 hours operational hours per day for the pipeline and beach equipment. The maximum
number of laborers for the dredging activity would be 36 with 36 truck vehicles to calculate on
road vehicle emissions with one hour daily operation for 36 truck vehicles. The Ventura Harbor
maintenance dredging activity historically and currently would typically utilize a hydraulic
(cutterhead) dredge with a pipeline are similar to a Controlled Emission for a 2,600 HP diesel
dredge with SCR/Ammonia Injection. The engines used to provide suction and power the
cutterhead are large-bore stationary diesels. As per the County of Santa Barbara, Environmental
Thresholds and Guidelines Manual (and discussion with Caterpillar Diesel), a 50 percent load
factor was used for the engine. By taking into account these load factors and applying to the
Proposed Project (Alternative 1) air emission analyzed and discussed in Appendix F, an air
conformity analysis has been determined for peak daily (lbs/day) and maximum yearly
(tons/year) air emission for the dredge detailed in Appendix F, Table 4.5.3, Emissions for
Dredges (lbs/day.
Ancillary dredging vessels (two tug boat, two crew boats) emissions data for the boats are
based on Table II-3.3 included within USEPA's AP-42, A Compilation of Air Pollutant
Emission Factors. Beach and land based work equipment for the pipeline and other beach work
includes one dozer, one excavator, and one forklift, and a maximum of 36 worker trucks
representing thirty-six (36) laborers working and commuting. A summary analysis of the daily
emission for ancillary vessels, equipment, and vehicles are stated in Appendix F of the EA, in
Tables 4.5.4 (Ancillary Equipment Operations and Horsepower Ratings), 4.5.5 (Tug Boat Fuel
Data), and 4.5.6 (Daily Emissions for Ancillary Vessels and Vehicles Associated With Dredging
Operations, lbs/day), summarizes the calculated daily emission from the ancillary vessels,
equipment and vehicles. Ancillary vessels (two tug boat, two crew boats) and beach equipment
(one dozer, one excavator, and one forklift) would operate eight (8) hours a day, and 36 trucks
would operate one (1) hour a day during the annual dredging. A maximum 75 work days
annually for dredging are incorporated for the lbs per day and tons per year emissions.
Air emissions analysis and discussion have been calculated for laborers commute
vehicles (light duty truck) were also determined using the CEQA Air Quality Handbook
(SCAQMD, 1993, with revisions through 2018), and emission calculations (Calculations 4
through 8, Appendix F) for vehicle (working and commuter) emission. The approximate speed
of the laborers vehicles was assumed to be 40 miles per hour. 36 dredging laborers per day
would travel to the Ventura Harbor dredging area. The dredging workers would have lodging
86
accommodations in the city of Ventura. Workers vehicle daily trips typically would be a daily
distance of approximately 12.5 miles per day (or 6.25 miles each way), also known as vehicles
mile traveled (VMT) that includes performing maintenance of and/or inspection of pipeline on
the beach. A summary analysis of the daily emission of the worker (working and commuter)
vehicles is stated in Appendix F, Table 4.5.6, Daily Emissions for Ancillary Vessels, Vehicles
and Equipment Associated with Dredging Operations (lbs/day).
Air emission analysis and discussion for the Proposed Project (Alternative 1) peak day
emissions [pounds per hour (lbs/hr)] and maximum annual emissions [tons per year (tons/yr)]
generated from all the dredge equipment and land based equipment and vehicles for the proposed
annual Ventura Harbor maintenance dredging activities including placement of suitable dredged
material areas (e.g., South Beach, McGrath State Beach, McGrath State Beach Nearshore, and/or
South Jetty Beach) have been calculated and compared with air emission criteria thresholds set
by the VCAPCD (lbs/day), the SCAQMD (lbs/day), and Federal (tons/year) to determine project
related (construction) impacts. Table 12 below is a summary of the Proposed Project (Alternative
1) peak daily emission (lbs/day) and maximum annual (tons/year) air emissions (Appendix F,
Table 4.5.7).
87
Table 12
Proposed Project (Alternative 1) Peak daily emissions (lbs/day) and
Maximum annual emissions (tons/year)
Equipment
Type
Hydraulic
Dredge 2,600
HP Diesel
Barge w/BACTSCR Ammonia
Injection,
Controlled
Emission
Lbs/day
Tug Boat,
lbs/day
Crew Boat
Dozer, lbs/day
Excavator,
lbs/day
Forklift, lbs/day
Workers
Equipment
Vehicles
Peak Daily
Emissions,
Lbs/Day
Maximum
Total
Emissions,
Tons/Year (Yr)
VCAPCD
Evaluation
Criteria
ROC
PM
10
PM
2.5
SO2
Pblead
GHG
CO2eq
52.2
19.2
23.8
6.0
0.7
4x10-
4,428
163.2
4.2
0.13
228.0
10.20
0.06
124.8
5.4
.015
52.8
1.2
.007
13.2
0.3
.0018
0.8
0.4
.008
4x10-
2x10-
3x10-
4,545
3,629
2,992
1
1
0.02
.005
0.009
.002
.002
.0005
.001 .0003 .001
.0002 5x10- .0002
4x10-
8x10-¹
1,912
1,081
36
4.34
2.00
0.51
0.25
0.063
0.14
2x10-
1,234
186.2
292.5
150
78.1
19.6
2.1
2x10-
19,821
8x10-
675
Metric
Tons
(MT)
CO2eq
/yr
NA
10,000
Metric
Tons
(MT)
Equip.
Number
CO
NO2
1
14.3
2
2
1
7.0
NA
11.0
25
5.7
25
88
2.9
NA
0.8
NA
0.1
NA
CO2eq
/yr
Federal
Standard
Threshold,
Tons/Yr
100
100
50
100
100
Exceeds
Federal
Standard
Threshold,
No
No
No
No
No
Tons/Yr?
Notes:
NA means not applicable; (i.e., there is no emission threshold)
1 ton = 2000 lbs.
MT means metric ton
I metric ton (MT) = 2,204 lb
100
25
25,000
(MT)
CO2eq
/yr
No
No
No
The Proposed Project (Alternative 1) maximum annual emissions (tons/year) are below the
Federal (tons/year) air criteria pollutants threshold (de minimis) of CO, NO2, ROC, PM10,
PM2.5, SO2, Pb, and GHG. With the implementation of air quality environmental
commitments that incorporate the use of retarding injection timing of diesel-powered equipment
to reduce nitrogen oxide (NO2) and that incorporate the use of reformulated diesel fuel to
reduce ROC and SO2, impacts would be temporary and short term. Air quality conditions
would return to pre-project conditions after project completion. Based on the above, impacts
would be less than significant.
Estimated GHG emissions are shown below (Table 13):
Table 13
Proposed Project (Alternative 1)
Maximum Annual GHG Emission to
Proposed Project (Alternative 1) Maximum
Annual Emissions (MT/yr CO2eq)
675
While a hopper dredge or clamshell dredge could possibly complete the work, it is not likely.
Material dredged by the hydraulic dredge would be pumped through a pipeline from Ventura
Harbor to the placement of suitable dredged material area sites on either South Beach, McGrath
State Beach, McGrath State Beach Nearshore, and/or South Jetty Beach. Land based
89
construction equipment (a dozer, an excavator, and a forklift) would be used to mobilize the
temporary pipeline on the beach prior to the start of dredging and demobilize the temporary
pipeline off the beach upon completion of dredging and would be used to grade the newlyplaced sand to the extent practicable. Workers vehicle trucks would be used to perform routine
maintenance and inspection of the pipeline on the beach, and also for commuting. Tug boats
would be used to move the hydraulic dredge as necessary within the dredge footprint. Crew
boats would be used to ferry crew out to the dredge, and for miscellaneous transport of
personnel and equipment on an as-needed basis. Placement of suitable dredged material on the
beach/surf zone would not produce dust since the dredged material is primarily wet sand.
Placement of suitable dredge material in the nearshore would not produce dust since this
activity is aquatic placement with sediments being placed into the water. If a hopper dredge is
used, the self-propelled vessel would transport the material to placement at suitable dredged
material area sites on either South Beach (surf zone), McGrath State Beach (surf zone), McGrath
State Beach Nearshore, and/or South Jetty Beach (surf zone). If a clamshell dredge is used,
material would be placed onto barges and transported by tugboats to for placement of suitable
dredged material area sites on either South Beach (surf zone), McGrath State Beach (surf zone),
McGrath State Beach Nearshore, and/or South Jetty Beach (surf zone). A crew boat would be
used to ferry crew out to the derrick barge and for miscellaneous transport of personnel and
equipment on an as-needed basis. A comparison of dredge types (i.e., a hydraulic cutterhead
dredge with a temporary pipeline; a clamshell dredge; and a hopper dredge) of peak day
(lbs/hour) emissions for the air criteria pollutants of concern (ROC; CO; NOx; SOx, and PM10),
and maximum annual (tons/year) of some air criteria pollutants of concern (ROC; CO; NOx;
SOx, PM10; GHG), are summarized in Appendix F, Table 4.5.9, and in Table 14 below. The
use of a hopper dredge or a clamshell dredge is not likely, and is considered in this analysis as a
contingency.
Table 14 Summary of Proposed Project (Alternative 1) Emissions By Dredge Type
Peak Daily
Emissions
(lbs/day)
Hydraulic
Dredge
Clamshell
Dredge
Hopper
Dredge
ROC
CO
NO2
SO2
PM10
150.00
186.20
292.50
2.10
78.10
27.86
16.9
98.52
34.21
16.86
3.24
147.8
345.55
214.16
18.81
Maximum
Annual
Emissions
(tons/year)
Hydraulic
Dredge
ROC
CO
NO2
SO2
PM10
GHG
(CO2eq, in
MT/year)
5.70
7.00
11.00
0.10
2.90
675.00
90
GHG
(MT/year)
Clamshell
5.09
Dredge
Hopper
0.69
Dredge
Federal
50
Thresholds
(tons/day)
3.10
17.98
6.24
3.08
9.80
31.40
73.43
45.51
4.00
2.00
100
100
100
100
10,000
The Proposed Project (Alternative 1) annual dredging activities includes the placement of
suitable dredged material area(s) in Ventura Harbor and in the vicinity of Ventura Harbor are
subject to Federal, state CARB, and VCAPCD air quality regulations and standards. The
VCAPCD requires an air permit for a dredge to be operated in the harbor, as a stationary source
of emissions. The dredging operator (e.g., Corps or Corp's Contractor) would be required to tune
dredging equipment for minimum emissions immediately prior to dredge in order to reduce air
pollution. The study area and the Proposed Project (Alternative 1) project area already
experiences some reduced air quality from the large variety of motorized craft and vessels using
the harbor, traffic along access roads to the beach from the cities of Ventura and Oxnard, and
overhead commercial air traffic in route to the Oxnard airport. Air quality conditions would
return to pre-project conditions after project completion. Emissions from the dredge and other
support equipment would cause temporary and short impacts during dredging activity.
Therefore, the overall impact of the Proposed Project (Alternative 1) construction emissions on
local ambient air quality would be minimal compared to the existing day to day emissions
generated by local air emitters.
The Proposed Project (Alternative 1) annual dredging activities including the placement
of suitable dredged material area(s) in Ventura Harbor and the vicinity of Ventura Harbor could
operate under a VCAPCD permit for a dredge in the Federal channel to be operated in Ventura
Harbor, as a stationary source of emissions, and the VPD has a VCAPCD Permit No 1139 to
operate a dredge. In accordance with Permit No. 1139, issued by the VCAPCD, the contractor
would be required to use No. 1 grade diesel fuel, or, Chevron Special Diesel, or alternative fuel
approved by the VCAPCD, or fuel approved by CARB. The operator would be required to tune
dredging equipment for minimum emissions immediately prior to activities in order to reduce air
pollution. With the implementation of the Air Quality Environmental Commitment on the
contractor being required to follow all applicable requirements of the VPD's Permit 1139 from
the VCAPCD, the potential level of impact from the Proposed Project (Alternative 1) would be
reduced to a level of short and temporary impact. Air quality would return to pre-project
conditions following completion of dredging. Based on the above, impacts would be less than
significant.
As discussed above, the total emissions of each air criteria pollutant from the Proposed
Project (Alternative 1) is below de minimus levels as stated in 40 CFR 93.153(b). Based on the
above discussion and in Appendix F, the Corps has determined that the Proposed Project
(Alternative 1) on the Ventura Harbor maintenance dredging project conforms to the Federal
91
Clean Air Act (CAA) as amended (1990); therefore, a Conformity Determination is not required.
There may be an odor from the dredge sediments that could be originating from organic
compounds and/or metals that naturally occur in the sediments. Upon drying and exposure to the
sun, the dredged material oxidizes to become the same color as the other sand on the beach(es)
and/or in the nearshore within a few days, and the odor would also disappear. Air quality would
return to pre-project conditions upon completion of construction. Based on the above, impacts
would be less than significant.
No Action alternative (Alternative 2)
This alternative would avoid impacts to air quality since there would be no maintenance
dredging unless it resulted in frequent emergency dredging activities to relieve dangerously
shoaled conditions area.
With no dredging, there would be no diesel emissions from the dredge, no diesel
emissions from tug or crew boats supporting the dredge, and no land based equipment from a
dozer, an excavator, or a forklift for beach and pipeline placement and removal, or from worker
truck vehicles commuting and/or performing routine maintenance and/or inspection of the
pipeline on the beach.
5.5 Noise
Significance Threshold
Based on the existing conditions discussed above, impacts would be considered
significant if the alternative results in:
·
Permanently elevates noise levels within the Federal channel.
Proposed Project (Alternative 1)
Automobiles, including those on Highway 101 and on Harbor Blvd., recreational boats
and vehicles, and small commercial fishing boats are the major contributors to the ambient noise
environment at Ventura Harbor and nearby beaches (i.e., South Jetty Beach; South Beach;
McGrath State Beach) that generate noise levels that tend to increase during heavy summer
recreational utilization. The Proposed Project (Alternative 1) typically generates noise that
comes from the dredge, tug boat and crew boat(s) would typically occur sometime from
September 15 to March 15 for an approximate 1 (one) month duration, which is a different time
period compared to when the noise levels increases due to summer recreational activities in
Ventura Harbor and on the nearby beaches. Therefore, the Corps has determined that there
would be no impacts from the Proposed Project (Alternative 1) during the summer season noise
activities in Ventura Harbor and the nearby beach(es).
92
The placement of dredged material on the beach(es) and/or nearshore typically occurs
with a temporary pipeline coming from the dredge that operates in Ventura Harbor with the
temporary pipeline coming from the dredged, sitting on the beach, and then disperses and spews
dredge sediment at the preapproved placement of dredged material areas on the beach(es) and/or
nearshore that results in beach nourishment. The noise from the temporary pipeline that moves
the dredged material from Ventura Harbor is a low sounding noise, partly due to the thick size of
the temporary pipeline that greatly reduces the sound of the flow of dredged sediment going
through the temporary pipeline, and therefore, the noise from the dredged material going through
the temporary pipeline is negligible. Therefore, the Corps has determined that the potential noise
impact from the placement of dredged material on the beach(es) and/or the nearshore would be
less than significant.
The Proposed Project (Alternative 1) in Ventura Harbor is located in an area of many
established and varied noise sources (primarily automobiles and harbor craft). The Proposed
Project (Alternative 1) potential impact on ambient noise could occur during the maintenance
dredging. Noise emissions vary from one dredge to another such that it is not possible to
uniquely quantify the exact project-related impact yet an estimated range of noise (in dB) can be
quantified and assessed for a dredge. A hydraulic dredge typically generates noise ranging from
60 to 80 dB(A) at 50 feet from the source (USEPA, 2004). Spherically radiating point sources for
noise emissions are atmospherically attenuated by a factor of 6 dB per doubling of the distance.
Because most areas to be dredged are at least 100 feet away from residential areas, the
anticipated increase in noise levels would range from 54 to 74 dB(A). Furthermore, dredging
operations would occur on an as needed basis. As a result, there would be periodic, short term,
and moderate impacts to noise levels during dredging operations (McGraw-Hill Book Co., 1979,
"Handbook of Noise Control" defines 60-80 dB as "moderate" noise). Noise impacts would
return to ambient levels once activities cease.
The noise levels at various distances from an 80 dB noise source are estimated as
follows:
100 feet - 74 dB
200 feet - 68 dB
400 feet - 62 dB
500 feet - 60 dB
1000 feet - 54 dB
2000 feet - 46 dB
3000 feet - 40 dB
(Calculated using a point source spherical radiator equation, CALTRANS Noise Manual, 1980.)
The Caltrans data suggests that a typical dredging noise source would begin to fade into
the wave noise background by around 500 ft. from the dredge, and would be equal in magnitude
to even the quietest areas of Ventura by about 3,000 ft. from the dredge. There are no sensitive
receptors within 500 ft. of the Proposed Project dredging operations.
93
Under the Proposed Project Alternative, the Federal channel would typically be dredged
using a hydraulic cutterhead dredge with a pipeline. Operational noise of a hopper dredge,
similar to noise from a hydraulic cutterhead dredge, has noise source ranges from 85 to 108 dBA.
Furthermore, noise levels are atmospherically attenuated by a factor of 6 dB per doubling of the
distance. Potential noise levels at various distances are shown in the Table 15 below.
Table 15 Potential Noise Levels At Various Distances
Distance from Construction Activities
Noise Levels (dBA)
(ft.)
50
80 - 90
100
74 84
200
68 78
400
66 72
800
60 66
Source: USEPA 1971, 1972, 1974.
If the contractor chooses to work at night, activities would be performed in accordance
with local noise ordinances. If necessary, the contractor would be responsible for obtaining a
permit from the City of Ventura. With the implementation of the Noise Environmental
Commitments discussed in Section 6 of the EA, that noise levels of the Proposed Project
(Alternative 1) dredged activities would not exceed the residential authorized noise limits
established by the City of Ventura noise ordinance, that if double or triple-daily shifts are
utilized, the contractor would obtain any necessary permits or exemptions from the City of
Ventura, that construction equipment would be properly maintained and scheduled in order to
reduce unsafe and nuisance noise effects to sensitive biological resources would be avoided
whenever possible, therefore, the Corps has determined that the potential impacts would be
reduced to a level of short and temporary impact from the Proposed Project (Alternative 1) on
noise, and would be a less than significant impact on noise resources.
The dredge would be operating within the confines of the Federal channel, equipment to
mobilize and demobilize the pipeline on the beach and vehicles transporting materials to the
staging area and periodic inspections of the pipeline would their limit operations to the dry
portion of the beach to the extent practicable to ensure noise would be maintained at safe levels
to sensitive receptors. As a result, noise impacts in Ventura Harbor would be attenuated at the
levels indicated above. With the implementation of the noise environmental commitment in
Section 6 of the EA, impacts to noise would be less than significant. Noise levels would return to
pre-project conditions upon completion of construction. Based on the above, impacts to noise
would be less than significant.
No Action alternative (Alternative 2)
94
The No Action alternative would avoid all noise impacts associated with the proposed
project. However, a "No Action" response may result in frequent emergency dredging
operations to relieve dangerously shoaled conditions in the harbor.
5.6 Land Use (LU) and Recreation
5.6.1 Land Use (LU)
Significance Threshold
Based on the existing conditions discussed above, impacts would be considered
significant on land use if the alternative results in:
·
Permanent changes incompatible with designated uses.
Proposed Project (Alternative 1)
The VPD provides the Corps written entry for authorization to operate on its beaches,
beach parking lots, and storage yard, as part of the proposed project. The placement of dredged
material on the beaches and in the nearshore would temporarily increase turbidity. However, by
discharging the dredge material on the beach and/or the nearshore, replenishing of the beach
would occur and would be a long term benefit.
An alternate staging area, located in Surfer's Knoll parking lot, and on a portion of South
Beach immediately west of Surfer's Knoll Parking lot, would be utilized in the event that the
Spinnaker Drive staging area is unavailable. The portion of South Beach to be used as an alternate
staging area would be on the seaward side of and west of (adjacent to) Surfer's Knoll parking lot.
The approximate area of the Surfer's Knoll parking lot, approximately 35,000 square feet (SF),
and the portion of South Beach, approximately 22,500 SF, for a total of approximately 57,500 SF
to be used as an alternate staging area is (Figure 5). Surfer's Knoll parking lot has two
ingress/egress from Spinnaker Drive and has two ingress/egress onto South Beach. Construction
equipment including piping material, vehicles and a trailer would be transported from Spinnaker
Drive through Surfer's Knoll parking lot, and then temporarily staged in Surfer's Knoll parking
lot and/or on a portion of South Beach immediately adjacent to Surfer's Knoll parking lot. To
accommodate safe access, transport, and storage of equipment and pipeline to the alternate
staging area, the Surfer's Knoll parking lot would temporarily be closed during the duration of the
winter/spring annual dredging timeframe. During the temporary closure of Surfer's Knoll parking
lot, the public would be able to park vehicles along Spinnaker Drive or park across the street in
the Ventura Harbor Village parking lot where additional parking is available. Two, ingress/egress
exist to South Beach from Surfer's Knoll parking lot. Ingress and egress of equipment and
materials to South Beach from Surfer's Knoll Parking lot would occur on the south side entrance
95
of Surfer's Knoll parking lot to South Beach, which would have the least amount of potential
impacts to South Beach. Equipment and pipeline would not be placed on sand dunes. The north
side entrance of Surfer's Knoll Parking lot to South Beach would remain open to the public for
beach access. Furthermore, since 2004 when Western snowy plover surveys during dredging
were initially conducted annually through the present (2018), the Western snowy plover has never
been documented using the area of South Beach adjacent to the Surfer's Knoll parking lot being
proposed as alternate staging/storage area (Corps, 2018a); this disturbance has primarily been due
to human activity and dogs not on leashes. The Corps would continue to implement
environmental commitments and protection measures to avoid potential impacts to Western
snowy plover during pre-mobilization and de-mobilization of equipment and pipeline when
utilizing the alternate staging area on South Beach. Sufficient parking along Spinnaker Drive,
which provides ingress and egress to Surfer's Knoll parking lot and is immediately adjacent to the
Surfer's Knoll parking lot, and additional parking is available across Surfer's Knoll parking lot in
Ventura Marina parking lot that would minimize potential impacts to parking. Additionally, there
is sufficient mooring in Ventura Harbor for other commercial and recreation vehicles that would
not create a long term impact from the Proposed Project (Alternative 1) to LU. LU would return
to pre-project conditions upon completion of dredging. With the implementation of LU
environmental commitments, the Proposed Project (Alternative 1) potential impacts to LU would
be temporary and local. LU would return to pre-project conditions upon completion of
construction. Based on the above, impacts would be less than significant.
With the implementation of LU Environmental Commitments discussed in Section 6 of
the EA, that placement and removal of dredging pipe(lines) would be under the direct
supervision of the Corps and/or VPD dredging coordinator and that the Corps contractor would
provide to the extent practicable public access to roads, streets and highways that might be
utilized for hauling and maintenance, that large scale trucks trips to transport equipment will be
limited to off-peak commute periods, that sand ramps would be provided for emergency vehicle
and pedestrian access approximately every approximately 500 ft. along the temporary pipeline
route, except in the area adjacent to the vegetated dunes on South Beach or adjacent to the
Western snowy plover nesting south of Surfer's Knoll and at McGrath State Beach, that
transportation of heavy construction equipment and/or materials that require the use of
oversized-transport vehicles on State highways will require a Caltrans transportation permit,
recommended that an oversize load permit be obtained from the County of Ventura Public
Works Agency, Transportation Department if using a County of Ventura road that involves the
transport of heavy construction equipment and/or materials which requires the use of oversizedtransport vehicles, that the contractor would remove any dredging or beach replenishment related
debris left on the beach as soon as practicable, usually within 24 hours, and that the number of
vehicle trips on the beach south of the estuary will be limited to the installation (mobilization),
emergency maintenance and removal (demobilization) including removal of the temporary
pipeline and manning the placement location (for mandatory safety requirements). With the
implementation of LU environmental commitments, impacts would be temporary and short term.
LU would return to pre-project conditions upon completion of construction. Based on the above,
impacts would be less than significant.
96
No Action alternative (Alternative 2)
There is no anticipated change in LU with the No Action alternative (Alternative 2);
therefore, there would be no impacts.
5.6.2 Recreation
Significance Threshold
Based on the existing conditions discussed above, impacts would be considered significant on
recreation if the alternative results in:
·
Permanent changes incompatible with designated uses.
Proposed Project (Alternative 1)
The VPD provides recreational activities in Ventura Harbor as well as on the beaches
within Ventura Harbor.
Dredging, dredged material placement and the placement of dredge pipeline may
temporarily interfere with land based and water based recreational activities within the
immediate vicinity of the project. These recreational activities include boating, fishing, surfing,
swimming, and beach recreation (e.g., walking, sunbathing) activities. The potential
environmental impacts and disturbances to such activities are expected to be minimal.
Recreational and commercial uses are heaviest in the summer in Ventura Harbor and on the
beaches, which would not be impacted, since the Proposed Project (Alternative 1) annual
dredging activities are typically completed within a one month period sometime from September
15 and March 15 each year with a contingency plan (Appendix G) that would be implemented if
dredging extends beyond March 15 anytime during multi-cycle program period. Weather
conditions, performance of the dredging equipment, and funding levels can all influence the
duration of the dredging activities. Because of these uncertainties, a performance period of up to
75 days annually is allowed for dredging.
South Beach has the greatest opportunities for placement of dredged material because it
is administered by the VPD. A Proposed Project (Alternative 1) benefit would beach
nourishment on South Beach. Placement of dredged material could also occur on McGrath State
Beach, or on South Jetty Beach, a contingency beach. The Proposed Project (Alternative 1)
annual dredging activities would occur sometime between September 15 through March 15,
typically a fall through winter through early spring seasonally period. Recreational activities
tend to increase in Ventura Harbor during heavy summer recreational utilization, which is a
different season compared to the Proposed Project (Alternative 1) dredging project duration
period. Therefore, the Corps has determined that there would be no impacts from the Proposed
Project (Alternative 1) to summer recreational activities in Ventura Harbor. A Proposed Project
97
(Alternative 1) project benefit would occur in enhancement of the McGrath State Beach
Nearshore placement of dredged material area, as waves would tend to break over the berm,
creating additional surfing area(s), and providing additional recreational opportunities.
The Corps may use surface dredged material placement pipeline over part of the sandy
beach. Surface lain pipeline setting on the beach would allow for simplicity, cost efficiency,
safety and readily allow for pipe maintenance. This could result in minor impacts to beach
visitors attempting to cross the pipe, but sand ramps would be placed at appropriate intervals on
the beach, roads, streets, highways, walking/bike trail, to ensure adequate pedestrian public
access. The sand ramps could also be utilized for hauling of dredging equipment and
construction work, ingress and egress, access to construction staging/storage area, periodic
inspection of the pipeline during dredging, beach patrol by life guards or law enforcement
vehicles, or emergency vehicles. Burying of the pipeline on the beach could also be an option,
upon the request and approval of the local sponsor, VPD. Beach public access would return to
pre-project conditions after completion of dredging with removal of pipeline. The pipe itself
would not cover a significant area of beach, and beach replenishment would enhance recreational
use. Recreational uses are heaviest in the summer and are not expected to be significantly
adversely impacted, since the annual dredging activities are expected to typically occur between
September 15 and March 15. The Proposed Project would not include activities that would
permanently change the designated land use or recreation of the terrestrial environment in
Ventura Harbor, and therefore result in less than significant impacts to land use. The Corps has
included a recreational and land use environmental commitments in Section 6 of the EA, which
requires in-field coordination between the dredging contractor, the Corps and the VPD regarding
placement and removal of the dredged material placement pipeline. Land use and recreation
would return to pre-project conditions upon completion of construction. Therefore, based on the
above, and with the implementation of the recreation and land use environmental commitment,
impacts on land use and recreation would be less than significant.
Modifications to the existing bottom topography should be expected as a result of the
proposed dredging project. Local, but minor, changes to the bathymetry would result because of
relocation of marine sediments. In addition, topographic changes to the existing land forms
would occur from the dredged materials placement on South Beach and South Jetty Beach above
the MHHW, which would nourish beaches, and from the slow effects of erosion. The beach is
eroded annually. Beach dredged material placement /replenishment would, therefore, produce a
benefit through probable increases in beach recreational usage following the completion of the
project. The beaches could be graded to cover black organically-rich dredged material, to build
the beach and to improve overall aesthetics on the beach. Potential impacts of the proposed
activities affecting the existing recreation would be localized to the immediate project vicinity
and are considered minor in nature. Recreation would return to pre-project conditions upon
completion of construction. Impacts would be less than significant.
The utilization of heavy equipment would detract from beach recreational use (i.e.
walking, jogging, sunbathing, etc.) of South Beach or South Jetty Beach. Since beach dredged
material placement would typically be completed before or by March 15, which is prior to the
98
summer peak recreation use, the impacts to the beach area would be temporary, localized, and
not significant. The dredge equipment and floating pipes could obstruct recreational and
commercial vessels. The navigational impacts could be minimized by properly marking the
pipes and buoys so that boaters can safely avoid the immediate dredging area. The Corps has
included recreational environmental commitment(s) in Section 6 of the EA, which requires infield coordination between the contractor, the Corps, and the USCG District. Recreation would
return to pre-project conditions upon completion of construction. Based on the above, and with
the implementation of the recreational environmental commitment(s), impacts to recreation
would be less than significant.
The temporary closure of the Surfer's Knoll parking lot as a staging area for dredging
equipment and vehicles during the late winter-early spring duration of annual dredging, would be
a temporary and localized impact for ingress and egress to South Beach. Currently, there are two
ingress/egress areas from Surfer's Knoll parking lot to access South Beach, and it is proposed
one ingress/egress area from Surfer's Knoll parking lot to access South Beach would remain
open to the public during the temporary closure of Surfer's Knoll parking lot. There is additional,
sufficient access to the beach along Spinnaker Drive, which provides ingress and egress to South
Beach. Recreational use of Surfer's Knolls parking lot would return to pre-project conditions
upon completion of dredging. Based on the above, impacts would be insignificant.
The placement of dredged material on the beaches and/or nearshore would temporarily
increase turbidity. However, by discharging the dredge material on the beach and/nearshore,
replenishing of the beach would occur and would be a long term benefit for beach replenishment
and recreational opportunities.
No Action alternative (Alternative 2)
There are no substantial benefits resulting from the "No Action" alternative, except for
avoidance of temporary disturbance to navigation and water-related recreation. Several adverse
impacts would occur if the harbor was not dredged, and if sediment was not returned to the
littoral system. Recreational and commercial boats entering or leaving the harbor would
experience dangerous conditions, and eventually would be unable to use the harbor. Beaches
would erode, and certain sections would become unusable.
5.7 Aesthetics
Significance Threshold
Based on the existing conditions discussed above, impacts would be considered
significant on aesthetics if the alternative results in:
·
A substantial modification of the scenic vista.
Proposed Project (Alternative 1)
99
The Proposed Project (Alternative 1) dredge sits in water in Ventura Harbor where it
dredges in the Federal dredge areas, and would have a temporary impact on aesthetics. The
temporary pipeline and placement of dredged material would temporarily degrade the aesthetic
quality of the beaches and at the placement of dredged material areas. A temporary pipeline lays
on the beach and does block the view of some of the sand dunes and beach habitat areas of the
Western snowy plover, but a preapproved and confined temporary pipeline avoids the sand dunes
and beach habitat areas of the Western snowy plover. The discharge of dredged material coming
out of the temporary pipeline spews and disperses in a sawtooth type of pattern that would
temporarily change the profile of the beach but would be discharging in preapproved, confined
location(s) on the beach(es) and/or in the nearshore. The color of the dredged material that
disperses and spews out of the temporary pipeline is initially black, and superficially appears
incompatible with the beach(es) and/or in the nearshore. The tide and currents would restore
beach(es) and/or nearshore profile to pre-project conditions. The temporary pipeline would be
removed upon completion of the dredging activity. Replenishment of eroded sand with dredged
material would result in a Proposed Project (Alternative 1) project benefit by improving the
aesthetic quality of the shoreline from beach replenishment compared to pre-project conditions.
Aesthetics would return to pre-project conditions upon completion of construction. Based on
the above, the impacts to aesthetic quality would be minimal, temporary, and shore term, and
would be less than significant.
Shoaled areas within the Federal channel would be typically dredged using a hydraulic
cutterhead dredge with a pipeline to maintain navigation safety. In general, dredging entails
temporary construction activities. Therefore, the presence of the dredge and supporting vessels
within Ventura Harbor would not permanently affect views of the beach, the Pacific Ocean, the
harbor or marina, Heavy equipment used in placement and removal of pipes and beach grading
may degrade aesthetics locally. The dredged material placement on the beach with a pipeline
would experience temporary, localized impacts to aesthetics as the pipeline lying on the sand
reduces a portion of the view of the beach. The aesthetic qualities of the proposed project area
would not be substantially impaired as a result of the proposed project because the beach
dredged material placement and surf-zone dredged material placement would be completed prior
to the peak period of human utilization beach activity that typically occurs around Memorial
holiday of any year. Impacts would be temporary, localized, and not significant. Beach
replenishment provides wide, sandy beaches, enhancing the aesthetic character of the area, and
provides a benefit for beneficial reuse of suitable sediment from dredge areas. Aesthetics
including views of the beach, Pacific Ocean and surrounding harbor area would return to preproject conditions upon completion of construction. Impacts would be less than significant
impact.
No Action Alternative (Alternative 2)
The "No Action" alternative would avoid impacts from the sight of the dredge, pipeline,
and associated equipment, or from placement of suitable dredge material sediments. This
alternative, however, would result in the narrowing and eventual disappearance of beach due to
100
continued erosion of the beach, and an abrupt shoreline with minimal sand buffer, both of which
are not as aesthetically pleasing as the Proposed Project (Alternative 1).
This alternative, however, would result in continued erosion of the beach, an abrupt
shoreline with minimal sand buffer, both resulting in a less pleasing aesthetic quality.
5.8 Cultural Resources
5.8.1 Proposed Project Alternative (1): Annual Maintenance Dredging of Federal Channels
and Sand Traps
Under the proposed Project Alternative, annual maintenance dredging and dredged
material placement would occur as described in Section 3.2.1. All the areas described have been
dredged routinely since 1963 when the harbor was constructed, prior to passage of the National
Historic Preservation Act in 1966.
5.8.1.1 Dredge Material Placement Areas
Sediment from the harbor has been placed at the same placement areas during past Corps
routine maintenance dredge events. All surf zone placement areas, the pipeline placement area,
and the nearshore placement area have been surveyed. As noted in Section 2.3, these areas are
dynamic settings due to littoral transport and accumulated sediments will not occur in the surf
zone nor in the nearshore environment. The dredge material placement areas and pipeline
placement area would not be likely to contain cultural or historic submerged artifacts based on
this dynamic environment. The project would not demolish or alter existing structures and
would not change the surrounding viewshed, so there would be no direct or indirect effects to the
built environment. For these reasons, there would be no impacts to cultural resources. The type
of dredge used would not change the impact. Equipment and pipeline would not be placed on
sand dunes, only on active beach areas. The dredge material placement areas were addressed in
previous environmental documentation and Corps consultation with the SHPO (1985-1994). No
cultural resources listed in or eligible for listing in the National Register of Historic Places would
be affected by the proposed dredging.
5.8.1.2 Staging Area(s)
The primary staging area is an empty, unpaved lot at the north end of Spinnaker Drive
that is owned by VPD and used as a staging area by VPD and the Corps. Although the area
appears to been cleared of vegetation, SCCIC records do not indicate it has been subjected to
archaeological survey, nor is there a record of previous consultation with SHPO, however, based
on historical aerial photography (https://www.historicaerials.com), before and after construction
of the harbor, the area was an active beach with littoral transport and therefore would not require
archaeological survey because of the dynamic setting. No cultural resources listed in or eligible
for listing in the National Register of Historic Places would be affected by equipment staging in
this area.
101
The alternate staging area planned at the Surfer's Knoll parking lot to be used if the
Spinnaker Drive staging area is unavailable, using access to South Beach immediately west of
the parking lot, is also the previously surveyed South Beach surveyed areas (Sturm 1985)
discussed in Section 4.8.1.1 It is also an active beach setting with littoral transport, and a long
history as a dredge material placement area, therefore no cultural resources listed in or eligible
for listing in the National Register of Historic Places would be affected by the proposed staging
in this area. Equipment and pipeline would not be placed on sand dunes, only on active beach
areas.
5.8.1.3 Equipment Mooring
The mooring area available to the dredging contractor is an open marine access area north
of Area A. Equipment mooring in a public harbor is not an activity that has a reasonably
foreseeable potential to cause effects to a historic property and therefore does not require further
consultation with the SHPO.
5.8.1.4 Dredging Crew Parking
The dredging crew would use the public parking at the VPD Harbor Boat Launching
facility for parking of their personal vehicles. Vehicle parking in a public parking lot is not an
activity that has a reasonably foreseeable potential to cause effects to a historic property and
therefore does not require further consultation with the SHPO.
5.8.2 Project Alternative (2): No Action Alternative
Under the No-Action Alternative, dredging would not occur, so there would be no
potential to encounter buried or submerged cultural resources, and no associated activities, and
therefore no impact to cultural resources.
5.8.3 Project Alternative (3): Biennial Dredging
Under the Biennial Dredging Alternative, the same activities would be conducted in the
same way but occur less often, so there would be no potential to encounter buried or submerged
cultural resources, and no associated activities, and therefore no impact to cultural resources.
5.8.4 Project Alternative (4): Biannual Dredging
Under the Biannual Dredging Alternative, the same activities would be conducted in the
same way but occur more often, so there would be no potential to encounter buried or submerged
cultural resources, and no associated activities, and therefore no impact to cultural resources.
5.8.5 Cultural Resources Summary
No cultural resources listed on or eligible for the National Register of Historic Places are
present within the APE. Dredging will occur in previously dredged areas. Sand placement in the
102
surf zone or the nearshore along the coast will occur in areas that have received sand in the past.
The environment and setting for the proposed activities has been previously disturbed to such a
degree that no significant cultural resources could remain. Therefore, the Corps has determined
there are no historic properties present and that there will be "No Historic Properties Affected"
by periodic maintenance of the Ventura Harbor as described at 36 CFR 800.2(d)(1) of the
National Historic Preservation Act (NHPA). For this reason, the Corps has no further
obligations under Section 106 of the NHPA or its implementing regulation 36 C.F.R 800, as
amended.
5.9 Vessel Traffic and Safety
5.9.1 Vessel Traffic
Significance Threshold
Based on the existing conditions discussed above, impacts would be considered significant on
vessel transportation and safety if the alternative results in:
·
·
A navigational hazard to boat traffic or interfere with any emergency response or
evacuation plans.
Substantially changes vessel traffic or patterns.
Proposed Project (Alternative 1)
The sea based access would be the primary mode of transportation for movement of heavy
equipment for the Proposed Project (Alternative 1). Sea based transportation of dredge and dredge
equipment would follow regular and defined navigation routes used by ships and large sea based
container vessels and would not disrupt the normal flow of boat traffic. Vessel traffic and safety
would return to pre-project conditions upon completion of construction. Therefore, impacts from
sea based transportation would be temporary and short term.
Under the Proposed Project (Alternative 1), shoaled areas within the Federal Channel
would be dredged typically using a hydraulic cutterhead dredge with a pipeline to maintain
navigation safety. The dredge, crew and tug boats, would be transported by sea. Support
equipment (one rubber-tired loader, one excavator, and one forklift) and piping could be
transported using sea vessels. Dredged material placement that occurs on the downcoast beach
south of the harbor would be discharged using a pipeline from the dredge, temporarily rendering
the immediate area unsuitable for vessel traffic. To ensure safe transit during dredge
construction activity, appropriate coordination would be maintained between the dredging
contractor, the Corps, the VPD, and the USCG, and in- and egress lanes would be established
and regulated. Information regarding dredging operations would be published in Local Notice to
Mariners, warning boat users about times, durations, and locations of construction activities.
Construction would not impede access to any channels or entranceways, and would, therefore,
not create a substantial reduction in navigation safety or create a navigational hazard to vessel
traffic or interfere with local emergency/excavation response plans. Potential impacts to foreign
103
and interstate commerce vessel transports into the harbor would be avoided with the Proposed
Project annual dredging activities. Last, dredging would not change the number of slips and
moorings. As a result, vessel traffic or patterns would remain unaffected. Vessel traffic and
safety would return to pre-project conditions upon completion of construction. Impacts would be
less than significant.
No Action alternative (Alternative 2)
There would be no impact to Vessel Traffic by the No Action alternative (Alternative 2).
5.9.2 Safety
Proposed Project (Alternative 1)
The Corps, VPD VHP, the USCG, and the dredging contractor follow safety criteria and
requirements and the Corps, VPD and the USCG enforce their safety rules to ensure a safe,
accident free work environment. With the implementation of the safety regulations, impact to
safety would be reduced to less than significant.
No Action alternative (Alternative 2)
There would be no maintenance dredging that under the No Action Alternative. During a
typical year, a boat with an 8-foot draft could potentially not safely pass through the channel
regularly after a year without dredging the Ventura Harbor Federal channels. The Federal
channels then might not be navigable within a few weeks following winter storms. The "No
Action" project alternative would require re-deployment of the USCG rescue vessels to another
harbor, lengthening the response time to maritime emergencies off the coast of the City of
Ventura County. There is a high potential for danger to life and property if the Federal channels
are not maintained at safe depths.
Vessel traffic and traffic patterns would remain unchanged since the number of slips and
moorings would remain unchanged. However, continued shoaling of the federal channel would
compromise navigational safety. Furthermore, the inability of VHP or USCG vessels to transit
could compromise emergency response and evacuation plans. It is likely that a limited and
localized emergency dredging operation would be undertaken in the event that continued
shoaling threatens navigational safety.
5.10 Ground Transportation
Significance Threshold
Based on the existing conditions discussed above, impacts would be considered
significant on traffic if the alternative results in:
104
·
A substantial increase in AADTs of main arteries used to access the site.
Proposed Project (Alternative 1)
Under the Proposed Project (Alternative 1), shoaled areas within the Federal Channel
would be dredged using a hydraulic cutterhead dredge with a pipeline to maintain navigation
safety to maintain safe navigation. Support equipment (one rubber-tired loader, one excavator,
and one forklift) and piping could be transported using land vehicles. A maximum of 36
individuals and 36 vehicles would utilize highways and streets for the approximately month long
duration of construction. The increases in AADT associated with the Proposed Project
(Alternative 1) are shown in Table 16, Comparison of Baseline AADT to Proposed Project
(Alternative 1) Traffic Increases. Furthermore, the Proposed Project (Alternative) 1 would not
require the closure of any roads. Traffic conditions would return to pre-project conditions upon
completion of the proposed program construction. The dredge would be operating within the
confines of the Federal channel, equipment to mobilize and demobilize the pipeline on the beach
and vehicles transporting materials to the staging area and periodic inspections of the pipeline
would limit their operations to the dry portion of the beach to the extent practicable to avoid
visitors on the beach and traffic in and around the harbor. Ground transportation would return to
pre-project conditions upon completion of construction. Impacts would be less than significant.
Table 16 Comparison of Baseline AADT to Proposed Project Traffic Increases
Roadway Name
AADT
Projected Percent
Increase
Increase
in AADT in
Baseline
AADT
US Hwy 101 (at Victoria Avenue)
137,000
36
0.026%
PCH-1 (at US Hwy 101)
30,500
36
0.118%
Harbor Blvd. (at Gonzales Road)
0.164%
22,000 * 36
Seward Avenue (at US Hwy 101).
134,000
36
0.027%
Olivas Park Drive (at Victoria Avenue)
0.082%
43,700 * 36
Source: CALTRANS, 2016; County of Ventura. 2017*.
Ground Transportation Environmental Commitments discussed in Section 6. of the EA
include: placement/installation (mobilization) and removal (demobilization) of dredging
pipe(lines) would be under the direct supervision of the Corps coordinating with the dredging
contractor and the VPD; the contractor would to the extent practicable provide public access to
beaches, sidewalk/trails, roads, streets and highways that would be utilized for hauling,
maintenance, mobilization and demobilization of equipment and piping; when required and when
applicable to ensure public access to beaches, the contractor would install sand ramps
approximately every 500 feet on the beaches for emergency vehicles and public access; the
contractor would to the extent practicable limit large scale truck trips of equipment and piping to
off peak commute periods and avoid sensitive receptor areas, schools, hospitals, convalescent
105
homes, and residential areas; a CALTRANS transportation permit would be required on State
highways when transporting oversized-transport vehicles or heavy construction equipment,
materials and piping. With implementation of the Ground Transportation Environmental
Commitments, potential impacts would be temporary, short-term, and reduced. Ground
transportation would return to pre-project conditions upon completion of construction. Based on
the above, and with the implementation of Ground Transportation Environmental Commitments,
impacts would be less than significant.
No Action Alternative (Alternative 2)
There would be no maintenance dredging by the Corps under the No Action Alternative.
However, continued shoaling would prevent safe navigation through the bay. Emergency
dredging would require removal of shoaled material from the federal channels. It is likely that
emergency dredging would be limited in scope and duration. Emergency dredging could require
the use of highways and streets above. Any traffic impacts would de minimis and short-term.
5.11 Socioeconomics and Environmental Justice
Significance Threshold
Impacts would be considered significant if the alternative results in:
·
·
A substantial shift in population, housing, and employment.
A disproportionate high and adverse human health or environmental effect on minority or
low-income populations.
Proposed Project (Alternative 1)
Based on the evaluation and analysis of the total population, median household income,
low income (percentage below poverty threshold), and ethnicity data discussed on environmental
justice in the Section 4 (Affected Environment), the median household income and minority
population in the proposed project area (City of Ventura) is comparable to the County's minority
population. Additionally, the poverty threshold in the City of Ventura is comparable to the
County of Ventura's poverty threshold. Approximately 36 laborers at a maximum would be
involved with the Proposed Project (Alternative 1), and would not create a substantial shift in
population, housing or employment, as most of the dredging laborers are based outside of
Ventura. The Proposed Project would not result in a disproportionate impacts to minority
populations or low income populations. Therefore, there would be no impacts to socioeconomics
or environmental justice communities.
The proposed project is limited in scope annually and typically has a duration of
approximately one month per year. The Proposed Project (Alternative 1) would not reduce the
operating budget for the VPD. The proposed project would be a beneficial impact for the region
106
in promoting temporary new jobs and income but would not substantially impact population,
housing or employment. Upon completion of construction, socioeconomics would return to preproject conditions. Based on the above, impacts would be less than significant.
As summarized in Table 4.11, Socioeconomic and Environmental Justice Demographics
for Ventura and Ventura County, the City of Ventura and County of Ventura have similar low
income and minority population than Ventura County. Though environmental impacts associated
with the O&M dredging are expected to be minor, the impacts would not be disproportionately
borne by low income or minority populations, and therefore, the proposed project would not
result in a disproportionately high and adverse human health or environmental effects on
minority populations or low-income populations. Upon completion of construction,
socioeconomics would return to pre-project conditions. Based on the above, impacts would be
less than significant.
No Action (Alternative 2)
No direct or indirect effects would occur with the No Action alternative on
socioeconomics or environmental justice. Since the proposed project would not occur under the
No Action Alternative, this alternative leads to a no impact determination on socioeconomics or
environmental justice.
5.12 Growth Inducement and Cumulative Impacts
5.12.1 Growth Inducement
Ventura County is within the regional planning area of the Southern California
Association of Governments (SCAG) [SCAG, 2018]. SCAG region encompasses six counties
(Imperial, Los Angeles, Orange, Riverside, San Bernardino and Ventura) and 191 cities in an
area covering more than 38,000 square miles. The SCAG's Ventura County 2012 population
was at 835,000 and projected 2020 population is estimated to be 886,000; Ventura County 2012
employment was at 332,000 and projected to be 375,000 in 2020, and; Ventura County 2012
households was at 269,000 and projected to be at 285,000 in 2020. In 2016, the SBCAG adopted
the SCAG's 2016-2040 Regional Transportation Plan/Sustainable Communities Strategy
(RTP/SCS) as an economic development strategy as well as a transportation, infrastructure, and
sustainability strategy. The SCAG's 2016-2040 RTP/SCS growth forecast provides a consistent
economic and population growth forecast with a base year of 2012 to year 2040 for use in longrange comprehensive planning. SCAG's growth forecasts are projections used to plan for public
infrastructure, housing, and employment throughout the region. The SCAG Ventura County
2040 projections indicate that population in Ventura County is forecasted to grow to 966,000, an
increase of approximately 15.7%, between 2012 and 2040; 2040 projected employment within
the SCAG Ventura County is forecasted to grow to 420,000 jobs, an increase of approximately
26.5% between 2012 and 2040, and; 2040 projected new households within the SCAG Ventura
County region is forecasted to grow to 312,000, an increase of approximately of approximately
16.0 % between 2012 and 2040. The SCAG 2040 projections also indicate that population in the
107
City of Ventura is forecasted to grow to 125,300, an increase of approximately17.4%, between
2012 (106,700) and 2040; SCAG 2040 projected employment in the City of Ventura is
forecasted to grow to 66,000 jobs, an increase of approximately 8.73% between 2012 (60,700
jobs) and 2040, and; SCAG 2040 projected households in the City of Ventura is expected to
grow to 48,400, an increase of approximately 18.9%, between 2012 (40,700 households) and
2040.
There are no pending, new dredging projects planned for Ventura Harbor, or the
Proposed Project area that could potentially have impacts on growth inducement or on the above
discussed environmental resources. The Proposed Project (Alternative 1) is an annual
maintenance dredging of the Federal Channel in Ventura Harbor required to maintain the
entrance and navigation channels, and sand trap areas that are subject to continual shoaling by
sand accretion; assure the continued safe navigation for maritime traffic within the harbor; and,
provide beach nourishment material for downcoast beaches eroded by littoral processes. The
Proposed Project (Alternative 1) is not part of planned infrastructure improvements that would
result in additional growth. The Proposed Project (Alternative 1) would not require additional
employees other than temporary dredging laborers to perform the annual Federal dredging
operations in the Federal channel in Ventura Harbor. The Proposed Project (Alternative 1)
would not displace large numbers of people except for temporary disruption to the commercial
fishing or recreational vessels that would need to pass through the particular portion of the
Federal channel(s) that is being dredged or for temporary disruption to the public accessing the
portion of the beach with the pipeline placement and discharge onto the beach or the temporary
closure of the Surfer's Knoll parking lot as a temporary staging area for the dredging contractor's
construction equipment, vehicles and trailer. Therefore, the Proposed Project Alternative annual
Federal maintenance dredging project would not induce growth in the Proposed Project area.
Impacts would be less than significant.
5.12.2 Cumulative Impacts
In 1969, dredging started in Ventura Harbor. In 1972, the U.S. Federal Government
(Corps) assumed maintenance responsibility for the North and South jetty, and the entrance
channel. Since then, the Corps has performed maintenance dredging of the Federal channels [i.e.,
entrance and navigation channels, and the sand trap areas] of Ventura Harbor, Ventura County,
California, with an annual maximum dredging of 1,000,000 CY, or a potential maximum
6,000,000 CY over a multi-cycle program period. An average annual dredging of the Federal
channel over 49 years (from 1969 to 2018) is approximately 570,000 CY. For the multi-cycle
program period, the Corps proposes to dredge once a year, typically in the late winter to early
spring annual dredging operation for a month duration, but inclement weather conditions,
operational or performance issues of the dredging equipment, and/or insufficient funding levels,
can all influence the duration of the dredging activities. Because of these uncertainties, a
performance period of up to 75 days annually is allowed for Ventura Harbor Federal
maintenance dredging program. Annual dredging is could occur sometime between September
15 and March 15. A contingency plan (Appendix G) would be implemented if dredging extends
beyond March 15 anytime during the multi-cycle program period. Dredging is typically
108
performed by a hydraulic cutterhead dredge, but either a hydraulic dredge, hopper dredge,
clamshell dredge, or a combination of dredge platforms, could be utilized. Suitable dredge
material placement areas would be South Beach, McGrath State Beach, and/or McGrath State
Beach Nearshore south of the harbor, or South Jetty Beach (for contingency purposes) located
immediately north of South Beach. The VPD is responsible for all dredging outside the Federal
Channel in Ventura Harbor, that being VPD dredging in the inner harbor, which typically occurs
once a year with proposed removal of approximately up to 100,000 CY annually. The effects
from the VPD annual dredging in the inner harbor would be substantially less, due to a smaller
annual dredge volume, which is approximately 1/5th to 1/10th less of the sediment dredged
annually compared to the Federal channel annual maintenance dredging; therefore, impacts
would be less than significant to cumulative impacts.
A proposed project, Ventura Isle Marina (VIM) dock replacement project, located within
the greater Ventura Harbor, includes upgrades to existing docks F, G, H, I, L, and M (VPD,
2017b). The VIM currently provides 556 spaces (slips) for wet storage, ranging from 25 to 95
feet in size. The majority of the existing slips are intended for boats less than 50 feet in length
and only seven percent are available to boats exceeding 50 feet. The average slip size currently at
the project site is 38.93 feet. The VIM project site was partially remodeled in 2002, specifically
Docks, A, B, C D and E were rebuilt in 2002. However, the remaining docks and slips are more
than 50 years old and have aged out of their utility. Due to the age of the docks most are
dilapidated and in need of repair and replacement. Some of the slip fingers are not in service due
to safety hazard. Further, many of the slips are undersized for the existing boat mix and market
demand. The VIM project site is approximately 12 acres in size and comprised of 556 slips, 487
slips of which are built for boats smaller than 50 feet. As stated above, due to the larger size of
modern boats, smaller slips are no longer in demand. Further, as most 25 foot and 30 foot boats
are generally on trailers, the need for smaller slips has diminished. Additional structures on the
project site include restroom facilities, a management office, club offices, and a boat sales
building. The site primarily serves recreational boaters (not commercial boaters). Currently, 10
percent of the marina slips are allocated to house live-aboard residents which would remain
unchanged with implementation of the project. Landside improvements are ongoing on the
project site and include upgrades and repairs to the existing bathrooms, fences, landscaping, and
the parking lot. Additional upgrades include pavement restriping, on-site Wi-Fi, and bathroom
upgrades. The proposed VIM project is limited to waterside improvements. Five docks (G, H, I,
L and M) will be entirely demolished and new docks will be constructed; substantial upgrades to
dock F (i.e., half of F will be replaced) and minimal improvements to dock J (two additional slips
and an end tie). In addition, new gate structures and gangways will be constructed to control
access and improve security. The proposed replacement and reconfiguration of the subject docks
would decrease the number of existing slips from 556 to 455 with an increase in average slip size
from 38.93 feet to 44.93 feet, or a net change of approximately + 6 feet per each average slip
size, to meet the current and projected demands of the boating market in this area. As such, a
range of slip sizes would remain available to accommodate marina users. The proposed project
would decrease the dock area from approximately 83,000 square feet to approximately 75,000
square feet and would decrease the number of guide piles from 211 to approximately 200. New
pile elevations would be consistent with VPD's Resolution 3254 requiring a minimum top
109
elevation of 15 feet MLLW for new guide piles. Existing dinghy docks would be reconfigured
but retain the same total area of approximately 1,600 square feet. While refinements may occur
to the slip mix, it is expected the number of slips and size will be generally within the parameters
stated herein. Based on the above, the proposed VIM dock area would decrease by
approximately 9 percent compared to the existing VIM dock area. Impacts would be less than
significant.
The Holiday Inn Express & Suites hotel at Ventura Harbor Resort would be constructing
a 40 new guest room expansion, located between the ocean and Harbor Boulevard, alongside the
boats and the Promenade in Ventura Harbor (VPD, 2018c). Along with the new rooms added, the
renovation of the existing Holiday Inn Express & Suites would include an expanded lobby and
views of the boats for check-in with an adjacent breakfast area and a new front exterior entryway
to start in 2019. There are approximately 69 rooms at the existing Holiday Inn Express and
Suites hotel in the harbor, and the addition of 40 new guest rooms would increase the total rooms
to approximately 109, or approximately an increase of 58 percent for the proposed expansion but
would be constructed on land at the current hotel site that is designated for commercial use, and
would not decrease the availability of open water set aside in Ventura Harbor. Impacts would be
less than significant.
A new development, known as Portside Ventura Harbor, slated for completion in
November 2019, would be the first new major development in the harbor in three decades VPD,
2018d). The 27-acre coastal community will feature 270 deluxe apartment residences, 30
live/work units, a contemporary 104 boat-slip marina, 21,000 square feet of retail and outdoor
community venues that are designed to complement locally-owned businesses in Ventura
Harbor. The land is designated for commercial use. Approximately 6.44 acres of open water
would be reduced from the new development but would only be a decrease of approximately
5.28% of the existing open water set aside in Ventura Harbor. Impacts would be less than
significant.
There is the potential that other existing leases are in place which allow for placement of
suitable dredged material annually in the Proposed Project (Alternative 1) area, or the vicinity of
Ventura Harbor, or in the study area that could occur during the same time period of the
Proposed Project (Alternative 1). If the existing lease(s) are in, or the vicinity of Ventura
Harbor, or in the study area of the Proposed Project (Alternate 1) but not directly in the Proposed
Project (Alternate 1) area, then the Proposed Project (Alternative 1) could avoid to the extent
practicable the other lease(s) that allow for placement of suitable dredged material. Therefore,
the Proposed Project (Alternative 1) potential impact would be temporary and localized, and the
potential cumulative impact would be less than significant, to the other existing leases for
placement of suitable dredged material.
The Proposed Project (Alternative 1) avoids nesting season for coastal bird species,
including listed species that includes the Western snowy plover, and avoids the peak grunion
spawning season. Environmental commitments are implemented to avoid impacts to listed
species and special status species. Annual dredging is typically scheduled to occur sometime
110
between September 15 and March 15. A contingency plan (Appendix G) would be implemented
if dredging extends beyond March 15 anytime during the multi-cycle program period that
requires coordination with the USFWS. Since dredging operations typically do not occur from
15 March through 15 September of any year, impacts to nesting birds and peak grunion
spawning periods are avoided. As a result, there are no cumulative impacts to coastal bird
species or grunion. Cumulative impacts to other species, such as invertebrates, would be less
than significant because impacts would be temporary and localized, and these organisms are
anticipated to be able recolonize immediately after discharge ends. The planktonic stage of these
organisms' life cycles is expected to contribute greatly to the recolonization of this newly
exposed substrate, as would contributions by the migration of juvenile and adult individuals from
adjacent undisturbed areas. Oliver et al (1977) found that shallow water communities inhabiting
naturally highly variable and frequently disrupted physical environments rebounded or recovered
more quickly from experimental disturbances than those found in less variable and more benign
conditions, and field studies of dredged areas have shown that recolonization typically begins as
early as 2 weeks after dredging stops. With the implementation of the Biological Resources
Environmental Commitments in Section 6 of the EA, the cumulative impact of the Proposed
Project Alternative on biological resources would be a less than significant impact.
Dredging and the discharge of dredged material placement would not result in significant
impacts, individually and cumulatively, to littoral material, also known as substrate, because the
littoral process is exposed to a high energy, turbulent water environment. Sand removed from the
dredged footprint would be replenished via natural sediment transport. Sand deposited on the
beaches would be dispersed by high energy waves and currents down-coast. Impacts would be
less than significant.
Cumulative impacts from the Proposed Project Alternative on water quality [i.e.,
potential increase in turbidity; potential dissolved oxygen (DO) reduction] are expected to be
temporary and localized. Water quality parameters would return to pre-project conditions upon
project completion. With the implementation of the Water Quality Environmental Commitment
in Section 6 of the EA that the Proposed Project (Alternative 1) would not interfere with tidal
circulation and fresh water inflows into and through the Santa Clara River estuary or the mouth
of the Santa Clara River, it has been concluded that the potential impacts from the Proposed
Project (Alternative 1) placement of suitable dredged material beach replenishment would be
reduced to a level of less than significant impact. Therefore, it has determined that cumulative
impacts from the Proposed Project (Alternative 1) dredging on water quality would be a less than
significant.
Under the current Federal dredging program, approximately 1,000,000 cy of dredged
material could be removed annually from the Federal channels in Ventura Harbor. Emissions for
the Proposed Project Alternative would be below applicable Federal, state CARB, and
regional/local VCAPCD ambient air quality standards (Tables 13 and 14). The dredge used is
typically a hydraulic cutterhead with a pipeline. Diesel air emission analysis and discussion for
per day emissions Lbs/day and Tons per year (tons/yr) generated from diesel vessels and
construction equipment vehicles includes a dredge, two tug boats, two crew boats, a rubber-tired
111
loader, an excavator, and a forklift during the Proposed Project (Alternative 1) annual Ventura
Harbor Federal maintenance dredging activities covering a multi-cycle program period have
been calculated and compared with emission criteria thresholds set by the VCAPCD, SCAQMD,
and Federal and to determine project related (construction) impacts. As summarized in Tables
13 and 14 above and in Appendix F, the air quality calculation and analysis for the Proposed
Project (Alternative 1) emissions (i.e., Lbs/Day; and Tons/Yr) generated by the proposed
Ventura Harbor maintenance dredging activity would be 186.2 Lbs/Day (or 7.0 Tons/Yr) for CO;
292.5 Lbs/Day (or 11.0 Tons/Yr) for NO2; 150 lbs/day (or 5.7 Tons/Yr) for ROC; 78.1 lbs/day
(or 2.9 Tons/Yr) for PM10; 19.6 lbs/day (or 0.8 Tons/Yr) for PM2.5; 2.1 lbs/day (or 0.1
Tons/Yr) for SO2, and; .0002 Lbs/Day (or 0.000008 Tons/Yr) for Pb. GHG annual emissions for
the Proposed Project (Alternative 1) is 675 Metric Tons (MT)/Yr CO2eq. From the air emission
calculations and analysis performed on the Proposed Project (Alternative 1) summarized in
Appendix F and in the tables above, it has been determined the Proposed Project (Alternative 1)
NO2 and ROC emissions in lbs/day do exceed the VCAPCD or SCAQMD daily construction
threshold but the Proposed Project (Alternative 1) maximum annual GHG emissions are below
the VCAPCD's, SCAQMD's, and CARB's annual GHG emission threshold (10,000 Metric
tons/year), and the Proposed Project (Alternative 1) peak daily emissions (lbs/day) for CO,
PM10, PM2.5, SO2, and Pb are below the SCAQMD CO, PM10, PM2.5, SO2, Pb daily
(lbs/day) air pollutants emission thresholds. The Proposed Project (Alternative 1) maximum
annual emissions (tons/year) are below the Federal (tons/year) air criteria pollutants de minimis
threshold for CO, NO2, ROC, PM10, PM2.5, SO2, Pb, and GHG. With the implementation of
air quality environmental commitments that incorporate the use of retarding injection timing of
diesel-powered equipment to reduce nitrogen oxide (NO2) and incorporate the use of
reformulated diesel fuel to reduce ROC and SO2, impacts would be temporary and short term.
Air quality conditions would return to pre-project conditions after project completion. Based on
the above, impacts would be less than significant. Additionally, other factors influence existing
air conditions in the project area. The Proposed Project (Alternative 1) annual dredging activities
includes the placement of suitable dredged material area(s) in Ventura Harbor and in the vicinity
of Ventura Harbor are subject to Federal, state CARB, and VCAPCD air quality regulations and
standards. The VCAPCD requires an air permit for a dredge to be operated in the harbor, as a
stationary source of emissions. The dredging operator (e.g., Corps or Corp's Contractor) would
be required to tune dredging equipment for minimum emissions immediately prior to dredge in
order to reduce air pollution. The study area and the Proposed Project (Alternative 1) project area
already experiences some reduced air quality from the large variety of motorized craft and
vessels using the harbor, traffic along access roads to the beach from the cities of Ventura and
Oxnard, and overhead commercial air traffic in route to the Oxnard airport. Air quality
conditions would return to pre-project conditions after project completion. Emissions from the
dredge and other support equipment would cause temporary and short impacts during dredging
activity. Therefore, the overall impact of the Proposed Project (Alternative 1) construction
emissions on local ambient air quality would be minimal compared to the existing day to day
emissions generated by local air emitters. Therefore, it has been has determined that the
Proposed Project (Alternative 1) area would not result in a cumulatively, considerably,
substantial, or significant net increase during the multi-cycle program period years, starting from
September 15, 2018 through September 15, 2025, for air criteria pollutant including those area(s)
112
in Ventura County VCAPCD region that are in non-attainment under an applicable Federal,
state, regional or local ambient air quality standard. Impacts would be less than significant.
Dredging of the channels in the harbor and discharge of dredged material placement area
avoids to the extent practicable interruption of the vessel operations going through certain
channels in the harbor, and recreational and commercial uses of the harbor and the beach due to
the pipeline placement and discharge area. Therefore, the Proposed Project (Alternative 1)
potential impact would be temporary and localized, and the potential cumulative impact would
be less than significant to existing vessel operations in the harbor and to land or recreational uses
and activities.
In the reasonably foreseeable future, there will be a need for annual dredging because
there is a harbor and because services need to be provided since there are commercial and
recreational uses. Future dredging quantities would likely remain the same as past and current
quantities, cited in Table 1 (Ventura Harbor Dredging History, 1969-2018) of the EA, since the
Federal maintenance dredging areas would remain the same. New development is expected in
Ventura Harbor, as discussed above, but the potential impacts to open water and land would be
minimal; therefore, impacts would be less than significant. Biological resources impacts would
remain the same in the future since all LEDPA factors that led to the beaches/nearshore
placement area (beach/surf zone; nearshore) being designated as the placement of suitable
dredged material area(s) would remain the same, though temporary biological resources and
water quality turbidity would occur, they would achieve equilibrium after the placement of
suitable dredged material, and would return to pre-project conditions after project completion.
Littoral material (substrate) would remain the same in the future as it has been in the past and
future in Ventura Harbor, since the amount of littoral transport has remained relatively consistent
over time that travels along the coastline from north to south in Ventura Harbor. Air quality
emissions would remain the same in the future since diesel ancillary equipment (tug boat; crew
boat) and heavy equipment (loader; excavator; forklift) would continue to use diesel oil, and
therefore, there would be no substantial increase in diesel air emission during the multi-cycle
program period. Temporary disruption could occur to vessel operation traffic through the harbor
and access by the public on a portion of the beach due to the pipeline corridor on the beach and
discharge site but vessel operations, land use and recreation would not have a permanent change
in operation or use due to the limited days of dredging operations that occur once a year.
Therefore, it has been determined that the cumulative impacts from the past, current, and future
Ventura Harbor Federal maintenance dredging project's including in the vicinity of Proposed
Project area and at the South Beach placement area, would be temporary and localized, and that
the cumulative impacts to water quality, air quality, land use and recreation, vessel operations,
biological resources, would be less than significant impacts.
113
6.0
ENVIRONMENTAL COMMITMENTS
The following commitments were designed to minimize potential environmental impacts,
to comply with environmental law and to comply with public agency recommendations during
coordination and preparation of the Environmental Assessment. These environmental
commitments would be incorporated to the extent practicable into the project plans (draft plans,
Appendix I) and specifications whenever they are within the responsibility of the contractor or
Corps field representatives.
Water Quality
o
When placing dredged materials on the beach/surfzone or nearshore [e.g., South Beach,
McGrath State Beach, McGrath State Beach Nearshore, and/or South Jetty Beach (a
contingency beach)], the contractor would stay within the boundaries of the identified
construction zones. Environmentally sensitive areas, such as estuaries, would be
avoided, to the extent practicable.
o
Project features would not interfere with tidal circulation and fresh water inflows into and
through the Santa Clara River estuary or the mouth of Santa Clara River. Activities
boundaries would be clearly marked.
Biological Resources
o
Vehicle use on approved beach areas is authorized only for activities associated with the
various dredging operations. No recreational use by the dredging contractor is allowed
within beach areas using any type of motorized vehicle.
o
Onshore storage and staging of materials or equipment is confined to authorized areas.
o
Mobilization, maintenance, and demobilization of the dredge pipeline on beaches and
sand bar areas will avoid dunes, dune vegetation, and naturally occurring beach debris
to the extent practicable.
o
Placement of the dredge pipeline outfall and beach replenishment will not occur within 200
feet of the active Santa Clara river mouth or its estuary.
o
After placement of the temporary dredge pipeline, regular inspection of the pipeline
would occur as part of the operations and maintenance, as noted in Appendix E (U.S.
Fish and Wildlife, Corps Correspondences on Procedural Changes to Ongoing Dredging
Activities), as follows:
1) Any beach re-contouring during Ventura Harbor dredging activities will be limited
only to the footprint of the pipeline.
114
2) The number of vehicle trips on beach south of the estuary will be limited to the
installation (mobilization), emergency maintenance, and removal (demobilization).
Routine maintenance inspections will be performed on foot.
o
Annual dredging activities are scheduled to be completed by March 15th, which helps to
avoid California grunion spawning, and avoids Western snowy plover and California least
tern nesting, and other nesting bird activity. In the event that dredging activities are
anticipated to occur after March 15th, then informal Section 7 consultation would be
initiated with the USFWS per the Contingency Plan (Corps 2016). Coordination would
occur with other applicable resource agencies as required. If further project activities would
result in effects to threatened or endangered species or their critical habitats, the activities
would be modified or discontinued in compliance with applicable regulations and
consultation/coordination. When necessary, the Corps would implement the contingencies
described in Appendix G (Contingency Plan, Corps 1998b, 2016).
o
If dredging continues after March 15 into grunion spawning season, impacts will be
mitigated by utilizing single-point surf zone placement of suitable dredged material, or
diked-placement of suitable dredged material, to limit the area affected by placement of
suitable dredged material.
o
Beach re-contouring during dredge pipeline use or after demobilization is limited to the
footprint of the approved corridor. Beach combing after dredge pipeline demobilization
is not approved.
o
The number of vehicle trips on the beach south of the estuary would be reduced to the
extent practicable during equipment and dredge pipeline mobilization, inspection and
maintenance, and demobilization.
o
During dredge pipeline mobilization and demobilization, a qualified snowy plover
monitor would walk ahead of vehicles before they proceed to ensure that western snowy
plovers are not within the traveled path.
o
Prior to dredging areas B and D in 2019, grain size sediment sampling would occur.
Air Quality and Noise
o
Use of retarding injection timing of diesel-powered equipment to the extent practicable to
reduce NO2.
o
Use of reformulated diesel fuel to the extent practicable to reduce ROC and SO2.
o
Construction equipment would be properly maintained in order to reduce release of diesel
and hydrocarbon effluent into the atmosphere. The contractor would follow all
applicable air quality standards, including those regarding emissions, fuel use and fuel
115
consumption. Appropriate measures would be taken to reduce fugitive dust caused by
beach activities. Vehicle speed on the beach would be kept at a minimum to avoid the
formation of dust clouds. It is recommended that Ventura County Air Pollution Control
District (VCAPCD) Rule 51 (Nuisance) and VCAPCD Rule 55 (Fugitive Dust) be
followed to the extent practicable.
o
The contractor would be required to follow all applicable requirements of the Ventura
Port District's (VPD) Permit No. 1139 issued from the VCAPCD. Otherwise, the
contractor must obtain all necessary air permit(s) prior to commencement of work, pay all
associated fees, and follow all permit requirements.
o
If work is done under the VPD's air permit No. 1139, the contractor would be required to
use no. 1 grade diesel fuel or Chevron Special Diesel or alternative fuel subject to
approval by the VCAPCD. The VCAPCD requested, in 1984, that this condition be
added to subsequent dredging contracts, and includes it in their permit. The condition
would be included in the contract specifications, as requested. The VCAPCD permit is
renewed annually. The contractor would also maintain daily logs of fuel consumption,
operating hours, and Brake Horsepower usage of the dredge (as a basis for calculating air
pollutant emissions) as required in the VCAPCD permit. These logs would be made
available to the Corps upon request.
o
Staging areas would be periodically watered and maintained to reduce fugitive dust.
o
Activities on unpaved areas, such as staging areas, should be reduced to the extent
practicable during high wind events to reduce fugitive dust.
o
Noise levels of the dredge activities would not exceed the limits established by the City
of Ventura's noise ordinance. If double or triple-shifts are utilized, the contractor would
obtain any necessary permits or exemptions from the City of Ventura.
o
Construction equipment would be properly maintained and scheduled in order to reduce
unsafe and nuisance noise effects to sensitive biological resources and residential areas.
Sensitive receptors, such as schools and hospitals, would be avoided whenever possible.
o
Within sound range of the residential zone, between the hours of 8:00 p.m. and 7:00 a.m.,
construction activities would not exceed authorized noise limits. If noise exceeds
threshold limits, and/or reasonable complaints are received from local residents, the
contractor would implement additional measures to reduce these impacts. Specific
measures would be identified in coordination with the Corp's Contracting Officer.
Land Use (LU) and Recreation
o
Placement and removal of dredging pipes would be under direct supervision of the Corps
and/or Ventura Port District dredging coordinator.
116
o
The Corps contractor would provide to the extent practicable public access to roads,
streets and highways that might be utilized for hauling and maintenance. When possible,
large scale truck trips to transport equipment would be limited to off-peak commute
periods. Sand ramps would be constructed over all road crossings, and at intervals along
the beach, to maintain public access, and would be provided for emergency vehicle and
pedestrian access every approximately 500 ft. along the temporary pipeline route, except
in the area adjacent to the vegetated dunes on South Beach or Western snowy plover
nesting south of Surfer's Knoll and at McGrath State Beach. Transportation of heavy
construction equipment and/or materials which requires the use of oversized-transport
vehicles on State highways would require a Caltrans transportation permit. It is
recommended that an oversize load permit be obtained from the County of Ventura
Public Works Agency, Transportation Department if using a County of Ventura road that
involves the transport of heavy construction equipment and/or materials which requires
the use of oversized-transport vehicles.
o
The contractor would remove any dredging or beach replenishment-related debris left on
the beach as soon as practicable, usually within 24 hours.
o
The dredge and associated equipment must be marked in accordance with U.S. Coast
Guard provisions. The contractor must contact the U.S. Coast Guard (USCG), two weeks
prior to commencement of dredging. The following information would be provided to
the USCG:
1. The size and type of equipment to be used in the work.
2. Names and radio call signs for working vessels.
3. Telephone number for on-area contact with project engineer.
4. The schedule for completing the project.
5. Any hazards to navigation.
o
The dredge operator would move the dredge equipment for USCG and Harbor Patrol law
enforcement and rescue vessels.
o
The number of vehicle trips on the beach south of the estuary would be limited to the
installation (mobilization), emergency maintenance, and removal (demobilization).
Routine maintenance inspections will be performed by foot.
Cultural Resources
117
o
Pursuant to 36 C.F.R.§ 800.13, in the event of any discoveries during construction of
either human remains, archeological deposits, or any other type of historic property, the
dredging contractor would notify the Corps Construction Representative and Archeology
Staff within 24 hours (Meg McDonald at 213-452-3849 or Danielle Storey at 213-3080437). The contractor would immediately suspend all work within 100 feet where
cultural resources are discovered. The Permittee would not resume construction in the
area surrounding, i.e., immediately adjacent to, the potential cultural resources, until the
Corps re-authorizes project construction, per 36 C.F.R. § 800.13 of the NHPA.
o
Maintain a 100-foot buffer from sand dunes on all beaches with vehicles and equipment
or when placing pipeline.
o
Maintain a buffer of 200 feet from the Santa Clara River estuary at all times to avoid
working near any river terrace areas.
118
7.0
COORDINATION
The Corps has coordinated the Draft EA with the following agencies and stakeholders: U.S. Fish
and Wildlife Service (USFWS), U.S. Environmental Protection Agency (US EPA) Region 9,
National Marine Fisheries Service (NMFS), National Park Service (NPS) Channel Islands,
California Coastal Commission (CCC), California Regional Water Quality Control Board
(CRWQCB, Los Angeles Region), California Department Parks and Recreation (CDPR, also
known as State Parks), California Department of Fish and Game (CDFG), California Division of
Boating and Waterways, State of California's Department of Transportation (CALTRANS), the
California State Lands Commission (CSLC), Ventura County Air Pollution Control District
(VCAPCD), the County of Ventura Resource Management Agency (Ventura County RMA),the
City of San Buenaventura (City of Ventura), the City of Oxnard, Non-Governmental
Organizations (NGOs), and the Ventura Audubon Society.
The complete mailing list for copies of the EA is included in Appendix L.
U.S. Fish and Wildlife Service (USFWS):
The Corps coordinated with the USFWS, Ventura Office [point of contact (POC) Chris Dellith],
on the annual notification on the start and completion of annual maintenance dredging since
2012 through 2018. A combined pre-dredge eelgrass/Caulerpa taxafolia algae survey was
conducted in 2015, as Federal Dredge Area A was proposed to be dredged, and no eelgrass or
Caulerpa was present; the survey results report was coordinated with the USFWS. In early 2016,
the Corps coordinated a revised Contingency Plan with the USFWS, Ventura Office if dredging
extended beyond March 15 of any year with implementation of protection avoidances measures
if Western snowy plovers were observed on the beach where placement of suitable dredged
material was occurring. In the spring 2016, the Corps coordinated the results of a grunion run
(W1 on the Walker Scale) on South Beach during dredging with the UFSWS. The Corps
coordinated with the SC-DMMT in early 2018 during the January 2018 and February 2018
monthly SC-DMMT meetings on discussions of the Draft SAP and Appendices. In August
2018, the Corps coordinated with the USFWS on the proposed project discussed in the Draft
Environmental Assessment (DEA) that included two, new project features, those being a new
beach dredged material placement area (South Jetty Beach, a contingency beach), and a new
alternate staging area located at Surfer's Knoll Parking lot including the portion of South Beach
immediately west of the parking lot. The DEA would be provided to the USFWS, Ventura
office, for review and comment.
National Marine Fisheries Service (NMFS):
The Corps coordinated with NMFS, Long Beach Office (POC Bryant Chesney), on the annual
notification on the start and completion of annual maintenance dredging since 2012 through
2018. A combined pre-dredge eelgrass/Caulerpa taxafolia algae survey was conducted in 2015,
as Federal Dredge Area A was proposed to be dredged, and no eelgrass or Caulerpa was present;
the survey results report was coordinated with the NMFS. In the spring 2016, the Corps
coordinated the results of a grunion run (W1 on the Walker Scale) on South Beach during
dredging with the NMFS. The Corps coordinated with the SC-DMMT in early 2018 during the
119
January 2018 and February 2018 monthly SC-DMMT meetings on discussions of the Draft SAP
and Appendices. In August 2018, the Corps coordinated with the SC-DMMT on the SAPR and
Appendices for review and comment, and the SAPR was finalized in regular monthly SCDMMT on August 29, 2018. In early August 2018, the Corps coordinated with the NMFS on the
proposed project discussed in DEA that included two, new project features, those being a new
beach dredged material placement area (South Jetty Beach, a contingency beach), and a new
alternate staging area located at Surfer's Knoll Parking lot including the portion of South Beach
immediately west of the parking lot. The DEA would be provided to the NMFS for review and
comment.
U.S. Environmental Protection Agency (USEPA):
The Corps coordinated with the USEPA, Region 9, San Francisco office (POC Allan Ota) and
with Southern California/Los Angeles office (POC Melissa Scianni), on the annual notification
on the start and completion of annual maintenance dredging since 2012 through 2018. The Corps
coordinated with the USEPA and with the SC-DMMT in early 2018 during the January 2018 and
February 2018 monthly SC-DMMT meetings on discussions of the Draft SAP and Appendices.
The Draft SAP and Appendices had an out of cycle review and comment from the pertinent SCDMMT agencies (USEPA; CCC; Los Angeles RWQCB) on May 3, 2018, and the SAP and
Appendices were approved with the pertinent SC-DMMT agencies on May 15, 2018. A
conditions survey was moved to May 2018 to determine the best areas to samples since limited
material was present. On May 30, 2018, updated vibracore location based on the May 2018
survey were coordinated with the pertinent SC-DMMT agencies, and on May 31, 2018, the SCDMMT concurred with the revised locations. Sampling occurred on June 19 and 20, and July 2,
2018. In August 2018, the Corps coordinated with the SC-DMMT on the Draft SAPR and
Appendices for review and comment, and the Draft SAPR and its Appendices were approved by
the SC-DMMT on August 29, 2018 during the regularly monthly August 2018 SC-DMMT
meeting. The DEA would be provided to the USEPA for review and comment.
California Coastal Commission (CCC):
The Corps coordinated with the CCC, Federal Consistency Group, on the annual notification on
the start and completion of annual maintenance dredging since 2012 through 2018. In the spring
2016, the Corps coordinated the results of a grunion run (W1 on the Walker) scale with the CCC.
During summer of 2018, the Corps coordinated with the CCC on proposed project discussed in
the DEA that included two, new project features, those being a new beach dredged material
placement area (South Jetty Beach), and a new alternate staging area located at Surfer's Knoll
Parking lot including the portion of South Beach immediately west of the parking lot. During
the summer of 2018, the Corps coordinated with the CCC (Larry Simon) a discussion on the new
Draft EA that included two, new project features, those being a new beach dredged material
placement area (South Jetty Beach), and a new alternate staging area located at Surfer's Knoll
Parking lot including the portion of South Beach immediately west of the parking lot, and the
Corps proposed the Proposed Project (Alternative 1) would be a Negative Determination (NND),
and Mr. Larry Simon (CCC) agreed. The Corps coordinated with the CCC and with the SCDMMT in early 2018 during the January 2018 and February 2018 monthly SC-DMMT meetings
on discussions of the Draft SAP and Appendices. The Draft SAP and Appendices had an out of
120
cycle review and comment from the pertinent SC-DMMT agencies (CCC; USEPA; Los Angeles
RWQCB) on May 3, 2018, and the SAP and Appendices were approved with the pertinent SCDMMT agencies on May 15, 2018. A conditions survey was moved to May 2018 to determine
the best areas to samples since limited material was present. On May 30, 2018, updated vibracore
location based on the May 2018 survey were coordinated with the pertinent SC-DMMT
agencies, and on May 31, 2018, the SC-DMMT concurred with the revised locations in the SAP.
Sampling occurred on June 19 and 20, and July 2, 2018. In early August 2018, the Corps
coordinated with the CCC, Federal Consistency Group, on the proposed project that included
two, new project features, those being a new beach dredged material placement area (South Jetty
Beach, a contingency beach), and a new alternate staging area located at Surfer's Knoll Parking
lot including the portion of South Beach immediately west of the parking lot. The DEA would be
provided to the CCC for review and comment. In August 2018, the Corps coordinated with the
SC-DMMT on the Draft SAPR and Appendices for review and comment, and the Draft SAPR
and its Appendices were approved by the SC-DMMT on August 29, 2018 during the regularly
monthly August 2018 SC-DMMT meeting. The Corps has coordinated with the CCC an ND
statement of determination and a copy of the DEA for review and comment.
Los Angeles Regional Water Quality Control Board (Los Angeles RWQCB):
The Corps coordinated with the Los Angeles Regional Water Quality Control Board (RWQCB)
POCs Michael Lyons (previous POC) and Jun Zhu], on the annual notification on the start and
completion of annual maintenance dredging since 2012 through 2018. Weekly water quality
sampling and monitoring reports during annual dredging of the Federal channel in Ventura
Harbor were transmitted by e-mail to the Los RWQCB POC, and Annual Report was transmitted
within 30 days of completion of annual dredging. The Corps coordinated with the Los Angeles
RWQCB and with the SC-DMMT in early 2018 during the January 2018 and February 2018
monthly SC-DMMT meetings on discussions of the Draft SAP and Appendices. The Draft SAP
and Appendices had an out of cycle review and comment from the pertinent SC-DMMT agencies
(CCC; USEPA; Los Angeles RWQCB) on May 3, 2018, and the SAP and Appendices were
approved with the pertinent SC-DMMT agencies on May 15, 2018. A conditions survey was
moved to May 2018 to determine the best areas to samples since limited material was present.
On May 30, 2018, updated vibracore location based on the May 2018 survey were coordinated
with the pertinent SC-DMMT agencies, and on May 31, 2018, the SC-DMMT concurred with
the revised locations in the SAP. Sampling occurred on June 19 and 20, and July 2, 2018. In
August 2018, the Corps coordinated with the SC-DMMT on the Draft SAPR and Appendices for
review and comment, and the Draft SAPR and its Appendices were approved by the SC-DMMT
on August 29, 2018 during the regularly monthly August 2018 SC-DMMT meeting. The DEA
and a CWA 401 WQC would be provided to the Los Angeles RWQCB for review and comment.
California State Parks (California Parks and Recreation Department), Channel Island District:
The Corps coordinated with California State Parks staff (POC Alexis Frangis, Nate Cox) on the
annual notification on the start and completion of annual maintenance dredging since 2012
through 2018. In September 2018, the Corps coordinated with the California State Parks,
Channel Island District, on request for California State Parks Western Snowy Program Annual
121
Reports and on coordination of the DEA. The DEA would be provided to the California State
Parks, Channel Island District for review and comment.
California Department of Fish and Wildlife (CDFW):
The Corps coordinated with CDFW staff (POCs Bill Pazonkas, Loni Adams, Dave Blakenship),
Region 5 (South Coast Region) on the annual notification on the start and completion of annual
maintenance dredging since 2012 through 2018. A combined pre-dredge eelgrass/Caulerpa
taxafolia algae was conducted in 2015, as Federal Dredge Area A was proposed to be dredged,
and no eelgrass or Caulerpa was present; the survey results report was coordinated with the
CDFW staff (Bill Pazonkas, Loni Adams). In early 2016, the Corps coordinated a revised
Contingency Plan with the CDFW, if dredging extended beyond March 15 of any year with
implementation of protection avoidances measures if Western snowy plovers were observed on
the beach where placement of suitable dredged material was occurring. In the spring 2016, the
Corps coordinated the results of a grunion run (W1 on the Walker Scale) on South Beach during
dredging with the CDFW staff (Bill Pazonkas, Loni Adams). The Corps coordinated with the
SC-DMMT in early 2018 during the January 2018 and February 2018 monthly SC-DMMT
meetings on discussions of the Draft SAP and Appendices. In August 2018, the Corps
coordinated with the SC-DMMT on the SAPR and Appendices for review and comment, and the
SAPR was finalized in regular monthly SC-DMMT on August 29, 2018. The DEA would be
provided to the CDFW for review and comment.
Ventura County Air Pollution Control District (VCAPCD):
In June 2018, the Corps coordinated with the VCAPCD Planning Division (POC Nicole Collazo)
on the proposed project discussed in the DEA, and discussed the VCAPCD daily (lbs/day)
significance thresholds (ROC and NO2) criteria and the draft GHG VCAPCD guidance. The
DEA and an air quality calculation and analysis in Appendix F would be provided to the
VCAPCD Planning Division for review and comment.
Ventura County Resources Management Agency (Ventura County RMA):
In June 2018, the Corps coordinated with the Ventura County Resources Management Agency
RMA (POC Anthony Ciuffetelli) on the proposed project discussed in the DEA. The DEA would
be provided to the Ventura County RMA for review and comment.
122
8.0
COMPLIANCE WITH ENVIRONMENTAL REQUIREMENTS
A. NATIONAL ENVIRONMENTAL POLICY ACT of 1969.
[National Environmental Policy Act of 1969. 42 United States Code (U.S.C.) 4321 et seq.;
Council on Environmental Quality (CEQ) Regulations for Implementing NEPA, 40 Code
of Federal Regulations (CFR) Parts 1500 et seq., USACE Regulations for Implementing
NEPA, 33 CFR Part 230.]
The National Environmental Policy Act (NEPA) is the nation's primary charter for protection of
the environment. It establishes national environmental policy which provides a framework for
Federal agencies to minimize environmental damage and requires Federal agencies to evaluate
the potential environmental impacts of their proposed actions.
CEQ Regulations for implementing NEPA establish the requirements and procedures by which
Federal agencies fulfill their obligations under NEPA. The regulations also define such key terms
as "cumulative impact", "mitigation", and "significant" (as it relates to impacts) to ensure
consistent application of the terms in environmental documents.
Corps guidance for implementing NEPA is provided in Engineer Regulation 200-2-2, March
1988 and at 33 CFR Part 230. This regulation provides guidance for implementation of the
procedural provisions of the NEPA for the Civil Works Program of the Corps. It supplements the
CEQ regulations.
This EA has been prepared to comply with the requirements of NEPA and the CEQ and Corps
Regulations. In addition, the Corps coordinated: in June 2018 with the VCAPCD and Ventura
County RMA; in August 2018 with Federal and state agencies (e.g., US Fish and Wildlife
Service, National Oceanic Atmospheric Administration (NOAA/NMFS); U.S. Environmental
Protection Agency (USEPA); California Coast Commission (CCC) Federal Consistency Group;
Los Angeles Regional Water Board Control Board (Los Angeles RWQCB), and; in September
2018 with the California State Parks, Channel Island District, for discussion and input prior to
the release of the public DEA. The proposed project would be in compliance with this Act upon
completion of the NEPA process.
B. CLEAN WATER ACT (33 U.S.C. 1251 et seq.)
Section 401 of the Clean Water Act (CWA) requires every applicant for a Section 404 permit for
an action that may result in a discharge of dredged or fill material into "waters of the United
States" to obtain a State WQC (WQC) or waiver that the proposed activity will comply with
established effluent limitations and state water quality standards (i.e. beneficial uses, water
quality objectives, and anti-degradation policy). The state of California's Los Angeles Regional
Water Quality Control Board (Los Angeles RWQCB) issues Section 401 WQCs for activities
within the Los Angeles RWQCB Region 3 that includes the proposed project in Ventura County.
123
A draft CWA 401 WQC application has been coordinated with the Los Angeles RWQCB for the
proposed project along with the DEA.
Section 404 authorizes the Secretary of the Army acting through the Corps to issue permits for
the discharge of dredged or fill materials into the waters of the United States, including wetlands
at specified disposal sites. The selection and use of disposal sites must be in accordance with
guidelines developed by the Administrator of the USEPA in conjunction with the secretary of the
Army and published in 40 CFR Part 230 (known as the 404(b) (1) guidelines). Under the Section
404(b) (1) guidelines, the Corps would examine practicable alternatives to the proposed
discharge and permit only the Least Environmentally Damaging Practicable Alternative
(LEDPA).
The Corps does not issue permits to itself, but generally it demonstrates compliance with Section
404 through a Section 404(b)(1) Evaluation. In addition, the requirements and conditions of
nation-wide permits and regional general permits may be applied to Corps projects and thus
considered when addressing compliance under Section 404. All other entities must obtain a
permit before undertaking any discharge of fill materials into waters of the United States. A draft
404(b)(1) Evaluation has been prepared and is provided in Appendix C of the EA.
The proposed project complies with the requirements of the California Regional Water Quality
Control Board (RWQCB) under the CWA Section 401 WQC, pursuant to 33 USC 1341. The
proposed project complies with the guidelines promulgated by the Administrator, Environmental
Protection Agency, under authority of Section 404(b)(1) of the Clean Water Act (CWA) 33 USC
1344).
C. COASTAL ZONE MANAGEMENT ACT of 1972
Under the Coastal Zone Management Act (CZMA), any federal agency conducting or supporting
activities directly affecting the coastal zone must demonstrate the activity is, and proceed in a
manner, consistent with approved State's Coastal Zone Management Program, to the maximum
extent practicable. As no federal agency activities are categorically exempt from this
requirement, the Corps will obtain concurrence from the California Coastal Commission (CCC),
Federal Consistency Group, for the necessary determination. A draft Negative Determination
(ND) has been submitted to the CCC, Federal Consistency Group, for project concurrence along
with the DEA. In compliance with the coordination requirements of the Act, the DEA was sent to
CCC, Federal Consistency Group, for review and comment. The Corps would continue
coordination efforts with the CCC, Federal Consistency Group, through the multi-cycle program
period of the EA. The proposed project will be in compliance with this Act.
D. ENDANGERED SPECIES ACT OF 1972, SECTION 7(c)
As discussed above, and following coordination with the U. S. Fish and Wildlife Service
(USFWS) and the National Marine Fisheries Service (/NMFS), the Corps has determined that the
proposed maintenance dredging operations would have no effect on any species proposed or
124
listed as threatened or endangered under the ESA, and will not result in the adverse modification
of any designated critical habitat. Therefore formal consultation pursuant to Section 7 (c) of this
Act is not required. In compliance with the coordination requirements of the Act, the DEA was
sent to the USFWS and NMFS for their review and comment. The Corps would continue
coordination efforts with the USFWS and NMFS through the multi-cycle program period of the
EA. The proposed project will be in compliance with this Act.
E. NATIONAL HISTORIC PRESERVATION ACT
The National Historic Preservation Act (NHPA) provides a regulatory framework for the
documentation, evaluation, and protection of cultural resources that may be affected by federal
projects or by private projects operating under federal license, using federal money, or occurring
on federally managed land. In accordance with section 306108 of the NHPA (commonly known
as "Section 106"), the Corps has determined that the periodic maintenance of the Ventura Harbor
meets the definition of an undertaking as defined at 36 CFR 800.16(y). The Corps has further
determined that there are no historic properties present and that there will be "No Historic
Properties Affected" by periodic maintenance of the Ventura Harbor. Pursuant to 36 CFR
800.3(a)(1), the Corps has satisfied its responsibilities to take into account the effects of this
undertaking on historic properties and has no further obligations under Section 106 of the
NHPA. The proposed project is in compliance with this Act.
F. MAGNUSON-STEVENS FISHERY MANAGEMENT AND CONSERVATION ACT
The EA contains an EFH Assessment as required by the Magnuson-Stevens Act. Although
construction will occur within Essential Fish Habitat, the Corps has determined that the proposed
project would have less than significant effects to EFH. In compliance with the coordination
requirements of the Act, the DEA was sent to NMFS for their review and comment. The Corps
would continue coordination efforts with the NMFS through the multi-cycle program period of
the EA. The proposed project will be in compliance with this Act.
G. FISH AND WILDLIFE COORDINATION ACT (FWCA)
This Act requires Federal agencies to consult with the U.S. Fish and Wildlife Service (USFWS)
and the fish and wildlife agencies of states where the "waters of any stream or other body of
water are proposed or authorized, permitted or licensed to be impounded, diverted... or
otherwise controlled or modified" by any agency under a Federal permit or license. Consultation
is to be undertaken for the purpose of "...preventing loss of and damage to wildlife resources."
The intent is to give fish and wildlife conservation equal consideration with other purposes of
water resources development projects. The Fish and Wildlife Coordination Act (FWCA)
requires the Corps to consult with the U. S. Fish and Wildlife Service (USFWS) whenever the
waters of any stream or other body of water are proposed to be impounded, diverted, or
otherwise modified. In compliance with the coordination requirements of the Act, the DEA was
sent to the USFWS for review and comment. Coordination efforts with the USFWS will continue
through the multi-cycle program period of the EA. The proposed project is in full compliance
with this Act.
125
H. CLEAN AIR ACT of 1970 (42 U.S.C. 7401 et seq.)
The 1977 Amendments to the Clean Air Act enacted legislation to control seven toxic air
pollutants. The USEPA adopted National Emission Standards for Hazardous Air Pollutants,
which have been designed to control Hazardous Air Pollutants and emissions to prevent adverse
health effects in humans.
1990 Amendments to the Clean Air Act determine the attainment and maintenance of air basins
for National Ambient Air Quality Standards (NAAQS) (Title I), motor vehicles and
reformulation (Title II), hazardous air pollutants (Title III), acid deposition (Title IV), operating
permits (Titles V), stratospheric ozone protection (Title VI), and enforcement (Title VII).
Under Section 176(c) of the Clean Air Act Amendments (CAAA) of 1990, the Lead Agency is
required to make a determination of whether the Proposed Project "conforms" to the State
Implementation Plan (SIP). General Conformity is defined in Section 176(c) of the CAAA as
compliance with the SIP's purpose of eliminating or reducing the severity and number of
violations of the NAAQS and achieving expeditious attainment of such standards. However, if
the total direct and indirect emissions from the Proposed Project are below the General
Conformity Rule "de minimis" emission thresholds established at 40 C.F.R. 93.153(b)(1) for all
criteria pollutants for which the air basin is in non-attainment or maintenance status, the
Proposed Project would be exempt from performing a comprehensive Air Quality General
Conformity Analysis, and would be considered to be in conformity with the SIP. As discussed in
the DEA, Ventura County is under jurisdiction of the VCACPD, and an air quality calculation
and analysis for the proposed project is detailed in Appendix F. Furthermore, emissions
associated with maintenance dredging is exempt from General Conformity Rule per 40 CFR
93.153(c)(ix) and the yearly (tons/year) for all air criteria pollutants are below de minimus
significance threshold, and are not expected to exceed de minimis significance threshold levels
established as a criteria for a finding of conformity. Therefore, the Proposed Project is consistent
with the SIP and meets the requirements of Section 176(c).
Based upon a recent U.S. Supreme Court decision (Massachusetts v. EPA 549 U.S. 497 (2007)),
the USEPA has been given the authority to regulate CO2 or GHG emissions as an air pollutant
under the Federal Clean Air Act (42 U.S.C. §7602(g)). The USEPA has adopted 40 CFR Part 98
Mandatory Reporting of Greenhouse Gases Rule which requires mandatory reporting of GHG
emissions for facilities that emit more than 25,000 metric tons (MT) of CO2eq emissions per
year (USEPA, 2009) and 40 CFR Part 52 Proposed Prevention of Significant Deterioration and
Title V Greenhouse Gas Tailoring Rule which mandates Prevention of Significant Deterioration
(PSD) permitting to facilities whose stationary source CO2eq emissions exceed 25,000 MT per
year of USEPA threshold of significance or 10,000 MT per year of the VCAPCD threshold of
significance. Neither of these regulations is applicable to the Proposed Project because it has no
operating stationary emission sources that are subject to these regulations, or the Proposed
Project MT per year is below both USEPA and VCAPCD MT/year threshold of significance.
The Proposed Project is in compliance with this Act.
126
I. ENVIRONMENTAL JUSTICE
Executive Order 12898, Federal Actions to Address Environmental Justice in Minority
Populations and Low-Income Populations
Executive Order 12898 was signed on February 11, 1994, directing Federal agencies to "...make
achieving environmental justice part of its mission by identifying and addressing...
disproportionately high and adverse human health or environmental effects of its programs,
policies, and activities on minority populations and low-income populations in the [U.S.]..."
Sections 4.11 and 5.11 of the DEA addresses environmental justice. The proposed project is in
compliance with this executive order.
127
9.0
CONCLUSION
The Federal annual maintenance dredging and disposal operations proposed for Ventura Harbor
have been designed and scheduled to avoid, minimize, and reduce the probable effects on the
environment.
This EA, and informal coordination with the appropriate public agencies, indicates that the
proposed activity would not have a significant impact upon the existing environment or the
quality of the human environment. As a result, preparation of an Environmental Impact
Statement (EIS) is not required.
128
10.0
LIST OF PREPARERS
Prepared by:
Kirk C. Brus, Environmental Coordinator, Physical Scientist, Regional Planning Section
Erin Jones, Biological Sciences Environmental Manager, Ecosystem Policy Section
Meg McDonald, Archeologist, Ecosystem Planning Section
Kenneth Wong, Environmental Coordinator, Physical Scientist, Environmental Policy Group
Reviewed By:
Jodi Clifford, Chief, Environmental Resources Branch
Hayley Lovan, Chief, Ecosystem Planning Section
Mark Cooke, Project Manager, Navigation Section
All of above are from the U.S. Army Corps of Engineers (Corps), Los Angeles District (LAD).
129
11.0
REFERENCES
AMEC Geomatrix. 2011a. Sampling and Analysis Plan (SAP) Results (SAPR) Report and
Appendices, Ventura Harbor (Federal) Maintenance Dredging.
AMEC Geomatrix. 2011b. Ventura Harbor Pre-Dredge Biological Surveys Caulerpa Taxafolia
Algae and Eelgrass Survey For Maintenance Dredging Operations
Applied Environmental Technologies (AET), Inc. 1993, 1994, 1995, 1996, 2010. Water Quality
Monitoring Reports, Maintenance Dredging, Ventura Harbor, California.
Applied Environmental Technologies (AET), Inc. 2000. Personal communication with the Corps.
Applied Environmental Technologies (AET), Inc. 2000, 2001, 2002, 2003, 2004. Summary of
Evaluation, Three Years of Intertidal Biological Characterization, McGrath State Park Sandy
Beach Ventura Harbor Dredging and Beach Replenishment, 2000. Annual Reports: 2001, 2002,
2003, 2004.
Applied Environmental Technologies (AET), Inc. 2010. Water Quality Monitoring, Ventura
Harbor Dredging and Beach Replenishment. March 25, 2010 Report (Final Baseline).
Applied Environmental Technologies (AET), Inc. 2011. Water Quality Monitoring, Ventura
Harbor Dredging and Beach Replenishment. March 1, 2011 Report (Final Baseline).
Applied Environmental Technologies (AET), Inc. 2017. Water Quality Monitoring, Ventura
Harbor Dredging and Beach Replenishment. April 12, 2017 Report (Final Baseline and
Summary Report).
Applied Environmental Technologies (AET), Inc. 2018. Water Quality Monitoring, Ventura
Harbor Dredging and Beach Replenishment. March 7, 2018 Report (Final Baseline and
Summary Report).
Atwood, J. and P. Kelly. 1984. Fish Dropped on Breeding Colonies as Indicators of Least Tern
Food Habitats. Wilson Bulletin 96(1):34-47.
Beach Erosion Authority for Clean Oceans and Nourishment (BEACON). 2011. Coastal
Regional Sediment Management Plan (CRSMP), Regional Sediment Management (RSM).
http://www.beacon.ca.gov/projects/016-CRSMP.htm
130
Beach Erosion Authority for Clean Oceans and Nourishment (BEACON). 2018.
http://www.beacon.ca.gov/
Accessed August 16, 2018
Bowes, S.M and Corn M. 1990. Noise exposure reduction aboard an oceangoing hopper dredge.
Journal of the American Industrial Hygiene Association. Retrieved from and accessed on
October 8, 2015. http://www.ncbi.nlm.nih.gov/pubmed/2220564
Bowland & Associates. 2002. Ventura Harbor California Least Tern & Western Snowy
Plover 2001 Monitoring Report (April September 15, 2001).
Bowland & Associates. 2003 (a). Ventura Harbor California Least Tern & Western Snowy
Plover 2002 Monitoring Report (April September 15, 2002).
Bowland & Associates. 2003 (b). Ventura Harbor U.S. Army Corps of Engineers Dredging
January 2003, California Least Tern & Western Snowy Plover Monitoring Report.
Bowland & Associates. 2004. Ventura Harbor U.S. Army Corps of Engineers Dredging
February - March 2004, California Least Tern & Western Snowy Plover Monitoring Report.
Bowland & Associates. 2010. Ventura Harbor U.S. Army Corps of Engineers Dredging, Western
Snowy Plover and California Least Tern 2010 Monitoring Report.
Bowland & Associates. 2011. Ventura Harbor U.S. Army Corps of Engineers Dredging, Western
Snowy Plover and California Least Tern 2011 Monitoring Report.
California Air Resources Board (CARB). 2018a. Ambient Air Quality Standards (State and
National).
https://www.arb.ca.gov/research/aaqs/aaqs2.pdf
Accessed June 1, 2018
California Air Resources Board (CARB). 2018b. Federal and State Nonattainment and Pollutants
and Attainment Pollutants https://www.arb.ca.gov/pm/pmmeasures/pmch05/socenc05.pdf
Accessed June 1, 2018
California Air Resources Board (CARB). 2018c. Reporting Guidance for Determining Rule
Applicability for California's Mandatory GHG Reporting Program
https://www.arb.ca.gov/cc/reporting/ghg-rep/guidance/applicability-general.pdf
Accessed June 20, 2018
131
California Department of Parks and Recreation (CDPR/State Parks). 2003a. McGrath State
Beach Natural Resources Management Plan.
California Department of Parks and Recreation (CDPR/State Parks). 2009. California Marine
Life Projection Act Initiative (MLPA): Regional Profile of the MLPA South Coast Study Region
(Point Conception to the California-Mexico Border).
California Department of Parks and Recreation (CDPR/(State Parks). 2010. Western Snowy
Plover Annual Report 2010, Channel Coast District.
California Department of Parks and Recreation (CDPR/State Parks). 2014. McGrath State Park
closed due to flooding (August 10, 2014 notice release).
https://www.parks.ca.gov/NewsRelease/394
Accessed May 30, 2018
California Department of Parks and Recreation (State Parks). 2015. Statistical Report
(2014/2015 Fiscal Year)
http://www.parks.ca.gov/pages/795/files/14-15%20statistical%20report%20-%20internet.pdf
Accessed June 6, 2018
California Department of Parks and Recreation (CDPR/State Parks). 2017. Western Snowy
Plover Annual Report 2017, Channel Coast District.
California Department of Transportation (CALTRANS). 1980. Caltrans Noise Manual.
California Department of Transportation (CALTRANS). 2016. All Traffic Volumes (Traffic
Counts) on California State Highway System (CSHS).
http://www.dot.ca.gov/trafficops/census/docs/2016_aadt_volumes.pdf
Accessed May 18, 2018.
California Regional Water Quality Control Board, Los Angeles Region. 2017. Final 2014 and
2016 California Integrated Report (Clean Water Act Section 303(d) List/ 305(b) Report).
https://www.waterboards.ca.gov/water_issues/programs/tmdl/2014_16state_ir_reports/category5
_report.shtml
Accessed May 31, 2018.
California Resources Agency. 2003. Draft Review Of California Coastal Erosion Planning And
Response: A Strategy For Action.
132
Chambers, W.L. 1908. The present status of the Least Tern in Southern California. Condor 10:
237 pp.
Chambers Group, Inc. 1992. Draft Environmental Impact Report/Environmental Assessment for
the BEACON Beach Nourishment Demonstration Project.
Chambers Group, Inc. 2004. Comparative Dredge Emissions Study.
Coastal Sediment Management Workgroup (CSMW). 2011.
http://www.dbw.ca.gov/csmw/crsmp.aspx; http://dbw.ca.gov/csmw/default.aspx
Code of Federal Regulation (CFR). 2010. 40 CFR. Protection of the Environment.
http://cfrpublications.com/Category/40-40-cfr-protection-of-the-environment.aspx
Council of Environmental Quality (CEQ). 2010. White House Council on Environmental Quality
(CEQ) issued draft NEPA guidance.
Council on Environmental Quality (CEQ). 2016. Final Guidance For Federal Departments and
Agencies on the Consideration of Greenhouse Gas Emissions and the Effects of Climate Change
in NEPA Reviews. Accessed October 3, 2016.
https://www.whitehouse.gov/administration/eop/ceq/initiatives/nepa/ghg-guidance
Davis, N. 1978. Studies of the southern California nearshore sand bottom community, 211 pp.
Ph. D. thesis, University of California, San Diego.
Davis, N. and G.R. Van Blaricom. 1978. Spatial and temporal heterogeneity in a sand bottom
epifaunal community of invertebrates in shallow water. Scripps Institution of Oceanography.
Fager, E.W. 1968. A sand-bottom epifaunal community of invertebrates in shallow water.
Scripps Institution of Oceanography, La Jolla, CA.
Federal Register (FR). 1993. 58 FR 63247, Determining Conformity of Federal Actions To State
or Federal Implementation, US EPA.
Frost, N. 2015a. California least tern breeding survey, 2014 season. California Department of
Fish and Wildlife, Wildlife Branch, Nongame Wildlife Program Report, 2015-01. Sacramento,
CA. 23 pp + Appendices.
133
Frost, N. 2015b. California least tern breeding survey, 2015 season. California Department of
Fish and Wildlife, Wildlife Branch, Nongame Wildlife Program Report, 2016-01. Sacramento,
CA. 24 pp + Appendices.
Gotshall, D.W. 1989. Pacific Coast Inshore Fishes. Sea Challengers, Monterey, CA. 96
pp.
Grinnell, J. & A.H. Miller. 1944. The Distribution of the Birds of California. Pacific Coast
Avifauna.27 pp.
Havis, R. N. 1988. Sediment Resuspension by Selected Dredges, Environmental Effects of
Dredging Technical Note EEDP-09-2, U.S. Army Engineer Waterways Experiment Station,
Vicksburg, Miss.
Hayes, D. F. 1986a. Guide to Selecting a Dredge for Minimizing Resuspension of Sediment,
Environmental Effects of Dredging Technical Note EEDP-09-1, U.S. Army Engineer Waterways
Experiment Station, Vicksburg, Miss.
Heal The Bay. 2018. Heal The Bay's 2016-2017 Annual Beach Report Card.
https://healthebay.org/wp-content/uploads/2017/07/BRC_2017_FINAL_LowRes_07.05.17.pdf
Accessed March 30, 2018.
Herbich, J.B. and S.B. Brahme. 1983. Literature Review and Technical Evaluation of Sediment
Resuspension During Dredging, U.S. Army Engineers Waterways Experiment Station CDS
Report No. 266.
Hutchinson, Elmarie S., Page, Gary W., Persons, Philip E. 1987. The Nesting of Snowy Plovers
on Ventura Sand Spit During and After the 1987 Maintenance Dredging of Ventura Harbor.
November 1987.
Intergovernmental Panel on Climate Change. 2007a. IPCC (2007a) Climate Change 2007: The
Physical Science Basis, Contribution of Working Group I to the Fourth Assessment
Report of the Intergovernmental Panel on Climate Change. (Solomon, S., D. Qin, M. Manning,
Z. Chen, M. Marquis, K. B. Averyt, M. Tignor, and H. L. Miller, eds.).Cambridge University
Press, Cambridge, United Kingdom and New York, NY, USA. http://ipccwg1.ucar.edu/wg1/wg1-report.html
134
Kastendiek, J.E. 1975. The role of behavior and interspecific interactions in determining the
distribution and abundance of Renilla kollikeri, a member of a subtidal sand bottom
community. Ph.D. thesis, Univ. Calif., Los Angeles, 194 p.
Keane, K. 2000. California least tern breeding survey, 1998 season. California Department of
Fish and Game, Habitat Conservation and Planning Branch Report, 2000-01. Sacramento, CA.,
43pp.
Keane, K., Smith, L. J. 2016. California Least Tern Foraging Ecology in Southern California: A
Review of Foraging Behavior Relative to Proposed Dredging Locations. Report Number:
ERDC/EL CR-16-3.
King, Chester. 2015. Cultural, Archaeological, and Paleontological Resources at McGrath
State Beach. Prepared by Topanga Anthropological Consultants, Topanga, California, for
Wishtoyo Foundation and Wishtoyo Foundation's Ventura Coastkeeper Program, Ventura.
LaSalle, M.W., Homziak, J., Lunz, J.D., and Fredette, T.J. 1991. A Framework for Assessing the
Need for Seasonal Restrictions on Dredging and Disposal Activities, Dredging Activities
Technical Support Program, Technical Report D-91-1, U.S. Army Corps of Engineers,
Washington D.C.
Los Angeles Contaminated Sediment Task Force (CSTF). June 2003. Literature Review Of
Effects of Resuspended Sediments Due To Dredging Activity."140 pp.
Macfarlane, H. 1988. Underwater Archeological Survey Near Ventura Harbor, California, on
file, U.S. Army Corps of Engineers, Los Angeles District.
Manson Construction Company. 2018. Ventura Dredging Sediment Analysis Report.
McCauley, J.E., R.A. Parr and D.R. Hancock. 1977. Benthic Infauna and Maintenance Dredging:
A Case Study, Water Resources II:233-242.
McEwan, D. and T.A. Jackson. 1996. Steelhead restoration and management plan for California.
Calif. Dept. Fish & Game publication. 233pp.
MacFarlane, Heather. 1988. Technical Synthesis Report Underwater Archaeological Survey
Near Ventura Harbor, California. Prepared by MacFarlane Archaeological Consultants,
Ventura, for the U.S. Army Corps of Engineers, Los Angeles District.
135
MacFarlane, Heather. 1994. Letter Report of Cultural Resource Investigations, Underwater
Remote Sensing Survey, California; (2) Dredged Materials Redistribution Area Offshore near
Ventura Harbor, Ventura County, California, Service Request No. 94-4407 [ER] dated 14 June
1994. Prepared by MacFarlane Archaeological Consultants, Ventura, for the Statistical
Research, Inc., Tucson.
McGraw-Hill Book Co. 1979. Handbook of Noise Control.
McLellan, T. N., Havis, R. N., Hayes, D. F., and Raymond, G. L. 1989. Field Studies of
Sediment Resuspension Characteristics of Selected Dredges, Improvement of Activities and
Maintenance Techniques Research Program, Technical Report HL-89-9, U.S. Army Corps of
Engineers, Washington, D.C.
Merrill, R.J. and E.S. Hobson. 1970. Field Observations of Dendraster excentricus, a Sand
Dollar of Western North America. The University of Notre Dame. April 1970.
Munz, P.A. 1974. A Flora of Southern California U.C. Press., 1086 pp.
National Research Council (NRC). 1987. Responding to Changes in Sea Level: Engineering
Implications. National Academy Press: Washington, D.C.
http://www.nap.edu/catalog.php?record_id=1006
Noble Consultants. 1989. Coastal Sand Management Plan, Santa Barbara, Ventura County
Coastline. Irvine, California, Prepared for BEACON (Beach Erosion Authority for Control
Operations and Nourishment).
O'Connor, J.M., D.A. Neumann, and J.A. Sheik, Jr. 1977. Sublethal Effects of Suspended
Sediment on Estuarine Fish, Technical Paper U.S. Army Corps of Engineers Coastal Engineering
Research Center (No. 77-3): 90pp.
O'Hirok, L.S. 1985. Barrier beach formation and breaching, Santa Clara River mouth, California.
Masters thesis, University of California, Los Angeles.
Oliver, J.S., P.N. Slattery, L.W. Hulberg and J.W. Nybakken. 1977. Patterns of Succession
in Benthic Infaunal Communities Following Dredging and Dredged Material Disposal in
Monterey Bay, U.S. Army Waterways Experiment Station Technical Report D-77-27:186pp.
136
Orme, A. R. 1982. Temporal variability of a summer shorezone. In Thorne, C.E. ed., Space and
time in geomorphology, Allen and Unwin, London, 285-313.
Page, G.W., and Lynne E. Stenzel (eds). 1981. The Breeding Status of the Snowy Plover in
California. Western Birds 12:1-40
Page, G.W., Lynne E. Stenzel, David W. Winkler, and Christopher W. Swarth. 1983. Spacing
Out at Mono Lake: Breeding Success, Nest Density, and Predation in the Snowy Plover. Auk
100:13-24.
Parr, T., D. Diener and S. Lacy. 1978. Effects of Beach Replenishment on the Nearshore Sand
Fauna at Imperial Beach, California, U.S. Army Corps of Engineers Coastal Engineering
Research Center Miscellaneous Report No. 78-4:125pp.
Pi Environmental. 2015. Eelgrass (Zostera marina) and Caulerpa taxifolia Pre-dredge Surveys
USACE Navigation Channel Area A Ventura Harbor, Ventura, California, Final Report.
Ricketts, E. F. and J. Calvin. 1968. Between Pacific Tides, Fourth Edition, Stanford University
Press, Stanford, California, pg 214 Between Pacific Tides, Fourth Edition, Stanford University
Press, Stanford, California.
Rosenberg, R. 1977. Effects of Dredging Activities on Estuarine Benthic Macrofauna, Marine
Pollution Bulletin 8:102-104.
Small, A. 1994. California Birds Their Status and Distribution. Ibis Publishing company,
Vista, CA. 342 pp.
Smith, R. I. and J. T. Carlton (Editors). 1975. Light's Manual, Intertidal Invertebrates of the
Central California Coast, Third Edition, University of California Press, Berkeley, California.
Soule, D.F. and M. Oguni. 1976. Marine Studies off San Pedro, California. Part II. Potential
Effects of Dredging on the Biota of Outer Los Angeles Harbor. Toxicity, Bioassay, and
Recolonization Studies. Rep. So. California Sea Grant Program (No. 2-87):325pp.
South Coast Air Quality Management District (SCAQMD). 1993. CEQA Air Quality Handbook,
1993, with revisions through 2018.
South Coast Air Quality Management District (SCAQMD). 2015. SCAQMD Air Quality
Significance Thresholds. CEQA Handbook.
137
http://www.aqmd.gov/docs/default-source/ceqa/handbook/scaqmd-air-quality-significancethresholds.pdf?sfvrsn=2
Accessed June 14, 2018
South Coast Air Quality Management District (SCAQMD). 2018. Greenhouse Gas (GHG)
Carbon Dioxide equivalent (CO2eq) and threshold.
Southern California Association of Governments (SCAG). 2018.
http://www.scag.ca.gov/about/Pages/Home.aspx
Accessed June 21, 2018
Stillwater Sciences. 2011. Geomorphic Assessment of the Santa Clara River (SCR)
Watershed, Synthesis of the Lower and Upper Watershed Studies, Ventura and Los Angeles
Counties, California. April 2011.
Sturm, Bradley L. 1985. Ventura Marina Dredging Project. U.S. Army Corps of Engineers,
Los Angeles District.
Swanson, M.L., M. Josselyn, and J. McIver. 1990. McGrath State Beach Santa Clara River
Estuary Natural Preserve: restoration and management plan. Ventura County, California,
California Department of Parks and Recreation.
U.S. Army Corps of Engineers (Corps), Office of the Chief of Engineers. 1979. Effects of
Dredging and Disposal on Aquatic Organisms.
U.S. Army Corps of Engineers (Corps), Los Angeles District. 1983. Environmental Assessment:
Ventura Harbor Maintenance Dredging.
U.S. Army Corps of Engineers (Corps), Los Angeles District. 1984. Environmental Assessment:
Ventura Harbor Maintenance Dredging.
U.S. Army Corps of Engineers (Corps), Los Angeles District. 1985. Environmental Assessment:
Ventura Harbor Maintenance Dredging, Ventura County, California.
U.S. Army Corps of Engineers (Corps), Los Angeles District. 1986. Environmental Assessment:
Ventura Harbor Maintenance Dredging, Ventura County, California.
U.S. Army Corps of Engineers (Corps), Los Angeles District. 1987a. Ventura Harbor Detached
Breakwater Repair, Ventura County, California.
138
U.S. Army Corps of Engineers (Corps), Los Angeles District. 1987b. Ventura Marina Dredging
and Beach Disposal Geotechnical Report.
U.S. Army Corps of Engineers (Corps), Los Angeles District. 1988. Environmental Assessment:
Ventura Harbor Maintenance Dredging, Ventura County, California.
U.S. Army Corps of Engineers (Corps), Los Angeles District. 1989. Feasibility Report and
Environmental Assessment: Ventura Harbor Navigation Improvements, Ventura County,
California.
U.S. Army Corps of Engineers (Corps). 1991. Supplemental Environmental Assessment,
Modification of the Ventura Harbor Maintenance Dredging Program, Ventura County,
California.
U.S. Army Corps of Engineers (Corps), Los Angeles District. 1992. Environmental
Assessment: Ventura Harbor Detached Breakwater Repair, Ventura County, California.
U.S. Army Corps of Engineers (Corps). 1993a. Environmental Assessment: Santa Barbara
Harbor Maintenance Dredging, Santa Barbara County, California.
U.S. Army Corps of Engineers (Corps). 1993b. Environmental Assessment: Ventura Harbor
Maintenance Dredging, San Luis Obispo County, California.
U.S. Army Corps of Engineers (Corps). 1994a. Environmental Assessment: Ventura Harbor
Maintenance Dredging, Ventura County, California.
U.S. Army Corps of Engineers (Corps). 1994b. Environmental Assessment for Channel
Islands/Port Hueneme Harbors Maintenance Dredging, Ventura County, California
U.S. Army Corps of Engineers (Corps). 1996. Environmental Assessment: Maintenance
Dredging, Breakwater Repairs and Modifications, and Emergency Repairs at Ventura Harbor,
Ventura County, California.
U.S. Army Corps of Engineers (Corps). 1997. Environmental Assessment: Maintenance
Dredging at Ventura Harbor, Ventura County, California.
U.S. Army Corps of Engineers (Corps). 1998a. Environmental Assessment: South Jetty Repairs
and Modifications at Ventura Harbor, Ventura County, California.
139
U.S. Army Corps of Engineers (Corps). 1998b. Environmental Assessment for Ventura Harbor
Six-year Federal maintenance dredging Program, Ventura County, California. Contingency Plan.
U.S. Army Corps of Engineers (Corps). 1999. Environmental Assessment and Mitigated
Negative Declaration for the Port of Hueneme Deep Draft Navigation Study, Ventura County,
California.
U.S Army Corps of Engineers (Corps), Los Angeles District. 2000. Environmental Assessment
for the Port Hueneme East and West Jetty Repair Project Ventura County, California.
U.S. Army Corps of Engineers (Corps). 2001. Environmental Assessment: South Beach Groin
Repairs, Ventura Harbor, Ventura County, California.
U.S. Army Corps of Engineers (Corps). 2002. Environmental Assessment: Detached
Breakwater Repairs, Ventura Harbor, Ventura County, California.
U.S. Army Corps of Engineers (Corps). 2004a. Coast of California Storm and Tidal Waves
Study (CCSTWS) Ventura/Santa Barbara Counties, California. Project Management Plan
(PMP) Report.
U.S. Army Corps of Engineers (Corps). 2004b. Environmental Assessment for Ventura Harbor
Six-year Federal maintenance dredging Program, Ventura County, California.
U.S. Army Corps of Engineers (Corps). 2006. Assuring the Adequacy of Environmental
Documentation for Construction and Maintenance Dredging of Federal Navigation Projects.
U.S. Army Corps of Engineers (Corps). 2006. Overdepth Dredging and Characterization Depth
Recommendations.
U.S. Army Corps of Engineers (Corps). 2008a. Plans for Ventura Harbor Maintenance Dredging
(Bid Package) Solicitation.
U.S. Army Corps of Engineers (Corps). 2008b. Environmental Assessment (FEA), Detached
Breakwater Repairs at Ventura Harbor, Ventura County, California.
U.S. Army Corps of Engineers (Corps). 2008c. Engineering Manual (EM) 385-1-1, Safety
Safety and Health Requirements.
140
U.S. Army Corps of Engineers (Corps). 2009. Engineering Circular (EC) 1165-2-211, Water
Resources Policies and Authorities, Incorporating Sea-Level Change Considerations in Civil
Works Programs.
U.S. Army Corps of Engineers (Corps). 2010. Bathymetry, Ventura Harbor Federal maintenance
dredge areas. Historical Federal Maintenance Dredge Volume, Ventura Harbor (1969-2010) and
placement of suitable dredged material area(s) [disposal sites].
U.S. Army Corps of Engineers (Corps). 2011a. SAP and SAPR Report. Ventura Harbor Federal
maintenance dredge areas grain size analysis and compatibility of dredged sediment. Generated
by the U.S. Army Corps of Engineers (Corps) Los Angeles District (LAD) Geotechnical Branch.
U.S. Army Corps of Engineers (Corps). 2011b. Ventura Harbor Six Year Federal Maintenance
Dredging Program, Ventura County, California.
U.S. Army Corps of Engineers (Corps). 2016. Contingency Plan (revised).
U.S. Army Corps of Engineers (Corps). 2018a. E-mail communications between Corps and
Jackie Worden (VPD bird monitor), August 27, 2018.
U.S. Army Corps of Engineers (Corps). 2018b. Sampling and Analysis Plan (SAP) Results
(SAPR) Report. Prepared by AECOM/Kinnetic Laboratory, Inc.
U.S. Army Corps of Engineers (Corps). 2018c. Draft Plans. Ventura Harbor Federal maintenance
dredging program.
U.S. Census Bureau, 2018. U.S. FactFinder and 2012- 2016 American Community Survey
(ACS) 5 year estimates. Ventura County and City of San Buenaventura (Ventura).
https://factfinder.census.gov/faces/nav/jsf/pages/community_facts.xhtml
https://factfinder.census.gov/faces/tableservices/jsf/pages/productview.xhtml?src=CF
https://factfinder.census.gov/faces/nav/jsf/pages/community_facts.xhtml#
https://factfinder.census.gov/faces/tableservices/jsf/pages/productview.xhtml?src=CF
U.S. Environmental Protection Agency (USEPA). 1971. Noise from Construction Equipment
and Operations, Building Equipment, and Home Appliances. Accessed on and retrieved on
October 8, 2015. http://nepis.epa.gov/Exe/ZyNET.exe/9101NN3I.TXT
U.S. Environmental Protection Agency (USEPA). 1972. Noise Control Act. Accessed on and
retrieved on October 8, 2015. http://www2.epa.gov/laws-regulations/summary-noise-control-act
141
U.S. Environmental Protection Agency (USEPA). 1974. Protective Noise Levels. Accessed on
and retrieved on October 8, 2015. http://nepis.epa.gov/Exe/ZyNET.exe/20012HG5.TXT
U.S. Environmental Protection Agency (USEPA. 1985. AP-42, A Compilation of Air Pollutant
Emission Factors. 1985, with updates through 2018.
U.S. Environmental Protection Agency (USEPA) and U.S. Army Corps of Engineers (Corps).
1992. Dredging Operations Technical Support (DOTS). 1992. Dredged Material Assessment and
Management Seminar [Notebook].
U.S. Environmental Protection Agency (USEPA) and U.S. Army Corps of Engineers (Corps).
1992. Evaluating Environmental Effects of Dredged Material Management Alternatives--A
Technical Framework. EPA842-B-92-008. 72 p.
U.S. Environmental Protection Agency (USEPA). 1993. Federal Register (FR) 58, Volume 58,
Number 228, Rules and Regulations 63247.
U.S. Environmental Protection Agency (USEPA). 1994. General Conformity Guidance:
Questions and Answers (EPA, 1994). 37 pp.
USEPA/U.S. Army Corps of Engineers (Corps). 1998. Evaluation of Dredged Material Proposed
for Discharge in Waters of The U.S. Testing Manual [Inland Testing Manual (Gold Book)].
EPA-823-B-98-004.
U.S. Environmental Protection Agency (USEPA). 2004. "Hudson River PCBs Superfund Area:
Quality of Life Performance Standards Noise" Website
https://www3.epa.gov/hudson/quality_of_life_06_04/full_report.pdf
Accessed on October 1, 2018
U.S. Environmental Protection Agency (USEPA). 2005. Best Practices in Preparing Port
Emission Inventories.
U.S. Environmental Protection Agency (USEPA). 2009a. Climate Change Science Program
(CCSP) (2009) Synthesis and Assessment Product 4.1: Coastal Sensitivity to Sea-Level
Rise: A Focus on the Mid-Atlantic Region. A report by the U.S. Climate Change
Program and the Subcommittee on Global Change Research. [J. G. Titus (Coordinating
Lead Author), E. K. Anderson, D. Cahoon, S. K. Gill, R. E. Thieler, J. S. Williams
(Lead Authors)], U.S. Environmental Protection Agency, Washington, D.C.
142
http://www.climatescience.gov/Library/sap/sap4-1/-report/default.htm
U.S Environmental Protection Agency (USEPA). 2018a. General Conformity De Minimis and
Tables. Website https://www.epa.gov/general-conformity/de-minimis-tables
Accessed on June 14, 2018
U.S. Fish and Wildlife Service (USFWS). 1981. Pacific Coast Ecological Inventory: Los
Angeles, California.
U.S. Fish and Wildlife Service (USFWS). 1984. Biological Assessment of Maintenance
Dredging Program of the Los Angeles District (DRAFT).
U.S. Fish and Wildlife Service (USFWS). 1989. Coordination Act Report: Ventura Harbor
Navigation Improvements, Ventura County, California.
U.S. Fish and Wildlife Service (USFWS). 1993. Determination of Threatened Status for the
Pacific Coast Population of the Western Snowy Plover, Rule. Federal Register 58:12864-12874,
March 5, 1993.
U.S. Fish and Wildlife Service (USFWS). 1993. News Release: "Fish and Wildlife Service Lists
the Coastal Population of the Western Snowy Plover as Threatened."
U.S. Fish and Wildlife Service (USFWS). 1994. Personal communication with Ms. Marie
Lindsey.
U. S. Fish and Wildlife Service (USFWS). 1999. Designation of Critical Habitat for the Pacific
Coast Population of the Western Snowy Plover; Rule. Federal Register 64:68507-68544,
December 7, 1999.
U. S. Fish and Wildlife Service (USFWS). 2001. Western Snowy Plover (Charadruis
alexandrinus nivosus) Pacific Coast Population Draft Recovery Plan. Portland, Oregon. xix +
630 pp.
U.S. Fish and Wildlife Service (USFWS). 2005. Steelhead recovery plan
U.S. Fish and Wildlife Service (USFWS). 2008
U.S. Fish and Wildlife Service (USFWS). 2018. Species Reports. Available by internet
http://ecos.fws.gov/tess_public/
143
VanBlaricom, G.R.. 1978. Disturbance, predation, and resource allocation in a high energy
sublittoral sandbottom ecosystem: Experimental analyses of critical structuring processes for the
infaunal community. Dissertation, University of California, San Diego.
Ventura Audubon Society. 2004. 2003 Snowy Plover observations by California Department
Parks and Recreation (CDPR), McGrath State Beach and Santa Clara Estuary, Ventura Harbor,
Ventura, California.
Ventura Audubon Society. 2011. 2011 Western Snowy Plover (WSP) observations.
Ventura (City of San Buenaventura). 2008. City of Ventura Municipal Codes, Article 1. Noise
Regulations Generally, Section 10.650.150 Special noise sources, section D (Construction of
buildings and structures).
Ventura (City of San Buenaventura). 2018a. Wastewater.
https://www.cityofventura.ca.gov/503/Wastewater
Accessed May 31, 2018
Ventura (City of San Buenaventura). 2018b. Designated noise zones
https://library.municode.com/ca/san_buenaventura/codes/code_of_ordinances?nodeId=DIV10PU
PEMORE_CH10.650NOCO
Accessed June 6, 2018
Ventura (City of San Buenaventura). 2018c. City of Ventura Municipal Codes, Article 1. Noise
Regulations Generally, Section 10.650.150 Special noise sources, section D (Construction of
buildings and structures)
https://library.municode.com/ca/san_buenaventura/codes/code_of_ordinances?nodeId=DIV10PU
PEMORE_CH10.650NOCO
Accessed June 6, 2018
Ventura County. 2017. Traffic Volumes of Ventura County Roads. County of Ventura Public
Works Agency Transportation Department, Ventura, California.
http://pwaportal.ventura.org/TD/Residents/Streets_and_Transportation/Reports_and_Programs/T
F_TrafficVolumeBookletTrends.pdf Accessed May 17, 2018
Ventura County. 2018. Noise standards (Division 8, Chapter 1.1, Section 8107-9.6.22 (Noise
Standard)
144
https://library.municode.com/ca/ventura_county/codes/code_of_ordinances?nodeId=DIV8PLDE
_CH1ZO_ART7STSPUS_8107-9.6.22NOST
Accessed June 6, 2018
Ventura County Air Pollution Control District (VCAPCD). 2003. Ventura County Air Quality
Assessment Guidelines, 170 pp.
Ventura County Air Pollution Control District (VCAPCD). 2005. Rule 220 (General
Conformity). http://www.vcapcd.org/Rulebook/Regxi/RULE%20220.pdf
Ventura County Air Pollution Control District (VCAPCD). 2010. http://www.vcapcd.org/
Ventura County Air Pollution Control District (VCAPCD). 2018a. Air Monitoring Stations.
http://www.vcapcd.org/MonitoringStations.htm
Accessed May 31, 2018
Ventura County Air Pollution Control District (VCAPCD). 2018b. Air Quality Standards (State
and Federal Nonattainment Pollutants).
http://www.vcapcd.org/air_quality_standards.htm
Accessed June 1, 2018.
Ventura County Air Pollution Control District (VCAPCD). 2018c. Final 2016 Air Quality
Management Plan (dated February 14, 2017)
http://www.vcapcd.org/pubs/Planning/AQMP/2016/Final/Final-2016-Ventura-CountyAQMP.pdf
Accessed June 1, 2018
Ventura County Air Pollution Control District (VCAPCD). 2018d. Ventura County Air Quality
Assessment Guidelines (dated October 2003)
http://www.vcapcd.org/pubs/Planning/VCAQGuidelines.pdf
Accessed June 5, 2018
Ventura County Air Pollution Control District (VCAPCD). 2018e. Draft greenhouse gases
(GHG) language e-mail from VCAPCD on June 5, 2018
Ventura County Watershed Protection District. 2010.
http://portal.countyofventura.org/portal/page/portal/PUBLIC_WORKS/Watershed_Protection_D
145
istrict/Programs_and_Projects/Santa%20Clara%20River%20Hydrology%20Report%20%20Phase%20I
Ventura County Watershed Protection District. 2018. Precipitation Depth-Duration (Long Term)
Maximum Annual Precipitation (in inches), Station # VC 216B (Ventura Marina Port
District), 1965 through 2010.
http://www.vcwatershed.net/hydrodata/reports/216%20%20%20%20%20%20%20%20%20%20
%20%20%20Rainfall%20Frequency%20Long%20Duration-Draft.pdf
Accessed on May 30, 2018
Ventura Port District (VPD). 2010. http://www.venturaharbor.com
Ventura Port District (VPD). 2017a. Transparency Reports. Financial Statements and Budget.
Ventura Port District Annual Budget FY2017-18 (dated June 28, 2017)
https://venturaharbor.com/wp-content/uploads/2014/05/Ventura-Port-District-FY1718Budget.pdf
Accessed May 17, 2018.
Ventura Port District (VPD). 2017b. Ventura Isle Marina Dock Replacement Project Initial
Study Study/Mitigated Negative Declaration (CEQA document)
https://venturaharbor.com/wp-content/uploads/2016/02/Ventura-Port_083017-FINAL.pdf
Accessed June 25, 2018
Ventura Port District (VPD). 2018a. Harbor History
https://venturaharbor.com/about-ventura-harbor/history/
Accessed June 6, 2018.
Ventura Port District (VPD). 2018b. Rules and Regulations
https://venturaharbor.com/rules-regulations/
Accessed June 7, 2018.
Ventura Port District (VPD). 2018c
https://venturaharbor.com/expansion-starts-40-new-guest-room-holiday-inn-express-suites/
Accessed June 25, 2018.
Ventura Port District (VPD). 2018d
https://venturaharbor.com/portside-ventura-harbor-start-leasing-summer-2018/
Accessed June 26, 2018
146
Ventura Port District (VPD). 2018e. Santa Clara River Discharge Summary.
Warriner, John S., Jane C. Warriner, Gary W. Page, and Lynne E. Stenzel. 1986. Mating
System and Reproductive success of a Small Population of Polygamous Snowy Plovers. Wilson
Bulletin 98:15-37
Williams, R.P. 1978. Sediment Discharge in the Santa Clara River Basin, Ventura County,
California. USGS Water Resources Investigation 29-78.
Wilson-Jacobs, Ruth, and E. Charles Meslow. 1984. Distribution, Abundance, and Nesting
Characteristics of Snowy Plovers on the Oregon Coast. Northwest Science 58:40-48
FIGURES
Figure 1a: Study Area Site Location Map
Figure 1b: Project Area Site Location Map
Figure 2a: Ventura Harbor Federal Maintenance Dredge Areas
Figure 2b: Placement of Suitable Dredged Material Discharge Disposal Area(s)/Site(s)
Figure 3: Bathymetry for Ventura Harbor Federal Maintenance Dredge Areas
Figure 4: Vibracore Sample Locations For Ventura Harbor Federal Maintenance Dredge Areas
Figure 5: Staging (Storage/Laydown) Area(s)
147
APPENDICES
148
Appendix A: Comparison of Dredge Types
149
Appendix B: Federally Threatened and Endangered Species in Ventura County
150
Appendix C: 404(b)(1) Evaluation
151
Appendix D: Water Quality Monitoring Data During Dredging Activities, 2017, 2018
152
Appendix E: U.S. Fish and Wildlife, U.S. Army Corps of Engineers Correspondences (2002,
2003) on Procedural Changes to Ongoing Dredging Activities
153
Appendix F: Air Quality Emission Calculations and Analysis, Ventura Harbor Federal
Maintenance Dredging Program
154
Appendix G: Contingency Plan (Corps 1998b; 2016)
155
Appendix H: 2017-2018 Sampling and Analysis Plan (SAP), SAP Results (SAPR) Report, and
Appendices
156
Appendix I: Draft Plans
157
Appendix J: Fishery Management Plans & managed species/species complexes for the Pacific
region
158
Appendix K: Intertidal Biological Characteristics of McGrath State Beach, Ventura Harbor
Dredging and Beach Replenishment
159
Appendix L: Mailing List
160
161