LETTER OF PERMISSION: The Town of Brookfield is applying for Department of the Army authorization to discharge fill material within 0.08 acre of Poplar Creek and to discharge dredged and fill material in a total of 1.02 acres of wetlands for the construction of a connector road with a triple cell box culvert and associated floodplain compensatory storage.
PROJECT DESCRIPTION AND PURPOSE: The Town of Brookfield is applying for Department of the Army authorization to discharge fill material within 0.08 acre of Poplar Creek and to discharge dredged and fill material in a total of 1.02 acres of wetlands for the construction of a connector road with a triple cell box culvert and associated floodplain compensatory storage.
Information for File # MVP-2017-04353-MHK
Applicant:
Town of Brookfield
Corps Contact:
Marie Kopka
Address:
250 N. Sunnyslope Road, Suite 296, Brookfield, WI 53005
E-Mail:
Marie.H.Kopka@usace.army.mil
Phone:
(651) 290-5733
Primary County:
Waukesha
Section:
29
Township:
7N
Range:
20 E
Information Complete On: October 5, 2018
Posting Expires On: November 5, 2018
Authorization Type: LOP-06-WI
This application is being reviewed in accordance with the practices for documenting Corps
jurisdiction under Sections 9 & 10 of the Rivers and Harbors Act of 1899 and Section 404 of the
Clean Water Act identified in Regulatory Guidance Letter 16-01.
Project
PROJECT DESCRIPTION AND PURPOSE: The Town of Brookfield is applying for Department
of the Army authorization to discharge fill material within 0.08 acre of Poplar Creek and to
discharge dredged and fill material in a total of 1.02 acres of wetlands for the construction of a
connector road with a triple cell box culvert and associated floodplain compensatory storage.
The project would also include temporary impacts to 0.02 acre of tributary. The new roadway
would be constructed from southeast of The Corners of Brookfield development to the south
termini of Janacek Road for the purpose of alleviating traffic at the intersection of West
Bluemound Road and Jennifer Drive and providing connectivity between The Corners
development and proposed development east of Poplar Creek. The typical section would
include two 12-foot driving lanes, 30-inch curb and gutter on both sides, a 5-foot terrace, and 8foot multi-use path on the north side of the road. The roadway crossing over Poplar Creek
would include a 12-foot by 12-foot 4-inch triple cell box culvert.
NAME, AREA AND TYPES OF WATERS (INCLUDING WETLANDS) SUBJECT TO LOSS:
The proposed triple cell box culvert would result in a discharge of fill material within Poplar
Creek, a state listed 303d impaired water. Poplar Creek is listed as impaired by low levels of
dissolved oxygen caused by phosphorus and other pollutants. The project would result in a loss
of 0.38 acre of fresh wet meadow and 0.11 acre of floodplain forest for the access road
construction, and would result in excavation of 0.46 of fresh wet meadow and 0.05 acre of
floodplain forest for the construction of compensatory flood storage. This wetland complex is
dominated by box elder, reed canary grass, tall reed grass, common buckthorn, and narrowleaved cattail and is identified as part of the Advanced Identification of Wetland Disposal Areas
(ADID) in Waukesha County. The project would take place in the FEMA 100-year floodplain.
ALTERNATIVES CONSIDERED FOR THE CONNECTOR ROAD AND WATERWAY
CROSSING: The applicant states that the criteria considered for the roadway and culvert
includes impacts to general environmental areas, wetlands, floodplain, utility, right-of-way, and
cost.
Page 1 of 2
The `no action' or `no build' alternative was considered and retained for comparison purposes.
Under this alternative, the applicant states that increased traffic demand from both
developments has potential to impede traffic flow and emergency vehicle access which could
hinder access to the developments and have a negative impact on economic growth.
Alternative location for access road: a triple cell 12-foot by 12-foot box culvert at an extension of
the Sommers Drive cul-de-sac was considered but could negatively impact an existing gas
main, divide an environmental corridor between IH94 and Bluemound Road, impede
developable land to the east, and have the greater amount of wetland fill than the preferred
alternative.
Alternative project design: a single span box girder bridge with piles driven at the abutments
was considered in the same location as the preferred alternative but would result in 0.27 acre of
wetland fill, the largest increase in floodplain elevations, the relocation of a sanitary sewer
interceptor and potential impacts to an existing gas main.
Minimization of the preferred roadway alternative: The two 12-foot lanes would match the
Janacek Road width and accommodate truck traffic. The width of the multi-use path was
reduced from 10 feet to 8 feet. Side slopes were steepened from 4:1 to 3:1. A retaining wall
was designed on the upstream side of the culvert to reduce wetland impacts.
In addition, the location of the compensatory flood storage was dictated by the Waukesha
County ordinance which requires the storage to be located in the immediate vicinity of the fill
activity. The majority of the floodplain area consists of wetland. The flood storage area is
proposed in 0.51 acre of wetland located north of the proposed fill and west of Poplar Creek and
was chosen because of existing topography and the larger area of wetland to the east of Poplar
Creek. The excavated wetland area would be seeded with a native wetland seed mix. The
applicant states that the fresh wet meadow and floodplain forest community types would remain
after final grading.
Erosion control and storm water management would be conducted with Best Management
Practices and would include ditch checks, erosion bales, temporary and permanent
seeding/mulch, silt fence, erosion mats, etc.
COMPENSATORY MITIGATION: The applicant proposes to fulfill federal compensatory
mitigation requirements by purchasing credits from a federally approved mitigation bank if
available or by purchasing advanced credits from the Wisconsin Wetland Conservation Trust
(In-Lieu Fee) program contingent upon Corps approval.
Additional information is available upon request.
Drawings
See attached exhibits labeled MVP-2017-04353-MHK Pages 1 through 4.
Page 2 of 2
MVP-2017-04353-MHK PAGE 1
POPLAR CREEK BRIDGE AND SOUTH LORD STREET
FOR THE
TOWN OF BROOKFIELD
WAUKESHA COUNTY, WISCONSIN
SEPTEMBER, 2018
LIST OF DRAWINGS
SHEET NO.
1
TITLE SHEET
2
STANDARD SYMBOLS AND GENERAL NOTES
3
TYPICAL SECTIONS
4-5
I
-9
4
EK
CRE
LAR
POP
7
BOX CULVERT GENERAL PLAN
8
BOX CULVERT CROSS SECTIONS, QUANTITIES,
BOX CULVERT SECTIONS
11
BOX CULVERT DETAILS
12
INLET C.I.P. CONCRETE RETAINING WALL DETAILS
13
OUTLET APRON AND WING DETAILS
14
FENCING DETAILS
15
GUARDRAIL POST ANCHORAGE DETAILS
16
FOUNDATION & FIRST FLOOR DEMOLITION PLAN
17
SECOND FLOOR & ROOF DEMOLITION PLAN
8
WY 1
MOUND ROAD/H
UE
W.BL
N.JANACEK ROAD
PROJECT LOCATION
8
1
Y
HW
/
D
LV
B
NO SCALE
STORM SEWER DETAILS AND STRUCTURES
9-10
STRUCTURE B-67-382
N
EROSION CONTROL DETAILS
6
NOTES, AND DETAILS
TOWN OF BROOKFIELD, WI
PROJECT LOCATION MAP
DRAWING TITLE
I
94
D
N
A
EL
R
O
M
E.
18-19
DEER CREEK
DEMOLITION SECTIONS
20
WEST BIORETENTION BASIN DETAILS
21
EAST BIORETENTION BASIN DETAILS
22
FLOODPLAIN COMPENSATORY STORAGE GRADING PLAN
23
ALIGNMENT DETAILS
24-27
PLAN AND PROFILE
28-30
RESTORATION PLAN
31
CROSS SECTIONS
Strand Associates, Inc.
910 West Wingra Drive
Madison, WI 53715
PROJECT LOCATION MAP
608-251-4843
N
608-251-8655 fax
NO SCALE
www.strand.com
Call 811 3 Work Days Before You Dig
or Toll Free (800) 242-8511
CONTRACT NO.
Milwaukee Area (414) 259-1181
2-2018
®
ASSOCIATES
Hearing Impaired TDD (800) 542-2289
www.DiggersHotline.com
SHEET
1
JOB NO.
S:\MAD\1100--1199\1127\024\Drawings\CAD\Micros\PLAN\01-Title.dgn
user: dimitriosh
8/7/2018
1:49:06 PM
1127.024
836
permanent
tributary
impacts
Shallow Open Water
Wetland
Impactsacre)
(0.08 Acres)
(0.08
SOMMERS DR
Floodplain Forest Wetland
Impacts (0.16 Acres)
830
Temporary Shallow Open Water
temporary tributary impacts
Wetland Impacts (0.02 Acres)
838
(0.02 acre)
840
828
832
844
828
2
83
Creek
848
852
846
82
8
832
836
822
850
822
822
822
832
2
82
854
828
82
2
856
85
4
856
842
824
8
82
828
830
826
834
830
830
50
100
822
Feet
Path: S:\MAD\1100--1199\1127\024\Drawings\GIS\Wetland Disturbance 11x17.mxd
User: danc
824
WB
836
834
826
830
Date: 9/25/2018
I94
832
832
828
834
25
EB I
94
82
8
/
0
830
830
828
840
N JANACEK RD
830
WETLAND DISTURBANCE EXHIBIT
828
POPLAR CREEK CROSSING AND NEW CONNECTION ROAD
TOWN OF BROOKFIELD
WAUKESHA COUNTY, WISCONSIN
840
excavated
freshFresh
wetWet
Temporary
Degraded
Meadow
Impacts
(0.46
Acres)
meadow
(0.46
acre)
r
Popla
836
822
830
830
828
828
828
Degraded Fresh Wet Meadow
Impacts (0.38 Acres)
83
8
828
828
828
RD
822
828
828
830
828
830
828
826
2
82
820
E
PRIVAT
2
82
Slope Intercepts
SEWRPC Delineated Wetlands
822
822
Legend
828
822
2
83
6
82
820
828
828
824
0
82
826
822
MVP-2017-04353-MHK Page 2
832
Time: 4:22:26 PM
FIGURE 3
1127.024
MVP-2017-04353-MHK PAGE 3
R/W
R/W
DATE:
60'
8'
2'
5'
6"
2.5'
24'
2.5'
1'
1'
3:
1M
AX
2
.
0%
AX
1M
3:
AX
1M
3:
2
.
0%
2
.
0%
AX
1M
4:
0%
2.
0%
.
2
2
.
0%
REVISIO N S
3'
3:
1M
AX
3-INCHES ASPHALTIC CONCRETE SHARED USE PATH
6-INCHES ASPHALTIC CONCRETE PAVEMENT
30-INCH CURB AND GUTTER (TYP.)
12-INCHES CRUSHED AGGREGATE BASE COURSE
EXISTING GROUND (TYP.)
6-INCHES TOPSOIL, SEED, AND
NO.
6-INCHES CRUSHED AGGREGATE BASE COURSE
CLASS 1, URBAN TYPE A EROSION MAT
SOUTH LORD STREET
0%
.
4
3:
1M
AX
1'
2
.
0%
0%
.
2
4
.
0%
3:
1M
AX
AX
1M
3:
AX
1M
3:
*
6-INCHES ASPHALTIC CONCRETE PAVEMENT
W AU K ESH A CO U N TY,W ISCO N SIN
1'
2018
CO N TRACT 2-
2'
TO W N O F BRO O K FIELD
24'
PO PLAR CREEK BRIDG E AN D SO U TH LO RD STREET
2'
T Y P IC A L S E C T IO N S
STA 10+00.00 - STA 26+88.81
AGGREGATE SHOULDER (TYP.)
EXISTING GROUND (TYP.)
12-INCHES CRUSHED AGGREGATE BASE COURSE
JOB NO.
* SEE SHEET 8 FOR GRADING BY EAST BIORETENTION BASIN
PRAXAIR DRIVEWAY
1127.024
PROJECT MGR.
JJG
®
ASSOCIATES
SHEET
3
S:\MAD\1100--1199\1127\024\Drawings\CAD\Micros\PLAN\03_Typical Sections.dgn
user: dimitriosh
8/7/2018
1:49:07 PM
WV
835
838
837
WV
MVP-2017-04353-MHK PAGE 4
83
6
830
83
2
MH
835
MH
826
8
3
0
825
824
5
82
832
1
3:
829
6
82
5
82
823
828
0
82
827
1
2
8
822
821
8
3
0
12+
00
825
8
2
4
820
8
2
6
REVISIO N S
8
82
5
2
8
4
2
8
3
2
8
2
2
8
1
3:
828
831 827
831
1
3
8
0
3
8
830
9
2
8
8
2
8
7
2
8
6
2
8
829
82
7
827
82
4
833
83
1
828
835
834
832
3
4
3
3
8
8
830
83
0
830
DATE:
835
835
MH
+5
0
A
835
831
832
MH
830
83
3
83
5
MH
831
829
3:
1
2
82
820
9
81
+5
0
8
2
7
82
5
825
3
2
8
1
82820
9
81
8
81
820
8
81
82
4
82
3
8
82 22
1
WETLAND BOUNDARY PER
1
82
5
2
8
822
0
83
0
82
82
1
827
5
2
8
9
2
8
4
2
8
7
2
8
822
6
2
8
1
82
8
18
823
0
82
823
5
82
EXISTING GROUND
W AU K ESH A CO U N TY,W ISCO N SIN
4
2
8
I
P
TOP OF EXISTING RETAINING WALL
CO N TRACT 22018
9
81
830
828
TO W N O F BRO O K FIELD
6
82
7
82
14+
00
9
81
0
82
831
STO RAG E G RADIN G PLAN
82
5
8
2
5
8
2
2
POST
+5
0
POST
0
82
82
4
0
82
AR
PL
PO
2
82
FLO O DPLAIN CO M PEN SATO RY
7
5
26
2
8
8
82
8
PO PLAR CREEK BRIDG E AN D SO U TH LO RD STREET
1
82
82
2
K
EE
CR
823
82
6
820
822
13+
00
8
2
4
81
7
9
81
9
81
SEWRPC DELINEATION
S.
LO
RD
ST
RE
ET
8
2
5
820
0
82
8
2
2
1
82
A
8
81
2
82
823
821
SILT FENCE (TYP.)
NO.
8
2
9
MH
825
825
826
7
2
8
8
2
4
7
82
EL=832.00 +/EL=831.00
828
829
828
6
8225
8
8
3376 4
3
888
3 321
88333 9
88 2
8
830
EXISTING GROUND THROUGH
:1
3
D
E
S
O
P
D
O
N
R
U
P
O
R
G
844
3
82
835
843
842
84
8
8
41
30
9
+5
0
EL=835.00 +/-
100-YR FLOODPLAIN BOUNDARY
15+
00
POPLAR CREEK (827.02)
EL=821.00
SECTION (APPROX.)
JOB NO.
1127.024
PROJECT MGR.
EXISTING CREEK BANK
JJG
1
% TO P
OP
L
AR C
R
E
E
K
FLOOD PLAIN COMPENSATORY STORAGE GRADING PLAN
9
82
N
®
0 FEET
40
ASSOCIATES
80
SECTION A-A
NO SCALE
SHEET
9
S:\MAD\1100--1199\1127\024\Drawings\CAD\Micros\PLAN\22_Compensatory Storage Grading Plan.dgn
user: dimitriosh
8/7/2018
1:49:20 PM