Mountrail County is seeking authorization for its Route 9 Reconstruction Project. The 13.5-mile project begins approximately 12 miles west of Ross on US 2 and south to ND Hwy 1804. Jurisdictional waters are located in Sections 19 and 20, Township 156 North, Range 94 West, Mountrail County, North Dakota. Construction would result in 0.99-acre of permanent and 0.22-acre of temporary impact. The County proposes to purchase mitigation credits from the Ducks Unlimited In-Lieu-Fee Program. [Latitude 48.330418 degrees North; Longitude -102.80841 degrees West]
Mountrail County is seeking authorization for its Route 9 Reconstruction Project. The 13.5-mile project begins approximately 12 miles west of Ross on US 2 and south to ND Hwy 1804. Jurisdictional waters are located in Sections 19 and 20, Township 156 North, Range 94 West, Mountrail County, North Dakota. Construction would result in 0.99-acre of permanent and 0.22-acre of temporary impact. The County proposes to purchase mitigation credits from the Ducks Unlimited In-Lieu-Fee Program. [Latitude 48.330418 degrees North; Longitude -102.80841 degrees West]
Public Notice
Subject: Public Notice of Permit Application
Action ID:
NWO-2013-01203-BIS
Comments Period: October 10, 2018 October 30, 2018
SUBJECT: The U.S. Army Corps of Engineers, Omaha District, (Corps) is evaluating a permit
application for a roadway improvement project along 13.5 miles of Mountrail County Route 9
from Sta. 2003+14 to Sta. 2487+91, which would result in approximately 0.99 acres of
permanent impacts and approximately 0.22 acres of temporary impacts to wetlands being
regulated as waters of the United States. This notice is to inform interested parties of the
proposed activity and to solicit comments. This notice may also be viewed at the Corps web
site at
http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/NorthDakota/PublicNotices.aspx
AUTHORITY: This application is being evaluated under Section 404 of the Clean Water Act
(CWA) for the discharge of dredged or fill material in waters of the United States.
APPLICANT:
Mountrail County
Attn: Ms. Jana Hennessy
8103 61st Street NW
Stanley, North Dakota 58784
LOCATION: The approximately 13.5 mile long project site is located along Mountrail County
Route 9 in Sections 5, 6, 7, 17, 18, 19, 20, 19, and 30, Township 155 North, Range 94 West,
Sections 18, 19, 20, 29, and 30, Township 155 North, Range 94 West, Latitude 48.330418°,
Longitude -102.80841°, Mountrail County, North Dakota. The discharge site being regulated
under Section 404 of the CWA is located in Sections 19 and 20, Township 156 North, Range
94 West, in Mountrail County, North Dakota.
PROJECT DESCRIPTION: The applicant is proposing to reconstruct a portion of Mountrail
County Route 9 through grading, paving, drainage improvements, roadway realignment,
vertical curve reduction, culvert replacements, and the relocation of utilities. Based on the
available information, the overall project purpose is to reconstruct Mountrail County Route 9 to
provide a roadway that meets current and future design standards. The applicant believes
there is a need to improve roadway conditions as County Route 9 has been subjected to
substantial increases in truck traffic over the past three years. As a result of the overweight
loads and general stress caused by this type of traffic, the road has become severely
deteriorated. The attached drawings provide additional project details.
ADDITIONAL INFORMATION:
U.S. ARMY CORPS OF ENGINEERS Omaha District
North Dakota Regulatory Office, 3319 University Drive, Bismarck, North Dakota 58504
http://www.nwo.usace.army.mil/Missions/Regulatory-Program/North-Dakota/
CENWO-ODR-ND
Page 2
Action ID: NWO-2013-01203-BIS
Environmental Setting. There are approximately 7.50 acres of Palustrine Emergent
wetlands within the project area. The site is located in a rural setting which has been recently
subjected to oil development within western North Dakota. The Palustrine Emergent wetland is
a linear, prairie stream that connects with the White Earth River which is a tributary to Lake
Sakakawea. The discharge site is adjacent to fields which are regularly planted to crops.
Alternatives. The applicant has not provided information concerning project alternatives at
this time. Additional information concerning project alternatives may be available from the
applicant or their agent. Other alternatives may develop during the review process for this
permit application. All reasonable project alternatives, in particular those which may be less
damaging to the aquatic environment, will be considered.
Mitigation. The Corps requires that applicants consider and use all reasonable and
practical measures to avoid and minimize impacts to aquatic resources. If the applicant is
unable to avoid or minimize all impacts, the Corps may require compensatory mitigation. The
applicant has proposed to potentially purchase mitigation credits through Ducks Unlimited in
order to mitigate for permanent loss to regulated waters of the United States.
OTHER GOVERNMENTAL AUTHORIZATIONS: Water quality certification or a waiver, as
required under Section 401 of the Clean Water Act from the North Dakota Department of
Health (NDDoH) is required for this project. The applicant has not indicated they have applied
for certification.
HISTORIC PROPERTIES: Based on the available information included in the Class III
Cultural Resource Report, cultural resources were identified within the Corps determined area
of potential effect. The Corps will initiate consultation with the State Historic Preservation
Officer under Section 106 of the National Historic Preservation Act, as appropriate.
ENDANGERED SPECIES: The proposed activity may affect Federally-listed endangered or
threatened species or their critical habitat. The Corps will initiate consultation with the U.S.
Fish and Wildlife Service, pursuant to Section 7 of the Endangered Species Act, as
appropriate.
ESSENTIAL FISH HABITAT: The proposed project would not adversely affect Essential Fish
Habitat (EFH) as defined in the Magnuson-Stevens Fishery Conservation and Management
Act. The Corps will initiate consultation with the National Marine Fisheries Service, pursuant to
Magnuson-Stevens Fishery Conservation and Management Act, as appropriate.
The above determinations are based on information provided by the applicant and our
preliminary review.
EVALUATION FACTORS: The decision whether to issue a permit will be based on an
evaluation of the probable impacts, including cumulative impacts, of the described activity on
the public interest. That decision will reflect the national concern for both protection and
utilization of important resources. The benefit, which reasonably may be expected to accrue
from the described activity, must be balanced against its reasonably foreseeable detriments.
All factors which may be relevant to the described activity will be considered, including the
U.S. ARMY CORPS OF ENGINEERS Omaha District
North Dakota Regulatory Office, 3319 University Drive, Bismarck, North Dakota 58504
http://www.nwo.usace.army.mil/Missions/Regulatory-Program/North-Dakota/
CENWO-ODR-ND
Page 3
Action ID: NWO-2013-01203-BIS
cumulative effects thereof; among those are conservation, economics, aesthetics, general
environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards,
floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water
supply and conservation, water quality, energy needs, safety, food and fiber production,
mineral needs, consideration of property ownership and, in general, the needs and welfare of
the people. The activity's impact on the public interest will include application of the Section
404(b)(1) guidelines promulgated by the Administrator, Environmental Protection Agency (40
CFR Part 230).
The Corps is soliciting comments from the public, Federal, State, and local agencies and
officials, Indian tribes, and other interested parties in order to consider and evaluate the
impacts of this proposed activity. Any comments received will be considered by the Corps to
determine whether to issue, modify, condition, or deny a permit for this proposal. To make this
decision, comments are used to assess impacts on endangered species, historic properties,
water quality, general environmental effects, and other public interest factors listed above.
Comments are used in the preparation of an Environmental Assessment and/or an
Environmental Impact Statement pursuant to the National Environmental Policy Act.
Comments are also used to determine the need for a public hearing and to determine the
overall public interest of the proposed activity.
SUBMITTING COMMENTS: Written comments, referencing Public Notice NWO-2013-01203BIS must be submitted to the office listed below on or before October 30, 2018.
US Army Corps of Engineers, Omaha District
North Dakota Regulatory Office
Attn: Swade Hammond, Project Manager
3319 University Drive
Bismarck, North Dakota 58504
Email: Swade.D.Hammond@usace.army.mil
The Corps is particularly interested in receiving comments related to the proposal's probable
impacts on the affected aquatic environment and the secondary and cumulative effects.
Anyone may request, in writing, that a public hearing be held to consider this application.
Requests shall specifically state, with particularity, the reason(s) for holding a public hearing. If
the Corps determines that the information received in response to this notice is inadequate for
thorough evaluation, a public hearing may be warranted. If a public hearing is warranted,
interested parties will be notified of the time, date, and location. Please note that all comment
letters received are subject to release to the public through the Freedom of Information Act. If
you have questions or need additional information please contact the applicant or the Corps'
project manager Swade Hammond, (701) 255-0015 X 2012,
Swade.D.Hammond@usace.army.mil.
Attachments: ENG4345 Application form and Attachment E project drawings
U.S. ARMY CORPS OF ENGINEERS Omaha District
North Dakota Regulatory Office, 3319 University Drive, Bismarck, North Dakota 58504
http://www.nwo.usace.army.mil/Missions/Regulatory-Program/North-Dakota/
U.S. Army Corps of Engineers (USACE)
Form Approved
0710·0003
Expires: 01·08-2018
·
OMS No.
APPLICATION FOR DEPARTMENT OF THE ARMY PERMIT
33 CFR 325. The proponent agency is CECW-CO·R.
The public reporting burden for this collection of information, OMB Control Number 0710·0003, is estimated to average 11 hours per response, including the time
for reviewing instructions, searching eKlstlng data sources, gathering and maintaining the data needed, and completing and reviewing lhe collection of
information. Send comments regarding the burden estimate or burden reduction suggestions to the Department of Defense, Washington Headquarters Services,
at
w.hsJ1alex,es<1mbx,dJl:9.Qbe subject to any penalty for failing to comply with a collection of Information if It does not display a currenUy valid OMB control number. PLEASE DO NOT
RETURN YOUR APPLICATION TO THE ABOVE EMAIL.
PRIVACY ACT STATEMENT
Authorities: Rivers and Harbors Act, Section 10, 33 USC 403; Clean Water Act, Section 404, 3 3 USC 1344; Marine Protection, Research, and
Sanctuaries Act,
Section 103, 33 USC 1413; Regulatory Programs of the Corps of Engineers; Final Rule 33 CFR 320-332. Principal Purpose: Information provided on this form
will be used in evaluating the application for
a permit.
Routine Uses: This lnformaUon may be shared with the Department of Justice and other federal, state, and
local govemment agencies, and the public and may be made available as part of a public noUce as required by Federal law. Submission of requested information
Is voluntary, however, if Information Is not provided the permit application cannot be evaluated nor can a permit be Issued. One set of original drawings or good
reproducible copies which show the location and character of the proposed activity must be attached to this application (see sample drawings and/or instructions)
and
be submitted
and may be accessed at the following website:
llllltlldP.Cld.d.el!lns.lL99Yle.dYacyLS
,
1. APPLICATION NO
JJ'vvO -;).of 3 [J{;}OJ-[)IS
(ITEMS
Last - Hennessy
M ount rai l County
City
7.
-
Stale·
ND
Zlp
APPLICANT'S PHONE NOs. w/AREA CODE
a. Residence
·
-·
AUTHORIZED AGENT'S NAME AND TITLE (agi nt is not required)
Middle-
First Craig
·
Last - Mizera
E-mail Address - craig.mizera@hdrinc.com
9
8103 61st Street NW
Stanley
P LICATION COMPLETE
E
Company· HOR Engineering, Inc.
APPLICANT'S ADDRESS:
Address-
)B THE CORPS)
(ITEMS BELOW TO BE Fil EDS
Middle·
115/a IH5b-ceasox
..)
E-mail Address· janah@co.mountrail.nd.us
6.
_
2. FIELD OFFICE CODE
8
First· Jana
= [ "';i'l\
I
1 THRU 4 TO BE Fl
5. APPLICANT'S NAME
Company·
-c;tpplicalicm.lbati&00l4mr' led In full will be returned.
n
a
e
eted (SORN #A1145b)
to the District Engineer having jurisdiction over the locaUon of the
System of Record Notice (SORN). The information received is entered Into our pe1
-
58784
Country - USA
City
-
4503 Coleman Street, Suite 105
Stale·
Bismarck
ND
Zip·
58503
Country· USA
10. AGENTS PHONE NOs w/AREA CODE
c.
b. Business
AGENT'S ADDRESS:
Address-
Fax
b. Business
a. Residence
701-628-2390
c.
Fax
701-557-9602
STATEMENT OF AUTHORIZATION
11. I hereby authorize,
HDR Engineering, Inc
to act in my behalf as my agent in the processing of this application and to furnish, upon request,
supplemental information in support of this permit application.
cHtb.h)AJ p ! - V
jr
f
?-11/-18
SIGNATURE OF APPLICANT
DATE
NAME, LOCATION, AND DESCRIPTION OF PROJECT OR ACTIVITY
12. PROJECT NAME
OR TITLE (see instructions)
Mountrail County Route 9 Reconstruction
14. PROJECT STREET ADDRESS (If appllcable)
13. NAME OF WATERBODY, IF KNOWN (if applicable)
15. LOCATION OF PROJECT
Latitude; ·N see
attached sheet
State-
City -
Longitude: 0W
Zip·
16. OTHER LOCATION DESCRIPTIONS, IF KNOWN (see instructions)
-
Municipality
State Tax Parcel ID
Section
see attached sheet
ENG FORM 4345, MAY
Township·
2018
Range·
PREVIOUS EDITIONS ARE
OBSOLETE.
Page 3 of1
17.
DIRECTIONS TO THE SITE
From Ross, ND continue west on US2 approximately 12 miles until County Route 9 (lOlst Ave NW). Turn south approximately 1.5 miles
and the wetland is located on both sides of the road. The wetland will be approximately 0.5 miles south of 102nd Avenue NW.
18.
Nature of Activity (Description of project, Include all features)
The project includes reconstruction of Mountrail County Route 9 from US Highway 2 to State Highway 1804. The project length is 13.5
miles. This would include:
·
Grading, paving, and drainage improvements to meet NDDOT and AASHTO design standards.
·
Straightening the roadway alignment in one area to remove a curve and have the road follow the section line.
·Reduce vertical curves along the roadway.
·Ten existing centerline culverts would be replaced to meet NDDOT criteria.
·
Existing utilities within the roadway right-of-way would be relocated as necessary to accommodate roadway improvements.
·One jurisdictional wetland would be impacted due to placement of fill to accommodate roadway improvements.
19. Project Purpose (Describe the reason or purpose of the project, see instructions)
The purpose of the project is to provide a roadway that meets current and forecasted design standards. The total project length is
approximately 13.5 miles from US Hwy 2 south to State Hwy 1804.
County Route 9 has been subjected to substantial increases in truck traffic over the past three years. As a result of the overweight loads and
general stress caused by this type of traffic, the road has become severely deteriorated. Mountrail County and its citizens have expressed the
need for reconstruction of the roadway to maintain safe access in the area.
USE BLOCKS 20-23
IF DREDGED AND/OR FILL MATERIAL IS TO BE DISCHARGED
20. Reason( s) for Discharge
See attached sheet.
21. Type(s) of Material Being Discharged and the Amount of Each Type In Cubic Yards:
Type
Amount in Cubic Yards
Type
Amount in Cubic Yards
Type
Amount in Cubic Yards
see attached sheet
22. Surface Area In Acres of Wetlands or Other Waters Fiiied (see instructions)
Acres
see attached sheet
or
Linear Feet
23. Description of Avoidance, Minimization, and Compensation (see instructions)
See attached sheet.
ENG FORM 4345, MAY 2018
Page 3 of 2
0 Yes No
24.
Is Any Portlon of the Work Already Complete?
25.
Addresses of Adjoining Property Owners, Lessees, Etc., Whose Property Adjoins the Waterbody ( moro lllan can be entered hero, please onacll a supplemental 1111)
a. Address- Edith Ann and
City·
IF YES, DESCRIBE THE COMPLETED WORK
Daniel Joyce
PO Box 582, Tioga
State· ND
Zip.
State·
Zip-
State·
Zip·
State-
Zip·
State·
Zip·
58852
b. Address-
City-
c. Address-
City-
d. Address-
City·
e. Address-
City·
26.
List of Other Certificates or Approvals/Denials received from other Federal, State, or Local Agencies for Work Described In This Application.
AGENCY
IDENTIFICATION
NUMBER
TYPE APPROVAL*
·Would include but is not restricted to zoning, building, and
DATE APPLIED
DATE APPROVED
DATE DENIED
Hood plain permlls
27.
Application Is hereby made for penmlt o r permits to authorize the work described in this application. I certify that this information In this application is
complete and accurate. I further certify that I possess the authority to undertake the work described herein or am acUng es the duly authorized agent of the
applicant.
9-/Jt--/g
DATE
9/14/2018
SIGNATURE OF AGENT
DATE
he Application must be signed by the person who desires to undertake the proposed activity (applicant) or it may be signed by a duly
authorized agent If the statement In block
18 U.S.C. Section
1001
11
has been filled out and signed.
provides that: Whoever, in any manner within the jurisdiction of any department or agency of the United States
knowingly and willfully falsifies, conceals, or covers up any trick, scheme, or disguises a material fact or makes any false, fictitious or fraudulent
statements or representations or makes or uses any false writing or document knowing same to contain any false, fictitious or fraudulent
statements or entry, shall be fined not more than
ENG FORM 4345, MAY 2018
$10,000 or imprisoned not more than flve years or both.
Page3 of 3
Attachment E
Section 75 Sheets for Areas Containing JD Wetlands
...,
STATE
PROJECT NO.
ND
09(04)13
ON l S
SE
75
I
10
:?
"'
_2_5..1:2_Q._O_E-G_kL,ASS II
S.C30
T-156-N
R-94-W
Sta
2360+00 to 2400+00
7.3SACRE
Total=
7.38ACRE
_1§1:7.QQ!l__I_EMPORARY COVER CROP
Sla
2360+00 to 2400...0 0
7.38ACRE
Total
7.38ACRE
253-101 STRAW MULC
Sta
2360TOO 10 2400·00
.---1lliEJiE_
Tota!=
14.76ACRE
,]\.Jl'N!I:
·:;J;l!jf',l'\!Lo
''·
Sec 19
T-156-N
R-94-W
D
L2_J
-
Delineated WeUand
Permanent WeUand Impact
Temporary
WcUand Impact
Fibor Rolls
Seeding
Class II
ECB Type 3
This document
Flow Arrow
is prelimina,.y,,
RJWLlne
and not for
Temporary Easement Une
Section Line
Rlprap
cons.tuction or
·implementation
purposes.
Sec20
T-156-N
R-94-W
Wetland Impacts and Erosion Control
County Route 9
Mountrail County
Sta. 2360+00 to 2400+00
911412018
2:10:43P\1
CM!ZERA