Proposed Discharge of Fill for Heraeus Metals Expansion Project, Wartburg, Morgan County, Tennessee
Public Notice No. 18-24
Nashville District
Application No. LRN-2004-00247
Date: October 9 2018; Expires: November 8, 2018
Please address all comments to:
Nashville District Corps of Engineers
Eastern Regulatory Field Office (Attn: Ken M. Jones)
501 Adesa Pkwy, Suite 250, Lenoir City, TN 37771
SUBJECT: Proposed Discharge of Fill for Heraeus Metals Expansion Project, Wartburg,
Morgan County, Tennessee
TO ALL CONCERNED: The work described below has been submitted for a Department of the Army Permit (DA) pursuant to Section 404 of the Clean Water Act (CWA). Before a permit can be issued, certification must be provided by the Tennessee Department of Environment and Conservation (TDEC)
Division of Water Resources pursuant to Section 401(1) (1) of the CWA, that applicable state water quality standards will not be violated by the work.
APPLICANT: Morgan County Economic Development Board
Attn: Mr. Timothy Johnson
P.O. Box 979
Wartburg, TN 37887
LOCATION: The proposed project is located between 1975 Old Knoxville Highway in Wartburg, Tennessee. The proposed impacts occur in Flat Fork Watershed, Emory River Mile 24.2R, Morgan County, Tennessee. The project is located within the Crooked Fork Watershed HUC-12 060102080403.
The project site can be found on the Camp Austin, Tennessee 7.5 Minute quadrangle map. See Attachment 1.
DESCRIPTION: The applicant proposes to expand the existing Heraeus Metals facility in Wartburg, Tennessee. This project includes filling 2.28 acres of wetlands and encapsulating 992 linear feet of stream channel, and implementing an on-site permittee-responsible mitigation plan which increases stream channels and replaces impacted wetlands. The proposed project involves stream and wetland impacts as detailed in Attachment 1.
Project plans of the proposed project are provided in this notice (Attachment 2). If you wish to view additional plans, please contact this office or visit our web site at: http://www.lrn.usace.army.mil/Media/PublicNotices.aspx
AVOIDANCE AND MINIMIZATION OF IMPACTS TO WATERS OF THE U.S.: Based
on information submitted, impacts to waters of the U.S. (WOUS) will be minimized as multiple 1
building layouts have been considered, and the current building footprint and access road are configured to maximize work in the dry portions of the site and reduce work in wet areas.
Additionally, multiple revisions of the grading plans for the proposed site have been made to
reduce the disturbance and impacts to surrounding wetlands.
COMPENSATORY MITIGATION: The applicant has proposed to mitigate for impacts to 992 linear feet of stream channel and 2.28 acres of wetland fill with restoration of 1,562 linear feet within an onsite existing impoundment and the onsite creation of 4.58 acres of wetland.
PUBLIC INTEREST REVIEW/CUMULATIVE EFFECTS: The decision whether to issue a permit will be based on an evaluation of the probable impacts including cumulative impacts of the activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the work must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the work will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shore erosion and accretion,
recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership, and, in general, the needs and welfare of the people. In addition, the evaluation of
the impact of the activity on the public interest will include application of the guidelines promulgated by the Administrator, Environmental Protection Agency, under authority of Section 404(b)(1) of the CWA(40 CFR Part 230).
SOLICITATION OF COMMENTS: The USACE is soliciting comments from the public; federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by USACE to determine whether to issue, modify, condition, or deny a permit for
this proposal. To make this decision, comments are used to assess impacts on endangered species,
historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. An Environmental Assessment will be prepared prior to a final decision concerning issuance or denial of the requested DA permit.
HISTORIC AND CULTURAL RESOURCES: A search of the National Register returned no findings of historic properties currently listed on the National Register of Historic Places within the project area. A Phase I cultural/archaeological survey has not been conducted for the site. The Corps invites responses to this public notice from American Indian Tribes or tribal governments; Federal, State, and local agencies; historical and archeological societies; and other parties likely to have knowledge of or concerns regarding historic properties and cultural significance at or near the project area. Upon submittal of the final design plans, USACE would evaluate the design plans along with any substantive comments from this public notice to determine the potential of impacts to
historic and cultural resources for Section 106 compliance. If the Corps determines that consultation is required, the Corps would consult with the Tennessee Historic Commission
(SHPO) and American Indian Tribes in accordance with Section 106 of the National Historic Preservation Act, as appropriate.
ENDANGERED/THREATENEND SPECIES REVIEW (Per Section 7 of the Endangered Species Act): Based on information provided by the consultant, and a review of the United States Fish and Wildlife Service (USFWS) website, http://ecos.fws.gov/ecos/indexPublic.do, and the Natural Heritage Program website,
http://environment- online.state.tn.us:8080/pls/enf_reports/f?p=9014:3::::::, the following federally-listed species are known to or believed to occur in project area.
Species Nomenclature
Federal Status
Clams
Finerayed pigtoe (Fusconaia cuneolus)
Endangered
Cumberland Bean (pearlymussel) (Villosa Trabalis)
Endangered
Alabama Lampmussel (Lampsilis virescens)
Endangered
Purple Bean (Villosa perpurpurea)
Endangered
Turgid Blossom (pearlymussel) (Epioblasma turgidula)
Endangered
Fishes
Spotfin Chub (Erimonax monachus)
Threatened
Flowering Plants
Virginia spiraea (Spiraea virginiana)
Threatened
Cumberland Rosemary (Conradina verticillata)
Threatened
Cumberland Sandwort (Arenaria cumberlandensis)
Endangered
Mammals
Indiana bat (Myotis sodalis)
Endangered
Gray bat (Myotis grisescens)
Endangered
Northern Long-Eared Bat (Myotis septentrionalis)
Threatened
A copy of the notice is being furnished to the United States Fish and Wildlife Service (USFWS) for their review. This public notice serves as coordination with the USFWS pursuant to Section 7(c) of the Endangered Species Act of 1972 (as amended). Per this notification, we request comments from the USFWS concerning potential impacts to threatened and/or endangered species. After receipt of comments, the USACE will evaluate the potential effects on proposed and/or listed species and their designated critical habitat and initiate consultation with USFWS, if required
OTHER APPROVALS: In addition to the DA permit, other federal, state, and/or local approvals may be required for the proposed work, including:
a. Water Quality Certification from TDEC is required pursuant Section 401 (a)(1) of the Clean Water Act.
PUBLIC HEARING REQUESTS: Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application.
Requests for public hearings shall state, with particularity, the reasons for holding a public hearing.
COMMENT PERIOD: Written statements received in this office on or before November 8, 2018, will become a part of the record and will be considered in the determination. Any response to this notice should reference LRN-2004-00247 and be directed to the Regulatory Branch, Attention: Ken M. Jones, at the above address or email at ken.m.jones@usace.army.mil.
Sincerely,
Casey Ehorn Chief,
East Branch
Regulatory Division
U.S. Army Corpsof Engineers
PN LRN-18-24: Attachment 1
File: LRN-2004-00247
Heraeus Metals Expansion
Site Maps
Sheet 1 of 2
PN LRN-18-24:
Attachment 1 File:
LRN-2004-00247 Heraeus
Metals Expansion Site
Maps
Sheet 2 of 2
PN LRN-18-24: Attachment 2
File: LRN-2004-00247
Heraeus Metals Expansion
Site Maps
Sheet 1 of 5
PN LRN-18-24: Attachment 2
File: LRN-2004-00247
Heraeus Metals Expansion Site Maps
Sheet 2 of 5
PN LRN-18-24: Attachment 2
File: LRN-2004-00247
Heraeus Metals Expansion
Site Maps
Sheet 3 of 5
PN LRN-18-24: Attachment 2
File: LRN-2004-00247
Heraeus Metals Expansion
Site Maps
Sheet 4 of 5
PN LRN-18-24: Attachment 2
File: LRN-2004-00247
Heraeus Metals Expansion
Site Maps
Sheet 5 of 5