Proposed discharge of Fill for construction of V-Weir and water wheel at Tellico River Mile 21.3, Monroe County, Tennessee.
Public Notice No. 18-42
Nashville District
Application No. LRN-2018-00542
Date: October 10, 2018; Expires: November 9, 2018
Please address all comments to:
Nashville District Corps of Engineers
Regulatory Branch, Attn: Ken M Jones
501 Adesa Parkway, Suite 250, Lenoir City, Tennessee 37771
ken.m.jones@usace.army.mil
SUBJECT: Proposed discharge of Fill for construction of V-Weir and water wheel at Tellico River Mile 21.3, Monroe County, Tennessee.
TO ALL CONCERNED: The application described below has been submitted for a Department of the Army (DA) Permit pursuant to Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. §403) and Section 404 of the Clean Water Act (CWA) (33 U.S.C. §1344).
Before a permit can be issued, certification must be provided by the Tennessee Department of Environment and Conservation (TDEC) Division of Water Resources pursuant to Section 401(1)
(1) of the CWA, that applicable state water quality standards will not be violated by the work.
APPLICANT: Tellico Christian Community
Attn: Mr. Marcus Martin
163 Horseshoe Lane
Tellico Plains, Tennessee 37385
LOCATION: The proposed project is located within the Tellico River at Mile 21.3, Monroe County, Tennessee. Coordinates for the proposed project site are Latitude N35.42828°, W84.26517°. The proposed project site can also be found on the MOUNT VERNON, TN, 7.5 Minute quadrangle map and lies
within the Middle Tellico River HUC 12 (060102040307) 12 Digit Hydrological Unit Code (HUC). (Attachment 1)
DESCRIPTION OF PROPOSED WORK: The applicant proposes to install a rock v-weir in the Tellico River in coordination with the United States Department of Agriculture Natural Resources Conservation Service to provide water for agricultural use at the Tellico Christian Community farms. The v-weir will provide enough hydraulic head to power a bottom driven water wheel that will pump water to upland storage containers. The water wheel will be installed at the left (downstream) bank to pump water at a maximum withdrawal rate of approximately 30 gallons per minute. Pumping will occur from May to October.
Project plans of the proposed project are provided in this notice (Attachment 2). If you wish to view additional plans, please contact this office or visit our web site at: http://www.lrn.usace.army.mil/Media/PublicNotices.aspx
AVOIDANCE AND MINIMIZATION OF IMPACTS TO WATERS OF THE U.S.: Based
on information provided in the project application, no trees would be cut during construction and all work has been designed to minimize impacts to environmental resources. To minimize impacts to waters of the U.S., all proposed fill activities will be conducted in the low flow periods of the Tellico River. The v-weir will be constructed with a low, flush to the bottom center to minimize
impacts to flow and aquatic life passage, and is designed to not create a barrier to boat or canoe usage of the river.
COMPENSATORY MITIGATION: The applicant does not propose any compensatory mitigation. According to the applicant, impacts to the aquatic environment would be minimal and no aquatic vegetation or littoral wetlands are evident or anticipated in the project area.
PUBLIC INTEREST REVIEW/CUMULATIVE EFFECTS: The DA permit decision will be based on an evaluation of the probable impacts including cumulative impacts of the activity on the public interest. The DA permit decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the work, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the work will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shore erosion and accretion,
recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership, and, in general, the needs and welfare of the people.
SOLICITATION OF COMMENTS: The U.S. Army Corps of Engineers (Corps) is soliciting comments from the public, federal, state, and local agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate the impacts of this proposed activity.
Any comments received will be considered by the Corps to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment (EA) and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. An EA will be prepared prior to a final decision concerning issuance or denial of the requested DA Permit.
HISTORIC AND CULTURAL RESOURCES: A search of the National Register returned no findings of historic properties currently listed on the National Register of Historic Places within the project area. A Phase I cultural/archaeological survey has not been conducted for the site. The Corps invites responses to this public notice from American Indian Tribes or tribal governments; Federal, State, and local agencies; historical and archeological societies; and other parties likely to have knowledge of or concerns regarding historic properties and cultural significance at or near the project area. Upon submittal of the final design plans, USACE would evaluate the design plans along with any substantive comments from this public notice to determine the potential of impacts to
historic and cultural resources for Section 106 compliance. If the Corps determines that consultation is required, the Corps would consult with the Tennessee Historic Commission (SHPO) and American Indian Tribes in accordance with Section 106 of the National Historic Preservation Act, as appropriate.
ENDANGERED/THREATENEND SPECIES REVIEW (Per Section 7 of the Endangered Species Act): Based on information provided by the consultant, and a review of the United States Fish and Wildlife Service (USFWS) website, http://ecos.fws.gov/ecos/indexPublic.do, and the Natural Heritage Program website,
http://environment- online.state.tn.us:8080/pls/enf_reports/f?p=9014:3::::::, the following federally-listed species are known to or believed to occur in project area.
Species Nomenclature
Federal Status
Clams
Appalachian Monkeyface (pearlymussel) (Quadrula sparsa)
Experimental
Cracking Pearlymussel (Hemistena lata)
Experimental
Finerayed pigtoe (Fusconaia cuneolus)
Endangered
Cumberlandian Combshell (Epioblasma brevidens)
Experimental
Cumberland Bean (pearlymussel) (Villosa Trabalis)
Endangered
Dromedary Pearlymussel (Dromus dromas)
Experimental
Fanshell (Cyprogenia stegaria)
Experimental
Orangefoot Pimpleback (pearlymussel) (Plethobasus cooperianus)
Experimental
Oyster Mussel (Epioblasma capsaeformis)
Experimental
Ring Pink (mussel) (Obovaria retusa)
Experimental
Rough Pigtoe (Pleurobema plenum)
Experimental
Shiny Pigtoe (Fusconaia cor)
Experimental
White Wartyback (pearlymussel) (Plethobasus cicatricosus)
Experimental
Fishes
Duskytail Darter (Etheostoma percnurum)
Pygmy Madtom (Noturus stanauli)
Spotfin Chub (Erimonax monachus)
Threatened
Flowering Plants
White Fringeless (Orchid Platanthera integrilabia)
Threatened
Snails
Anthony's (Riversnail Athearnia anthonyi)
Endangered
Mammals
Carolina Northern Flying Squirrel (Glaucomys sabrinus coloratus)
Endangered
Indiana bat (Myotis sodalis)
Endangered
Gray bat (Myotis grisescens)
Endangered
Northern Long-Eared Bat (Myotis septentrionalis)
Threatened
OTHER APPROVALS: Water Quality Certification from the State of Tennessee is required for the proposed fill below ordinary high water in accordance with Section 401(a)(1) of the
Clean Water Act. In addition to the DA, TVA, and TDEC permits, other federal, state, and/or local approvals may be required for the proposed work.
PUBLIC HEARING REQUESTS: Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, the reasons for holding a hearing.
CLOSE OF COMMENT PERIOD: Written statements received by November 9, 2018 will become a part of the record and considered in the evaluation of the permit application. Any response should be directed to the Regulatory Branch, Attention: Mr. Ken M. Jones, at the above address or at
ken.m.jones@usace.army.mil.
If you received this notice by mail and wish to view all of the diagrams, visit our web site at: http://www.lrn.usace.army.mil/Media/PublicNotices.aspx, or contact Ken M. Jones at the above address or phone number.
Casey Ehorn Chief,
East Branch
Regulatory Division
U.S. Army Corps of Engineers
PN 18-42: Attachment 1
File: LRN-2018-00542
Tellico Christian Community
Site Maps
Sheet 1 of 2
PN 18-42: Attachment 1
File: LRN-2018-00542
Tellico Christian Community
Site Maps
Sheet 2 of 2
Amish Tellico Christian Community
Monroe
PN 18-42: Attachment 2
File: LRN-2018-00542
Tellico Christian Community
Drawings
Sheet 1 of 4
PN 18-42: Attachment 2
File: LRN-2018-00542
Tellico Christian Community
Drawings
Sheet 2 of 4
PN 18-42: Attachment 2
File: LRN-2018-00542
Tellico Christian Community
Drawings
Sheet 3 of 4
PN 18-42: Attachment 2
File: LRN-2018-00542
Tellico Christian Community
Drawings
Sheet 4 of 4