The applicant proposes to modify the permit for the extension of time and consolidate previously authorized permits.
Full Public Notice Proposed Project Plans Attachment A
PROJECT DESCRIPTION: The applicant proposes to modify the permit for the extension of time and consolidate previously authorized permits; and to conduct new work associated with a new dredging cut and a new marine ship dock (Dock 4). Refer to previously authorized permitting in Attachment A, in 4 sheets, for a Regulatory Permit History Table. Specifically, the applicant also proposes the following new work:
• To remove an existing concrete boat ramp and install a new boat launch constructed of dual steel rails and an adjacent walkway at a location approximately 2,850 feet upstream from its current location;
• To install 950 linear feet of bulkhead at or above the ordinary high watermark; To permanently discharge of 1,827.21 cubic yards of fill material into 3 wetlands, totaling 1.10 acres, and temporarily discharge fill material into 0.11 acre of wetlands during the construction of a new 120-foot by 70-foot marine Ship Dock (Dock 4), 4 breasting dolphins, 4 mooring dolphins, protection piles, utilities, supply infrastructure, equipment area, laydown areas, and pipe racks;
• To dredge to -42 mean lower low water plus 2 foot overdraft by removing 155,000 cubic yards from a new area for Ship Dock 4 area (8.7 acre);
•To perform maintenance dredging by hydraulic or mechanical means, within an 8.7-acre area for new Ship Dock 4, for an additional 10 years and remove approximately 50,000 cubic yards per event (about every two years); and
• To utilize dredge material placement areas 13, 14, 17, 18, 21, 22, 23 (preferred), 24, and/or 25 for the effluent discharge of return water.