PROPOSED CONSTRUCTION OF A METHANOL PRODUCTION FACILITY IN ST. JAMES PARISH
NAME OF APPLICANT: South Louisiana Methanol LP, c/o PPM Consultants, Inc., Attn: Tim Powers, 7936 Office Park Boulevard, Suite A, Baton Rouge, Louisiana 70809.
LOCATION OF WORK: On the Mississippi River, RDB, mile 161.5, approximately 0.7 mile south of Romeville, Louisiana, in St. James, Louisiana, in St James Parish, within the Barataria Basin, East-Central Louisiana Coastal, in hydrologic unit (HUC 08090301), as shown on the attached drawings.
CHARACTER OF WORK: The applicant has requested Department of the Army authorization to clear, grade, excavate, and place fill and aggregate material to construct and maintain a methanol production facility and marine terminal which will include the construction of a barge dock, heavy haul Mississippi River levee and LA Hwy 18 crossing/ramp, barge mooring structures, an effluent discharge line, removal of an existing dock, and dredging. Additionally, the complex will include access roads, administrative buildings, heavy haul roads, two natural gas pipelines, an overhead Entergy power line, underground utilities, and a raised pipe rack crossing LA Hwy 18 and the Mississippi River levee. The proposed project is situated on an approximately 1,273-acre site that has been determined to contain jurisdictional forested and herbaceous wetlands and other waters of the U.S. Approximately 1,114,054.00 cubic yards material will be excavated and placed back on site, and approximately 666,073.00 cubic yards of gravel, concrete, rock, and earthen fill material will be hauled in and used as fill for the project.
A Preliminary analysis has determined that there are no wetlands on the protected side of the levee within the project area but there are some other waters of the U.S. that will not be impacted. The proposed project would directly impact approximately 0.33 acre of jurisdictional herbaceous batture wetlands and approximately 0.12 acre of jurisdictional forested batture wetlands. Additionally, approximately 0.39 acre of jurisdictional herbaceous batture wetlands will be temporarily impacted by board mats during construction. Approximately 6 acres of Mississippi River waters bottoms will be temporarily impacted by dredging for barge access to the facility. Approximately one acre of the Mississippi River will be impacted by the new dock structure. It is anticipated that the proposed project would have no impact on adjacent wetlands.
JOINT PUBLIC NOTICE
October 22, 2018
United States Army Corps of Engineers
New Orleans District
Regulatory Branch
7400 Leake Avenue
New Orleans, Louisiana 70118
State of Louisiana
Department of Environmental Quality
Office of Environmental Services
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
(504) 862-1301
Project Manager
Neil T. Gauthier
Neil.T.Gauthier@usace.army.mil
MVN 2014-00702-CM
(225) 219-3225
Project Manager
Elizabeth Hill
WQC Application Number
WQC 181017-02
Interested parties are hereby notified that a permit application has been received by the
New Orleans District of the US Army Corps of Engineers pursuant to: [X] Section 10 of
the Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X]
Section 404 of the Clean Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental Quality,
Office of Environmental Services, for a Water Quality Certification (WQC) in accordance
with statutory authority contained in LRS 30:2074 A(3) and provisions of Section 401 of
the Clean Water Act.
PROPOSED CONSTRUCTION OF A METHANOL PRODUCTION FACILITY
IN ST. JAMES PARISH
NAME OF APPLICANT: South Louisiana Methanol LP, c/o PPM Consultants, Inc., Attn:
Tim Powers, 7936 Office Park Boulevard, Suite A, Baton Rouge, Louisiana 70809.
LOCATION OF WORK: On the Mississippi River, RDB, mile 161.5, approximately 0.7 mile
south of Romeville, Louisiana, in St. James, Louisiana, in St James Parish, within the
Barataria Basin, East-Central Louisiana Coastal, in hydrologic unit (HUC 08090301), as
shown on the attached drawings.
CHARACTER OF WORK: The applicant has requested Department of the Army
authorization to clear, grade, excavate, and place fill and aggregate material to construct
and maintain a methanol production facility and marine terminal which will include the
construction of a barge dock, heavy haul Mississippi River levee and LA Hwy 18
crossing/ramp, barge mooring structures, an effluent discharge line, removal of an existing
dock, and dredging. Additionally, the complex will include access roads, administrative
buildings, heavy haul roads, two natural gas pipelines, an overhead Entergy power line,
underground utilities, and a raised pipe rack crossing LA Hwy 18 and the Mississippi River
levee. The proposed project is situated on an approximately 1,273-acre site that has been
determined to contain jurisdictional forested and herbaceous wetlands and other waters of
the U.S. Approximately 1,114,054.00 cubic yards material will be excavated and placed
2
back on site, and approximately 666,073.00 cubic yards of gravel, concrete, rock, and
earthen fill material will be hauled in and used as fill for the project.
A Preliminary analysis has determined that there are no wetlands on the protected side
of the levee within the project area but there are some other waters of the U.S. that will not
be impacted. The proposed project would directly impact approximately 0.33 acre of
jurisdictional herbaceous batture wetlands and approximately 0.12 acre of jurisdictional
forested batture wetlands. Additionally, approximately 0.39 acre of jurisdictional
herbaceous batture wetlands will be temporarily impacted by board mats during
construction. Approximately 6 acres of Mississippi River waters bottoms will be
temporarily impacted by dredging for barge access to the facility. Approximately one acre
of the Mississippi River will be impacted by the new dock structure. It is anticipated that
the proposed project would have no impact on adjacent wetlands.
The applicant stated that the proposed project has been designed to avoid and
minimize direct and secondary adverse impacts to the maximum extent practicable. Any
further reduction would limit usage of the property deeming the project impracticable. As
compensation for unavoidable wetland impacts, the applicant proposes to mitigate in-kind
wetland credits from a Corps approved mitigation bank located in the watershed.
The comment period for the Department of Army will close in 30 days from the date of
this joint public notice. Written comments, including suggestions for modifications or
objections to the proposed work, stating reasons thereof, are being solicited from anyone
having interest in this permit and/or this WQC request and must be mailed so as to be
received before or by the last day of the comment period. Letters concerning the Corps of
Engineers permit application must reference the applicant's name and the Permit
Application Number, and be mailed to the Corps of Engineers at the address above,
ATTENTION: REGULATORY BRANCH. Similar letters concerning the Water Quality
Certification must reference the applicant's name and the WQC application number and
be mailed to the Louisiana Department of Environmental Quality at the address above.
The application for this proposed project is on file with the Louisiana Department of
Environmental Quality and may be examined during weekdays between 8:00 a.m. and
4:30 p.m. Copies may be obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable
impacts, including cumulative impacts of the proposed activity on the public interest. That
decision will reflect the national concern for both protection and utilization of important
resources. The benefit which reasonably may be expected to accrue from the proposal
must be balanced against its reasonably foreseeable detriments. All factors which may be
relevant to the proposal will be considered including the cumulative effects thereof; among
those are conservation, economics, aesthetics, general environmental concerns,
wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land
use, navigation, shoreline erosion and accretion, recreation, water supply and
conservation, water quality, energy needs, safety, food and fiber production, mineral
needs, considerations of property ownership and, in general, the needs and welfare of the
3
people.
The US Army Corps of Engineers is soliciting comments from the public, federal, state,
and local agencies and officials, Indian Tribes, and other interested parties in order to
consider and evaluate the impacts of this proposed activity. Any comments received will
be considered by the US Army Corps of Engineers to determine whether to make, modify,
condition, or deny a permit for this proposal. To make this decision, comments are used
to assess impacts on endangered species, historic properties, water quality, general
environmental effects, and other public interest factors listed above. Comments are used
in the preparation of an Environmental Assessment and/or an Environmental Impact
Statement pursuant to the National Environmental Policy Act. Comments are also used to
determine the need for a public hearing and to determine the overall public interest of the
proposed activity.
The New Orleans District is unaware of properties listed on the National Register of
Historic Places near the proposed work. The possibility exists that the proposed work may
damage or destroy presently unknown archeological, scientific, prehistorical, historical
sites, or data. Copies of this notice are being sent to the State Archeologist and State
Historic Preservation Officer.
Our initial finding is that the proposed work would not affect any species, nor affect any
habitat designated as critical to the survival and recovery of such species, listed as
endangered by the U.S. Department of Commerce.
Our initial finding is that the proposed work would not affect any species, nor affect
any habitat designated as critical to the survival and recovery of such species, listed as
endangered by the U.S. Department of Interior. Utilizing Standard Local Operating
Procedure for Endangered Species in Louisiana (SLOPES), dated October 22, 2014,
between the U.S. Army Corps of Engineers, New Orleans and U.S. Fish and
Wildlife Service, Ecological Services Office, the Corps has determined that this project is
in an area where the pallid sturgeon can be found and this project is Not Likely to
Adversely Affect the species.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal
would result in the destruction or alteration of up to 0 acres of EFH utilized by various life
stages of red drum and penaeid shrimp. Our initial determination is that the proposed
action would not have a substantial adverse impact on EFH or federally managed fisheries
in the Gulf of Mexico. Our final determination relative to project impacts and the need for
mitigation measures is subject to review by and coordination with the National Marine
Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters,
the evaluation of the probable impacts will include the application of guidelines established
by the Administrator of the Environmental Protection Agency. Also, a certification that the
proposed activity will not violate water quality standards will be required from the
Department of Environmental Quality, Office of Environmental Services before a permit is
issued.
4
Any person may request, in writing, within the comment period specified in this notice,
that a public hearing be held to consider this application. Requests for public hearings
shall state, with particularity, the reasons for holding a public hearing. You are requested
to communicate the information contained in this notice to any other parties whom you
deem likely to have interest in the matter.
The applicant has certified that the proposed activity described in the application
complies with and will be conducted in a manner that is consistent with the Louisiana
Coastal Resources Program. The Department of the Army permit will not be issued unless
the applicant received approval or a waiver of the Coastal Use Permit by the Department
of Natural Resources.
for
JOHN M. HERMAN
Chief, Central Evaluation Section
Regulatory Branch
LANIER & ASSOCIATES
SUPPLEMENTAL DRAWINGS
FIGURES 39 THROUGH 43
N
18
1,000
0
2,000
SCALE: 1"=2,000'
(Approximate)
EC
EC
08
EC
07
EC
EC 16
04
5 ROCK DAMS
TYP (PHASE 1)
09
EC
05
EC
17
EC
10
PHASE 1 SILT
FENCING, WITH
CHECK DAMS
ALONG ROADSIDE
DITCHES
15
EC
14
06
EC
EC
03
EC
13
EC
LEGEND:
12
EC
EXISTING DRAINAGE DITCH
EC01
EXISTING DRAINAGE DITCH ID
PROPOSED WETLANDS
PROPOSED WATERS OF THE US
SOURCE: ESRI WORLD IMAGERY
PPM
PPM CONSULTANTS, INC.
www.ppmco.com
DRAWN BY:
DRAWN DATE:
PROJECT NUMBER:
BILLING GROUP:
BWH
569203
09/24/18
--
SOUTH LOUISIANA
METHANOL LP
7719-1 LOUISIANA HIGHWAY 18
ST. JAMES, LOUISIANA
SUPPLEMENTAL
DRAWING FOR
PHASE 1 BMP
LOCATIONS
FIGURE
NUMBER
39
N
18
2,000
PHASE 2 SILT
FENCING, WITH
CHECK DAMS
ALONG ROADSIDE
DITCHES
SCALE: 1"=2,000'
EC
EC
08
EC
07
EC
EC 16
04
5 ROCK DAMS
TYP (PHASE 1 & 2)
09
EC
05
EC
17
(Approximate)
EC
10
1,000
0
14
06
03
EC
EC
EC
15
EC
13
EC
LEGEND:
2
C1
EXISTING DRAINAGE DITCH
E
EC01
EXISTING DRAINAGE DITCH ID
PROPOSED WETLANDS
PROPOSED WATERS OF THE US
SOURCE: ESRI WORLD IMAGERY
PPM
PPM CONSULTANTS, INC.
www.ppmco.com
DRAWN BY:
DRAWN DATE:
PROJECT NUMBER:
BILLING GROUP:
BWH
569203
09/24/18
--
SOUTH LOUISIANA
METHANOL LP
7719-1 LOUISIANA HIGHWAY 18
ST. JAMES, LOUISIANA
SUPPLEMENTAL
DRAWING FOR
PHASE 2 BMP
LOCATIONS
FIGURE
NUMBER
40
NOTES:
1.
2.
3.
4.
5.
6.
SILT FENCE SHALL BE IN THE LOCATIONS ON THE PLAN VIEW AND MAY BE SUPPLEMENTED WITH REQUIREMENTS OF
REGULATORY AUTHORITIES ISSUING PERMITS. THE SILT FENCE INSTALLATION AND CHECK OUT SHALL PRECEDE
AND LANDSCAPE DISTURBANCE.
INSTALLATION OF THE SILT FENCE SHALL BE IN ACCORDANCE WITH ASTM D 6462, THE MANUFACTURER'S
RECOMMENDATION, AND THE DETAILS SHOWN ON THIS SHEET. POST SPACING SHOWN IS MAXIMUM FOR
UNSUPPORTED INSTALLATION WITH ELONGATION <50% (ASTM D 4632). FOR SILT FENCE MATERIAL WITH ELONGATION
>50% AND SUPPORTED SILT FENCES, THE MAXIMUM POST SPACING IS 4'.
SILT FENCE SHALL BE PURCHASED IN A CONTINUOUS ROLL AND CUT TO ALIGNMENT LENGTH TO AVOID JOINTS. LAPS
END POSTS SHALL BE AS SHOWN BELOW. SECURING SILT FENCE BY SIMPLY OVERLAPPING WITHOUT INTEGRAL
SECURING WITH DOUBLE POSTS IS NOT ACCEPTABLE.
SILT FENCE SHALL BE FASTENED SECURELY TO THE UP SLOPE SIDE OF THE SUPPORT POSTS USING A MINIMUM OF
3/4" LONG HEAVY-DUTY WIRE STAPLES ORIENTED AT A 45° FROM THE VERTICAL OR TIE WIRES. IN THE CASE OF
NON-WOODEN POSTS IS NOT ACCEPTABLE.
POSTS SHALL BE 2"x2"x3'-6" (OR LONGER) WOOD OR STEEL (STANDARD "T" OR "U" TYPE 1.3 lbs/linear foot).
SILT FENCE SHALL HAVE THE FOLLOWING PROPERTIES:
PROPERTY
2"x2"x3'-6"
WOOD OR STEEL POST
(MAXIMUM 6' SPACING)
TEST METHOD
MINIMUM TEST VALUE
TENSILE STRENGTH (lbs.)
MINIMUM AVERAGE ROLL
VALUE (MARV)
ASTM D 4632
90
ULTRAVIOLET LIGHT
(% RETAINED STRENGTH)
ASTM D 4355
( 500 hr EXPOSURE)
>70
APPARENT OPENING SIZE
MAXIMUM AVERAGE ROLL
VALUE - PER ASTM D 4632
ASTM D 4751
>#30
(U.S. STANDARD SIEVE
SIZE)
PERMITTIVITY (SECOND-1)
MINIMUM AVERAGE ROLL
VALUE
ASTM 4491
0.05
7. SHOULD SEDIMENT ACCUMULATE TO THE POINT WHERE THE FENCE WILL BE OVERTOPPED WITH FLOW OR THE
WEIGHT OF THE SEDIMENT THREATENS TO COLLAPSE THE FENCE, REMOVE THE SEDIMENT AND PLACE IT ABOVE
THE SILT FENCE OUT OF CONCENTRATED FLOW AREAS OR AT OTHER APPROVED LOCATIONS.
8. AT THE CONCLUSION OF CONSTRUCTION WHEN ALL VEGETATIVE ACTIONS HAVE BEEN COMPLETED THE SILT FENCE
WILL BE REMOVED AND TRAPPED SILT WILL BE SPREAD ACROSS ESTABLISHED VEGETATION OUTSIDE PATHS OF
CONCENTRATED FLOW. MAXIMUM DEPTH OF SPREAD SOIL SHALL BE 4".
SILT
FENCE
WORK
AREA
24" min.
UNDISTURBED
AREA
BACKFILLED AND
COMPACTED SOIL
6" min.
18" min.
6" min.
SIDE VIEW
2"x2"x3'-6"
WOOD OR STEEL POST
(MAXIMUM 6' SPACING)
BACKFILLED AND
COMPACTED SOIL
PLAN VIEW
PPM
PPM CONSULTANTS, INC.
www.ppmco.com
DRAWN BY:
DRAWN DATE:
PROJECT NUMBER:
BILLING GROUP:
BWH
569203
09/24/18
--
SOUTH LOUISIANA
METHANOL LP
7719-1 LOUISIANA HIGHWAY 18
ST. JAMES, LOUISIANA
SUPPLEMENTAL
DRAWING FOR
SILT FENCE
DIAGRAM
FIGURE
NUMBER
41
SPECIFICATIONS:
1. ROCK DAM CONSTRUCTION SHOULD BE DONE PRIOR TO GRADING.
2. INSTALL ROCK DAM ALL THE WAY ACROSS THE DITCH AND PLACE ROCK
DAM IN DITCH.
3. DIG OUT 6" INTO THE DITCH AND PLACE ROCK DAM IN DITCH.
4. ROCK DAMS SHOULD BE CONSTRUCTED TO A HEIGHT EQUAL TO THE
DEPTH OF THE DITCH.
5. ROCK DAMS SHOULD HAVE SLOPES NO GREATER THAN 2:1 ON THE BASIN
SIDE AND NO GREATER THAN 3:1 ON THE OUTLET SIDE OF THE DAM.
6. ON THE BASIN SIDE OF THE DAM, A MINIMUM OF 6" IF GRAVEL SHOULD BE
USED TO COVER THE DAM FROM TOP TO BOTTOM TO SLOW DRAINAGE.
7. PROTECT THE CHANNEL DOWNSTREAM OF THE LOWEST CHECK DAM
FROM EROSION, SINCE WATER WILL FLOW OVER AND AROUND DAM.
8. ADD ADDITIONAL RIP-RAP AT BASE FOR AN ENERGY DISSIPATER (APRON).
APRON LENGTH SHOULD BE APPROXIMATELY EQUAL TO THE HEIGHT OF
THE ROCK DAM.
MAX WIDTH 10'
MIN. WIDTH 5'
6"
MAINTENANCE:
1. ROUTINE INSPECTION.
2. REMOVAL OF DEBRIS.
3. REMOVE TRAPPED SEDIMENT FROM RIP-RAP WHEN 50% OF THE SEDIMENT
STORAGE VOLUME IS OCCUPIED WITH SEDIMENT (HALF FULL).
4. REPAIR AND SEED SIDE SLOPE AREAS THAT HAVE ERODED OR HAVE
BECOME DAMAGED BY EQUIPMENT DURING SILT CLEANOUT OR OTHER
OPERATIONS.
GEOTEXTILE
FABRIC
CROSS-SECTION A-A'
HEIGHT=DEPTH OF DITCH
1' MIN.
RIP-RAP
BASIN
SIDE
OUTLET
SIDE
2:1 OR FLATTER
MAX DEPTH 7'
MIN. DEPTH 3'
3:1 OR FLATTER
GEOTEXTILE
SIDE VIEW
A
1' MIN.
2:1
SLOPE
3:1
SLOPE
DEPTH=HEIGHT OF ROCK DAM
A'
PLAN VIEW
REFERENCE:
URBAN STORM WATER RUNOFF: ROADS, HIGHWAYS, BRIDGES. BEST MANAGEMENT
PRACTICES (BMPs) FOR COASTAL LOUISIANA, NONPOINT SOURCE POLLUTION, LOUISIANA
DEPARTMENT OF NATURAL RESOURCES, 2008.
PPM
PPM CONSULTANTS, INC.
www.ppmco.com
DRAWN BY:
DRAWN DATE:
PROJECT NUMBER:
BILLING GROUP:
BWH
569203
09/24/18
--
SOUTH LOUISIANA
METHANOL LP
7719-1 LOUISIANA HIGHWAY 18
ST. JAMES, LOUISIANA
SUPPLEMENTAL
DRAWING FOR
ROCK DAM
DIAGRAM
FIGURE
NUMBER
42
Proposed Impacts
Wetland Impacts
Permanent Impacts
Partial Impacts
Other Waters Impacts
~0.39 Acres
~0.02 Acres
~0.37 Acres
~0.96 Acres
Precast Concrete
Pilings ~2' x ~2'
Permanent Impacts
Temporary Work Area
Temporary Work Area: No clearing
will be done and all work will be conducted
from mats which will be removed as soon
as construction is complete
Precast Concrete
Pilings ~2' x ~2'
Permanent Impacts
Partial Impact Area
0
200
Feet
400
:
Figure 43
43177 East Pleasant Ridge Road
Hammond, Louisiana 70403
P. 985-662-5501, F. 985-662-5504
South Louisiana
Methanol LP
F:\KLE\South Lousiana Methanol Pipeline\GIS Maps\Delineation\Figure 43
Legend:
Temporary Work Area
Proposed Wetlands
Permanent Impacts
Proposed Other Waters
Partial Impacts
Other Water Impacts
This figure was prepared utilizing public and proprietary data. It should not be used
to establish any legal boundaries or specific locations. ELOS Environmental, L.L.C.,
is not responsible for any usage of this figure contrary to its original, intended purpose.