BANK SPONSOR: City of Columbia, Missouri - Utilities Department
PROJECT LOCATION: The proposed Hinkson Creek mitigation site is located in Sections 15, 22, and 27, Township 49 North, Range 12 West, in Boone County, Missouri. The Perche Creek mitigation site is located in Sections 29, 30, and 31, Township 48 North, Range 13 West in Boone County, Missouri. Both sites are located within the city limits of Columbia, Missouri.
ACTIVITY: The Sponsor proposes to construct and to operate a compensatory mitigation bank that is comprised of two separate sites within the city limits of Columbia, Missouri.
BANK SPONSOR: City of Columbia, Missouri - Utilities Department
PROJECT LOCATION: The proposed Hinkson Creek mitigation site is located in Sections 15, 22, and 27, Township 49 North, Range 12 West, in Boone County, Missouri. The Perche Creek mitigation site is located in Sections 29, 30, and 31, Township 48 North, Range 13 West in Boone County, Missouri. Both sites are located within the city limits of Columbia, Missouri.
ACTIVITY: The Sponsor proposes to construct and to operate a compensatory mitigation bank that is comprised of two separate sites within the city limits of Columbia, Missouri.
City of Columbia, Missouri
Proposed Umbrella Wetland & Stream Mitigation Bank
Hinkson Creek and Perche Creek Sites
(Bank Prospectus)
City of Columbia
Columbia, Missouri
Boone County, Missouri
TABLE OF CONTENTS
I. INTRODUCTION AND OBJECTIVES OF PROPOSED MITIGATION BANK ....................2
II. ESTABLISHMENT AND OPERATION OF THE BANK ......................................................1
III. BANK OWNERSHIP AND LONG-TERM MANAGEMENT
2
IV. RESPONSIBILITY STATEMENT..........................................................................................2
V. SERVICE AREA FOR THE MITIGATION BANK SITE .......................................................2
VI. NEED AND TECHNICAL FEASIBILITY .............................................................................6
VII. QUALIFICATIONS OF THE SPONSOR
6
VIII. MITIGATION PLAN REQUIREMENTS FOR BANK SITE ..............................................7
A. Ecological Context .............................................................................................................. 6
B. Objectives
7
C. Site Selection and Baseline Information ............................................................................. 8
1. Area Land Use ................................................................................................................ 8
2. Hydrology ...................................................................................................................... 8
3. Soils................................................................................................................................ 8
4. Vegetation ...................................................................................................................... 9
LIST OF FIGURES
FIGURE 1: Project
Coordinates .....................................................................................................................
1
FIGURE 2: The Geographic Extent of Bank Service Areas Within
Missouri ..........................................................................................................................
4
FIGURE 3: City of Columbia Mitigation Bank Primary Service Areas
Map .................................................................................................................................
5
APPENDIX
REFERENCE MAPS
City of Columbia, Umbrella Wetland & Stream Mitigation Bank
Page 1
City of Columbia, Missouri
Proposed Umbrella Wetland & Stream Mitigation Bank
I. INTRODUCTION AND OBJECTIVES OF PROPOSED MITIGATION BANK
The City of Columbia (Sponsor) is proposing to develop an umbrella mitigation banking
instrument that will govern the operation and the maintenance of the proposed Hinkson Creek
mitigation site and the Perche Creek mitigation site. Additional mitigation sites may be proposed
in the future under this umbrella banking instrument. The two initial bank sites will be constructed
in order to restore aquatic and terrestrial habitats and enhance the existing habitats of
approximately 90-120 acres of wetland and the establishment and/or enhancement of
approximately 17,000 feet of stream buffer on Perche Creek and approximately 22,000 feet of
stream buffer along Hinkson Creek for a mitigation bank that will provide compensatory
mitigation for City of Columbia infrastructure construction projects with unavoidable wetland
and/or stream impacts. The proposed Umbrella Wetland and Stream Mitigation Bank (Bank) will
be established and constructed at two locations either within City limits or adjacent to and bordered
by Hinkson and Perche Creeks in Boone County, Missouri (Figure 1).
Figure 1: Project Coordinates
Site
Latitude
Longitude
Sec/Twn/Range
Hinkson Creek 39o 00' 30.89" 92o 15' 28.02" Sec. 15,22 & 27, T49N, R12W
Perche Creek
38o 54' 46.75' 92o 25' 31.93" Sec. 29, 30 & 31, T48N, R13W
II. ESTABLISHMENT AND OPERATION OF THE BANK
The U.S. Army Corps of Engineers (USACE) approval of this Instrument constitutes the
regulatory approval required for the City of Columbia, Missouri Umbrella Wetland and
Stream Mitigation Bank to be used to provide compensatory mitigation for Department of
the Army permits pursuant to 33 C.F.R. 332.8(a)(1). This Instrument is not a contract
between the Sponsor or the Property Owner and the USACE or any other agency of the
federal government. Any dispute arising under the Instrument will not give rise to any claim
by the Sponsor or the Property Owner for monetary damages. This provision is controlling
notwithstanding any other provision or statement in the Instrument to the contrary.
The Sponsor proposes to create/restore/enhance/preserve a total of approximately 480 acres of
wetland/stream and wetland/stream buffer at the Bank at two sites:
Hinkson Creek This site, owned by the City Solid Waste Utility, is located on part of
the City's landfill property. This project will include approximately 10,000 feet of stream
buffer along Hinkson Creek. The site will be developed primarily for stream credits
through riparian corridor improvements i.e., tree plantings and preservation of existing
riparian areas that are owned by the Sponsor. Depending on site design, a small wetland
could be developed in the southeast corner within the existing agricultural field.
Perche Creek This site is approximately 420 acres in size and is owned by the City
Sewer Utility. The site is located at the confluence of Hinkson and Perche Creeks and is
proposed to be developed for compensatory wetland and stream mitigation credits. The
current land use is a mix of agricultural row crops and hay fields along with the existing
floodplain riparian and scour/oxbow features. The Sponsor proposes to restore/enhance
City of Columbia, Umbrella Wetland & Stream Mitigation Bank
Page 2
approximately 90-120 acres of wetland and restore/enhance approximately 21,700 feet
with 200-300 foot stream buffers at the Perche Creek Site.
Both sites are bordered or bisected by Hinkson and/or Perche Creek. The Bank is located
entirely within the Hinkson Creek watershed and at the confluence with Perche Creek,
which is in the Lower Missouri-Moreau (HUC 10300102) and within or adjacent to the
city limits of Columbia, Missouri. Hinkson Creek is classified as intermittent (Class C)
upstream of Route 163 in Columbia and perennial (Class P) downstream of Route 163
within Missouri's Water Quality Standards (10 CSR 20-7.031), with the designated
beneficial uses of irrigation, livestock and wildlife watering, protection of warm water
aquatic life and human health (fish consumption), whole body contact recreation (Category
B) and secondary contact recreation. The dominant soil types at the Bank are 1) Moniteau,
a poorly-drained silt loam, 2) Haymond, a well-drained silt-loam, 3) Wilbur, a moderately
well-drained silt loam, 4) Perche, a moderately well-drained silt loam, and 5) Carlow, a
poorly-drained silty clay. The existing riparian corridors average 50 feet in width at both
sites and are primarily made up of silver maple and sycamore with some cottonwood and
miscellaneous hard mast species.
III. BANK OWNERSHIP AND LONG-TERM MANAGEMENT
The Sponsor purchased these properties through fee-simple title acquisition in the mid-1980s and
1990s. Upon assurance of Bank acceptance, the Sponsor will place a restrictive real estate
covenant or an approved integrated natural resource management plan with an annual
appropriation in the city's budget that assures the properties will be maintained as wetland, stream
and upland habitats in perpetuity. The Sponsor will own the Bank until all the compensatory
mitigation credits are debited and the Sponsor will retain the Bank, thereafter, as natural resource
type public land. The Sponsor will be the Owner/Operator of the Bank and the Sponsor will be
responsible for the implementation of any long-term and/or adaptive management plans, approved
by the Corps of Engineers, for the life of the Bank or for as long as the city owns the Bank
properties. A conservation easement that includes prohibited uses for the Bank properties will be
filed with the appropriate county of city office upon a fee simple sale of one or both properties.
IV. RESPONSIBILITY STATEMENT
Wetland and stream credits have not yet been determined. Credits generated by the construction
of this Bank are intended to be used as compensation for City of Columbia construction projects
that result in unavoidable wetland and/or stream impacts. Likely third party use will be limited to
other regional government entities (MoDOT, Boone County, Municipalities).
However,
mitigation credits may be sold on the open market with the approval of the Sponsor and the
approval of the Corps of Engineers. In the event that the Sponsor should sell credits to a third
party, the Sponsor would assume all legal responsibility for providing adequate compensatory
mitigation at the time the third party secures the mitigation credits at the Bank.
V. SERVICE AREA FOR THE MITIGATION BANK
According to 33 CFR Part 332.8(d)(6)(ii)(A) and the Mitigation Banking Instrument Outline For
Proposed Mitigation Banks Within the State of Missouri, the service area for a bank "should be
appropriately sized to ensure that the aquatic resources provided will effectively compensate for
adverse environmental impacts across the entire service area." Furthermore, the USACE Districts
City of Columbia, Umbrella Wetland & Stream Mitigation Bank
Page 3
and the Interagency Review Team (IRT) have agreed that the Ecological Drainage Unit (EDU),
defined by the Missouri Resource Assessment Partnership (MoRAP), is the largest service area
unit that will be considered for mitigation banks. The city's linear transportation and infrastructure
projects typically involve numerous small impacts within several watersheds; therefore, this EDU
is the proposed service area for the Bank.
An EDU is based on combining watersheds containing aquatic assemblages that are relatively
similar and are distinct within the context of the surrounding watersheds. There are 19 EDUs
within Missouri, and the boundaries of these will serve as the primary service area boundaries for
the City Bank. The Plains/Des Moines EDU in the northeast corner of the state and the
Plains/Kansas EDU, which comprises only a small area around the Kansas River in Missouri, are
combined with the Plains/ Mississippi Tributaries between the Des Moines and Missouri Rivers
and the Plains/Missouri River tributaries between the Blue and Lamine Drainages, respectively.
Thus, there are 17 functional service areas as listed in Figure 2 and illustrated in Figure 3 at the
end of this section.
The primary goal of this Bank consists of providing compensatory mitigation for unavoidable
impacts to wetlands and streams resulting from transportation and infrastructure projects within
its primary service area, EDU #5. This EDU lies within the Ozark Highland Border
(Moreau/Loutre) Aquatic Subregion. The Moreau/Loutre EDU lies in east-central Missouri and
includes all of the smaller direct tributaries to the Missouri River downstream of the outlet of the
Little Chariton River to the confluence of the Missouri and Mississippi Rivers; however, the EDU
service area for the proposed Bank does not include the Missouri River proper. The EDU is
primarily within the Ozark Highlands; however, the northern and western boundaries also extend
into the Central Dissected Till Plains. This EDU is contained within Howard, Boone, Cooper,
Morgan, Miller, Moniteau, Cole, Osage, Callaway, Gasconade, Montgomery, Warren, Franklin,
St. Charles, and St. Louis counties. Overall, there are 8,109 miles of primary stream channel within
this EDU, of which 2,338 miles are classified as perennial. Major streams include Bonne Femme
Creek, Petite Saline Creek, Moniteau Creek, Perche Creek, Hinkson Creek, Cedar Creek,
Moreau Creek, Middle River, Auxvasse Creek, Loutre River, Boeuff Creek, Charette Creek, St.
Johns Creek, Bonhomme Creek, and Coldwater Creek. Because this EDU straddles two major
ecoregions, it is very physiographically, hydrologically, and biologically diverse. The EDU is
mainly within the Inner and Outer Ozark Border ecological subsections, but it also includes
portions of the Prairie Ozark Border and the Claypan Till Plains subsections.
Bank credits will generally be authorized to be used/purchased to replace lost aquatic resources
from within EDU #5, but credit use/purchase may be authorized, by the Corps of Engineers, in
consultation with the IRT, for losses of aquatic resources that occur outside the primary service
area on a case-by-case basis. Mitigation ratios may increase when impacts located outside the
primary service area are mitigated at this Bank. The USACE District, with jurisdiction over the
area of impact, will be responsible for authorizing the use of credits from the Bank and determining
the appropriate mitigation ratio in accordance with applicable requirements. The establishment of
the primary service area for the Bank does not preclude any subsequent public interest review
processes of Section 10/404 permit applications for specific infrastructure projects.
City of Columbia, Umbrella Wetland & Stream Mitigation Bank
Page 4
Figure 2: The Geographic Extent of Bank Service Areas within Missouri
Service
Area
USACE
District
1
2
3
Kansas City
Kansas City
St. Louis
Rock Island
Kansas City
4
5
6
7
8
9
10
11
12
13
14
15
16
17
EDU Service Area Location Description
Plains/Missouri Tributaries between Nishnbotna and Platte Drainages
Plains/Grand/Chariton
Plains/ Mississippi Tributaries between the Des Moines and Missouri Rivers
Plains/Des Moines
Plains/Missouri Tributaries between Blue and Lamine Drainages
Plains/Kansas
Kansas City Ozark/Moreau/Loutre
St. Louis
Kansas City Plains/Osage
Kansas City Ozark/Osage
Kansas City Ozark/Gasconade
St. Louis Ozark/Meramec
St. Louis Ozark/Mississippi Tributaries between Missouri and Ohio Rivers
Little Rock Ozark/Elk/Spring
Little Rock Ozark/White
Little Rock Ozark/Current/Black
St. Louis Ozark/Upper St. Francis/Castor
Little Rock Mississippi Alluvial Plain/White/Black
Memphis Mississippi Alluvial Plain/St. Francis
Memphis Mississippi Alluvial Lower Mississippi/St. John's Bayou
City of Columbia, Umbrella Wetland & Stream Mitigation Bank
Page 5
Figure 3: City of Columbia Mitigation Bank Primary Service Area
City of Columbia, Umbrella Wetland & Stream Mitigation Bank
Page 6
VI. NEED AND TECHNICAL FEASIBILITY
The Sponsor is responsible for an ever expanding urban area. As the City of Columbia expands
there is an increasing need for new or upgrades to existing infrastructure. This includes, but is not
limited to, roads, sewers, power lines and sub-stations, storm-water facilities, municipal buildings,
and recreational improvements. It is not unusual for infrastructure projects to involve impacts to
wetlands and/or waters of the United States. When impacts occur it is often necessary to provide
compensatory mitigation. The Sponsor views the Bank as an opportunity to develop existing city
property into natural resource assets while providing for future Clean Water Act impacts.
The two sites chosen are well situated along Hinkson and Perche Creeks for bank development
activities. The Sponsor is promoting stream buffer improvements through its Hinkson Creek
Collaborative Adaptive Management (CAM) process. This project will benefit CAM goals by
restoring stream buffer to significant areas along Hinkson Creek. The most critical, technical
aspect of wetland and stream restoration is the hydrology. Stream buffer restoration is not highly
dependent on hydrology other than the potential for loss due to overbank flooding. Wetland
restoration/enhancement is highly dependent on hydrology for success. The Sponsor believes that
there is adequate hydrologic potential to meet wetland restoration goals at the Perche Site.
VII. QUALIFICATIONS OF THE SPONSOR
The Sponsor has a dedicated group of staff responsible for regulatory matters. The Sponsor has
been granted many Section 404 permits requiring the development of a mitigation plan and
managing the subsequent implementation and/or construction of the mitigation sites. The Sponsor
has a permanent staff of civil engineers with years of experience designing infrastructure projects,
including engineering plans and cost estimates. A technician on staff for the Sponsor previously
assisted with the development of five mitigation banks including preparation of the prospectus for
the MoDOT Blue Springs Wetland Mitigation Bank in Jackson County, Missouri, and the
development, from prospectus to final banking instrument, of the MoDOT North Fork Spring
River Wetland Mitigation Bank in Barton County, Missouri. The Sponsor has the expertise to
carry out the development of the mitigation banking instrument as well as the development of the
required construction plans, planting plans, and cost estimates for the Bank.
VIII. MITIGATION PLAN REQUIREMENTS FOR BANK SITE
A. Ecological Context
The City of Columbia, and the Hinkson and Perche Creek Wetland and Stream Mitigation Bank
are located within the Ozark Highlands Section, Outer Ozark Border Subsection, and more
specifically the Rock Bridge Oak Woodland/Forest Low Karst Hills Land Type Association
(LTA). "This LTA occupies hills with karst features associated with Hinkson Creek. The LTA
includes broad, gently rolling uplands and deep, abruptly dissected valleys associated with
Hinkson Creek, lower Perche Creek, and other creeks in Boone County and within the City of
Columbia. It is separated from all surrounding LTAs on the basis of well-developed karst."
"The LTA consists of loess-covered upland divides dissected by deeply entrenched streams cutting
through Mississippian limestone. Till is almost completely absent. The landscape is replete with
City of Columbia, Umbrella Wetland & Stream Mitigation Bank
Page 7
sinkholes, losing streams, and numerous caves. Local relief averages 200 feet but is noticeably
lower in the Perche Creek valley. The LTA includes the Manitou Bluffs between Rocheport and
McBaine. Historically, the LTA was oak savanna and woodland on the upland surface, while oak
and mixed-hardwood forests covered the valley slopes and bottoms. Some poorly drained
ephemeral wetlands and some prairies may have occupied the flatter uplands. Today, the
landscape is dominated by the City of Columbia and its rapidly expanding urban influence.
However, many of the valleys are still timbered and relatively wild. Many of the caves and their
rare species are protected in parks and conservation areas." (Atlas of Missouri Ecoregions, Nigh
& Schroeder, 2002)
B. Objectives
The desired outcome of the City of Columbia, Umbrella Wetland and Stream Mitigation Bank is
diversity of function and habitat. Following the watershed approach, the Hinkson Creek site and
Perche Creek site, will serve crucial functions of storm and floodwater retention, sediment/nutrient
filtration, while also providing a broad range of fish and wildlife habitat.
The Sponsor proposes to create several constructed wetland pools within the floodplain portion of
the Perche Creek site, which is currently a combination of fallow fields and cultivated agricultural
land. The Perche Creek site has two relatively large existing wetlands. The largest is a cutoff
remnant stream channel (oxbow) that is historically called Brushwood Lake. The second wetland
is an associated scour that exits Brushwood Lake to the south. Additionally, the Sponsor proposes
to construct at least two wetland pools at the Perche Creek Site. These pools should remain
fishless, and therefore offer prime breeding habitat for local amphibians. All of the enhanced and
constructed pools will provide vital breeding and feeding habitat for a variety of mammals, insects,
and birds, including shorebirds, waterfowl, wading birds and raptors. The wetland pools will also
provide critical breeding habitat for indigenous amphibians and reptiles, which could potentially
include the Northern crawfish frog (Rana areolata circulosa), a species of conservation concern
in Missouri. Also, the preservation/enhancement of the remnant forested oxbow slough
(Brushwood Lake) will provide those same benefits outlined above, while also offering established
protective cover for the aforementioned species. The Sponsor is anticipating the
restoration/enhancement of forested, scrub/shrub and emergent marsh wetland habitats.
In addition to the wetland areas, both the Hinkson Creek and Perche Creek sites will be developed
for stream credits consisting of riparian restoration, enhancement and preservation. The Sponsor
will control either one side of the creek for relatively long sections and/or both sides of Hinkson
and Perche Creeks at the two sites. The Sponsor will preserve, enhance and restore the existing
riparian corridors, as well as the mature lowland and upland forests. The Sponsor also proposes
to plant native grasses and native trees as buffer in the areas not being developed as wetlands or
riparian corridors.
C. Site Selection and Baseline Information
1. Area Land Use
Historic use of the Bank site has been a mix of agriculture and urban buffer. The Hinkson Creek
and Perche Creek sites still have active row crop agriculture. In studying aerial photography, it
appears that Hinkson Creek has not had any recent substantial stream channelization. The
floodplain is mostly intact and has not been heavily developed. Long, meandering loops and
frequent over-bank flooding through a heavily forested valley probably dissipated the energy of
City of Columbia, Umbrella Wetland & Stream Mitigation Bank
Page 8
the stream historically. With increasing urbanization and subsequent greater areas of impervious
surface flood intensity has increased. The valley likely had a high water table and therefore a
potential mixture of both surface and groundwater driven wetlands. Currently, portions of the
Perche Creek and Hinkson Creek sites are planted annually to row crops (soybeans/corn), with the
exception of the oxbow slough and its associated riparian and upland forest habitat
The city has owned both properties (fee simple) since the early to middle 1980s. There are no real
estate encumbrances that would prevent construction, restoration, enhancement, maintenance or
function of the proposed improvement on either of the sites. The Hinkson Creek site is bordered
on the south by Hinkson Creek Road and on the north and east by Rogers Road. The Perche Creek
site is an extensive area owned by the city that is near the Columbia Regional Wastewater
Treatment Plant and is bisected by the MKT Recreation Trail. It is somewhat isolated from
roadways. Much of this site was purchased in the 1980s in anticipation of future needs. Most of
the immediate surrounding area to the south and west is prone to annual flooding.
2. Hydrology
Hydrology at both sites is primarily the result of surface water collection resulting from direct
precipitation and over-bank flooding of Hinkson and Perche Creeks. The Perche Creek site has
contributing hydrology from 2-3 upland drainages. Grading, ditching, and terracing have been
constructed in an attempt to remove surface water from the current and historical agricultural
portions of the sites. The remnant oxbow channel (Brushwood Lake) on the Perche Creek site
holds water nearly year-round and tends to only draw down completely during very dry periods in
the summer months. The groundwater table at the Perche Creek site has likely lowered due to
channel incision of both Hinkson and Perche Creeks. The Sponsor has not studied the seasonal
groundwater fluctuations on the sites and does not deem it necessary as the designed wetlands will
perch surface water for periods of time sufficient to meet wetland hydrology criteria.
In developing wetlands on the Perche Creek site, the city proposes to create shallow depressions
and detention pools in order to detain storm and flood water for longer periods of time. A review
of the Hinkson Creek hydrograph for the past six years indicates overbank flood events in 4 of the
6 years or 66% frequency. The increased pool volume at the Perche Creek site should promote
some gradual recharge and filtration of these waters before entering back into Hinkson and Perche
Creeks, while at the same time providing valuable habitat for wetland dependent plant and animal
species.
There may be wetland development at the Hinkson Creek site. However, at this time the primary
focus for this site will be stream riparian corridor restoration, enhancement, and preservation. In
addition to this, the Sponsor plans to construct ditch plugs in order to restore hydrology to former
forested wetland areas that have been drained through a network of ditches.
3. Soils
The dominant soil types at the Bank are 1) Moniteau, a hydric, poorly drained silt loam, 2)
Haymond, a well-drained silt loam, 3) Wilbur, a moderately well-drained silt loam, 4) Perche, a
moderately well-drained silt loam, and 5) Carlow, a poorly-drained silty clay. The poorly-drained
hydric soils will be very good areas for pool construction as will the moderately well-drained soils.
The Sponsor believes that with good design and adequate hydrologic inputs that many areas at the
Perche Creek site can be developed into diverse wetland habitats. There are many areas within
the Perche Creek site that can be developed into forested floodplain buffer and riparian habitat.
Existing wetlands at the Perche Creek site have soils with well-developed redoximorphic features.
City of Columbia, Umbrella Wetland & Stream Mitigation Bank
Page 9
4. Vegetation
The Perche Creek site is an area of approximately 420 acres, of which 250 acres are annually
planted to row crops and approximately 150 acres are in hay production. For the most part, the
agricultural fields are graded to drain surface water to the ditches along the field edges that convey
water off the site. Some edge areas, as well as some shallow depression areas within the
agricultural fields, pond water for short durations, sufficient for hydrophytic vegetation growth
during wet years. These areas comprise approximately 14 acres of the site and are highly disturbed
from plowing, disking, and chemical applications associated with agriculture. These areas are
dominated by smartweed, amaranth, fall panic grass, and barnyard grass. These areas should be
greatly enhanced by the Bank development, resulting in a proliferation of emergent species that
should benefit from more favorable growing conditions, stable hydrologic influences, and the
cessation of chemical applications.
Forested areas at the Perche Creek site are limited to the riparian corridor along Hinkson and
Perche Creeks, the MKT Trail corridor and the oxbow (Brushwood Lake). These lowland areas
are dominated by silver maple, sycamore, and black willow. Secondary species consisting of bur
oak, swamp white oak, hackberry, pin oak, cottonwood, river birch, hickory, ash, walnut, and
American elm are present. Dominant undergrowth in these lowland woods consists of grapevine,
poison ivy, coral berry, Virginia wild rye, nettle, wood reed, and river oats. The forested areas
appear to be fairly well-drained, with a few sparsely vegetated, wetter depression areas
interspersed throughout. Width of the existing riparian corridor is 50 to 100 feet with an average
of 50 feet. The reintroduction of hydrology across the site should greatly enhance the habitat
viability of the lower elevation forests.
The riparian areas adjacent to Hinkson Creek at the Hinkson Creek site are similar to the Perche
Creek site with a more prominent hard mast tree component. Corridor width along the site is
variable and generally wider than 50 to 100 feet with the exception of the reach adjacent to the
crop field north of Hinkson Creek Road.
A non-comprehensive list of existing plants observed across both sites has been generated.
Approximately 75% of the observed species are OBL, FACW or FAC. Most of the species
observed are very typical species encountered in similar habitats across central Missouri; however,
a few, such as arrowhead, buttonbush, soft rush, and monkey flower are more conservative. They
are a good indication that these areas can be restored to a functional, wetland habitat. The existing
seed bank at the site should provide ample diversity once agriculture is ceased and wetland
hydrology is restored to the site.
City of Columbia, Umbrella Wetland & Stream Mitigation Bank
Page 10
APPENDIX
Aerial Overview Maps
USGS Topographic Maps
City of Columbia, Umbrella Wetland & Stream Mitigation Bank
Page 11
City of Columbia, Umbrella Wetland & Stream Mitigation Bank
Page 12
City of Columbia, Umbrella Wetland & Stream Mitigation Bank
Page 13
City of Columbia, Umbrella Wetland & Stream Mitigation Bank
Page 14
City of Columbia, Umbrella Wetland & Stream Mitigation Bank
Page 15
City of Columbia, Umbrella Wetland & Stream Mitigation Bank
Page 16
PUBLIC NOTICE
US Army Corps
of Engineers
Kansas City District
Permit No. NWK-2018-01181
Issue Date: October 24, 2018
Expiration Date: November 23, 2018
30-Day Notice
______________________________________________________________________________
BACKGROUND: This notice is to announce the proposed establishment of the Hinkson Creek
and Perche Creek Umbrella Wetland and Stream Mitigation Bank to be constructed and operated
by the City of Columbia, Missouri (Sponsor). The Sponsor proposes to construct the mitigation
bank in order to generate compensatory mitigation credits that will be used as compensation for
the city's construction projects and other private projects that result in the unavoidable loss of
wetlands and stream channels. Additionally, upon the approval of the Sponsor and upon the
approval of the Corps of Engineers, mitigation credits may be sold to other units of government
and to private developers for projects completed within the city limits of Columbia or completed
within the boundary of the proposed service area of the bank.
The Kansas City District, Corps of Engineers, Regulatory Branch, requests comments from the
public, from the local, state, and tribal governments, and the Federal natural resource agencies
concerning the proposed establishment of this mitigation bank. If this mitigation bank is
approved, the Corps of Engineers will verify that construction of these two initial mitigation
project sites is authorized by Nationwide Permit (NWP) No. 27 (Aquatic Habitat Restoration,
Establishment, and Enhancement Activities).
Please review the proposed Hinkson Creek Perche Creek Umbrella Wetland & Stream
Mitigation Bank Prospectus found at: http://www.nwk.usace.army.mil/Media/PublicNotices.aspx
and provide written comments to: U.S. Army Corps of Engineers, Kansas City District,
Regulatory Branch, 601 East 12th Street, Room 402, Kansas City, Missouri 64106. Please
include the Corps of Engineers project number NWK-2018-01181 in your comment letter.
BANK SPONSOR: City of Columbia, Missouri Utilities Department
P.O. Box 6015
Columbia, Missouri 65205
PROJECT LOCATION (As shown on the attached drawings): The proposed Hinkson Creek
mitigation site is located in Sections 15, 22, and 27, Township 49 North, Range 12 West, in
Boone County, Missouri. The Perche Creek mitigation site is located in Sections 29, 30, and 31,
Township 48 North, Range 13 West in Boone County, Missouri. Both sites are located within
the city limits of Columbia, Missouri.
Hinkson Creek Site
Latitude: 39.00858 -- Longitude: -92.257783 (decimal degrees)
[USGS QUADRANGLE: BROWNS, MISSOURI]
Perche Creek Site
Latitude: 38.912986 Longitude: -92.425536 (decimal degrees)
[USGS QUADRANGLE: HUNTSDALE, MISSOURI]
AUTHORITY: The U.S. Army Corps of Engineers has the authority to approve mitigation
banks and the authority to regulate the discharge of dredged or fill material into waters of the
United States that may result from this project under Section 404 of the Clean Water Act
(33 USC 1344). The regulations for this Act are found at 33 CFR 320-332.
ACTIVITY (As described in the mitigation bank prospectus): The Sponsor proposes to
construct and to operate a compensatory mitigation bank that is comprised of two separate sites
within the city limits of Columbia, Missouri. At the Hinkson Creek site the forest riparian
corridor will be expanded by planting trees adjacent to the existing trees along the creek. The
length of forest riparian corridor expansion will occur along approximately 10,000 linear feet of
Hinkson Creek resulting in a forested area about 60 acres in size.
At the Perche Creek site the Sponsor proposes to restore/enhance approximately 90 acres of
wetland and the Sponsor proposes to restore and enhance approximately 21,770 linear feet of
stream channel with a forest riparian corridor that is 200-300 feet wide. Currently, the land use
on this property is predominately for the production of agricultural row crops and hay. Farming
on the property will be discontinued in perpetuity. This site comprises approximately 420 acres.
The primary objective of the Bank is to construct diverse aquatic and riparian habitats in order to
provide adequate compensatory mitigation credits to replace the unavoidable loss of wetlands
and streams that result from the city's various infrastructure projects. The city projects that
require compensatory mitigation will be conducted primarily within the city limits of Columbia.
Additionally, as stated above, the city may also approve the sale of mitigation credits at this bank
to private developers, private citizens, and other units of Federal, state, and local governments.
WETLANDS/AQUATIC HABITAT: The Corps of Engineers has reviewed aerial
photography of the two proposed mitigation sites and we have made a preliminary determination
that Hinkson Creek and Perche Creek are likely considered waters of the United States. The
existing wetlands that occur adjacent to these creeks are likely to be considered waters of the
United States as well. Therefore, in addition to the approval of the mitigation bank the Corps
will also complete the DA permit process for the construction of the Bank if necessary. The
Sponsor is required to submit a jurisdictional determination for all existing stream channels and
wetlands that currently exist at both project sites. The existing aquatic resources will be
described in the baseline condition section in the draft and in the final banking instrument.
APPLICANT'S STATEMENT OF AVOIDANCE, MINIMIZATION, AND
COMPENSATORY MITIGATION FOR UNAVOIDABLE IMPACTS TO AQUATIC
RESOURCES: All existing wetland will be avoided except for small areas that will be filled by
the construction of low berms necessary to create wetland pools. Some wetlands will be avoided
completely while other existing wetlands will be incorporated into the planned wetland pools.
The Corps of Engineers does not anticipate that compensatory mitigation will be required for a
loss of any existing wetland located within the described project areas because the project will
increase the overall wetland acreage.
ADDITIONAL INFORMATION: Additional information about this application may
be obtained by contacting Douglas R. Berka at 816-389-3657 or by email at:
douglas.r.berka@usace.army.mil. All comments to this public notice should be directed
to Mr. Berka at the following address. U.S. Army Corps of Engineers, Regulatory Branch,
601 East 12th Street, Room 402, Kansas City, Missouri 64106.
STATE AUTHORIZATION: The Missouri Department of Natural Resources will review the
proposed mitigation bank project and determine if the project meets the conditions of the state's
water quality certification issued for NWP No. 27.
CULTURAL RESOURCES: Kansas City District will comply with the National Historic
Preservation Act of 1966 and 36 CFR 800. We have checked the National Register of Historic
Places and the Federal Register and no property listed in the Register or proposed for listing is
located in the permit area. This is the extent of our knowledge about historic properties, in the
permit area, at this time. However, we will evaluate input by the State Historic Preservation
Officer, Tribal Historic Preservation Officers (or Tribe designated representative) and the public
in response to this public notice, and we may conduct or require a reconnaissance survey of the
permit area to check for unknown historic properties, if warranted.
ENDANGERED SPECIES: In compliance with Section 7 of the Endangered Species Act
[16 U.S.C. 1531 et seq.], the Corps of Engineers will work cooperatively with the Sponsor and
with the U.S. Fish and Wildlife Service (Service) in analyzing the effects of the proposed
construction activities and the effects of long-term management activities on listed species or
designated critical habitats. We will obtain and review the official species list from the Service's
IPaC website at https://ecos.fws.gov/ipac/. Following this public notice comment period the
Corps will make an effect determination and consult with the Service on actions that may affect
listed species or designated critical habitat to ensure those actions will not jeopardize the
continued existence of a listed species or result in the destruction or adverse modification of
designated critical habitat. In order to complete our evaluation, comments are solicited from the
Service, other interested agencies, and individuals.
FLOODPLAINS: This activity is being reviewed in accordance with Executive Order 11988,
Floodplain Management, which discourages direct or indirect support of floodplain development
whenever there is a practicable alternative. By this public notice, comments are requested from
individuals and agencies that believe the described work will adversely impact the floodplain.
If the proposed mitigation bank is approved the required restrictive real estate covenant will
prohibit any future development of the floodplain within the mitigation bank boundary.
WATER QUALITY CERTIFICATION: Section 401 of the Clean Water Act (33 USC 1341)
requires that all discharges of dredged or fill material must be certified by the appropriate state
agency as complying with applicable effluent limitations and water quality standards. This
public notice serves as an application to the state in which the discharge site is located for
certification of the discharge. The discharge must be certified before a Department of the Army
permit can be issued. Certification, if issued, expresses the state's opinion that the discharge will
not violate applicable water quality standards. The Missouri Department of Natural Resources
has issued Section 401 water quality certification for the Corps' NWP No. 27. However, the
state may modify their NWP No. 27 certification for this project if warranted.
PUBLIC INTEREST REVIEW: The decision to approve this mitigation bank site will be
based on an evaluation of the probable impact, including the cumulative impacts of the proposed
activity, on the public interest. That decision will reflect the national concern for both protection
and utilization of important resources. The benefits which reasonably may be expected to accrue
from the proposal must be balanced against its reasonably foreseeable detriments. All factors
which may be relevant to the proposal will be considered including the cumulative effects
thereof; among those are conservation, economics, esthetics, general environmental concerns,
wetlands, cultural values, fish and wildlife values, flood hazards, floodplain values, land use,
navigation, shoreline erosion and accretion, recreation, water supply and conservation, water
quality, energy needs, safety, food and fiber production, mineral needs and, in general, the needs
and welfare of the people. The evaluation of the impact of the activity on the public interest will
include application of the guidelines promulgated by the Administrator, Environmental
Protection Agency under authority of Section 404(b) of the Clean Water Act (33 USC 1344).
The Corps of Engineers is soliciting comments from the public; Federal, state, and local agencies
and officials; Indian Tribes; and other interested parties in order to consider and evaluate the
impacts of this proposed activity. Any comments received will be considered by the Corps of
Engineers to determine whether to approve this mitigation bank. To make this decision,
comments are used to assess impacts on endangered species, historic properties, water quality,
general environmental effects, and the other public interest factors listed above. Comments are
used in preparation of an Environmental Assessment and/or an Environmental Impact Statement
pursuant to the National Environmental Policy Act. Comments are also used to determine the
need for a public hearing and to determine the overall public interest of the proposed activity.
COMMENTS: This notice is provided to outline the details of the proposed activity so that this
District may consider all pertinent comments prior to determining if approval of this mitigation
bank is in the public interest. Any interested party is invited to submit to this office written facts
or objections relative to this activity on or before the public notice expiration date. Comments
both favorable and unfavorable will be accepted and made a part of the record and will receive
full consideration in determining whether it would be in the public interest to approve this
mitigation bank site. Copies of all comments, including names and addresses of commenters,
may be provided to the Sponsor. Comments should be mailed to the Corps of Engineers,
Regulatory Branch, at the address shown in the third paragraph on page one of this public notice.
PUBLIC HEARING: Any person may request, in writing, prior to the expiration date of this
public notice, that a public hearing be held to consider this application. Such requests shall state,
with particularity, the reasons for holding a public hearing.
c::J Wetland and Mitigation Bank Area
L ~ J Columbia City Limits
-
Streams
0
Location: City of Columbia, Umbrella
Wetland & Stream Mitigation Bank
Boone County, Missouri
0.5
1
2
3
- - US Highways
PERMIT NO. NWK-2018-01181
CITY OF COLUMBIA, MISSOURI
UMBRELLA WETLAND AND STREAM MITIGATION BANK
HINKSON CREEK AND PERCHE CREEK
BOONE COUNTY, MISSOURI
SHEET 1OF3
25 OCTOBER 2018
(:::=J Wetland and Mitigation Bank Area
C:J
City Boundary
Streams
Road Centerlines
Location: City of Columbia, Umbrella
Wetland & Stream Mitigation Bank
Boone County, Missouri
Hinkson Creek Site
300
600
1,200
1,800
2,400
Feel
PERMIT NO. NWK-2018-01181
CITY OF COLUMBIA, MISSOURI
UMBRELLA WETLAND AND STREAM MITIGATION BANK
HINKSON CREEK AND PERCHE CREEK
BOONE COUNTY, MISSOURI
SHEET 2 OF 3
25 OCTOBER 2018
~ Wetland and Mitigation Bank Area
[': J City Boundary
- - - Streams
- - - Road Centerlines
Location: City of Columbia, Umbrella
Wetland & Stream Mitigation Bank
Boone County, Missouri
Perche Creek Site
0
300
600
1,200