This project proposes to add a new site to the Montana Aquatic Resources Services in-lieu fee program to generate compensatory mitigation credit to offset unavoidable impacts to waters of the United States. The project proponent is proposing to construct a siphon to divert water from Big Muddy Creek into an abandoned historic channel of the creek and to construct a channel plug, within the historic channel, at the southwest portion of the project boundary, in order to restore the water table depth within the existing salt flat wetland. The preliminary site plan proposes to generate 81.5 wetland mitigation credits (57 credits from preservation of existing wetlands and 24.5 credits from restoration of salt flat wetlands and rehabilitation of the stream channel.

This project proposes to add a new site to the Montana Aquatic Resources Services in-lieu fee program to generate compensatory mitigation credit to offset unavoidable impacts to waters of the United States. The project proponent is proposing to construct a siphon to divert water from Big Muddy Creek into an abandoned historic channel of the creek and to construct a channel plug, within the historic channel, at the southwest portion of the project boundary, in order to restore the water table depth within the existing salt flat wetland. The preliminary site plan proposes to generate 81.5 wetland mitigation credits (57 credits from preservation of existing wetlands and 24.5 credits from restoration of salt flat wetlands and rehabilitation of the stream channel.

PUBLIC NOTICE Omaha District

Application No: NWO-2011-01760-MTH Applicant: Montana Aquatic Resources Services (Wendy Weaver) Waterway: Big Muddy Creek Issue Date: October 26, 2018 Expiration Date: November 27, 2018 30 DAY NOTICE

Missoula Regulatory Office | 1600 North Avenue West | Suite 105 Missoula, Montana 59801

PUBLIC NOTICE FOR MARS' IN LIEU FEE MITIGATION SITE SUBMITTED TO U.S. ARMY CORPS OF ENGINEERS, in cooperation with the Interagency Review Team (IRT) SUBJECT: The U.S. Army Corps of Engineers, Omaha District (Corps) is evaluating a request by Montana Aquatic Resources Services (MARS) to add an In-Lieu Fee (ILF) compensatory mitigation site to the Program's Instrument, established in January 2013. This proposed mitigation site would cover the Lower Missouri Watershed District. This notice may also be viewed at the Corps web site at: http://www.nwo.usace.army.mil/Missions/Regulatory-Program/Montana/Public-Notices/ The project described herein is not being proposed by the Corps, but by the applicant; the Corps will evaluate the proposed work to determine if it is allowable under current laws and regulations. AUTHORITY: The purpose of this public notice is to evaluate the potential of this proposed site plan to adequately compensate for wetland impacts authorized under Section 404 of the Clean Water Act. LOCATION: The approximately 265-acre project site, including approximately 7 acres of historic stream channel and approximately 30 acres of salt flat wetland is located in the eastern portion of the Fort Peck Indian Reservation adjacent to Medicine Lake National Wildlife Refuge, in the Manning Lake Wetlands Complex (Complex), near Big Muddy Creek within the NW ¼ NW ¼ Section 9, Township 29 North, Range 54 East, Latitude 48.28728°, Longitude -104.71345°, Roosevelt County, Montana. PROJECT DESCRIPTION: The purpose of the proposed wetland mitigation project is to provide compensatory wetland mitigation credit for 20 advance wetland credits sold to the Montana Department of Transportation (MDT). This was a bulk credit sale transaction and there were no permits at the time of the sale. Additionally, this project is U.S. ARMY CORPS OF ENGINEERS ­ OMAHA DISTRICT http://www.nwo.usace.army.mil/Missions/Regulatory-Program/Montana/Public-Notices/

CENWO-ODR-MT

Page 2

Action ID: NWO-2011-01760-MTH

proposed to provide mitigation for 2.09 advance wetland mitigation credits sold to offset permitted impacts to 1.39 acres of emergent wetland adjacent to the Missouri River. The project proponent is proposing to construct a siphon to divert water from Big Muddy Creek into an abandoned historic channel of the creek and to construct a channel plug, within the historic channel, at the southwest portion of the project boundary, in order to restore the water table depth within the existing salt flat wetland. The preliminary site plan proposes to generate 81.5 wetland mitigation credits (57 credits from preservation of existing wetlands and 24.5 credits from restoration of the salt flat wetlands and rehabilitation of the stream channel). The conceptual layout of the project is provided in Figure 3 of the attached proposed site plan. HISTORIC PROPERTIES: The Corps is lead federal agency for determining compliance with Section 106 of the National Historic Preservation Act for this project and will complete a cultural resource review of the project site in conjunction with their obligations under Section 106 and the National Environmental Policy Act. The Corps has not determined effects to properties eligible for listing on the National Register of Historic Properties. ENDANGERED SPECIES: The proposed activity has the potential to affect the following Federally-listed endangered (e) or threatened (t) species: northern long-eared bat (t), piping plover (t), and whooping crane (e). There is no designated critical habitat within the permit area. Effects to species and critical habitat will be evaluated after a Draft Site Plan has been submitted. EVALUATION FACTORS: The decision whether to approve the proposal will be based on an evaluation of the overall proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits which reasonably may be expected to accrue from the proposed activity must be balanced against any reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered. This Public Notice allows the public to provide comments or concerns about the project which will be considered before a decision is made to notify MARS to proceed with a Draft Mitigation Site Plan. COMMENTS: The Corps of Engineers is soliciting comments from the public; Federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. All public notice comments will be considered public information and will be subject to review by the applicant. Any person may request, in writing and within the comment period specified in this notice, that a public hearing be held for the purpose of gathering additional information. U.S. ARMY CORPS OF ENGINEERS ­ OMAHA DISTRICT http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Montana.aspx

CENWO-ODR-MT

Page 3

Action ID: NWO-2011-01760-MTH

Requests for public hearings must be identified as such and shall state specifically the reasons for holding a public hearing and what additional information would be obtained. The request must be submitted to the U.S. Army Corps of Engineers, at the Missoula Regulatory Office, 1600 North Avenue West, Suite 105, Missoula, Montana 59801. If it is decided that additional information is required and that a public hearing should be held, interested parties will be notified of the date, time and location. Any interested party (particularly officials of any town, city, county, state, or Federal agency; Indian tribe; or local association whose interests may be affected by the work) is invited to submit to this office written facts, arguments, or objections on or before the expiration date listed on the front of this notice. Any agency or individual having an objection to the work should specifically identify it as an objection with clear and specific reasons. Comments, both favorable and unfavorable, will be accepted, made a part of the record and will receive full consideration in subsequent actions on this application. All replies to the public notice should be addressed to Nathan Green at the Missoula Regulatory Office, 1600 North Avenue West, Suite 105, Missoula, Montana 59801, by email at Nathan.J.Green@usace.army.mil, or telephone at (406) 541-4845 extension 323. Please refer to identification number NWO-2011-01760-MTH in any correspondence concerning this project. Comments postmarked after the expiration date of this public notice, or received by fax or e-mail after the expiration date, will not be considered. Comments left on our voicemail system will not be considered. Attachments: Proposed Site Plan

U.S. ARMY CORPS OF ENGINEERS ­ OMAHA DISTRICT http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Montana.aspx

Proposal for Modification of In-Lieu Fee Program Instrument Proposed Site Plan Manning Lake Salt Marsh Flat Wetland Restoration Project on Fort Peck Tribal Lands Lower Missouri Watershed District (#12)

OCTOBER 2018

Prepared for: U.S. Army Corps of Engineers Regulatory Program Omaha District Headquarters 1616 Capitol Ave., Ste. 9000 Omaha, NE 68102 Prepared by: Montana Aquatic Resources Services, Inc. Statewide In-Lieu Fee Mitigation Program P.O. 338 Livingston, MT 59047

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44

Proposed Amendment to the MARS Approved ILF Program Instrument Modification of an approved Instrument, including the addition and approval of new in-lieu fee (ILF) project sites or expansions of previously approved ILF project sites, must follow the appropriate Instrument amendment procedure outlined in Section 332.4 and Section 230 of the Army Corps of Engineers (ACOE) and Environmental Protection Agency (EPA) 2008 Final Compensatory Mitigation Rule. This amendment proposal is submitted to the ACOE District Engineer following the outline and requirements of the 2008 Final Rule at Sections 332.4(c)(2) through (14). As stated, the ILF program sponsor must prepare and obtain ACOE approval for a mitigation plan including items in paragraphs (c)(2) through (c)(14) of that section for each new compensatory mitigation project site, and submit an Instrument amendment proposal for the new mitigation site. (1) Introduction Montana Aquatic Resources Services (MARS) has identified a potential restoration project on the Fort Peck Indian Reservation, Roosevelt County, northeast Montana within the Lower Missouri Watershed (Watershed #12) (Figure 1). The project occurs both within and immediately adjacent to the Manning Lake Wildlife Refuge. The Assiniboine and Sioux Tribes of the Fort Peck Indian Reservation (Tribes) hold a great respect for and desire to conserve and protect all species. The traditional culture of the Assiniboine and Sioux people focuses around the various fish and wildlife species that we share with the earth. In line with this philosophy, the Tribes are working toward the conservation, protection, and restoration of what may be one of the most unique and valuable wetland complexes in the state of Montana. The Manning Lake Wetlands Complex (Complex), an extensive wetland/wet meadow complex along with adjacent upland habitats, lies in the eastern portion of the Fort Peck Indian Reservation near Big Muddy Creek. Adjacent to Medicine Lake National Wildlife Refuge, the Complex is an incredible, unique landscape providing vital breeding and rearing habitat for a diversity of waterfowl, shore birds, songbirds, and other species of conservation concern. The Complex was nominated by the Tribes and designated by Montana Audubon in 2008 as an Important Bird Area (IBA) of Montana. This plan outlines the conceptual restoration plan, general information about each of the 12 different components of a mitigation plan, and identified specific next steps the project will take if initially approved by the U.S. Army Corps of Engineers to proceed. (2) Objectives MARS' goal for this project is to restore, enhance, and preserve a salt marsh flat area on the Manning Lake Wildlife Refuge of the Fort Peck Indian Reservation in the Lower Missouri Watershed (#12) in 2018/2019 using mitigation fees resulting from two credit sales. The proposed compensatory mitigation project proposes to offset the impacts to wetlands resources with in-kind, in-watershed restoration (Figure 1). The primary objectives of this compensatory mitigation project are to:

Proposal for Modification of In-Lieu Fee Program Instrument ­ Proposed Site Plan Manning Lake Salt Marsh Flat Wetland Restoration in Lower Missouri Watershed District (#12)

45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88

1.) Restore the frequency and duration of inundation and soil saturation of a salt marsh flat that was impacted by the channelization of Big Muddy Creek that occurred at some point prior to 1946 (aerial photos earlier than this were not immediately found), 2.) Restore partial flows to a 2.6 mile segment of the historic alignment of Big Muddy Creek, and 3.) Preserve these resources via a 25-yr, auto-renewing lease with the Tribal Council and a deed restriction with one landowner. Related Credit Sales The first credit sale occurred on July 26, 2016 for 20 advance wetland credits to the Montana Department of Transportation (MDT). This was a bulk credit sale transaction and there were no permits at the time of the sale. On August 27, 2018, MDT provided information on future projects that will debit from the MARS sale and include the following: · Bainville-East (PE II, NH-MT1-MT(63)659, CN#6388001) which will impact 1.65 acres of wetland. This permit has not been submitted yet. · Culbertson - East (NH-MT 1-10(85)6464, CN # 6388002) which will impact 1.01 acres of wetland. The 404 application was submitted August 14, 2018 and are anticipating a permit at the end of September. · Westby-West (STPP 30-(3)16, CN #7953000) which will impact approximately 3 acres of wetland. This permit has not been submitted yet. The second credit sale transaction using mitigation fees anticipated is a wetland credit sale to BNSF Railway for 2.09 wetland credits for permanent impacts to 1.39 acres of emergent wetland adjacent to the Missouri River. The project area falls on both the Fort Peck Indian Reservation and a private parcel owned by Mark Wolff. MARS originally contacted Deb Madson from the Office of Environmental Protection to discuss opportunities to work with the tribe for wetland restoration to become a partner in the project and to bring funds to facilitate restoration and preservation of the wetland area on these lands. (3) Site selection

The Manning Lake Salt Flat Marsh restoration site was selected because: 1) the site's hydrology has clearly been degraded by historic agricultural practices through the straightening and channelization of Big Muddy Creek in this area adjacent to Manning Lake, thereby creating an opportunity for restoration to take place; 2) supports goals and objectives from the Comprehensive Conservation and Management Plan for the Manning Lake Wetland Tribal Wildlife Refuge; 3) offsets impacts to wetland areas in the Lower Missouri Watershed for mitigation responsibilities contracted by MARS (see previous sub-section on Related Credit Sales); and 4) addresses threats identified in the Compensation Planning Framework (CPF) for this watershed (CFR §332.8(c). Threats to the Lower Missouri watershed, articulated in MARS' approved Compensation Planning Framework for Watershed District #12, include pg. 3

Proposal for Modification of In-Lieu Fee Program Instrument ­ Proposed Site Plan Manning Lake Salt Marsh Flat Wetland Restoration in Lower Missouri Watershed District (#12)

89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130

oil and gas development, certain agricultural practices, transportation infrastructure, dams, urban and residential developments and invasive species. Securing management protection for the Complex is a necessary step towards avoiding and/or reducing the effects of such possible threats. However, extending management protection over the Complex is complicated by the diverse mixture of tribal trust, allotted trust, and fee lands. Trust land is defined as land that is held in trust by the United States government for Indian owners. Tribal trust land is collectively owned by a tribe(s) while allotted trust land is owned by a single or multiple Indian owners. Allotted trust lands are often highly fractionalized, with a forty acre parcel potentially having sixty or more owners, all holding varying percentages of undivided ownership interest. Determining the current lease status of allotted land can be complicated as lease contracts may be secured through agreements with the Bureau of Indian Affairs (BIA), Tribal Natural Resource Department, or through private agreement, making record searches difficult. In addition, many owners are not actively involved in the management of their lands, many live out of state, and some do not keep up their contact information to date. BIA leases require a minimum of 51% interest approval, which depending on the number of interest holders, can be a lengthy process. Trust land leases are secured through either the BIA or a private agreement with the landowner(s). The standard length of business leases are 10 years and run from January 1 ­ December 31st. Lease bidding for BIA managed trust lands opens in the fall of the lease end year. Current Complex-area business leases for pasture lands start at $4/acre. To simplify management strategies within the Complex, the Tribes passed Resolution #2392008-01, designating a portion of the Complex as the Manning Lake Wetlands Tribal Wildlife Refuge (Refuge) and authorizing the drafting of a Refuge Management plan. The Tribes are striving to extend management protection over all available lands within the Refuge through purchase or lease. (Spaur, 2014). This in-lieu fee project is composed of two discrete tax parcels. The Salt Marsh is located on both Fort Peck Indian Reservation lands and also a private landowner, Mark Wolff. As a part of the mitigation project, the Fort Peck Tribe lands will be protected in perpetuity by auto renewing 25-year leases and the private parcel will be protected by virtue of a deed restriction. These land protections will be placed on the properties to protect the project from any future human-caused disturbances and will run with the land so that it prohibits the current owners (and its successors or assigns) from activities that will impact the sites (see Section X. Site Protection Instruments and Appendix X for Cooperative Management Agreement and Deed Restriction).

pg. 4

Proposal for Modification of In-Lieu Fee Program Instrument ­ Proposed Site Plan Manning Lake Salt Marsh Flat Wetland Restoration in Lower Missouri Watershed District (#12)

131 132

pg. 5

Proposal for Modification of In-Lieu Fee Program Instrument ­ Proposed Site Plan Manning Lake Salt Marsh Flat Wetland Restoration in Lower Missouri Watershed District (#12)

133 pg. 6

Proposal for Modification of In-Lieu Fee Program Instrument ­ Proposed Site Plan Manning Lake Salt Marsh Flat Wetland Restoration in Lower Missouri Watershed District (#12)

134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177

(4) Site protection instrument The project site falls on both Fort Peck Indian Reservation tribal lands and a portion on private landowner, Mark Wolff. MARS is currently in negotiations with the Tribal Council to establish 25-year auto-renewing land leases within a Cooperative Management Agreement and Mark Wolff to establish a deed restriction. MARS has reserved sufficient funds to pay for these permanent land protection agreements. A copy of the Site Protection Agreements documents are provided in Appendix X. (5) Baseline information The project site occurs in the Glaciated Dark Brown Prairie Level IV Ecoregion that is part of the larger Northwestern Glaciated Plains Level III Ecoregion. The Glaciated Dark Brown Prairie ecoregion is characterized as rolling glacial drift plains with gravel benches and scattered paleodunes (Woods et al. 2002). The prairie is considered semi-arid, with precipitation generally ranging from 11 to 16 inches annually. Temperatures average a low of -6o F in January, to an average high of 88o F in July (Woods et al. 2002). The land cover is comprised of a mosaic of cropland and rangeland that has a potential climax community dominated by wheatgrassneedlegrass. Saline soils are common along the lower Big Muddy area (Woods et al. 2002). Soils found at the site are mapped by the Natural Resources Conservation Service (NRCS) as soil map unit 34 - Lallie silty clay, saline, 0 to 2 percent slopes. These soils are thought to have formed in an ancient lakebed and have a clayey alluvium parent material. Soil texture is a silty clay to a depth of 60 inches. This soil is very poorly drained, is slightly to strongly saline, and typically has a maximum sodium adsorption ratio of 5.0. The project area is classified as a Wet Meadow (WM) 10-14" p.z. (R053AE068MT) ecological site (NRCS 2018). A formal description of this type of ecological site has not been finalized and is not currently available. Agricultural uses in the Manning Lake area include haying, grazing and a small amount of dryland farming. Most of the southern portion of the Refuge consists of marsh or open water. While much of the Complex is currently in good condition due to its remote location and limited usefulness for agricultural purposes, about 2,100 acres have been identified by the National Wetland Inventory as drained wetlands. Potential threats to the Refuge include additional drainage, energy development (including biomass production), overgrazing, breaking of native prairie for farming, drought, invasive species, climate change, and complex ownership including a high degree of land fractionalization. (Spaur 2014). The Fort Peck Tribes Non-Point Source (NPS) Assessment report identified the Big Muddy Creek watershed as moderately to severely impaired from pollutants such as excess sediment and nutrients. Nitrogen and phosphorous were the specific non-point source nutrients of concern in their report. The causes for increased sediment and nutrients were attributed to be livestock grazing, dryland and irrigation farming, streambank erosion, and natural sources. Grazing was also identified by the Montana Department of Environmental Quality as a source of impairment to Big Muddy Creek water quality in their 2016 Water Quality Assessment Report pg. 7

Proposal for Modification of In-Lieu Fee Program Instrument ­ Proposed Site Plan Manning Lake Salt Marsh Flat Wetland Restoration in Lower Missouri Watershed District (#12)

178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221

submitted to the U.S. Environmental Protection Agency Region VIII. Big Muddy Creek is rated as impaired for the designated use of aquatic life (fish, shellfish, and wildlife protection and propagation). The causes of impairment are similar to that of the Fort Peck Tribes NPS Assessment Report and include nutrients (total nitrogen and total phosphorous), and sedimentation/siltation due to agriculture and grazing. Based on the site visit conducted on July 17, 2018, the proposed salt marsh mitigation site has three distinct wetland habitats, salt flat, softstem bulrush marsh, and wetland meadows. Photos of these areas are included in Appendix A. Salt Flat - The salt flat is a sparsely vegetated area. Softstem Bulrush Marsh ­ The softstem bulrush marsh occurs near the center of the slat flat, and that is relatively linear feature, oriented from north to south. Wet Meadow ­ Wet Meadow habitats occur within the old alignment of Big Muddy Creek, as well as in the areas between the old channel alignment and the salt flat. Additional ecological information that will be collected/generated for this site includes: · wetland delineation · wetland functional assessment · soil samples from the salt flat area · topographic data · comprehensive water budget This information will be used to update the preliminary draft mitigation plan. (6) Determination of Credits MARS proposes to generate a minimum of 37 mitigation ratio-based credits from this project to satisfy the 22.09 wetland credit obligation (Table 2). MARS estimated the wetland mitigation credits using the compensatory wetland mitigation ratios provided by the ACOE's Omaha District Montana Wetland Mitigation Procedure (January 2013). These credits are based on the following components: 1.) Restoration of a more natural hydrologic regime to the salt flat site; 2.) Hydrologic restoration to the historic channel of Big Muddy Creek; 3.) Fencing to exclude livestock; 4.) Wetlands will be preserved through the restrictions imposed on the area by the establishment of the Manning Lake Refuge and by 25 year auto-renewing land and water lease agreements between the Tribal Council and MARS; and 5.) Adjacent buffer areas will also be preserved by 25-year auto-renewing land and water lease agreements. Any additional stream or wetland credits above those required to offset MARS current obligations in the Watershed from the two credit sales discussed previously are proposed to be certified by the Corps and available for MARS to use for additional sales in the watershed as certified wetland credits to be sold at a 1:1 ratio. pg. 8

Proposal for Modification of In-Lieu Fee Program Instrument ­ Proposed Site Plan Manning Lake Salt Marsh Flat Wetland Restoration in Lower Missouri Watershed District (#12)

222 223 224 225 226 227 228

The Draft Mitigation Plan will include the credit release schedule (see Section VI-C of the MARS Final Instrument). The scheduled release of credits will correspond to the timeframe established for Plan approval and completion of the monitoring of the compensatory mitigation project to ensure that performance measures have been met. Table 2. Wetland Credit Generation Credit

Ratio*

Restoration (Rehabilitation) Wetland Preservation Upland Preservation Total Debits

229 230 231 232 233 234 235 236 237

1.5 to 1 4 to 1 5 to 1 --

Acres

Credits

To be determined

To be determined

265

81.5 22.09 59.41

37 228

24.5 57

Remaining Credits * Ratios taken directly from the ACOE Omaha District's Wetland Compensatory Mitigation Ratios (April 2005).

(7) Mitigation work plan The purpose of this project is to improve wetland health through hydrologic restoration to the salt flat and the historic channel of Big Muddy Creek. The project will enhance native wetland plant communities through this hydrologic restoration and site protection from grazing. Increasing the frequency, duration, and consistency of site inundation will also support migrating and breeding populations of waterfowl, sandpipers, and other wading birds. The conceptual layout of the project is provided in Figure 3.

pg. 9

Proposal for Modification of In-Lieu Fee Program Instrument ­ Proposed Site Plan Manning Lake Salt Marsh Flat Wetland Restoration in Lower Missouri Watershed District (#12)

238 pg. 10

Proposal for Modification of In-Lieu Fee Program Instrument ­ Proposed Site Plan Manning Lake Salt Marsh Flat Wetland Restoration in Lower Missouri Watershed District (#12)

239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282

If approved by the Corps, MARS will complete the following activities and revise/update the Draft Mitigation Plan: 1. Defining the geographic boundaries of the project ­ A rough conceptual design has been developed and with that design as a starting point for this proposal, MARS proposes to implement creditable activities within that area. This area will be the basis for a lease agreement with the Fort Peck Tribal Council and Mr. Wolff. 2. Securing water rights to support project: Determination of water right allocation for project is necessary. Investigation into either a tribal water right allocation from Big Muddy Creek or a state right from DNRC is ongoing. At this time MARS is working directly with the Fort Peck Tribes to secure a portion of their total allocation for Big Muddy Creek for the salt marsh mitigation site and has submitted an application for a beneficial water use permit to the Water Resource Office. Additional and updated information on physical water availability and water rights will be provided in the Draft Mitigation Site Plan. 3. Developing a water management plan ­ A preliminary water budget was developed for the site, indicating that a minimum of 65 ac-ft of water would be necessary to support the site with water through the growing season. This estimate will be revised. MARS has consulted and will continue to consult with the Tribes regarding water rights. Depending on the interest and ability for the Fort Peck Tribes to supply water to the site, some management parameters may need to be modified. More detail will be provided in the Draft Mitigation Site Plan. 4. Conducting Soil Analyses ­ Soil test pit analysis and testing has been completed to determine levels of contaminants and naturally occurring salts found in the soils to inform site restoration and management. Based on discussions with the Montana Salinity Control Association and Energy Labs in Helena, specific tests will be conducted in the 0-6 inch and 6 to 24 inch depth classes for soil pH, conductivity, Lime, Sodium Adsorption Ratio (SAR), Exchangeable Sodium Percentage (ESP), Sulfate/Chloride, Selenium, Arsenic, Cadmium, and Boron. These soil testing results will be provided in the Draft Mitigation Site Plan. 5. Mapping baseline extent of wetlands found at the site. Details of the existing wetlands will be provided in the Draft Mitigation Site Plan. 6. Executing prescribed construction methods, timing and sequence ­ MARS proposes to contract with Confluence Consulting to fully develop a site restoration plan for the site. This will include designs for the proposed siphon to get water out of Big Muddy Creek, the channel plug, and revegetation efforts. MARS will provide additional information in the Draft Mitigation Site Plan once approval of the Amendment to MARS ILF Instrument is granted by the Corps. (8) Maintenance plan The proposed leases will legally bind the Fort Peck Tribal Council, Mr. Wolff, and any future owners to protect the restored wetland site, especially by prohibiting any uses that would limit the wetland's ability to function at a high level. MARS is working on a cooperative agreement with the Tribe regarding long-term management of the site. MARS or an independent third party will monitor the leases to ensure that maintenance of the area continues and any required adaptive management activities are initiated. pg. 11

Proposal for Modification of In-Lieu Fee Program Instrument ­ Proposed Site Plan Manning Lake Salt Marsh Flat Wetland Restoration in Lower Missouri Watershed District (#12)

283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325

In addition, MARS will grant the Office of Environmental Protection (OEP) an endowment to manage these parcels to the specifications in the Management Plans that MARS will complete for each parcel. To assist with this maintenance, MARS will grant OEP an endowment using long-term management funds to repair fences, maintain the siphon, and to conduct invasive species treatments if needed. (9) Performance standards The following general areas of performance will be evaluated as part of the project and be described in greater detail in the Draft and Final Mitigation Site Plans: 1.) Inundation of the historic channel and soil saturation with 12-inches of the ground surface in the salt flat areas for a minimum of 12.5% of the growing season (approximately 18 consecutive days per year); 2.) Habitat mapping to show how the increased hydrology is changing local plant communities; 3.) Removal of disturbance by prohibiting livestock grazing and other activities from the buffer area; 4.) Measuring success of native vegetative plantings; and 5.) Annual monitoring of the siphon to ensure it functions smoothly. (10) Monitoring requirements The preservation aspect of the mitigation project will be monitored continually by the Fort Peck Tribe to ensure terms of the Deed Restriction/Conservation Easement are being adhered to. Performance of the success of the restoration aspects of the project will be defined as performance measures in the Final Site Mitigation Plan that MARS will develop. MARS will monitor the site at least annually for a minimum of five consecutive years. (11) Long-term management plan MARS and the Fort Peck Tribe will enter into a long-term Cooperative Management Agreement with responsibility to manage the site and any subsequent landowner in perpetuity. Deed restriction/conservation easement monitoring by MARS or an independent third party will ensure that the long-term management of the area continues to show that no further loss of ecological function of the wetland or stream features within the project area has occurred. (12) Adaptive management plan Annual performance monitoring will indicate when adaptive management is required. MARS intends that the mitigation project be maintained in perpetuity as 25-year auto renewing leases and a deed restriction in the mitigation area. Steps to be taken in the event of the need for adaptive management or enforcement of the land protection document terms and conditions will be identified in the Draft Mitigation Plan. (13) Financial assurances pg. 12

Proposal for Modification of In-Lieu Fee Program Instrument ­ Proposed Site Plan Manning Lake Salt Marsh Flat Wetland Restoration in Lower Missouri Watershed District (#12)

326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353

MARS ILF Instrument stipulates that 17% and 13%, respectively, of the ILF fees collected for its compensatory mitigation projects be dedicated to contingency and long-term management of ILF projects statewide. MARS maintains those contingency and long-term management fees in an interest-bearing, FDIC-insured account. (Note: According to the Final Mitigation Rule, performance bonds, casualty insurance, letters of credit and other similar financial assurances apply only to mitigation banks. Because this project is an In-Lieu Fee Compensatory Mitigation Project, these forms of financial assurances are not included in MARS ILF Instrument and do not apply.)

References Fort Peck Assiniboine and Sioux Tribes, Office of Environmental Protection, FY 2017 Grant Proposal NPS Management Grant CWA Section 319, 2017. Natural Resources Conservation Service (NRCS). 2018. Web Soil Survey. Available URL: https://websoilsurvey.sc.egov.usda.gov/App/WebSoilSurvey.aspx. Site accessed September 2019. Spaur, Jeanne. 2014. Comprehensive Conservation and Management Plan for the Manning Lake Wetland Tribal Wildlife Refuge 2014-2019. Fort Peck Tribes, Office of Environmental Protection, Poplar, MT. Woods, Alan J., J.M. Omernik, , J.A. Nesser, J. Shelden, J.S. Comstock, S.H. Azevedo, 2002, Ecoregions of Montana, 2nd edition (color poster with map, descriptive text, summary tables, and photographs). Map scale 1:1,500,000.

pg. 13

354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385

Appendix A - Site Photographs Salt Flat Mitigation Site Fort Peck Tribes' Manning Lake Wildlife Refuge Fort Peck Indian Reservation, Montana

Proposal for Modification of In-Lieu Fee Program Instrument ­ Proposed Site Plan Manning Lake Salt Marsh Flat Wetland Restoration in Lower Missouri Watershed District (#12)

Photo 1. Example photo of the salt flat and adjacent

Photo 2. Example photo of the salt flat and the

Photo 3. Example of wet meadow habitats. The old

Photo 4. Example of the old channel of Big Muddy

wet meadow areas.

Big Muddy Creek channel is on the right side of the photo.

softstem bulrush marsh.

Creek.

Photo 5. Facing downstream at the straightened and

channelized reach of Big Muddy Creek, just south of the salt flat.

pg. 15

Proposal for Modification of In-Lieu Fee Program Instrument ­ Proposed Site Plan Manning Lake Salt Marsh Flat Wetland Restoration in Lower Missouri Watershed District (#12)

386

pg. 16

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas