You can copy from here when filling out the rest of the page.
INSTALL AND MAINTAIN A DIESEL PLANT AND APPURTENANT STRUCTURES IN SAINT CHARLES PARISH
NAME OF APPLICANT: Diamond Green Diesel, c/o Ramboll Environ US Corporation, Adam
Goodine, 1055 Saint Charles Avenue, New Orleans, Louisiana 70130.
LOCATION OF WORK: Section 7, Township 12 South, Range 8 East, in Norco, Louisiana, in
Saint Charles Parish, as shown on the attached drawings.
HUC: 08090203: Lower Mississippi Region
Latitude: 29.999294 Longitude: -90.391411
CHARACTER OF WORK: To install and maintain an additional diesel plant and appurtenant
structures in Norco, Louisiana. The original diesel plant was previously issued under MVN 2005-00775
EMM. The rest of the site has been previously cleared and filled for a parking and laydown area under
permit MVN 2008-00030 EMM. The jurisdictional wetlands were previously compensated for under
MVN 2005-00775 EMM and MVN 2008-00030 EMM, as such compensatory mitigation is not
anticipated at this time.
JOINT PUBLIC NOTICE
October 29, 2018
United States Army
Corps of Engineers
New Orleans District
Regulatory Branch
7400 Leake Avenue
New Orleans, Louisiana 70118
State of Louisiana
Department of Environmental Quality
Attn: Water Quality Certifications
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
(504) 862-2259
Project Manager
Scott N. Kennedy
scott.n.kennedy@usace.army.mil
Permit Application Number
MVN 2005-00775 EMM
(225) 219-3225
Project Manager
Elizabeth Hill
WQC Application Number
WQC 181003-01
Interested parties are hereby notified that a permit application has been received by the New Orleans
District of the U.S. Army Corps of Engineers pursuant to: [ ] Section 10 of the Rivers and Harbors Act of
March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404 of the Clean Water Act (86 Stat. 816;
33 USC 1344).
Application has also been made to the Louisiana Department of Environmental Quality, Water
Quality Certifications, for a Water Quality Certification (WQC) in accordance with statutory authority
contained in LRS 30:2074 A(3) and provisions of Section 401 of the Clean Water Act.
INSTALL AND MAINTAIN A DIESEL PLANT AND
APPURTENANT STRUCTURES IN SAINT CHARLES PARISH
NAME OF APPLICANT: Diamond Green Diesel, c/o Ramboll Environ US Corporation, Adam
Goodine, 1055 Saint Charles Avenue, New Orleans, Louisiana 70130.
LOCATION OF WORK: Section 7, Township 12 South, Range 8 East, in Norco, Louisiana, in
Saint Charles Parish, as shown on the attached drawings.
HUC: 08090203: Lower Mississippi Region
Latitude: 29.999294 Longitude: -90.391411
CHARACTER OF WORK: To install and maintain an additional diesel plant and appurtenant
structures in Norco, Louisiana. The original diesel plant was previously issued under MVN 2005-00775
EMM. The rest of the site has been previously cleared and filled for a parking and laydown area under
permit MVN 2008-00030 EMM. The jurisdictional wetlands were previously compensated for under
MVN 2005-00775 EMM and MVN 2008-00030 EMM, as such compensatory mitigation is not
anticipated at this time.
The comment period for the Department of the Army Permit and the Louisiana Department of
Environmental Quality WQC will close 20 days from the date of this joint public notice. Written
comments, including suggestions for modifications or objections to the proposed work, stating reasons
-2thereof, are being solicited from anyone having interest in this permit and/or this WQC request and must
be mailed so as to be received before or by the last day of the comment period. Letters concerning the
Corps of Engineers permit application must reference the applicant's name and the Permit Application
Number, and be mailed to the Corps of Engineers at the address above, ATTENTION:
REGULATORY BRANCH. Similar letters concerning the Water Quality Certification must reference
the applicant's name and the WQC Application number and be mailed to the Louisiana Department of
Environmental Quality at the address above. Individuals or parties may request an extension of time in
which to comment on the proposed work by writing or e-mailing the Corps of Engineers Project Manager
listed above. Any request must be specific and substantively supportive of the requested extension, and
received by this office prior to the end of the initial comment period. The Section Chief will review the
request and the requestor will be promptly notified of the decision to grant or deny the request. If granted,
the time extension will be continuous to the initial comment period and, inclusive of the initial comment
period, will not exceed a total of 30 calendar days.
The application for this proposed project is on file with the Louisiana Department of
Environmental Quality and may be examined weekdays between 8:00 a.m. and 4:30 p.m. Copies may be
obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable impacts,
including cumulative impacts of the proposed activity on the public interest. That decision will reflect the
national concern for both protection and utilization of important resources. The benefit which reasonably
may be expected to accrue from the proposal must be balanced against its reasonably foreseeable
detriments. All factors which may be relevant to the proposal will be considered including the cumulative
effects thereof; among those are conservation, economics, aesthetics, general environmental concerns,
wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use,
navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality,
energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and,
in general, the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state, and local
agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate the
impacts of this proposed activity. Any comments received will be considered by the U.S. Army Corps of
Engineers to determine whether to make, modify, condition, or deny a permit for this proposal. To make
this decision, comments are used to assess impacts on endangered species, historic properties, water
quality, general environmental effects, and other public interest factors listed above. Comments are used
in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant
to the National Environmental Policy Act. Comments are also used to determine the need for a public
hearing and to determine the overall public interest of the proposed activity.
The New Orleans District is unaware of properties listed on the National Register of Historic
Places near the proposed work. The possibility exists that the proposed work may damage or destroy
presently unknown archeological, scientific, prehistorical, historical sites, or data. Issuance of the public
notice solicits input from the State Archeologist and State Historic Preservation Office regarding potential
impacts to cultural resources.
The New Orleans District has determined that the proposed work would neither affect any species
listed as endangered by the U.S. Department of Commerce, nor affect any habitat designated as critical to
the survival and recovery of any endangered species.
-3Utilizing Standard Local Operating Procedure for Endangered Species in Louisiana (SLOPES),
dated October 22, 2014, between the U.S. Army Corps of Engineers, New Orleans and U.S. Fish and
Wildlife Service, Ecological Services Office, the Corps has determined that the proposed activity would
have no effect on any listed species.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the MagnusonStevens Fishery Conservation and Management Act. The applicant's proposal would result in the
destruction or alteration of up to N/A acres of EFH utilized by various life stages of red drum and penaeid
shrimp. Our initial determination is that the proposed action would not have a substantial adverse impact
on EFH or federally managed fisheries in the Gulf of Mexico. Our final determination relative to project
impacts and the need for mitigation measures is subject to review by and coordination with the National
Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters, the
evaluation of the probable impacts will include the application of guidelines established by the
Administrator of the Environmental Protection Agency. Also, a certification that the proposed activity
will not violate water quality standards will be required from the Department of Environmental Quality,
Water Quality Certifications, before a permit is issued.
Any person may request, in writing, within the comment period specified in this notice, that a
public hearing be held to consider this application. Requests for public hearings shall state, with
particularity, the reasons for holding a public hearing.
The applicant has certified that the proposed activity described in the application complies with
and will be conducted in a manner that is consistent with the Louisiana Coastal Resources Program. The
Department of the Army permit will not be issued unless the applicant received approval or a waiver of
the Coastal Use Permit by the Department of Natural Resources.
You are requested to communicate the information contained in this notice to any other parties
whom you deem likely to have interest in the matter.
Michael Farabee
Chief, Eastern Evaluation Section
Enclosures
L:\Loop Project Files\_CAD\1690008197_DGD_Pipeline Wetlands Permitting\_Permit_2018-06\2018-10\01_Site Location Map.dwg
SITE
1
1/2
2000
0
0
1 MILE
2000
4000
6000 FEET
CONTOUR INTERVAL 5 FEET
SOURCE: U.S.G.S. 7.5 minute series (topographic)
Hahnville, Louisiana Quadrangle, 2012.
LaPlace, Louisiana Quadrangle, 2012.
Luling, Louisiana Quadrangle, 2012.
LaBranch, Louisiana Quadrangle, 2012.
Legend
Proposed
Overall Project Boundary
SITE LOCATION MAP
DIAMOND GREEN DIESEL EXPANSION PROJECT - NORTH PLANT
ST. CHARLES PARISH, LOUISIANA
DRAFTED BY: APR/ELS
DATE: 10/19/18
FIGURE
1
1690008197
L:\Loop Project Files\_CAD\1690008197_DGD_Pipeline Wetlands Permitting\_Permit_2018-06\2018-10\02_Wetlands Impact Map.dwg
U.S. Highway 61 - Airline Highway
LDNR: P20180100 / USACE: MVN ETT 2008-00030
LDNR: P20180100 /
USACE MVN ETT 2008-00030
Diamond Green Diesel
Access Road
Diamond Green Diesel Laydown Area
Permitted in 2005
LDNR: P20050123 / USACE: MVN 2005-775-EE
LDNR: P20150630 /
USACE: MVN20080030ETT
DGD Rail LDNR: P20150630 /
USACE: MVN 20080030ETT
DGD Rail LDNR: P20101540 / USACE: MVN 2010-02773 EKK
Developed and Project Area (acres)
96.12
Proposed
Overall Project Boundary
Wetland Impacts
Authorized Under Other Permits
Upland Area
Included in Project Boundary
Wetland Impacts
Authorized Under
P20160951 / MVN-00775EMM
Project Wetland Impacts
Authorized under
P20180100 / MVN ETT 2008-00030
Notes:
1. All Design Data provided by Diamond Green Diesel.
2. As-built drawings and/or plats shall have written on them the date of completion of said activities
and shall be submitted to the Louisiana Department of Natural Resources, Office of Coastal
Management, P. O. Box 44487, Baton Rouge, LA 70804-4487 within 30 days following project
completion.
3. All structures built under the authorization and conditions of this permit shall be removed from
the site within 120 days of abandonment of the facilities for the herein permitted use, or when
these structures fall into a state of disrepair such that they can no longer function as intended.
This condition does not preclude the necessity for revising the current permit or obtaining a
separate Coastal Use Permit, should one be required, for such removal activities.
4. Structures must also be marked/lighted in accordance with U. S. Coast Guard regulations.
5. In order to ensure the safety of all parties, the permittee shall contact the Louisiana One Call
System (1-800-272-3020) a minimum of 48 hours prior to the commencement of any excavation
(digging, dredging, jetting, etc.) or demolition activity.
HISTORIC WETLANDS IMPACTS MAP
DIAMOND GREEN DIESEL EXPANSION PROJECT - NORTH PLANT
ST. CHARLES PARISH, LOUISIANA
DRAFTED BY: APR/ELS
DATE: 10/19/18
APPROX. SCALE (ft.)
0
400
FIGURE
2
1690008197
L:\Loop Project Files\_CAD\1690008197_DGD_Pipeline Wetlands Permitting\_Permit_2018-10\03-_Site Plan.dwg
U.S. Highway 61 - Airline Highway
CITRIC ACID AREA
U.S. Highway 61 - Airline Highway
DGD2
PRETREATMENT
UNIT-54
28.4127
DGD2 TANK FARM UNIT 56
RENEWABLE
NAPHTHA / LEU
CONSTRUCTION MANAGEMENT
AND SAFETY AREA 1
Existing
Entergy
Sub
S5225
NEW ADMIN/
WAREHOUSE
BUILDING
Entergy
Expansion
31.9183
GUMS
UNLOADING
AREA
Contractor Parking
S5231
S5234L
S5228
S5234B
T-56-018
Construction
Laydown Area 1
T-56-019
T-56-020
BLEACHING
EARTH AND
FILTER AID
LOADING
AREA
NEW FLARE
Z-56-001
NEW TRUCK
UNLOADING
Guard Shack
Proposed
Construction
Laydown Area 2
NEW RACK
T-56-017
NEW MCC
T-56-015
T-56-010
T-56-011
DGD2
NEW
WWTU2
NEW MCC
TRANSFORMER
AREA
DGD2 ECOFINING UNIT 55
Existing Flare
S
CLU
' EX
ION
ZO
NE
Construction
Management
& Safety
Area 1
Existing
SMR Unit
Existing
Parking
ion ROW
ansmiss s)
230kV Tr
er
Proposed r Impacts by Oth
Entergy
ation fo
(Authoriz
Construction
Management
& Safety
Area 2
200
Parkway
Pipeline
Station
Note: Permitting to be
undertaken by others.
Wetlands
DGD Rail
LDNR: P20101540 / USACE: MVN 2010-02773 EKK
Proposed
Overall Project Boundary
Wetlands Authorized for
Impact from Past Permits
Uplands
Construction Complete
DGD Rail
LDNR: P20101540 / USACE: MVN 2010-02773 EKK
Notes:
1. All Design Data provided by Diamond Green Diesel.
2. As-built drawings and/or plats shall have written on them the date of completion of said activities and shall be submitted to the Louisiana
Department of Natural Resources, Office of Coastal Management, P. O. Box 44487, Baton Rouge, LA 70804-4487 within 30 days following
project completion.
3. All structures built under the authorization and conditions of this permit shall be removed from the site within 120 days of abandonment of the
facilities for the herein permitted use, or when these structures fall into a state of disrepair such that they can no longer function as intended.
This condition does not preclude the necessity for revising the current permit or obtaining a separate Coastal Use Permit, should one be
required, for such removal activities.
4. Structures must also be marked/lighted in accordance with U. S. Coast Guard regulations.
5. In order to ensure the safety of all parties, the permittee shall contact the Louisiana One Call System (1-800-272-3020) a minimum of 48 hours
prior to the commencement of any excavation (digging, dredging, jetting, etc.) or demolition activity.
SITE PLAN
DIAMOND GREEN DIESEL EXPANSION PROJECT - NORTH PLANT
ST. CHARLES PARISH, LOUISIANA
DRAFTED BY: APR/ELS
DATE: 10/21/18
APPROX. SCALE (ft.)
0
400
FIGURE
3
1690008197
L:\Loop Project Files\_CAD\1690008197_DGD_Pipeline Wetlands Permitting\_Permit_2018-10\04_Cross-Section Location Map.dwg
A'
B
B'
A
Proposed
Overall Project Boundary
Uplands
Construction Complete
Notes:
1. All Design Data provided by Diamond Green Diesel.
2. As-built drawings and/or plats shall have written on them the date of completion of said activities and shall be submitted to the Louisiana
Department of Natural Resources, Office of Coastal Management, P. O. Box 44487, Baton Rouge, LA 70804-4487 within 30 days following
project completion.
3. All structures built under the authorization and conditions of this permit shall be removed from the site within 120 days of abandonment of the
facilities for the herein permitted use, or when these structures fall into a state of disrepair such that they can no longer function as intended.
This condition does not preclude the necessity for revising the current permit or obtaining a separate Coastal Use Permit, should one be
required, for such removal activities.
4. Structures must also be marked/lighted in accordance with U. S. Coast Guard regulations.
5. In order to ensure the safety of all parties, the permittee shall contact the Louisiana One Call System (1-800-272-3020) a minimum of 48 hours
prior to the commencement of any excavation (digging, dredging, jetting, etc.) or demolition activity.
CROSS-SECTION LOCATION MAP
DIAMOND GREEN DIESEL EXPANSION PROJECT - NORTH PLANT
ST. CHARLES PARISH, LOUISIANA
DRAFTED BY: APR/ELS
DATE: 10/19/18
APPROX. SCALE (ft.)
0
400
FIGURE
4
1690008197
L:\Loop Project Files\_CAD\1690008197_DGD_Pipeline Wetlands Permitting\_Permit_2018-10\05_XS A-A' & B-B'dwg.dwg
LIMITS OF WORK
APPROXIMATELY 502'
EXISTING UPLANDS
9" GRAVEL PAVING (TYP.)
2
1
6'
EXISTING GRADE
3'
SELECT GRANULAR MATERIAL
(LOCALLY AVAILABLE RIVER
SAND OR NON PLASTIC SOIL)
CHRUSHED STONE
GEOGRID
TYPICAL CROSS-SECTION A-A'
NOT TO SCALE
LIMITS OF WORK
APPROXIMATELY 2945'
9" GRAVEL PAVING (TYP.)
EXISTING GRADE
EXISTING UPLANDS
2
1
6'
3'
GEOGRID
SELECT GRANULAR MATERIAL
(LOCALLY AVAILABLE RIVER
SAND OR NON PLASTIC SOIL)
CHRUSHED STONE
TYPICAL CROSS-SECTION B-B'
NOT TO SCALE
Notes:
1. All Design Data provided by Diamond Green Diesel.
2. As-built drawings and/or plats shall have written on them the date of completion of said activities and shall be submitted to the Louisiana Department of Natural Resources, Office of
Coastal Management, P. O. Box 44487, Baton Rouge, LA 70804-4487 within 30 days following project completion.
3. All structures built under the authorization and conditions of this permit shall be removed from the site within 120 days of abandonment of the facilities for the herein permitted use, or
when these structures fall into a state of disrepair such that they can no longer function as intended. This condition does not preclude the necessity for revising the current permit or
obtaining a separate Coastal Use Permit, should one be required, for such removal activities.
4. Structures must also be marked/lighted in accordance with U. S. Coast Guard regulations.
5. In order to ensure the safety of all parties, the permittee shall contact the Louisiana One Call System (1-800-272-3020) a minimum of 48 hours prior to the commencement of any
excavation (digging, dredging, jetting, etc.) or demolition activity.
CROSS-SECTIONS A-A' AND B-B'
DIAMOND GREEN DIESEL EXPANSION PROJECT - NORTH PLANT
ST. CHARLES PARISH, LOUISIANA
DRAFTED BY: APR/ELS
DATE: 10/19/18
FIGURE
5
1690008197