MAINTENANCE DREDGING OF THE PEARL RIVER SHIP CHANNEL IN ST. TAMMANY PARISH
MAINTENANCE DREDGING OF THE PEARL RIVER SHIP CHANNEL IN ST. TAMMANY PARISH
NAME OF APPLICANT: Hancock County Port & Harbor Commission, ℅ Anchor QEA,
Attn: Renee Robertson, 9797 Timber Circle, Suite B, in Daphne, Alabama 36527.
LOCATION OF WORK: Project site is located within the Mississippi Sound, at the
mouth of the Pearl River in St. Tammany Parish, Louisiana, as shown on the enclosed
drawings.
Latitude: 30.178433 Longitude: -89.52525, Hydrologic Unit Code 08090203 – Eastern
Louisiana Coastal.
CHARACTER OF WORK: Maintenance dredging and deepening of the Pearl River
Ship Channel in order to provide safe navigation for larger vessels. Project
implementation will require excavation of approximately 600,000 cubic yards of native
material over a span of 5 years. The excavated material will be transferred via barge to
the existing permitted (SAM-2013-00088-MJF) Heron Bay Beneficial Use site, located
within Hancock County, Mississippi. The applicant maintains that no jurisdictional
wetlands would be directly affected by this action, thus no compensatory mitigation is
anticipated.
DEPARTMENT OF THE ARMY
CORPS OF ENGINEERS, NEW ORLEANS DISTRICT
7400 LEAKE AVENUE
NEW ORLEANS, LOUISIANA 70118
REPLY TO
ATTENTION OF
October 29, 2018
Operations Division
Regulatory Branch, ODR-E, Room 280
Project Manager
Stephanie Castaing
Stephanie.L.Castaing@usace.army.mil
(504) 862-1564
SUBJECT: MVN 2018-0704-EPP
PUBLIC NOTICE
Interested parties are hereby notified that an application has been received by the
District engineer for a Department of the Army permit to authorize the following pursuant
to (X) Section 10 of the Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33
USC 403); and/or ( ) Section 404 of the Clean Water Act (86 Stat. 816; 33 USC 1344).
MAINTENANCE DREDGING OF THE PEARL RIVER SHIP CHANNEL
IN ST. TAMMANY PARISH
NAME OF APPLICANT: Hancock County Port & Harbor Commission, Anchor QEA,
Attn: Renee Robertson, 9797 Timber Circle, Suite B, in Daphne, Alabama 36527.
LOCATION OF WORK: Project site is located within the Mississippi Sound, at the
mouth of the Pearl River in St. Tammany Parish, Louisiana, as shown on the enclosed
drawings.
Latitude: 30.178433 Longitude: -89.52525, Hydrologic Unit Code 08090203 Eastern
Louisiana Coastal.
CHARACTER OF WORK: Maintenance dredging and deepening of the Pearl River
Ship Channel in order to provide safe navigation for larger vessels. Project
implementation will require excavation of approximately 600,000 cubic yards of native
material over a span of 5 years. The excavated material will be transferred via barge to
the existing permitted (SAM-2013-00088-MJF) Heron Bay Beneficial Use site, located
within Hancock County, Mississippi. The applicant maintains that no jurisdictional
wetlands would be directly affected by this action, thus no compensatory mitigation is
anticipated.
-2The comment period will close 15 days from the date of this public notice
advertisement. Written comments, including suggestions for modifications or objections
to the proposed work, stating reasons therefore, are being solicited from anyone having
interest in this permit request. Letters must reference the applicant's name and the
subject number, be addressed and mailed to the above address, ATTENTION:
REGULATORY BRANCH. Individuals or parties may request an extension of time in
which to comment on the proposed work by writing or e-mailing the Corps of Engineers
Project Manager listed above. Any request must be specific and substantively
supportive of the requested extension, and received by this office prior to the end of the
initial comment period. The Section Chief will review the request and the requestor will
be promptly notified of the decision to grant or deny the request. If granted, the time
extension will be continuous to the initial comment period and, inclusive of the initial
comment period, will not exceed a total of 30 calendar days.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the
probable impacts, including cumulative impacts of the proposed activity on the public
interest. That decision will reflect the national concern for both protection and utilization
of important resources. The benefit which reasonably may be expected to accrue from
the proposal must be balanced against its reasonably foreseeable detriments. All
factors which may be relevant to the proposal will be considered including the
cumulative effects thereof; among those are conservation, economics, aesthetics,
general environmental concerns, wetlands, historic properties, fish and wildlife values,
flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion,
recreation, water supply and conservation, water quality, energy needs, safety, food and
fiber production, mineral needs, considerations of property ownership and, in general,
the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public, federal,
state, and local agencies and officials, Indian Tribes, and other interested parties in
order to consider and evaluate the impacts of this proposed activity. Any comments
received will be considered by the U.S. Army Corps of Engineers to determine whether
to make, modify, condition, or deny a permit for this proposal. To make this decision,
comments are used to assess impacts on endangered species, historic properties,
water quality, general environmental effects, and other public interest factors listed
above. Comments are used in the preparation of an Environmental Assessment and/or
an Environmental Impact Statement pursuant to the National Environmental Policy Act.
Comments are also used to determine the need for a public hearing and to determine
the overall public interest of the proposed activity.
The New Orleans District is unaware of properties listed on the National Register of
Historic Places near the proposed work. The possibility exists that the proposed work
may damage or destroy presently unknown archeological, scientific, prehistorical,
historical sites, or data. Issuance of this public notice solicits input from the State
Archeologist and State Historic Preservation Officer regarding potential impacts to
cultural resources.
-3The New Orleans District has determined that the proposed activity will have no
effect on the Dusky Gopher frog (Rana sevosa) and the Gopher Tortoise (Gopherus
polyphemus) and is not likely to adversely affect the West Indian Manatee with the
inclusion of the Standard Manatee Conditions For In-Water Activities; based on the
Standard Local Operating Procedure for Endangered Species of Louisiana (SLOPES),
dated October 22, 2014, between the U.S. Army Corps of Engineers and U.S. Fish and
Wildlife Service, Ecological Services Office.
The New Orleans District's preliminary determination for the National Marine
Fisheries Service (NMFS) under Section 7 of the Endangered Species Act (ESA) is that
the proposed project activities may affect, but not likely to adversely affect the following
species: Gulf sturgeon (Acipenser oxyrinchus desotoi), green sea turtle (Chelonia
mydas), Kemp's ridley sea turtle (Lepidochelys kempii), loggerhead sea turtle (Caretta
caretta), hawksbill sea turtle (Eretmochelys imbricate) and the leatherback sea turtle
(Dermochelys coriacea). Further consultation shall be initiated. The Corps is unaware of
any other ESA listed species or of any other ESA designated critical habitat that may be
affected by this project.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. The applicant's
proposal would result in the destruction or alteration of up to 50 acres of EFH utilized
by various life stages of red drum and penaeid shrimp. Our initial determination is that
the proposed action would not have a substantial adverse impact on EFH or federally
managed fisheries in the Gulf of Mexico. Our final determination relative to project
impacts and the need for mitigation measures is subject to review by and coordination
with the National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable
waters, the evaluation of the probable impacts will include the application of guidelines
established by the Administrator of the Environmental Protection Agency. Also, a
certification that the proposed activity will not violate water quality standards will be
required from the Department of Environmental Quality, Water Quality Certifications
Section before a permit is issued.
Any person may request, in writing, within the comment period specified in this notice,
that a public hearing be held to consider this application. Requests for public hearings
shall state, with particularity, the reasons for holding a public hearing.
The applicant has certified that the proposed activity described in the application
complies with and will be conducted in a manner that is consistent with the Louisiana
Coastal Resources Program. The Department of the Army permit will not be issued
unless the applicant received approval or a waiver of the Coastal Use Permit by the
Department of Natural Resources.
-4You are requested to communicate the information contained in this notice to any
other parties whom you deem likely to have interest in the matter.
Enclosure
Michael V. Farabee
Chief, Eastern Evaluation Section
Crawford
Landing
607
907
10
Clearmont Harbor
Logtown
59
Lakeshore
Breakwater - Authorized
Under SAM-2013-00088
90
Pearlington
Proposed Heron Bay Placement
Area (78 Acres) - Authorized
Under SAM-2013-00088
arl
Pe
Breakwater - Authorized
Under SAM-2013-00088
er
Riv
Pearl River Ship Channel (50 Acres)
Heron
Bay
sippi
Missis
na
Louisia
3736758.9586
Little Lake
The Rigolets
Proposed Barge Route
Lake Borgne
© 2018 Microsoft Corporation Earthstar Geographics SIO
SOURCE: Aerial image provided by Bing (Microsoft,).
HORIZONTAL DATUM: Mississippi State Plane, East Zone, NAD83, U.S. Survey Feet.
NOTE: Ship channel length is 9,600 feet. Channel width varies from 200 feet to 250
feet, with the average being 227 feet.
0
2.5
Miles
Publish Date: 2018/07/31 1:30 PM | User: dholmer
Filepath: K:\Projects\1254-Hancock County\Hancock County Port\Permit-Pearl River Ship Channel\1254-RP-001 (Pearl River SC Permit).dwg Figure 1
Figure 1
Dredged Material Characterization Project Area
Pearl River Ship Channel Dredging Permit
Hancock County Port and Harbor Commission
Matchline
23 Acres
er
l Riv
Pear
0+00
10+00
-
20+00
0
-1
30+00
40+00
10
Lat: N30°10'44.5704"
Long: W89°31'25.1943"
LEGEND:
Existing Bathymetry (2' Contour Interval)
80+00
Project Alignment
Proposed Dredge Boundary and Footprint of Dredge Cut
SOURCE: ©2017 DigitalGlobe ©CNES (2017) Distribution Airbus DS
©2017 Microsoft Corporation.
HORIZONTAL DATUM: Mississippi State Plane, East Zone, NAD83, U.S. Feet.
VERTICAL DATUM: Mean Lower Low Water (MLLW).
0
600
Feet
Publish Date: 2018/07/31 1:30 PM | User: dholmer
Filepath: K:\Projects\1254-Hancock County\Hancock County Port\Permit-Pearl River Ship Channel\1254-RP-002 (Pearl River SC Permit).dwg Figure 2
Figure 2
Pearl River Ship Channel Site Plan (1 of 2)
Pearl River Ship Channel Dredging Permit
Hancock County Port and Harbor Commission
Matchline
40+00
27 Acres
-10
50+00
60+00
70+00
80+00
90+00
96+00
Lat: N30°09'09.5485"
Long: W89°31'24.5323"
-10
LEGEND:
Existing Bathymetry (2' Contour Interval)
80+00
Lake Borgne
Project Alignment
Proposed Dredge Boundary and Footprint of Dredge Cut
SOURCE: ©2017 DigitalGlobe ©CNES (2017) Distribution Airbus DS
©2017 Microsoft Corporation.
HORIZONTAL DATUM: Mississippi State Plane, East Zone, NAD83, U.S. Feet.
VERTICAL DATUM: Mean Lower Low Water (MLLW).
0
600
Feet
Publish Date: 2018/07/31 1:30 PM | User: dholmer
Filepath: K:\Projects\1254-Hancock County\Hancock County Port\Permit-Pearl River Ship Channel\1254-RP-002 (Pearl River SC Permit).dwg Figure 3
Figure 3
Pearl River Ship Channel Site Plan (2 of 2)
Pearl River Ship Channel Dredging Permit
Hancock County Port and Harbor Commission
STA 20+00
Elevation in Feet (MLLW)
10
10
Mean High Water = 1.0' MLLW
5
Mean Low Water = -0.6' MLLW
0
0
Existing Surface
Design Dredge Elevation
-5
-10
-10
-15
-20
2' Allowable Overdepth
-20
Dredged Material to be Removed
-25
-30
-30
-140
-120
-100
-80
-60
-40
-20
0
20
Offset in Feet
2x Vertical Exaggeration
40
60
80
100
120
140
STA 40+00
Elevation in Feet (MLLW)
10
10
Mean High Water = 1.0' MLLW
5
Mean Low Water = -0.6' MLLW
0
0
Existing Surface
Design Dredge Elevation
-5
-10
-10
-15
-20
2' Allowable Overdepth
-20
Dredged Material to be Removed
-25
-30
-30
-140
-120
-100
-80
-60
-40
-20
0
20
Offset in Feet
2x Vertical Exaggeration
40
60
80
100
120
140
Publish Date: 2018/07/31 1:30 PM | User: dholmer
Filepath: K:\Projects\1254-Hancock County\Hancock County Port\Permit-Pearl River Ship Channel\1254-RP-002 (Pearl River SC Permit).dwg Figure 4
Figure 4
Sections on Project Stationing (1 of 2)
Pearl River Ship Channel Dredging Permit
Hancock County Port and Harbor Commission
STA 60+00
Elevation in Feet (MLLW)
10
10
Mean High Water = 1.0' MLLW
5
Mean Low Water = -0.6' MLLW
0
0
Existing Surface
Design Dredge Elevation
-5
-10
-10
-15
-20
2' Allowable Overdepth
-20
Dredged Material to be Removed
-25
-30
-30
-140
-120
-100
-80
-60
-40
-20
0
20
Offset in Feet
2x Vertical Exaggeration
40
60
80
100
120
140
STA 80+00
Elevation in Feet (MLLW)
10
10
Mean High Water = 1.0' MLLW
5
Mean Low Water = -0.6' MLLW
0
0
Existing Surface
Design Dredge Elevation
-5
-10
-10
-15
-20
2' Allowable Overdepth
-20
Dredged Material to be Removed
-25
-30
-30
-140
-120
-100
-80
-60
-40
-20
0
20
Offset in Feet
2x Vertical Exaggeration
40
60
80
100
120
140
Publish Date: 2018/07/31 1:30 PM | User: dholmer
Filepath: K:\Projects\1254-Hancock County\Hancock County Port\Permit-Pearl River Ship Channel\1254-RP-002 (Pearl River SC Permit).dwg Figure 5
Figure 5
Sections on Project Stationing (2 of 2)
Pearl River Ship Channel Dredging Permit
Hancock County Port and Harbor Commission
Lat: N30°11'04.6602"
Long: W89°27'42.6076"
Lat: N30°11'02.5507"
Long: W89°27'35.6428"
y
n Ba
Hero
Lat: N30°10'46.3332"
Long: W89°27'58.8913"
Lat: N30°10'41.2686"
Long: W89°28'03.0270"
Lat: N30°10'35.9913"
Long: W89°28'00.8576"
SOURCE: ©2017 DigitalGlobe ©CNES (2017) Distribution Airbus DS ©2017 Microsoft Corporation.
HORIZONTAL DATUM: Mississippi State Plane, East Zone, NAD83, U.S. Feet.
VERTICAL DATUM: Mean Lower Low Water (MLLW).
NOTE: Placement area permitted by MDMR (DMR-140197) and USACE (SAM-2013-00088-MJF)
LEGEND:
Target Area for Marsh Fill Placement
0
400
Feet
Cross Section Location (See Figure 7)
Publish Date: 2018/07/31 1:30 PM | User: dholmer
Filepath: K:\Projects\1254-Hancock County\Hancock County Port\Permit-Pearl River Ship Channel\1254-RP-002 (Pearl River SC Permit).dwg Figure 6
Figure 6
Heron Bay, Mississippi Placement Area
Pearl River Ship Channel Dredging Permit
Hancock County Port and Harbor Commission
Crest Width
10- to 12-Feet
3
TBD
1
Crest Width
10- to 12-Feet
Containment
2
1
Sidecast
Containment
Dike
Sidecast
Containment
Dike
1
2
2
Existing
Marsh
1
Existing Grade
Existing Grade
Typical Cross Section of Marsh Fill Placement Containment Area
Not to Scale
NOTES:
1. Dike height will be designed based on actual dredging volume.
2. Dikes to be degraded after marsh construction for intertidal circulation.
3. Marsh target range = +0.5' to +1.5' MLLW (+0.2' to +1.2' NAVD88).
Publish Date: 2018/07/31 1:30 PM | User: dholmer
Filepath: K:\Projects\1254-Hancock County\Hancock County Port\Permit-Pearl River Ship Channel\1254-RP-002 (Pearl River SC Permit).dwg Figure 7
Figure 7
Typical Placement Area Cross Section
Pearl River Ship Channel Dredging Permit
Hancock County Port and Harbor Commission