You can copy from here when filling out the rest of the page.
This notice announces a prospectus has been submitted for the development of the Mud Creek Stream Mitigation Bank (MCSMB) pursuant to 33 CFR 332, Compensatory Mitigation for Losses of Aquatic Resources (Federal Register: April 10, 2008, effective June 9, 2008).
Public Notice No. 18-46
Nashville District
Application No. LRN-2018-00728
Date: November 1, 2018; Expires: November 30, 2018
Please address comments to:
Nashville District Corps of Engineers, Regulatory Division
3701 Bell Road
Nashville, TN 37214-2660
SUBJECT: This notice announces a prospectus has been submitted for the development of the Mud Creek Stream Mitigation Bank (MCSMB) pursuant to 33 CFR 332, Compensatory Mitigation for Losses of Aquatic Resources (Federal Register: April 10, 2008, effective June 9, 2008).
BANK SPONSOR: Resource Environmental Solutions, LLC
5020 Montrose Blvd., Suite 650
Houston, TX 77006
LOCATION: The proposed stream mitigation project encompasses 959.59 acres that is located in the town of Wartburg in Morgan County, Tennessee (Latitude N 36.116039, Longitude W - 84.571531). The proposed mitigation project would incorporate approximately 7.5 miles (40,000
+/- linear feet) of intermittent and perennial stream channels in the upper Mud Creek watershed, which is a tributary of Crooked Fork that ultimately drains into the Emory River.
PURPOSE: The MCSMB would provide compensatory stream mitigation for permitted impacts within the proposed geographic service area of the Emory (06010208), Lower Clinch (06010207), and Watts Bar Lake (06010201) HUC 8 watersheds.
GENERAL INFORMATION: Mitigation banks are defined as a site, or suite of sites, where aquatic resources (e.g., wetlands, streams, riparian areas) are restored, established, enhanced, and/or preserved for the purpose of providing compensatory mitigation for impacts authorized by Department of the Army (DA) permits pursuant to Section 10 of the Rivers and Harbors Act of 1899 and/or Section 404 of the Clean Water Act. In general, units of restored, established, enhanced or
preserved wetlands or streams are expressed as “credits” which may subsequently be withdrawn to offset “debits” incurred at a permitted project site. In this way, a permit requirement to provide compensatory mitigation can be transferred to the mitigation bank sponsor. The operation and use of a mitigation bank are governed by an approved mitigation banking instrument (MBI). The MBI is the legal document for the establishment, operation and use of a mitigation bank. This bank is intended to be a private commercial bank. The sponsor would be responsible for the successful development of the mitigation bank including monitoring and reporting requirements.
A group of federal and state regulatory and resource agency representatives known as the Interagency Review Team (IRT) would oversee the execution and management of the project. The IRT is chaired by the US Army Corps of Engineers, Nashville District (USACE). The primary role of the IRT is to facilitate establishment of the mitigation site through the development of a MBI. The IRT will review the prospectus, instrument, and other appropriate documents and provide comments to the USACE.
Approval of the use of the bank for specific projects is the decision of the USACE pursuant to Section 10 of the Rivers and Harbors Act of 1899 and/or Section 404 of the Clean Water Act and/or the Tennessee Department of Environment and Conservation (TDEC) pursuant to Section 401 of the CWA and/or applicable state of Tennessee statute(s) and regulation(s).
PROJECT DESCRIPTION: The existing streams are degraded due to channelization, channel modifications, and habitat alterations. Prior land uses included unrestricted cattle access and farming activities. TDEC conducted a habitat and water quality assessment in Mud Creek (from Crooked Fork River to headwaters). That assessment determined sources of impairment included grazing in riparian or shoreline zone, which resulted in alterations of stream-side vegetation.
The principal tributary in the proposed project area drains into Crooked Fork, which is downstream of the project boundaries.
The overall goal of the mitigation bank is to restore, to the greatest extent possible, the ecological function of the degraded aquatic resources within the mitigation bank site. The proposed project would consist of the rehabilitation, re-establishment, enhancement, and riparian buffer plantings
on Mud Creek and tributaries by utilizing natural channel design techniques capable of providing a functional lift to natural channel hydrology, hydraulic, geomorphic, physiochemical, and
biological characteristics. Of the approximately 40,000 linear feet in the project area, 299 linear feet would be reestablished, 24,808 linear feet would be restored, and 15,165 linear feet would be preserved.
Specific project goals include: (1) restoration of dynamically stable stream channels to improve bedform diversity and lateral stability; (2) restore natural, stable dimensions, patterns and profiles to stream reaches using natural channel design techniques; (3) restore natural channel hydrology by removing culverts and impoundments and reconnecting streams back to their relic floodplain;
(4) decrease channel velocities by increasing channel sinuosity and improving floodplain
connectivity; (5) install Large Woody Debris (LWD) and rock structures to improve aquatic habitat and lateral stability; (6) improve water quality by reducing non-point source pollution and in-stream sediment contribution through livestock exclusion; (7) increase re-oxygenation zones to improve water quality and biological integrity; (8) establish a minimum 50-foot riparian buffer with native vegetation to provide shade, increase stream bank stability, nutrient filtration, and habitat; (9) protect streams and riparian zones through land use restrictions; and (10) establish streams with adjacent floodplain wetlands to provide water benefits with the understanding that it could generate additional mitigation credits.
The project prospectus can be obtained by contactingryan.evans@usace.army.mil.Information in the mitigation plan would serve as the basis for deriving and releasing credits for the mitigation bank.
HISTORIC AND CULTURAL RESOURCES: A search of the National Register returned no findings of historic properties currently listed on the National Register of Historic Places within the project area. A Phase I cultural/archaeological survey has not been conducted for the site. At this early stage in the regulatory process, no project design plans have been submitted; therefore,
USACE cannot complete an effects determination for historic and cultural resources. The Corps invites responses to this public notice from American Indian Tribes or tribal governments; Federal, State, and local agencies; historical and archeological societies; and other parties likely to have knowledge of or concerns regarding historic properties and cultural significance at or near the project area. Upon submittal of the design plans, USACE would evaluate the design plans along with any substantive comments from this public notice to determine the potential of impacts to historic and cultural resources for Section 106 compliance. If the Corps determines that consultation is required, the Corps would consult with the Tennessee Historic Commission
(SHPO) and American Indian Tribes in accordance with Section 106 of the National Historic Preservation Act, as appropriate.
ENDANGERED/THREATENED SPECIES REVIEW: A review of the United States Fish and Wildlife Service (USFWS) website, http://ecos.fws.gov/ipac identified the following federally-listed species that are known to or believed to occur in Morgan County, Tennessee:
Species Nomenclature
Federal Status
Mammals
Gray bat (Myotis grisescens)
Endangered
Indiana bat (Myotis sodalis)
Endangered
Northern long-eared bat (Myotis septentrionalis)
Threatened
Fishes
Spotfin chub (Erimonax monachus)
Threatened
Freshwater Mussels
Turgid blossom (Epioblasma turgidula)
Endangered
Finerayed pigtoe (Fusconaia cuneolus)
Endangered
Alabama lampmussel (Lampsilis virescens)
Endangered
Purple bean (Villosa perpurpurea)
Endangered
Cumberland bean (Villosa trabalis)
Endangered
Flowering Plants
Cumberland rosemary (Conradina verticillata)
Endangered
Cumberland sandwort (Minuartia cumberlandensis)
Endangered
Virginia spirea (Spirea virginiana)
Endangered
A copy of this notice is being furnished to USFWS for their review. After receipt of any comments, the USACE will evaluate the potential effects to proposed and/or listed species and their designated critical habitat, and initiate consultation with the U.S. Fish & Wildlife Service, if required.
COMMENT PERIOD: Written statements received in this office by November 30, 2018 will become a part of the record and will be considered in the determination. Any response to this notice should be directed to the Nashville District Corps of Engineers, Regulatory Division, Attention: Mr. Ryan Evans at the above address or by email: ryan.evans@usace.army.mil.
\s\
Joshua W. Frost
Chief, Technical Services Branch
Regulatory Division
U.S. Army Corps of Engineers
Camp Austin7.5' quadrangle
Exhibit A
Camp Austin7.5' quadrangle
Exhibit
B
Camp Austin7.5' quadrangle
Exhibit
C