You can copy from here when filling out the rest of the page.
PURPOSE: The applicant, Oil search, stated purpose is to safely produce commercial quantities of liquid hydrocarbons in OSA’s State of Alaska and Arctic Slope Regional Corporation (ASRC) oil and gas leasehold by operating from a site east of the Colville River Delta; to process hydrocarbons on or near the drill sites; and to transport sales quality oil through a new export pipeline to the Kuparuk sales oil pipeline, and then to the Trans-Alaska Pipeline Service (TAPS). A secondary purpose of the Project is to further delineate geological features and hydrocarbon accumulations in OSA's leasehold utilizing the proposed infrastructure.
LOCATION: The Project would be located in the North Slope Borough (NSB) in the Pikka Unit between Kuparuk and the Colville River Unit development (Alpine), east of the Colville River, approximately 6.5 miles northwest of the Village of Nuiqsut.
PERMIT HISTORY: In June 15, 2015 the applicant originally proposed to impact 288 acres of waters of the United States (U.S.), including wetlands (WOUS). In July 2017, the applicant submitted a revised permit application modifying the width of the access road from 38 to 35 feet wide. This change resulted in a reduction of impacts to WOUS of 16.4 acres to 271.6 acres. This reduction was not analyzed in the DEIS due to the timing of receipt of these changes, although this change was describe in the original Public Notice for the permit in September 2017.
In response to comments on the DEIS, the applicant (OSA) further modified their proposal as described above. These changes in Project description decreased the overall Project footprint by another 10.3 acres of WOUS to 261.3 acres. This is a 27 acre reduction in impacts to WOUS from the original application dated June 15, 2015. A difference in acreages from the Final Environmental Impact Statement (FEIS) and this PN is due to the method in which impacts were calculated. To determine total impacts to WOUS for the proposed project the applicant used more detailed methods than those necessary for the FEIS.
This is the second Public Notice period for the Nanushuk Development Project permit application. It includes the final project proposal and a new Compensatory Mitigation Plan.
All comments should reach this office no later than the expiration date of this Public Notice to become part of the record and be considered in the decision. Comments on the Public Notice for this permit can be submitted via the U.S. Postal Service to: U.S. Army Corps of Engineers, CEPOA-RD, Ms. Ellen Lyons, 2175 University Avenue, Suite 201E, Alaska 99709-4927 or also via email at: Ellen.H.Lyons@usace.army.mil. We request that you include with your comments: (1) Your name, address, and affiliation (if any); (2) Be as specific as possible when stating your concern or comment; (3) Provide any background documents to support your comments, as necessary.
PURPOSE: The applicant, Oil search, stated purpose is to safely produce commercial quantities of liquid hydrocarbons in OSA’s State of Alaska and Arctic Slope Regional Corporation (ASRC) oil and gas leasehold by operating from a site east of the Colville River Delta; to process hydrocarbons on or near the drill sites; and to transport sales quality oil through a new export pipeline to the Kuparuk sales oil pipeline, and then to the Trans-Alaska Pipeline Service (TAPS). A secondary purpose of the Project is to further delineate geological features and hydrocarbon accumulations in OSA's leasehold utilizing the proposed infrastructure.
LOCATION: The Project would be located in the North Slope Borough (NSB) in the Pikka Unit between Kuparuk and the Colville River Unit development (Alpine), east of the Colville River, approximately 6.5 miles northwest of the Village of Nuiqsut.
PERMIT HISTORY: In June 15, 2015 the applicant originally proposed to impact 288 acres of waters of the United States (U.S.), including wetlands (WOUS). In July 2017, the applicant submitted a revised permit application modifying the width of the access road from 38 to 35 feet wide. This change resulted in a reduction of impacts to WOUS of 16.4 acres to 271.6 acres. This reduction was not analyzed in the DEIS due to the timing of receipt of these changes, although this change was describe in the original Public Notice for the permit in September 2017.
In response to comments on the DEIS, the applicant (OSA) further modified their proposal as described above. These changes in Project description decreased the overall Project footprint by another 10.3 acres of WOUS to 261.3 acres. This is a 27 acre reduction in impacts to WOUS from the original application dated June 15, 2015. A difference in acreages from the Final Environmental Impact Statement (FEIS) and this PN is due to the method in which impacts were calculated. To determine total impacts to WOUS for the proposed project the applicant used more detailed methods than those necessary for the FEIS.
This is the second Public Notice period for the Nanushuk Development Project permit application. It includes the final project proposal and a new Compensatory Mitigation Plan.
All comments should reach this office no later than the expiration date of this Public Notice to become part of the record and be considered in the decision. Comments on the Public Notice for this permit can be submitted via the U.S. Postal Service to: U.S. Army Corps of Engineers, CEPOA-RD, Ms. Ellen Lyons, 2175 University Avenue, Suite 201E, Alaska 99709-4927 or also via email at: Ellen.H.Lyons@usace.army.mil. We request that you include with your comments: (1) Your name, address, and affiliation (if any); (2) Be as specific as possible when stating your concern or comment; (3) Provide any background documents to support your comments, as necessary.
POA-2015-25, Nanushuk Application_PN
POA-2015-25, Permit Application
POA-2015-25, Figure Set
POA-2015-25, Applicant Proposed Mitigation Statement
US Army Corps
of Engineers
Alaska District
Public Notice of
Application for Permit
Regulatory Division (1145)
CEPOA-RD
2175 University Avenue, Suite 201E
Fairbanks, Alaska 99709-4927
PUBLIC NOTICE DATE: November 2, 2018
EXPIRATION DATE:
December 3, 2018
REFERENCE NUMBER: POA-2015-25
WATERWAY:
Colville River
Project Information: On September 1, 2017, the Alaska District Corps of Engineers
(Corps) published a Public Notice (PN) for Department of the Army (DA) permit number
POA-2015-25, Colville River, for a DA permit application from Armstrong Energy, LLC
to construct the Nanushuk Development Project. This PN for the permit ran concurrent
with the Public Notice period for the Draft Environmental Impact Statement (DEIS). The
DEIS is available at: http://www.nanushukeis.com/documents.html).
Effective May 3, 2018, Oil Search Alaska, LLC (OSA) became the applicant for
Nanushuk Project. In response to comments received on the DEIS, the applicant has
modified their proposed project to reflect Alternative 5 in the DEIS and added a
Compensatory Mitigation Statement. OSA submitted a revised permit application to the
Corps on October 6, 2018, which included the following changes: 1) change the
Applicant's proposed project to reflect Alternative 5 and add a Compensatory Mitigation
proposal; 2) change road side slopes from 3:1 to 2:1; 3) change road surface widths
from 38 and 35 feet to 32 feet; 4) change fill volume from 2.8 to 2.9 million cubic yards;
5) relocate Drill Site 2 approximately 0.4 mile further east away from the Colville River;
and 6) add tundra access ramps on the gravel roads and a gravel boat ramp.
Permit History: In June 15, 2015 the applicant originally proposed to impact 288 acres
of waters of the United States (U.S.), including wetlands (WOUS). In July 2017, the
applicant submitted a revised permit application modifying the width of the access road
from 38 to 35 feet wide. This change resulted in a reduction of impacts to WOUS of
16.4 acres to 271.6 acres. This reduction was not analyzed in the DEIS due to the
1
timing of receipt of these changes, although this change was describe in the original
Public Notice for the permit in September 2017.
In response to comments on the DEIS, the applicant (OSA) further modified their
proposal as described above. These changes in Project description decreased the
overall Project footprint by another 10.3 acres of WOUS to 261.3 acres. This is a 27
acre reduction in impacts to WOUS from the original application dated June 15, 2015.
A difference in acreages from the Final Environmental Impact Statement (FEIS) and this
PN is due to the method in which impacts were calculated. To determine total impacts
to WOUS for the proposed project the applicant used more detailed methods than those
necessary for the FEIS.
This is the second Public Notice period for the Nanushuk Development Project permit
application. It includes the final project proposal and a new Compensatory Mitigation
Plan.
This proposed project, including the changes described above, has been evaluated in a
Final Environmental Impact Statement (FEIS) which can be found at
http://www.nanushukeis.com/documents.html.
OSA proposes placement of 2.9 million cubic yards (cy) of clean fill material into
261.3 acres of waters of the U.S. including wetlands to construct the Project. The
Project also includes discharges of dredged material over 5.8 acres of navigable
waters of the U.S. (Harrison Bay of the Beaufort Sea), for screeding activities in
front of the existing Oliktok Dock and trenching for power and fiber optic cables
at pipeline-road crossings.
All work would be performed in accordance with the POA-2015-25 Permit Application
pdf (43 pages), and POA-2015-25 Figure Set pdf (sheets 1-61), dated October 5, 2018.
Also attached is POA-2015-25 Applicant Proposed Mitigation Statement pdf dated
October 5, 2018 (pages 1-16). All documents are available at
http://www.poa.usace.army.mil/Missions/Regulatory/Public-Notices/.
Applicant: Oil Search Alaska, LLC. Mr. Bruce Dingeman. 510 L Street, Suite 310,
Anchorage, Alaska 99501.
Agent: Patrick Conway, Oil Search Alaska, LLC, 510 L St., Suite 310, Anchorage,
Alaska 99501; Patrick.Conway@oilsearch.com, 907-375-6938.
Location: The Project would be located in the North Slope Borough (NSB) in the Pikka
Unit between Kuparuk and the Colville River Unit development (Alpine), east of the
Colville River, approximately 6.5 miles northwest of the Village of Nuiqsut.
Project Purpose: The applicant's stated purpose is to safely produce commercial
quantities of liquid hydrocarbons in OSA's State of Alaska and Arctic Slope Regional
2
Corporation (ASRC) oil and gas leasehold by operating from a site east of the Colville
River Delta; to process hydrocarbons on or near the drill sites; and to transport
sales quality oil through a new export pipeline to the Kuparuk sales oil pipeline, and
then to the Trans-Alaska Pipeline Service (TAPS). A secondary purpose of the Project
is to further delineate geological features and hydrocarbon accumulations in OSA's
leasehold utilizing the proposed infrastructure.
Permit Authority: The proposed project would involve work in navigable waters of the
U.S., and the discharge of fill material in waters of the U.S., including wetlands.
Therefore, the project is subject to Section 10 Rivers and Harbors Act 1899 (33 U.S.C.
403) and Section 404(b) of the Clean Water Act (40 CFR 230).
Mitigation: The applicant has proposed a variety of avoidance and minimization
measures. OSA has also proposed compensatory mitigation. Their proposal can be
found in the POA-2015-25 Applicant Proposed Mitigation Statement pdf dated October
5, 2018 (pages 1-16).
Other Environmental Review and Consultation Requirements: Other environmental
review and consultation requirements include Executive Order 13175 Consultation and
Coordination with Indian Tribal Governments, Executive Order 12898 Federal Actions to
Address Environmental Justice in Minority Populations and Low-Income Populations,
106 of the National Historic Preservation Act of 1966, Endangered Species Act Section
7 consultation and Magnuson-Stevens Act Essential Fish Habitat.
·
·
·
Endangered Species: The Corps has determined that the proposed project may
affect, but is not likely to adversely affect polar bears (Ursus maritimus), polar bear
critical habitat, and Steller's eiders (Polysticta stelleri). The project may adversely
affect spectacled eiders (Somateria fischeri). Additionally, the project may affect,
but is not likely to adversely affect bowhead whales (Balaena mysticetus) and
bearded seal (Erignathus barbatus nauticus). The Corps has initiated section 7
consultation with the U.S. Fish and Wildlife Service and National Marine Fisheries
Service.
Essential Fish Habitat: The Corps has determined that the proposed project may
affect marine essential fish habitat and has completed consultation with the
National Marine Fisheries Service, under the Magnuson-Stevens Act
(COE_Nanushuk Proj Colville River DEIS_EFH pdf emailed to Ellen Lyons from
Mary Goode dated 11/13/2017).
Historic Properties: The Corps has made a determination that historic properties
exist within the permit area but the Project is not likely to adversely affect historic
properties. The Corps has initiated consultation with the State Historic
Preservation Office under 106 of the National Historic Preservation Act.
Additionally, the Alaska District fully supports tribal self-governance and
government-to-government relations between federally recognized Tribes and the
Federal government. Tribes with protected rights or resources that could be
significantly affected by a proposed Federal action (e.g., a permit decision) have
the right to consult with the Alaska District on a government-to-government basis.
3
Views of each Tribe regarding protected rights and resources will be accorded due
consideration in this process. Notification of invitation to participate in governmentto-government consultation, additional opportunities to obtain project related
information, request for participation in decision-making processes regarding the
protected Tribal right or resources and opportunities to provide comments were
provided by phone, email correspondence, and hardcopy to the Tribes within the
area potentially affected by the proposed work. Additionally, consultation may be
initiated by the affected Tribe upon written request to the District Commander
during the public comment period. The Corps will be available to conduct
government-to-government consultations with all affected federally recognized
tribes.
Application Location for Download: This public notice with attachments can be
found at http://www.poa.usace.army.mil/Missions/Regulatory/Public-Notices/. For a
hard copy of the Permit Application, please contact the agent for the applicant, Mr.
Patrick Conway; contact information listed above.
Final EIS Location for Download: A Final Environmental Impact Statement (Final
EIS) has been prepared for this project and is available for review at
http://www.nanushukeis.com/documents.html.
Comments: Comments on the Public Notice for this permit can be submitted via
the U.S. Postal Service to: U.S. Army Corps of Engineers, CEPOA-RD, Ms. Ellen
Lyons, 2175 University Avenue, Suite 201E, Alaska 99709-4927 or also via email
at: Ellen.H.Lyons@usace.army.mil. We request that you include with your comments:
(1) Your name, address, and affiliation (if any); (2) Be as specific as possible when
stating your concern or comment; (3) Provide any background documents to support
your comments, as necessary.
The Corps is soliciting comments from the public; Federal, State, and local agencies
and officials; Indian Tribes; and other interested parties in order to consider and
evaluate the impacts of this proposed activity. Any comments received will be
considered by the Corps to determine whether to issue, modify, condition or deny a
permit for this proposal. To make this decision, comments are used to assess impacts
on endangered species, water quality, conservation, economics, aesthetics, wetlands,
cultural values, navigation, fish and wildlife values, water supply, and any other factors
judged important to the needs and welfare of the people. The decision to issue a DA
permit or not will be based on an evaluation of the potential impacts, including direct,
indirect, and/or cumulative impacts of the proposed project on the public interest. That
decision will reflect the national concern for both the protection and utilization of
important resources. The benefit which reasonably can be expected to accrue from the
proposal must be balanced against its reasonably foreseeable detriments. For the
discharge of fill into special aquatic sites, evaluation of the impact of the activity on the
public interest will include application of the 404(b)(1) guidelines promulgated by the
Administrator of the Environmental Protection Agency (40 CFR Part 230). Subject to the
preceding sentence and any other applicable guidelines or criteria (see 40 CFR Part
4
320.2 and 320.3), a permit will be granted unless the District Commander determines
that it would be contrary to the public interest.
Public Hearing: Any person may request, in writing, within the designated comment
period specified in this notice, that a public hearing be held to consider the application.
Requests for public hearings shall state, with particularity, the reasons for public hearing
and shall be submitted to the Corps, using the contact information referenced above.
- THE DEADLINE FOR PROVIDING COMMENTS IS DECEMBER 3, 2018 District Engineer
U.S. Army, Corps of Engineers
5
Nanushuk Project
Applicant Proposed Mitigation Statements
Submitted by:
October 5, 2018
POA-2015-25
THIS PAGE
INTENTIONALLY
LEFT BLANK
POA-2015-25
Applicant Proposed Mitigation Statements
Background:
To develop a complete individual permit application under Section 404 of the Clean Water Act,
certain information pertaining to how Oil Search Alaska, LLC (OSA) is proposing to mitigate
impacts to waters of the U.S. (WOUS) is necessary. The information is provided to satisfy box
23 of the ENG Form 4345.
Applicant's Proposed Mitigation:
1. Avoidance of impacts to aquatic ecosystems, including wetlands:
The following measures will be taken to avoid impacts to the greatest extent practicable:
WOUS:
Drill sites are located east of the Colville River and as far east as practicable, while still
meeting the Nanushuk Project (Project) purpose and need to produce commercial
quantities of crude oil from the target reservoirs. The location of drill sites avoids
placement of surface facilities west of the East Channel of the Colville River (East
Channel), which eliminates the need for associated transportation and pipeline
infrastructure to access this area.
Connection to the existing gravel road system allows use of the existing Deadhorse
Airport to support field logistics. This eliminates the need for a new project-specific
airstrip to transport personnel and the associated regular fixed-wing air travel impacts in
the project area. Connection to the existing gravel road system also results in less storage
space required at each drill site to accommodate required site support materials, fuels,
hazardous substances, and solid waste, reducing the overall size of each pad.
Stockpiling of gravel within WOUS is not proposed as part of the Project. Therefore,
additional acreage is not being requested. Gravel will be transported directly from the
material site and placed on the permitted project footprint.
Existing barge infrastructure at Oliktok Point will be used to avoid the need to construct
new marine facilities to support sealift module delivery.
Seasonal ice pads and roads will be used to support winter pipeline and gravel
infrastructure construction, avoiding the need for additional fill to support construction.
Drilling for vertical support members (VSMs) will occur from an ice road and drilling
cuttings will be sidecast onto the ice around each VSM, avoiding a discharge of fill
material into WOUS, since the sidecasting will not change the bottom elevation of a
WOUS or replace any portion of a WOUS with dry ground. The drilling cuttings will be
removed once VSM installation is complete.
Trenching will occur during the winter, and all trenched materials will be temporarily
sidecast onto an ice pad adjacent to the trench. Trenched materials will be taken off the
ice pad and backfilled into the excavation once trenching is complete. This will avoid a
discharge of fill material into WOUS from the sidecast.
POA-2015-25
1
Applicant Proposed Mitigation Statements
Power cables and fiber optic cables will be installed on the horizontal support members
(HSMs) using messenger cables, avoiding the need for power poles and associated fill.
At pipeline-river crossings, all pipelines, HSMs, and suspended cables will be elevated to
maintain adequate freeboard.
Table 1 shows the acreage associated with the quantifiable avoidance mitigation measures listed
above.
Table 1. Acreage of Quantifiable Avoidance Measures
Avoidance Measure
Acres
Avoided
Connection to the existing gravel road system and use of the existing
Deadhorse Airport to support field logistics
32
Stockpiling of gravel within WOUS is not proposed as part of the Project
13
Use of existing barge infrastructure at Oliktok Point
2
Use of seasonal ice pads to support winter pipeline and gravel infrastructure
construction
24
Drilling VSMs from an ice road with drilling cuttings temporarily sidecast onto
the ice around each VSM and removed after VSM installation is complete
38
Winter trenching with all trenched materials temporarily sidecast onto an ice
pad and backfilled into the excavation after trenching is complete
<1
Installation of power cables and fiber optic cables on HSMs using messenger
cables
<0.1
Total Avoidance Measures
109
Wildlife:
Power and fiber optic cables will be installed on the HSMs using messenger cables,
avoiding the use of overhead powerlines. Avoidance of overhead powerlines reduces the
potential for bird strikes and limits creation of predator perching opportunities on power
poles.
Cultural Resources/Subsistence:
A site-specific survey was conducted and, to the extent possible, project facilities will be
located outside of a 500-foot buffer from documented cultural resources.
Noise:
A new project-specific airstrip will not be developed as part of the Project. This avoids
regular fixed-wing air traffic into the project area, reducing noise/disturbance impacts to
local residents, subsistence users, and wildlife, as well as air quality impacts.
POA-2015-25
2
Applicant Proposed Mitigation Statements
Power generated at the Central Processing Facility (CPF) will be supplied to each drill
site through a power cable to reduce noise and air quality impacts at each of the drill
sites.
2. Minimization of unavoidable impacts to WOUS, including wetlands:
The following measures will be taken to minimize impacts to the greatest extent possible:
WOUS:
Locating drill sites as far east as practicable from the Colville River minimizes the
distance of gravel road and pipeline needed to tie into existing infrastructure.
The proposed project has been updated to a modified version of Alternative 5 evaluated
in the Nanushuk Project Draft Environmental Impact Statement (Draft EIS; U.S. Army
Corps of Engineers [USACE] 2017) that includes use of 4.7 miles of the existing
Mustang Road, resulting in a reduction of fill in WOUS. Based on analysis presented by
USACE in the Draft EIS, this update also has potential to reduce impacts to other
resources.
Based on stakeholder feedback, Drill Site 2 (DS2) has been relocated approximately
3,200 feet east to a location southeast of Lake 9211, minimizing the DS2 access road and
infield pipeline by approximately 0.7 mile.
Drill Site 3 (DS3) has been relocated to a suitable location outside of the Colville River
floodplain, thus minimizing placement of gravel within the floodplain.
Gravel roads and pads are located outside of the Alaska Department of Natural Resources
0.5-mile setback from the Colville River, to the extent practicable, minimizing potential
impacts to the watershed and subsistence users in the project vicinity.
Roads will have standard minimum thickness (5 feet minimum) to protect underlying
permafrost by insulating and maintaining stable permafrost conditions.
Pads will have standard minimum thickness (6 feet minimum) to protect underlying
permafrost by insulating and maintaining stable permafrost conditions. Pads are at least 1
foot thicker than roads due to higher thermal loads associated with pads.
The following engineering methods will be employed to minimize heat transfer from
infrastructure on pads to the underlying permafrost:
o In well conductors, the gap between the well conductor and inner pipe will be
filled with polyurethane foam.
o Thermosyphons will be installed adjacent to well rows and at-grade heated
structures (e.g., the warehouse and cold storage).
o Heated at-grade structures will be constructed with 4 to 8 inches of rigid
insulation installed approximately 24 inches below the foundation/floor slabs.
o Flare stack height will be selected to reduce ground-level radiant heat intensity to
levels that will protect personnel, structures, and equipment as well as to avoid
permafrost degradation (typically 1,500 btu/hr/ft2).
POA-2015-25
3
Applicant Proposed Mitigation Statements
Gravel roads provide all-season access to parallel export/import and infield pipelines for
visual inspection and for routine and emergency maintenance and repairs. This also
reduces the need for tundra travel associated with these activities. Roads and pipelines
will be located within 1,000 feet of each other where feasible.
On-site processing minimizes the length of the multiphase pipeline and potentially allows
for a smaller total processing facility footprint relative to construction of pre-processing
facilities at each drill site.
No processing of multiphase fluids will occur at DS2 or DS3, avoiding the need for
processing infrastructure at each site and reducing the overall gravel footprint.
All on- and off-pad pipelines will be elevated above grade on VSMs to reduce impacts to
permafrost.
The export/import pipeline will be co-located with existing pipelines and/or gravel roads
associated with the Southern Miluveach and Kuparuk River Units between the Mustang
Pad and the Kuparuk DS2C near CPF2. Where available, co-location with existing
pipelines and roads minimizes impacts to the aquatic environment compared to spacing
the two features farther apart.
Project roads are located to reduce impacts to hydrology through minimization of the
placement of gravel fill within the floodplain. In addition, the placement of the
Miluveach River and Kachemach River bridges at narrow portions of the rivers
minimizes placement of gravel fill in the floodplain and piers below ordinary high water.
Road widths have been designed, in part, based on the weights and sizes of vehicles
expected to travel on them. Access roads to the boat ramp and pump house pad will be
constructed to a minimum 24foot-wide surface to minimize gravel fill relative to the 32foot-wide gravel access road and DS1, DS2, and DS3 infield roads.
Gravel road footprints have been further minimized by using 2:1 side slopes instead of
3:1 side slopes and reducing the access and infield road widths to 32 feet at the surface.
Pad and road layouts consider topography and maintenance of natural drainage patterns
and avoid ponds, lakes, and streams, where possible, to minimize gravel requirements,
maintain natural drainage patterns, and minimize water ponding. Where natural drainage
patterns are crossed, roads will be designed perpendicular to the general flow direction to
the extent practicable. Layout design also considers the effects of spring breakup and
other flood events.
In addition to minimum gravel thickness criteria, gravel facilities located within the
floodplain will be built to more conservative elevations based on hydrologic conditions,
including both open-water and ice-affected stage frequency conditions, to minimize
potential effects on hydrology.
Drill sites are oriented with the long axis parallel to the prevailing northeast/southwest
wind direction to minimize snow drift and related maintenance activities, resulting in a
minimization of potential effects on hydrology during spring breakup.
POA-2015-25
4
Applicant Proposed Mitigation Statements
Pads and roads will be designed to limit point sources of runoff to the surrounding tundra.
Instead, both snowmelt and rain water on the pad will primarily seep directly through the
gravel.
Drill site locations are designed to minimize lengths of infield roads and pipelines, with
considerations for hydrology, wetlands, and subsistence use.
All drill sites are sized to minimize overall gravel requirements while maintaining space
for a sufficient number of well heads to meet the overall project purpose. Well-head
spacing has been reduced from 30 feet to 20 feet to further minimize drill site footprint.
Bridge abutments will be designed using sheet piles to minimize the gravel fill footprint,
road embankment erosion, and stream scour.
External corrosion inspections of pipelines will be conducted during winter and will be
supported by approved tundra travel vehicles to avoid impacts associated with summer
tundra travel.
Drainage culverts will be sited and designed at streams and concentrated drainages to
pass the 50-year flood event with a headwater elevation not exceeding the diameter of the
culvert to minimize potential impacts to hydrology. Where possible, as determined by
engineering or regulatory agencies, culverts within the 200-year floodplain may be
designed to pass the 75-year flood event. Prior to construction, an engineer will walk and
slope-stake roads to determine the precise locations of drainage structures and determine
on-site conditions for final layout.
Fish passage culverts will be designed at stream crossings where the Alaska Department
of Fish and Game (ADF&G) determine that fish are present, and design will be in
accordance with ADF&G Title 16 fish passage standards. Flow velocities at culvert
outlets will be analyzed, and outlet erosion control measures will be designed as
necessary to prevent channel degradation.
Cross-drainage culverts will be installed within the access and infield roads to reduce
impoundment and allow conveyance of surface water flow that intersects the road, in
order to maintain natural drainage patterns. As a general guideline, cross-drainage
culverts will be sited approximately every 500 feet along the alignment during initial
design efforts, although exact placement of culverts will depend on actual in-field local
drainage patterns.
Regular ice road use will be limited to construction activities to minimize the need for
annual withdrawal of water for ice road construction. Ice roads are not planned for use on
a regular basis to support development drilling and operations.
In accordance with permits, ice road crossings of designated streams and rivers will be
slotted, breached, or weakened upon completion of use.
Pending commercial agreements and availability of supply, seawater purchased from a
third party will be used to supply make-up water, minimizing use of local freshwater
sources and avoiding the need for additional seawater treatment and transportation
infrastructure.
POA-2015-25
5
Applicant Proposed Mitigation Statements
During drilling and operations, grind and inject facilities (Underground Injection Control,
or UIC, Class I well) will be available for disposal of Resource Conservation and
Recovery Act exempt and non-hazardous waste. This will minimize the risk of fluid spills
during transport of fluids to an off-site disposal facility. Project modifications reduced the
number of UIC wells from four to two: one primary disposal well and one backup
disposal well.
Discharge of domestic wastewater to the tundra at the project site is not planned during
normal conditions. As a result, a number of impacts would be minimized, including the
potential for soil erosion from water discharge and potential impacts to water quality,
vegetation, birds, and wildlife.
Personnel will be required to stay on gravel or ice surfaces to minimize impacts to the
tundra unless their specific job duties require them to be on the tundra and that activity is
properly permitted.
Except for removal of snow and ice in excess of 4 inches from work areas, disturbance of
the tundra, including vegetation and organic cover, will be avoided during gravel
placement to minimize impacts to permafrost.
Dust control measures will be implemented to reduce the incidence of dust on vegetation
and snow.
Snow removal management measures will be implemented to reduce the potential for
gravel fill to be pushed off pads during snow removal.
At the conclusion of production, abandonment of project facilities will be conducted in
accordance with Alaska Department of Natural Resources Division of Oil and Gas North
Slope Areawide Lease Mitigation Measures and in compliance with all permit and lease
requirements.
Table 2 shows the acreage associated with the quantifiable minimization mitigation measures
listed above.
Table 2. Acreage of Quantifiable Minimization Measures
Minimization Measure
Acres
Minimized
All pads are sized to minimize overall gravel requirements while maintaining
space for a sufficient number of well heads to meet the overall project purpose.
Well-head spacing has been reduced from 30 feet to 20 feet to further minimize
drill site footprint.
13
Gravel road footprints have been further minimized by using 2:1 side slopes
instead of 3:1 side slopes and reducing both the access and drill site infield road
widths to 32 feet at the surface.
42
Road widths have been designed, in part, based on the weights and sizes of
vehicles expected to travel on them. Access roads to the boat ramp and pump
house pad will be constructed to a minimum 2424-foot-wide surface to
1
POA-2015-25
6
Applicant Proposed Mitigation Statements
minimize gravel fill relative to the 32-foot-wide gravel access road and DS1,
DS2, and DS3 infield roads.
DS2 has been relocated approximately 3,200 feet east to a location southeast of
Lake 9211, minimizing the DS2 access road and pipeline.
5
Total Minimization Measures
61
Vegetation:
Ice roads will be routed and constructed to minimize impacts to sensitive vegetation such
as willow, per North Slope Borough (NSB) requirements.
Buried utility installations that are not covered by gravel fill (i.e. roadway) will be
revegetated using transplanted sprigs, cultivars, or seed either gathered onsite or
otherwise obtained that match the native plant species that occur in the vicinity of the
trenched area. Revegetation work shall be performed by the end of the first growing
season following the utility installation. Revegetation will be monitored in subsequent
growing seasons and additional efforts will be performed until revegetation of the site is
complete.
Air Quality:
Air emissions will be minimized through compliance with ambient air quality standards
as demonstrated through computer modeling approved by the Alaska Department of
Environmental Conservation (ADEC).
No incinerator will be located on site, thereby reducing overall project air emissions.
Post-construction, natural gas-fired combustion turbines will be used for power
generation and compression, which minimizes the use of diesel-fired emission units.
Combustion turbines will be equipped with appropriate technologies to ensure efficient
combustion, increased fuel efficiency, and reduced greenhouse gas (GHG) emissions
rates.
Most combustion turbines at the CPF will be equipped with waste heat recovery units for
process and space heat, reducing GHG emissions.
OSA will use a safety flare for emergency control of excess gas, instead of venting the
excess gas, to reduce GHG emissions.
OSA will implement good combustion practices for all fuel-fired equipment, including
regular maintenance according to manufacturer's recommendation, to reduce potential
GHG emissions.
Wildlife:
Roads and pipelines will be separated by a minimum of 500 feet, where feasible, to
minimize caribou disturbance and excessive snow drift accumulation and reduce the risk
of vehicle impacts to the pipeline.
All pipelines, HSMs, and suspended cables will be a minimum of 7 feet above tundra
surface except where pipelines intersect a road or pad or are constructed within 100 feet
of an existing pipeline that is elevated less than 5 feet.
POA-2015-25
7
Applicant Proposed Mitigation Statements
Project facilities were located to reduce impacts to wildlife by moving the Miluveach
River Bridge and access road away from ADF&G-identified sensitive brown bear
denning habitat.
A Polar Bear Interaction Plan and a Wildlife Avoidance and Interaction Plan will be
developed to provide personnel with guidance to minimize the possibility of wildlife
interactions and impacts to bears and human safety.
Facility lighting will be designed to minimize the impact of lighting on visual aesthetics
and minimize the occurrence of bird strikes. The facility lighting will minimize light
visible from outside of project facilities by using downward illumination such as
downcast floodlights and excluding use of horizontally aimed floodlights, locating mast
poles away from the pad edge, using lighting fixtures with lamps contained within the
reflector, and shading externally facing windows on buildings.
Placement of new gravel fill on tundra is not planned to occur during the bird nesting
season, to minimize the potential for disturbances to nesting birds and broods.
Pipelines will have a non-reflective finish to reduce reflectivity and potential impacts to
wildlife from visual disturbances.
Project facilities are located to reduce impacts to hydrology and fish through
minimization of the gravel fill footprint within 500 feet of fish-bearing water bodies,
where practicable.
All water withdrawal will be conducted in compliance with water withdrawal
authorizations and fish habitat permit stipulations to maintain adequate lake volumes in
fish-bearing lakes.
North Pacific Right Whale Critical Habitat:
Vessels directly supporting the project will either:
a. avoid transiting through designated North Pacific right whale critical habitat (73
FR 19000); or
b. implement the following mitigation measures while traveling within North Pacific
right whale critical habitat at speeds greater than 5 knots (kn).
i. Operators will maintain a ship log indicating the time and geographic
coordinates at which vessels enter and exit North Pacific right whale
critical habitat.
ii. Vessels will travel at speeds of 10 kn (or less) with Marine Mammal
Observers (MMOs) while traveling within the boundaries of designated
North Pacific right whale critical habitat.
iii. At least one MMO or trained crew member will maintain a constant watch
for North Pacific right whales, from the vessel's bridge or other similar
vantage point, during travel through North Pacific right whale critical
habitat,
iv. The MMO or trained crew member will maintain direct contact with the
vessel pilot, advising the pilot/operator of the position of observed North
Pacific right whales as soon as they are observed.
POA-2015-25
8
Applicant Proposed Mitigation Statements
v. If a North Pacific right whale is sighted, avoidance measures will be taken
to maintain a 500 yard distance between the whale and the vessel.
vi. Vessel will stay at least 300 meters (m) away from cow-calf pairs, feeding
aggregations, or whales that are engaged in breeding behavior.
vii. The vessel operator will avoid: i) direct approach of whales; ii) operating
in a way to separate members of a group of whales or sea lions from other
members of that group; iii) causing a whale of any species to make
multiple changes in direction; and iv) pursuing marine mammals.
viii. If a whale approaches the vessel and if maritime conditions safely allow,
the engine will be put in neutral and the whale will be allowed to pass
beyond the vessel. If the vessel is taken out of gear, vessel crew will
confirm that no whales are within 50 m of the vessel when propellers are
re-engaged, thus minimizing risk of marine mammal injury; or
c. in the absence of on-duty MMOs, travel at speeds of 5 kn or less within the
boundaries of designated North Pacific right whale critical habitat.
Marine Mammal Observer Protocol
a. The MMO will have experience or training in field identification of marine
mammals and their behaviors, and will be trained to prepare reports of
observations and complete data entry forms accurately.
b. The MMO will have the following equipment at a minimum: binoculars, a range
finder, compass, Global Positioning System (GPS), and a log book or data sheets
that are used to record observations.
c. The MMO will work in shifts lasting no longer than 4 hours, and will not work
for more than 12 hours in a 24hour period. Note that during the MMO breaks, a
crew member can be assigned to be the observer as long as they do not have other
duties at that time and they have received instructions and tools to allow them to
make marine mammal observations.
d. The MMO will have the ability to effectively communicate orally, by radio and in
person, with project personnel to provide real-time information on marine
mammals, and will have the ability to order appropriate mitigation responses to
avoid take of marine mammals.
e. The MMO will have no other primary duties beyond watching for, acting on, and
reporting events related to marine mammals. For crew members, this mitigation
measure only applies during the time the crew member must assume the duties of
the MMO due to the absence of a qualified MMO.
Reporting
a. When project vessels are traveling through North Pacific right whale critical
habitat, the MMO will record information about North Pacific right whales
observed within the critical habitat using a log book or data sheets. Sightings of
North Pacific right whales will be reported to National Marine Fisheries Service
(NMFS) within 24 hours. These sighting reports will include the following
information:
POA-2015-25
9
Applicant Proposed Mitigation Statements
i. Ship logs (time and location for when a vessel entered and exited North
Pacific right whale critical habitat).
ii. Species, date, and time for each observation.
iii. Number of animals per sighting event; and number of
adults/juveniles/calves per sighting event (if determinable).
iv. Geographic coordinates for the observed animals, with the position
recorded by using the most precise coordinates practicable (coordinates
must be recorded in decimal degrees, or similar standard (and defined)
coordinate system).
v. Environmental conditions as they existed during each sighting event,
including sea conditions, weather conditions, visibility (km/mi), lighting
conditions, and percent ice cover.
vi. Photographs or video obtained.
vii. A summary report containing the data recorded by the MMO during barge
transit through North Pacific right whale critical habitat will be submitted
to NMFS within 90 calendar days of the completion of transit through the
critical habitat.
Cultural Resources/Subsistence/Socioeconomics:
Impacts to subsistence use areas will be minimized through location of project facilities
(including the Miluveach River Bridge) away from subsistence use areas near the mouth
of the Miluveach River.
Bridge locations have been chosen to minimize impacts to boaters and subsistence use
areas. Clearance for the Kachemach River crossing will maintain adequate freeboard plus
an additional 4 feet to minimize interference with vessel-based subsistence activities.
Tundra access ramps will be constructed at three previously proposed road turnouts on
infield roads to DS1, DS2, and DS3 to facilitate access for off-road travelers.
A boat ramp, including a small staging and turnaround area with enough space for shortterm parking of vehicles with trailers, will be constructed on the lower Kachemach River
in the vicinity of DS2 to facilitate use by local users to launch and retrieve boats.
OSA will work with the Kuukpik Corporation to establish access agreements for use of
project gravel roads and ice roads to increase potential access routes for subsistence
activities.
OSA will provide regular project updates to the community and leadership in Nuiqsut
during project development, and will incorporate measures to address concerns into
project designs, where practicable. Additionally, OSA will continue to communicate
regularly with the community and leadership in Nuiqsut throughout construction and
operations.
OSA will interface with the Kuukpik Subsistence Oversight Panel to minimize conflict
with subsistence users.
POA-2015-25
10
Applicant Proposed Mitigation Statements
OSA will work with the Kuukpik Corporation, the City of Nuiqsut, and the NSB to
ensure that Nuiqsut and NSB residents have opportunities to apply for work on the
Project and will provide local North Slope companies with opportunities to compete for
contract work associated with the Project. OSA will also work with contractors, trade
associations, Alaska Process Careers Consortium, and Iisavik College to develop
training programs for North Slope residents, if needed.
Spill Prevention and Response Planning:
External pipe walls will be coated with fusion-bonded epoxy. Pipelines containing
temperature-controlled fluids and multiphase product will include an insulation system
consisting of polyurethane foam insulation covered with an interlocked sheet metal
jacket. Pipeline facilities will include pig launchers and receivers capable of handling inline inspection tools, and maintenance and cleaning tools.
Where pipelines cross road embankments, coated and insulated pipelines will be encased
in structural steel pipe casings buried within the roadway section. Casings for pipelineroad crossings will extend a minimum of 2 feet beyond the road embankment toe.
All pipelines will be designed above ground and the Miluveach River and Kachemach
River crossings are located in the vicinity of proposed roads, allowing for better access
for leak detection, maintenance, and potential spill response.
Gravel road connection to existing infrastructure provides reliable year-round, rapid
access to project facilities in the event of an emergency, including a blowout, oil spill, or
need for medical evacuation.
Periodic surveillance of the pipelines will be conducted in accordance with federal
regulatory and American Society of Mechanical Engineers (ASME) B31.4 requirements
and in accordance with ADEC regulations (18 Alaska Administrative Code 75). Leak
detection systems and surveillance will be compliant with ASME codes and state and
federal standards. For pipeline-river crossings, either isolation valves or vertical loops
will be used, depending on the type of pipeline.
All fuel and hazardous substances used by the Project will be handled and stored on site
in compliance with state and federal regulatory guidance and the Project's Oil Discharge
Prevention and Contingency Plan (ODPCP) and Spill Prevention Control and
Countermeasures (SPCC) Plan. All fuels and chemicals will be stored in appropriate
primary containment. Secondary containment areas will be designed in compliance with
all applicable permits and regulations.
Fuels and other products will be transported to the project area using a licensed,
commercial transporter following federal Department of Transportation regulations for
safe transport of materials to minimize spill risk.
Trained North Slope employees and contractors who are familiar with North Slope
oilfields will be employed, providing personnel who are familiar with industry
requirements regarding environmental and regulatory compliance standards. Personnel
will be trained on Nanushuk Operational Plans, including oil handler training, waste
management, snow removal, spill prevention, and wildlife interaction, which will
minimize the potential for impacts during daily operations.
POA-2015-25
11
Applicant Proposed Mitigation Statements
Dedicated spill response equipment will be positioned throughout the field to minimize
spill response time. This allows responders to address a potential spill and start response
as soon as possible, while minimizing the amount of fluid that may be released and
associated impacts. The locations and types of oil spill response equipment, and
equipment deployment times will be identified in detail in the project ODPCP.
OSA will maintain its membership with Alaska Clean Seas and the Mutual Aid
Agreement with other operators on the North Slope to provide resources to respond to
spills, which may require resources other than those readily staged on pad. Membership
in Alaska Clean Seas supports faster response time, especially if additional equipment or
personnel are required to address an accidental release.
Noise:
Routine helicopter use will be avoided during regular development, drilling, or
production activities, minimizing noise and related impacts to aesthetics, wildlife, and
subsistence.
3. Compensation for unavoidable impacts to waters of the U.S., including wetlands:
As described in the Applicant Proposed Mitigation Statements submitted as part of a July 2017
Department of the Army Permit application, Armstrong Energy, LLC, the applicant at that time,
recommended that compensatory mitigation is not appropriate for the Project. The Project falls
within three 10-digit Hydrologic Unit Code (HUC) watersheds: the Colville River Delta
Watershed (HUC 1906030410), the Kachemach River Watershed (HUC 1906030411), and the
Miluveach River Watershed (HUC 1906030412), which are all located within the Colville River
Basin (6-digit HUC 190603). These three watersheds total approximately 500,000 acres. Based
on the U.S. Geological Survey Land Cover dataset with addition of existing developments,
approximately 0.15 percent of those 500,000 acres has been directly impacted by placement of
gravel fill. Similarly, U.S. Fish and Wildlife Service (USFWS) National Wetland Inventory
mapping indicates that less than 1 percent (0.85 percent) of the area is classified as uplands.
Following implementation of extensive avoidance and minimization measures described above,
direct impacts from the Project would result in a loss of just 0.05 percent of aquatic resources
within the three watersheds, resulting in a cumulative conversion of less than 1 percent (0.2
percent) of aquatic resources to uplands. Thus, the Project occurs in precisely the type of region
identified by USACE and the U.S. Environmental Protection Agency (EPA) as inappropriate for
compensatory mitigation: a "region . . . where wetlands constitute the overwhelming majority of
land cover type, and there is a lack of available upland sites for creating wetlands or degraded
wetlands sites for enhancement or restoration." 1
OSA understands that USACE has evaluated these factors and has determined that compensatory
mitigation is appropriate for the Project because "the direct, indirect and cumulative impacts of
the proposed project would occur within wetlands that are unique due to their location
within/adjacent to the Colville River Delta (CRD)...which is the largest (approximately 250
1
EPA, USFWS, and National Marine Fisheries Service, Alaska Wetlands Initiative Summary Report, May 1, 1994,
Attachment 1, Mitigation Requirements of the Clean Water Act Section 404 Regulatory Program: Applying
Flexibility in Alaska.
POA-2015-25
12
Applicant Proposed Mitigation Statements
square miles) and most complex delta in northern Alaska, draining about 30% (20,700 square
miles) of the North Slope."2 In addition, "EPA has identified the CRD, its associated tributaries
and wetlands, and adjacent wetland systems, as an Aquatic Resource of National Importance
(ARNI)."3 While USACE acknowledges that the Project is not located in the CRD, USACE has
stated that the Project would "result in impacts to wetlands that are adjacent to and
hydrologically feed the CRD. These adjacent areas are also included in the ARNI designation.
These wetlands are of importance to both the human and aquatic environment, and the filling of
these wetlands would result in losses of specific aquatic resource functions, for example;
terrestrial mammal and waterbird habitat, flood flow moderation and conveyance and
maintenance of the soils thermal regime."4 Based on these factors, USACE has determined
compensatory mitigation to be appropriate for the proposed Project.
OSA acknowledges the ecological importance of the CRD. For these reasons, OSA has avoided
and minimized impacts to the CRD to the maximum extent practicable. For example, as
described above, drill sites have been located east of the Colville River and as far east as
practicable, while still meeting the overall project purpose to produce commercial quantities of
crude oil from the target reservoirs. The location of drill sites avoids placement of surface
facilities west of the East Channel of the Colville River, which eliminates the need for associated
transportation and pipeline infrastructure to access this area. Additional measures to minimize
impacts to specific aquatic resource functions highlighted by USACE are included in OSA's
application through the use of proven arctic engineering design standards; these include roads
and pads that have a standard minimum thickness to protect the thermal regime of the underlying
permafrost by insulating and maintaining stable permafrost conditions; separating roads and
pipelines by a minimum of 500 feet, where feasible, to minimize terrestrial mammal (caribou)
disturbance; and implementation of rigorous hydrologic design criteria for bridges and culverts
to minimize impacts to flood flow moderation and conveyance across the landscape.
As part of project evaluation under the National Environmental Policy Act, USACE's Draft EIS
has not identified any significant impacts to aquatic resources, including wetlands and other
WOUS. However, based on USACE's determination that compensatory mitigation for the
proposed Project is appropriate, OSA is evaluating the availability of appropriate and practicable
options for compensatory mitigation within the watersheds affected by the proposed Project. Due
to the lack of availability of mitigation banks and In-Lieu Fee programs, Permittee-Responsible
Mitigation (PRM) was identified as the only mechanism by which compensatory mitigation
could be performed.
In accordance with the 2008 Mitigation Rule (33 CFR § 325 and 332; 40 CFR § 230), OSA is
developing PRM based on a watershed approach. OSA is currently assessing the Colville River
Basin (HUC-6) and the HUC-10 and HUC-12 watersheds that would be directly impacted by the
Project for their potential to support PRM commensurate with the impacts of the proposed
Project. OSA's watershed approach includes evaluation of existing aquatic resource conditions,
potential threats to aquatic resources, and goals for improving aquatic resources within the
affected watersheds. OSA is also considering mitigation located within the encompassing Arctic
2
USACE, CEPOA-RD Memorandum for Record, Subject: POA-2015-25, Nanushuk Development Project,
Appropriateness of Mitigation, September 14, 2018.
3
Ibid.
4
Ibid.
POA-2015-25
13
Applicant Proposed Mitigation Statements
Alaska Subregion (4-digit HUC 1906); mitigation that qualifies as out-of-kind mitigation5 and
could serve the aquatic resource needs of the watershed; and mitigation on public lands
consistent with Memorandum of Agreement between the Department of the Army and the
Environmental Protection Agency Concerning Mitigation Sequence for Wetlands in Alaska
under Section 404 of the Clean Water Act.6
Potential compensatory mitigation concepts are being reviewed based on practicability,
consistency with the watershed approach, potential for functional lift and/or overall
environmental benefit, and value to local stakeholders. Through their review process, OSA
identified a limited number of permittee responsible compensatory mitigation concepts within
the Colville River Basin and the Arctic Alaska Subregion that could compensate for unavoidable
impacts associated with the Nanushuk Project. These mitigation concepts include:
Restoration of fish passage and flood-flow moderation and conveyance through
replacement or repair of existing stream culverts;
Rehabilitation of existing gravel infrastructure to support maintenance of natural
drainage patterns and maintenance of the soil thermal regime;
Upgrading existing infrastructure to meet arctic engineering design standards and protect
soil thermal regime and hydrologic function;
Removal of fill from floodplain areas to restore hydrologic connectivity and improve
fish and wildlife habitat;
Preservation of land under threat from future development.
OSA is in the process of refining these concepts through discussions with landowners and other
stakeholders. OSA will develop a compensatory mitigation plan for submittal to USACE as part
of the ongoing permit review process. This plan will identify the selected mitigation project and
describe it in detail according to the requirements of the 2008 Mitigation Rule (33 CFR §
332.4(c)).
5
a resource of a different structural and functional type from the impacted resource (40 CFR 230.92)
Department of the Army and Environmental Protection Agency. 2018. Memorandum of Agreement
between the Department of the Army and the Environmental Protection Agency concerning Mitigation Sequence for
Wetlands in Alaska under Section 404 of the Clean Water Act. June 15, 2018.
https://www.epa.gov/sites/production/files/2018-06/documents/epa_army_moa_alaska_mitigation_cwa_404_06-152018_0.pdf
6
POA-2015-25
14
Nanushuk Project
Figure Set
(Sheets 1-61)
Submitted by:
October 5, 2018
THIS PAGE
INTENTIONALLY
LEFT BLANK
ADJACENT LAND OWNERSHIP CONTACT INFORMATION
4
61
0
100
200
300 FT
DS1 ROAD
B
A
A
E07
ACCESS
ROAD
B
CENTRAL PROCESSING FACILITY (CPF) PAD LAYOUT
6
61
LEGEND
WATERBODIES
WETLANDS
UPLANDS
0
125
250
375 FT
B
A
C
C
A
B
DS1 ROAD
PLAN
DS1 LAYOUT
8
61
LEGEND
WATERBODIES
WETLANDS
UPLANDS
0
150
300
450 FT
B
A
W64
W01
C
C
A
B
DS2 ROAD
PLAN
DS2 LAYOUT
10
61
LEGEND
WATERBODIES
WETLANDS
UPLANDS
0
150
300
DS3 ROAD
450 FT
B
A
C
W60
C
W01
A
B
PLAN
DS3 LAYOUT
12
61
LEGEND
WATERBODIES
WETLANDS
UPLANDS
B
0
100
200
A
300 FT
A
ACCESS ROAD
B
OPERATIONS CENTER LAYOUT
14
61
LEGEND
WATERBODIES
WETLANDS
UPLANDS
0
30
60
90 FT
EXISTING KUPARUK SPINE ROAD
EXISTING KUPARUK
PIPERACK
NANUSHUK PIPELINE
EXI
DS2 STING
C R KUP
OAD AR
UK
PIPELINE CROSSING
OF EXISTING ROAD
TIE-IN PAD LAYOUT
16
61
LAKE MC7903
NANUSHUK
PIPELINE
0
75
150
225 FT
PUMP HOUSE
MODULE
FRESHWATER
PIPELINE
B
LEGEND
WATERBODIES
SEE SHEET 34 FOR
TYPICAL ROAD SECTION
WETLANDS
UPLANDS
WATER SOURCE
ACCESS ROAD
PLAN
A
A
B
C
C
WATER INTAKE STRUCTURE
SECTION C-C
MC7903 WATER INTAKE AND PUMP HOUSE PAD
49 61
KACHEMACH RIVER PIPELINE CROSSING
MILUVEACH RIVER PIPELINE CROSSING
PIPELINE RIVER CROSSING
55 61
THIS PAGE
INTENTIONALLY
LEFT BLANK
U.S. ARMY CORPS OF ENGINEERS
APPLICATION FOR DEPARTMENT OF
THE ARMY PERMIT
Nanushuk Project
POA-2015-025
Submitted by:
October 5, 2018
POA-2015-25
THIS PAGE
INTENTIONALLY
LEFT BLANK
POA-2015-25
October 5, 2018
Ms. Ellen Lyons
Alaska District Regulatory Division
US Army Corps of Engineers
2175 University Avenue, Suite 201E
Fairbanks, AK 99709-4927
RE:
Department of the Army POA-2015-025 Permit Application Rev 2
Nanushuk Project
North Slope, Alaska
Dear Ms. Lyons:
Oil Search Alaska, LLC (OSA) is pleased to submit the enclosed Department of the Army (DA)
application package for a permit to construct the Nanushuk Project (Project). The Project has
been assigned U.S. Army Corps of Engineers (USACE) file number POA-2015-025.
Effective March 15, 2018, OSA assumed the role of operator for the Project. As a result, OSA
became the Applicant for POA-2015-025 as requested by Armstrong Energy, LLC, on May 3,
2018. This permit application package supersedes applications submitted by Repsol E&P USA,
Inc, in June 2015 and by Armstrong Energy, LLC, in October 2015, April 2016, and July 2017.
Enclosed please find the DA permit application with the following components:
·
·
·
·
DA permit application form
Project Description
Supporting Figures
Applicant Proposed Mitigation Statements
Since submittal of the July 2017 permit application and publication of the Draft Environmental
Impact Statement (Draft EIS) in September 2017, and based on comments received from
agencies and stakeholders, OSA has updated its proposed Project to a modified version of
Alternative 5 evaluated in the Draft EIS. The updated proposed Project includes the following
substantive changes:
·
Changes in road alignment and bridge locations including use of and upgrade to 4.7
miles of the existing Mustang Road.
·
Separation of the Central Processing Facility (CPF) from Drill Site 1 (DS1) and relocation
of the Operations Center south of Lake MC7903.
·
Relocation of Drill Site (DS2) approximately 3,200 feet east to a location southeast of
Lake 9211.
·
Relocation of the tie-in pad approximately 1 mile east of the previously proposed
location.
POA-2015-25
POA-2015-25
Nanushuk Project
Application for Department of the Army Permit
Submitted by:
October 5, 2018
POA-2015-25
THIS PAGE
INTENTIONALLY
LEFT BLANK
POA-2015-25
POA-2015-25
17. DIRECTIONS TO THE SITEThe proposed Nanushuk Project (Project) is located approximately 52 miles west of Deadhorse and, at its closest point, is approximately
7 miles northeast of the community of Nuiqsut on Oil Search, Alaska, LLC (OSA) operated State of Alaska and Arctic Slope Regional
Corporation (ASRC) oil and gas leases southeast of the East Channel of the Colville River. The Project is located southwest of the
existing Oooguruk Development Project, west of the existing Kuparuk River Unit, and east of the existing Alpine and Alpine Satellite
Development Projects.
18. Nature of Activity (Description of project, include all features)
OSA proposes to drill wells and construct and operate infrastructure and facilities to produce and transport sales-quality oil to the TransAlaska Pipeline System (TAPS). Project components include construction of three gravel drill sites (DS1, DS2, and DS3), Central
Processing Facility (CPF), Operations Center, tie-in pad, infield pipelines, export/import Nanushuk Pipeline system, access road, infield
roads, boat ramp, and potable water system. The Project also includes screeding in front of the existing Oliktok Dock and trenching for
electrical and fiber optic cables at pipeline-road crossings. Minor upgrades to existing roads may also be required.
See attached Project Description for details.
19. Project Purpose (Describe the reason or purpose of the project, see instructions)
To safely produce commercial quantities of liquid hydrocarbons in OSA's State of Alaska and ASRC oil and gas leasehold by operating
from a site east of the Colville River Delta; to process hydrocarbons on or near the drill sites; and to transport sales-quality oil through a
new export pipeline to the Kuparuk sales oil pipeline, and then to TAPS. A secondary purpose of the Project is to further delineate
geological features and hydrocarbon accumulations in OSA's leasehold utilizing the proposed infrastructure.
USE BLOCKS 20-23 IF DREDGED AND/OR FILL MATERIAL IS TO BE DISCHARGED
20. Reason(s) for Discharge
- Gravel fill is necessary for the construction of the CPF, Operations Center, drill sites, tie-in pad, potable water system pad, access road,
and infield roads. Clean gravel would be obtained from an existing permitted source. See Project Description for additional details.
- Additional fill consisting of sand slurry mixture is necessary for the construction of vertical support members (VSMs) to support the
infield and export/import pipelines as wells as the potable water system pipeline.
Temporary discharges:
- Sediment will be smoothed or re-contoured in a 5.7-acre area via screeding to facilitate barge offloading at Oliktok Dock.
- Sediment over a surface area of less than 0.1 acre will be temporarily removed and replaced during trenching and burial of power and
fiber optic cables at locations where they cross roads.
21. Type(s) of Material Being Discharged and the Amount of Each Type in Cubic Yards:
Type
Amount in Cubic Yards
Type
Amount in Cubic Yards
Type
Amount in Cubic Yards
Type
Amount in Cubic Yards
Gravel
2,856,000 cy
Sand slurry
13,950 cy
Screeding sediment (temporary)
2,000 - 3,000 cy
Trenching fill (temporary)
500 cy
22. Surface Area in Acres of Wetlands or Other Waters Filled (see instructions)
Acres
261.3 acres (and an additional 5.8 acres of fill from temporary discharges)
or
Linear Feet
23. Description of Avoidance, Minimization and Compensation (see instructions)
Please see the attached Applicant Proposed Mitigation Statements.
ENG FORM 4345, Dec 2014
POA-2015-25
PREVIOUS EDITIONS ARE OBSELETE
Page 2 of 3
POA-2015-25
THIS PAGE
INTENTIONALLY
LEFT BLANK
POA-2015-25
Nanushuk Project
Project Description
Submitted by:
October 5, 2018
POA-2015-25
THIS PAGE
INTENTIONALLY
LEFT BLANK
POA-2015-25
Nanushuk Project
Project Description
October 2018
POA-2015-25
Nanushuk Project
THIS PAGE
INTENTIONALLY
LEFT BLANK
POA-2015-25
Nanushuk Project
CONTENTS
1.0
2.0
Introduction ...................................................................................................................... 1
1.1
Location .................................................................................................................... 1
1.2
Site Conditions ......................................................................................................... 2
Project Components ........................................................................................................ 2
2.1
Drill Sites .................................................................................................................. 5
2.2
Central Processing Facility ....................................................................................... 5
2.3
Operations Center .................................................................................................... 6
2.4
Tie-in Pad ................................................................................................................. 6
2.5
Pipelines ................................................................................................................... 6
2.6
2.5.1
Infield Pipelines ............................................................................................. 7
2.5.2
Nanushuk Pipeline ........................................................................................ 8
2.5.3
Pipeline River Crossings ............................................................................... 8
Gravel Roads............................................................................................................ 8
2.6.1
Bridges and Culverts ..................................................................................... 9
2.7
Potable Water System .............................................................................................10
2.8
Boat Ramp ..............................................................................................................10
2.9
Oliktok Point Dock Screeding ..................................................................................10
2.10 Summary of Temporary and Permanent Discharge to Waters of the U.S. ...............10
3.0
Support Infrastructure ................................................................................................... 14
3.1
Gravel Source..........................................................................................................14
3.2
Camps .....................................................................................................................14
3.3
Water Use ...............................................................................................................15
3.4
Ice Road Infrastructure ............................................................................................16
3.5
Fuel and Hazardous Substances .............................................................................17
3.6
3.5.1
Handling and Storage ..................................................................................17
3.5.2
Spill Prevention and Response ....................................................................17
Waste Management and Disposal ...........................................................................18
3.6.1
Class 1 Disposal Wells .................................................................................18
3.6.2
Solid Waste ..................................................................................................18
3.6.3
Hazardous and Universal Waste ..................................................................18
3.7
Communications ......................................................................................................19
3.8
Power Generation ....................................................................................................19
3.9
Lighting ....................................................................................................................19
Project Description, Rev 2
i
POA-2015-25
Nanushuk Project
3.10 Workforce ................................................................................................................19
4.0
Logistics ......................................................................................................................... 19
5.0
Operational Plans ........................................................................................................... 20
6.0
Schedule ......................................................................................................................... 20
7.0
Permit Requirements ..................................................................................................... 23
8.0
Site Closure .................................................................................................................... 24
9.0
References ...................................................................................................................... 25
TABLES
Table 1. Project Components and Locations .............................................................................. 1
Table 2. Footprint of Project Components and Fill Requirements in WOUS ..............................12
Table 3. Temporary Discharges in WOUS ................................................................................14
Table 4. Camps.........................................................................................................................15
Table 5. Ice Road Infrastructure ................................................................................................16
Table 6. Potential Permits, Authorizations, and Approvals ........................................................23
FIGURES
Figure 1. General Project Location ............................................................................................. 3
Figure 2. Proposed Project......................................................................................................... 4
Figure 3. Project Schedule Years 1-6........................................................................................22
SHEETS
Sheets 1-61. USACE Permit Application Figure Set
Project Description, Rev 2
ii
POA-2015-25
Nanushuk Project
Abbreviations
AAC
Alaska Administrative Code
ADEC
Alaska Department of Environmental Conservation
ADF&G
Alaska Department of Fish and Game
ADNR
Alaska Department of Natural Resources
ASRC
Arctic Slope Regional Corporation
CFR
Code of Federal Regulations
CPF
central processing facility
cy
cubic yards
DS1
Drill Site 1
DS2
Drill Site 2
DS2M
Kuparuk drill site 2M
DS3
Drill Site 3
EPA
U.S. Environmental Protection Agency
FRP
Facility Response Plan
HSM
horizontal support member
Kuparuk
Kuparuk River Unit
Kuparuk CPF2
Kuparuk Central Processing Facility 2
mcy
million cubic yards
MG
million gallons
NSB
North Slope Borough
ODPCP
Oil Discharge Prevention and Contingency Plan
OHW
ordinary high water
OSA
Oil Search Alaska, LLC
Project
Nanushuk Project
Q1, Q2, Q3, Q4
first quarter, second quarter, third quarter, fourth quarter
RCRA
Resource Conservation and Recovery Act
SPCC
Spill Prevention, Control, and Countermeasure
UIC
underground injection control
USACE
U.S. Army Corps of Engineers
USDOT
U.S. Department of Transportation
VSM
vertical support member
Project Description, Rev 2
iii
POA-2015-25
Nanushuk Project
Abbreviations
WAP
Waste Analysis Plan
WOUS
waters of the U.S.
Project Description, Rev 2
iv
POA-2015-25
Nanushuk Project
1.0 INTRODUCTION
Oil Search Alaska, LLC (OSA), is proposing development of hydrocarbon deposits from its oil
and gas leasehold on the North Slope of Alaska. The Nanushuk Project (Project) targets oil
deposits in the Alpine C and Nanushuk reservoirs. OSA will drill wells and construct and operate
infrastructure and facilities to produce and transport sales-quality oil to the Trans-Alaska
Pipeline System.
1.1 Location
The Project is located approximately 52 miles west of Deadhorse and, at its closest point, is
approximately 7 miles northeast of the community of Nuiqsut (Figure 1; Sheet 1) on OSAoperated State of Alaska and Arctic Slope Regional Corporation (ASRC) oil and gas leases
southeast of the East Channel of the Colville River. The Project is located southwest of the
existing Oooguruk Development Project, west of the existing Kuparuk River Unit (Kuparuk), and
east of the existing Alpine and Alpine Satellite Development Projects. Table 1 and Sheet 5 detail
the location of project components.
Table 1. Project Components and Locations
Project Component
Townshipa
Range
Section(s)
Central Processing Facility (CPF)
Drill site 1 (DS1)
Drill site 2 (DS2)
11 North
12 North
11 North
11 North
11 North
11 North
11 North
11 North
11 North
10 North
11 North
11 North
10 North
10 North
11 North
11 North
11 North
6 East
6 East
6 East
5 East
6 East
6 East
9 East
6 East
6 East
7 East
6 East
7 East
7 East
8 East
8 East
5 East
6 East
12 North
10 North
11 North
10 North
10 North
11 North
11 North
11 North
11 North
11 North
6 East
7 East
6 East
7 East
8 East
6 East
7 East
8 East
9 East
6 East
14
26
04
36
31
24
16
24
05
02, 03
14, 23, 24
19, 30, 31, 32, 33, 34, 35
01, 02
05, 06
31, 32, 33
25, 36
01, 02, 04, 05, 09, 10, 11, 14, 21, 22, 23, 24, 28,
29, 30, 31
26, 35, 36
12 North
11 North
13 North
6 East
6 East
9 East
Drill site 3 (DS3)
Operations Center
Tie-in pad
Pump house pad
Boat ramp
Access road
Mustang Road upgrades
Infield roads
Miluveach River bridge
Kachemach River bridge
Nanushuk Pipelineb
Infield pipelines
Potable water system
Oliktok Dock screeding area
Project Description, Rev 2
02, 03, 34, 35
28, 29
01, 02
06
14, 23, 24
19, 29, 30, 32, 33, 34, 35
23, 24, 26, 27, 28, 31, 32, 33
16, 19, 20, 21, 28, 29
01, 02, 04, 09, 10, 11, 14, 21, 22, 23, 28, 29, 30,
31
25, 26, 36
14, 23, 24
05
1 of 25
POA-2015-25
Nanushuk Project
Table 1. Project Components and Locations
Project Component
Townshipa
Range
Section(s)
a
All locations are based on the Umiat Meridian.
b
Includes export pipeline, make-up water pipeline, make-up gas pipeline, and power and fiber optic cables (see Section 2.5.2)
The Project is located in the North Slope Borough (NSB). Kuukpik Corporation owns the surface
estate of lands at the drill sites and lands traversed by portions of the infield roads and infield
pipelines (Sheets 3 and 4). The State of Alaska, through the Alaska Department of Natural
Resources (ADNR), manages the surface lands traversed by the Nanushuk Pipeline (see
Section 2.5.2) and access road. The Project will access subsurface mineral resources that are
shared by the State of Alaska and ASRC. None of the project facilities are located on or near
Alaska Native allotments.
1.2 Site Conditions
The Project is within the Arctic Coastal Plain physiographic region at elevations ranging from
sea level to 100 feet above sea level. The landscape of the Arctic Coastal Plain is generally flat
with landforms between drainages dominated by patterned ground, shallow lakes and ponds,
and wetlands resulting from poorly drained soils. As is typical on the North Slope, the Project is
located on permafrost where the subsurface is perennially frozen up to a depth of approximately
2,000 feet.
2.0 PROJECT COMPONENTS
The Project will include construction of Drill Site 1 (DS1), Drill Site 2 (DS2), Drill Site 3 (DS3),
Central Processing Facility (CPF), Operations Center, tie-in pad, infield pipelines, export/import
Nanushuk Pipeline, access road, infield roads, boat ramp, and potable water system (Figure 2;
Sheet 5). The Project also includes screeding1 activities in front of the existing Oliktok Dock and
trenching activities for electrical and fiber optic cables at pipeline-road crossings. Minor
upgrades and maintenance to the existing road system may also be required to facilitate
transportation of sealift modules. Gravel material for project development will be sourced from
one or more existing gravel mine sites (see Section 3.1), which will be permitted and operated
independently of the Project. The footprint and quantity of fill needed for each project
component are summarized in Section 2.10. Support infrastructure is discussed in Section 3.0.
All project facilities are designed and will be constructed to meet federal, state, and local
regulatory requirements; industry standards; arctic oil field best practices; and other OSA
internal standards. Gravel pads will have a minimum gravel thickness of 6 feet and side slopes
of 2 to 1. Gravel roads will have a minimum gravel thickness of 5 feet and side slopes of 2 to 1.
Gravel infrastructure located in the floodplain will be built to more conservative elevations based
on hydrologic conditions.2 Placement of the roads and pads will be optimized to minimize
ponding to the extent practical, and road and pad elevations will be designed as appropriate to
prevent overtopping. In areas where ponding next to a pad cannot be avoided during flood
events or where flowing water may occur adjacent to the gravel embankment, erosion potential
will be determined and erosion control will be provided as needed.
1
Screeding is a process of redistributing sediment to smooth the seafloor to facilitate barge offloading.
Based on field conditions, pads are estimated to range from 6.5 to 10.5 feet thick, and roads are estimated to be an
average of 6.5 to 7.5 feet. Thicknesses could be greater in floodplains.
2
Project Description, Rev 2
2 of 25
POA-2015-25
Be a u fo rt S ea
Nikaitchuq
Unit
Milne Point
Unit
Oooguruk
Unit
Pikka
Unit
Caelus Oooguruk
Drill Site
Simps on
Bay
Oliktok Point
Northstar
Unit
J on es I s la nd s
Colville
River Unit
Harr ison
Bay
Gwy dyr
Bay
Caelus Energy
Nuna Drill
Site 1
CPAIAlpine
Development
Project
C
v
ol
il
le
R
iv
Beechey
Point Unit
Re t ur n Is la nd s
Dewline
er
Placer
Unit
Prudhoe
Bay
CPF2
Mustang
Prudhoe Bay Unit
S.Miluveach
!
(
Kuparuk River Unit
NUIQSUT
PROJECT FACILITIES
EXISTING FACILITIES
ACCESS AND INFIELD
GRAVEL ROADS
EXISTING ROAD
PROPOSED COLVILLE RIVER
ACCESS ROAD
NPR-A BOUNDARY
EXISTING PIPELINES
PIPELINE SYSTEMS
!
(
KUUKPIK BOUNDARY
O&G UNIT BOUNDARIES
COMMUNITY
POA-2015-25
!
(
Guitar Unit
DEADHORSE
OIL SEARCH ALASKA LLC.
NANUSHUK PROJECT
µ
General Project Location
0
1
0 1 2
2
4
4
Miles
Kilometers
Figure 1
GCS: NAD 1983 StatePlane Alaska 4 FIPS 5004 Feet
DATE: 8/24/2018. REV: 1.0. By: JB
Document name: DEV-DF-PE-M_GeneralProjectLocation
3J
NDS1
3H
OTP
an
ne
l
a
Ch
El a
k
e
to v
ac
h
C
h
Ku
C
ol
pi g
vi
lle
ak
ru
R
e
iv
nn
el
3A
3S
Ea
r-
Ch
st
a
e
nn
l
3B
3G
3F
DS1
2W
W SAK 11
Bo at Ram p
DS2
2U
2T
2X
MS F
2V
CPF
M
il
u
W SAK 18
v
TIE-IN PAD
ac
2A
h
Ri
W SAK 14
FOUR CORNERS
ve
OC
2C
r
Kach em ach
Ri ver
Cr ossi n g
DS3
Pum p
Ho u se
Pad
e
MC7903
2B
Ka
Mi lu veach
Ri ver
Cr ossi n g
ch
em
ac
h
CPF-2
2H
2M
2F
R
iv
2G
er
MUSTANG
2K
ASRC MS
2L
PROPOSED PROJECT COMPONENTS
OTHER INFRASTRUCTURE
DRILL SITES
BOAT RAMP ACCESS ROAD
EXISTING FACILITIES
CENTRAL PROCESSING FACILITY
INFIELD GRAVEL ROADS
EXISTING ROAD
MUSTANG ROAD UPGRADES
EXISTING PIPELINES
NANUSHUK PIPELINE
KUUKPIK BOUNDARY
OPERATIONS CENTER
PUMP HOUSE PAD
BOAT RAMP
TIE-IN PAD NEAR CPF2
ACCESS GRAVEL ROAD
2S
INFIELD PIPELINE
FRESHWATER PIPELINE
POA-2015-25
OIL SEARCH ALASKA LLC.
NANUSHUK PROJECT
µ
Proposed Project
0
0
0.5
1
1
Figure 2
Miles
2
Kilometers
GCS: NAD 1983 StatePlane Alaska 4 FIPS 5004 Feet
DATE: 8/24/2018. REV: 1.0. By: JB
Document name: DEV-DF-PE-M_ProjectComponents
Nanushuk Project
Gravel infrastructure will be constructed during the winter months. After the gravel footprint is
surveyed and staked, all snow and ice in excess of 4 inches will be removed from the tundra
surface in the work area; the tundra surface will not be otherwise disturbed. Pit-run gravel will be
placed in lifts using large-capacity dump trucks and will be spread out with bulldozers or similar
heavy earthmoving equipment. Each lift will be compacted by a heavy roller. During summer
months, ice that is present in the gravel will melt, leading to further consolidation and settlement.
To enhance this process, the gravel will be farmed3 and re-compacted during the summer
months after each year that gravel placement occurs. No infrastructure will be placed on gravel
pads and roads until regrading and compaction is completed.
2.1 Drill Sites
The Project includes three gravel drill sites: DS1, DS2, and DS3 (Sheets 8 to 13). The number
and locations of the drill sites are dictated by the configuration of the oil reservoirs defined by
previous exploration efforts, with consideration for site accessibility requirements, and by
operational constraints. Drill sites are also oriented with the long axis parallel to the prevailing
northeast/southwest wind direction to minimize snow drifting.
The three drill sites will accommodate up to 146 total production and injection wells (32 at DS1,
60 at DS2, and 54 at DS3) with 20-foot spacing between wellheads. DS1, DS2, and/or DS3 may
also include an additional well slot to accommodate a Class 1 underground injection control
(UIC) disposal well (see Section 3.6). Each drill site will accommodate drilling equipment and
support facilities, including well testing equipment, well stimulation equipment, drilling mud and
cement tanks, production gathering facilities, diesel fuel storage tanks, a communication tower,
cold storage, emergency response equipment, and drilling laydown areas. Each drill site also
includes space for temporary camps (see Section 3.2). An access corridor will provide egress
and ingress in the event of an emergency. This corridor serves a secondary function of
providing access to facilities and infrastructure for maintenance and service. Power generated
at the CPF will be supplied to each drill site through a power cable, which will be attached to
infield pipelines (see Section 2.5.1). No processing of multiphase product--a mixture of crude
oil, natural gas, and water--beyond routine well testing and process fluid heating will occur at
the drill sites.
2.2 Central Processing Facility
The CPF will comprise processing and utilities modules (Sheets 6 and 7). Multiphase product
from the three drill sites will be transported to the CPF via multiphase pipelines for processing.
Facilities at the CPF will have capacity to process approximately 120,000 barrels per day of
cumulative oil production. Seawater and water separated from the oil will be transported back to
the drill sites via water injection pipelines to be re-injected into the subsurface formation to help
with crude oil production. Separated gas will be used for fuel at the CPF, and the remainder will
be transported back to the drill sites via pipelines for gas lift. Excess gas, if any, will be injected
into dedicated injection wells at the drill sites, or made available for market. Sales-quality oil
processed at the CPF will be transported to the tie-in pad (Section 2.4) near the Kuparuk
Central Processing Facility 2 (CPF2) via the Nanushuk Pipeline (Section 2.5.2), where it will tie
into the Kuparuk Sales Pipeline for transportation to the Trans-Alaska Pipeline System.
3
Farming, also called seasoning, consists of turning the upper layers of gravel to expose buried areas and facilitate
drying.
Project Description, Rev 2
5 of 25
POA-2015-25
Nanushuk Project
Processing facilities at the CPF will comprise a combination of truckable and sealift modules.4
These include equipment designed for phase separation, heating and cooling, pumping, gas
treatment and compression for gas lift injection, and water treatment for injection. The CPF also
includes metering and pigging facilities; power generation facilities; a truck fill station;
construction material and equipment staging areas; and a central control room. The CPF will
house a tank farm consisting of diesel, refined fuel, crude oil, injection water, production
chemicals, glycol, and methanol storage tanks (see Section 3.5).
The CPF will include either a single or dual flares to support both high- and low-pressure safety
relief systems. The flares will be designed in accordance with regulatory requirements. The
height and width of the flare stacks have not yet been determined.
2.3 Operations Center
The Operations Center (Sheets 14 and 15) will include facilities to support field-wide operations.
Operations Center infrastructure includes:
A 200-bed operations camp to house operations and maintenance personnel, including
living quarters, housekeeping, a recreation area, food service facilities, and a small
medical clinic
Office, warehouse, and maintenance buildings
Warm and cold storage buildings
Water/wastewater treatment plants and temporary waste storage areas
Communication structures, including a communication tower
Diesel-fired back-up power generators and fuel storage
A helicopter landing pad (helipad; note that routine helicopter use is not planned under
normal operating conditions)
The Operations Center may also house construction camps during the construction phase.
Following construction, the camps will be decommissioned and removed from the site. The area
vacated on the pad will then be used by operations for outdoor storage or for other purposes.
2.4 Tie-in Pad
The Project includes a tie-in pad located on new gravel fill near the existing Kuparuk CPF2
facility (Sheets 16 and 17). The tie-in pad provides space for tie-in of the Nanushuk Pipeline
infrastructure to existing North Slope facilities. Tie-in pad infrastructure will include a pig
launcher and receiver, a metering skid, a pipe rack, pumping infrastructure, a shutdown valve, a
laydown area, and a communications tower.
2.5 Pipelines
The Project includes two types of pipelines: infield pipelines, which connect the drill sites to the
CPF, and the Nanushuk Pipeline, which connects the CPF to existing infrastructure on the North
Slope via the tie-in pad (see Section 2.4). Specific infrastructure planned for each pipeline is
described below.
4
Truckable processing facility modules are generally smaller modules fabricated off site and transported to the North
Slope and the CPF location by truck. Sealift modules are larger processing facility modules constructed off site and
delivered to the North Slope by barge.
Project Description, Rev 2
6 of 25
POA-2015-25
Nanushuk Project
All pipelines will rest on horizontal support members (HSMs) supported by one or two (such as
at anchor supports) 8- to 24-inch-diameter pipe pile vertical support members (VSMs) spaced
approximately 55 to 60 feet apart. Where feasible, pipelines will be located parallel to gravel
roads (see Section 2.6) at a distance of between 500 and 1,000 feet to minimize caribou
disturbance and excessive snow drift while facilitating access for visual pipeline inspection,
monitoring, repairs, modifications, and testing.
Both the infield pipelines and the Nanushuk Pipeline pipe racks will include power and fiber
optic cables to transmit power and facilitate communication between the CPF, drill sites,
Operations Center, and tie-in pad to avoid the need to install power poles. Cables will be
installed on the HSMs using messenger cables. All pipelines, HSMs, and suspended cables will
be a minimum of 7 feet above the tundra surface, except where pipelines intersect a road or
pad, are constructed within 100 feet of an existing pipeline that is elevated less than 5 feet, or to
meet NSB regulatory requirements in effect at the time of NSB permitting.
External pipe walls will be coated with fusion-bonded epoxy. Pipelines containing temperaturecontrolled fluids and multiphase product will include an insulation system consisting of
polyurethane foam insulation covered with an interlocked sheet metal jacket. Pipelines will have
a non-reflective finish to reduce reflectivity and potential impacts to wildlife.
Pipeline construction activities will occur via ice road during two to three winter construction
seasons. VSM locations will be surveyed and drilled, followed by VSM installation into the predrilled holes using sand slurry fill. Drilling will occur from an ice road and will result in cuttings
sidecast onto the ice around each VSM. The cuttings will then be removed to an upland or
previously disturbed area.
Where pipelines cross road embankments, coated and insulated pipelines will be encased in
structural steel pipe casings buried within the roadway section (Sheets 51 and 52). Casings for
pipeline-road crossings will extend at least 2 feet beyond the road embankment toe. The power
and fiber optic cables will cross under the road prism via a trench located parallel to each
pipeline-road crossing (Sheet 53). Trenching will occur during winter. Trenched materials will be
temporarily sidecast onto an ice pad adjacent to the trench. This will avoid a discharge of fill
material into waters of the U.S. (WOUS), since the sidecasting will not change the bottom
elevation of a WOUS or replace any portion of a WOUS with dry ground. Trenched materials will
be taken off the ice pad and backfilled into the excavation once trenching is complete.
2.5.1 Infield Pipelines
Infield pipelines connect the drill sites to the CPF (Sheets 20 to 24, 42 to 47). The DS1, DS2,
and DS3 infield pipe racks each include:
A multiphase pipeline to deliver multiphase product from the drill site to the CPF
A water injection pipeline to transport injection water from the CPF to the drill site for
reinjection
A gas lift pipeline to transport treated gas from the CPF to the drill site
A gas injection pipeline to transport excess gas to dedicated injection wells at the drill
site
An infield power cable to transmit power produced at the CPF to the drill site
An infield fiber optic cable to transmit signals and communications between the CPF and
the drill site
Project Description, Rev 2
7 of 25
POA-2015-25
Nanushuk Project
In addition, a freshwater pipeline will transport water from the water intake structure at Lake
MC7903 (Section 2.7; Sheet 48) to the Operations Center and CPF. The freshwater pipeline will
be located on dedicated VSMs from the intake structure to the Operations Center. The
freshwater pipeline will then share Nanushuk Pipeline VSMs to the CPF.
2.5.2 Nanushuk Pipeline
The export/import Nanushuk Pipeline pipe rack (Sheets 25 to 33, 40 to 41, and 54) includes:
An export pipeline to transport sales-quality oil from the CPF to the tie-in pad near the
Kuparuk CPF2
A make-up water pipeline to transport make-up injection water from the tie-in pad to the
CPF
A bi-directional make-up gas pipeline to transport make-up gas from the tie-in pad to the
CPF or excess gas from the CPF to the tie-in pad
A power cable to transmit power produced at the CPF to the tie-in pad
A fiber optic cable to transmit signals and communications between the CPF and the tiein pad
The Nanushuk Pipeline infrastructure will be located parallel to the proposed access road (see
Section 2.6) and Mustang access road between the CPF and Kuparuk drill site 2M (DS2M).
Between DS2M and the tie-in pad near Kuparuk CPF2, the Nanushuk Pipeline will parallel
existing pipelines and/or gravel roads associated with the Kuparuk River Unit. The Nanushuk
Pipeline cannot be located on existing VSMs due to insufficient space on existing pipe racks.
However, co-location with the existing pipeline and road corridor minimizes impacts to the
aquatic environment compared to having the two features spaced farther apart.
2.5.3 Pipeline River Crossings
The Nanushuk Pipeline and the DS3 infield pipeline will cross the Miluveach River and
Kachemach River, respectively. The pipeline crossings may require placement of VSMs below
ordinary high water (OHW; Sheet 55). All pipelines, HSMs, and suspended cables will be
elevated at river crossings to maintain adequate freeboard. At the Kachemach River crossing,
up to 4 feet of elevation may be added to accommodate boat traffic. VSMs placed within known
floodplains will be designed to withstand the effects of scour, bank migration, and forces from
ice floe impacts.
2.6 Gravel Roads
The Project includes 12.4 miles of gravel infield roads, including a 3.5-mile DS1 road, a 2.1-mile
DS2 road, 5.2-mile DS3 road, a 1.4-mile boat ramp access road, and a 0.2-mile water source
access road, to provide all-season ground transport between the CPF, drill sites, and other
project facilities (Sheets 20 to 24), The Project also includes a 9.5-mile gravel access road to
provide all-season ground transport connecting the CPF to existing infrastructure (Sheets 25 to
33).
Gravel roads will be constructed to be 24 (approximately 44 feet at the base) to 32 feet
(approximately 52 feet at the base) wide at the surface but may be wider at curves to
accommodate larger module transport. Six road turnouts (three along the access road, one
along the DS1 road, one on the DS2 road, and one on the DS3 road) will be included to allow
safe access to project facilities during movement of large equipment, including modules and
drilling rigs (Sheet 35). Three gravel tundra access ramps will also be located at road turnouts
near DS1, DS2, and DS3 to facilitate access for off-road travelers (Sheet 36). Access and infield
Project Description, Rev 2
8 of 25
POA-2015-25
Nanushuk Project
roads are designed to accommodate two-way traffic and will be used during facility construction,
drilling, and operations for mobilization of construction materials; drill rigs and drilling materials;
supplies; personnel; and, if necessary, emergency spill response equipment.
The access road will follow the existing Mustang access road for approximately 4.7 miles. Use
of the Mustang access road will require upgrades to bring it up to minimum design standards
and improve road surface condition. Upgrades could include expansion of the road base width
and addition of higher quality material to improve load capacity. At this time, improvements to
the Kuparuk road system are not planned. If needed, this work would be planned and permitted
prior to sealift module transport.
Proposed gravel roads will parallel the proposed pipelines to facilitate year-round access for
maintenance, repair, monitoring, and, if necessary, emergency response (see Section 2.5).
Gravel roads will maintain a separation distance from pipelines of 500 feet or more, where
practicable, but of no more than 1,000 feet in order to reduce risk of vehicle impacts, ensure
access during a spill or fire, and expedite snow removal. All gravel roads will also include 4-foothigh flexible reflective markers along the sides, spaced approximately 50 to 75 feet apart and 1
foot from the road shoulder. Where pipelines cross gravel roads, they will be buried within the
roadway section and encased with structural pipe sized appropriately for required loads
(Section 2.5).
2.6.1 Bridges and Culverts
The access road crosses the Miluveach River and the DS3 infield road crosses the Kachemach
River on 170- and 245-foot bridges, respectively. Both bridges will be multi-span structures, and
will include pipe pile foundations at sheet pile abutments and several sets of intermediate pier
piles between abutments. Piers may be set in both the floodplains and the main river channel
below OHW (Sheets 56 to 59). Both bridges will consist of steel girders with precast concrete
decks with a 32-foot clear width between the faces of a removable steel railing. Both the
Miluveach River and Kachemach River bridges are designed to maintain adequate freeboard. At
the Kachemach River crossing, up to 4 feet of elevation may be added to accommodate boat
traffic.
The access road will also cross two identified streams or concentrated drainages5 using culvert
batteries. The DS3 infield road will have three concentrated drainage crossings. Drainage
culverts (both size and number) will be sited and designed at streams and concentrated
drainages to pass the 50-year flood event with a headwater elevation not exceeding the
diameter of the culvert. Where possible, as determined by engineers and/or regulatory
agencies, culverts within the 200-year floodplain may be designed to pass the 75-year flood
event. Prior to construction, an engineer will walk and slope-stake the roads to determine
precise locations of drainage structures and determine on-site conditions for final layout.
Typical drainage culverts will be structural steel pipe (Sheet 38). Fish passage culverts (Sheet
39) will be designed at stream crossings where the Alaska Department of Fish and Game
(ADF&G) determine that fish are present, and design will be in accordance with ADF&G Title 16
fish passage standards. Flow velocities at culvert outlets will be analyzed, and outlet erosion
control measures will be designed as necessary to prevent channel degradation. Downstream
scour protection, where required, may consist of articulated concrete block mats or other
appropriate material (such as riprap). Typically, steel pipe culverts will be constructed during the
winter months. Multi-plate culverts will be installed during the summer months to allow proper
compaction of gravel around the culverts; however, temporary passage structures can be
5
A concentrated drainage is defined as a relatively saturated area that lacks an OHW mark but is likely to convey flow
during breakup, or an incised thermokarst-polygon field that may potentially convey flow.
Project Description, Rev 2
9 of 25
POA-2015-25
Nanushuk Project
installed during the winter, allowing continued flow during construction of the permanent multiplate structure.
Cross-drainage culverts will be installed within the infield and access roads to reduce
impoundment and allow conveyance of surface water flow that intersects the road, in order to
maintain natural drainage patterns (Sheet 37). As a general guideline, cross-drainage culverts
will be sited approximately every 500 feet along the alignment during initial design efforts,
although exact placement of culverts will depend on actual in-field local drainage patterns.
2.7 Potable Water System
Lake MC7903 will be the primary source of fresh water for operations camp needs. Water will
be recovered using a water intake structure and electric skid mounted pump (Sheets 48 to 50).
The intake structure will be supported on concrete pipe support anchors. Water will be
circulated between the water intake structure, the Operations Center, and the CPF via two
freshwater pipelines located within an insulated carrier pipeline. The carrier pipeline will be
placed on dedicated VSMs from the intake structure directly to the Operations Center for
treatment and storage. The pipeline will then share the Nanushuk Pipeline VSMs to the CPF.
The Lake MC7903 system will include construction of a water source access road (a minimum
of 24 feet wide at the surface; Sheet 34) and pump house pad (Sheet 50) to provide regular
access to the water intake structure from project facilities.
2.8 Boat Ramp
A boat ramp will be constructed on the lower Kachemach River in the vicinity of DS2. The
concrete ramp will have an approximate slope of 15 percent with erosion protection, such as
armor rock and/or concrete erosion protection mats, to stabilize the side slopes. The ramp will
be 20 feet wide at surface and include a small staging and turnaround area with enough space
for short-term parking of vehicles with trailers (Sheets 18 to 19). The ramp will also include an
access road (a minimum of 24 feet wide at the surface) to provide access from the DS2 infield
road (Sheet 34).
2.9 Oliktok Point Dock Screeding
Sealift modules for the processing facilities at the CPF will be transported to the North Slope via
barge and will be offloaded at the existing dock at Oliktok Point during the open water season.
Barge offloading is accomplished by temporarily grounding barges at the dock face, which
requires a relatively flat area in front of the dock face to avoid creation of barge stress by point
loading due to bathymetric irregularities. The Project includes site preparation of the barge
landing area within a 500-foot-wide by 500-foot-long (5.7-acre) area in front (seaward) of the
dock face through screeding just prior to the arrival of the first barge (Sheet 60).
The screeding process includes scraping or dragging sediments within the proposed area to a
desired depth of 8.0 to 8.5 feet below Mean Lower Low Water. Sediments will not be removed
from the water, nor will they leave the general dock area. Approximately 2,000 to 3,000 cubic
yards (cy) of seafloor may be redistributed, with the final volume dependent on site conditions
prior to commencement of activities.
2.10 Summary of Temporary and Permanent Discharge to Waters of the U.S.
In total, the Project will result in unavoidable temporary and permanent discharges into
jurisdictional WOUS located within the project area. Permanent discharges will affect a total of
261.3 acres of WOUS, including 260.7 acres of gravel infrastructure, 0.6 acre of pipeline VSMs,
Project Description, Rev 2
10 of 25
POA-2015-25
Nanushuk Project
and less than 0.1 acre bridge pilings in WOUS (Sheet 61). Project development will require
approximately 2.86 million cubic yards (mcy) of clean gravel fill and 13,950 cy of sand slurry.
The Project will also affect a total of 0.1 acre of non-jurisdictional uplands. Table 2 includes a
summary of project fill requirements.
Project Description, Rev 2
11 of 25
POA-2015-25
Nanushuk Project
Table 2. Footprint of Project Components and Fill Requirements in WOUS
Fill Type
Footprint
(acres)
Footprint in
WOUS (acres)
Fill Quantity
(cy)
Notes/Dimensions
CPF
Gravel
17.1
17.1
241,000
Approximately 1,050 to 1,062 feet long by 719 to 731 feet wide;
minimum 6-foot thickness.
DS1
Gravel
16.2
16.2
224,000
Approximately 1,434 to 1,446 feet long by 402 to 614 feet wide;
minimum 6-foot thickness
DS2
Gravel
19.5
19.5
312,000
Approximately 1,785 to 1,803 feet long by 393 to 611 feet wide;
minimum 6-foot thickness.
DS3
Gravel
18.0
18.0
249,000
Approximately 1,667 to 1,679 feet long by 392 to 604 feet wide;
minimum 6-foot thickness.
Operations Center
Gravel
16.4
16.4
259,000
Approximately 991 to 1,007 feet long by 759 to 775 feet wide;
minimum 6-foot thickness.
Tie-in pad
Gravel
0.8
0.8
7,000
Approximately 148 to 156 feet long by 148 to 156 feet wide;
minimum 6-foot thickness.
Pump house pad
Gravel
1.1
1.1
12,000
Approximately 212 to 220 feet long by 212 to 220 feet wide;
minimum 6-foot thickness
Boat ramp
Gravel
2.0
1.9
21,000
Approximately 200 to 387 feet long by 244 to 374 feet wide;
minimum 6-foot thickness
Access road
Gravel
72.7
72.7
599,000
9.5 miles long; 32-foot surface width (minimum 52 feet at the
base); minimum 5-foot thickness. Includes three 100- to 210foot-long by 40-foot-wide turnouts.
Mustang Road upgrades
Gravel
3.0
3.0
31,000
4.7-mile-long existing road; upgrades for consistency with
design criteria of 32-foot surface width (minimum 52 feet at the
base); minimum 5-foot thickness.
Infield roadsa
Gravel
94.0
94.0
901,000
12.4 miles long; 24- to 32-foot surface width (minimum 44 to 52
feet at the base); minimum 5-foot thickness. Includes three 100foot-long by 40-foot-wide turnouts with tundra access ramps.
-
260.8
260.7
2,856,000
Miluveach River bridge
Pipe pile
<0.1
<0.1
-
170-foot-long bridge with intermediate pipe piles.
Kachemach River bridge
Pipe pile
<0.1
<0.1
-
245-foot-long bridge with intermediate pipe piles.
Sand
slurry
0.3
0.3
8,400b
Project Component
Total gravel fill
Nanushuk Pipeline
VSMs
Project Description, Rev 2
22.1 miles of pipeline requiring approximately 3,070 VSMs.
12 of 25
POA-2015-25
Nanushuk Project
Table 2. Footprint of Project Components and Fill Requirements in WOUS
Fill Type
Footprint
(acres)
Footprint in
WOUS (acres)
Fill Quantity
(cy)
Infield pipeline VSMs
Sand
slurry
0.2
0.2
5,450b
Potable water system
Sand
slurry/
concrete
pile
<0.1
<0.1
100b
Total other fill
-
0.6
0.6
13,950
Total fill
-
261.4
261.3
2,869,950
Project Component
Notes/Dimensions
14.3 miles of pipeline requiring approximately 1,980 VSMs.
Intake pipeline supported on concrete pipe support anchors. 0.2
mile of standalone pipeline requiring approximately 30 VSMs.
Notes: WOUS: waters of the U.S.; cy: cubic yards; VSMs: vertical support members; DS1, DS2, DS3: drill sites 1, 2, and 3; CPF: Central Processing Facility; OHW: ordinary high
water.
a
Infield roads include the DS1, DS2, DS3 infield roads, the boat ramp and water source access roads, and three road turnouts with tundra access ramps.
b
VSM fill quantity is estimated to be approximately 2.7 cy per VSM
Project Description, Rev 2
13 of 25
POA-2015-25
Nanushuk Project
The Project will also include temporary discharges to 5.8 acres of jurisdictional WOUS as a
result of screeding at the existing Oliktok Dock, and trenching of electrical and fiber optic cables
in jurisdictional WOUS at each pipeline-road crossing (Table 3).
Table 3. Temporary Discharges in WOUS
Footprint
(acres)
Footprint
in WOUS
(acres)
Fill
Quantity
(cy)
Notes/Dimensions
Screeding
footprint
5.7
5.7
2,000 to
3,000
500- by 500-foot screeding area to depth of 8.0
to 8.5 feet below MLLW.
Power/fiber optic
cable trenching
0.1
0.1
500
Total area of
temporary
impact
5.8
5.8
Project
Component
Approximately 300-foot-long by 18-inch-wide
by 5-foot-deep trench at each of 6 pipeline
road crossings.
Notes: WOUS: waters of the U.S.; cy: cubic yards; MLLW: Mean Lower Low Water
3.0 SUPPORT INFRASTRUCTURE
In addition to major components, the following infrastructure will be used to support
construction, drilling, and operation of the Project.
3.1 Gravel Source
An estimated 2.86 mcy of gravel will be needed to construct proposed project facilities. Clean
gravel material for project development will be obtained from one or more of the existing mine
sites located on the North Slope in the vicinity of the project area. Likely sources include Mine
Site F, owned and operated by the NSB, or the ASRC Mine Site. Both potential gravel sources
are less than 15 miles from the CPF. Permitting and operation of existing mine sites would be
conducted by the mine owner or designated operator.
Gravel will be hauled during the winter over as few seasons as practicable. All gravel mining,
overburden and gravel stockpiling, and mine rehabilitation activities will be evaluated as part of
the permitting and operation of the gravel mine independent of the Project. Gravel will be loaded
onto dump trucks for transport to the project site via a combination of existing gravel roads, new
gravel roads, and/or ice roads. No gravel will be stockpiled at the project site outside of
permitted footprint for gravel fill.
3.2 Camps
An operations camp will be located on the Operations Center. This will be the main base camp
for operations and maintenance throughout the life of the Project. A number of additional
temporary camps will be established to support construction and drilling activities. Camps are
detailed in Table 4.
Project Description, Rev 2
14 of 25
POA-2015-25
Nanushuk Project
Table 4. Camps
Camp
Location
Capacitya
Project Year(s)b
Operations camp
Operations Center
200 people
2 to life of the Projectc
Temporary construction camp(s)
Project gravel pad(s)
800 people
2 to 5
Off-site pioneer construction camp(s)
ice pad or existing
gravel pad
300 people
1 to 2
Drilling support camps
DS1, DS2, and DS3
120 to 150 people per rig
4 to 19
Notes: DS1, DS2, and DS3: drill sites 1, 2 and 3.
a
Based on the number of beds
b
See project schedule (Section 6.0).
c
The design life of the Project is 30 years.
The off-site pioneer construction camp(s) will be located near the selected mine site on an ice
pad or on an existing gravel pad, pending available space. The pioneer construction camps will
be used until the construction camps are installed and operational.
The construction camps will be located on one or more of the Project gravel pads and will
provide space to accommodate construction personnel. The construction camps will remain in
place through the completion of the construction and startup phase, after which the camps will
be decommissioned and removed from the site.
A drilling support camp will be located on each drill site to support drilling activities. After
completion of drilling activities on each pad, the associated camp will be decommissioned and
removed from the drill site.
3.3 Water Use
During construction, non-potable fresh water from local permitted lakes will be used for ice road
and pad construction and maintenance, and for possible hydrostatic testing of pipelines. Ice
roads require approximately 1 million gallons (MG) of fresh water per mile. Ice pads require
approximately 82,400 gallons of water per acre for a 6-inch-thick pad. Hydrostatic testing could
require up to 2.52 MG of water. Potable fresh water for domestic use at the construction camps
will be trucked from Deadhorse or other existing facilities. Typical fresh water volumes for
domestic water use during construction, drilling, and operations are approximately 100 gallons
per worker per day.
During the drilling phase, approximately 10,000 gallons per day per rig of non-potable water will
be obtained from locally permitted sources within the project area to support drilling activities.
Potable fresh water for domestic use at the drilling camp will be trucked from Deadhorse or
other existing facilities. In addition, approximately 4.9 MG of make-up water (likely seawater) are
needed per year for production and injection well stimulation to improve well productivity.
During operations, approximately 5.5 MG of potable fresh water for the operations camp will be
supplied by the potable water system (see Section 2.7). Non-potable fresh water used for dust
suppression will be obtained from locally permitted lakes. A 0.25-inch water application for road
dust control requires approximately 20,000 gallons of water per mile of gravel road per
application. Approximately 150,000 barrels per day of make-up water will be used as injection
water for reservoir pressure maintenance. Pending commercial agreements and availability of
supply, make-up water will likely be purchased from a third party and will be transported from
the tie-in pad near the Kuparuk CPF2 to the project area via a make-up water pipeline on the
Nanushuk Pipeline VSMs (see Section 2.5).
Project Description, Rev 2
15 of 25
POA-2015-25
Nanushuk Project
Snowmelt and other run-off from project facilities will be managed through implementation of
standard Best Management Practices under a site-specific Storm Water Pollution Prevention
Plan (see Section 5.0). An Alaska Pollutant Discharge Elimination System determination will be
undertaken as potential water discharges are identified during project planning. See Section 3.6
for details on disposal of project wastewater.
3.4 Ice Infrastructure
Single season ice roads will be used during construction of the pipelines, gravel roads, and
bridges. Table 5 lists the approximate mileage of ice roads planned during construction
activities. Exact ice road routes may vary by up to 1 mile based on topography, other field
conditions, and agency approvals. Single season ice roads do not require a Department of the
Army permit.
Table 5. Ice Road Infrastructure
Year
Year 1/2
Year 2/3
Year 3/4
Year 4/5
Approximate Mileage
60 to 70
58 to 70
36 to 70
36 to 70
Routes
Access road construction (Kuparuk DS2M to CPF)
Gravel source(s) access (TBD)
Infield road construction (CPF to DS1, DS2, and DS3)
Nanushuk and infield VSM and pipeline installation
Gravel source(s) access (TBD)
Infield road construction (CPF to DS1, DS2, and DS3)
Nanushuk and infield VSM and pipeline installation
Gravel source(s) access (TBD)
Nanushuk and infield pipeline installation and hydrostatic testing
Notes: DS1, DS2, DS3: drill sites 1, 2, and 3; CPF: Central Processing Facility; Kuparuk DS2M: Kuparuk drill site 2M; TBD: to be
determined; VSM: vertical support member
Standard-duty ice roads on the North Slope are a minimum of 6 inches thick and an average of
approximately 12 inches thick due to terrain features. Ice roads for construction, materials, and
personnel transportation will be constructed to support expected loads and protect the
vegetation and organic soil beneath. Ice roads will also be constructed to avoid ice-road
sensitive vegetation, such as willows, that extends above the snow level, per NSB permit
stipulations. Ice roads will be wide enough to safely accommodate two-way vehicular traffic
(minimum of 20 feet), drill rig access (minimum of 30 feet), and other traffic, as required. The ice
road season each year varies depending on weather conditions and ice road completion times.
The tundra-based ice road season lasts from approximately January through late April;
however, it can be longer or shorter depending upon snow depth and soil temperature, and
early-access approval (USACE 2012). In accordance with permits, ice road crossings of
designated streams and rivers will be slotted, breached, or weakened upon completion of use.
Seasonal ice pads will also be used to support construction activities, including gravel
placement, and pipeline and bridge installation. Ice pads will likely be located adjacent to
bridges, at each major gravel pad, and every 3 to 4 miles along access/infield roads and
Nanushuk/infield pipelines. Construction support ice pads will house field offices, break shacks,
enviro-vacs, and field shops, and will stage construction equipment, vehicles, materials, and
supplies until gravel pads become available for use. Each construction support ice pad will be a
minimum of 6 inches thick and 1 acre or less in size.
Project Description, Rev 2
16 of 25
POA-2015-25
Nanushuk Project
If space on an existing gravel pad is not available, an ice pad may be used to house the off-site
pioneer construction camp (see Section 3.2) in the first winter season of construction.
Water for ice roads and ice pads will be obtained from permitted surface water sources (see
Section 3.3).
3.5 Fuel and Hazardous Substances
3.5.1 Handling and Storage
The Project will require the transport of diesel and gasoline from Deadhorse to the project area
to support activities during construction, drilling, and operations. During construction, dedicated
temporary storage areas for diesel and gasoline will be defined and placed on ice pads and,
once complete, moved onto the project gravel pads. Permanent diesel fuel storage tank
infrastructure will be located on the CPF and the Operations Center. Storage at the Operations
Center will be in a bulk tank and/or in ISO tanks. Emergency generators located at the
Operations Center will have day tanks that will be refilled as needed from the bulk storage tank.
The Operations Center will also have storage tanks or ISO tanks for gasoline storage and
dispensing. The primary storage location for production chemicals will be at the Operations
Center, with smaller amounts at the CPF and drill sites.
All fuels and hazardous substances used by the Project will be handled and stored on site in
compliance with state and federal regulatory guidance and the Project's Oil Discharge
Prevention and Contingency Plan (ODPCP) and Spill Prevention, Control, and Countermeasure
(SPCC) Plan. The ODPCP will comply with State of Alaska requirements in Alaska Statute
46.04.030 and 18 Alaska Administrative Code (AAC) 75, as well as U.S. Department of
Transportation (USDOT) requirements in 49 Code of Federal Regulations (CFR) 194. The
SPCC Plan will comply with U.S. Environmental Protection Agency (EPA) regulations in
40 CFR 112. All fuels and chemicals will be stored in appropriate primary containment.
Secondary containment areas will be designed in compliance with all applicable permits and
regulations. If required, two Facility Response Plans (FRPs) will also be prepared: an EPA FRP
and a USDOT FRP. The USDOT FRP will address federal regulations of the Nanushuk Pipeline
under 49 CFR 195.
3.5.2 Spill Prevention and Response
OSA will design and develop the Project to avoid and minimize the possibility of spills. Spill
prevention measures considered throughout the design and engineering phase include a
maintenance and inspection program as well as an employee spill prevention training program.
Hydrostatic testing will validate the integrity of the pipelines prior to operation.
OSA has internal standards in place that provide guidance on spill prevention measures. These,
in combination with compliance with all state, federal, and local regulations, reduce the
likelihood of a spill occurring.
Pipeline spill prevention measures include multiple forms of leak detection, isolation valves or
vertical loops, and regular maintenance and cleaning. Leak detection systems and surveillance
will be compliant with American Society of Mechanical Engineers (ASME) codes and state and
federal standards. For pipeline-river crossings, either isolation valves or vertical loops will be
used, depending on the type of pipeline. Pipeline facilities will include pig launchers and
receivers capable of handling in-line inspection tools, and maintenance and cleaning tools.
The Project will include dedicated oil spill response equipment positioned throughout the field.
The locations and types of oil spill response equipment, and equipment deployment times will
be identified in detail in the project ODPCP and staged before startup. Equipment and support
Project Description, Rev 2
17 of 25
POA-2015-25
Nanushuk Project
infrastructure will be managed and maintained by OSA in coordination with Alaska Clean Seas.
In the case of a leak, pipeline operations would shut down immediately, and appropriate agency
notifications would be made. The cause of the incident would be identified, and repairs would be
implemented after regulatory approval. Spill containment and mechanical cleanup would begin
as soon as possible.
3.6 Waste Management and Disposal
A range of wastes will be generated during construction, drilling, and operations. A Waste
Management Plan will be prepared to address the types and quantities, regulatory controls, and
management options for solid and liquid wastes. OSA will also use other resources, such as the
Alaska Waste Disposal and Reuse Guide (commonly known as the Redbook), to guide waste
management decisions. Key elements of the waste management approach will include:
Full compliance with federal, state, and NSB waste management regulations
Waste minimization through careful project planning and beneficial reclamation, reuse,
and recycling when practicable
Subsurface disposal of authorized waste streams
Planning for changing types and volumes of wastes and seasonal transportation
restrictions, particularly during the construction phase
Evaluating opportunities for product substitution to reduce hazardous waste
Training staff on waste management and spill prevention procedures
3.6.1 Class 1 Disposal Wells
A total of two Class 1 UIC waste disposal wells (one primary and one backup) will be permitted.
The Class 1 wells will be located at project drill sites or at the Operations Center. The Class 1
wells will be used to dispose of Resource Conservation and Recovery Act (RCRA) exempt and
non-hazardous waste and treated domestic wastewater from project camps. During the period
of time before the domestic wastewater treatment facilities are commissioned and/or if disposal
wells are not available, domestic wastewater will be managed in compliance with all federal,
state, and local standards.
A Waste Analysis Plan (WAP) will be prepared to fulfill the requirements of UIC and Solid Waste
Disposal permits. The WAP will outline procedures for classifying, sampling, and analyzing
wastes prior to downhole disposal. The purpose of the WAP is to ensure that wastes are
properly characterized before deciding whether they may be accepted for injection/disposal in
the Class 1 wells.
3.6.2 Solid Waste
Non-hazardous solid waste will be trucked off site and disposed of at the NSB landfill. Any
waste receptacles stored outside will be managed to avoid potential wildlife interactions, via
methods such as waste segregation and the covering of dumpsters, which will be outlined in
OSA's Wildlife Avoidance and Interaction Plan.
3.6.3 Hazardous and Universal Waste
Hazardous and universal waste, as defined by RCRA, will be managed on site in appropriate
locations and containers prior to transport off site for disposal or recycling. All hazardous waste
generated by the Project will be handled by qualified persons and disposed of in accordance
with regulations.
Project Description, Rev 2
18 of 25
POA-2015-25
Nanushuk Project
3.7 Communications
Communications between project facilities will occur via fiber optic cables installed on infield and
Nanushuk Pipeline HSMs using messenger cables (see Section 2.5). Communication towers
will be located at the drill sites, the CPF, the Operations Center, and the tie-in pad.
Communication tower height and design will be determined as part of project engineering.
Communication towers are not anticipated to require guy-wires. Towers will be equipped with
Federal Aviation Administration compliant lighting, if required.
3.8 Power Generation
Power generation facilities, located at the CPF, will consist of gas-powered turbines. Power will
be supplied to other project facilities, including drilling rigs, via power cables installed on infield
and Nanushuk Pipeline HSMs using messenger cables (see Section 2.5). When power from the
CPF is not available, diesel-fired engines used to power the drilling rigs will comply with EPA
Tier 4 emission standards.
3.9 Lighting
A lighting plan will be developed as part of project engineering. Project facilities will be lit in
accordance with applicable regulations and best practices. Outdoor lighting will be designed to
be adequate for the location and the tasks being performed as defined in the The Lighting
Handbook (IES 2011). OSA will minimize light visible from outside of project facilities by using
downward illumination such as downcast floodlights and excluding use of horizontally aimed
floodlights; locating mast poles away from the pad edge; using lighting fixtures with lamps
contained within the reflector; and shading externally facing windows on buildings.
3.10 Workforce
The on-site project workforce will be the highest during the construction phase. Construction
employment will increase from Year 1 to a peak of approximately 1,000 personnel in Year 4.
The size of the drilling workforce will depend upon the number of drill rigs operating on site, with
approximately 150 personnel per rig. The on-site operations workforce will be approximately
200 people.
4.0 LOGISTICS
Project area access will be required for:
Pad, pipeline, and facilities construction
Transportation of construction; drilling; and operations supplies, materials, and
personnel to project pads and facilities
Transport of solid waste to existing waste facilities in Deadhorse or elsewhere
Emergency medical transportation
Emergency response for spills and other events
Project access to the North Slope and to the drill sites, CPF, and Operations Center will occur
via a combination of ground (gravel and ice roads), marine, and air transport. The access road
will be the primary means of transport for personnel, equipment, and supplies from existing
facilities, including Deadhorse and the Dalton Highway, to the project area during construction,
drilling, and operation. Infield roads will provide year-round access from the CPF and
Operations Center to the drill sites (see Section 2.6). Ice roads will be used during the ice road
Project Description, Rev 2
19 of 25
POA-2015-25
Nanushuk Project
season until the gravel roads can be constructed (see Section 3.4). Ground transportation
vehicles include long-haul trucks (semi-trailers), single unit short-haul trucks, crew cab pickup
trucks, passenger vans, personnel buses, light commercial trucks, water/fuel/waste tanker
trucks, field service trucks, heavy-haul tractor/trailers, self-propelled motorized transports, and
wheel-mounted cranes.
During construction, marine transport will support delivery of larger modules that cannot be
transported to the North Slope by road. Sealift modules will be transported to the North Slope
and offloaded at the Oliktok Dock by a minimum of six barges. The barges will follow standard
routes of travel along the western Alaska coast to Oliktok Point. Typical barge speeds are
around 7 knots. After offloading, sealift modules will be transported by self-propelled motorized
transports along gravel roads to the CPF. No additional use of marine transport is planned
during drilling and operations.
During construction, drilling, and operations, the commercial airport in Deadhorse, located
approximately 52 miles away, will support air transport of project personnel and small materials
and supplies to the North Slope. No new airstrip is proposed for the Project. Personnel and
materials flown into Deadhorse will be driven to the project area via the existing road system
and ice roads until the proposed gravel access road is completed.
The Operations Center includes space for a helipad. During construction, helicopters will be
used to support ice road layout, survey, and summer cleanup efforts. These activities usually
take place in July or early August and last approximately 4 weeks, with daily helicopter traffic
during that time. Helicopters may be used in the event of health or safety emergencies over the
life of the project; however, routine helicopter use is not planned under normal operating
conditions.
5.0 OPERATIONAL PLANS
OSA will develop a variety of construction and operational plans to provide guidance to OSA
employees and contractors. Proposed plans include the following:
Cultural Resources Management Plan
ODPCP, FRP, and SPCC Plan
Snow Removal Plan
Dust Control Plan
Wildlife Avoidance and Interaction Plan
Polar Bear Interaction Plan
Waste Management Plan
Waste Analysis Plan
Storm Water Pollution Prevention Plan
Additional plans may be developed as project permitting progresses.
6.0 SCHEDULE
Construction will begin in the fourth quarter (Q4) of Year 1 (2019) and will end in Q3 of Year 5
(2023), a 3.5-year period.
Drilling activities will begin in Year 4. The drilling program will include as many as three rigs
drilling for up to 15 years. The first rig will be mobilized to the site as soon as gravel compaction
Project Description, Rev 2
20 of 25
POA-2015-25
Nanushuk Project
has been achieved. The number of rigs used will be subject to market conditions and rig
availability on the North Slope.
Operations will begin in Year 5 and will continue through the 30-year design life of the Project.
Figure 3 provides additional details of the project schedule for Years 1 through 6 by quarter.
Project Description, Rev 2
21 of 25
POA-2015-25
Nanushuk Project
Figure 3. Project Schedule Years 1-6
Project Description, Rev 2
22 of 25
POA-2015-25
Nanushuk Project
7.0 PERMIT REQUIREMENTS
Table 6 lists the permits, authorizations, and approvals from federal, state, and local agencies
that may be required for the Project.
Table 6. Potential Permits, Authorizations, and Approvals
Agency
Permits/Authorizations/Plans
Scope and Jurisdiction
FEDERAL
USACE
Department of the Army Clean Water Act (CWA)
Section 404/Rivers and Harbors Act Section 10
Permit
Section 404: discharge of fill into waters of the
U.S., including wetlands
Section 10: structures or work in navigable
waters
EPA
Class I Underground Injection Control (UIC)
Wells
Construction of disposal wells for non-hazardous
liquids and municipal wastewater
EPA
Spill Prevention, Control and Countermeasure
Plan
For any facility with storage of more than 1,320
gallons of petroleum hydrocarbons
EPA
Facility Response Plan
Substantial Harm Determination to be completed
to determine scope
USCG
Rivers and Harbors Act Section 9 Bridge Permit
Bridges or pipelines crossing navigable waters
USDOT
Facility Response Plan
Addresses federal regulations of oil export
pipeline under 49 CFR 194 (Pipeline and
Hazardous Materials Safety Administration)
USFWS
Marine Mammal Protection Act Letter of
Authorization/Incidental Take
For activities occurring within polar bear habitat
USFWS
Endangered Species Act (ESA) Section 7
consultation
Consultation regarding threatened and
endangered species under USFWS jurisdiction
NMFS
ESA Section 7 consultation
Consultation regarding threatened and
endangered species under NMFS jurisdiction
Minor Air Permits
Air quality permits
ADEC DEH
Solid Waste General Permit
Temporary storage of Resource Conservation
and Recovery Act (RCRA)-exempt oil and gas
related waste and RCRA non-exempt, nonhazardous waste
ADEC DEH
Grind and Inject Facility Approval
Approval of the facility; EPA regulates the well
(see Class I UIC well)
ADEC SPAR
Oil Discharge Prevention and Contingency Plan
Spill response planning
ADEC DW
Alaska Pollutant Discharge Elimination System
North Slope General Permit AKG332000
General permit for specific discharges
ADEC DEH
Drinking Water Design Plan Review
Review of drinking water system
ADEC DW
Wastewater Design Plan Review
Review of wastewater system
ADEC DW
CWA Section 401 Water Quality Certificate
Water quality concurrence/waiver needed for
USACE Section 404 permit
ADF&G DH
Title 16 Fish Habitat Permit
For activities that may affect fish habitat or
passage
STATE
ADEC DAQ
Project Description, Rev 2
23 of 25
POA-2015-25
Nanushuk Project
Table 6. Potential Permits, Authorizations, and Approvals
Agency
Permits/Authorizations/Plans
Scope and Jurisdiction
ADNR
DMLW
Temporary Land Use Permit
For temporary activities, such as construction of
ice infrastructure and tundra travel, across state
lands
ADNR
DMLW
Temporary Water Use Authorization
Approval of temporary water uses, including ice
infrastructure needs
ADNR DOG
Lease Plan of Operations Authorization
Approval of activities on state oil and lease
outside of the Pikka Unit
ADNR DOG
Unit Plan of Operations Authorization
Approval of activities within the Pikka Unit
ADNR DOG
AS 38.05.850 Easement
For project components located on state lands
outside of the state oil and gas lease (i.e., access
road)
ADNR SPCS
Pipeline Right-of-Way Lease AS 38.35
Easement for Nanushuk Pipeline across state
lands
ADNR
DMLW
Tidelands Permit (Temporary Land Use Permit)
Screeding in state waters at Oliktok Dock
AOGCC
Permit to Drill
Approval for each well drilled
AOGCC
Class II UIC Enhanced Oil Recovery Well Area
Injection Order
Approval of fluid injection for the purpose of
enhanced oil recovery
NSB
Industrial Development & Use Permit
Approval for development project in NSB
NSB
Rezone and Master Plan Approval
Approval to zone specific area for resource
development and conduct activities described in
Master Plan within the NSB
NSB
Certificate of Inupiat History, Language, and
Culture/Traditional Land Use Inventory (TLUI)
Clearance (Form 500)
Confirmation that project area does not have
identified TLUI sites/establishment of buffer
zones for identified TLUI sites
LOCAL
Notes: USACE: U.S. Army Corps of Engineers; EPA: U.S. Environmental Protection Agency; USCG: U.S. Coast Guard; USDOT:
U.S. Department of Transportation; USFWS: U.S. Fish and Wildlife Service; NMFS: National Marine Fisheries Service; ADEC:
Alaska Department of Environmental Conservation; DAQ: (ADEC) Division of Air Quality; DEH: ADEC Division of Environmental
Health; SPAR: ADEC Spill Prevention and Response; DW: ADEC Division of Water; ADF&G DH: Alaska Department of Fish and
Game Division of Habitat; ADNR: Alaska Department of Natural Resources; DMLW: ADNR Division of Mining Land & Water; DOG:
ADNR Division of Oil and Gas; AS: Alaska Statute; SPCS: ADNR State Pipeline Coordinator's Section; AOGCC: Alaska Oil and Gas
Conservation Commission; NSB: North Slope Borough
8.0
SITE CLOSURE
As leaseholder and operating entity of the Nanushuk Project, OSA, in conjunction with other
Working Interest Owners, will assume primary responsibility for site closure upon completion of
production activities. Site closure will be conducted in accordance with federal and state leases
and permits, including the requirements of the Pikka Unit Approval, general requirements in the
ADNR Division of Oil and Gas North Slope Areawide Lease Mitigation Measures, requirements
stipulated by the NSB as part of the development permit, and other permit conditions and
stipulations required by state and federal agencies with regulatory authority over the Project.
The ADNR Division of Oil and Gas North Slope Areawide Lease Mitigation Measures require
that:
Project Description, Rev 2
24 of 25
POA-2015-25
Nanushuk Project
Upon abandonment of material sites, drilling sites, roads, buildings or other
facilities, such facilities must be removed and the site rehabilitated to the
satisfaction of the Director, unless the Director, in consultation with DMLW,
ADF&G, ADEC, NSB, and any non-state surface owner, determines that such
removal and rehabilitation is not in the state's interest.
Upon completion of project activities and in compliance with permit and lease requirements,
OSA will commence dismantlement, removal, and rehabilitation (DR&R) activities, which are
generally expected to include:
Notification and coordination with Kuukpik Corporation, ADNR, NSB, and other
regulatory agencies to discuss specific DR&R requirements and timeframes.
Plugging and abandonment of wells in accordance with general industry best practices
and compliance with Alaska Oil and Gas Conservation Commission requirements
identified in 20 AAC 25.105 to 20 AAC 25.172. Abandonment of specific wells may occur
throughout the life of the Project.
Development of a restoration plan that includes required elements identified by
permitting agencies.
Dismantlement and removal of installed equipment and infrastructure, unless
coordination with landowners or agencies indicates otherwise.
Enactment of restoration activities identified in the restoration plan in accordance with
goals and objectives identified in the plan.
Initiation of regular monitoring and reporting of site recovery based on performance
standards and according to the schedule and requirements identified in the plan.
The timeframe of these activities will be identified through coordination with landowners and
agencies.
9.0
REFERENCES
IES (Illuminating Engineering Society). 2011. The Lighting Handbook, 10th Edition.
USACE (U.S. Army Corps of Engineers). 2012. Point Thomson Project Final Environmental
Impact Statement. U.S. Army Corps of Engineers, Alaska District, Alaska Regulatory
Division, Anchorage, AK.
Project Description, Rev 2
25 of 25
POA-2015-25