You can copy from here when filling out the rest of the page.
Papio-Missouri River Natural Resources District - he proposed project would place 199,684 cubic yards of clean earthen fill to construct an earthen dam and auxiliary spillway, known as Pigeon/Jones Creek Dam Site 12A (PJ-12A). The earthen dam would be approximately 895 feet long by 360 feet wide by 61 feet tall, and would create a reservoir approximately 35 acres in size. The crest will be 14 feet wide at the highest elevation of 1,311 feet above mean sea level (msl). A 200-foot wide auxiliary spillway having a crest elevation of 1,303 feet above msl is planned for the east abutment. The permanent pool elevation will be at 1,286 feet above msl. The principal spillway will be a 60-inch diameter, reinforced concrete pipe located perpendicular to the centerline of the dam. The permanent pool is set at an elevation to capture 264.8 acre feet of sediment over a 100-year period. The dam and impoundment are intended to provide sediment storage and grade control for the Pigeon and Jones Creek watersheds.
Papio-Missouri River Natural Resources District - he proposed project would place 199,684 cubic yards of clean earthen fill to construct an earthen dam and auxiliary spillway, known as Pigeon/Jones Creek Dam Site 12A (PJ-12A). The earthen dam would be approximately 895 feet long by 360 feet wide by 61 feet tall, and would create a reservoir approximately 35 acres in size. The crest will be 14 feet wide at the highest elevation of 1,311 feet above mean sea level (msl). A 200-foot wide auxiliary spillway having a crest elevation of 1,303 feet above msl is planned for the east abutment. The permanent pool elevation will be at 1,286 feet above msl. The principal spillway will be a 60-inch diameter, reinforced concrete pipe located perpendicular to the centerline of the dam. The permanent pool is set at an elevation to capture 264.8 acre feet of sediment over a 100-year period. The dam and impoundment are intended to provide sediment storage and grade control for the Pigeon and Jones Creek watersheds.
PUBLIC NOTICE
Application No: NWO-2017-00037-WEH
Project Name: Pigeon/Jones Creek Dam Site 12A
Applicant: Papio-Missouri River Natural Resources District
Waterway: Pigeon Creek
Issue Date: November 8, 2018
Expiration Date: November 28, 2018
21 DAY NOTICE
Reply To:
NEBRASKA REGULATORY OFFICE
8901 SOUTH 154TH STREET, SUITE 1, OMAHA, NEBRASKA 68138-3635
JOINT PUBLIC NOTICE: This public notice is issued jointly by the U.S. Army Corps of
Engineers (USACE), Omaha District, and the Nebraska Department of Environmental Quality
(NDEQ). The NDEQ will review the proposed project for state certification in accordance with
the provisions of Section 401 of the Clean Water Act. The NDEQ hereby incorporates this public
notice as its own public notice and procedures by reference thereto. For the purposes of the NDEQ,
their public notice will expire 30 calendar days from the issue date shown above.
AUTHORITY: Section 404 of the Clean Water Act (33 USC 1344).
APPLICANT: Mr. Terry Schumacher, Papio-Missouri Natural Resource District, 8901 South
154th Street, Omaha, Nebraska 68138
PROJECT LOCATION: The project is located at approximately 42.318564, -96.633773 in
Sections 8, 9 and 17, Township 27 North, Range 7 East, Dakota County, Nebraska.
PROJECT DESCRIPTION: The proposed project would place 199,684 cubic yards of clean
earthen fill to construct an earthen dam and auxiliary spillway, known as Pigeon/Jones Creek Dam
Site 12A (PJ-12A). The earthen dam would be approximately 895 feet long by 360 feet wide by
61 feet tall, and would create a reservoir approximately 35 acres in size. The crest will be 14 feet
wide at the highest elevation of 1,311 feet above mean sea level (msl). A 200-foot wide auxiliary
spillway having a crest elevation of 1,303 feet above msl is planned for the east abutment. The
permanent pool elevation will be at 1,286 feet above msl. The principal spillway will be a 60-inch
diameter, reinforced concrete pipe located perpendicular to the centerline of the dam. The
permanent pool is set at an elevation to capture 264.8 acre feet of sediment over a 100-year period.
The dam and impoundment are intended to provide sediment storage and grade control for the
Pigeon and Jones Creek watersheds.
1
PROJECT PURPOSE: The applicant's project purpose is sediment and grade control in the
Pigeon Creek watershed. The proposed project would decrease accumulated sediments in the
downstream Pigeon/Jones Levee System and drainage district. The need for erosion and sediment
control in this portion of the watershed is based on the quantity of sediment that has been, and
continues to be, delivered downstream to the Pigeon/Jones Creek levee system and drainage
district.
The basic project purpose, as defined by the USACE, is sediment and grade control.
The overall project purpose, as defined by the USACE, is sediment and grade control in the Pigeon
Creek watershed.
SPECIAL AQUATIC SITES: The placement of fill will impact 0.09 acres of Palustrine
Emergent Temporarily Flooded/Seasonally Flooded (PEMA/C) riverine channel wetlands and
503.83 linear feet of the perennial channel (Pigeon Creek). The reservoir will inundate 0.26 acre
of PEMA/C riverine channel wetlands, and 0.01 acre of Palustrine Forested Temporarily Flooded
(PFOA) riverine floodplain wetlands and 10,416.57 linear feet of intermittent and perennial stream
channels.
AVOIDANCE, MINIMIZATION, AND MITIGATION: The project is located in the
Blackbird-Soldier Watershed (10230001 HUC-8). The applicant is considering alternatives that
would avoid, minimize, and mitigate impacts to Water of the United Sates, including wetlands.
The alternatives include no-build, stream restoration and habitat structures, stream isolation, land
management practices, wetland restoration, dry dams and multiple smaller sediment storage
structures in uplands.
Compensatory Mitigation
There are no available mitigation banks or in-lieu fee programs within the project area that would
provide opportunities for compensatory mitigation. The applicant proposes permittee-responsible
compensatory mitigation to be completed on-site. The applicant provided a conceptual mitigation
plan including a Nebraska Stream Condition Assessment Protocol (NeSCAP). The applicant is
proposing to mitigate the 0.35 acres of PEMA/C riverine channel and riverine floodplain wetland
impacts (fill and inundation) through the creation of at least 1.40 acres of PEMA/C lacustrine
fringe wetlands around the perimeter of the proposed lake (using a 4:1 ratio due to the out-of-kind
replacement proposed - riverine to lacustrine). The applicant is proposing to mitigate the 0.01
acres of PFOA riverine floodplain wetland impacts (inundation) through the creation of at least
0.02 acres of PFOA riverine floodplain wetlands (using a 2:1 ratio due to the in-kind creation).
The applicant is proposing to mitigate for the permanent loss (filling) of 503.84 linear feet (0.27
acre) of perennial stream channel through restoration of a reach of Pigeon Creek downstream from
the dam site in a manner that will achieve, at a minimum, equal functional replacement utilizing
the NeSCAP. The applicant is proposing the 10,623.41 linear feet of stream channel inundated by
the flood pool elevation, causing a loss of 24,482.34 NeSCAP units, will be offset by the
establishment of functionally equivalent lentic habitat.
2
After addressing applicable comments, the applicant must prepare a final mitigation plan, in
accordance with the twelve components of the Mitigation Rule 33 CFR part 332.4(c)(2) through
(c)(14), which must be approved by the Corps prior to issuing the individual permit. The approved
final mitigation plan will be incorporated into the individual permit by reference.
CULTURAL RESOURCES: The USACE will comply with the National Historic Preservation
Act of 1966, and amendments and the procedures set forth in 33 CFR 325, Appendix C. We have
checked the National Register of Historic Places, and there are no known National Register sites
in the vicinity. This is the extent of our knowledge about historic properties in the permit area at
this time. We will evaluate input by the State Historic Preservation Office, Tribes, and the public
in response to this public notice, and we may conduct or require a survey of the permit area to
check for unknown historic or prehistoric properties, if warranted.
ENDANGERED SPECIES: This project is in the known range of the threatened Northern longeared bat, Myotis septentrionalis. In compliance with the Endangered Species Act, a preliminary
may affect determination has been made. Coordination with the U.S. Fish and Wildlife Service
and other interested agencies will be completed to determine the effects on the threatened
Northern long-eared bat.
FLOODPLAIN: This activity is being reviewed in accordance with Executive Order 11988,
Floodplain Management, which discourages direct or indirect support of floodplain development
whenever there is a practicable alternative. By this notice, comments are requested from
individuals and agencies that believe the described work will adversely impact the floodplain.
WATER QUALITY CERTIFICATION: Section 401 of the Clean Water Act (33 USC 1341)
requires that all discharges of fill material must be certified by the appropriate state agency as
complying with applicable effluent limitations and water quality standards. The discharge must
be certified before a Department of the Army permit can be issued. Certification, if issued,
expresses the State's opinion that the discharge will not violate applicable water quality
standards. It is the responsibility of the applicant to contact Nebraska Department of
Environmental Quality as soon as possible in the permitting process to discuss
requirements for certification. Please contact:
CWA Section 401 Coordinator
Water Quality Division, Planning Unit
Nebraska Department of Environmental Quality
1200 'N' Street, Suite 400
Lincoln, NE 68509-8922
Phone: 402.471.2875
Fax: 402.471.2909
E-mail: ndeq.401certification@nebraska.gov
3
PUBLIC INTEREST REVIEW: The decision whether to issue the USACE permit will be based
on an evaluation of the probable impacts including cumulative impacts of the proposed/completed
activity on the public interest. That decision will reflect the national concern for both protection
and utilization of important resources. The benefits, which reasonably may be expected to accrue
from the proposal, must be balanced against their reasonably foreseeable detriments. All factors
which may be relevant to the proposal will be considered including the cumulative effects thereof;
among those are conservation, economics, aesthetics, general environmental concerns, wetlands,
historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation,
shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy
needs, safety, food and fiber production, mineral needs, considerations of property ownership and,
in general, the needs and welfare of the people. In addition, the evaluation of the impact of the
work on the public interest will include application of the guidelines promulgated by the
Administrator, Environmental Protection Agency, under authority of Section 404(b) of the Clean
Water Act (40 C.F.R. Part 230).
COMMENTS: The USACE is soliciting comments from the public, Federal, State, and Local
agencies and officials, Indian Tribes and other interested parties in order to consider and evaluate
the impacts of this activity. Any comments received will be considered by the USACE to determine
whether to issue, modify, condition or deny a permit for this project. To make this decision,
comments are used to assess impacts on endangered species, historic properties, water quality,
general environmental effects, and the other public interest factors listed above. Comments are
used in the preparation of an Environmental Assessment and/or an Environmental Impact
Statement pursuant to the National Environmental Policy Act. Comments are also used to
determine the need for a public hearing and to determine the overall public interest of the activity.
Anyone whose interests may be affected by the proposed/completed work is invited to submit
favorable or unfavorable written comments to the Nebraska Regulatory Office, 8901 South 154th
Street, Suite 1, Omaha, NE 68138-3635. The District Engineer is particularly interested in
receiving comments related to the proposal's probable impacts on the affected aquatic system's
functional values, cumulative and secondary effects and endangered species. All comments
received will be considered public information; copies of all comments, including names and
addresses of commenters, may be provided to the applicant unless confidentiality is requested.
Comments must be submitted on or before the expiration date (located at the top of the first page)
of this notice to be considered in the subsequent actions on this application.
PUBLIC HEARING: Before the expiration date of this notice, anyone may request, in writing,
that a public hearing be held to consider this application. Requests shall specifically state the
reason(s) for holding a public hearing. If the District Engineer determines that the information
received in response to this notice is inadequate for thorough evaluation, a public hearing may be
warranted. If a public hearing is warranted, interested parties will be notified of the time, date, and
location.
4
ADDITIONAL INFORMATION: Additional information about this application may be
obtained by writing to Adam Nebel at the address shown on page one or by calling (402) 8960896. You can also e-mail adam.r.nebel@usace.army.mil.
REQUEST TO POSTMASTERS: Please post this notice conspicuously and continuously until
the expiration date specified at the top of page one.
NOTICE TO EDITORS: This notice is provided as background information for your use in
formatting news stories. This notice is not a contract for classified display advertising.
5
www.olssonassociates.com
R
TEL 402.474.6311
FAX 402.474.5160
PIGEON/JONES CREEK DAM SITE 12A
PAPIO-MISSOURI RIVER NATURAL RESOURCES DISTRICT
601 P Street, Suite 200
P.O. Box 84608
Lincoln, NE 68508
NEAR THE VILLAGE OF HUBBARD IN DAKOTA COUNTY, NE
OLSSON ASSOCIATES
DATE PRINTED
REV.
NO.
DATE
PROJECT LOCATION
DAM SITE 12A
REVISIONS
REVISIONS DESCRIPTION
APPLICANT'S CERTIFICATE
September 10, 2018
ENGINEER'S CERTIFICATE
NOT TO BE USED FOR CONSTRUCTION
PIGEON/JONES CREEK DAM SITE 15
PRELIMINARY
INDEX OF DRAWINGS
Diggers Hotline
Of Nebraska
STATE OF NEBRASKA
Statewide (800) 331-5666
Call Before You Dig... It's The Law
COVER SHEET
PROJECT LOCATION
PAPIO-MISSOURI RIVER NRD
PIGEON / JONES WATERSHED - SITE 12A
LOCATION MAP
drawn by:
checked by:
approved by:
QA/QC by:
project no.:
drawing no.:
date:
DAKOTA COUNTY, NEBRASKA
2018
WATERSHED BOUNDARY
MKM
007-1658
9/10/2018
SHEET
1 of
of34
drawn by:
checked by:
approved by:
QA/QC by:
project no.:
drawing no.:
date:
SHEET
6 of
of34
MKM
007-1658
DAKOTA COUNTY, NEBRASKA
PAPIO-MISSOURI RIVER NRD
PIGEON / JONES WATERSHED - SITE 12A
SITE GRADING PLAN
2018
REV.
NO.
DATE
REVISIONS
REVISIONS DESCRIPTION
OLSSON ASSOCIATES
DATE PRINTED
September 10, 2018
NOT TO BE USED FOR CONSTRUCTION
PRELIMINARY
601 P Street, Suite 200
P.O. Box 84608
Lincoln, NE 68508
TEL 402.474.6311
FAX 402.474.5160
www.olssonassociates.com
R
1325
1320
1320
1315
1315
1310
1310
1305
1305
1300
1300
1295
1295
1290
1290
1285
1285
1280
1280
1275
1275
1270
1270
1265
1265
1260
1260
1255
1255
1250
1245
100+00
1250
101+00
102+00
103+00
104+00
105+00
106+00
107+00
108+00
109+00
110+00
1245
111+00
drawn by:
checked by:
approved by:
QA/QC by:
project no.:
drawing no.:
date:
SHEET
7 of
of34
DAKOTA COUNTY, NEBRASKA
PAPIO-MISSOURI RIVER NRD
PIGEON / JONES WATERSHED - SITE 12A
2018
1325
DATE
1330
EMBANKMENT GRADING
1330
REV.
NO.
REVISIONS
REVISIONS DESCRIPTION
DAM CENTERLINE (100+00 - 111+00)
MKM
007-1658
OLSSON ASSOCIATES
DATE PRINTED
September 10, 2018
NOT TO BE USED FOR CONSTRUCTION
PRELIMINARY
601 P Street, Suite 200
P.O. Box 84608
Lincoln, NE 68508
TEL 402.474.6311
FAX 402.474.5160
www.olssonassociates.com
R
www.olssonassociates.com
1300
1300
1295
1295
1290
1290
1285
1285
1280
1280
1275
1275
1270
1270
1265
1265
1260
1260
1255
1255
1250
1250
1245
1245
1240
1240
90 100 110 120 130 140 150 160 170 180
20
30
40
50
60
70
80
2018
REV.
NO.
DATE
DAM TYPICAL SECTION
REVISIONS
10
EMBANKMENT GRADING
SHORELINE RIPRAP DETAIL
drawn by:
checked by:
approved by:
QA/QC by:
project no.:
drawing no.:
date:
SHEET
8 of
of34
DAKOTA COUNTY, NEBRASKA
0
PAPIO-MISSOURI RIVER NRD
PIGEON / JONES WATERSHED - SITE 12A
-200 -190 -180 -170 -160 -150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10
601 P Street, Suite 200
P.O. Box 84608
Lincoln, NE 68508
1305
OLSSON ASSOCIATES
1305
DATE PRINTED
1310
September 10, 2018
1310
TEL 402.474.6311
FAX 402.474.5160
R
1315
NOT TO BE USED FOR CONSTRUCTION
1315
PRELIMINARY
1320
REVISIONS DESCRIPTION
1320
MKM
007-1658
Wetland G: Fill
0.03 acre PEMA/C
Channel 1A: Fill
503.84 lf Perennial Stream
Wetland I: Fill
0.06 acre PEMA/C
Channel 6: Inundation
2911.77 lf Intermittent Stream
Wetland F: Inundation
0.07 acre PEMA/C
Wetland E: Inundation
0.05 acre PEMA/C
Channel 1A: Inundation
6453.74 lf Perennial Stream
Channel 5: Inundation
423.65 lf Intermittent Stream
Wetland D: Inundation
0.09 acre PEMA/C
Wetland H: Inundation
0.01 acre PFOA
Wetland A: Inundation
0.05 acre PEMA/C
Channel 2: Inundation
627.41 lf Ephemeral Stream
F:\Projects\015-3156\40-Design\GIS\20180816_LNKNRPL_015-3156_Version2_DS_CompMitPlan_NeSCAP.mxd PUBLISHED BY: rparker DATE: August 29, 2018
42.318564
-96.633773
%
Legend
Project Site
Impact to Wetlands Unimpacted Wetlands
Normal Pool (1,286')
Fill
Freshwater Emergent Wetland
Perennial Stream
Dam Footprint (from CAD)
Inundation
Freshwater Forested/Shrub Wetland
Intermittent Stream
Freshwater Pond
Ephemeral Stream
Power Pole Contours (from CAD)
%
Unimpacted Streams
Impact to Streams
Fill
Project Site Mean Center
Inundation
0
±
100
200
400
600
800
1,000
Feet
1 inch = 500 feet
WGS 1984 ARC System Zone 11
Basemap: USGS National Map, 2018
Pigeon/Jones Creek Dam Site 12A
Dakota County, Nebraska
Application for Section 404 Individual Permit
Impacts to Wetlands and Other Waters
FIGURE
3
Stream Mitigation 50' Riparian Buffer
2.7 acres available for mitigation
Wetland Mitigation 50' Buffer
2.0 acres available for mitigation
Stream Mitigation Reach - Perennial
1,186 lf (0.27 acre) available for mitigation
Wetland Mitigation Sites - PEMA
1.7 acres available for mitigation
Wetland Mitigation Sites - PFOA
0.22 acres available for mitigation
F:\Projects\015-3156\40-Design\GIS\20180816_LNKNRPL_015-3156_Version2_DS_CompMitPlan_NeSCAP.mxd PUBLISHED BY: rparker DATE: August 31, 2018
Water Quality 50' Buffer
42.318564
-96.633773
Legend
Project Site
Wetland Mitigation 50' Bufer Unimpacted Wetlands
Normal Pool (1,286')
Project Footprint
Water Quality 50' Buffer
Mitigation Sites
Power Pole Footings
No Access
PEMA - Lacustrine Fringe
Abandoned Railroad Bridge
PFOA - Riverine Floodplain
0
±
100
200
400
600
800
%
1,000
Feet
1 inch = 500 feet
WGS 1984 ARC System Zone 11
Basemap: ESRI World Imagery, 2018
Unimpacted Streams
Stream Mitigation Reach
Freshwater Forested/Shrub Wetland
Perennial Stream
50' Riparian Buffer
Freshwater Emergent Wetland
Intermittent Stream
Conservation Easement
Freshwater Pond
Ephemeral Stream
Pigeon/Jones Creek Dam Site 12A
Dakota County, Nebraska
Conceptual Plan for Compensatory Mitigation
Wetland and Stream Mitigation SItes
FIGURE
3