The U.S. Army Corps of Engineers, Albuquerque District, (Corps) is proposing to issue Regional General Permit (RGP) 15 for maintenance of existing stormwater management facilities under the City of Colorado Springs Permanent Extended Detention Basin (EDB) Maintenance Program. This notice is to inform interested parties of the proposed RGP and to solicit comments.
SUMMARY OF PROPOSED ACTION: The U.S. Army Corps of Engineers, Albuquerque District, (Corps) is proposing to issue Regional General Permit (RGP) 15 for maintenance of existing stormwater management facilities under the City of Colorado Springs Permanent Extended Detention Basin (EDB) Maintenance Program. This notice is to inform interested parties of the proposed RGP and to solicit comments.
PURPOSE AND NEED: The purpose of this proposed RGP is to provide a streamlined permitting mechanism for maintenance activities that cause only minimal individual and cumulative environmental impacts in existing stormwater management facilities that have been adopted into the City of Colorado Springs EDB Maintenance Program.
AUTHORITY: Section 404 of the Clean Water Act for the discharge of dredged or fill material in all waters of the United States.
AREA OF COVERAGE: The RGP would be applicable to all waters of the U.S. located within and associated with existing stormwater management facilities within the geographical boundaries of the city limits of Colorado Springs in the State of Colorado.
SCOPE OF ACTIVITIES: Activities proposed to be authorized by this RGP are limited to those activities that are required in order to maintain existing EDBs at the constructed baselines, as defined by the EDB Maintenance Program, including, but not limited to, cleaning, maintenance, and repair of inflow points, fore-bays, trickle channels, micro-pools, outlet structures, and embankments, removal of accumulated sediment.
LENGTH OF AUTHORIZATION: The regional general permit, if issued, will expire five years from the date of issuance.
OTHER GOVERNMENTAL AUTHORIZATIONS: Water quality certification or a waiver, as required under Section 401 of the Clean Water Act, is required for this regional general permit. The State of Colorado Water Quality Control Division is evaluating the proposed RGP and the Corps anticipates that Colorado 401 Water Quality certification will be issued for the permit.
COMMENT PERIOD: All comments pertaining to this Public Notice must reach this office on or before December 9, 2018. Extensions of the comment period may be granted for valid reasons provided a written request is received by the limiting date. If no comments are received by that date, it will be considered that there are no objections. Anyone may request, in writing, that a public hearing be held to consider this application. Requests shall specifically state, with particularity, the reason(s) for holding a public hearing. If the Corps determines that the information received in response to this notice is inadequate for thorough evaluation, a public hearing may be warranted. If a public hearing is warranted, interested parties will be notified of the time, date, and location.
SUBMITTING COMMENTS: Comments and requests for additional information should reference Public Notice No. SPA-2018-00329-SCO and be submitted to:
Joshua Carpenter
U.S. Army Corps of Engineers
201 West 8th Street, Suite 350
Pueblo, CO 81003
(719) 744-9379
E-mail: joshua.g.carpenter@usace.army.mil
Please note that all written comments received are subject to release to the public through the Freedom of Information Act.
Regional General Permit 15
CITY OF COLORADO SPRINGS
PERMANENT EXTENDED DETENTION BASIN (EDB)
MAINTENANCE ACTIVITIES
Effective Date: TBD
Expiration Date: TBD
Purpose of this Regional General Permit: The purpose of this regional general permit
(RGP) is to authorize discharges of dredged or fill material into waters of the United States
associated with maintenance of existing stormwater management facilities under the City of
Colorado Springs Permanent Extended Detention Basin (EDB) Maintenance Program.
Activities in basins that have not been officially adopted into the EDB Maintenance Program
or that do not comply with the provisions of this RGP may require an individual permit.
Permittee: City of Colorado Springs (City) and/or contractors and subcontractors acting on
behalf of the permittee
Permit Area: City limits of the City of Colorado Springs
Scope of Work: Work that is authorized by this RGP will be limited to those activities that
are required in order to maintain existing EDBs at the constructed baselines, as defined by
the EDB Maintenance Program. These activities typically include cleaning, maintenance,
and repair of inflow points, fore-bays, trickle channels, micro-pools, outlet structures, and
embankments, removal of accumulated sediment, and other minor activities that are
necessary to maintain the basin's capacity and designed stormwater management
capabilities.
The Corps must approve all site proposed to be covered by this RGP. Attachment 1
provides a list of facilities that will be approved by the Corps upon issuance of the RGP.
Attachment 2 provides a synopsis of the Standard Operating Procedures for the activities
that are covered by this RGP.
Preble's Meadow Jumping Mouse (PMJM): In accordance with General Condition (GC) 7,
the Corps will initiate consultation with the U.S. Fish and Wildlife Service under Section 7 of
the Endangered Species Act, as appropriate, within 30 days of receipt of the annual reports
(see GC 11). The consultation will attempt to address concerns that may be identified for
any sites proposed to be added to the list of approved facilities for future work under this
RGP.
Additionally, in an effort to avoid and minimize impacts to PMJM, the City has developed
standard protocols for all activities located within PMJM critical habitat (Attachment 3).
General Conditions: All activities authorized under this RGP are subject to the following
conditions:
Regional General Permit 15
Permanent Extended Detention Basin (EDB) Maintenance Activities
1. The discharge of dredged or fill material shall not consist of unsuitable material (e.g.,
trash, debris, car bodies, asphalt, etc.) and must be free from toxic pollutants in toxic
amounts. Fill must be from a source where threatened or endangered species and
historic property impacts have been reviewed and no impacts will occur. The use of
broken concrete IS NOT authorized for use by this permit.
2. Measures must be taken to prevent spilled fuels, lubricants, wet concrete (other than
that placed in forms), or other toxic materials from entering the stream.
3. Topsoil must be stripped and stockpiled at the site, and replaced as surface finish on
disturbed areas. All disturbed areas will be seeded in accordance with City of
Colorado Springs Drainage Criteria Manual, Volume I, tables 14-10 and 14-11
depending on location.
4. This RGP does not authorize activities that may impede fish passage.
5. Precautions shall be taken to avoid and minimize impacts and protect wetlands from
damage during construction activities. Wetlands must be restored to pre-construction
conditions for all impacts associated with temporary fill activities.
6. All activities authorized by this RGP shall be maintained in good condition and in
compliance with the terms and conditions of the permit. The City is not relieved of
this requirement if constructed structures are abandoned. In the event that the City
wishes to abandon or cease maintenance of an authorized structure, the City shall
either remove the structure in its entirety and restore the site to pre-construction
grade, including stabilization of all disturbed areas, or obtain a permit modification
from the Corps.
7. Activities authorized by this permit shall not jeopardize the continued existence of a
threatened or endangered species, or a species proposed for such designation, as
identified under the Federal Endangered Species Act (ESA), or which is likely to
destroy or adversely modify the critical habitat of such species.
The City shall be responsible for all consultation with the U.S. Fish and Wildlife
Service (USFWS) for projects that could impact threatened or endangered species,
or species proposed for such designation, or critical habitat of such species.
Consultation between the City and the USFWS may conclude with the identification
of conservation recommendations by the USFWS in non-jeopardy Biological Opinion
(BO). At the Corps' discretion, these recommendations will be incorporated into the
permit verification. If the USFWS renders a jeopardy BO and reasonable and
prudent alternatives cannot be implemented to avoid the unacceptable impacts, the
project will require an individual Department of the Army permit. Authorization of an
activity under this permit does not authorize the "take" of a threatened or
endangered species as defined under the ESA. In the absence of separate
authorization (e.g., an ESA Section 10 Permit, a BO with "incidental take" provisions,
Page 2
Regional General Permit 15
Permanent Extended Detention Basin (EDB) Maintenance Activities
etc.) from the USFWS, both lethal and non-lethal "takes" of protected species are in
violation of the ESA.
8. Activities authorized by this permit shall not affect historic properties listed, or eligible
for listing, in the National Register of Historic Places (Register) until the City has
satisfied the requirements of the National Historic Preservation Act (NHPA) and the
provisions of Title 33, CFR, Part 325, Appendix C.
The City shall be responsible for all consultation with the Colorado State Historic
Preservation Officer (SHPO), and Native American Tribes and/or other consulting
parties, if applicable, for projects that could affect any historic properties listed,
determined to be eligible, or that the City has reason to believe may be eligible for
listing on the Register.
For projects that may affect historic properties, the City shall notify the Corps that the
required consultation has been completed before the project may proceed. If
previously unknown historic or archeological materials are discovered while
accomplishing the activity authorized by this permit, the City shall stop work
immediately and notify the Corps. The City will initiate the internal provisions to deal
with the Inadvertent Discovery of Archaeological, Cultural, or Paleontological
Materials, as appropriate, and in coordination with the SHPO. The authorized activity
shall not resume until the City provides the Corps with a written verification that the
requirements of the NHPA have been satisfied.
9. This permit does not authorize discharges of dredged or fill material associated with
channelization, ditching, mechanized land clearing, cutting off meanders, blocking off
channels, or otherwise realignment of stream channels.
10. This RGP only applies to sites that have been accepted into the City of Colorado
Springs Permanent EDB Maintenance Program and approved by the Corps for
inclusion in Attachment 1. The list of sites may be updated at any time deemed
necessary by the Corps, but typically will be updated based on the information
contained in the annual report (see GC 11).
11. Annual reports shall be provided to the Corps by September 30 of each calendar
year. These reports will include a list of completed actions that were authorized
under the RGP during the prior 12 months and a list of sites that are scheduled for
maintenance in the following 12 months. The following information must be included
for each activity:
a. Types of activities (as listed in Attachment 1);
b. Location information including the facility name, facility ID number, and
latitude/longitude coordinates;
c. Name of waterway(s);
Page 3
Regional General Permit 15
Permanent Extended Detention Basin (EDB) Maintenance Activities
d. Date of work completion;
e. Estimated acres of temporary and permanent impacts to wetlands and other
waters of the U.S. resulting from the maintenance activities, including
drawings and other supporting documentation of the impacts;
f.
For projects involving permanent impacts to wetlands, a statement
addressing any potential compensatory mitigation requirements that may be
warranted, including a description of the wetlands that were affected and the
activities that caused the impacts;
g. Assessments of the stability of the sites, including access and staging areas,
and any remedial work that may be required, if any;
h. Before and after photos of completed work with figure labels including time,
date, bearing, and a general description of the site;
i.
A statement regarding the status of all sites covered by this permit, including
sites that were not subjected to maintenance work during the current
reporting period; and
j.
A list of new sites proposed to be added or approved sites to be removed
from the list (Attachment 1). In order for new sites to be added to the list, the
City must provide the following information for each site and receive written
approval from the Corps:
(1) Basin ID;
(2) Basin Name;
(3) Baseline narrative, including:
i. Basin capacity in acre-feet;
ii. Top, bottom, and 100-year water surface elevations; and
iii. 100-year peak in-flow and out-flow in cubic feet per second;
(4) Presence/absence of wetlands and streams;
(5) A general assessment of anticipated maintenance needs; and
(6) Potential PMJM critical habitat.
12. Within 30 days of receipt of annual reports, the Corps will notify the City of any onetime only compensatory mitigation that may be required for projects completed
during the review period. Typically, such mitigation will be required for greater than
1/10 acre of permanent impacts to wetlands for sites where compensatory mitigation
Page 4
Regional General Permit 15
Permanent Extended Detention Basin (EDB) Maintenance Activities
previously has not been accomplished, either during original construction or prior
maintenance, in association with a Corps authorization.
Once the one-time mitigation has been completed, or a determination made that
mitigation is not required, no further mitigation will be required for maintenance
activities within the maintenance baseline for the facility.
If one-time mitigation is required, the permittee will provide the Corps with a
schedule for identification of compensatory mitigation option(s) to be implemented,
upon written Corps approval, and completed by the end of the following reporting
cycle. Failure to satisfy mitigation requirements will constitute a violation of the
permit conditions, and may result in suspension or revocation of the RGP.
13. Representatives from the Corps shall be allowed to inspect the authorized activities
at any time deemed necessary in order to ensure that the activities are being, or
have been accomplished, in accordance with the terms and conditions of the permit.
Further Information:
1. Colorado Law: The City is responsible for obtaining necessary authorizations under
state water law or dam safety regulations.
2. District Engineers have authority to determine if an activity complies with the terms
and conditions of a RGP;
3. Congressional Authorities. This permit authorizes work in accordance with Section
404 of the Clean Water Act (33 U.S.C. 1344);
4. Limits of this authorization:
a. This permit does not obviate the need to obtain other federal, state, or local
authorizations required by law;
b. This permit does not grant any property rights or exclusive privileges; and
c. This permit does not authorize interference with any existing or proposed
federal projects;
5. Limits of Federal Liability. In issuing this permit, the federal government does not
assume any liability for the following:
a. Damages to the permitted project, or uses thereof, as a result of other
permitted or unpermitted activities or from natural causes;
b. Damages to the permitted project, or uses thereof, as a result of current or
future activities undertaken by or on behalf of the United States in the public
interest;
Page 5
Regional General Permit 15
Permanent Extended Detention Basin (EDB) Maintenance Activities
c. Damages to persons, property, or other permitted or unpermitted activities or
structures caused by the activity authorized by this permit;
d. Design or construction deficiencies associated with the permitted work; and
e. Damage claims associated with any future modification, suspension, or
revocation of this permit;
6. Reliance on applicant's data. The determination by the Corps that a verification
based upon this permit is not contrary to the public interest will be made in reliance
on the information provided by the applicant;
7. Re-evaluation of permit decisions. The Corps may reevaluate its decision on this
permit at any time the circumstances warrant (33 CFR 325.7(a)). Circumstances that
could require a reevaluation include, but are not limited to, the following:
a. Failure to comply with the terms and conditions of this permit;
b. The information provided by you in support of your permit application proves
to have been false, incomplete, or inaccurate; or
c. Significant new information surfaces that the Corps did not consider before
verifying that the project is authorized by this permit.
Such re-evaluation may result in a determination that it is appropriate to use the
suspension, modification, and revocation procedures contained in 33 CFR 325.7 or
enforcement procedures such as those contained in 33 CFR 326.4 and 326.5. The
referenced enforcement procedures provide for the issuance of an administrative
order requiring the permittee to comply with the terms and conditions of the permit
and for the initiation of legal action where appropriate;
8. Renewal of the RGP: This RGP may be reviewed for reissuance prior to its
expiration date. Any reissuance will be processed in accordance with 33 CFR 325.2
including a public notice and environmental procedures and documentation required
by the national Environmental Policy Act of 1969.
This permit becomes effective when the federal official designated to act for the
Albuquerque District Engineer has signed below.
_______________________________________
Allan Steinle, Chief
Albuquerque District Regulatory Division
Page 6
_______________________
Date
Attachment 1: Approved Sites.
Pond ID
1
2
4(a)
4(b)
5
10
12
13
17
26
30
31
32
37
40
48
50
51
251
503
504
507
512
517
522
Name
Briargate Pond #1
Briargate Pond #2
Chapel Hills Pond #1
Trafalger Detention Pond
Chapel Hills Pond #2
Pine Creek F
Ridgeline
Interquest South Pond A
Stoneglen/Hollycrest
Kettle Creek Detention E
Estates @Middlecreek #3
Estates @ Middlecreek #2
Estates @ Middlecreek #1
Flying Horse #1
Ramtron
Pine Creek B
Voyager and Stout
Grey Hawk
Voyager Business Park
Campglen
Chaseglen and Farthing
Zeppelin and Powers
Sandcreek Detention Pond 1
Sandcreek Detention Pond 2
Mesa and Filmore
Lat.
38.9436
38.9441
38.9516
38.9509
38.9486
38.9742
39.0005
38.9818
38.9699
38.9827
39.0116
39.0127
39.0139
38.9669
39.0045
38.9664
39.0168
39.0233
38.9998
38.7528
38.7620
38.7910
38.8719
38.8906
38.8695
Page 7
Long.
-104.7831
-104.7894
-104.7837
-104.7845
-104.7783
-104.7546
-104.7948
-104.8076
-104.7669
-104.7724
-104.8023
-104.7995
-104.7952
-104.7588
-104.8015
-104.7686
-104.8121
-104.8127
-104.7966
-104.8148
-104.8134
-104.7291
-104.7129
-104.7115
-104.8537
Attachment 2: Standard Operating Procedures for Maintenance Activities.
1. Inflow Point (Inlet): The inflow point is where runoff enters the EDB through
storm sewer pipe, surface drainage channel or ditch. Activities at the inflow point
will include:
a. Removal of sediment, trash, or other debris that has accumulated near or
in the inlet;
b. Removal of large, woody and other excess vegetation from the area
around the inlet that limits flow and/or risks damage to the inlet structure;
and
c. Maintenance and repair of erosion/structural damage to the inflow point
(may include adding rip-rap or concrete structure to provide energy
dissipation and concrete patching).
2. Fore-bay: The fore-bay is located below the inflow point and is designed to
remove large particles, trash, and other debris. It is typically (but not always)
made of concrete and has a flat bottom for easier maintenance. Activities at the
fore-bay may include:
a. Removal of accumulated sediment, trash, or other debris:
(1) For large fore-bays, heavy machinery (skid steer loader, long reach
excavator, front end loader) may be utilized; and
(2) Wet sedimentation may be temporarily stockpiled on site and
allowed to de-water prior to hauling to materials handling facility or
certified/licensed land fill for disposal;
b. Drain pipe/weir maintenance and restoration; and
c. Concrete structure repair.
3. Trickle Channel: The trickle channel conveys small flows from the fore-bay (or
inlet) to the micropool (or outlet structure). Trickle channels are typically concrete
but may also be constructed of rock. Activities in the trickle channel may include:
a. Removal of accumulated sediment, trash, or other debris:
(1) Sediment and debris that is left to accumulate in the trickle channel
will eventually block the flow of water. Water that is diverted out of
the trickle channel will cause damage to and erosion within the
EDB;
b. Removal of woody vegetation growing near the trickle channel; and
c. Erosion/structure repair, including concrete patching/repair.
Page 8
4. Micropool: The micropool is a small area of standing water (about 2-3 foot deep)
just in front of the outlet structure. It is designed to prevent the outlet structure
from clogging by maintaining a constant pool of water and is the only area in an
EDB where standing water is not a problem. (Note: Not all EDBs have
micropools). Activities in the micropool include:
a. Removal of accumulated sediment:
(1) Sediment removal will normally take place once sedimentation
reaches 12 inches of accumulation;
(2) Sediment removal may require a vacuum truck that is capable of
removing both sediment and water;
(3) For large micropools, heavy machinery (skid steer loaders, long
reach excavator, front end loader) may be utilized; and
(4) Concrete structure repair.
5. Outlet Structure: The outlet structure controls the rate that stored runoff is
discharged from the EDB. It includes several different components (well screen,
orifice plate, trash rack) that each require frequent maintenance. Inadequate
maintenance of these components can cause severe problems with EDB
performance; including standing water, inadequate pollutant removal and
downstream flooding. Activities at the outlet structure include:
a. Well Screen/Trash rack maintenance and repair;
b. Orifice Plate maintenance and repair;
c. Sediment/Trash/Debris Removal; and
d. Concrete structure repair.
6. Sediment Removal: General sediment removal from within the body of the EDB
may be required in order to return the EDB to its baseline capacity and capability.
Often, these operations require the use of heavy machinery to include dump
trucks and can include the removal of up to 30,000 cubic yards of sedimentation.
Sedimentation removal activities can include:
a. Inventory and maintenance needs;
b. Sampling and evaluation of sediment;
(1) For ponds greater than one acre and less than four acres, one
sampling station should be located in each acre; and
(2) For ponds larger than 4 acres, the pond will be divided into four
sections with a minimum of 1 sampling station from each section;
Page 9
c. Excavation utilizing heavy machinery and tandem axle or articulated heavy
haul trucks;
d. On-site, temporary, stockpiling operations for de-watering of sediment; and
e. Site restoration and erosion control.
7. Embankments: Erosion control/maintenance/repair can require several pieces of
heavy machinery depending on severity. Repairing embankment erosion is a
critical piece of EDB maintenance as it prevents sedimentation from developing in
key pieces of the EDB as well as ensuring the EDB functions to baseline capacity
and capability. Activities on EDB embankments include:
a. Installation of clean fill and topsoil materials;
b. Compaction of materials once placed;
c. Placement of seeding in accordance with City of Colorado Springs
Drainage Criteria Manual, Volume I, Tables 14-10 and 14-11; seed can be
placed utilizing two processes:
(1) Hydro-seeding (works well on flat or slightly sloped areas); and
(2) Direct placement of seed mixture, usually 1.5 2 pounds per acre,
followed by installation of straw mat (works well on slopes greater
than 3:1);
d. In some instances where no other effective alternative has been found,
rock armoring the embankment with rip-rap may be accomplished:
(1) Rip rap utilized will be large (12 inch or greater) granite rock or
other suitable material in compliance with General Condition 1; and
(2) Concrete grout may be used between rocks to hold it in place.
8. Maintenance of Ditches and Unpaved EDB Access Roads: In cases where
drainage ditches may be jurisdictional and feeding or exiting an EDB, this RGP
authorizes routine maintenance, grading, and reshaping of drainage ditches in
order to restore their original conformation and capacity. This RGP also
authorizes the repair and maintenance of EDB access roads within jurisdictional
areas.
Page 10
Attachment 3: Protocols for activities located within PMJM critical habitat.
1. Designate a single route through the habitat. The route will be of minimal width
(i.e. one narrow lane).
2. Stage heavy equipment outside of the habitat (preferably > 150 feet) whenever
practicable.
3. Excavate, fill, or clear only those areas absolutely necessary.
4. Remove excess fill from the site or to an area at least 150 feet from PMJM
habitat.
5. Direct dewatering activities away from habitat and into an area that will not drain
directly in PMJM habitat.
6. Minimize local and downstream erosion by placing erosion barrier fences around
excavated materials, if they are to remain for more than one day.
7. Revegetate disturbed areas as soon as equipment is moved and maintenance
activities are complete. Whenever possible, seed mixtures or planting stock will
be native species that match the vegetation existing at the site prior to
disturbance.
8. Any residue of chemicals should be cleaned and/or removed from the site to a
safe disposal area.
9. Submit, annually, to the Fish and Wildlife Service a report summarizing all
activities in EDBs characterized as containing PMJM habitat and not covered
under the Colorado Springs City-Wide Block Clearance Zone dated 4 November
2014.
10. Submit, annually, to the Fish and Wildlife Service a report of any new EDBs that
may require consultation for adding to the list of EDBs containing PMJM habitat.
Page 11