AFTER-THE FACT RESIDENTIAL SUBDIVISION IN LIVINGSTON PARISH
AFTER-THE FACT RESIDENTIAL SUBDIVISION IN LIVINGSTON PARISH
NAME OF APPLICANT: 6844, LLC, c/o Hydrik Wetlands Consultants, Attn: Michael Henry,
2323 LA Highway 190 East, Suite 2, Hammond, Louisiana 70401.
LOCATION OF WORK: Located on an approximate 111.65-acre site, in Sections 10 & 11,
Township 7 South, Range 3 East, along and south of Buddy Ellis Road, approximately 1.65
miles west of Louisiana Highway 447, near Denham Springs, Louisiana, located in Livingston
Parish, as shown on the enclosed drawings (Latitude 30.4530 N Longitude -90.8931 W). This
project is located in the Pontchartrain Basin (Amite River HUC 08070202).
The work described below was partially completed prior to obtaining a Department of the Army
permit and was in violation of Section 301 of the Clean Water Act. All legal issues concerning
the unauthorized work have been deferred.
CHARACTER OF WORK: The applicant is requesting an after-the-fact Department of the
Army permit authorization to clear, grade, excavate, place and maintain fill material for the
construction of an approximate 256-lot residential subdivision (Ellis Estates), near Denham
Springs, Louisiana, within Livingston Parish. The proposed development would include
residential homesites, 4 detention ponds, utility and drainage infrastructure and appurtenances,
green space areas, and ingress/egress. Approximately 416,258 cubic yards of native material
would be excavated as a result of pond construction and placed as fill in jurisdictional areas
during project construction. Approximately 0.66 acre of jurisdictional wetlands have been
impacted prior to the applicant obtaining a Department of the Army permit. Approximately
14.26 acres of jurisdictional forested wetlands (including after-the-fact portion) would be directly
impacted as a result of project implementation. Approximately 1.25 acres of jurisdictional Other Waters of the United States (OWOUS) would be excavated and 1.03 acres OWOUS would be
avoided and not directly impacted. The applicant has claimed that the project has been
designed to avoid and minimize direct and condary adverse wetland impacts to the maximum
extent practicable. The applicant is proposing to utilize best management practices during and
after the construction phase of the project. The applicant is proposing to compensate for the
unavoidable impact by purchasing mitigation credits from an approved mitigation bank.