Urban Drainage & Flood Control District is proposing stream stabilization on a segment of Cherry Creek located between South Quebec Street and Iliff Drive.

PUBLIC NOTICE US Army Corps of Engineers Omaha District

REPLY TO: Denver Regulatory Office 9307 South Wadsworth Blvd Littleton, CO 80128-6901 FAX (303) 979-0602

Application No: NWO-2018-00533-DEN Project: Cherry Creek Stream Stabilization (Quebec to Iliff) Applicant: Urban Drainage and Flood Control District Waterway: Cherry Creek Issue Date: November 21, 2018 Expiration Date: December 21, 2018

30 DAY NOTICE

PUBLIC NOTICE FOR SECTION 404 PERMIT APPLICATION SUBMITTED TO U.S. ARMY CORPS OF ENGINEERS The District Engineer, U.S. Army Engineer District, Omaha, Nebraska is evaluating a Department of the Army permit application from Mr. Ken MacKenzie, Urban Drainage and Flood Control District (UDFCD), 2480 West 26th Avenue, Suite 156-B. Permits are issued under Section 404 of the Clean Water Act (Section 404) which regulates the discharge of dredged or fill material into waters of the United States. Summary The UDFCD proposes stream stabilization to a segment of Cherry Creek, located between South Quebec Street and Iliff Drive. Location The project area is located at approximately 39.681040°N, -104.897490°W, within the Cherry Creek corridor between South Quebec Street and Iliff Drive, downstream from Cherry Creek Reservoir. The project area is located approximately 3 miles north of the Cherry Creek dam and Cherry Creek State Park, 7 miles south of downtown Denver, and 2.5 miles east of Interstate 25. The project area is in Sections 21 and 28, Township 4 South, Range 67 West of the 6th Principal Meridian in the City and County of Denver, Colorado. Description of Work The UDFCD would stabilize this reach of Cherry Creek through the implementation of a range of stream stabilization methods. UDFCD would excavate approximately 150,000 cubic yards of the existing Cherry Creek corridor and realign the existing Cherry Creek channel to mimic bankfull and sinuosity 1 Project: Cherry Creek Stream Stabilization Project Waterway: Cherry Creek

Corps File No: NWO-2018-00533-DEN Applicant: Urban Drainage and Flood Control District

characteristics found in upstream reference reaches. UDFCD would construct 17 riffle/pool structures and 3 sculpted concrete grade control structures to support a new channel slope. Floodplain benches would be created adjacent to the active channel to create a wider channel cross-section which would allow high flows to spread and expand. Approximately 10,000 linear feet of hard and soft bank stabilization would occur to stabilize the channel once realignment is complete. UDFCD would revegetate wetland, riparian and upland areas within this reach with native trees, shrubs and herbaceous vegetation. Purpose The basic project purpose is stream stabilization. The overall project purpose is to improve flow conveyance and stability of Cherry Creek between South Quebec Street and Iliff Drive. Impacts and Mitigation The total length of impacts to Cherry Creek is approximately 5480 linear feet (3.26 acres). The total impacts to wetlands is 0.53 acres. The Applicant has proposed to provide on-site, permittee responsible mitigation for impacts to open waters and wetlands. ********************* The Colorado Department of Public Health and Environment, WQCD-GWPS-B2, 4300 Cherry Creek Drive South, Denver, Colorado 80222-1530, will review the proposed project for state certification in accordance with the provisions of Section 401 of the Clean Water Act. The certification, if issued, will express the State's opinion that the operations undertaken by the applicant will not result in a violation of applicable water quality standards. For further information, please contact the Colorado Water Quality Control Division, (303) 692-3500. In compliance with the Endangered Species Act, a preliminary determination has been made that the described work will not adversely affect species designated as threatened or endangered or adversely affect critical habitat. In order to complete our evaluation of this activity, comments are solicited from the U.S. Fish and Wildlife Service and other interested agencies and individuals. The Corps of Engineers, Omaha District will comply with the National Historic Preservation Act of 1966, and amendments and the procedures set forth in 33 CFR 325, Appendix C. We will evaluate input by the State Historic Preservation Office, Tribes, and the public in response to this public notice, and we may conduct or require a survey of the permit area to check for unknown historic or prehistoric properties, if warranted. The decision whether to issue a permit will be based on an evaluation of the probable impacts including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits which reasonably may be expected to accrue from the proposal must be balanced against the reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, wetlands, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. In addition, the evaluation of the impact of the work on the public interest will include application of the guidelines promulgated by the Administrator, Environmental Protection Agency, under authority of Section 404(b) of the Clean Water Act (40 C.F.R. Part 230). The Corps of Engineers is soliciting written comments from the public; Federal, state and local 2 Project: Cherry Creek Stream Stabilization Project Waterway: Cherry Creek

Corps File No: NWO-2018-00533-DEN Applicant: Urban Drainage and Flood Control District

agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. Comments, both favorable and unfavorable, will be accepted, made a part of the record and will receive full consideration in subsequent actions on this application. Any agency or individual having an objection to the work should identify it as an objection with clear and specific reasons. All replies to the public notice should be sent to the U. S. Army Corps of Engineers, Denver Regulatory Office, 9307 South Wadsworth Blvd, Littleton, Colorado 80128-6901. For additional information please contact Aaron R. Eilers, Regulatory Project Manager, at (303) 979-4120 or aaron.r.eilers@usace.army.mil or visit the Denver Regulatory Office web site at: http://www.nwo.usace.army.mil/Missions/RegulatoryProgram/Colorado/PublicNotices.aspx The District Engineer will consider requests for holding a public hearing, for the purpose of gathering additional information. Before the expiration date of this notice, anyone may request, in writing, that a public hearing be held. Requests for a public hearing should state specifically the reasons for holding a public hearing, and what additional information would be obtained. Should the District Engineer decide that additional information is required and a public hearing should be held, interested parties will be notified of the date, time and location. Comments received after the close of business on the expiration date of this public notice will not be considered.

3 Project: Cherry Creek Stream Stabilization Project Waterway: Cherry Creek

Corps File No: NWO-2018-00533-DEN Applicant: Urban Drainage and Flood Control District

U

' I

c

L I ' 11 1 A·: v

L

Q\

~

rt) .:.: cu 0

- ·

g

"'u

tit A'/·

,'j,

"'

Ct

>-

l- 1 , f 1\vo

' t, , ,

_§ I

vi.

llJ

'" iiic

\

~

\

Denv r

Cl

US-6E ·

Bu

r ..

iD 0 1 "

'"

'

L1, .·~ I v

I

l~ f' · n~._.

\

ra

1

-' ) . \

A nn "

-.

I

,A L .

"

· ·,

Lil

I

rn

[2]

0

M

'll

f

u;

'\)

'

I

ur

I-

1

f'

~k

r:

;./

l

1.11 ' ·r · n

0

t

~ o un t ry

s

2

Q

:'.!

(/I

.,,,

c

L StmJrn l 'I (J,

_w

nv r

~ 0

·:

.,

I. Rill /\·1cZ

:i

E I sl Ave

.0

((,

0

"' Ill

:r~

0.

-,

IJ

n

A'·JC

...

in E 12111 A·1

-g

E ,n M

20

r 7th Ave Pk-.·1y

E 3rd

I ,.....' C:

-

E 11 th A·1 (f)

m

:~

if> -

..

1'JJ i'jj

~

L 13 th Av e

I

\

!

lub

;;; il>

ve

=:

·!J

ii)

(l

::;;;

ns

;..

c Ex p o ~ 111 l'"" .>

(f)

c

n ra tl

!1

11)

u::

c

LL

L

U1

I

A

ij_CfJ

2

lub

ifl

<1·

w

'

.>

no

UJ ·-·,,,

in E Miss1° SIPJ I Av ~ Vi E An z na Ave

>.

. If: ·f)

~

c;

ld ll

>-

c

'"

8 U)

I CO

I-' rt

rr, <'J

E ..J

- f' l I

E 111 11 i\'/ .

{j)

nL.. II F qi " I · Vi

1

1f4

L

c

{j)

r

,,,

- JvJj.0 1

Li i "

E Ev &1 ~ /\vu

E·lf.i111pd

(/)

Ave

E J ·1 II Av

/

.-

t/l

If)

E Jo, !IOll A·:e

n\ ' B1·r f-)/ t A«bu1y A·1e ' ''1 lllvt1

VC

~

I-

I

·,.

i

0 'Q

0

.;...

( f)

I

O>

~ ~

Th , 1d " ' - n H;iv

0

UJ

~

t l'.'le

rli

l' El

E K lllliCk',' 11-1?.

\' 1

rJ

c 2

E Flo 11 d.:1 Ave

({) E Florid A·1e E luw.:i 1\·1

(

'

;;:.

17J

\\ l) .

'\)

o.{)

" . ,_

..

v

(j)

C'

':I

J:

_,-J:

'I

E H;:i mprl n Av

11 · A11

}

-" ~\I

,..,..N:,11· ··Ufl 1'1 ,~, I 1.1 '

;

h rry Hi I ls V i II .l g~ r

( ·,·

Ou111cy A·1e

~ """' . n~

·J

s /·/('o

I

§ :J

nm

0

r

/ i ,.,,

0;j) ·

~- ~ ~

lllll lV

~

l b

E Belle'11 e·J A'le

':!!

0 ~

[

'ill l · ,' \

I ~· ~ fl '

ii ' I

7 \ ,. . . ,> /, -

·f!

- ~-

· t, ·

I

1

C h··11 y ~ , ·<' k !>e' " i1 i ::>l.;1» p lk

<:! -

\}/

I

Service La~er Cre\IJl~:,S~~r~~s: Es~, HERE, Delorme, lntermap, l~rii:menl : P Corp .. GEBCO, OS\3$, 'f'llO~NP§, ffRCAN, GeoBase, IGN "~ada~ter NL, Ordnance Survey, Esr! Japan, METI, Esri Cnna (Hcing Kong), sviisstopo,

I

Legend

D

Study Area

FIGURE 1 REGIONAL MAP 0 0.25 0.5

1 Mile

I

I

I

~'

CORVUS

CHERRY CREEK QUEBEC TO ILIFF Denver, Denver and Arapahoe Counties Mao Date: 10/24/2017

Legend

0

410

820

1,640 Feet

Photo Points - - Streams*

CJ Study Area

FIGURE 2 STUDY AREA

Flow Direction (NW)

CJ Counties

*Streams data from CO state or COOT and are a roximate ' '

~-

CORVUS t ~

· . .,- .,n11 ._ ,,i,;· r ;i; u·.

CHERRY CREEK QUEBEC TO ILIFF Denver, Denver and Arapahoe Counties Mao Date: 10/24/2017

Legend ·

0

162.5

325 '

'I

I

Sample Points

-

Wetlands (0.52 acre)

-

Open Waters (3.26 acres)

~

650 Feet

''

FIGURE 3

~,

WETLANDS AND OPEN WATERS

CORVUS [ 1'1 , .-.fl,..,.rl'l(~'bV' r.ll!l L(

Flow Direction

CHERRY CREEK QUEBEC TO ILIFF Denver, Denver and Arapahoe Counties Mao Date: 10/5/2018

Legend ·

0

162.5

325

Sample Points

-

Wetlands (0.52 acre)

-

Open Waters (3.26 acres)

~

650 Feet

FIGURE 3

~,

WETLANDS AND OPEN WATERS

CORVUS

( tT, n_n'""'l rt:41 (< ·1H1 '. r 1.U L

Flow Direction

CHERRY CREEK QUEBEC TO ILIFF

Denver, Denver and Arapahoe Counties Ma Date: 10/5/2018

CONTRACT DRAWINGS FOR THE CONSTRUCTION OF:

CHERRY CREEK CORRIDOR IMPROVEMENTS QUEBEC TO ILIFF DENVER PROJECT NUMBER: 2018-PROJMSTR-0000023 SEMSWA PROJECT NUMBER: CPR16-00005

APRIL2018

INDEX OF DRAWINGS SHEET NO. GENERAL

URBAN DRAINAGE AND R.OOD COKTROL DISTRICT

DRAWING NO.

SHEET TITLE

x

G-1

TTTlESHEET

G-2 G-3

SCTEPIAN

x

GEfrEW. NOTES ANO LEGEND

CIVIL C-IStoc-8

OEMO AND REMOVAL PLANS GRADING Pt.ANS

x

8tD11

12to 13

C-9toC-10

CHANNEL PROFILE

14to 19

C-11 toC-13

17

C.14

18

C.15

CROSS SECTIONS TYPICAL CHANNB.. SECTIONS DOWNSTREAM TIE IN DROP Pl.AN DOWNSTREAM TIE IN DROP SECTIONS

x x

4to7

,.

MILES

·

0

15

10 KILOMETERS

20 15

;I! TMEllUPU"""""°" PREPARED UNDER

C.18 C.17

21

C.18

1.a RIFFL.E DROP Pl.AN 0.15' RIFFLE DROP PLAN

22

C.10

RIFFLE DROP SECTIONS

23

C.20

SECONDARY TRAJL aIDSSING WITH 'Z OROPPIAN

24

C.21

25

C.22

281D27

C-23toC-24

28

C.25

28to30

C-28toC-'Zl

31

C-28

32

C.29

33

341<>"'

C-31 toC-36

"40to41

C-371DC-38

42

"""'

SECONDARY TRAIL ~ING WITH 2.5' DROPPIAN

SECONDARY TRAIL CROSSING wrTH DROP SECTIONS SECONDARY TRAIL CROSSING DETAILS

DROP STRUCTURE DETAILS BANK PROTECTION DETAILS TRJBUTARYREPAIRCETAILS IUFF AVE. WATER QUAL!TYTREATMENT PLAN AND DETAILS ILIFF AVE. WATER QUALITY TREATMENT STRUCTURAL DETAILING STORM SEWER MODIFICATION Pl.ANAND PROFlLES

49

L·7

001<>53

L-BtoL-11

M.,57

L-13tal-15

.

L·12

EROSION CONTROL EC.1 68

..

MISCELLANEOUS DETAILS

EC-2

Pl..ANT\NG NOTES AND ZONE CROSS

SECTION Pl..ANT\NG Pl.ANS

PL.ANT1NG SCHEDULE PLANTING DETAILS

x x x x

x x x x

x

x

x

x x x

x x x x

TTTlESHEEr

GENERAL NOTES

EC-3

SITE PLAN

81 tD72

EC-'tcEC-15

EC PLANS

73"'78

EC-1StoEC-10

EC DETAILS

80

x

STORM SEWER DETAILS

LANDSCAPE PLANS - STREAM DESIGN L-1 tol..... 43to46 TRA!LAND AMENITY PLANS 47to48 L..Stol-9 TRl>JLANO AMENllY OETAJLS

""''I

Ii

19

""

I

VICINllY MAP

I,

l

5

C-1to~

DESIGNED:

sow

~3

§ij ~=

~i'--~~~--'-<>ECKE>.-M_oc_·_._~~.==::o;:.:..::"'-"=:=-~~-'---'~--'~~~~~~~~.L---''--~~~-'-~~--'~-=-~~-'-~~~~~~~~~~~~~~~~~~~~~-L~~~~~~~~~~~~~~~~..1.;;;=-...;;;;;;~

NO.

60% SUBMITTAL

..,.

MTE

4110/2018

GENERAL C-1

SITE PLAN PROJECT NO. 13-003.G&

\

Cherry Tree Estates

~~~~~Rl=RBAN FILL CONTAINING OEBR!S 9HISTORICAI. URBAN OUS MATERIAL REFER TO THE PINYON ENVIRONME~~l~~GATION" REPORT BY LIMITS OF CONSTRUCTION

=~~:ANO BURY~~~~=~~

THE MATER!ALS MANAGEMENT PLAN.

--~

· ---REM-D_VE:!~'\ ~, ',

LIMIT OF CONSTRUCTION

EXISTING WETLANDS

CONCRETE REMOVAL

PREPARED UNDER

THE SUPEFNISIOr-i OF

NOTE:

ALL TREES IMTHIN LIMITS OF CONSTRUCTION TO BE REMOVED UNLESS OT HERWISE NOTED.

URBAN FILL TEST PrT LOCATIONS SHEET REVISIONS

DESIONEO

DATE

SOW

MAB

60% SUBMITTAL

CHECKEO

MDC

'~

OESQ:i lPTICN

8 __

_L~ --K-~-~~;~~-NAU_:F___ -- --- -- -_--- -- -- -- ~N~~~~-----REMOVE2240LFOF

---

'\ ' '\,,, " ',

EXISTING TREE

41lP18

_ _._\ \ _ _

'~

\

So1

~ ~.r--::::::::::::=-:----,::ivil"---::._::::::::.:.:::_ __i,:·~11~0120~1·:.J CIVIL

)...,,.

CHERRY CREEK CORRIDOR IMPROVEMENTS

~

C-1

DEMO AND REMOVAL PLANS PROJECT NO. 13-003.04

DATE

DRA.W!NO NO

SHEET NO

_i_ OF ..1§...

100'

50'

REMOVE ENTIRE lENGTH OF BLOCK RETAINING .f'

WALL(AP7ROX..1

"

LIMITSOF CONSTRUCTION

NOTE' AU TREESWITHINLIMITSOF / CONSTRUCTION TO BE REMOVED

EXISTING TREE EXlSTING WETl.ANDS

CONCRETE REMOVAL

llTP18

,'

/ ~~·

LIMIT OF CONSTRUCTION ,'

~=o~-/

,, ,,

,,,~~/

/

/

REMOVE ENTIRE LENGTH OF BLOCK RETAINING WALL (APPROX. 60 LF)

(

URBAN FIU TEST PIT LOCATIONS OESIGNa>.

EETREVI DATE

sow DRAWN:

MAB MDC

OESCRIPTION

60% SUBMITTAL DEMO AND REMOVAL PLANS PROJECT NO. 13-003.04

SHEET NO.

REMOVE 24· CPP (40 LF)

LIMIT OF CONSTRUCTION

EXISTING WETLANDS

0TP 18 PREPARED UNDER TM ESUPERV1SION OF

- _

URBAN FILL TEST PIT LOCATIONS

NO~ES WITHIN LIMITS OF

~NSTRUCTION

TO BE REMOVED UNLESS OTHERWISE NOTED.

SO% SUBMITTAL Q1ECKED:

MDC

PROJECT NO. 13-003.04

---

I 100'

' - L-------

'

I DEWOPTION

SOW

f" I

i :

HEET REVI I N

DESIGNED:

--l

---

I

"'

~ ·4V

EXISTING TREE

CONCRETE REMOVAL

I

I

~ t:'1~hG~EI~

!t'°!!E.o:!

I

CHERRY CREEK CORRIDOR IMPROVEMENTS

CIVIL

DEMO AND REMOVAL PLANS

"""'

4110f2018

LJ FIU L AINING

AREA OF HlSTORICAL URBAN DEBRIS ANO POTENTIAL HAZARDOUS MA 1 RIAL REFER TO THE ~ISTORICAL URBAN FILL INVESTipATION· REPORT BY

PINYON ENVIRONMENTAL FOR M9._~ DETAIL REMOVE

HAZARDOUS MATERIAL ANO eu~r.s_UITABLE DEBRIS IN "'

ACCORDANCE WITH THE

100'

MATE~

MANAGEMENT PLAN.

I

I

REMOVE 34SY OF GROUTED BOULDER

LIMITS OF CONSTRUCTION

I

RlPRAP RUNDOWN

EXISTING GROUTED BOULDE

DROP STRUCTURE

,,--~

......_

(PROTECT IN PLACE)

__ , I

I

I /

--0_/

/

AREA OF HISTORICAL URBAN FILL CONTAINING DEBRIS AND POTENTIAL HAZARDOUS MATERIAL REFER TO THE ·HISTORICAL URBAN FILL INVESTIGATIOW REPORT BY PINYON ENVIRONtlENTAL FOR MORE DETAIL REMOVE HAZARDOUS MATERIAL ANO BURY SUITABLE DEBRIS IN ACCORDANCE WITH THE MATERJALS MANAGEMENT PLAN.

NOTE:

ALL TREES WITHIN LIMITS OF CONSTRUCTION TO BE REMOVED UNLESS OTHERWISE NOTED.

LIMIT OF CONSTRUCTION EXISTING TREE EXISTING WETlANOS

CONCRETE REMOVAL

eTP18

URBAN FILL TEST PIT LOCATIONS

EETAEVl

CHERRY CREEK CORRIDOR IMPROVEMENTS

sow

60% SUBMITTAL MDC

PROJECT NO. 13-003.04

4/10J2018

CIVIL

stream W>dlcape-·pllllaiai

DEMO AND REMOVAL PLANS 2._oF~

\

Cherry Tree Estates

6 r--1

'j

--~

--- - -- ~- ------=- =-- --

-

~

DROP 3

~

I

_ _ __

-"-~

DROP 4 1' RJFFLE

\ _ LIMITS OF

1' RIFFLE WITH BENCH

STORM SEWER OUTFALL 2 SEE CWG. C..i5

I

----------------

5415-

:=r:~ - - - -\ - --

~

CONSTRUCTION

STC_ABl~~~~~- - - -- - - - -

-

- DR _O_P ; -

1' RIFFLE WITH BENCH STABILIZATION STRUCT\JRE

~

~

i ~

§ ffi

~~

:;i~ ~~

!i ,_

PREPARED UNDER THESlJPERVISIONOF

OESICNEO

SHEET REVI SIONS

sow

MA·

so% susM1nAL

~

MULLER

O·H1'

~~

<,.P..~,

l - - - l - - l - - - - - - - - l - - + - - - s - =E -N _G_tr IN_e E_ER_a lN_G_m c_o_M_PA_N_Y--1 ?

.~~ l) ~. ~.~.'."."E}~ ~

Sou.t~·.uut l.Aetro

CHERRY CREEK CORRIDOR IMPROVEMENTS

411 0/2018

0> DENVER WATER

GRADING PLAN A

Sl-tEETNO

o;:iri~>v;;~~ l---------C-IV_l_L---------+,o=o==-i

... ,. -:::.::.:0,cn°..~,.TT

C-5

1 m='="'P":!::U=cbilmu<='==='~ ~~ t__ _ _ _...L_M _ o_c_ t __ _~·~ ·O~J~EC~T~N~0~ . 1~>-00J ~.~ ~!___ _j__j_ _L__ _ _ _ _ _ _ _...L_..L_ _ _= · plmuW>&=== · :....._ __L_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __.__ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.._·_0_,_1_·~

sa

100

Cherry Tree Estates

-

------- -------- --

"""'

CHERRY CREEK CORRIDOR IMPROVEMENTS

4110/201 8

CIVIL

ORA'MNGND

C-0

---~/-

--,

I

)

-

-

____---:;:::-.-comm -

p:ll'llm

,....,,-

- -

I

-

STORM SEWER OUTFALL 11 see cwG. C-36

.'

-------<

100-YRPMRREVISED PRELIMINARY

FLOODPLAIN, TYP.

.............

··

I

... ___

..,__...... ...

_...

I I

"' ~ ;::; ~

~

S HEET R

SIONS

CHERRY CREEK CORRIDOR IMPROVEMENTS

411012016

CIVIL

ORAWING NO

C-

GRADING PLAN D

I

I 5415

5410

9+00

10+00

11 +00

12+00

13+00

14+00

CHERRY CREEK CHANNEL PROFILE (STA. o+ oo TO 14+00) SCALE: 1· = 100' (HORlZ.) r 10' (VERT.)

=

5420

5420 STOR

5415

5410

5405

_____ J_____ , ___ __ 1 ____ _

----------~-----J

5400

5395

5390

26+00

CHERRY CREEK CHANNEL PROFILE HYDRAULIC INFORMATION: a ,c =1608CFS QBIOFLUSt<=1300CFS C100 = 5000 CFS CSMA.LL FLUSH = 300 CFS

(STA. 14+00 TO 28+00)

=

SCALE: 1" 100' (HORIZ.} 1" = 10' (VERT.)

27+00

28+00

I

P~OPOSED

I

5425

28+00

29+00

30+00

31+00

32+00

33+00

35+00

34+00

36+00

37+00

J RADE FROIM

I

,,.- 2Q11 CHERRY CREEK /

38+00

StABJUZATlGN PLAN

39+00

40+00

I 5425

42+00

41+00

CHERRY CREEK CHANNEL PROFILE (STA. 28+00 TO 42+00) SCALE:

5435

r = 100' (HOR!Z.) 1" = 10' (VERT.)

I

5435

5430

-----1 I

5425

I

5420

5410

I

~,

"

I

! -54 _ 05_ ! -_ __-:-__"..,_ ·");/~- -

-----~----

___ __t _______ ____

-----------~+~~~~:~:+.-~,~=---+---_--_-+l-_-_-_--~~~-J--+-~---~'-'~-~'--_-_·~---_-_·-~--J~l ~~~~~~~~1~~~~~--~ "J'°''' O !nA.~c~)

I

48+00

49+00

J~~~~

5400

5400 42+00

HYDRAULIC INFORMATION: O,o - 1608 CFS Oeic HUSH

0 100 = 5000 CFS

43+00

= 1300 CFS = 300 CFS

Q SMALL FLUSH

44+00

45+00

46+00

47+00

50+00

CHERRY CREEK CHANNEL PROFILE (STA. 42+ 00 TO 56+00) SCALE : 1" = 100' (HORIZ.) 1":: 10' (VERT.)

51+00

52+00

53+00

54+00

55+00

56+00

,I

~'g'~ rl-1 r-r, -~ I

- r --

5420 100.v;uw i---+-------i-------t-------- - - - t,= ._YRWATE c=±-R SURFACE

5400

I

I

.......... -

~--;- i -~;r- , -~- .·ci=,, _=__+ _ sr: .·L PiRTIARY-t.L---t~ -IRAJ'--+'-----+--=-=---1 5400 PRIMARY TRAIL

l

!

UNci.AsslFIED

~ r----~---t---t----EM-s:,:

_

536_0~--~--~--~---l 1BO

5420

160

1~

120

100

BO

BO

~

0

~

----- ~~~ ~

~

EXCA ATION

~--~--1 53_!0

0

BO

60

l - - - ' - 1- -~ --1

___

1~

100

140

160

CROSS SECTION (STA. 5+65.12!;1:\,

6d

...I

5420

5420

5400

5400

5380

120

100

BO ~ ~ 0 ~ ~ CROSS SECTION (STA. 10+79.en/'S\.

BO

"'

100

BO

60

120

140

...

~

5440

JJ:::_____~20

~

I

5420

~

5400

I CONC~

~I

I

I'

53BO 1BO

I

l

~

5400

I TRAIL

160

140

120

100

BO

60

~

~ 0 ~ ~ BO CROSS SECTION (STA.17+53.08!&

"'

HYDRAULIC INFORMATION: 0, 0 "' 1608 CFS C\ua FwaH · 1300 CFS 0,oo a 5000 CFS uSH = 300 CFS

r//J MULLER

F"RE.PARED UNDER

~i ,,,,.,,.,.,,,.,.OF

1~

sow MAB

603 susMirrAL

Moc

PROJEcr·a. 13-003.04

·

ENGINEERING CO MPANY

BO

100

120

140

200

...

m""~

t}

<;:rui:'rti~&'.&r

CHERRY CREEK CORRIDOR IMPROVEMENTS

~~

CIVIL

5) oENVERWATER

CROSSSECTIONS

ORAWINONO.

C-1'

~.~.. ~ ~~~--'-~~~~~~~~~~~SHEE>"~~~ ~"'..I!~!-· .___~~...____.~---'-'==-'=-":..:='-----'---'-~.__~~~~-'----'-~~~~-ea~!"-'--~.__~~1-I_~_?._ Jl ' . ~._~._~!-"R_,·_··_···_o·_c_o"·_~_ ~~-

illldlapemllilr

240

220

200

180

160

140

120

100

80

60

40

20

~

0

40

60

80

100

120

140

160

180

200

220

240

260

280

300

320

CROSS SECTION (STA. 23+65.09)/S\,

...

"'

A't ~ml.. I ~;;;l:"' ---~ -~ -==---- -

I

5440

~o l~

- - - - SURFACE 1

I

I

',b

1·-~; -

· · ,,~~ · ·

1 ~-r:;h -~[ :~KMENT

5400

I

I

I

-

I

JJ_ ~7-

I

BANKFULL CHANNEL

··-

· 1

I

I

.- · ' ~~ --

260

240

220

200

180

160

:-----:::C -

-

~-

lRAIL

EXCAVATI

100

120

80

60

~

40

~

0

40

5380

I

I

280

260

240

220

200

180

160

I

i

140

120

...

0

~

- - 11 5420

1:~

I

60

80

120

100

140

160

5380 ~

=

~

180

CROSS SECTION (STA. 31 +17.SD)/t\,

,.

I_ _. _.,

I

I 140

5440

I

1 - 1

j\_ seJ NDARY

U~CLASSIFl~O

1··

I

' rEN)IER WA'f.ER L PROr·RTY

---

I I -· /t'~

r-- - :r~ !

j

I

I

5380

-280

I

240

280

260

300

I 100

80

60

40

~

40

CROSS SECTION (STA. 34+68.62)'1\.

"'

60

80

100

120

140

160

5380 180

200

220

240

260

280

I

5440

5440

5420

5420

5400 54] 0 53BO

5380 300

2BO

260

240

220

200

1BO

160

140

100

BO

60

40

CROSS SECTION !STA. 41 +51.45) 20

£

20

20

40

100

BO

120

140

160

"'

5440

5420

5400

53BO 200

1BO

160

140

120

100

~

~

~

0

~

~

40

60

BO

100

1~

120

CROSS SECTION (STA. 46+02.27)/rt\,

i

6d

5440

~

5420

I

5420

I

5400

SECONDARY

'1W

PROpqSED GRAD

5400

53BO

53BO 140

120

100

BO

60

40

20

0

~

20

60

BO

100

120

140

160

CROSS SECTION (STA. 52+22.89)/f\.

Ni

i DATE

HEET REVI I N

CHERRY CREEK CORRIDOR IMPROVEMENTS

4110/2018

CIVIL C.13

FLOODPLAIN BENCH VARIES SEE GRADING PLAN

FLOODPLAIN BENCH VARIES SEE GRADING PLAN

44' -50'

~ffi wlc

°'"' BANK PROTECTION 2 SEE DETAIL, OWG. C.26

VARIES 6' T09'

BENCH VARIES O'T03'

BENCH VARIES 3'T06' 3'

VARIES 6' T09'

GRADE TO DRAIN, SEE GRADING PLAN (TYP.)

9"TOPSOJL 1' 0EEP LOW-FLOW

CHANNEL a·ToPSOIL

BANK PROTECTION 1 SEE DETAIL, OWG. C-26

20' BOlTOM WIDTH

BANKFULL CHANNEL WITH BENCH ON OUTSIDE BEND (LOOKING DOWNSTREAM)

··

8'-0"

VARIES, 9' TO 12'

g·TOPSOlL

BANK PROTECTION 1 SEE DETAIL, OWG. C.26

BANKFULL CHANNEL WITHOUT BENCH ON OUTSIDE BEND (LOOKING DOWNSTREAM)

'f

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas