You can copy from here when filling out the rest of the page.
Interested parties are hereby notified that the Walla Walla District has received an application for a Department of the Army permit for certain work in Waters of the United States, including wetlands, as described below in the attached documents.
Interested parties are hereby notified that the Walla Walla District has received an application for a Department of the Army permit for certain work in Waters of the United States, including wetlands, as described below in the attached documents:
APPLICANT: Martin Quill, Trestle Creek Investments, LLC
AGENT: Martin Taylor, James A. Sewell and Associates, LLC
U.S. ARMY CORPS OF ENGINEERS PROJECT MANAGER: Shane P. Slate, (208) 433-4474, shane.p.slate@usace.army.mil
PURPOSE: The excavation and discharge of fill material and the installation of dock and breakwater structures to improve lake access and safe boat moorage for the adjacent residential development.
WATERWAY: Lake Pend Oreille and Trestle Creek
LOCATION: The proposed project would be located on Lake Pend Oreille, within Sections 16, 17, and 21, of Township 57 North, Range 1 East, near latitude 48.283458º N and longitude -16.353176º W, and latitude 48.278333º N and longitude -116.350826º W, in Bonner County, near Hope, Idaho.
DRIVING DIRECTIONS: From Sandpoint, head east on Highway 200 to North Park Road to access the Northern Dock Area, turn on Idaho Country Road to access the Southern Dock Area.
AUTHORITY: This permit will be issued or denied under the authority of Section 404 of the Clean Water Act (33 U.S.C. 1344). A Department of the Army permit is required for the discharge of dredged or fill material into waters of the United States, including wetlands.
This permit will be issued or denied under the authority of Section 10 of the Rivers & Harbors Act of 1899 (33 U.S.C. 403). A Department of the Army permit is required for work or structures waterward of the ordinary high water mark located in or over navigable waters of the United States, including the excavation, dredging or deposition of material in navigable waters, or any alteration obstructing or affecting the course, location, condition, or capacity of the navigable waterway.
WORK: Construction of the Idaho Club Trestle Creek Marina project. The project was previously authorized on May 27, 2009 under DA Permit number NWW-2007-001218; extended on March 14, 2012 with the time limit for completing work under the previous permit expiring on March 15, 2017. No construction occurred under the original permit. No changes to the project designs from the previous permit are proposed.
The proposed project would involve the permanent discharge of 8,500 cubic yards of native material, 404 cubic yards of rock, 38 cubic yards of concrete, and the temporary discharge of 33 cubic yards of rock (equipment access road), into Lake Pend Oreille and Trestle Creek, associated with the modification and upgrading of an existing marina, comprised of two dock areas. The project also proposes to reconnect the North Fork Trestle Creek with its historical confluence to Trestle Creek.
In the north dock area: 1080 cubic yards of native material will be excavated below the ordinary high water mark of Lake Pend Oreille to remove a small upland island, creating an additional open water area of approximately 1.10 acres, and establishing a generally uniform boat basin depth of 2,055.5 feet. A total of 14,000 cubic yards of material will be excavated to remove the entire upland island as shown on drawing sheet 4 of 21. Approximately 8,500 cubic yards of this material will then be discharged into a 0.88 acre backwater area of the lake, creating uplands and a new shoreline. The new shoreline will be vegetated with native plantings. An existing boat ramp will also be removed and replaced by a new 20-foot by 100-foot long concrete boat ramp. A new dock system consisting of 105 boat slips will be constructed within the newly reconfigured marina area.
In the south dock area: rebuild an existing 8- by 100-foot breakwater and replace the existing dock system with a new dock system consisting of 19 slips. The shoreline in the south dock area will be stabilized using rock riprap.
The total dock and walkway area for both the North and South areas will total 20,158 square feet of decked area over Lake Pend Oreille. he North Fork of Trestle Creek will be returned to its original confluence with the main stem of Trestle Creek as part of a stream restoration plan aimed at providing fish passage during all flow stages of the Trestle Creek system. The restoration will increase aquatic habitat diversity by restoring in-channel pools, reestablish floodplain vegetation, and re-establish fish passage and fluvial connectivity
The applicant proposes the following measures to minimize impacts to Waters of the United States:
All excavation and fill work will be performed under dry conditions during the drawdown period for Lake Pend Oreille to reduce the possibility of turbidity impacts to the lake.
A vegetation restoration plan will be implemented and monitored for the reconstructed shoreline of Lake Pend Oreille and the riparian areas of Trestle Creek, within the project area.
Dock structures shall utilize light penetrative decking to reduce shading impacts from the dock system.
CONSTRUCTION PERIOD: Applicant proposes to perform construction during the fall/winter drawdown period of Lake Pend Oreille. The permit would authorize construction for a period of three (3) years.
OTHER ENVIRONMENTAL DOCUMENTS AND DA PERMITS ISSUED TO APPLICANT: The marina expansion was previously authorized under DA Permit No. NWW-2007-001218, issued May 27, 2009. The time limit for completing the work authorized by the permit was extended on March 14, 2012 and ended on March 15, 2017.
WATER QUALITY CERTIFICATION: This notice will also serve as a Public Notice that the Idaho Department of Environmental Quality (IDEQ) is evaluating whether to certify that the discharge of dredge and/or fill material proposed for this project will not violate existing water quality standards. A Department of the Army permit will not be issued until water quality certification has been issued or waived by the IDEQ, as required by Section 401 of the Clean Water Act. If water quality certification is not issued, waived or denied within sixty (60) days of this public notice date, and an extension of this period is not requested by and granted to the IDEQ, certification will be considered waived. Additionally, within thirty (30) days of this Public Notice, any person may provide written comments to IDEQ and request in writing that IDEQ provide them notice of their preliminary 401 Certification decision. Comments concerning Water Quality Certification for this project should be mailed to: Idaho Department of Environmental Quality, Coeur d’Alene Regional Office, 2110 Ironwood Parkway, Coeur d’Alene, Idaho 83814.
AQUATIC RESOURCE DESCRIPTION: Lake Pend Oreille and the Pend Oreille River comprise one of the largest water bodies in the state of Idaho. It is a natural lake that has been enlarged by the construction of the Albeni Falls Dam near Oldtown, ID, a multi-purpose project on the Pend Oreille River operated by the Corps of Engineers. It covers an area exceeding 90,000 acres of water and has a shoreline of 226 miles. The Albeni Falls Project is operated to maintain a water surface elevation of 2062.5 feet NGVD during summer recreation season and can be drawn down to 2051 feet NGVD during the winter. There are several communities around the lake including Hope, East Hope, Bayview, Laclede, Priest River, Dover and Sandpoint. Most of the riparian lands along the lake and river are privately owned. However, there are substantial areas in the southern portion of Lake Pend Oreille under federal ownership. Residences and summer cabins are common along much of the waterfront properties along the lake and river.
CULTURAL RESOURCES: Coordination is currently being conducted with the office of the Idaho State Historic Preservation Officer to determine if this activity will affect a site that is listed on the National Register of Historic Places, or a site that may be eligible for listing on the Register. We are also coordinating with the appropriate Tribal entity or the Tribal Historic Preservation Offices for the Confederated Salish and Kootenai Tribes of the Flathead Reservation, the Kalispel Tribe of Indians, and the Kootenai Tribe of Idaho Tribes, to determine if there are any tribal historic or cultural interests within the project area.
TRIBAL TREATY RIGHTSAND INTERESTS: Federal agencies acknowledge the federal trust responsibility arising from treaties, statues, executive orders and the historical relations between the United States and American Indian Tribes. The federal government has a unique trust relationship with federally recognized American Indian Tribes, including the Confederated Salish and Kootenai Tribes of the Flathead Reservation, the Kalispel Tribe of Indians, and the Kootenai Tribe of Idaho. The Corps has a responsibility and obligation to consider and consult on potential effects to Tribal rights, uses and interests. The Corps further recognizes there may be a need for additional and on-going consultation.
ENDANGERED SPECIES: The project is within the known or historic range of bull trout and their critical habitat. Coordination is currently being conducted with the U.S. Fish and Wildlife Service (USFWS) to determine if the activity will have any effect on species designated as endangered or threatened under the Endangered Species Act, or their critical habitat, under the Endangered Species Act of 1973 (87 Stat. 844).
ESSENTIAL FISH HABITAT: The Magnuson-Stevens Fishery Conservation and Management Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal agencies to consult with the National Marine Fisheries Service on all actions or proposed actions, permitted, funded or undertaken by the agency that may adversely affect Essential Fish Habitat (EFH). No EFH species are known to use the project area. Preliminarily, we have determined the described activity would have no effect on EFH.
ENVIRONMENTAL IMPACT STATEMENT: Preliminary review indicates the proposed activities will not require preparation of an Environmental Impact Statement. Comments provided will be considered in preparation of an Environmental Assessment.
EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact, including cumulative impacts, of the proposed activity on the public interest. This decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered, including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and in general, the needs and welfare of the people. In addition, our evaluation will include application of the EPA Guidelines (40 CFR 230) as required by Section 404(b)(1) of the Clean Water Act.
CONSIDERATION OF PUBLIC COMMENTS: The Corps of Engineers is soliciting comments from the general public; Federal, State and local agencies and officials, Tribal entities and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
PUBLIC HEARING: Any person may request in writing, within the comment period specified in this notice, that a public hearing be held to consider this proposed activity. Requests for a public hearing shall state specific reasons for holding a public hearing. A request may be denied if substantive reasons for holding a hearing are not provided or if there is otherwise no valid interest to be served.
COMMENT & REVIEW PERIOD: Interested parties are invited to provide comments on the proposed activity, which will become a part of the record and will be considered in the final decision. Please mail all comments to:
U.S. Army Corps of Engineers
Walla Walla District
Attn: Shane Slate
Coeur d'Alene Regulatory Office
1910 Northwest Boulevard, Suite 210
Coeur d'Alene, Idaho 83814-2676
Or email: shane.p.slate@usace.army.mil
Comments should be received no later than the comment due date of December 28, 2018, as indicated on this notice, to receive consideration.
Kelly J. Urbanek
Chief, Regulatory Division
Walla Walla District
Public Notice:
U.S. Army Corps
Of Engineers
Walla Walla District
201 North Third Avenue
Walla Walla, WA 99362-1876
Application for Permit
APPLICATION NO.: NWW- 2007-001218
WATERWAY: Lake Pend Oreille and Trestle Creek
APPLICANT: Trestle Creek Investments, LLC
DATE ISSUED: November 28, 2018
30-Day
Notice
END DATE: December 28, 2018
Interested parties are hereby notified that the Walla Walla District has received an
application for a Department of the Army permit for certain work in Waters of the United
States, including wetlands, as described below in the attached documents:
APPLICANT: Martin Quill, Trestle Creek Investments, LLC
AGENT: Martin Taylor, James A. Sewell and Associates, LLC
U.S. ARMY CORPS OF ENGINEERS PROJECT MANAGER:
Shane P. Slate, (208) 433-4474, shane.p.slate@usace.army.mil
PURPOSE:
The excavation and discharge of fill material and the installation of dock and breakwater
structures to improve lake access and safe boat moorage for the adjacent residential
development.
WATERWAY: Lake Pend Oreille and Trestle Creek
LOCATION: The proposed project would be located on Lake Pend Oreille, within
Sections 16, 17, and 21, of Township 57 North, Range 1 East, near latitude 48.283458º
N and longitude 116.353176º W, and latitude 48.278333º N and longitude
116.350826º W, in Bonner County, near Hope, Idaho.
DRIVING DIRECTIONS: From Sandpoint, head east on Highway 200 to North Park
Road to access the Northern Dock Area, turn on Idaho Country Road to access the
Southern Dock Area.
CENWW-RD
November 28, 2018
Application Number: NWW-2007-001218
AUTHORITY:
This permit will be issued or denied under the authority of Section 404 of the Clean
Water Act (33 U.S.C. 1344). A Department of the Army permit is required for the
discharge of dredged or fill material into waters of the United States, including wetlands.
This permit will be issued or denied under the authority of Section 10 of the Rivers &
Harbors Act of 1899 (33 U.S.C. 403). A Department of the Army permit is required for
work or structures waterward of the ordinary high water mark located in or over
navigable waters of the United States, including the excavation, dredging or deposition
of material in navigable waters, or any alteration obstructing or affecting the course,
location, condition, or capacity of the navigable waterway.
WORK: Construction of the Idaho Club Trestle Creek Marina project. The project was
previously authorized on May 27, 2009 under DA Permit number NWW-2007-001218;
extended on March 14, 2012 with the time limit for completing work under the previous
permit expiring on March 15, 2017. No construction occurred under the original permit.
No changes to the project designs from the previous permit are proposed.
The proposed project would involve the permanent discharge of 8,500 cubic yards of
native material, 404 cubic yards of rock, 38 cubic yards of concrete, and the temporary
discharge of 33 cubic yards of rock (equipment access road), into Lake Pend Oreille
and Trestle Creek, associated with the modification and upgrading of an existing
marina, comprised of two dock areas. The project also proposes to reconnect the
North Fork Trestle Creek with its historical confluence to Trestle Creek.
In the north dock area, 1080 cubic yards of native material will be excavated
below the ordinary high water mark of Lake Pend Oreille to remove a small
upland island, creating an additional open water area of approximately 1.10
acres, and establishing a generally uniform boat basin depth of 2,055.5 feet. A
total of 14,000 cubic yards of material will be excavated to remove the entire
upland island as shown on drawing sheet 4 of 21. Approximately 8,500 cubic
yards of this material will then be discharged into a 0.88 acre backwater area of
the lake, creating uplands and a new shoreline. The new shoreline will be
vegetated with native plantings. An existing boat ramp will also be removed and
replaced by a new 20-foot by 100-foot long concrete boat ramp. A new dock
system consisting of 105 boat slips will be constructed within the newly
reconfigured marina area.
-2-
CENWW-RD
November 28, 2018
Application Number: NWW-2007-001218
In the south dock area, rebuild an existing 8- by 100-foot breakwater and replace
the existing dock system with a new dock system consisting of 19 slips. The
shoreline in the south dock area will be stabilized using rock riprap.
The total dock and walkway area for both the North and South areas will total
20,158 square feet of decked area over Lake Pend Oreille.
The North Fork of Trestle Creek will be returned to its original confluence with the
main stem of Trestle Creek as part of a stream restoration plan aimed at
providing fish passage during all flow stages of the Trestle Creek system. The
restoration will increase aquatic habitat diversity by restoring in-channel pools,
reestablish floodplain vegetation, and re-establish fish passage and fluvial
connectivity.
The applicant proposes the following measures to minimize impacts to Waters of the
United States.
All excavation and fill work will be performed under dry conditions during the
drawdown period for Lake Pend Oreille to reduce the possibility of turbidity
impacts to the lake.
A vegetation restoration plan will be implemented and monitored for the
reconstructed shoreline of Lake Pend Oreille and the riparian areas of Trestle
Creek, within the project area.
Dock structures shall utilize light penetrative decking to reduce shading impacts
from the dock system.
CONSTRUCTION PERIOD: Applicant proposes to perform construction during the
fall/winter drawdown period of Lake Pend Oreille. The permit would authorize
construction for a period of three (3) years.
OTHER ENVIRONMENTAL DOCUMENTS AND DA PERMITS ISSUED TO
APPLICANT: The marina expansion was previously authorized under DA Permit No.
NWW-2007-001218, issued May 27, 2009. The time limit for completing the work
authorized by the permit was extended on March 14, 2012 and ended on March 15,
2017.
WATER QUALITY CERTIFICATION: This notice will also serve as a Public Notice that
the Idaho Department of Environmental Quality (IDEQ) is evaluating whether to certify
that the discharge of dredge and/or fill material proposed for this project will not violate
existing water quality standards. A Department of the Army permit will not be issued
until water quality certification has been issued or waived by the IDEQ, as required by
-3-
CENWW-RD
November 28, 2018
Application Number: NWW-2007-001218
Section 401 of the Clean Water Act. If water quality certification is not issued, waived or
denied within sixty (60) days of this public notice date, and an extension of this period is
not requested by and granted to the IDEQ, certification will be considered waived.
Additionally, within thirty (30) days of this Public Notice, any person may provide written
comments to IDEQ and request in writing that IDEQ provide them notice of their
preliminary 401 Certification decision. Comments concerning Water Quality Certification
for this project should be mailed to: Idaho Department of Environmental Quality, Coeur
d'Alene Regional Office, 2110 Ironwood Parkway, Coeur d'Alene, Idaho 83814.
AQUATIC RESOURCE DESCRIPTION: Lake Pend Oreille and the Pend Oreille River
comprise one of the largest water bodies in the state of Idaho. It is a natural lake that
has been enlarged by the construction of the Albeni Falls Dam near Oldtown, ID, a
multi-purpose project on the Pend Oreille River operated by the Corps of Engineers. It
covers an area exceeding 90,000 acres of water and has a shoreline of 226 miles. The
Albeni Falls Project is operated to maintain a water surface elevation of 2062.5 feet
NGVD during summer recreation season and can be drawn down to 2051 feet NGVD
during the winter. There are several communities around the lake including Hope,
East Hope, Bayview, Laclede, Priest River, Dover and Sandpoint. Most of the riparian
lands along the lake and river are privately owned. However, there are substantial
areas in the southern portion of Lake Pend Oreille under federal ownership.
Residences and summer cabins are common along much of the waterfront properties
along the lake and river.
CULTURAL RESOURCES: Coordination is currently being conducted with the office of
the Idaho State Historic Preservation Officer to determine if this activity will affect a site
that is listed on the National Register of Historic Places, or a site that may be eligible for
listing on the Register. We are also coordinating with the appropriate Tribal entity or the
Tribal Historic Preservation Offices for the Confederated Salish and Kootenai Tribes of
the Flathead Reservation, the Kalispel Tribe of Indians, and the Kootenai Tribe of Idaho
Tribes, to determine if there are any tribal historic or cultural interests within the project
area.
TRIBAL TREATY RIGHTS and INTERESTS: Federal agencies acknowledge the
federal trust responsibility arising from treaties, statues, executive orders and the
historical relations between the United States and American Indian Tribes. The federal
government has a unique trust relationship with federally recognized American Indian
Tribes, including the Confederated Salish and Kootenai Tribes of the Flathead
Reservation, the Kalispel Tribe of Indians, and the Kootenai Tribe of Idaho.
-4-
CENWW-RD
November 28, 2018
Application Number: NWW-2007-001218
The Corps has a responsibility and obligation to consider and consult on potential
effects to Tribal rights, uses and interests. The Corps further recognizes there may be a
need for additional and on-going consultation.
ENDANGERED SPECIES: The project is within the known or historic range of bull trout
and their critical habitat. Coordination is currently being conducted with the U.S. Fish
and Wildlife Service (USFWS) to determine if the activity will have any effect on species
designated as endangered or threatened under the Endangered Species Act, or their
critical habitat, under the Endangered Species Act of 1973 (87 Stat. 844).
ESSENTIAL FISH HABITAT: The Magnuson-Stevens Fishery Conservation and
Management Act, as amended by the Sustainable Fisheries Act of 1996, requires all
Federal agencies to consult with the National Marine Fisheries Service on all actions or
proposed actions, permitted, funded or undertaken by the agency that may adversely
affect Essential Fish Habitat (EFH). No EFH species are known to use the project area.
Preliminarily, we have determined the described activity would have no effect on EFH.
ENVIRONMENTAL IMPACT STATEMENT: Preliminary review indicates the proposed
activities will not require preparation of an Environmental Impact Statement. Comments
provided will be considered in preparation of an Environmental Assessment.
EVALUATION: The decision whether to issue a permit will be based on an evaluation
of the probable impact, including cumulative impacts, of the proposed activity on the
public interest. This decision will reflect the national concern for both protection and
utilization of important resources. The benefit which reasonably may be expected to
accrue from the proposal must be balanced against its reasonably foreseeable
detriments. All factors which may be relevant to the proposal will be considered,
including the cumulative effects thereof; among those are conservation, economics,
aesthetics, general environmental concerns, wetlands, historic properties, fish and
wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion
and accretion, recreation, water supply and conservation, water quality, energy needs,
safety, food and fiber production, mineral needs, consideration of property ownership
and in general, the needs and welfare of the people. In addition, our evaluation will
include application of the EPA Guidelines (40 CFR 230) as required by Section
404(b)(1) of the Clean Water Act.
CONSIDERATION OF PUBLIC COMMENTS: The Corps of Engineers is soliciting
comments from the general public; Federal, State and local agencies and officials,
Tribal entities and other interested parties in order to consider and evaluate the impacts
-5-
CENWW-RD
November 28, 2018
Application Number: NWW-2007-001218
of this proposed activity. Any comments received will be considered by the Corps of
Engineers to determine whether to issue, modify, condition or deny a permit for this
proposal. To make this decision, comments are used to assess impacts on endangered
species, historic properties, water quality, general environmental effects and the other
public interest factors listed above. Comments are used in the preparation of an
Environmental Assessment and/or an Environmental Impact Statement pursuant to the
National Environmental Policy Act. Comments are also used to determine the need for
a public hearing and to determine the overall public interest of the proposed activity.
PUBLIC HEARING: Any person may request in writing, within the comment period
specified in this notice, that a public hearing be held to consider this proposed activity.
Requests for a public hearing shall state specific reasons for holding a public hearing. A
request may be denied if substantive reasons for holding a hearing are not provided or if
there is otherwise no valid interest to be served.
COMMENT & REVIEW PERIOD: Interested parties are invited to provide comments on
the proposed activity, which will become a part of the record and will be considered in
the final decision.
Please mail all comments to:
U.S. Army Corps of Engineers
Walla Walla District
Attn: Shane Slate
Coeur d'Alene Regulatory Office
1910 Northwest Boulevard, Suite 210
Coeur d'Alene, Idaho 83814-2676
Or email: shane.p.slate@usace.army.mil
Comments should be received no later than the comment due date of December 28,
2018, as indicated on this notice, to receive consideration.
Kelly J. Urbanek
Chief, Regulatory Division
Walla Walla District
Enclosures:
PN_NWW-2007-001218_Drawings.pdf
PN_NWW-2007-001218_TrestleCreekDrawings.pdf
-6-
PROJECT
LOCATIO~
t----··+-····· -·· -· . __.____'.
'
L1Ke
Pe,t'D
~..,
BASE MAPS: USGS "TROUT PEAK, ID"
AND DELORME STREET ATLAS
NOTTO SCALE
USACE REF. N0.:2007-1218-C01 IDL REF. NO.: L-96-S-602A
FOR: PEND OREILLE BONNER DEVELOPMENT, LLC
151 CLUBHOUSE WAY
SANDPOINT, ID 83864
PROJECT: THE IDAHO CLUB LAKESIDE
PROJECT LOCATION: LAKE PEND OREILLE I TRESTLE CREEK
SANDPOINT, ID 83864
LEGAL: A PORTION OF SEC's 16 & 21, T 57 N, R 1 E, BOISE MER.
COUNTY: BONNER
STATE: IDAHO
APPROX LAT/LONG: N 48° 16.819'; W 116° 21.031'
REVISED FOR CORPS 6/2008
SHEET
1I ofOF21£.. 7...--
·
.'
·
TRESTLE CREEK
NORTH BRANCH
II_
1". 80'
l040
·IO
Mjli
H
ICALllHPHT
BASE PLANS BY
RIVER DESIGN GROUP, S.14-2007.
THE IDAHO CLUB LAKESIDE
TRESTLE CREEK VICINITY I LOCATION MAP
USACE REF. NO.: 2007-1218-C01
FOR: PEND OREILLE BONNER DEVELOPMENT, LLC
151 CLUBHOUSE WAY
SANDPOINT, ID 83864
PROJECT: THE IDAHO CLUB LAKESIDE
PROJECT LOCATION: LAKE PEND OREILLE
SANDPOINT, ID 83864
LEGAL: A PORTION OF SEC 21, T 57 N, R 1 E, BOISE MER.
COUNTY: BONNER
STATE: IDAHO
APPROX LAT/LONG: N 48" 18.819'; W 116" 21.031'
DATE: JOINT APP DATED 912007;
REVISED FOR CORPS PUBLIC NOTICE 1212007
SHEET
OF 2..
z2 of 21 z..
·
·
LAKE
ISLAND~
TOBE
RElolCNEO
REMOVE
EXISTINO
'tOATRAMP
PEND
OREILLE
2062.5 & 2051 ELEVATION SURVEY BY
J.R.S. SURVEYING, INC., 2007.
~
1·
0
=200'
100
200
THE IDAHO CLUB LAKESIDE - NORTH
EXISTING SHORELINE CONDITIONS
USAGE REF. N0.:2007-1218-C01 IDL REF. NO.: L-96-S-002A
FOR: PEND OREILLE BONNER DEVELOPMENT, LLC
151 CLUBHOUSE WAY
SANDPOINT, ID 83864
PROJECT: THE IDAHO CLUB LAKESIDE
PROJECT LOCATION: LAKE PEND OREILLE I TRESTLE CREEK
SANDPOINT, ID 83864
LEGAL: A PORTION OF SEC's 16 & 21, T 57 N, R 1 E, BOISE MER.
COUNTY: BONNER
STATE: IDAHO
APPROX LAT/LONG: N 48° 16.819'; W116' 21.031'
REVISED FOR CORPS 6/2008
OF "Z. V
3 of
21
SHEET )
SCALE IN FEET
·
·
0.88 Al:. I
PROPOSED
AU.
LAKE
PROPOSED
EXCAVATION
&
DREDGINCJ
e.mcv
1.10AC/1080CYblilow
Ot-l't"tM; 14,CDO CY 9bow
OtMU
ElCISTINO
UP\NCl
UDAC
PEND
OREILLE
2062.5 & 2051 ELEVATION SURVEY BY
J.R.S. SURVEYING, INC., 2007.
~
1" = 200'
0
100
SCALE IN FEET
200
THE IDAHO CLUB LAKESIDE - NORTH
PROPOSED SHORELINE
USAGE REF. N0.:2007-1218-C01 IDL REF. NO.: L-96-S-602A
FOR: PEND OREILLE BONNER DEVELOPMENT, LLC
151 CLUBHOUSE WAY
SANDPOINT, ID 83864
PROJECT: THE IDAHO CLUB LAKESIDE
PROJECT LOCATION: LAKE PEND OREILLE I TRESTLE CREEK
SANDPOINT, ID 83864
LEGAL: A PORTION OF SEC's 16 & 21, T 57 N, R 1 E, BOISE MER.
COUNTY: BONNER
STATE: IDAHO
APPROX LAT/LONG: N 48°16.819';W116° 21.031'
REVISED FOR CORPS 612008
SHEET
v
4 ofOF21Z.,~
EXISTING CONDITIONS
·
·
EXISTING
ROAD
:::::::::::::::::-: ::::::::::.::::::~p::----
A1
A
PROPOSED SHORELINE
FESCUE BLEND
-- -- -·---------...
- ----------------···--- -----------·-- ------- ----- -·-·----------·-· ---·-----·-.
-----·--------
-----------·-----·----------·-----··-
EXISTING CONDITIONS
EXISTING
DOCK
EXISTING
SIDE-TIE
DOCK
------·--------------.--
B
PROPOSED SHORELINE
PROPOSED
OHW2062.5
- - - .- - ...
- - - --
..
---.-- ---------.--...-··----...------··----.-
..
----- ----··.----....
..
...
.-----... -··
- . ----.- .
-
- - -
- - - --------------------------------·--...---------··---...
---··
------
- ------.-. - - -- ---
- ...
- ---
--. ----------- -...
--------. ------...-- -------....
----.--·---·····
-----------------.---....- -----------------·-.-------------..-------
-- ---...---·. -----...
-...
--- -:-::::::::~:::::-:-:-:-·------.----:-:-:-::::::~::::::-:-:-·---:-;:::::::::::::=:=:=~- ,
BB
NOTTO SCALE
THE IDAHO CLUB LAKESIDE - NORTH
CROSS SECTIONS
USACE REF. N0.:2007-1218-C01 IDL REF. NO.: L-96-S-602A
FOR: PEND OREILLE BONNER DEVELOPMENT, LLC
151 CLUBHOUSE WAY
SANDPOINT, ID 83864
PROJECT: THE IDAHO CLUB LAKESIDE
PROJECT LOCATION: LAKE PEND OREILLE I TRESTLE CREEK
SANDPOINT, ID 83864
LEGAL: A PORTION OF SEC's 16 & 21, T 57 N, R 1 E, BOISE MER.
COUNTY: BONNER
STATE: IDAHO
APPROX LAT/LONG: N 48°16.819';W116° 21.031'
REVISED FOR CORPS 612008
2_, V
5 ofOF21
SHEET (
·
·
LAKE
PEND
REMOVE EXISTING
~TRAMP
BO' SETlllGK
FROM TRESTLE CRK
MAIH CHANNEL
EGSTINO TREES 1H SETBACK TO BE
RETAINED
OREILLE
OBSERVATION
PlATFORM
2062.5 & 2051 ELEVATION SURVEY BY
J.R.S. SURVEYING, INC., 2007.
~
1" = 200'
0
100
SCALE IN FEET
200
THE IDAHO CLUB LAKESIDE - NORTH
PROPOSED DOCK, SETBACKS, & BOAT LAUNCH RAMP PLAN
USACE REF. N0.:2007-1218-C01 IDL REF. NO.: L-96-S-602A
FOR: PEND OREILLE BONNER DEVELOPMENT, LLC
151 CLUBHOUSE WAY
SANDPOINT, ID 83864
PROJECT: THE IDAHO CLUB LAKESIDE
PROJECT LOCATION: LAKE PEND OREILLE/TRESTLE CREEK
SANDPOINT, ID 83864
LEGAL: A PORTION OF SEC's 16 & 21, T 57 N, R 1 E, BOISE MER.
COUNTY: BONNER
STATE: IDAHO
APPROX LAT/LONG: N 48°16.819';W116° 21.031'
REVISED FOR CORPS 612008
2..- 7.
6 of 21
SHEET'' OF
·
·
FESCUE BLEND _ __
PROPOSED
OHW
2062.5'
LAKE
PEND
OREILLE
PROPOSED
OHW
2062.5'
ROCK&
JOINT
PLANTINGS
FESCUE
BLEND
REMOVE EXISTING
BOAT RAMP
NATIVE
FESCUES
ROCK&
JOINT
PLANTINGS
OBSERVATION
PLATFORM
2062.5 & 2051 ELEVATION SURVEY BY
J.R.S. SURVEYING, INC., 2007.
1" = 100'
0
50
SCALE IN FEET
100
THE IDAHO CLUB LAKESIDE - NORTH
PROPOSED DOCKS, BREAKWATER PLAN DETAIL
USAGE REF. N0.:2007-121~01 IDL REF. NO.: L-96-S-B02A
FOR: PEND OREILLE BONNER DEVELOPMENT, LLC
151 CLUBHOUSE WAY
SANDPOINT, ID 83864
PROJECT: THE IDAHO CLUB LAKESIDE
PROJECT LOCATION: LAKE PEND OREILLE I TRESTLE CREEK
SANDPOINT, ID 83864
LEGAL: A PORTION OF SEC's 16 & 21, T 57 N, R 1 E, BOISE MER.
COUNTY: BONNER
STATE: IDAHO
APPROX LAT/LONG: N 48°16.819';W116° 21.031'
REVISED FOR CORPS 6/2008
SHEET 7 of
OF21
7
2,, V
\
o~:p
BOAT LAUNCH
& SERVICE
PLAN VIEW
·
.. ..:
CONCRETE BOAT RAMP20' WX 100' LONG
SEPTIC PUMP
STATION
FLOATING
PILES AT iocK 10' x 60'
INSET IN DOg~ END ON BOTH SIDES
RAMP4' X 40'
NO PILES
NTS
---------
BOATLAUN~C~HiB;~p------~
ELEV. 2062.5
& SERVICE o~:p
CROSS SECTION
_ _ _.J__ _ _ _ _ _ _ __
OHW
RAMP
4'X40'
FLOATING
DOCK
25'
____ I
NTS
ELEV. 2051
OUTSIDE OF
DOCK AREA
20'WI
CONCR~~:~go·
LONG
STRUCTU
AT RAMP
-~PR~O=.::....:PO~S~E~D~BOQ~TRA
L DETAILS
TI
LAUNCH
RAMP AR
USACE REF N
FOR· PEND. o.,2007-121s co
151
BONNER
SANDPOINT I WAY
CLUBHO~~~LLE
EA
b~ LOPMENT,
REF. NO.: L-96-S
LLC -602A
PROJECT· TH D 83864
PROJECT.LOC~~~~? CLUB LAKESIDE
~EGAL' A~;,g~i, ~~ND OREILLE I TRESTLE CR
e ~~~~DOCK PILE
TH DOCK
O FLOAT DOCK
INSETOR BESIDE
PILE DOCK
OUNTY' BONNER OF SEC's 16 &21
EEK
IDAHOT 57 N, R 1 E, BOISE MER
4~}°ATE:
SHEETRrl~~~~R,:;~~
APPROX LAT/LONG: N
8 of 21
116° 21.031'
.
FIXED DOCK
ELEV. 2062.5
OHW
·
>----~28'
OR40'----<
PRE-CAST CONCRETE
PANELS ON GAL TRUSS
OLWELEV.
2051
OUTSIDE OF
DOCK AREA
RIP RAP 114 CUBIC YD PER
LINEAR FT
TO PROTECT FROM TOE
SCOUR _,_
FLOATING DOCK
40'SLJps
FIXED DOCK
2 PILES ON EACH
SIDE ON EACH SIDE
BENEATH
BREAKWATER 10'
APART
90
I
~
~
71
89
72
88
73
87
74
86
75
76
85
0
rrJ
Oo
N
0
±53'
·
.48. .
FIXED DOCKS
3 PILES ON FINGER
DOCK BENEATII
DOCK 10' APART
BOARDWALK.
NO PILES
BOARDWALK ON
GROUND
1"
=30'
1" = 60'
0
84
77 78 79 80 81
L_
STRUCTURAL DETAILS
40's11--~~~~TY_P_IC_A_L_DO_C_K~~~~-;
USAGE REF. N0.:2007-1218-C01 IDL REF. NO.: L-96-S-602A
FOR: PEND OREILLE BONNER DEVELOPMENT, LLC
151 CLUBHOUSE WAY
SANDPOINT, ID 83864
PROJECT: THE IDAHO CLUB LAKESIDE ·
PROJECT LOCATION: LAKE PEND OREILLE I TRESTLE CREEK
SANDPOINT, ID 83864
LEGAL: A PORTION OF SEC's 16 & 21, T 57 N, R 1 E, BOISE MER.
COUNTY: BONNER
STATE: IDAHO
APPROX LAT/LONG: N 48° 16.819'; W 116° 21.031'
REVISED FOR CORPS 6/2008
.
SHEET
9.
9 ofOF21i
'/._./
·
..
.-u.
·
DOCKS SHALL HAVE A
uvn
DECK THAT IS
··-a·
ABOVE THE HIGH WATER LEVEL.
·
ALL DIMENSION ~UMllEll (Oi£PT r~ BOARD AHO DECKING) SHALL BE DOUG rlll/SOUTHUIH .PINE, CRAOE-H0,2 Oii
ICTT[R, PRESSURE ·TREAJED WJTH WATERBORNE SALT-CC.I., TO A RETENTION LEYEl
.40p~f (AWPB-LPZZ). fACIA
.
·
·
IOAllD AHO DECKING SHALL BE CEDAR, ORADE-H0.2 OR BETICR.
or
All SCREWS SHA.LL HAVE A RUST PROOF FINISH SUCH .AS HOT-DIP GALVAHIICO, ALUMINUM. OR STIJHLESS STEEL.
~~~'i;.f~IS~~E_HERS, INCLUDING LAG BOLTS, MACHIN[ BOLTS, ,WASHtllS AHO NUTS SHALi; HAVE A. SIMILAR RUST
CHAMFER CHO
CHANNEL (TlP)
or
NOTCH OUT PILING SO THAT
WEB Of CHANNEL RESTS OH
or
TOP
'Iw
I----.-
o.
0
PIUN!i (ti'P) ··
3/.J." DIA. WEEP HOLE BELOW
LOW WATER l£Vtt. (TlP)
IMBEOMEHT OE:PTH
.S IN01¢ATEO BY OWNER
SECTION VIEW
FASTENER LEG£.ND:·
@
'
@
©
MATERIAL LEGEND:
0
JOISTS TO STEEL: '1/2" ·X 8" GALV. BOLTS
W/WASHERS ANO .HUTS THROUGH ORILLEO HOLES AT
EACH BEARING. RECESS BOLT HEADS IN JOIST.
"·
·
~WO
fAC,..::
16'1 COi.IMON DRIVE SCA[WS EVERY 12'
ALONG JOISTS ANO £VERY CROSS TIE BEARING. SPACE ·
HAILS I 1/:i." FT!OM £lt0 or Fot.CIA.
DECKING: TllREE· I 5d °COWMON oiiivE SCREWS PER
BEARlllG. SPAC[ I l/2"'fRO~EHO AHO 3/.J." F'ROM
EOG[
QECK BOARDS.
or
®
,
©
SPACERS: TWO 16d 'COMMON DIJIV[ SCREWS-PER ENO.
SPACE I 1/2" f'ROM ENO AND 3/.J." fROW EDGE or
SPACERS.
RAIL: TwO 8" SPIKES PER BEAAIHG THROU!iH DRILLED
HOLES TO AVolO SPUTTINO. SPA~[ I 3/,>," FROM END
'PF SPACER AND' 3/.J.' f.ROM E~E Of !!AIL.
ilONNER COUNTY PUBLIC
WORKS-WATE.RWAYS
NOTTO SCALE
(!)
@
0
©
4X4 COHTINUOUS RIJL
2X4X12'
SPACE~
E_V[RY 12"
:UI CEDAR OE.CKIHG
2.Xll Cl:DAR r.i.cu BOAR~
0· d5 JOISTS
@· c
·
~11.5 STEU
CHANNEL
.0
©
4"XB"Xl/4" STEIL PLATE
@
L 2X2Xl/4" STEEL AHGLt
10' OU. m£L Pll.IHG (WALL: 3/1&"-~~11')
/0 1
I§ PIER DOCK
STANDARD DRAWING
NO. W-03
STRUCTURAL DETAILS
TYPICAL PIER DOCK CROSS SECTION
USACE REF. NO:: 2007-1218-C01
FOR: PEND OREILLE' BONNER DEVELOPMENT, LLC
151 CLUBHOUSE WAY
.
SANDPOINT, ID 83864 ·
PROJECT; THE IDAHO CLUB LAKESIDE
PROJECT LOCATION: LAKE PEND OREILLE
. SANDPOINT, ID 83864
LEGAL: A PORTION OF SEC 21, T 67 N, R 1 E, BOISE MER.
COUNTY: BONNER
STATE: IDAHO
·
APPROX ~T/LONG: N 45· 1B.819~W 116° 21.031'
DATE: JOINT APP DATED 9/2007;
REVISED FOR C RP PUBLIC NOTICE 1
7
SHEET
OF Z. 'Z
10 of 21
·
\
\
LAKE
·
''
\
\
\t
~.
PEND
\
~\\\
LAKE
\;
PEND
~
OREILLE
2062.5 & 2051 ELEVATION SURVEY BY
J.R.S. SURVEYING, INC., 2007.
~
1" = 200'
0
100
200
'\
THE IDAHO CLUB LAKESIDE - SOUTH
EXISTING & PROPOSED DOCKS
USACE REF. N0.:2007-1218-C01 IDL REF. NO.: L-96-S-602A
FOR: PEND OREILLE BONNER DEVELOPMENT, LLC
151 CLUBHOUSE WAY
SANDPOINT, ID 83864
PROJECT: THE IDAHO CLUB LAKESIDE
PROJECT LOCATION: LAKE PEND OREILLE I TRESTLE CREEK
SANDPOINT, ID 83864
· lfEGAL: A PORTION OF SEC's 16 & 21, T 57 N, R 1 E, BOISE MER.
COUNTY: BONNER
STATE: IDAHO
APPROX LAT/LONG: N 48°16.819';W116° 21.031'
REVISED FOR CORPS 6/2008
SHEET
SCALE IN FEET
\
/J.11 of 21
OF'l..-1..-
OHWM 2062.5'
EXISTING
BREAKWATER
[TO BE REBUILl]
\\
2062.5 & 2051 ELEVATION SURVEY BY
J.R.S. SURVEYING, INC., 2007.
1"= 100'
0
50
SCALE IN FEET
100
THE IDAHO CLUB LAKESIDE - SOUTH
PROPOSED DOCK LAYOUT DETAIL
USACE REF. N0.:2007-1218-C01 IDL REF. NO.: L-96-S-602A
FOR: PEND OREILLE BONNER DEVELOPMENT, LLC
151 CLUBHOUSE WAY
SANDPOINT, ID 83864
PROJECT: THE IDAHO CLUB LAKESIDE
PROJECT LOCATION: LAKE PEND OREILLE I TRESTLE CREEK
SANDPOINT, ID 83864
LEGAL: A PORTION OF SEC's 16 & 21, T 57 N, R 1 E, BOISE MER.
COUNTY: BONNER
STATE: IDAHO
APPROX LAT/LONG: N 48°16.819';W116° 21.031'
REVISED FOR CORPS 612008
i- 1,/'
12 of 21
SHEET,,, OF
·
·
....
1· 80'
~
.. .. .. ..
kiiil
!!!!!!!
SCALE IN FEET
BASE Pl.ANS BY
RIVER DESIGN GROUP, 8·1+2007.
...
l~S~~±±±tt±=t±ttti±t±±=±~:
~~1-----'1--~l--~~~+--~+--~+-~-l---1---+---1---1---1-~-4~-4---1-~l--~+--~+--~-l-~+-~+-~+-~-l-·a
eoo
an
uo
w
t100
475
450
czs
400
315
350
m
300
215
2so
m
200
115
1so
.
1:zs
ioo
15
25
SlAllON!ll
-
!1111"11 Clnlund
ROCK Sl!P POOi.
- - - EXISlfjG CHANIEI.
LOGWUI
fZlZZ] EXISlfjGCHANNElfll.L
ENOINEEREO
DEBRIS
~
flOODPl..AW ElCCAVAllON
er;~::!~ EXIST~GROAD
ccma.E GRAD!
COllTRa.
THE IDAHO CLUB LAKESIDE
TRESTLE CREEK RESTORATION PLAN & PROFILE
·r ··T·-·r-..·-r~-·-·,·-r-i"'
1 L~·,
i
... !
t:-...
~·-.....
]·..L.._: :·;- ::.:.~·! _.:.: ...
! J __ J__I
·0. . '".
.
:.. ·..,--- - 7 - ..·-··· .... ~-·--
Fll VOLUMI! 125 CY
NTS
USACE REF. NO.: 2007-1218-C01
FOR: PEND OREILLE BONNER DEVELOPMENT, LLC
151 CLUBHOUSE WAY
SANDPOINT, ID 83864
PROJECT: THE IDAHO CLUB LAKESIDE
PROJECT LOCATION: LAKE PEND OREILLE
SANDPOINT, ID 83864
LEGAL: A PORTION OF SEC 21, T 57 N, R 1 E, BOISE MER.
COUNTY: BONNER
STATE: IDAHO
APPROX LAT/LONG: N 48" 16.819'; W 116" 21.031'
DATE: JOINT APP DATED 9/2007;
REVISED FOR CORPS PUBLIC NOTICE 12/2007
SHEET (
OF 'Z.. '2.
4
13 of 21
0
'.
.·
··
'
XS-1 STA0+82
~111111-1111-llllllllllll~
~1111111111111111·1111111111~~
~111111111]11111-llllfllll~llll;~
rn11111111111111111·11111111111111m11m1~
I~lllllllllllllllilllllllllll·lllllllllllllllllllll
XS-2 STA1+19
XS-3 STA 1+79
X9-4 STA 2+21
XS-5 STA 2+87
NOTTO SCALE
-
EXISTtlGetwft!L
-
PROPOSED FlDDDPLAIN
~FlDOD~CUT
-
PROPOSED ow.IE!.
IBl~Nl!LfU
BASE PLANS BY
RIVER DESIGN GROUP, 8-14·2007.
THE IDAHO CLUB LAKESIDE
TRESTLE CREEK RESTORATION CROSS SECTION 1
USACE REF. NO.: 2007-1218-C01
FOR: PEND OREILLE BONNER DEVELOPMENT, LLC
151 CLUBHOUSE WAY
SANDPOINT, ID 83864
PROJECT: THE IDAHO CLUB LAKESIDE
PROJECT LOCATION: LAKE PEND OREILLE
SANDPOINT, ID 83864 .
LEGAL: A PORTION OF SEC 21, T 57 N, R 1 E, BOISE MER.
COUNTY: BONNER
STATE: IDAHO
.
APPROX LAT/LONG: N 48" 16.819':W 116" 21.031'
DATE: JOINT APP DATED 9/2007;
. REVISED FOR CORPS PUBLIC NOTICE 12/2007
SHEET / $' OF 'Z. '2,
14 of 21
\
·
'
·
X5-6 STA3+26
~11111111·11111111~111111111111111~
~II Ill IlIllIlIl IIIll IIIl IIll ll111:1111111111111111111111111
XS-7 STA3+48
9114
Xs-8 STA 4+99
-:-1-~t-+-+-t-i-!--l-+-l-l-f--+-t-+-+-!-+-+-+-t-\-t-1-+-i-t-iH-t--t-l-i-t-l-I
TTl~...,_,....,.....,.....,-~..,--,.....,-,.~--r-....-r-r-r.......-.--.-.-...-~.--.-.-.·-
~·~
892 -
:+-· r-- -
i-t---
.
9IM
·+-t-t-t-t-1-t-t-t-t-t-t-t-t-t-t--+-t-t-1-1--t-t-t-1-;-c -+-<-+-+-+--+--+--+--+--- 1112
Xs-9 STA 5+40
-
9112
atO
811
-ru
' ...
I-· -
I
· u
· u
-...
,.. I/
!"
.... ,,.
..
.....
,
....
/
~-
D
'
IO
IU
IO
IM
XS-10 STA5+69
~~Ill IIIH·Illllil IIl!l Illll Ill lIIll IIIll IIIm
NOTTO SCALE
-
EXISTJolO CHAllNEL
-
PAOPOSEDR.~
~
R.OODPl.AIN CUT
I
II
'
__ !_ _____ ,...,. .
--!
BASE Pt.ANS BY
RIVER DESIGN GROUP, 8-14-2007.
THE IDAHO CLUB LAKESIDE
TRESTLE CREEK RESTORATION CROSS SECTION 2
USACE REF. NO.: 2007-1218-C01
FOR: PEND OREILLE BONNER DEVELOPMENT, LLC
151 CLUBHOVSE WAY
SANDPOINT, ID 83864
PROJECT: THE IDAHO CLUB LAKESIDE
PROJECT LOCATION: LAKE PEND OREILLE
SANDPOINT, ID 83864
LEGAL: A PORTION OF SEC 21, T 57 N, R 1 E, BOISE MER.
COUNTY: BONNER
STATE: IDAHO
APPROX LAT/LONG: N 48" 16.819'; W 116" 21.031'
DATE: JOINT APP DATED 9/2007;
REVISED FOR CORPS PUBLIC NOTICE 12/2007
SHEET I~ OF
2
f
15 of 21
·
·.
·
e
F
.
G
... .......... ·
(...........
·.. :; :-
.
©
!!OCK ITEP POOL
PLANVll!W
......:.·.;
... . ·....:
.
2 ,________________
ROCK STEP.POOL
@
A. A·
1111
NTS
STRUCTURE ~IMENSIONS
A = POOL SP.AONG
·.B =STEP HEIGHT·
C = ROCK DIAMETER
D = POOL WIDTH
E = HIGH FLOW WEIR W1DTH
f. LOW FLOW WEIR WIDTH
G·= WEIR HEIGHT
H = LOW FLOW WEIR HEIGHT
I = HIGH FLOW WEIR HEIGH!
=
:
.
1-3 FT
.0:7' Fl'
Z·3FT
13-14FT
9 Fr
GFJ'
1.3 Fr
O.l.FI'
1.0.fT
THE IDAHO CLUB LAKESIDE
ROCK STEP POOL DETAIL
I
I
I
'
I
·-'-·----,-~
USACE REF. NO.: 2007-1;2111-C01
FOR: PEND OREILLE BONNER DEVELOPMENT, LLC
151 CLUBHOUSE WAY
SANDPOINT, ID 83864
PROJECT: THE IDAHO CLUB LAKESIDE
PROJECT LOCATION: LAKE PEND OREILLE
SANDPOINT, ID 83864
LEGAL: A PORTION OF SEC 21, T 57 N, R 1 E, BOISE MER.
COUNTY: BONNER
STATE: IDAHO
APPROX LAT/LONG: N 48" 16.819'; W 116" 21.031'
DATE: JOINT APP DATED 9/2007;
REVISED FOR CORPS PUBLIC NOTICE 1212007
SHEET t7 OF ~ '2-
16 of 21
·
·
SOOIMTS&
SHRUB TRANSPLANTS
BANKFULL
WATER SURFACE
BURIED CAP ROCKS
MIN. DIAMETER = I
MAX SCOUR DEPTH "' A
STACXfD LOOS W/ ROOTWAOS
FOOTER LOGS, MIN. DIA,
=D
f.i'-=E=N~G=IN~E=E=R=E=D~D~E~B~Rl~S~J=A~M=----~
\..V
CROSS SECTIONS
NTS
....
FLOW
DIRECTION
I
~
p
L
.. .
.. .
..............
...
.
...
..
...
._ . . ft.oO'Dttl'sN. · . . ·
·
·
f2\
'::J
.,
..
4
·
+
..
·
;f'
·
..
...
...
l
·+
:to
ENGINEERED DEBRIS JAM
PLAN VIEW
NTS
THE IDAHO CLUB LAKESIDE
ENGINEERED DEBRIS JAM
USACE REF. NO.: 2007-1218-C01
FOR: PEND OREILLE BONNER DEVELOPMENT, LLC
151 CLUBHOUSE WAY
SANDPOINT, ID 83864
PROJECT: THE IDAHO CLUB LAKESIDE
PROJECT LOCATION: LAKE PEND OREILLE
SANDPOINT, ID 83864
LEGAL: A PORTION OF SEC 2.1, T 57 N, R 1 E, BOISE MER.
COUNTY: BONNER
STATE: IDAHO
APPROX LAT/LONG: N 48.16.819'; w 116" 21.031'
DATE: JOINT APP DATED 9/2007;
REVISED FOR CORPS PUBLIC NOTICE 12/2007
SHEET/ f OF 2. '2.-
17 of 21
·
·
IANKPUU. OW4HU WIOTH
··
c
~·
lleD GIADI COHTIOt.
LOGOIROCK
LOO WEIR
0;\
~--.....--,P~R=O~F~l~Ll!~V~IEW=-:-~~NT~e,..-~
{.\
LOO WEIR
--
\.!J---==P~LA--=-=N~V~l~EW---Nr-s-~
IN«RJU. CHAHHEL WIDTH
LOG VAN!!
A----t--
WY.. SCOUR
DEPTH=F .
MAX. SCOUR
. DEflTH
f3\~-~L=O=G;::;.._;W:..;.=E~IR"'----CROSS &a;CTIOJil
\V
a
.2F
f.4\~·~~L_O~G_W_E_l_R~~..--~~
\.V
TEXTILE DETAIL
NTS
THE IDAHO CLUB LAKESIDE
LOG WEIR DETAIL
USACE REF. NO.: 2007-1218-C01
FOR: PEND OREILLE BONNER DEVELOPMENT, LLC
151 CLUBHOUSE WAY
.SANDPOINT, ID 83864
PROJECT: THE IDAHO CLUB LAKESIDE
PROJECT LOCATION: LAKE PEND OREILLE
SANDPOINT, ID 83864
LEGAL: A PORTION OF SEC 21, T 57 N, R 1 E, BOISE MER.
COUNTY: BONNER
STATE: IDAHO
APPROX LAT/LONG: N 48" 16.819'; W 116" 21.031'
DATE: JOINT APP DATED 912007;
REVISED FOR CORPS PUBLIC NOTICE 1212007
SHEET
OF '2. '2
I18 of 21
·
·
BAl«FIJLL CHANNEL WDTH
c
&ANKfUU WATER SURFACE
RIFFLE
RUN
GUDE
H
POOL
llfFFLE
H
SHJUI l SOD
HANsPLANTS 6"
TO 8"11i0:
G
G
CONTROL
© COBBLE GRADE
PRqFILE VIEW
®
NTS
COBBLE GRADE CONTftOL
CROIS SECTION
HTI
ROW
DIRECTION
POOL Wl>TH
A
STRUCTURE DIMENSIONS
=P09L WIDTH
B =RIFFLE WIDTH
c; =STRUCTURE LENGTH
A
=
D MAX. GUDE DEPTH
F =MAX. RIFFLE DEPTH
G · STRUCTURE DEPTH
H = BANK KEY-IN WIDTH
I =.COBBLE D50
"J =STRUCTURE LENGTH
;
10.9 - 12.7 ft
8.2 - 9.9 ft
10-l~ft.
1.2 ft
1.1 ft
1.5 ft
Rlffll! WIDTH
OPTIONAi.
6 In
10 ft
fi\f-"'C""O""B:::B:::L.::.E..:G~RA~D~E:-.:C::;O:::;H::::-;.TR::..;;O=L--::::=-PLAN VIEW
HTS
\V
THE IDAHO CLUB LAKESIDE
COBBLED GRADE CONTROL DETAIL
USACE REF. NO.: 2007-1218-C01
FOR: PEND OREILLE BONNER DEVELOPMENT, LLC
161 CLUBHOUSE WAY
SANDPOINT, ID 83864
PROJECT: THE IDAHO CLUB LAKESIDE
PROJECT LOCATION: LAKE PEND OREILLE
SANDPOINT, ID 83864
LEGAL: A PORTION OF SEC 21, T 67 N, R 1 E, BOISE MER.
COUNTY: BONNER
STATE: IDAHO
APPROX LAT/LONG: N 48°16.819';W116" 21.031'
DATE: JOINT APP DATED 9/2007;
REVISED FOR CORPS PUBLIC NOTICE 1212007
SHEET Z..0 OF '2. 1..
19 of 21
.·
lop of bank
uve CUTI"tlG$ TYP.
0.
VEGETATED SOIL LIFT W/ COIR LOG
.
PROFILE VIEW
NTs
COMPACT TOPSOIL TO SPECIFIED ELEVATION
INSTAU. WILLOWCUTTl'IGS
BETWEEN EACH LFT, 2' O.C.
111" TAPERED WOOD
STAKES lYPICAL
fi\
~
VEGETATED SOIL LIFT. W/ co·1R LOG
CROSS SECTION
NTS
VEGETATED SOIL LIFT SCHEDULE'
I
Callout
SOIL LIFT
. Halgh1
I
12"
Colr Log Designation
Oullld· Wrap
1111111 Wrap
12' RGl.nka
700 C«l.lal
NAG Cl28
· THE IDAHO CLUB LAKESIDE
VEGETATED SOIL LIFT W/ COIR LOO DETAIL
USAGE REF. NO.: 2007-1218-C01
FOR: PEND OREILLE BONNER DEVELOPMENT, LLC
151 CLUBHOUSE WAY
SANDPOINT, ID 83864
PROJECT: THE IDAHO CLUB LAKESIDE
PROJECT LOCATION: LAKE PEND OREILLE
SANDPOINT, ID 83864
LEGAL: A PORTION OF SEC 21, T 57 N, R 1 E, BOISE MER.
COUNTY: BONNER
STATE: IDAHO
APPROX LAT/LONG: N 48°16.819'; W 116" 21.031'
DATE: JOINT APP DATED 9'2007;
REVISED FOR CORPS PUBLIC NOTICE 12/2007
SHEET 'LI OF Z0 Z:: '
20 of 21
·
l ·
·
·NATIVE SHRUBS:
·
RED-OSIER DOGWOOD
·
WILLOW
·
SPIREA
·
BLACK COTIONWOOD
TRESTLE CREEK
MAIN CHANNEL
60'
w
z
2
UJ
(!)
5
::.::
>
::.::
w
w
Q.
0
a:
Q.
NATIVE
SHRUBS·
~
i::
~
Ill
li2w
::.::
z
~
a.
NATIVE FESCUES
a:
~
C/J
TURF-TYPE
TALLFESCUE
(J
~
40'
..NOTE:
ExfSTING TREES WITHIN SETBACK TO BERETAINED
TRESTLE CREEK
NORTH BRANCff
I
40'
I
SETBACK FROM EXISTING STREAM BANK
NATIVE FESCUES
'1
,___S_E_T-BA_CK_F_R_O_M_EX_!~·-N-G-STR_EAM
__BA_N_K_,~I
SHRUB
TYPE
SHRUB
TYPE
B
A
NORTH
BRANCH
SHRUB
lYPE
A
SHRUB TYPE A;
RED-OSIER DOGWOOD
WILLOW
BLACK COTIONWOOD
EXISTING CHANNa
SHRUB TYPE B:
SPIREA
"NOTE:
EXISTING TREES WITHIN SETBACK TO BE RETAINED
NATIVE FESCUES
PROPOSED CHANNEL
TRESTLE CREEK
NORTH BRANCH
TRESTLE CREEK
NORTH BRANCH
RECONAGURE TO
NATURALIZED CHANNEL
NOTTO SCALE
SEE RIVER DESIGN GROUP
RESTORATION PROJECT DETAIL
TYPICAL CREEK CROSS SECTIONS
SETBACKS AND BUFFERS
USACE REF. NO.: 2007·1218-C01
FOR: PEND OREILLE BONNER DEVELOPMENT, LLC
151 CLUBHOUSE WAY
SANDPOINT, ID 83864
PROJECT: THE IDAHO CLUB LAKESIDE
PROJECT LOCATION: LAKE PEND OREILLE
SANDPOINT, ID 83864
LEGAL: A PORTION OF SEC 21, T 57 N, R 1 E, BOISE MER.
COUNTY: BONNER
STATE: IDAHO
APPROX LAT/LONG: N 48" 16.819'; W 116" 21.031'
DATE: JOINT APP DATED 912007;
REVISED FOR CORPS PUBLIC NOTICE 12/2007
SHEET '2- OF 't. 'Z-
z.21 of 21
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Trestle Creek
BonnerCouni~
CONCEPTUAL DESIGN AND
DRAFT CONSTRUCTION PLAN SET
........
TRESTLE CREEK RESTORATION PROJECT
NEAR SANDPOINT, ID
SHEET INDEX
TL-1 TITLE SHEET
PREPARED FOR:
PP-1 PLAN AND PROFILE
Pierre Bordenave
lnterMountain Resources
101 North Fourth Avenue
PO Box 1724
Sandpoint, Idaho 83864
XS-1 CROSS SECTIONS
XS-2 CROSS SECTIONS
XS-3 CROSS SECTIONS
DT-1
DT-2
DT-3
DT-4
DT-5
ROCK STEP POOL DETAIL
LOG WEIR DETAIL
ENGINEERED DEBRIS JAM DETAIL
COBBLE GRADE CONTROL DETAIL
SOIL LIFT W/ COIR LOG DETAIL
...w
0
..c
_,
z
0
-0
0
i=
u
c
·oa.
w
:c z
en u0
w0
:::>
a::
-0
I-
c
V)
......
-...
0
V)
'-
0
Cl>
a::
c
LL.
..::.!'
V)
....J
'
Cl>
Cl>
u
<(
I-
Cl>
w
.,,
+:::
c
Cl>
.....
SP-1 SPECIFICATIONS
PREPARED BY:
_A
PROJECT VICINITY MAP
SCALE: 1"
=2000'
I
MT-1 MATERIALS LIST
RIVER
~DESIGN
'
P.O. BOX 1722
Whitefish, MT 59937
(406) 862-4927 Telephone
(406) 862-4963 Fax
www.riverdesigngroup.net
GROUP. INC.
101 SW Western Blvd.
Corvallis, OR 97333
(541) 738-2920 Telephone
(406) 862-4963 Fax
www.riverdesigngroup.net
llotclwotb
Im/ lb
0o...
07/ 2007
O.olil..
N. Wyatt
Orowni
N. Wyatt
Chodtodo
MO / JM
PROJECT NUMSER
ROG.07·019
REVISION
0
DATE
08/14/07
DRAWING NUMS~
TL-1
Drowl09
I
of 12
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
tructure
Structu11t Oescne!/on
Engineered Debnt Jem
CSL
Log WfJf!
Roc:lt Step Pool
Rifle Grade Control
LEGEND
N
w_. J .
- · - · - ·-
C::::J
C::::J
~E
s
EXISTING aw.!El
FlOOOPlAJN EXCAVATION
Station Stall Station End
70
85
125
170
220
255
295
- - - - EXISTING
CHANNEL
EXISTING ROAD C R O S S I N G : \
TO BE OBUTERATEO
CEDAR
TREE
I
~
/1-1- __..\-'"
Oo
~
J
I ..
l50
STA 0+71
RAISE CHANNEL INVERT 0.6 FT
TO IMPROVE FISH PASSAGE
THROUGH CULVERTS
EXCAVATE
FLOODPLAIN
EXISTING FOOT8RIDGE (TO BE
REMOVED)
'"'"'m"''
[
180
230
265
305
345
370
417
430
4'43
456
469
482
495
535
2001f
456
469
482
525
:'$.i
..~1
100
1l5
385
4'43
l
es
375
390
430
-
._ ~
CEDAR
TREE
335
STA 1+23 - 3+-45
CONSTRUCT 6 POOL FORMING
STRUCTIJRES (SEE TABL£)
EXCAVATE
FlOODPLAIN
SEE SHEET "XS")
Abb11tll11t/on
EOJ
CSL
LW
RSP
RGC
LocaUon a nd rype
EXISTING CHANNEL FU
l:i/::~~·I EXISTING ROAD
FILL
..
410
~
RSP
RSP
EOJ
LW
EDI.
LW
LW
EOJ
RGC
LW
RGC
RSP
RSP
RSP
RSP
RSP
RSP
RGC
VSL
'VEGETATED SOIL LIFTS TO
BE INSTALLED AS DEEMED
NECESSARY DURING
CONSTRUCTION . (SEE OT.S)
STEP POOL
0
~
(REFER TOOETAJI. OT· I)
...-
·ocQ.
II.I
XS-8
TRESTLE
CREEK
c
z
0
V)
LI. 0j::: ....
0 u 0Q)
XS-9
\ _
XS.10
"'O
STA S+OO · 5+91
RE-ACTIVATE HlSTORICAl
CHANNEL ANO CONFLUENCE
WITH TRESTLE CREEK
z
ai= °':::>
A.
36" CULVERTS
tf
Q)
I
XS.7
V)
XS-3
z ·a....
XS-2
XS-4
XS-1
xs.s
Q 0u
z
c
z
MONTANA
RAIL LINK
©r~__;;P~=~:...;:..._;
UAN Vl=W
~E_~"""1!!!!!!~. =~~~
.
1 40
...
c
~
c
°'
0u...
0
·~
0
....
0
V)
....I
ti
Q)
<(
I-
°'
w
...::t.
0
Q)
Q)
....
u
A.
1002
Q)
+::
VI
1000
....Q)
I
998
996
994
. . ................ . .....
' 992
990
~
c
.2
i
GI
iii
988
986
· 984
982
600
575
550
525
500
475
450
425
400
375
350
325
300
275
250
225
200
Station (ft)
1---
Proposed lhaflN eg - - - Bankfun · · · · · · · Existing Ground
~ Existing lhaflN eg I
®f--__:_P...:..R::..;:O::..;:F-=L=
l= E;..._V::...:l=W
E...:..~~-~
. =~~~
so·
1
175
150
125
100
75
50
25
0
Reldworio
0o·r..
lm/tb
o..ig,.
N. Wyon
07/2007
O.owno
N. Wyon
Cl>odc·do
MO / JM
PROJECT NUM&ER
ROG..07..019
REVISION
DATE
0
08/1'4/ 07
DRAWING NUMBER
PP-1
Drawing
2
of 12
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~,;o
XS-1 STA 0+82
1004
1-
1002
o»"'
"f 0"Qi~
Ea>
·I
30' FP
----
1000
2:1
CL .~.. ~~
'ij~~
1004
z :J
1002
Cc:: ti) Oc::
LEGEND
- - EXISTING CHANNEL
1000
998
- - PROPOSED FtOOOPlAIN
998
996
-60
-40
-50
-30
-20
-10
10
0
20
40
30
~ FLOODPLAIN CUT
l?O ~c;"'
ww(.'.) g~
~o
o~
~
&"""
~
<>"'
><>
-s"3';:~
=~-o
!a>~
:egg
3';: .,, ..,
996
XS-2 STA 1+19
1004
1004
,
-·
---_
,
-----__
30' FP
1002
1000
998
'-.....__
996
-60
-50
-40
-30
-20
-10
... ,
Q
1002
~'
c
·5
1000
z
998
-
0
t-
~/
10
0
20
30
40 996
1000
--------------·- ----- 1-
w
..
30' FP
0
__,,_,,,...,..,0............-..
998
996
996
994
994
0
I-
...0
:::::>
z
0
u
Q)
I-
t;'
0
·...o
V')
Q)
-I
1000
998
c
V')
0..
U) u c
0
0 ·.-:
U) °'
u.. 0...
U) V') ti0
1002
,
z
CJ °'z
XS-3 STA 1+79
1002
0..
"'O
U)
a=
4:
I
w
Q
CJ
Q)
°'
...
u
~
Q)
Q)
Q)
+:
IA
...
Q)
-50
-40
-30
-20
-10
10
20
40
30
50
I
XS-4 STA 2+21
1002
1002
1000
998
-----------------,
j
30'FP
"'"
-50
-40
-30
-20
I
~/.........---
996
994
...
"---------
-10
0
(;;\
'
2:1
1000
____________----
998
---
996
Fieldwork:
Dote:
im/ tb
07/ 2007
o..lil..
N.Wyott
Orowni
N.Wyott
Ch.eked,
MD/JM
PROJECT NUMBER
ROG-07-019
10
20
30
40
50
60
994
REVISION
0
DATE
08/14/07
DRAWING NUMBER
CROSS SECTIONS
~----~~~
=
1" 10' H
1" = 5'V
XS-1
Drowlng
3
of 12
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
XS-5 STA 2+87
1000
998
30'FP
996
--- - - - - - - - - - - - - - - - - - - - - - - -
---,~~.
~~--~
2:1
- - - - - - - - - - - - - - -
994
"--,,,,..--"
992
-80
-70
-60
-40
-50
-30
-20
-10
10
0
20
30
40
50
XS-6 STA 3+26
1000
1000
998
998
-0 '
996
·c;
-
30' FP
996
-------~
" ~-----
994
~
992_30
-20
-10
.--<'~~-------
----
~--------------------------------
en
---
z
994
~
10
0
c:
20
30
40
60
50
70
0
992
I
XS-7 STA 3+48
998
998
996
994
- - - - - - - - - - - - - - - - - -
-
- - -
---~
21
996
f--------------------~~-- 994
en
101
----------
"'
, ~,
-.......__
992
990_70
-60
-50
-40
-30
-20
-10
0
10
992
z
0
u
I
:::::>
0:::
I
en
0
~
V)
u
0:::
0u..
V)
-'
<{
I
w
0
CJ
20
30
40
60
50
c:
0
(/)
...0
Q)
z
t;'
CJ z ·a
w 0 ...
en
30' FP
Q..
""O
Q)
0..
c:
0
'+:
0
...0
vi
Q)
0:::
~
Q)
Q)
...
u
Q)
~
vi
...
IQ)
994
XS-8 STA 4+99
994
992
992
990
990
988
988
986
986
- EXISTING CHANNEL
~ FLOOOPLAIN CUT
- PROPOSED FLOODPLAIN
L:J
·-----· PROPOSEOCHANNEL
984
40984
CHANNEL Fill
Fleldwotlo
Dote:
lm/ tb
07/ 2007
Design:
N,Wyott
Otowr.
N.Wyott
Checked,
MD / JM
PROJECT NUMBER
RDG-07-019
REVISION
DATE
0
08/14/07
f1'r---C_R_O_S
_S_S_
E_
C_
T_
IO_N
_S~
1 ~~~;;;;;;;i·
\,V
1"= 10'H
1" = S'V
DRAWING NUMBER
XS-2
Drawing
4
of 12
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
8-tl~
..., ~~~
f 0 ~..;
a..
.!t~R
z:::i=a~~
(jQ ~c;~
°'li)~
~00 §l
j~~
..c:'3: '°
~:c~
Q::'.
~
.t: ~.o
3~~
XS-9 STA 5+40
994
--
----
992
990
....__
______--
/'
//
"""""-..~
......_________----
- /"-...........
,.-:.;:;::?7
~~::.--
986
-30
-20
992
--
~------
----...""-,
988
984.40
994
-10
10
0
20
30
990
//
//
-Q+..
c
988
/"
·c;
40
50
60
z
...-u
0
80984
70
w
XS-10 STA 5+69
992
990
"''
"--,
988
""'-···---
'"-._ -----
'--..
-30
-20
-10
0
10
©
20
-------·------------------~
992
990
I
I
~
~------""------;
;;:
------------
--
986
984
;--------
-----------..
Q.
fl)
986
988
986
"U
z
0
j:::
u
c
0
(/)
...0
Q)
0:::
z..
(/)
Q)
:::>
I-
t;
z ·c;
...
0
fl) u
c
0:::
0
fl) 0LL. '+:...0
fl) (/) t;0
Q..
....J
0
m::
u
<
I-
w
Q
Q)
0:::
~
Q)
Q)
...
u
Q)
+:
..,..
30
40
CROSS SECTIONS
50
60
70
80
90
...
Q)
984
I
I
I
1"
1·
=10' H
=5' v
Dote:
fm/ lb
07/ 2007
O.slgno
N. Wyatt
Aetdwork1
~
- - EXISTING CHANNEL
· - - - - - · PROPOSED CHANNEL
C=:J
CHANNEl Fill
Orowni
N. Wyalt
Chedced1
MO / JM
PROJECT NUMBER
ROG-07-019
REVISION
0
DATE
08/ 1·/ D7
DRAWING NUMBER
XS-3
Drow1119
-
5 of 12
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CONSTRUCTION NOTES:
A
~ROC~
1. Construction sholl begin at the most upstreom weir and proceed downstream olong step
pool alignment ond within design cotch points.
2. Rock shall be from an opproved source and sholl be sound, dense (SG=2.65 min) ond free
from cracks, seoms or other defects conducive to occelerated weothering.
3. Rock sholl be equipment placed so thot larger rocks are unlformily distributed and In contact
with one another ond smoller rocks filling in voids. No end dumping of rock will be ollowed.
D
4. Excavate pool to set weir footer ond pool foundotlon rocks. Footer rocks ore to be ploced
A'
to minimize voids and maximize rock to rock contact.
5. Ploce weir rocks ontop of footers, olign os shown In detail os so to create two octlve flow
widths. Weir and wing rock shall be p loced to minimize gops.
~FOOTER
6. Wrap eoch step pool from upstreom foce to downstreom face with specified geotextlle
fobrlc. Fabric sholl overlop at eoch section to Insure mlnlmol seepoge from constructed pools.
7. Backfill eoch pool and fill all gops ond voids of each structure with native grovels ond
cobble to minimize piping of water through eoch structure.
...-
ROCK
A
8. Excovate pool occordlng to specified dimensions. Use excovoted moterlol for structure
bockflll or houl to o location specified by construction manoger.
9. The construction monoger hos the right to oiler or chonge the design during construction due
to unforeseen circumstances.
cc
....w
ROCK STEP
_POOL
_ __
©1 ,_____
PLAN VIEW
NTS
ca
®
8 = STEP HEIGHT
0.7 FT
V')
::::>
z
I
t;'
Cl)
A. u
A. °"
0
C = ROCK DIAMETER
2-3 FT
w
13-14 FT
E = HIGH FLOW WEIR WIDTH
9 FT
F = LOW FLOW W EIR W IDTH
3 FT
G =WEIR HEIGHT
l.3 FT
H
0.3 FT
=LOW FLOW W EIR HEIGHT
I = HIGH FLOW WEIR HEIGHT
~
c:
0
+:
0
....
0
-
LL
....en <_,
V')
II)
Cl)
I
~
1.0 FT
°"
w
0
~
Cl)
Cl)
....
u
CJ
8
LINE POOL WITH
GEOTEXTILE FABRIC
(MIRAFI SOOX OR EQUAL)
OVERLAP FABRIC
AT END OF POOL
ROCK
1 -STEP
-POOL
--
PROFILE VIEW
NTS
©
Cl)
0
I.:
A
EXAMPLE OF A CONSTRUCTED STEP POOL
z
0 ....
0
~
u Cl)
0 0z ·a....
13 FT
D = POOL WIDTH
ROCK STEP
POOL
_
___;;;..._;;.___ _
A - A"
NTS
a.
'"O
c:
0
V')
A= POOL SPACING
~__;;;___
c:
·5
...0 °"
STRUCTURE DIMENSIONS
2
_..
0
+:
II)
Cl)
....
I
c
fleldwork1
Doter
07/ 2007
Im/ lb
Designs
N.Wyal!
Dfowni
N.Wyatf
CheMO / JM
PROJECT NUMSER
RDG.07-019
REVISION
D
DATE
08/1~/07
DRAWING NUMSER
DT-1
Drawing
6
of 12
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
D
CONSTRUCTION NOTES:
BANKFULL CHANNEL WIDTH
<-----A----~
1. Construction shall begin at structure throat (upstream
center) and proceed downstream toward banks. Use
logs with minimum dimensions as specified. Weir arm
slope shall be between 4 and 8% as specified by the
Construction Manager. Weir arm shall tie into bank
approximately 0.3 ft below bankfull elevation.
-
FLOW
DIRECTION
VANE SI.OPE 4-80/o
I
E
~
2. Excavate trench and stockpile excavated material for
use as backfill. Place base of upstream end of weir logs
below maximum scour depth. Anchor the upstream end
of the weir logs with footer rocks as specified.
BACKFILL WITH
GRAVEL AND COBBLE
INSTALL GEOTEXTILE AND
BACKFILL VOIDS WITH
GRAVEL AND COBBLE
3. Attach geotextile fabric to upstream side of weir logs
just below top of log so that fabric will not be exposed
after backfilling. Nalls shall be minimum 6-lnch length
sinker nails. Nall spacing shall be no more than 24
inches.
4. The Construction Manager shall inspect the orientation
and elevation of the structure prior to backfilling. Backfill
upstream side of weir log with native gravel and cobble.
Backfill shall be obtained from stockpiled material or
excavated from downstream pool.
fi'f--~~L~~:::.._.=_~=~~~~~~
OG WEl R
PROFILE VIEW
\.!:.,)
NTS
0
BURIED GRADE CONTROL
LOG OR ROCK
POOL
8ANKFULL CHANNEL WIDTH
5. Floodplain grade control sills shall be constructed of
log or rock and shall be keyed into the floodpla in no less
than 50% of the maximum riffle depth. The weir logs
shall be placed on top of the sill logs. Rootfans of the sill
logs and weir logs shall be placed at the edge of the
bankfull channel. The top of floodplain grade control sills
shall be 0.5 feet below bankfvll elevation and covered
with 0.5 feet of sod/shrub transplants.
6. Excavate pool according to specified dimensions. Use
excavated material to backfill structure, or haul to a
location approved by the Construction Manager.
BANKFULt WATER SURFACE
FLOODPLAIN
A-------4-----C----<
SHRUB & SOD
TRANSPLANTS
BANKFULL WATER SURFACE
RIFFLE CROSS-SECTION
(UPSTREAM OF WEIR)
f.i\f--~~L~~=.....:.;~=:..:;_~~~~OG WEIR
PLAN VIEW
NTS
"O
c
z
0
(/)
0 ....
t== 0
u Q)
-
(/)
Q)
n= u0
w 0°'
I ......
~
c
0
'+:
0
....
LL
(/)
POOL CROSS-SECTION
(DOWNSTREAM OF WEIR)
7. Notify the Construction Manager of any proposed
changes prior to implementation. The Construction
Manager reserves the right to modify structure design
specifications during construction, if warranted, due to
unforeseen conditions.
~
·oa.c
Ill :::::> z
Q I°' t;'
z ·a
....
BURIED GRADE CONTR
LOG OR ROCK
'\.V
...
+-'
f3\~~~LO~G
~ ~~
WE~IR
'-=---~~~~
\:_j
CROSS SECTION NTS
"...
0
0
ti
<
Q)
I-
°'
w
.:it
Q)
Q)
0
.....
u
Q)
+:
VI
Q)
'
I
A
B
= BANKFULL WIDTH
7 - 9 ft
3.5 - 4.5 ft
C = FLOODPLAIN SILL WIDTH
5 ft
D = LINEAR WEIR ARM LENGTH 10-14ft
E MAX. POOL DEPTH
2.1 - 2.9 ft
F - MAX. SCOUR DEPTH
2.9 ft
H VANE LOG DIAMETER
12 18 In
=WElR ARM WIDTH
=
=
I
=THROAT DEPTH
J = WEIR ARM ANGLE
0.9-1.l ft
20°- 30°
/BACKFILL WITH RIVER ALLUVIUM
LOG VANE
STRUCTURE DIMENSIONS*
MAX. SCOUR
DEPTH=F
EXAMPLE OF A CONSTRUCTED LOG WEIR
I
L
MAX. SCOUR
DEPTH= 2F
f4'f--~~L~O~G
~~~
WEIR'-=---~~~~\_:v
TEXTILE DETAIL NTS
fletd""'orlt:
Dote,
lm/rb
Oeslg ni
N. Wyatt
07/ 2007
Oro..,..na
N.Wyott
CMMD / JM
PROJECT NUMBER
ROG·Ol-019
REVlSION
DATE
0
08/ 1~/07
DRAWING NUMBER
DT-2
Drawing
7
of 12
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CONSTRUCTION NOTES:
1. Excavate trench ond set footer logs at maximum scour depth. Use footer
logs with minimum diameter ond stem length os specified.
2. Set rootwod logs on footer logs. Place logs stems sloping downward into
bank from edge of water. Use rootwod logs with minimum fon diameter and
stem length as specified .
3 Place additional logs ond woody debris into trench to oct os deflector logs
and hobitot cover. Number ond size of habitat logs moy vary from structures
shown.
FLOW
DIRECTION
4. Ballast structure with coble and cap rocks of minimum diameter os specified.
Set cop rocks below bonkfull elevation on overlapping logs. The Construction
Manager shall Inspect approve all structures prior to bad5. Backfill voids with native gravel and cobble to minimize gaps and piping of
water. Cover with sod mots and shrub transplants ot bankfull elevation.
7. Notify Construction Manager of any proposed changes prior to
implementation. The Construction Manager reserves the right to modify structure
design specifications during construction if warranted due to unforeseen
conditions.
:E
~
6. Space structures as specified.
L
-mm:
"'O
cC
ti)
F
CONSTRUCTED EDJ STRUCTURE
..,
Q
FLOODPLAIN
+
·o
Q.
c:
z
0
V)
t==
...0
w ....
t;'
a
a
LLI
m:
0
u
:::> z
0:::
Q)
V)
Q)
z ·o
0 0.......
u
c:
0:::
0
·.;::
0
0u..
...0
V)
t;
II.I <(
II.I ....w
A, MAX. SCOUR DEPTH
2.9 ft
B, MIN. CAP ROCK DIA.
18 in
C, ROOT FAN DIAMETER
2 - 3 ft
D, FOOTER LOG DIAMETER
8 - 12 in
F, AVG. STRUCTURE LENGTH
4 - 8 ft
G, AVG. STRUCTURE WIDTH
1 - 2 ft
H, ROOTWAD STEM LENGTH
7-lOft
I, FOOTER LOG STEM LENGTH
7-lOft
J, BANK KEY-IN DISTANCE
5 ft
z
z
II.I
"
CAP ROCKS (BUFIED)
/
MIN. DIAMETEI? = B - ··_ /
STRUCTURE DIMENSIONS*
SOD MATS &
SHRUB TRANSPLANTS
FLOODPLAIN
BANKFULL
WATER SURFACE
.
c:
-I
Q)
Cl:
~
Q
Q)
Q)
...
u
Q)
+:
"'Q)
.......
BURIED CAP ROCKS
MIN. DIAMETER = B
t
STACK ED LOGS W / ROOTWADS
FOOTER LOGS, MIN. DIA.
©
1
MAX SCOUR DEPTH
=D
ENGINEERED DEBRIS JAM
CROSS SECTIONS
~------
NTs
=A
ENGINEERED DEBRIS JAM
VIEW
---
®2 - - -PLAN
NTS
FleldwoR1
Date·
07/ 2007
D·tlg<>
N. Wyatt
lm/ tb
Orowr.
N. Wyatt
ChodMO / JM
PROJECT NUMBER
RDG-07°019
REVISION
DATE
0
08/ 14/ 07
DRAWING NUM!ER
DT-3
Drawing 8
of 1 2
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~,;o
i Qg>ci~
EcO
~'~
=
z~ o~~
t'.)0 ~c;"'
C>
~ ti)~
F~~
ci::
1. Excavate trench to specified structure dimensions and stockpile
excavated material for use as backfill. Use rounded materlal with D50
as specified.
~
~~~
»
~!~
:Eg;g
~
2. Shape the channel to the specified feature dimensions upstream and
downstream of structure.
4. The top of floodplain grade control sill shall be 0.5 feet below
bankfull elevation and covered with 0.5 feet of sod/ shrub transplants.
a=
FLOW
DIRECTION
::)
0
POOL WIDTH
u
::)
a=
fl)
-0
c
0
I-
5. Notify the Construction Manager of any proposed changes prior to
Implementation. The Construction Manager reserves the right to modify
structure design specifications during construction, if warranted, due to
unforeseen conditions.
...0
c
a=
J
GLIDE
RIFFLE
COBBLE SIZE= I ~
F
RIFFLE
I
c
u
Q
©
STRUCTURE DIMENSIONS
=
J
=STRUCTURE LENGTH
10.9 - 12.7 ft
8.2 9.9 ft
10-15ft
1.2 ft
1.1 ft
1.5 ft
OPTIONAL
6 in
10 ft
z
(/)
0
....
j::
0
u
Cl>
z
:::>
Ci::
I
V)
Cl>
Ci::
0
u...
0
....
0
t;
V)
~
<(
Cl>
ei::
I
w
~
=
"w
NTS
BANKFULL CHAN N EL WIDTH
RIFFLE WIDTH
B
SHRUB & SOD
TRANSPLANTS 6"
TO 8" THICK
a..
0
___.;;..~~-
H
c
ti'
I z ·o
z u0 a.......c
0
0
'+:
w
COBBLE _
GRADE CONTROL
1 _;._;;__
PROFILE VIEW
-·o..
I
A
=
.... 'w
3. The Construction Manager shall Inspect the orientation and elevation
of the structure prior to backfilling.
F MAX. RIFFLE DEPTH
G - STRUCTURE DEPTH
H BANK KEY -IN WIDTH
I = COBBLE D50
-
~00 ~j
CONSTRUCTION NOTES:
A = POOL WIDTH
B = RIFFLE WIDTH
C = STRUCTURE LENGTH
D =MAX. GLIDE DEPTH
.
Cl>
Cl>
....
u
Cl>
t;
...m
....
Cl>
I
m
0
u
(i\,___;::C;...;:O:;..=B=B=-=L=E=--=G...=..:RA=-==D:..=E=-C=O=N~
T...=..:R:.::O:..=L=----~
CROSS SECTION
NTS
fa\.._.....;;C__;O;.._B_B_L_E_G
_ RA
_ D_;;;
E__;C;;.._O
;;;;_N
. . ;;.T
._ R
_O
...;;;._
L_ _
\.V
PLAN VIEW
NTS
Aeldworkr
Jm/ tb
Oot·r
07/2007
Oeslgni
N;,Wyott
Orowni
M. Wyott
Ct..dcedo
MD /JM
PROJECT NUMBER
ROG-07-0 19
REVlSION
0
DATE
08/1'4/07
DRAWING NUMBER
DT-4
Drawing 9
of 12
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
top of bank
~endtobant
vegetate as
necessary/
~
"....
c
...c.
0
'"'£ CUTT,NGS TVP.
-
·o
Q.
~ z
"U
°'
ti'
u
Q..
c
0
V)
0 ui== ...0CV
u :::> z
f.i'-~S~O~l=
L --=L~IF
~T
.:........;;.
W=/_:C::...:O::...:lo..::..
R;;_L
=O
=G
=----==--
\V
PROFILE VIEW
::c
...~
.......
EXAMPLE OF VEGETATED SOIL LIFTS
NTS
-........
-
COMPACT TOPSOIL TO SPECIFIED ELEVATION
0
I
V)
CV
z ·er
...
0
0°'
LL.
0
·~
...00
--'
...
w
°'
V)
Ill
<
I
CV
~
Q
CV
...
Q)
u
CV
+:
Ill
0
...CV
U)
FLOODPLAIN
c
I
VEGETATED SOIL LIFT SCHEDULE
Callout
Height
Coir Log Designation
Outside Wrap
Inner Wrap
SOIL LIFT
12·
12" Rolanka
700 Coir Mat
NAG C125
'.-.!.....!.
18" TAPERED WOOD
STAKES lYPICAL
STREAMBEO
f2\1----=S::..:O::..:l=L--=L=l.FT
::.. .-=--=W
=/_:C::..O
:=-=lo.R
::..;;_L
=O
.::...=
G_---:-:=-:--
~
CROSS SECTION
Nrs
f'elclwoJnl/ 11>
Dot.1
07/ 2007
0..'vno
N.Wyon
Oto'"'"
N. Wyon
o..dced.
MO / JM
PROJECT NUMBER
ROG-07-019
REVISION
DATE
0
08/1 ~/07
ORAWINO NUMBER
DT-5
Drawing I 0 of 12
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
GENERAL SPECIRCATIONS
MATERIALS SPECIFICATIONS
EQUIPMENT SPECIFICATIONS
CONSTRUCTION SPECIFICATIONS
I · The project shall be constructed accord111<3 to the plan
!>et. The Contractor shall notify the Constniction Ma11a13er
of any cha11<3es pnor to implementation. The CoretnJction
Ma11a13er for this project shall be River Desi.Jn Group, Inc.
I : The Contractor shall fumeh all matenal:I necessary
to con5truct the project. The contractor shall dehver
all matenals to the desi.Jnated stockpile locations
labeled on the plan !>et or to a location specified by the
Construction Manac:ier. If a matenal source has been
pre-determined, the Construction Manac:ier shall provide
d1rect1orni to the Contractor.
I · The Contractor shall fum1sh all eq111pment neces5.ary to construct
the project. The Contractor shall mobihze all equipment to the prop
area as directed by the Coretruction Manac:ier.
I · Construction shall occur in accordance with the plan set, con5trucbon spec1ficatiore, eq111pment
speaf1cat1ons, matenal speaf1cat1ons, re~etat1on specifications and c:ieneral specrficattons.
2. It e the Contractor's resporni1bilrty to identify all
unclerc:iround utihbes pnor to construction. Call U-DIG pnor
to cornitruction.
2. Material quantities, d1merni1ons and slZes shall
~t5 incurred due to project de~ re5ult111<3 from
failure of the Contractor to meet the requ1reme~ of the
c:ieneral specifications, contractor quahhcatlorni, construction
spec1f1cat1ons, matenals specifications and revec:ietat1on
spec1f1cat1~ shall be the expe~ of the Contractor.
3.
CONTRACTOR QUALIFICATIONS
I · The Contractor shall have at least two (2) years of nver
restoration ~truct1on expenence and shall have
completed at least ftve (5) nver re5toration projects. Or,
the Contractor shall have at least one ( I ) year of nver
re5toration expenence, shall have completed at least three
(3) nver restoration projects, and shall have completed an
approved river restoration tra1ninc:i cla55. Approved tra1ninc:i
classes include those sponsored by W1ldland Hydrol()(jY,
Inc., or a s1m1larly quahf1ed pract1t1oner of natural channel
de$1c:in stream re5torat1on pnnc1ples.
conform to the notes and specifications provided on the
plan set or on the matenal5 l1st.
3. The Cornitruct1on Manac:ier shall 1rnipect and approve
all matenals pnor to co115truction. If matenals do not
meet the minimum requirements specified 1n the plan !>et
or matenal let, the Construction Manac:ier shall reject
the matenals.
REVEGETATION SPECIFICATIONS
I . The Contractor shall fum1sh all plants, seed,
c:irowinc:i media and equipment neces5ary to revec:ietate
the project. The Contractor shall dehver aH matenals
to the des1<3nated stock.pile locations labeled on the
plan set or to a location spec1f1ed by the Construction
Ma11a13er. If a plant source has been pre-determined,
the Construction Manac:ier shall provide directions to
the Contractor.
2. If the Contractor chooses to des1<3nate an employee
Without quahfiecl stream restoration expenence, the
Contractor shall be on-site at all times when the employee e
perform111<3 nver restoration worlc. Failure to abide by this
condition Without previous ac:ireement with the Construction
Manac:ier would be c:irounds for termination.
2. Plantmc:i prescnpt1ons, quantrl:ies, densrl:1es, and
Siles shall conform to the notes and specif1cat10l'l5
provided on the plan set, the matenal5 115t, and the
revec:ietation plan.
3. The Contractor shall ma1nta1n at least $2,000,000 in
3. Growinc:i media (topsoil, hydromulch, compost) shall
be clean and free of pesticides, herbicides, heavy
metals, solid waste and sewac:ie.
hab1lrty insurance and have proof of habtl1ty 1reurance on-site
dunnc:i the entirety of project construction.
4. The Construction Ma11a13er shall 1repect and
4. The Contractor shall have proof of work.er's
compensation insurance on-site dunnc:i the entirety of
project construction.
approve all ptant5 and matenals pnor to plant1nc:i. If
plants or matenals do not meet the minimum
requ1rement5 spec1f1ed 1n the plan set or matenalhst,
the Construction Manac:ier shall reject the matenals.
5. Copies of all project permits shall be posted on-51te in a
visible location. The Contractor 5hall comply with the
provis1orni of the perm1t5. The Contractor shall notify the
Construction Manac:ier of any lcnown cha11<3es or actMt1es
that coulcl violate permit requirements pnor to
1mplementat1on, The Construction Ma11a13er shall be
re5pons1ble for all correspondence with permit ac:ienc1es.
5. Revec:ietation equipment shall avoid cro5s111<3 newly
constructecl stream channels. Revec:ietat1on equipment
shall minimize 1mpact5 to stream bank.$ and exetinc:i
vec:ietat1on.
G. Natrve c:irass seed mix shall be spread on disturbed
areas as directed by the Construction Manac:ier.
Seedinc:i prescnpbons shall conform with speaficat1ore
in the des1c:in report, revec:ietation plan, plant 115t and
matenals let.
ar~s will be stalcecl out us111<3 a survey c:irade Global Pos1boninc:i
System (GPSJ, total station, or survey laser. The ~truction Manac:ier shall stalce the locations of the
construction access, 5toclcp1le locations, hm1ts of disturbance, temporary drver5ton channels, temporary
culverts, prop05ecl channel centerline, proposed channel marc:i1ns, channel bed features, floodplain
extents, wetlands and all structures aceo~f1"'3 to the plan !>et. Construction stalctnc:i shall occur 1n
accordance with the Survey Control Sh:if; At a minimum, stalct11<3 of features shall occur every 25 feet
al0"'3 the ahc:inment. The Contractor shall m1111mize i;l1sturbance to 13rade stalce5. If exce5s1ve deturbance
1
to c:irade stalce5 by the Contractor occurs 1t shall be the Contractor's e>cpense to re-stalce the project.
1
2. Pnor to construct10t1, construction
2. At a minimum, the Contractor shall provide the follOW111<3 equipment
for tins project:
Excavator - One (I J eiccavatol'(s) shall be required. The equipment shall
be minimum 200 class. The bucket volume shall be one (I) cubic
yard(s). The buck.et shall be equipped with a hydrauhc thumb for
c:iraspinc:i l0<3s, rock.5, and other matenal:I. The equipment must be
capable of cro5s111<3 water and worlc11"1<3 on or ad_pcent to steep slopes.
A chain shall be available for attach111<3 culverts, pumps and other
equipment or matenals to the bucket for trareport on-Site.
Dump Truclc One (I ) dump truclc(s) shall be required for thl5 project.
Trucl:(s) shall have a minimum bed volume of e1<3ht (8) cubic yards. The
truclc(s) shall be capable of dnvmc:i on non-asphalt 5Urfaces and off-road
surfaces.
Tra5h Pump - One (I) trash pump shall be required. 015Charc:ie
capacity 5hall be shall be at least 450 c:ipm (I cfs). Total head lift shall
be at least 95 ~. Pumps shall be equipped with at least I 00 feet of
4· diameter outlet hose. A pipe wrench shall be available for attachinc:i
hoses. Fuel and otl shall be supplied for the tr.a5h pumps.
Chainsaw - One (I) chainsaw shall be required. The chainsaw must be
capable of completely 5.aW111<3 10<35 of the diameter spec1f1ed in the
matenal spec1ficat1ore. Also, the chainsaw m115t be capable of sawinc:i
HOPE or PVC culverts or pipes a5 noted in the matenal specificat1~.
3. Construction acce55 shall be determniecJ by the ConstnJction Manac:ier. Construction equipment shall
not cross private land unless perm1551on e obtained from the landowner. The Contractor shall leave all
c:iates, whether open or cl05ecl, as found. i
·
stream without c:ieneratinc:i exce55 turbidity. Temporary culvert slle5 shall accommodate 15~ of
expectecl base flow dunnc:i construction. ,The Construction Manac:ier shall specify the Siles and locations
of the temporary culverts.
·'
5. Pnor to construction, temporary d1vers1on channels shall be con5tructecl to drvert water aw~ from
construction areas. Temporary d1vers1on channels shall be locatecl and constructecl accord1nc:i to the
des1<3n report or plan !>et. Temporary diver5ton channels constructed in fine sods such as 5and, Slit, or
orc:iamc matenal shall be completely hned with fabnc to prevent er05lon. The Contractor shall use ·Eco
Blocb·, or an approved equal, for construct111<3 cofferdams for temporary drvers1on channels. The
Contractor shall drvert water incrementally into the temporary diversion channel to m1nim1Ze turb1drty and
permit fish to move out of the dewatered channel sec:iments. The Contractor shall notify the Construction
Manac:ier prior to dewatennc:i channel sec:iment5. The Construction Manac:ier shall notify a qualified fish
b1ol0<31st of possible fish rescue needs.
3. All equipment shall be washed pnor to mobthzation to the site to
minimize the introduction of fore1<3n matenals and fluids to the project
site. All equipment shall be free of oil, hydrauhc fluid, and diesel fuel
leab. To prevent 1nv.a51on of nox10115 weeds or the spread of wh1rh11<3
disease spores, all equipment shall be power washed or cleaned to
remove mud and soil pnor to mobd1Zat1on into the project area. It will
be the Contractor's respore1bthty to 111$ure that ~uate measures
have been talcen.
4. Equipment shall be in a wetl-ma1ntainecl condition to m1mm1Ze the
hlcehhood of a fluid lealc. If a fluid lealc c:loe5 occur, the Construction
Manac:ier shall be notified 1mmed1ately, and all worlc ceasecl until the
lealc has been rectified. At all times dunnc:i the construction phase,
fluid spill containment equipment shall be present on-site and ready for
deployment should an accidental spill occur.
5. The Contractor shall ma1nta1n a complete tool set with commonly
replaced parts (e.c:i. O-nnc:isJ to m1n1m1Ze downtime 1n the event of
equipment malfunction. The Contractor shall have an emerc:iency spill
lat on site dunnc:i the project.
-_..
0
4. Stream cross111<3s !ihall be m1nimi.zecl dun11<3 construction. If multiple cross111'35 ( I 0 or more) are
expectecl, the contractor shall provide and install temporary culverts so that equipment can cross the
G. Straw bales and silt fenctnc:i shall be
~adable
and installed by the Contractor 1f deemed nece55ary by
the Construction Manac:ier. Construction fe11C111<3 (hm1ts of disturbance) shall be installed by the
Contractor if deemed necessary by the Coretruction Manaiaer.
7. Initially, the Contractor shall excavate the channel to approximate des1<3n d1mens1ons 115in'3 the
excavator. Excavation shall comply with con5truct1on stalces and the plan set. Excavation shall estabhsh
channel elevations within one-half foot of ftnal elevations. The Coretrucbon Ma11a13er shall inspect the
channel excavation for compliance with the plan set. All eiccavatecl matenals shall be stocl:ptlecl on-site,
above the bank.full channel until hauled off~s1te or used on-site. Disturbance to npanan vec:ietabon, channel
bank.$ and sod shall be m1mm1zecl. Excavated sod and npanan shrub trareplant5 shall be carefully
stock.plied and reu5ecl for plantmc:i floodplains or stream bank.$.
en
z
-~
-0
CJ
·oa.c
"'O
z
0
CJ
en
CJ
j:: "'CJ"
u zCl)
:::::>
0::
I
V)
'ti"
Cl)
z
·o
u
0..
0
"'"
0::
c
0
+:
V)
"'0"
t;
LI. 0
LL..
Ill
A.
c
(/)
....I
~
w
0
CJ
Cl)
0::
..lM::
Cl)
Cl)
u"'"
Cl)
-;:
Ill
8. After excavat111<3 the channel, the Contractor shall install the 13rade control, bani: stab1hzatton and
habitat structures usinc:i the excavator. Each structure shall be constructed in accordance with the
locations and specif1cat1ons provided in t~e plan set. The Co115tructlon Ma11a13er shall inspect and
approve all structures pnor to baclcfdhnc:i.
Cl)
"'"
I
9. After all structures are 1retalled, the ~hannel will be shaped to within 0.2 feet of the final elevations
specified on the plan set usinc:i an eiccavator. The Construction Manac:ier shall check. the ftnal elevations for
compliance with the plan set. All excavated matenals shall be stoclcp11ecl ot\-51te, above the bank.full
channel until hauled off-site or used on-site. Disturbance to npanan vec:ietation, channel banb and sod
shall be minimized.
I 0. Upon not1f1cat1on from the Construction Manac:ier, the Contractor shall divert water incrementally into
the new channel. Efforts shall be made to m1mm1ze turb1d1ty and permit fish to move out of the dewatered
channel sec:iments. ~lease of water into the new channel shall occur 1n accordance with the construction
phasinc:i approach outhned m the de51<3n report.
..._ _ _ _ _ _.. .
Flolcl-io lm/tb
I I · The Contractor shall remove excess matenals, temporary ailverts and equipment from the site. The
Contractor shall rec:irade disturbed areas and construction access roads to their onc:i1nal c:irades. The
Contractor shall treat compacted soil areas 1ncludinc:i access road5 and matenal stock.pile areas. The
Contractor shall remove soil from the project site 1f the sod 15 tainted With petroleum-basecl fluids.
Oat..
07/2007
Dotie..
N. Wyatt
o.a-
N. Wyatt
Oood&..i.
MD/JM
PROJECT NUMBER
RDG-07-019
REVISION
0
DATE
08/14/07
DRAWING NUMB&
SP-1
Drawing 11 of . 12
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Structure Index
Structure Description
Abbreviation
Engineered Debris Jam
EDJ
CSL
CSL
LW
Log W eir
Rock Step Pool
RSP
Riffle Grade Control
RGC
Location and Type
Station Start
Station End
Structure
RSP
70
85
· 85
100
RSP
EDJ
125
135
170
180
LW
·
~
220
255
295
335
350
375
390
417
430
443
456
469
482
525
230
265
305
345
370
385
410
430
443
456
469
482
495
535
200 If
Materials- Wood
Rootwads (#) Deflector Logs (#)
Footer Logs (#)
1
3
1
1
Vane Logs (#)
4
1
2
2
Footer Logs (#)
Materials - Rock
Cobble (cy)
Riprap (cy)
Boulders (#)
Mate rials -Wood
Rootwads (#) Deflector Logs (#)
4
4
4
4
4
5
25
Mate ria ls - Rock
Cobble (cy)
Riprap (cy)
Boulders (#)
Vane Logs (#)
4
4
...
1
3
2
1
25
25
4
2
4
Q
5
......
.E
LW
LW
EDJ
RGC
LW
RGC
RSP
RSP
RSP
RSP
RSP
RSP
RGC
VSL
TOTAL
2
2
3
1
2
2
1
2
10
14
5
5
4
2
2
4
4
8
12
4
4
4
4
4
4
4
4
4
4
20
80
5
25
25
25
25
25
25
8
0
Q.
I- z
en
..I
en
..I
c
-w
c
:!!:
c:
0
V)
0 ....
i'.= 0
u Cl>
=> z
I°'
z
V)
0
u
De °'
0
I-
-0
LL
V)
.....
<(
I-
w
Q
t;..
.~
0
....
0..
c:
0
·.;::
0
....
0
+
Cl>
"'
°'Cl>
~
Cl>
....
u
10
230
Cl>
+:
"'
Cl>
....
I-
W ood Specifications
Ite m
Footer Log
Rootv.ad
Deflector Log
Vane Log
Backer Log
Diameter (In)
Length (ft)
12
12
12
18
10
10
10
20
NIA
N/A
Rootwad (y/n)
no
y es
no
y es
NIA
Rock Specifications
Ite m
Cobble1
Riprap
Boulders
D1s (inches)
0 50 (inches)
0 90 (inches)
1
8
24
6
12
30
12
18
36
Fleldwoft.
0o...
""'l
b
07/ 2007
l>ot'9no
H. Wyatt
Orowna
""- Wyott
Cllochd·
MD I JM
PROJECT NUMBER
ROG-07-019
REVISION
0
DATE
08/1·/07
ORAWING NUMBER
MT-1
Drawing 1 2 of
12