The Nebraska Department of Transportation (NDOT) proposes to expand approximately 10.0 miles of United States Highway 30 (US-30) from a two-lane highway to a four-lane expressway. The current proposed project, Phase 3 - North Bend to Fremont, is the third and final phase of the Schuyler to Fremont US-30 project. The project would begin where the Phase 2 - Rogers to North Bend segment ends near County Road 11 and approximately 200 feet south of County Road S. From this point, Phase 3 would continue east for 10 miles where it converges with the US-30/US-77 interchange.

The Nebraska Department of Transportation (NDOT) proposes to expand approximately 10.0 miles of United States Highway 30 (US-30) from a two-lane highway to a four-lane expressway. The current proposed project, Phase 3 - North Bend to Fremont, is the third and final phase of the Schuyler to Fremont US-30 project. The project would begin where the Phase 2 - Rogers to North Bend segment ends near County Road 11 and approximately 200 feet south of County Road S. From this point, Phase 3 would continue east for 10 miles where it converges with the US-30/US-77 interchange.

PUBLIC NOTICE Application No: NWO-2012-01895-WEH Project Name: US-30, Phase 3 - North Bend to Fremont Applicant: Nebraska Department of Transportation Waterway: Rawhide Creek, Fremont Cutoff Ditch, Rawhide Creek Bypass Channel and Adjacent Wetlands Issue Date: November 29, 2018 Expiration Date: December 19, 2018

21 DAY NOTICE Reply To: NEBRASKA REGULATORY OFFICE 8901 SOUTH 154TH STREET, SUITE 1, OMAHA, NEBRASKA 68138-3635 JOINT PUBLIC NOTICE: This public notice is issued jointly by the U.S. Army Corps of Engineers (USACE), Omaha District, and the Nebraska Department of Environmental Quality (NDEQ). The NDEQ will review the proposed project for state certification in accordance with the provisions of Section 401 of the Clean Water Act. The NDEQ hereby incorporates this public notice as its own public notice and procedures by reference thereto. For the purposes of the NDEQ, their public notice will expire 30 calendar days from the issue date shown above. AUTHORITY: Section 404 of the Clean Water Act (33 USC 1344). APPLICANT: Mr. Tim Weander, Nebraska Department of Transportation, District 2 Engineer, 4425 South 108th Street, Omaha, Nebraska 68154. PROJECT LOCATION: The project is located in Sections 1 and 2, Township 17 North, Range 6 East; Sections 1, 2, 3, 4, 5 and 6 Township 17 North, Range 7 East; Sections 3, 4, 5 and 9 Township 18 North, Range 8 East in Dodge County, Nebraska. Impacts are located between 41.480406°, -96.693369° (Start of project MM 414.94) and 41.475942°, -96.506321° (End of Project MM 425.60). PROJECT DESCRIPTION: The Nebraska Department of Transportation (NDOT) proposes to expand approximately 10.0 miles of United States Highway 30 (US-30) from a two-lane highway to a four-lane expressway. The current proposed project, Phase 3 - North Bend to Fremont, is the third and final phase of the Schuyler to Fremont US-30 project. The project would begin where the Phase 2 - Rogers to North Bend segment ends near County Road 11 and approximately 200 feet south of County Road S. From this point, Phase 3 would continue east for 10 miles where it converges with the US-30/US-77 interchange. 1

The roadway improvement project involves construction of a four-lane expressway, including new drainage structures (culverts and bridges). The improvements will use Nebraska Expressway design standards and typical cross sections, consisting of a four-lane divided roadway with two 12-foot wide driving lanes and associated shoulders in each direction. The inside (left) shoulder would include 4 feet of surfacing and the outside (right) shoulder would include 8 feet of surfacing. The lanes would be separated by a 40-foot wide depressed grass median. The DR2 design standards include minimum and desirable requirements for horizontal curves as well as a requirement that the vertical alignment be set to prevent roadway overtopping during a 50-year storm event. A plan set showing typical cross-sections and aerial views of the proposed project with impacts to aquatic resources is attached. The project would include the construction of approximately 105 structures (culverts and bridges) intended to convey flows through/under US-30 and manage drainage from the US-30 median, side roads, driveways and field entrances. The complete list of structures is attached to this public notice. It should be noted the project would construct two bridges over the Fremont Cutoff Ditch and Rawhide Creek Bypass Channel. Other construction activities affecting wetlands and waters of the U.S. include clearing and grubbing, grading, placement of guardrail, new driveways, reconstructing intersections with county roads, relocating utilities, placing new traffic signs, and implementing erosion control measures. Borrow sites for fill material associated with this proposed project have not yet been identified by the applicant but shall be provided to the USACE and evaluated prior to the start of construction. An individual permit was issued in June 2016 for Phase 1 of the project, Schuyler to Rogers, authorizing impacts to 9.8229 acres of PEMA/C wetlands. In May 2017, a permit amendment was issued to authorize additional permanent impacts to 6.38 acre of PEMA/C wetlands, associated with borrow sites for obtaining fill material for Phase 1 of the project. In May 2018, a permit amendment was issued for Phase 2 ­ Rogers to North Bend, to authorize additional permanent impacts to 8.48 acres of PEMA/C wetlands, 1,940 linear feet of the Dowling-Purcell Ditch, 346 linear feet of the North Bend Cutoff Ditch and 407 linear feet of the Central Cutoff Ditch. In October 2018, a permit amendment was issued to authorize additional temporary impacts to 0.131 acre of PEMA/C wetlands, associated with temporary construction access in Phases 1 and 2 of the project. Compensatory mitigation was required for the permanent impacts associated with Phases 1 and 2. The current proposed project, Phase 3 - North Bend to Fremont, will permanently impact a total of 12.99 acres of wetlands, consisting of 12.82 acres of PEMA/C floodplain depression wetlands (including wetlands in agricultural settings) and 0.17 acre of PEMA/C riverine channel wetlands. These impacts will occur across 16 different impact sites. Additionally, a total of 178 linear feet of Rawhide Creek will be filled by the construction of a box culvert. The applicant's description of the 16 impact site locations identified by activity are available upon request. PROJECT PURPOSE: The applicant's project purpose is to provide a safer, more efficient roadway that improves regional connectivity on US-30 for the traveling public, including commercial traffic, in northeast Nebraska and to fulfill the Nebraska Legislature mandates contained in Legislative Bill (LB) 632 and LB 84. 2

The basic project purpose, as defined by the USACE, is road construction. The overall project purpose, as defined by the USACE, is to upgrade a segment of US-30 from Schuyler to Fremont with current expressway standards to provide a safe and efficient roadway to accommodate existing and future traffic volumes. SPECIAL AQUATIC SITES: The North Bend to Fremont project will permanently impact a total of 12.99 acres of wetlands, consisting of 12.82 acres of PEMA/C floodplain depression wetlands (including wetlands in agricultural settings) and 0.17 acre of PEMA/C riverine channel wetlands. AVOIDANCE, MINIMIZATION, AND MITIGATION: This project is located in two 6-digit Hydrologic Unit Codes (HUC); the west half of the project is within the Lower Platte 6-digit HUC, 102002; and the east half of the project is within the Elkhorn 6-digit HUC, 102200. The applicant has provided an environmental document including an alternatives analysis for the entire US-30 project from Schuyler to Fremont for the USACE to review for compliance with the 404(b)(1) guidelines during the permit decision. The current proposed project, North Bend to Fremont, is the third and final phase of the entire Schuyler to Fremont US-30 project. The applicant evaluated alternatives and provided a description of avoidance and minimization measures for impacts in the environmental document. Compensatory Mitigation: The applicant is proposing to mitigate unavoidable wetland impacts at two different permittee-responsible wetland mitigation sites, due to the project crossing two 6digit HUCs. The west half of the project's permanent impacts (within HUC 102002) would be mitigated at the Phase 2 ­ Rogers to North Bend "Rawhide" Advanced Permittee-Responsible Mitigation site located immediately west of Nebraska Hwy 79 and north of the proposed US-30 alignment in the North ½ of the SW ¼ of Section 31, Township 18 North, Range 6 East, Dodge County, Nebraska. The site is located in the Lower Platte 8-digit HUC (10200201) and would create PEMA/C floodplain depression wetlands in addition to those required for Phase 2. The east half of the project's permanent impacts (within HUC 102200) would be mitigated at the proposed "Taylor" wetland mitigation site, located immediately northwest of the intersection of Dodge County Road S and County Road 18 in Section 35, Township 18 North, Range 7 East. The applicant proposes to restore approximately 26 acres of PEMA/C wetland in the 33-acre parcel. The applicant has submitted a mitigation plan, which is available for review upon request. A conceptual design map of the "Taylor" mitigation site from the applicant's mitigation site plan is attached. CULTURAL RESOURCES: The USACE will comply with the National Historic Preservation Act of 1966, and amendments and the procedures set forth in 33 CFR 325, Appendix C. We have checked the National Register of Historic Places, and there are no known National Register sites in the vicinity. The applicant surveyed the US-30 project alignment from Schuyler to Fremont and coordinated these efforts with the Nebraska State Historic Preservation Office (SHPO) on June 25, 2015. Nebraska SHPO provided a response to the applicant on July 7, 2015. Additionally, the applicant has surveyed the proposed "Taylor" mitigation site and found no architectural or 3

structural resources within the parcel. This is the extent of our knowledge about historic properties in the permit area at this time. We will evaluate input by the State Historic Preservation Office, Tribes, and the public in response to this public notice, and we may conduct or require a survey of the permit area to check for unknown historic or prehistoric properties, if warranted. ENDANGERED SPECIES: This project is in the known range of the federally endangered whooping crane (Grus americana), interior least tern (Sternula antillarum athalassos), and pallid sturgeon (Scaphirhynchus albus), and the federally threatened northern long-eared bat (Myotis septentrionalis) and piping plover (Charadrius melodus). In compliance with the Endangered Species Act, a preliminary determination has been made that the described work may affect, not likely to adversely affect the northern long-eared bat and whooping crane; and the described work will have no effect on the interior least tern, piping plover, and pallid sturgeon. Coordination with the U.S. Fish and Wildlife Service and other interested agencies will be completed to determine the effects on the northern long-eared bat and whooping crane. FLOODPLAIN: This activity is being reviewed in accordance with Executive Order 11988, Floodplain Management, which discourages direct or indirect support of floodplain development whenever there is a practicable alternative. By this notice, comments are requested from individuals and agencies that believe the described work will adversely impact the floodplain. WATER QUALITY CERTIFICATION: Section 401 of the Clean Water Act (33 USC 1341) requires that all discharges of fill material must be certified by the appropriate state agency as complying with applicable effluent limitations and water quality standards. The discharge must be certified before a Department of the Army permit can be issued. Certification, if issued, expresses the State's opinion that the discharge will not violate applicable water quality standards. It is the responsibility of the applicant to contact Nebraska Department of Environmental Quality as soon as possible in the permitting process to discuss requirements for certification. Please contact: CWA Section 401 Coordinator Water Quality Division, Planning Unit Nebraska Department of Environmental Quality 1200 'N' Street, Suite 400 Lincoln, NE 68509-8922 Phone: 402.471.2875 Fax: 402.471.2909 E-mail: ndeq.401certification@nebraska.gov PUBLIC INTEREST REVIEW: The decision whether to issue the USACE permit will be based on an evaluation of the probable impacts including cumulative impacts of the proposed/completed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against their reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, 4

historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. In addition, the evaluation of the impact of the work on the public interest will include application of the guidelines promulgated by the Administrator, Environmental Protection Agency, under authority of Section 404(b) of the Clean Water Act (40 C.F.R. Part 230). COMMENTS: The USACE is soliciting comments from the public, Federal, State, and Local agencies and officials, Indian Tribes and other interested parties in order to consider and evaluate the impacts of this activity. Any comments received will be considered by the USACE to determine whether to issue, modify, condition or deny a permit for this project. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the activity. Anyone whose interests may be affected by the proposed/completed work is invited to submit favorable or unfavorable written comments to the Nebraska Regulatory Office, 8901 South 154th Street, Suite 1, Omaha, NE 68138-3635. The District Engineer is particularly interested in receiving comments related to the proposal's probable impacts on the affected aquatic system's functional values, cumulative and secondary effects and endangered species. All comments received will be considered public information; copies of all comments, including names and addresses of commenters, may be provided to the applicant unless confidentiality is requested. Comments must be submitted on or before the expiration date (located at the top of the first page) of this notice to be considered in the subsequent actions on this application. PUBLIC HEARING: Before the expiration date of this notice, anyone may request, in writing, that a public hearing be held to consider this application. Requests shall specifically state the reason(s) for holding a public hearing. If the District Engineer determines that the information received in response to this notice is inadequate for thorough evaluation, a public hearing may be warranted. If a public hearing is warranted, interested parties will be notified of the time, date, and location. ADDITIONAL INFORMATION: Additional information about this application may be obtained by writing to Adam Nebel at the address shown on page one or by calling (402) 8960896. You can also e-mail adam.r.nebel@usace.army.mil. REQUEST TO POSTMASTERS: Please post this notice conspicuously and continuously until the expiration date specified at the top of page one. NOTICE TO EDITORS: This notice is provided as background information for your use in formatting news stories. This notice is not a contract for classified display advertising. 5

PRO..ECT NO,

PRELIMINARY PLAN

DECEMBER 8, 2017

DEPARTMENT OF ROADS PROJECT NO. S-30-6(1044) C.N. 20626

NORTH BEND

INDEX OF SHEETS 1

FREMONT

=

TYP ICAL SECTIONS

2-W1 -2-W11

WETLANDS

2-N1 -2-N3

GENERAL INFORMATION

2-P1 -2-P2

P HASING EROSION & SEDIMENT

2-L30 -2-LSO

DODGE COUNTY

HWY. US-30

COVER

2-T1 -2-T3

FINAL LOC PLANS R.P. 414+81

CONTROL

STA. 625+00.00

2-L5 1 -2-L52

REMOVAL

2-L5 3 -2-L5 5

CONSTRUCTION P LAN AND P ROFILE

3-30

BEGIN PROJECT

52 - 81 "

ID

DRAINAGE CROSS SECTIONS

·

12

C.N. 20626

NOT FINAL - SUBJECT TO CHANGE

STATE OF NEBRASKA

RD 0

RD O TH/LL

RD 15

15

"

z

RO P

TT 27S

22

22

IS Ir

"

" "

"""'' Hldorlool

....,,

RD R

...... "

"

"

--

RD S

'<02

19

R.P. 425+51

25

END PROJECT

PROJECT TYPE

c =

"

"

HWY. US-30

STA. 1190+00.00

D

3R

D

3R W/SHOULOER WIDENING

C8:i

S BLVD

x

RD T

34

I

·

c

'

"

POP, 369

·

c = c 34

Nickerson

-'!

i"

"

21

Ji"'

RD Q

21

RD U

NEW RECONSTRUCTION

D

FULL GRADING

C8:i

NEW ALIGNMENT

DESIGNER/SQUAD LEADER: DOUG PILLARD PHONE ·

21

R7

O? c =

c =

LORRAINE LEGG

"

E

PHONE #

:':

!!'

!'.'.

'!

c =

c =

c =

c =

c =

c =

c =

-

c =

c N c =

..

c =

Ill

c =

N c =

c =

N c =

STANDARD:

DESIGN

SPEED:

NEW &

70 MPH

RECONSTRUCTION

R.P. 414+81 TENTATIVE LETTING: JULY X, 2019 BALANCE FACTOR TO BE USED: 1.4

N c =

N c =

PROJECT LENGTH DESIGN

402-479-4777

UNIT HEAD:

E

22

20

Sl£ET NO,

30-611044>

TO

=

I 0.7 MILES

R.P. 425+51

402-479-4446

......., . .

.

PRELIMINARY PLAN

12'-0"

12'-0"

20'-0"

12'-0"

····

2'-6"

· r · · · · ;.:. · · · · ·1 · ·::

·

\. 6:l

7

·

2.5"·

13

2

3

12'-0"

30'-0" LATERAL OBSTACLE CLEARANCE

12'-0"

6

4

.. . . 2'-0"

..

'-0' -

4'-0"

: .

3:1

12'-0"

6'-0"

·G

6

4

20'-0"

6:\

.

.

..

US-30

7

.

-2"/.

'-0'

STATION

IEXCEPT AS SHOWN ELSEWHERE>

846+81.00 847+36.00 1101+33.00 1100+69.00

EDGE OF SURFACING VARIES 2'-0" TD 30'-0" MAX.

NEW CONSTRUCTION

-;/ 6:1

BRIDGE AND APPROACH EXCEPTIONS

·THIS MATERIAL TO BE REMOVED BY THE SURFACING CONTRACTOR AND INCORPORATED INTO THE SHOULDERS.

12'-0"

4%- 4%

.. . .

STA. 625+00.00 TD STA. 1190+00.00 RT

TD

STATION

SIDE

-

852+81.00 853+36.00 1115+53.00 1114+89.00

LT. RT. LT. RT.

LEGEND

0 ® 0

8'-0"

4' -0"

NEW CONSTRUCTION BEVELED EDGE DETAIL

_,,,,

1.5-,.. TO 2%

4%

4%

0 ©

6:1

2.5"·

THE BEVELED EDGE IS INCLUDED IN THE DOWELED CONCRETE QUANTITIES

2

3

© G) © G) @ G

13

RIGHT TURN LANE AT N. RIDGE RD. STA. 1136+57. 71 TD STA. 1144+95.39

20'-0"

20'-0"

12'-0"

VARIES 4' TO 17'-0" MAX.

4

2%-

'-0 · 3

1 6:1

2

7 2%

6:\

·" · ·" "

-2%

VARIES 1.5% TO 2"&.

'-0"

2 LEFT TURN LANE

STATION 670+08.95 675+71.69 723+04.92 728+67.66 801+05.28 806+68.02 854+32.00 859+94.74 881+48.00 887+10.82 934+37.00 939+99.74 987+31.00 992+93.74 1039+95.75 1045+58.49 1139+31.00 1146+91.50

TD -

STATION 674+30.21 679+92.95 727+26.18 732+88.92 805+26.54 810+89.28 858+53.26 864+16.00 885+69.34 891+32.00 938+58.26 944+21.00 991+52.26 997+15.00 1044+17.01 1049+79. 75 1145+72.50 1156+28.00

·THIS MATERIAL TO BE REMOVED BY THE SURFACING CONTRACTOR AND INCORPORATED INTO THE SHOULDERS.

SIDE RT. LT RT. LT. RT. LT. RT. LT. RT. LT. RT. LT. RT. LT. RT. LT. LT. LT.

3

2

3

DEPRESSED MEDIAN STATION

& &

RT. RT.

2-T1

C.N. 20626

NOT FINAL - SUBJECT TO CHANGE

30'-0"

""' ...

30-611044>

647+63. 74 674+30.21 700+59.76 727+26.18 805+26.54 831+94.76 858+53.26 885+69.34 905+42.65 938+58.26 964+87. 76 991+52.26 1044+17.01 1079+54. 76 1145+72.50

TD -

STATION

SIDE

649+38.22 675+71.69 702+34.24 728+67.66 806+68.02 833+69.24 859+94.74 887+10.82 907+17 .14 939+99.74 966+62.24 992+93.74 1045+58.49 1081+29.24 1146+91.50

LT./RT. LT./RT. LT.IRT. LT./RT. LT./RT. LT.IRT. LT./RT. LT./RT. LT./RT. LT./RT. LT./RT. LT./RT. LT./RT. LT./RT. LT./RT.

2

@ @ @ @ ® @ @

10" DOWELED CONCRETE 4" FOUNDATION COURSE 8" LIME STABILIZED SUBGRADE EARTH SHOULDER CONSTRUCTION 10" TAPERED TD B" CONCRETE PAVEMENT PROFILE GRADE POINT LONGITUDINAL JOINT SUBGRADE PREPARATION 10" CONCRETE PAVEMENT 10" TEMPORARY SURFACING 1" GRAVEL SURFACING 2" GRAVEL EMBEDMENT B" TOPSOIL BEVELED EDGE, SEE DETAIL SAND FILL FOR MEDIAN 4" CONCRETE MEDIAN SURFACING 4" INTEGRAL CURB DETAIL "A" 12" DOWELED CONCRETE 12" TAPERED TO 10" CONCRETE

NOTE: FOR DETAILS NOT SHOWN SEE PLANS 301-R_ & 329-R_

PRELIMINARY PLAN NOT FINAL - SUBJECT TO CHANGE

......., ...

""' ...

30-611044>

2-T2

C.N. 20626

22'-0" LATERAL OBSTACLE CLEARANCE

i

W3

W1

W3

W1

W2

6

4 2'-0" TYP.

4 2'/.

4'/.

s:'

VARIES

T

6:1

THICKNESS

2.5"·

DETAIL NORTH RIDGE ROAD

"2

"'

STA. 11004+86.19 TO STA. 11005+61.00 STA. 11502+56.25 TO STA. 11504+34.24 STA. 11504+34.24 TO STA. 11506+61.00 STA. 11506+61.00 TO STA. 11523+05.00 CEXCEPT AS SHOWN ELSEWHERE>

4'-0" 8'-0" 8'-0" 8'-0"

""

0'-0" 14'-11" TO 12'-0" 21'-0" 4'-0" 4'-0" 21'-0" TO 12'-0" 4'-0" 12'-0"

LEGEND

0 ® 0

22'-0" LATERAL OBSTACLE CLEARANCE W1

··

W3

12'-9"

12'-9"

W1

0 ©

11000+53.75 11001+53.99 11003+34.00 11500+53.88

TO TO TO TO

STA. STA. STA. STA.

11001+53.99 11003+34.00 11004+86.19 11502+56.25

6'-0"

"2

"'

NORTH RIDGE ROAD STA. STA. STA. STA.

4'-0" 4'-0" 4'-0" 8'-0"

12'-0"

12'-0"

© 0 © 0 @) @

""

""

0'-0" 12'-0" 0'-0" 0'-0" TO 12'-0" 0'-0" 0'-0" 4'-0" 12'-0"

4'-6" 4'-6" TO 16'-6" 0'-0" TO 16'-6" 4'-6"

6'-0"

@ @ @ @ @

12'-0" LATERAL OBSTACLE CLEARANCE

2'-0" TYP.

· · · · · · · ·

COUNTY ROADS VARIES

STA. 2001+02.58 STA. 2501+02.56 STA. 3001+02.37 STA. 3501+02.37 STA. 4201+12.71 STA. 4501+12.71 STA. 5001+02.00 STA. 5501+02.00 STA. 6001+01.86 STA. 6501+02.14 STA. 7001+02.00 STA. 7501+02.00 STA. 8001+02.00 STA. 8501+02.00 STA. 9001+04.00 STA. 9501+04.00 STA. 11005+61.00

TO TO TO TO TO TO TO TO TO TO TO TO TO TO TO TO TO

STA. STA. STA. STA. STA. STA. STA. STA. STA. STA. STA. STA. STA. STA. STA. STA. STA.

11 11 A

2002+01.49 LT. & RT. 2502+84.94 LT. & RT. 3002+13.61 LT. & RT. 3502+09.94 LT. & RT. 4201+80.66 LT. & RT. 4502+76.36 LT. & RT. 5002+40.00 LT. & RT. 5502+40.00 LT. & RT. 6012+50.00 LT. & RT. 6508+30.00 LT. & RT. 7001+50.00 LT. & RT. 7502+10.00 LT. & RT. 8002+40.00 LT. & RT. 8501+90.00 LT. & RT. 9004+20.00 LT. & RT. 9503+67.00 LT. & RT. 11006+00.00 LT. & RT.

·THIS MATERIAL TO BE REMOVED BY THE SURFACING CONTRACTOR AND INCORPORATED INTO THE SHOULDERS.

@ @

.l 1

4" FOUNDATION COURSE B" LIME STABILIZED SUBGRADE EARTH SHOULDER CONSTRUCTION 11 10" TAPERED TO 8 CONCRETE PAVEMENT PROFILE GRADE POINT LONGITUDINAL JOINT SUBGRADE PREPARATION 10" CONCRETE PAVEMENT 10" TEMPORARY SURFACING

1" GRAVEL SURFACING 2" GRAVEL EMBEDMENT B" TOPSOIL BEVELED EDGE. SEE DETAIL SANO FILL FOR MEDIAN 4" CONCRETE MEDIAN SURFACING 4" INTEGRAL CURB DETAIL "A" 12" DOWELED CONCRETE 12" TAPERED TO 10" CONCRETE

NOTE: FOR DETAILS NOT SHOWN SEE PLANS 301-R_ & 329-R_

16'-0" 9 SLOPE VARIES

US-30 CROSSOVER

10" DOWELED CONCRETE

3'-0'

STA. 1190+17.5 RT. TO STA. 1192+46.7 RT. STA. 1187+91.8 RT. TO STA. 1194+62.4 LT. STA. 1231+08.9 LT. TD STA. 1243+58.4 RT. STA. 1230+74.5 RT. TO STA. 1244+14.9 LT.

PRELIMINARY PLAN NOT FINAL - SUBJECT TO CHANGE

......., ...

""' ...

30-611044>

2-T3

C.N. 20626

SURFACING TAPERS TD O' IN 15'-0 "

____________________

_! _PROECT

__________________

EDGE OF ROADWAY

_C _

2'- 0"

2'-0"

1'-6"

VARIES MIN.

O"

SURFACED SHOULDER WIDTH

_____________

EDGE OF SURFACED SHOULDER

EDGE OF SHOULDER

25'-0"

MIN.

SLOPE TRANSITION GUARDRAIL END TREATMENT

SURFACED SHOULDER WIDENING AT GUARDRAIL LOCATIONS

PLAN

... I

l

LANE

SHOULDER

WIDTH

WIDTH

I

<·:f11

TRAVELED WAY

::·6: 1 d';1 r;'.%7'; =======i:=: ===ss·

0.02'/FT.

SLOPE DR FLATTER

* EXTENSION OF

SURFACED SHOULDER

SUBGRADE PREPARATION

4" FOUNDATION COURSE

GRANULAR SUB-DRAIN DETAILS

SHOULDER SLOPE

Z " GRANULAR SUB-DRAIN

SECTION A-A

CONSTRUCTION NOTES:

THE GRADING FDR GUARDRAIL END TREATMENTS

GRANULAR SUB-DRAIN SHALL BE CONSTRUCTED WITH POSITIVE DRAINAGE.

([} GRANULAR

SUB-DRAIN SHALL BE INSTALLED AFTER ALL

{§) GRANULAR

SUB-DRAINS SHALL BE CONSTRUCTED AT INTERVALS OF

GRANULAR

SUB-DRAINS SHALL BE BUILT PERPENDICULAR TO THE CENTER LINE.

SHOULDERING

THE GRADE IS

&

EARTH WORK IS COMPLETED AND PRIOR TD SEEDING.

1%

OR OVER AND AT INTERVALS OF

100'

200'

1%.

WHERE

ON GRADES UNDER

BUILD GRANULAR SUB-DRAIN STATION

TO

625+00.00 625+00.00 852+81.00 853+36.00 1115+53.00 1114+89.00

-

STATION

846+81.00 847+36.00 1101+33.00 1100+69.00 1190+00.00 1190+00.00

SIDE

EACH

SPACING

LT. RT. LT. RT. LT. RT.

222 222 249 247 74 75

100 100 100 100 100 100

FT FT FT FT FT FT

SECTION A-A

z 0

620

615

iii > i5

630

625

PRELIMINARY PLAN

635

SEC. 34-T18N-R6E

640

NOT FINAL - SUBJECT TO CHANGE

PROJECT NO.

30-6(1044) C.N. 20626

SHEET NO. 2-W1

645

SEC. 35-T18N-R6E

z (!)

iii LU 0

.. 0 <( 0 0::

ROAD S '/ /,

PEMA/PEMC -

I

a <( D c:

3-T17N-R6E

SEC. 2-T17N-R6E

I'I, I.'I

l

'I I.

HWY US-30

--- -- -------- --;..:.,:' ----- ---:.-:. .-=""= .-="= .---.---r"=

---- -....::.:-;;;:;...;.:;;: -....;:.,.::- -......=.,:- --=-=- -.....:;.,::- -..-=.,:- -....=..=- -..-=.=- --=-=- -.....=.;- -...:.::---=.;- ....:.: -.....:...:- -....:.;----;...:.: -.=..: ....:..: -.,,..;.:'w=-....---=..----..---.-.--- -v=- -'IF'--..,.=- -----=--IF--.-----.----.--- -'IF'--.----r=--...---.----..---.-= ." lF . · r--...- ..,.--:.-:. r"=

-

"=r-.

F

-- - --- ----- _ -- -:.-;. -:.-:. _ -:.-;. _ -,,.,. ....r.:-;. _ -,,.,. _ -:.-;. _ F 8 e 8 e 8 8 I -

-

-

-

AG WETLAND

645

650

655

660

665

675

670

SEC. 35-T18N-R6E

"' N

t2

HWY US-30

"'

0

N I

!!; Vl I

!!! ;; b 0

STA. 675+00.95

c

-&' 0

00

NORTH

BEND TO FREMONT DODGE

COUNTY

<>-&-<>

f27..a 'i'n

·

LEGEND

LIMITS OF CONSTRUCTION WETLANDS - DO NOT DISTURB IMPACTED WETLANDS TEMPORARY IMPACTED WETLANDS

DATE: FLIGHT: SCALE:

z 0

680

675

685

690

PRELIMINARY PLAN

695

700

725

730

NOT FINAL - SUBJECT TO CHANGE

PROJECT NO.

30-6(1044) C.N. 20626

SHEET NO. 2-W2

705

iii > i5 z (!)

iii LU 0

.. 0 <( 0 0::

--- ..-

-

ROAD S

I

.I .i jN . i

'

\

j I

705

715

710

,.

720

AG WETLAND

.

I

;

I

I '

I

ISEC. 36 T1BN RGEI

D <( a

735 ISEC. 31-T1BN-R7EI

-

[

.Ill

!ROAD SI

-_._

- ='""*-""'* =:: =-"'* =""* ='""* ='""':"!: =-:: = --=

'

--.;ri

"' N

t2

"'

0

N I

!!; Vl I

!!! ;; b 0

IPEMAIPEMC

a.

"

o.i 'i

0 00

.

<>--&--<> LIMITS OF CONSTRUCTION · WETLANDS - DO NOT DISTURB IMPACTED WETLANDS TEMPORARY IMPACTED WETLANDS

- f22"..a 'i'n &'S.'S:I ·

DATE: FLIGHT: SCALE:

·-

z 0

735

740

750

745

iii > i5

PRELIMINARY PLAN

755

760

785

790

NOT FINAL - SUBJECT TO CHANGE

PROJECT NO.

30-6(1044) C.N. 20626

SHEET NO. 2-W3

765

SEC. 31-T18N-R7E

z (!)

iii LU 0

.. 0 <( 0 0::

ROAD S n -""":':. ---=-=- -

·'

-'""':"':.- -----=-=---

HWY US-30

PEMA/PEMC

I

ii ii ii ' i

765

775

770

780

795

SEC. 32-T18N-R7E

SEC. 31-T18N-R7E

SEC. 5-T17N-R7E

"' N

t2

"'

0

N I

!!; Vl I

!!! ;; b 0

a.

"

.,; 'i

0 00

STA. 779+62.45 CHWY. 30> STA. 4000+00.00 CCO. RD. 14

=

I·

l

--

--

----- - ..::.: .:.:-..:.:-..:;-- ---------- -- --- --------

lvPEMA/PEMC

,I I

----------

-- ---"'"'::j

i

·1 f j, ·I i /, '

\, a::

LEGEND

<>--&--<> LIMITS OF CONSTRUCTION ..--WETLANDS - DO NOT DISTURB -- , rzza 'l'h IMPACTED WETLANDS TEMPORARY IMPACTED WETLANDS

DATE: FLIGHT: SCALE:

z 0

BOO

795

iii > i5

805

810

PRELIMINARY PLAN

820

815

NOT FINAL - SUBJECT TO CHANGE

PROJECT NO.

30-6(1044) C.N. 20626

SHEET NO. 2-W4

825

SEC. 32-T18N-R7E

z (!)

iii LU 0

.. 0 <( 0 0::

- --

-

- - --

-

-

=

- ---------- ---- -- - ----- -- ------

c----------

SEC. 5-T17N-R7E

805+97.28

SEC. 5-T17N-R7E

- === -======= ==- =-------------- ------- --- -- -- ------------

HWY US-30

-------------- ---------- ---

-- -

------- -

-- -

SEC. 5-T17N-R7E

825

835

830

840

855

850

845

PEMA/PEMC

SEC. 4 T17N R7E

"' N

t2

"'

0

N I

HWY US-30

!!; Vl I

!!! a; b 0

a. "

SEC. 4-T17N-R7E

..; 'i

0 00

:'. Qi

<>--&--<> LIMITS OF CONSTRUCTION · WETLANDS - DO NOT DISTURB IMPACTED WETLANDS

- f22"..a 'i'n ·

DATE: FLIGHT: SCALE:

_.s:&sSsSl_:::-TEM=PO:RAR:::::.:Y:..::IM:P:A:CTE:DW:.:.:.ETLA:.:.:NDS--

875

870

865

860

855

STA. 859+24.00 = STA. 5000+00.00 CCO. RD. 158 - NORTH>= STA. 5500+00.00 CCO. RD. 158 - SOUTH>

SEC. 4-T17N-R7E

-

--

----

880

NOT FINAL - SUBJECT TO CHANGE

SHEET NO.

C.N. 20626

2-WS

885

SEC. 4-T17N-R7E

---- ----- -- ------

----

PRELIMINARY PLAN

PROJECT NO.

30-6(1044)

--------

- ----

---

- ----------

-----

----

HWY US-30

- --------- -

- --

-

--

- ------

----

--------

---

-

---

SEC. 4-T17N-R7E

!.

11

885

890

895

905

900

910

·

-

-----

---- --- -

--- - - -- - ---

- --- --------

---=-:. - ----

-=-:. -""":.-:.

-- --

__ _ -------

-

---

----

- ---

-

-

--

------ --------

HWY US-30

STA. 886+40.00 CHWY. 30> = STA. 6000+00.00 CCO. RD. 16 - NORTH>= STA. 6500+00.00 CCO. RD. 16 - SOUTH>

a.

"

..n 'i 0 0 "'

SEC. 3-T17N-R7E

LEGEND

0 N

.! ;;:

f22"..a &'S.'S:I

·

<>--&--<> LIMITS OF CONSTRUCTION · - - WETLANDS - DO NOT DISTURB 'i'n IMPACTED WETLANDS TEMPORARY IMPACTED WETLANDS

i

PEllA/PEllC

915

SEC. 3-T17N-R7E

\ l l

ii

PEMA/PEMC

DATE: FLIGHT: SCALE:

I

z 0

iii > i5 z (!)

iii LU

925

920

915 - ---- - --- - ---

-

--

-

-

0

.. 0 <( 0 "'

,

/

./

,

AG WETLAND

-

-

,

/

-

.......

_

--

.......

-

' ,

- ../-

-

-

....

·,

\ -

-

- - --

-

SEC. 3-T17N-R7E -

--

-

.

-

PRELIMINARY PLAN

935

-

I

'----

J

.......

r

930

-.....

'

'

·

'

. ......

...

AG WETLAND --

... _

..

__

I\.

, /'

940

/

....... __

-

-

-

--

·".

, ,,, -- -....., , ---

AG WETLAND

STA. 939+29.95 CHW Y. 30) = N=o= R=T STA -= '-'0= 0,--"- !CO.-=Hl= . 700 0. 0 +0 RD. 7-o- 1= -STA. 7500+00.00 !CO. RD. 17 - SOUTHl ·--"

!I ; ,.-PEMA/PEMC

ljo

Viv

1· 1, C3 · 1 11 0:: ' ,

/

\

I

I

'

'i ' -

"'

..._

l , .,

....... ,

J

..... - ..

'

:.f \ \

' ,

I

.' j)

"'\

i ,.,,·,·'--·

'\. ... .._,,,' ' ·

...

-..

'

. --

-

SHEET NO. 2-W6

C.N. 20626

NOT FINAL - SUBJECT TO CHANGE

> - ---

--

PROJECT NO.

30-6(1044)

945 .

'- . ......

....... .... -

,

\

.

PEMA/PEMC

'\

1\ \ \

'- , )

- SEC. 2-T17N-R7E

"'! PEMA/PEMC

.,

-- - ----------

-

AG WETLAND

---

-------

- -- ---

-- ------

--

SEC. 3-T17N-R7E

955

950

945

965

960

975

970

'. \

.'\

\ \ / \. .

\

V

SEC. 2-T17N-R7E

PEMAtPEMC

\ ....-.. I I -....... , - } .-- .-.PEMA/PEMC I

\

I

·

::-._

\

\

· I

'

--, .

---=----=---=---=--=----=---=---=--=----=---=-,,.,,.,__,,.,,.,._-::._-::__-::__--,,.:__--:-;:_--:-;:_-_-:-;: -:-;:___--:-;:_-_-:-;: _ -:-;: _...;.,::_-_-:-;: =:= -:-;: -:-;: -:-;:_--:-;:_...::::_-_-

'-

---

-

"' N

t2

0 ID

N I

!!; Vl I

!!! ;; b 0

a. " .; 'i

\ '

'

-

,

.

I

\

\

.

I ,

I

I

\

'

,..

L..-J

0

0 00

'\

I

-

/

-

'

-

\ _/

SEC. 2-T17N-R7E LEGEND

f27..a

·

<>--&--<> LIMITS OF CONSTRUCTION WETLANDS - DO NOT DISTURB 'i'n IMPACTED WETLANDS TEMPORARY IMPACTED WETLANDS

DATE: FLIGHT: SCALE:

.

\

z 0

975

980

985

990

iii > i5

PRELIMINARY PLAN

1000

995

NOT FINAL - SUBJECT TO CHANGE

'

z (!)

iii LU 0

fl'

SEC. 2-T17N-R7E

.. 0 <( 0 0::

SEC. 1-T17N-R7E

I \

/

'

/

/

\

SEC. 1-T17N-R7E

2-W7

1005

\

·,

I

.

I

C.N. 20626

SHEET NO.

. ---

\

STA. 992+23.00

PROJECT NO.

30-6(1044)

'

\

I

\'

''

'

-

,

'

'------------------

1005

1010

1015

1020

1025

1030

1035

SEC. 1-T17N-R7E

"' N

t2

0 00

N I

!!; Vl I

!!! ;; b 0

a.

"

...: 'i

0 00

SEC. 1-T17N-R7E

LEGEND

<>--&--<> LIMITS OF CONSTRUCTION ..--WETLANDS - DO NOT DISTURB -- , rzza 'l'h IMPACTED WETLANDS TEMPORARY IMPACTED WETLANDS

DATE: FLIGHT: SCALE:

z 0

1035

iii > i5

1040

1045

1050

SEC. 1-T17N-R7E

SEC. 5-T17N-RBE

z (!)

1055 ·-·1

._.

I ,

iii LU 0

Ll

AG WETLAND

.. 0 <( 0 0::

1060

C.N. 20626

.I

SHEET NO. 2-WB

1065

---

. I

---,

-.

STA. 1044+87.75 = STA. 9500+00.00

PEMA/PEMC

PRELIMINARY PLAN

NOT FINAL - SUBJECT TO CHANGE

PROJECT NO.

30-6(1044)

'

-.

--------------------- ---------

HWY US-30

-

-

.

.

I

_ __

-

-

1

_ __

1

-

-

---

-

---

'

---

-

-

I

-

-

·-...

-------

---

-

---

,

1070

1080

1075

'

'- -- · ....

SEC. 5-T17N-RBE

1065

'

·-

1090

1085

1095

SEC. 5-T17N-RBE

-"' N

t2

-----

-""'

-----------------------------·-------------------------------------------

HWY US-30

0 00

N I

!!; Vl I

!!! ;; b 0

L.f I

a. " ai 'i

0 00

.

I

\

SEC. 5-T17N-RBE

LEGEND

f27..a

·

<>--&--<> LIMITS OF CONSTRUCTION WETLANDS - DO NOT DISTURB 'i'n IMPACTED WETLANDS TEMPORARY IMPACTED WETLANDS

DATE: FLIGHT: SCALE:

1095

z 0

1100

1105

iii > i5

SEC. 5-T17N-RBE

z (!)

iii LU 0

AG WETLAND

.. 0 <( 0 0::

. ,..-- ·

\.

-

-

-

-- -

--- --

...... .

- --

/

-

--- -

- -----

-

-

-

'

-------.,,,,,,...

... - .. - --

)/

.,,,,,,...--------------

/

..... . _

1110

1115

-

.

l\.. "' ' I·i.

!!

'I I.

SEC. 5-T17N-RBE

...::.::--....=..= -

·

II ..

j

SEC. 4-T17N-RBE

lc..- - -- --- ---- 1 - .SEE S H EE T 2 - W 1

1135

1140

1145

0 !!; Vl I

-- -- - -

4-T17N-RBE

--- - ---- ,...... ·· ·-.

00

-- .....:: ....:.:-...:-. : .:..:-....:.:-...:.: -...:.:- -.....:.:--=.:-....:.: -

..

SEC.

N I

- ------=.,:-

II

- ........ --

-

1155

1150

AG WETLAND

t2

I

_,.,..

0 0:::

SEC. 3-T17N-RBE

z

HWY US-30 ---

--.,.::

--=.:..:: ...:.: ..:.: ...::.:-.;:: - ......:,:-..-..::

.:: .:: _:.:-..:.: -...:.:-..::-..::-.,;: .....:.: ....:: ..:: ..:: --------------

-

....:=

------

1146+57.00 !HWY. 30> = 11000+00.00 !NORTH RIDGE 11500+00.00 !NORTH RIDGE

!!! ;; b 0

ROAD ROAD -

SEC. 3-T17N-RBE

a.

" en 'i

0 00

1125

-- - --""="'--""="'---==---=----==---=-----==---==- ----=-- -=:._-=:. - --

PEMAIPEMC

"' N

2-W9

\

- - --

1130

1120

C.N. 20626

SHEET NO.

SEC. 4-T17N-RBE

- - - - - - ------ - - - e e ..- ttn e e me ·we

1125

PRELIMINARY PLAN

NOT FINAL - SUBJECT TO CHANGE

PROJECT NO.

30-6(1044)

SEC. 4-T17N-RBE

LEGEND

f22"..a &'S.'S:I

·

<>--&--<> LIMITS OF CONSTRUCTION · - - WETLANDS - DO NOT DISTURB 'i'n IMPACTED WETLANDS TEMPORARY IMPACTED WETLANDS

DATE: FLIGHT: SCALE:

z 0

1155

1160

1165

1170

PRELIMINARY PLAN

1175

1180

NOT FINAL - SUBJECT TO CHANGE

PROJECT NO.

30-6(1044) C.N. 20626

iii > i5 z (!)

iii LU 0

SEC. 3-T17N-RBE

.. 0 <( 0 0::

=-====-=== =-----

-

---- ---

------ ------

HWY US-30

--

...-:. < '/. "\i-- PEM_A/_-PEM_ _c""

SEC. 3-T17N-RBE

1185

1190

1195

..

ll

''

SEC. 3-T17N-RBE

1200

SEC. 3-T17N-RBE

1205

1210

SEC. 2-T17N-RBE

II

''

11

. '

I! 0 "'

t2

0 00

N I

I

J.'....-.,._.;

t i' I Vl ::::J >3: I

· ·

/

HWY US-30

!!; Vl I

!!! ;; b 0

SEC. 3-T17N-RBE

c

.g ci 'i

0 00

LEGEND

f22"..a &'S.'S:I

·

<>--&--<> LIMITS OF CONSTRUCTION · - - WETLANDS - DO NOT DISTURB 'i'n IMPACTED WETLANDS TEMPORARY IMPACTED WETLANDS

DATE: FLIGHT: SCALE:

SHEET NO. 2-W10

1185

PRELIMINARY PLAN

NOT FINAL - SUBJECT TO CHANGE

PROJECT NO.

30-6(1044) C.N. 20626

z 0

iii > i5 z (!)

iii LU 0

.. 0 <( 0 0::

STA. STA. STA.

II

II 11

I I

0 "'

t2

0 00

N I

!!; Vl I

!!! ;; b 0

\

AG c

'i

0 00

1146+57.00 CHWY. 30 l = 11000+00.00 CNORTH RIDGE ROAD 11500+00.00

' WETLAND'\

\ LEGEND

f22"..a &'S.'S:I

·

<>--&--<> LIMITS OF CONSTRUCTION · - - WETLANDS - DO NOT DISTURB 'i'n IMPACTED WETLANDS TEMPORARY IMPACTED WETLANDS

DATE: FLIGHT: SCALE:

SHEET NO. 2-W11

PRELIMINARY PLAN

NOT FINAL - SUBJECT TO CHANGE

PROJECT NO.

30-6(10441 C.N. 20626

z 0

iii > c z "'

iii "" 0 >-

: 5i' 0 "'

"' .... ... I "' "" .... ::> 11.

0 u

5

u

0 "'

0 IO

N I 11. "" V) I

!!!

0 0

DATE: FLIGHT: SCALE:

SHEET NO. 2-W12

Individual Permit Amendment

Table 1 ­ Structure Modifications Impact Site ID

Station

2W Sheet1

Existing Structure

Proposed Improvements

N/A

635+39

2-W1

N/A

Build 18-inch diameter, 74-foot long culvert pipe with area inlet on inlet and flared end section on outlet

N/A

647+64

2-W1

N/A

Build 18-inch diameter, 76-foot long culvert pipe with area inlet on inlet and flared end section on outlet

N/A

648+00

2-W1

N/A

Build 48-inch diameter, 150-foot long culvert pipe with inlet on inlet and flared send section on outlet

N/A

662+50

2-W1

N/A

Build 18-inch diameter, 91-foot long culvert pipe with area inlet on inlet and flared end section on outlet

N/A

670+08

2-W1

N/A

Build 18-inch diameter, 92-foot long culvert pipe with area inlet on inlet and flared end section on outlet

N/A

674+30

2-W1

N/A

Build 48-inch diameter, 165-foot long culvert pipe with flared end sections Remove 2 feet of existing pipe. Extend 27 feet left with flared end section on inlet

1

674+68 Lt.

2-W1

30-inch diameter, 52-foot long corrugated metal pipe

1

691+12

2-W2

N/A

Build 18-inch diameter, 5-foot long culvert pipe with area inlet

1

691+25

2-W2

N/A

Build twin 48-inch diameter, 148-foot long culvert pipes with flared end sections

N/A

700+57

2-W2

N/A

Build 18-inch diameter, 79-foot long culvert pipe with area inlet on inlet and flared end section on outlet

N/A

701+47 Rt.

2-W2

N/A

Lay 36-inch diameter, 54-foot long driveway pipe with flared end sections

N/A

711+22

2-W2

N/A

Build 18-inch diameter, 5-foot long culvert pipe with area inlet on inlet

2

711+35

2-W2

N/A

Build twin 48-inch diameter, 148-foot long culvert pipes with flared end sections

US-30 North Bend to Fremont Expressway October 2018

4

Project No. S-30-6(1044) Control No. 20626

Individual Permit Amendment

Impact Site ID

Station

2W Sheet1

Existing Structure

Proposed Improvements

N/A

723+05

2-W2

N/A

Build 18-inch diameter, 87-foot long pipe with area inlet on inlet and flared end section on outlet

N/A

727+27

2-W2

N/A

Build twin 48-inch diameter, 156-foot long pipes with flared end sections

2

727+73 Lt.

2-W2

36-inch diameter, 46-foot long corrugated metal pipe

N/A

740+08

2-W3

N/A

Build 54-inch diameter, 148-foot long culvert pipe with flared end sections

N/A

745+30

2-W3

N/A

Build 18-inch diameter, 78-foot long culvert pipe with area inlet on inlet and flared end section on outlet

3

753+00

2-W3

N/A

Build 54-inch diameter, 148-foot long culvert pipe with flared end section

N/A

762+30

2-W3

N/A

Build 18-inch diameter, 77-foot long culvert pipe with area inlet on inlet and flared end section on outlet

3

766+19

2-W3

N/A

Build 48-inch diameter, 148-foot long culvert pipe with flared end section

N/A

778+50

2-W3

N/A

Build 18-inch diameter, 79-foot long culvert pipe with area inlet on inlet and flared end section on outlet

3

779+38

2-W3

N/A

Build 48-inch diameter, 153-foot long culvert pipe with flared end section.

N/A

792+80

2-W3

N/A

Build 18-inch diameter, 77-foot long culvert pipe with area inlet on inlet and flared end section on outlet

N/A

801+05

2-W4

N/A

Build 18-inch diameter, 75-foot long culvert pipe with area inlet on inlet and flared end section on outlet

4

805+17

2-W4

N/A

Build twin 42-inch diameter, 151-foot long culvert pipes with flared end sections

N/A

819+81

2-W4

N/A

Build 18-inch diameter, 77-foot long culvert pipe with area inlet on inlet and flared end section on outlet

US-30 North Bend to Fremont Expressway October 2018

5

Remove 2 feet of existing pipe. Extend 38 feet left with flared end section on inlet

Project No. S-30-6(1044) Control No. 20626

Individual Permit Amendment

Impact Site ID

Station

2W Sheet1

Existing Structure

Proposed Improvements

N/A

831+50

2-W4

N/A

Build 18-inch diameter, 75-foot long culvert pipe with area inlet on inlet and flared end section on outlet

4

832+80

2-W4

N/A

Build 42-inch diameter, 156-foot culvert pipe with flared end section

4

832+82 Lt

2-W4

N/A

Build 36-inch diameter, 40-foot long driveway pipe with flared end section

N/A

834+25

2-W4

N/A

Build 18-inch diameter, 76-foot long culvert pipe with area inlet on inlet and flared end section on outlet

N/A

849+09

2-W4

N/A

Build twin 300-foot long, pre-stressed concrete girder bridges (S030 41903 L&R)

5

849+50 Lt.

2-W4

N/A

Build 48-inch diameter, 135-foot long culvert pipe with flared end section on inlet

5

851+50 Rt.

2-W4

N/A

Build 48-inch diameter, 130-foot long culvert pipe with flared end section on inlet

5 Fremont Cutoff Ditch

851+96

2-W4

N/A

Build twin 100-foot long span, prestressed concrete girder bridges (S030 41907 L&R)

N/A

852+62 Lt.

2-W4

N/A

Build 15-inch diameter, 36-foot long culvert pipe with area inlet on inlet and flared end section on outlet

N/A

852+96 Lt.

2-W4

N/A

Build 18-inch diameter, 66-foot long culvert pipe with area inlet on inlet and flared end section on outlet

5

853+19

2-W4

N/A

Build 15-inch diameter, 22-foot long culvert pipe

5

853+19 Rt.

2-W4

N/A

Build 15-inch diameter, 8-foot long culvert pipe with area inlet on inlet and junction box on outlet

5

853+54 Rt.

2-W4

N/A

Build 15-inch diameter, 60-foot long culvert pipe with area inlet on inlet and flared end section on outlet

N/A

858+50 Lt.

2-W5

N/A

Build 18-inch diameter, 26-foot long culvert pipe with area inlet on inlet

N/A

858+78

2-W5

N/A

Build 30-inch diameter, 170-foot long culvert pipe with flared end sections

US-30 North Bend to Fremont Expressway October 2018

6

Project No. S-30-6(1044) Control No. 20626

Individual Permit Amendment

Impact Site ID

Station

2W Sheet1

Existing Structure

Proposed Improvements

N/A

872+00

2-W5

N/A

Build 18-inch diameter, 68-foot long culvert pipe with area inlet on inlet and flared end section on outlet

N/A

878+32

2-W5

N/A

Build 18-inch diameter, 66-foot long culvert pipe with area inlet on inlet and flared end section on outlet

N/A

881+48

2-W5

N/A

Build 18-inch diameter, 66-foot long culvert pipe with area inlet on inlet and flared end section on outlet

6

6006+93

2-W11

N/A

Build 36-inch by 37-foot round equivalent culvert pipe with flared end section

6

6007+47

2-W11

N/A

Build twin 42-inch by 45-foot round equivalent culvert pipes with flared end sections

7

885+44

2-W5

N/A

Build 30-inch diameter, 150-foot long culvert pipe with flared end sections

7

905+25

2-W5

N/A

Build 18-inch diameter, 46-foot long culvert pipe with area inlet on inlet and flared end section on outlet

7

905+73

2-W5

N/A

Build 36-inch diameter, 148-foot long culvert pipe with flared end sections

8

921+29

2-W6

N/A

Build 18-inch diameter, 73-foot long culvert pipe with area inlet on inlet and flared end section on outlet

N/A

934+37

2-W6

N/A

Build 18-inch diameter, 75-foot long culvert pipe with area inlet on inlet and flared end section on outlet

8

938+67

2-W6

N/A

Build 30-inch diameter, 148-foot long culvert pipe with flared end sections

8

945+50

2-W6

N/A

Build 48-inch diameter, 148-foot long culvert pipe with flared end sections

N/A

952+00

2-W6

N/A

Build 18-inch diameter, 74-foot long culvert pipe with area inlet on inlet and flared end section on outlet

N/A

964+50

2-W6

N/A

Build 18-inch diameter, 76-foot long culvert pipe with area inlet on inlet and flared end section on outlet

N/A

965+75 Rt.

2-W6

N/A

Lay 36-inch diameter, 50-foot long driveway pipe with flared end section

US-30 North Bend to Fremont Expressway October 2018

7

Project No. S-30-6(1044) Control No. 20626

Individual Permit Amendment

Impact Site ID

Station

2W Sheet1

Existing Structure

Proposed Improvements

9

966+50

2-W6

N/A

Build 24-inch diameter, 167-foot long culvert pipe with flared end section

N/A

979+00

2-W7

N/A

Build 18-inch diameter, 77-foot long culvert pipe with area inlet on inlet and flared end section on outlet

N/A

987+31

2-W7

N/A

Build 18-inch diameter, 77-foot long culvert pipe with area inlet on inlet and flared end section on outlet

10

991+36

2-W7

N/A

Build twin 42-inch diameter, 167-foot long culvert pipes with flared end sections

N/A

1009+89

2-W7

N/A

Build 18-inch diameter, 80-foot long culvert pipe with area inlet on inlet and flared end section on outlet

N/A

1018+50

2-W7

N/A

Build 48-inch diameter, 150-foot long culvert pipe with flared end sections

N/A

1027+23

2-W7

N/A

Build 18-inch diameter, 81-foot long culvert pipe with area inlet on inlet and flared end section on outlet

N/A

1039+95

2-W8

N/A

Build 18-inch diameter, 80-foot long culvert pipe with area inlet on inlet and flared end section on outlet

11

1044+41

2-W8

N/A

Build 48-inch diameter, 153-foot long culvert pipe with flared end sections

11

1053+48

2-W8

N/A

Build twin 8-foot by 4-foot by 161foot concrete box culverts

N/A

1055+45

2-W8

N/A

Build 24-inch diameter, 76-foot long culvert pipe with area inlet on inlet and flared end section on outlet

N/A

1055+51

2-W8

N/A

Build 18-inch diameter, 3-foot long culvert pipe

Remove 2 feet left and right. Extend 6 feet left and 10 feet right.

11

9503+18

2-W8

36-inch diameter, 40-foot long round equivalent corrugated metal arch pipe

12

1069+24 Rt.

2-W8

N/A

US-30 North Bend to Fremont Expressway October 2018

8

Build 24-inch diameter, 139-foot long culvert pipe with flared end section on inlet and flap gate on outlet

Project No. S-30-6(1044) Control No. 20626

Individual Permit Amendment

Impact Site ID

Station

2W Sheet1

Existing Structure

Proposed Improvements

12

1069+50 Lt.

2-W8

N/A

Build 42-inch diameter, 59-foot long culvert pipe with flared end section on inlet and flap gate on outlet

12 Rawhide Creek

1070+58

2-W8

N/A

Build triple barrel 10-foot by 7-foot by 167-foot reinforced concrete box culvert (S030 42315)

12

1079+50

2-W8

N/A

Build 18-inch diameter, 91-foot long culvert pipe with area inlet on inlet and flared end section on outlet

12

1080+42 Rt.

2-W8

N/A

Build 24-inch diameter, 62-foot long driveway culvert pipe with flared end sections

N/A

1093+00

2-W8

N/A

Build 24-inch diameter, 95-foot long culvert pipe with area inlet on inlet and flared end section on outlet

N/A

1093+06

2-W8

N/A

Build 18-inch diameter, 3-foot long culvert pipe with area inlet

13

1100+68 Rt.

2-W9

N/A

Build 15-inch diameter, 47-foot long culvert pipe with area inlet on inlet and flared end section on outlet

13

1101+08 Rt.

2-W9

N/A

Build 15-inch diameter, 10-foot long culvert pipe with area inlet

13

1101+08 Lt.

2-W9

N/A

Build 15-inch diameter, 21-foot long culvert pipe with area inlet

13

1101+08 Lt.

2-W9

N/A

Build 18-inch diameter, 97-foot long culvert pipe with area inlet at inlet and flared end section on outlet

13

1101+76

2-W9

N/A

Build 15-inch diameter, 36-foot long culvert pipe with area inlet on inlet and flared end section on outlet

13

1106+54

2-W9

24-inch diameter, 23-foot long corrugated metal driveway pipe

13

1106+50 Rt.

2-W9

N/A

Lay 24-inch diameter, 100-foot long driveway pipe

13

1107+15 Lt.

2-W9

N/A

Lay 24-inch diameter, 90-foot long driveway pipe

13 Rawhide Creek Bypass Channel

1110+61

2-W9

N/A

Build twin 1,320-foot long, prestressed concrete girder bridges (S030 42380 L&R)

US-30 North Bend to Fremont Expressway October 2018

9

Remove

Project No. S-30-6(1044) Control No. 20626

Individual Permit Amendment

Impact Site ID

Station

2W Sheet1

Existing Structure

Proposed Improvements

N/A

1114+66 Rt.

2-W9

N/A

Build 15-inch diameter, 48-foot long culvert pipe with area inlet on inlet and flared end section on outlet

N/A

1115+21 Rt.

2-W9

N/A

Build 18-inch diameter, 82-foot long culvert pipe with area inlet on inlet and flared end section on outlet

N/A

1115+35 Lt.

2-W9

N/A

Build 15-inch diameter, 34-foot long culvert pipe with area inlet on inlet and flared end section on outlet

N/A

1115+75 Lt.

2-W9

N/A

Build 15-inch diameter, 44-foot long culvert pipe with area inlet

N/A

1129+38

2-W9

N/A

Build 18-inch diameter, 82-foot long culvert pipe with area inlet on inlet and flared end section on outlet

N/A

1133+19

2-W9

N/A

Build 42-inch diameter, 149-foot long culvert pipe with flared end sections

N/A

1139+31

2-W9

N/A

Build 18-inch diameter, 80-foot long culvert pipe with area inlet on inlet and flared end section on outlet

14

1144+65

2-W9

N/A

Build twin 9-foot by 4-foot by 169foot concrete box culverts

14

1145+63

2-W9

N/A

Build 18-inch diameter, 3-foot long culvert pipe with area inlet

14

1145+70 Lt.

2-W9

N/A

Build 24-inch diameter, 84-foot long culvert pipe with area inlet on inlet and flared end section on outlet

N/A

1153+19

2-W9

N/A

Build 18-inch diameter, 3-foot long culvert pipe with area inlet

N/A

1153+25

2-W9

N/A

Build 24-inch diameter, 90-foot long culvert pipe with area inlet on inlet and flared end section on outlet

N/A

1160+00

2-W10

N/A

Build twin 9-foot by 4-foot by 150foot concrete box culverts

N/A

1171+65

2-W10

N/A

Build 18-inch diameter, 79-foot long culvert pipe with area inlet on inlet and flared end section on outlet

N/A

1174+00

2-W10

N/A

Build twin 9-foot by 4-foot by 150foot concrete box culverts

US-30 North Bend to Fremont Expressway October 2018

10

Project No. S-30-6(1044) Control No. 20626

Individual Permit Amendment

Impact Site ID

Station

2W Sheet1

Existing Structure

14

11003+48 Lt.

2-W11

N/A

15

11503+20 Lt.

2-W11

15

11504+97 Lt.

2-W11

N/A

11506+88 Lt.

2-W11

15

11512+39 Lt.

2-W11

15

11513+06 Lt.

2-W11

N/A

11520+64 Rt.

2-W11

N/A

11520+72 Lt.

2-W11

15

11523+95

2-W11

16

1186+39

2-W10

16

1186+97

2-W10

16

1188+25

2-W10

N/A

1189+80

2-W10

18-inch diameter, 25-foot long corrugated metal drive pipe 18-inch diameter, 24-foot long corrugated metal drive pipe 18-inch diameter, 44-foot long corrugated metal drive pipe 18-inch diameter, 25-foot long corrugated metal drive pipe 18-inch diameter, 24-foot long corrugated metal drive pipe 24-inch diameter, 43-foot long corrugated metal drive pipe 24-inch diameter, 50-foot long corrugated metal drive pipe 42-inch diameter, 57-foot long corrugated metal pipe 24-inch diameter, 172-foot long corrugated metal pipe 18-inch diameter, 20-foot long corrugated metal pipe 18-inch diameter, 70-foot long corrugated metal pipe N/A

Proposed Improvements Lay twin 36-inch diameter, 40-foot long driveway culvert pipe with flared end sections Remove existing and lay 18-inch diameter, 38-foot long driveway culvert pipe Remove existing and lay 18-inch diameter, 34-foot long driveway culvert pipe Use in Place Remove existing and lay 18-inch diameter, 42-foot long driveway culvert pipe Remove existing and lay 18-inch diameter, 36-foot long driveway culvert pipe Remove existing and lay 24-inch diameter, 43-foot long driveway culvert pipe Remove existing and lay 24-inch diameter, 46-foot long driveway culvert pipe Remove 2 feet of pipe left and right. Extend 21 feet left and 71 feet right

Use in Place

Remove

Remove Build 18-inch diameter, 73-foot long culvert pipe with area inlet on inlet and flared end section on outlet

Notes: 1 2W Sheets are included in Attachment D. US-30 North Bend to Fremont Expressway October 2018

11

Project No. S-30-6(1044) Control No. 20626

LEGEND Ecoregion Level IV

Waterway

Lower Platte Alluvial Plain Roads Nebraska/Kansas Loess Hills Rogers to North Bend Northeastern Nebraska Loess Hills North Bend to Fremont Platte River Valley Mitigation Site Boundary County Boundary

HUC 8: 10200202 Lower Platte

HUC 8 Watershed

ide C Rawh

o I

reek

HUC 8: 10220003 Lower Elkhorn

City Boundary

Rawhide

ç ?

Taylor Mitigation Site

Start CN 20626 MM 414.94

Rawhide Mitigation Site

itc

h tc Di

ff D

ff to

ut o

Cu

k I

t on

ra lC

Rogers

End CN 20626 MM 425.60

em Fr

Ce nt

North Bend

Creek

h

Ames Pl

HUC 8: 10200201 Lower Platte-Shell

at t

eR

iv

Fremont

er

Morse Bluff Pl a

HUC 8: 10200203 Salt

O 0

Miles

tt e

Riv

er

Cedar Bluffs

PROJECT AND MITIGATION SITE LOCATION US-30 NORTH BEND TO FREMONT EXPRESSWAY 1.5

PATH: Z:\PROJECTS\NDOR\036646_US_30_2010\MAP_DOCS\MXD\WETLAND_MITIGATION_OPTIONS_REPORT\FIG1_PROJECT_MITIGATION_LOCATION2.MXD - USER: AFISCHER - DATE: 10/31/2017

FIGURE 1

PRD.ECT llD.

PRELIMINARY PLAN NOT FINAL - SUBJECT TD CHANGE

SIEET llD.

)()(

S-311-61111441 C.N. 211626

LEGEND ·11

PROPOSED PERIMETER FENCE

PRESERVE EXISTING MONITORING WELL

1·1

PROPERTY LINE

: =I [:;::f:;:I -T

EXISTING WETLAND EXISTING TREE LINE

--

- FO

EXISTING TELEPHONE LlNE

·

1=2=14_1214.5_ - _J2J1 - -

EXISTING FIBER OPTICS LINE PROPOSED GRADE

1

PROPOSED GRADE

6

FT. CONTOUR LINE IN. CONTOUR LINE

EXISTING GRADE CONTOUR LlNE

0

---- PROPOSED PERIMETER FENCE

- IJl.C. -

LIMITS OF CONSTRUCTIIJ'4

·

REMOVE EXISTING TREES ALONG PROPERTY LINE WHERE THEY

50

100

200

SCALE

BASELINE CONTROL POINT

lNTERFERE WITH PROPOSED PERIMETER FENCE

NOTES 1.

SEE ROADWAY PLANS

FCJ'I

INFORMATIIJ'4 ON CONTRCl...

POINTS. GENERAL NOTES AND EXCAVATION QUANTITIES.

2.

Iii

EXISTING TOPSOIL WITHIN LIMITS OF CONSTRUCTION TO BE SALVAGED - EXCAVATE A MINIMUM OF

Ill .. "'

6

IN OF

TOPSOIL PRIOR TO FINAL GRADING OPERATIONS. SEE

..

SEEDING PLAN FOR NOTE ABOUT TOPSOIL.

5I

... ::t:

3.

D

EXISTING

8' STEEL

PIPE AND

3111' CULVERT

TO REMAIN.

PROTECT THESE PIPES FROM DISTURBANCE.

REMOVE EXISTING TREES WITHIN PROPERTY BACK TO PROPOSED PERIMETER D Ill

IL <

FENCE

EXISTING 8' STEEL PIPE: INV. 213.23 a FIELD INV. 213.88 a DITCH EXISTING 30' CULVERT: N INV. 211.qq S INV. 211.q2

PROPOSED GATE a EXISTING ENTRANCE

EXISTING TWIN

...

4B'CULVERTS

0 .. I ,_ u D I "'

..

:g

ON N ·· , ....

- ;: 0 """'

@[Q)DWJ@ IP'ILWI IP'DIL IP'ILWI

SHEET 2 OF 15

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits