APPLICANTS: Clay County Parks Department and USACE- Smithville Project Office PROJECT LOCATIONS: Smithville Lake within Sections 8

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

APPLICANTS: Clay County Parks Department and USACE- Smithville Project Office

PROJECT LOCATIONS: Smithville Lake within Sections 8, 17, 18 and 19, Township 53 north, Range 32 west, Clay County, Missouri and within Sections 13 and 24, Township 53 north, Range 33 west, Clay County, Missouri.

ACTIVITY: The Clay County Parks Department has proposed the placement of rock riprap at 10 sites around the lake perimeter of the Camp Branch Campground area and at 14 sites around the perimeter of the Crows Creek picnic shelter area. The U.S. Army Corps of Engineers, Smithville Project Office has proposed to place rock riprap at 7 additional sites on the lake near the Visitor Center, Little Platte Swim Beach and the Day-use area north of Camp Branch Campground.

APPLICANTS: Clay County Parks Department and USACE- Smithville Project Office

PROJECT LOCATIONS: Smithville Lake within Sections 8, 17, 18 and 19, Township 53 north, Range 32 west, Clay County, Missouri and within Sections 13 and 24, Township 53 north, Range 33 west, Clay County, Missouri.

ACTIVITY: The Clay County Parks Department has proposed the placement of rock riprap at 10 sites around the lake perimeter of the Camp Branch Campground area and at 14 sites around the perimeter of the Crows Creek picnic shelter area. The U.S. Army Corps of Engineers, Smithville Project Office has proposed to place rock riprap at 7 additional sites on the lake near the Visitor Center, Little Platte Swim Beach and the Day-use area north of Camp Branch Campground.

PUBLIC NOTICE Permit No. NWK-2018-1572 Issue Date: December 12, 2018 Expiration Date: January 2, 2019

US Army Corps of Engineers Kansas City District

21-Day Notice ______________________________________________________________________________ This public notice is issued jointly with the Missouri Department of Natural Resources, Water Pollution Control Program. The Department of Natural Resources will use the comments to this notice in deciding whether to grant Section 401 water quality certification. Commenters are requested to furnish a copy of their comments to the Missouri Department of Natural Resources, P.O. Box 176, Jefferson City, Missouri 65102. APPLICANTS:

Clay County Parks, Missouri 1 Courthouse Square Liberty, Missouri 64068

USACE- Smithville Project Office P.O. Box 428 Smithville, Missouri 64089

PROJECT LOCATIONS (As shown on the attached drawings): Smithville Lake within Sections 8, 17, 18 and 19, Township 53 north, Range 32 west, Clay County, Missouri and within Sections 13 and 24, Township 53 north, Range 33 west, Clay County, Missouri. USGS QUAD: Smithville, Missouri Center Coordinates: Latitude: 39.40822; Longitude: -94.53191 (Camp Branch) Latitude: 39.40116; Longitude: -94.53394 (Crows Creek) AUTHORITY: Section 404 of the Clean Water Act (33 USC 1344) ACTIVITY (As shown on the attached drawings): The Clay County Parks Department has proposed the placement of rock riprap at 10 sites around the lake perimeter of the Camp Branch Campground area and at 14 sites around the perimeter of the Crows Creek picnic shelter area. The total length of all protected sites is 7,040 linear feet at the Camp Branch Campground area and 9,707 linear feet at the Crows Creek area. A total of approximately 28,469 cubic yards of riprap would be placed to slow shoreline erosion, protect recreational facilities, promote shallow water habitat and improve water quality in the lake. The rock will consist of a gradation between 4-24 inches and will be placed at a rate of approximately 1.7 cubic yards per linear foot of shoreline. The U.S. Army Corps of Engineers, Smithville Project Office has proposed to place rock riprap at 7 additional sites on the lake near the Visitor Center, Little Platte Swim Beach and the Dayuse area north of Camp Branch Campground. The total length of all protected sites is 3,020 linear feet. A total of approximately 4,055 cubic yards of riprap would be placed to slow shoreline erosion, protect recreational and other project facilities and structures, promote shallow water habitat and improve water quality in the lake. The rock will consist of a gradation between 4-24 inches and placed at a rate of approximately 1.7 cubic yards per linear foot of shoreline.

WETLANDS/AQUATIC HABITAT: No wetlands will be impacted by the proposed work. APPLICANT'S STATEMENT OF AVOIDANCE, MINIMIZATION, AND COMPENSATORY MITIGATION FOR UNAVOIDABLE IMPACTS TO AQUATIC RESOURCES: Shoreline stabilization is a technique to reduce soil erosion, improve water quality and reduce sedimentation. The rock will be placed along the shoreline without any disturbance, excavation or grading of the existing shoreline, bank or upland areas. ADDITIONAL INFORMATION: Additional information about this application may be obtained by contacting Brian Donahue at the U.S. Army, Corps of Engineers, Kansas City District Regulatory Office, Room 402, 601 East 12 th Street, Kansas City, Missouri 64106, telephone: (816) 389-3703 or email at brian.t.donahue@usace.army.mil. All comments to this public notice should be directed to the above address. CULTURAL RESOURCES: Kansas City District will comply with the National Historic Preservation Act of 1966 and 36 CFR 800. We have checked the National Register of Historic Places and the Federal Register and no property listed in the Register or proposed for listing is located in the permit area. There are 2 previously discovered and excavated historic sites in the vicinity of the work, in one location at Camp Branch, (CL-104) and at one location at the Crows Creek, (CL-213) recreation area. This is the extent of our knowledge about historic properties within the permit area at this time. However, we will evaluate input by the State Historic Preservation Officer, Tribal Historic Preservation Officers (or Tribe designated representative), the Kansas City District Archeologist and the public in response to this public notice, and we may conduct or require a reconnaissance survey of the permit area to check for unknown historic properties, if warranted. ENDANGERED SPECIES: In compliance with the Endangered Species Act, a preliminary determination has been made that the described work will not affect species designated as threatened or endangered or adversely affect critical habitat. In order to complete our evaluation of this activity, comments are solicited from the U.S. Fish and Wildlife Service and other interested agencies and individuals. FLOODPLAINS: This activity is being reviewed in accordance with Executive Order 11988, Floodplain Management, which discourages direct or indirect support of floodplain development whenever there is a practicable alternative. By this public notice, comments are requested from individuals and agencies that believe the described work will adversely impact the floodplain. WATER QUALITY CERTIFICATION: Section 401 of the Clean Water Act (33 USC 1341) requires that all discharges of dredged or fill material must be certified by the appropriate state agency as complying with applicable effluent limitations and water quality standards. This public notice serves as an application to the state in which the discharge site is located for certification of the discharge. The discharge must be certified before a Department of the Army permit can be issued. Certification, if issued, expresses the state's opinion that the discharge will not violate applicable water quality standards. PUBLIC INTEREST REVIEW: The decision to issue a permit will be based on an evaluation of the probable impact including the cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may

be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, esthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs and, in general, the needs and welfare of the people. The evaluation of the impact of the activity on the public interest will include application of the guidelines promulgated by the Administrator, Environmental Protection Agency under authority of Section 404(b) of the Clean Water Act (33 USC 1344). The Corps of Engineers is soliciting comments from the public; Federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. COMMENTS: This notice is provided to outline details of the above-described activity so this District may consider all pertinent comments prior to determining if issuance of a permit would be in the public interest. Any interested party is invited to submit to this office written facts or objections relative to the activity on or before the public notice expiration date. Comments both favorable and unfavorable will be accepted and made a part of the record and will receive full consideration in determining whether it would be in the public interest to issue the Department of the Army permit. Copies of all comments, including names and addresses of commenters, may be provided to the applicant. Comments should be mailed to the address shown on page 2 of this public notice. PUBLIC HEARING: Any person may request, in writing, prior to the expiration date of this public notice, that a public hearing be held to consider this application. Such requests shall state, with particularity, the reasons for holding a public hearing.

UU l ll'-Ut'UIO

Savannah

Chula

Gallatin Maysville

Highland Country Club

Chillicothe

CID

Troy

St Joseph

Powhattan

Horton

0

CID

t

(

Stewartsville

Cameron

J

Gower Plattsburg

Atchison

@)

Osborn

Kingston

Braymer

Polo

Lathrop

Ellingham

Hamifton

Tin

Dearborn

w

¢:J

Weston

© Valley Falls

Bogard

Platte City

0

l

PROJECT VICINITY

Kearney

Carrollton Excelsior Springs

@

@ Norbome

Leavenworth

Richmond Lansing

©

Liberty Waverly

Oskaloosa

Me<1deo

Lexington

Alma

Kansas City Peny

eka Blue Springs

Odessa

Stull

Lawrence

@

Swe

Lenexa

Lee's Summit

Olathe late

PERMIT NO. NWK-2018-1572 CLAY COUNTY, MISSOURI AND USACE-SMITHVILLE PROJECT OFFICE SHORELINE STABILIZATION SMITHVILLE LAKE CLAY COUNTY, MISSOURI SHEET 1 O F 8 11 DECEMBER 2018

Grandview

Gardner

OVe

Baldwin City

Concordia

Overland Park

CID

Go gle

0

Wam!Osburg

Knob Noster

PERMIT NO. NWK-2018-1572 CLAY COUNTY, MISSOURI AND USACE-SMITHVILLE PROJECT OFFICE SHORELINE STABILIZATION SMITHVILLE LAKE CLAY COUNTY, MISSOURI SHEET 2 OF 8 11 DECEMBER 2018

Camp Branch Campground 54

70

71

53 37 B Loop

Collins Rd

69

68 65

67

Camp Branch Marina

66

Legend Trails

Rip Rap Complete Proposed

0

425

850

1,700

2,550

Tract ID: 138, 144, 204, 220, 221, 228 Section 17 & 18, Range 32W, Township 53N Total Length: 7,040 feet Estimated Cubic Yards of rip rap: 11,968 Estimated 1.7 cubic yards per linear foot. Site #'s: 37, 53, 54, 65, 66, 67, 68, 69, 70, 71

Feet 3,400

PERMIT NO. NWK-2018-1572 CLAY COUNTY, MISSOURI AND USACE-SMITHVILLE PROJECT OFFICE SHORELINE STABILIZATION SMITHVILLE LAKE CLAY COUNTY, MISSOURI SHEET 3 OF 8 11 DECEMBER 2018

Crows Creek Shelter Arm 1

30

µ 29

32

32

Shelter 9

59

61 31

33

58

62

33

52

8

60

Shelter 7

28

64

63

50

51

Shelter 4

PERMIT NO. NWK-2018-1572 CLAY COUNTY, MISSOURI AND USACE-SMITHVILLE PROJECT OFFICE SHORELINE STABILIZATION SMITHVILLE LAKE CLAY COUNTY, MISSOURI SHEET 4 OF 8 11 DECEMBER 2018

0

Legend Trails

Rip Rap Complete Proposed

375

750

1,500

2,250

Feet 3,000

Tract ID: 125, 126, 128, 129, 130, 131 Section 19, Range 32W, Township 53N Total Length: 9707 feet Estimated Cubic Yards of rip rap: 16,501 Estimated 1.7 cubic yards per linear foot. Site #'s: 28, 29, 30, 31, 50, 51, 52, 58, 59, 60, 61, 62, 63, 64

Jerry Litton Visitor Center

PERMIT NO. NWK-2018-1572 CLAY COUNTY, MISSOURI AND USACE-SMITHVILLE PROJECT OFFICE SHORELINE STABILIZATION SMITHVILLE LAKE CLAY COUNTY, MISSOURI SHEET 5 OF 8 11 DECEMBER 2018

Legend

0

· Trails

Rip Rap -

Complete Proposed

~

,/.

230

460

920

1,380

Site Number: 72, 73, 74, 75, 78 USAGE Tract ID: 113, 122, 125 Section 19, Range 32W, Township 53N Section 24, Range 33W, Township 53N Total Length: 2245 feet Estimated Cubic Yards of rip rap: 3143 Estimated 1.4 cubic yards per linear foot.

Little Platte Swim Beach

PERMIT NO. NWK-2018-1572 CLAY COUNTY, MISSOURI AND USACE-SMITHVILLE PROJECT OFFICE SHORELINE STABILIZATION SMITHVILLE LAKE CLAY COUNTY, MISSOURI SHEET 6 OF 8 11 DECEMBER 2018

0

- 140

-

280

560

Site Number: 77 USACE Tract ID: 146 Section 13, Range 33W, Township 53N Total Length: 575 feet Estimated Cubic Yards of rip rap: 632.5 Estimated 1.1 cubic yards per linear foot.

840

Feet 1, 120

North of Camp Branch A Loop

PERMIT NO. NWK-2018-1572 CLAY COUNTY, MISSOURI AND USACE-SMITHVILLE PROJECT OFFICE SHORELINE STABILIZATION SMITHVILLE LAKE CLAY COUNTY, MISSOURI SHEET 7 OF 8 11 DECEMBER 2018

Legend

0

· Trails

Rip Rap -

Complete Proposed

'

~

162.5

325

650

975

Site Number: 76 USACE Tract ID: 229 Section 8, Range 32W, Township 53N Total Length: 200 feet Estimated Cubic Yards of rip rap: 280 Estimated 1.4 cubic yards per linear foot.

High Water Mark 867.20

Existing cut bank

Normal Pool Level 864.20

Normal Pool elevation is located at the base of each cut bank. High Water Mark is shown at 3' above normal pool. The rip rap will be approximately 8-10 feet thick at the base and the length shown on the map. The height of each cut bank will vary from 6 ­ 8 feet high.

PERMIT NO. NWK-2018-1572 CLAY COUNTY, MISSOURI AND USACE-SMITHVILLE PROJECT OFFICE SHORELINE STABILIZATION SMITHVILLE LAKE CLAY COUNTY, MISSOURI SHEET 8 OF 8 11 DECEMBER 2018

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas