Home

St. Paul District

Run scraper

Hawthorne Hill Phase II

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

PUBLIC NOTICE: Wisconsin Central Limited (WCL) has submitted a request for Department of the Army authorization under Section 404 of the Clean Water Act (CWA) for unavoidable wetland impacts associated with the construction of a 6.03 mile long (31,838 linear foot) extension of an existing 4.5-mile long double track rail siding located along the WCL Superior Subdivision from milepost (MP) 445.85 to MP 451.88. The proposed project would be an extension of the Hawthorn Hill Phase 1 double track which was constructed and put into service in 2017.

PROJECT DESCRIPTION AND PURPOSE: Wisconsin Central Limited (WCL) has submitted a request for Department of the Army authorization under Section 404 of the Clean Water Act (CWA) for unavoidable wetland impacts associated with the construction of a 6.03 mile long (31,838 linear foot) extension of an existing 4.5-mile long double track rail siding located along the WCL Superior Subdivision from milepost (MP) 445.85 to MP 451.88. The proposed project would be an extension of the Hawthorn Hill Phase 1 double track which was constructed and put into service in 2017.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas