Wes Buesing / Area II MN River Basin Projects

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

LETTER OF PERMISSION: The project consists of the construction of a dam structure in order to reduce flooding, provide wildlife habitat, capture sediment and control erosion which is occurring on a ravine tributary to Lake Marshall.

PROJECT DESCRIPTION AND PURPOSE: The project consists of the construction of a dam structure in order to reduce flooding, provide wildlife habitat, capture sediment and control erosion which is occurring on a ravine tributary to Lake Marshall.

Information for File # MVP-2018-03569-MMJ; Sodus 2 Grade Stabilization Project Applicant: Wes Buesing / Area II MN River Basin Projects Corps Contact: Melissa Jenny Address: 180 Fifth Street East, Suite 700, St. Paul, MN 55101 E-Mail: Melissa.m.jenny@usace.army.mil Phone: (651) 290-5363 Primary County: Lyon County ­ Sodus Township Section: 2 Township: 110 North Range: 41 West Information Complete On: November 28, 2018 Posting Expires On: December 22, 2018 Authorization Type: LOP-05-MN This application is being reviewed in accordance with the practices for documenting Corps jurisdiction under Sections 9 & 10 of the Rivers and Harbors Act of 1899 and Section 404 of the Clean Water Act. Project PROJECT DESCRIPTION AND PURPOSE: The project consists of the construction of a dam structure in order to reduce flooding, provide wildlife habitat, capture sediment and control erosion which is occurring on a ravine tributary to Lake Marshall. The proposed construction includes: -

Construction of an earthen dam structure, with maximum approximate dimensions of 250 feet long by 90 feet wide by 12 feet high. A 12" concrete pipe through the dam to convey normal flows, 72 feet in length. A 48" diameter concrete riser, 6.7 feet in height. A 20-foot wide earthen emergency spillway excavated around the west abutment. A riprap scour hole at the culvert outlet to dissipate energy measuring 16.5 feet by 21.5 feet. The excavation of a pond upstream of the dam as a source of clay material for the dam to act as a sediment pond. The approximate maximum dimensions of the area excavated for the pond are 200 feet long by 120 feet wide.

NAME, AREA AND TYPES OF WATERS (INCLUDING WETLANDS) SUBJECT TO LOSS: The project would impact 0.21 acre of wet meadow type wetland (0.17 acre of inundation and 0.04 acre of fill), and would impact 0.02 acre (approximately 358 linear feet) of streambed (0.01 acre of inundation and 0.01 acre of fill). In total the project would impact approximately 0.22 acre of wetland and streambed. ALTERNATIVES CONSIDERED: The applicant considered the following alternatives while planning this project:

Page 1 of 2

-

The "do nothing" alternative was considered. However, this alternative would not achieve the County's Water Plan goals of reducing downstream flooding, capturing sediment from the upstream agricultural watershed, and controlling erosion of the ravine. Bank erosion has been shown to be a major contributor to sediment loads in the Cottonwood River.

-

Another alternative which was considered would be to build the structure without a permanent pond. If this approach were taken, the dam would still serve the function of downstream flood and erosion reduction. However, the goal of sediment reduction would not be accomplished to the same extent, since ponding and detention have been shown to be much more effective at removing sediment from stream flows.

-

The project could possibly be moved to another location along the same unnamed tributary or some other tributary stream. However, the topography of the proposed site is most suitable for the structure, with reasonable elevation difference between the stream and the adjacent uplands.

COMPENSATORY MITIGATION: The applicant has proposed to compensate for unavoidable permanent wetland impacts associated with the project, at a 2:1 ratio, via purchase of 0.4100 wetland credit from a Corps approved wetland mitigation bank located in the same Bank Service Area (BSA) as the impact site, BSA 9. Drawings: See attached, labeled as 2018-03569-MMJ, Posting figures 1-10.

Page 2 of 2

2018-03569-MMJ, Posting figure 1

2018-03569-MMJ, Posting figure 2

2018-03569-MMJ, Posting figure 3

2018-03569-MMJ, Posting figure 4

2018-03569-MMJ, Posting figure 5

2018-03569-MMJ, Posting figure 6

2018-03569-MMJ, Posting figure 7

2018-03569-MMJ, Posting figure 8

2018-03569-MMJ, Posting figure 9

2018-03569-MMJ, Posting figure 10

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas